Tender Type
Request for Bid(Open-Tender)
Delivery Location
1 IMPALA ROAD - Pullens Hope - Pullens Hope - 1096
Organization Type
GOVERNMENT
Published
30 Sept 2026
OCDS Reference
ocds-9t57fa-172123
ESKOM requires the supply and delivery of refractory cast cement and factory bricks, tendered as an open request for bid for the mpumalanga area. Bids are decided on a weighted quality scorecard rather than price alone: quality management system requirements (25%), evidence of the qms in operation (25%), a draft contract quality plan (20%), a quality control plan or inspection and test plan (20%) and user-defined requirements (10%). The decisive consideration for a bidder is the quality documentation pack — form a, qms evidence, internal audit reports, a draft contract quality plan and an inspection and test plan — because every one of those items is scored and must accompany the bid.
Closing: 21 October 2026 at 10:00 — submit the completed returnables template as a signed PDF, or signed and locked, to the Eskom buyer.
Category selection: tick Category 3 on the Cover tab; only one category may be selected, otherwise the sheet returns an error.
Evaluation weighting: Section A 25%, Section B 25%, Section C 20%, Section D 20%, Section E 10%; each section scores as (score obtained ÷ maximum allocated) × 100% × section weight.
Section A — choose one option only: either a valid ISO 9001:2015 certificate with a relevant product/service scope, issued by an approved certification body holding recognised international accreditation and still unexpired, or Option 2 evidence of a QMS in operation (QMS manual or method statement, quality policy and objectives approved by top management, control of documented information, control of nonconforming outputs, nonconformity and corrective action, internal audit).
Section B evidence: organisation chart and responsibility matrix covering the quality management function, control of externally provided processes including evaluation and re-evaluation criteria, the latest internal management system audit report with nonconformity and corrective action reports, a certification management system audit report not older than 12 months, and management review records.
Section C and D deliverables: a draft Contract Quality Plan specific to the scope of works (ISO 10005) and a Quality Control Plan, checklist or Inspection and Test Plan per the scope, supported by an example from similar or previous work.
Section E: Form A completed and signed, plus any customer-specific requirements arising from the scope of work or specification.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 21 October 2026 - 10:00
Venue
null
Categories
Request for Bid(Open-Tender)
1 IMPALA ROAD - Pullens Hope - Pullens Hope - 1096
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
Source: ITT Supply and delivery of Chromecast_.pdf30 Sept
2026
Tender Published
Tender was published
21 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC3 Chromecast and Factory Bricks .pdf
No summary available
ITT Supply and delivery of Chromecast_.pdf
No summary available
SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks.pdf
No summary available
BOQ Chromecast and factory brick estimate.xlsx
Supply and delivery of refractory cast cement (25 kg bags) and refractory factory bricks (114 x 230 mm) to Eskom, with quantities of 25,000 units of cement and 4,000 units of bricks.
SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks .pdf
No summary available
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf
Eskom requires the supply and delivery of refractory cast cement and factory bricks. The tender is governed by Eskom's Standard Conditions of Tender, which set out the rules for submission, evaluation, and award.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.docx
Supply and delivery of refractory cast cement and factory bricks for Eskom in Mpumalanga, governed by a quality control plan with defined intervention points for inspection and testing.
Technical evaluation strategy (Chrome Cast).pdf
Supply and delivery of refractory cast cement and factory bricks for Hendrina Power Station's boiler, with a technical evaluation threshold of 70% and mandatory compliance with specified material properties.
240-68099512 Form A Rev 10 - Cat 3.docx
Supply and delivery of refractory cast cement and factory bricks to Eskom, with the successful bidder required to comply with Eskom's Supplier Quality Requirements (specification 240-105658000) and ISO 9001. The tenderer must complete and sign the quality acknowledgement form, selecting Category 3 quality requirements and accepting post-contract award quality obligations.
240-77471651(HIGH RISK).docx
Supply and delivery of refractory cast cement and factory bricks for Eskom, with an occupational health and safety (OHS) component that must be addressed in the tender submission. Bidders must complete OHS returnables, including a health and safety plan, risk assessment, and valid COIDA letter, among others.
SCOPE OF WORK FOR SUPPLY AND DELIVERY OF CHROMECAST AND FACTORY BRICKS.pdf
Supply and delivery of refractory cast cement and factory bricks to Hendrina Power Station in Mpumalanga, on an as-and-when-required basis for a maximum period of 60 months. The contract covers specified quantities of castable refractory cement (24,000 bags of 25 kg) and refractory bricks (4,000 units), with emergency delivery required within 24 hours.
240-109253698 CQP Template 2021.docx
Supply and delivery of refractory cast cement and factory bricks for Eskom in Mpumalanga. The tender pack centres on a Contract Quality Plan template that bidders must complete, covering quality management, sub-supplier control, documentation, and post-delivery activities.
240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx
No summary available
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Eskom Holdings SOC Ltd invites tenders for the supply and delivery of refractory cast cement and factory bricks at Hendrina Power Station for a period of five (05) years. Tender number E3620GXMPHEN. Issue date 30 September 2026. Closing date and time 21 October 2026 at 10h00. Tender validity period 120 days from closing. Tenders must be submitted electronically via the Eskom E-tendering site. No clarification meeting will be held.
Important Dates
Source: ITT Supply and delivery of Chromecast_.pdf (TENDER)Closing date: 21 October 2026 at 10:00 (10h00).
Clarification queries deadline: 16 October 2026 at 15:30 (5 working days before closing).
No clarification meeting will be held.
Tender validity period: 120 days from closing date and time.
Contact Information
Source: ITT Supply and delivery of Chromecast_.pdf (TENDER)Eskom Representative (queries):
Procurement Manager:
Fraud/corruption reporting:
Submission: electronic via Eskom E-tendering site (TenderBulletin at eskom.co.za).
Submission Guidelines
Source: ITT Supply and delivery of Chromecast_.pdf (TENDER)Submission method: electronic only via the Eskom E-tendering site (TenderBulletin at eskom.co.za). No hard copies accepted. Upload documents under folders Technical, Commercial, Financial, and Other. File limits: 50MB per file, 900MB total per submission. No zip/condensed files. Price list must be in PDF and Excel. If resubmitting, only the latest version counts; previous submissions are void. Ensure submission status is marked complete. Late tenders are not accepted.
Mandatory returnables (disqualifiable if missing or unsigned at closing):
Non-disqualifiable returnables (must be submitted within 5 working days if requested):
Returnables required for evaluation (score zero if not submitted):
Disqualification risks:
Evaluation Criteria
Source: ITT Supply and delivery of Chromecast_.pdf (TENDER)Evaluation stages:
B-BBEE points table (80/20 system): Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0.
Objective criteria may apply; if not met, the second-ranked tenderer may be recommended for award. Reverse e-auction not applicable.
Technical Specifications
Source: ITT Supply and delivery of Chromecast_.pdf (TENDER)Scope: Supply and delivery of refractory cast cement and factory bricks to Hendrina Power Station for a period of 5 years.
Mandatory technical requirement:
Methodology requirement:
Cataloguing:
Methodology
Source: ITT Supply and delivery of Chromecast_.pdfFunctionality criterion 2 (70%): Provide a detailed methodology for transportation and storage, including how the material will be protected from adverse weather conditions during transportation and after delivery.
Scoring:
Experience & Qualifications
Source: ITT Supply and delivery of Chromecast_.pdfFunctionality criterion 1 (30%): Company's experience in supplying refractory cast cement and factory bricks.
Scoring:
Quality Management
Source: ITT Supply and delivery of Chromecast_.pdfQuality requirements:
Mandatory technical criterion:
Pricing Schedule
Source: ITT Supply and delivery of Chromecast_.pdfPricing schedule must be submitted in PDF and Excel format.
Prices evaluated inclusive of VAT, corrected for arithmetic errors, adjusted for variations, compared on NPV basis.
Unconditional discounts considered for evaluation; conditional discounts applied at payment.
Prices scored out of 80 or 90 points.
Cataloguing line item may be required.
Financial Requirements
Source: ITT Supply and delivery of Chromecast_.pdf (TENDER)Pricing format:
Payment terms:
Security for performance (if required):
SDL&I (Supplier Development and Localisation) penalties and retention:
Financial viability:
Compliance Requirements
Source: ITT Supply and delivery of Chromecast_.pdf (TENDER)Eligibility criteria (must meet all):
Mandatory contractual requirements (assessed after evaluation, before award):
Additional contractual requirements (if applicable):
Safety requirements:
Quality requirements:
Tax compliance:
Employment Equity:
B-bbee:
Contractual Terms
Source: ITT Supply and delivery of Chromecast_.pdfContract form: NEC3 Supply Contract (SC3) with options:
SDL&I obligations:
Security for performance:
Payment terms:
Eskom reserves the right to negotiate with preferred bidders if prices are not market-related.
Subcontracting with subsidiaries discouraged; must be declared if done.
Requirements
Source: ITT Supply and delivery of Chromecast_.pdf (TENDER)Eligibility criteria: Tenderers must not be under any restriction to do business with Eskom or State-Owned Companies. Ineligible if: have nationality of a country on international sanctions list; submit more than one tender (except where e-tendering limit applies); JV/consortium agreement does not state joint and several liability; have conflict of interest; tender signed by non-authorised person; restricted by National Treasury; on Tender Defaulters list; sub-contract 100% of scope. Eskom will disqualify tenderers not meeting eligibility criteria.
Section
Source: ITT Supply and delivery of Chromecast_.pdfFunctionality requirements: Criteria 1: Company's experience in supplying Refractory cast cement and Factory Bricks = 30%. Criteria 2: Detailed methodology for protecting material from adverse weather during transportation and after delivery = 70%. Tenderers need overall weighted score of 70% or more to qualify. Scoring: 5=100% compliant, 4=80% compliant with qualifications, 2=40% non-compliant, 0=0% totally deficient. Prices evaluated inclusive of VAT, corrected for arithmetical errors, adjusted for variations, compared on NPV basis. Prices scored out of 80 or 90 points. Specific Goals scored out of 20 or 10 points per PPPFA. B-BBEE points table provided. Ranking by adding price and specific goals scores. Objective criteria may apply. Reverse e-auction not applicable.
Description
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF CHROMECAST AND FACTORY BRICKS.pdfSupply and delivery of refractory cast cement and factory bricks for the boiler plant at Hendrina Power Station, on an as-and-when-required basis. All supplied items must be accompanied by quality control documentation. The scope supports the tender technical evaluation process and applies to Hendrina Power Station.
Evaluation Criteria
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF CHROMECAST AND FACTORY BRICKS.pdf (unknown)Bidders are evaluated through the Tender Technical Evaluation process. The evaluation references the Generation Tender Technical Evaluation Procedure (240-168966153), the Tender Technical Evaluation Strategy (HSTTPMM055), and the Supplier Contract Quality Requirements Specifications (QM-58). No scoring split, minimum qualifying score, or preference point system is stated in the document.
Technical Specifications
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF CHROMECAST AND FACTORY BRICKS.pdf (unknown)Scope: Supply and delivery of refractory cast cement and factory bricks for the boiler plant at Hendrina Power Station, on an as-and-when-required basis.
Items required:
Delivery and logistics:
Storage and emergency supply:
Documentation:
Contract duration: Up to 60 months from the effective date (contract authorisation date).
Methodology
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF CHROMECAST AND FACTORY BRICKS.pdf (unknown)Supply and delivery of refractory cast cement and factory bricks on an as-and-when-required basis for up to 60 months. Transport from the contractor's works to Main Stores, Hendrina Power Station, Pullenshope, Mpumalanga, ensuring protection from damage, dirt, and moisture. The contractor must be present during offloading and participate in a joint receiving inspection. Maintain contingency spares in storage for emergencies; deliver emergency spares within 24 hours. Keep a suitably sized storage facility with minimum stock of all listed spares, ensuring quality is maintained. Use safe handling techniques during loading, offloading, and transport. The employer will not accept damaged items; the contractor remains responsible for replacement transport if items are defective.
Experience & Qualifications
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF CHROMECAST AND FACTORY BRICKS.pdf (unknown)The document defines roles: the System Engineer defines technical specifications and scope; the Contract Manager handles procurement documents; the Contractor provides all services required for the full scope of work. No specific experience or qualification requirements for the bidder are stated.
Quality Management
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF CHROMECAST AND FACTORY BRICKS.pdfAll supplied items must be accompanied by quality control documentation. Material certificates and applicable guarantees/warranties must be supplied to the employer's representative before any item is accepted on site. A receiving inspection is conducted jointly by the contractor and an Eskom representative to confirm no transport damage. The contractor must provide material data sheets and confirmation of technical specification on delivery. The document references ISO 9001 Quality Management Systems as an informative reference.
Compliance Requirements
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF CHROMECAST AND FACTORY BRICKS.pdf (unknown)The document does not state specific eligibility criteria such as CSD registration, tax clearance, B-BBEE level, or CIDB grading. Compliance with the referenced normative documents (Generation Tender Technical Evaluation Procedure, Tender Technical Evaluation Strategy, Supplier Contract Quality Requirements Specifications, and relevant SANS standards) is required.
Contractual Terms
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF CHROMECAST AND FACTORY BRICKS.pdfThe contract becomes effective on the date it is authorised. The supply period is up to 60 months from the effective date. The contractor must supply items on an as-and-when-required basis. Material certificates and applicable guarantees/warranties must be provided before acceptance. The contractor is responsible for safe handling and transport; damaged items will not be accepted, and the contractor remains liable for replacement transport if items are defective.
Section
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF CHROMECAST AND FACTORY BRICKS.pdfEvaluation is conducted through the Tender Technical Evaluation process, referencing the Generation Tender Technical Evaluation Procedure (240-168966153), the Tender Technical Evaluation Strategy (HSTTPMM055), and the Supplier Contract Quality Requirements Specifications (QM-58). No specific scoring split, minimum qualifying score, or preference point system is stated.
Technical Specifications
Source: BOQ Chromecast and factory brick estimate.xlsx (unknown)Supply and delivery of refractory materials:
Description
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfSupply and delivery of refractory cast cement and factory bricks. No further scope details are provided in the available document.
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Closing date: 21 October 2026 at 10:00 (SAST)
Compulsory site visit / clarification meeting: details are stated in the Tender Data. Attendance is compulsory; failure to attend results in disqualification. Date, time and venue are not specified in the available document.
Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Contact: Eskom Representative (name not specified)
Role: Eskom Representative (SCM)
Email: not specified
Telephone: not specified
Submission address: Eskom Tender Bulletin site (e-tendering) – no physical address provided.
All communication must be directed to the Eskom Representative only, in writing, in English.
Submission Guidelines
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Submission method: e-tendering via the Eskom Tender Bulletin site on the Eskom E-tendering page. Upload and finalise the tender before the closing date and time. No paper submissions are accepted for e-tendering.
Returnable documents (all must be completed, signed and submitted by the closing date and time):
Packaging (for paper submissions, if applicable):
Disqualification risks:
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Evaluation stages:
Objective criteria may be applied per section 2(1)(f) of the PPPFA, but functionality and B-BBEE scorecard elements cannot be used as objective criteria.
Reverse e-auction may be used; if so, the tender must not include prices.
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Scope: Supply and delivery of refractory cast cement and factory bricks.
No further technical specifications (quantities, standards, delivery locations) are provided in the available document.
Methodology
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Tenderers must comply with all obligations when submitting a tender, including checking documents on receipt, returning mandatory returnables, signing the original tender, and ensuring an authorised signatory. Tenderers must attend compulsory site visits/clarification meetings. Tenderers must provide clarification and documents as required, and sign the final draft of the contract.
Quality Management
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfTenderers must provide proof of safety, health, environmental and quality (SHEQ) systems, policies and capabilities. All costs and personnel associated with SHEQ must be reflected in the tender pricing.
Pricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfTenderers must include in rates, prices, and tendered total all duties, taxes, and other costs. Rates and prices must be fixed for the contract duration and not subject to adjustment unless stated. Prices must be in South African Rand unless otherwise instructed. If a bill of quantities or pricing schedule applies, errors in line-item prices or rates will be corrected to result in the corrected total. Pricing schedule must include a line item for cataloguing if required.
Financial Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Pricing format:
Insurance:
Security for performance:
Financial analysis:
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Eligibility:
Registrations and certificates:
Sheq:
Legislation:
Contract skills and participation goals:
B-BBEE Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)B-BBEE level is scored as per CSD report or certificate/affidavit. If B-BBEE is a pre-qualification criterion, the certificate/CSD number/report must be provided by the closing date and time. For PPPFA point allocation, if no B-BBEE certificate/affidavit is provided, the tenderer may be disqualified if otherwise evaluated as acceptable, or score zero for Specific Goals within the 90/10 or 80/20 allocation. B-BBEE scorecard elements may not be used as objective criteria.
Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfTenderers must provide proof satisfactory to Eskom that safety, health, environmental and quality (SHEQ) systems, policies and capabilities are in place. All costs and personnel associated with SHEQ must be reflected in the pricing.
Contractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfTender validity: The tender must remain valid for acceptance within the validity period stated in the Tender Data. Eskom may request an extension; a tenderer that agrees cannot modify its tender, and one that refuses is excluded from further consideration.
Confidentiality: All matters arising from the procurement are confidential. Documents provided by Eskom may only be used for preparing and submitting the tender.
Eskom's rights: Eskom may cancel the tender at any time before contract conclusion, with written reasons on request. Eskom may accept or reject any variation, deviation or alternative tender, and may negotiate with selected tenderers.
Liability: Eskom and its representatives are not liable for any losses or damages incurred by tenderers during the tender process.
Accuracy of documents: Eskom does not warrant the accuracy or completeness of the tender documents.
Contract formation: The successful tenderer must sign the Form of Agreement. The Standard Conditions of Tender and Tender Data do not form part of the contract.
Special Conditions
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Eskom may disqualify a tender if the tenderer has misrepresented information, and the tenderer may be suspended from business with any State-Owned Company for up to 10 years. Eskom may reject a financial institution if found not suitable. Eskom will publish responses to all tenderers in the same manner as the Invitation to Tender was issued. Eskom may announce prices if stated. Eskom will not disclose information relating to evaluation and processing of tenders except as required by law.
Section
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfEskom will evaluate tenders based on criteria stated in the Tender Data. Functionality, if a criterion, will be scored against functionality criteria and must meet the minimum threshold to proceed. Price evaluation per Tender Data, including handling of omissions or errors in pricing schedule. B-BBEE level scored as per CSD report or certificate/affidavit; if B-BBEE is a pre-qualification criterion, must be provided by closing. If no B-BBEE certificate/affidavit, tenderer may be disqualified if otherwise acceptable, or score zero for Specific Goals within 90/10 or 80/20 allocation. Objective criteria may be applied per section 2(1)(f) of PPPFA; B-BBEE scorecard element may not be used as objective criteria. Reverse e-auction uses 90/10 and 80/20 price and preference point systems.
Description
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsxSupply and delivery of refractory cast cement and factory bricks. Bids are assessed on the quality documentation submitted, using Eskom's Supplier Quality Management Tender Evaluation Scorecard (Rev 7, effective 21 January 2022, unique ID 240-12248652). Category 3 applies to this tender, so the Category 3 returnables and the five weighted quality sections govern the quality evaluation.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)Submission format
Returnables for Category 3 (the category selected for this tender)
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)Evaluation is by a weighted quality scorecard across five sections:
Section A is rated on either Option 1 (valid ISO certification) or Option 2 (evidence of a QMS in operation); only one option is scored.
Each section result is calculated as the score obtained over the maximum score allocated, multiplied by 100% and then by the section weight.
No minimum qualifying score is stated.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)Scope
Quality documentation required with the bid (Category 3)
Reference specifications
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)Quality management system
Description
Source: 240-68099512 Form A Rev 10 - Cat 3.docxThe tenderer must complete and sign the Supplier Quality Requirements acknowledgement form, acknowledging and accepting Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Evaluation Criteria
Source: 240-68099512 Form A Rev 10 - Cat 3.docx (unknown)The bidder must complete and sign the Supplier Quality Requirements acknowledgement form, confirming acceptance of Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001. For pre-contract award quality requirements, the bidder must select Category 3 (clause 4.1.3). The bidder must accept all post-contract award quality requirements and standard conditions as listed. The bidder must confirm compliance with ISO 9001 clauses 4-10 and the seven quality principles. No other eligibility criteria (such as CSD registration, tax clearance, B-BBEE level, or CIDB grading) are stated in the provided document.
Technical Specifications
Source: 240-68099512 Form A Rev 10 - Cat 3.docx (unknown)The tenderer must complete and sign the Supplier Quality Requirements acknowledgement form, acknowledging and accepting Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Compliance Requirements
Source: 240-68099512 Form A Rev 10 - Cat 3.docx (unknown)No specific compliance requirements are stated in the provided document.
Description
Source: 240-77471651(HIGH RISK).docxSupply and delivery of refractory cast cement and factory bricks.
Contact Information
Source: 240-77471651(HIGH RISK).docx (unknown)OHS Representative: Diane Maunatlala (Development Team)
Submission Guidelines
Source: 240-77471651(HIGH RISK).docx (unknown)Returnable OHS documents (all must be submitted and evaluated before contract award):
Evaluation Criteria
Source: 240-77471651(HIGH RISK).docx (unknown)OHS returnables are evaluated prior to contract award. No other evaluation criteria (e.g., price, functionality, preference points) are stated in the provided document.
Compliance Requirements
Source: 240-77471651(HIGH RISK).docx (unknown)OHS compliance is mandatory:
Description
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks .pdfSupply and delivery of refractory cast cement and refractory bricks. The commodity is not a designated sector for local production and content, and no CIDB compulsory training applies.
Important Dates
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks .pdf (TENDER)Closing date: 21 October 2026 at 10:00 (from tender record).
No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Contact Information
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks .pdf (TENDER)No contact information is provided in the document.
Submission Guidelines
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks .pdf (TENDER)Returnable documents: all must be completed, signed and submitted with the bid.
Disqualification risks:
Evaluation Criteria
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks .pdf (TENDER)Evaluation is based on the 90/10 or 80/20 preference point system.
Technical Specifications
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks .pdf (TENDER)Supply and delivery of refractory cast cement and refractory bricks.
Methodology
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks .pdfSkills development must involve tenderers directly and through their supply network; SETA accredited training providers may be approached. Targets exclude Eskom employees and registered learners. Tenderers bear full cost; Eskom makes no financial contribution. Tenderers may approach SETAs for grants and SARS for tax rebates. SDL&I penalty and performance security: 1% of contract value penalty for failure to meet SDL&I obligations; 1% of every invoice (excluding VAT) retained as security, released only upon full fulfilment. Reporting: quarterly reports per Data Collection Template; Eskom reviews within 30 days; corrective measures required before next report; SDL&I Implementation Schedule to be completed and returned within 28 days of contract award.
Pricing Schedule
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks .pdfTender response must be separated into local and imported components as per the Price Schedule. Local procurement content is total spending minus the imported component.
Financial Requirements
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks .pdf (TENDER)Pricing must be separated into local and imported components per the Price Schedule.
Compliance Requirements
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks .pdf (TENDER)B-BBEE requirements:
B-BBEE Requirements
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks .pdf (TENDER)Validity of Sworn Affidavits: Affidavits must include: deponent's name as per ID and ID number; designation (director, owner, member) showing authorisation; enterprise name as per CIPC and business address; percentage of black ownership, black female ownership, designated group (or black beneficiaries for specialised enterprises); total revenue for the year under review and basis (audited or management accounts); financial year end; B-BBEE status level (only one); empowering supplier status (for QSEs); date signed by deponent and Commissioner of Oath must be the same; Commissioner of Oath cannot be an employee or ex officio of the enterprise.
Special Conditions
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks .pdf (TENDER)Reporting and Monitoring: Suppliers must submit quarterly reports to Eskom per the Data Collection Template on SDL&I compliance. Eskom reviews reports within 30 days and notifies suppliers in writing if obligations not met. Suppliers must implement corrective measures before the next report, failing which retention clauses are invoked. Every contract must include an SDL&I Implementation Schedule, completed and returned to the SDL&I representative within 28 days of contract award, used for monitoring and reporting.
Section
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks .pdfSpecific goals (B-BBEE) carry a maximum of 10/20 points, added to price points and rounded to two decimals. Points are allocated per B-BBEE status level under the 90/10 or 80/20 system. Required documents to claim preference points: valid B-BBEE certificate (SANAS accredited), sworn/CIPS affidavit, proof of ownership/shareholding (preferably CIPC), certified ID copies of shareholders, proof of disability where applicable, and consolidated B-BBEE certificate for trusts, consortia or joint ventures. Tenderers failing to provide documentation may only score points out of 90/80 for price and 0 out of 10/20 for specific goals.
Description
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks.pdfSupply and delivery of refractory cast cement and refractory factory bricks. No further scope details are provided in the document.
Important Dates
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks.pdf (TENDER)Closing date: 21 October 2026 at 10:00 (as per tender record).
No briefing or site visit is mentioned in the document.
Contact Information
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks.pdf (TENDER)No contact details are provided in the document.
Submission Guidelines
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks.pdf (TENDER)Returnable documents (all must be completed, signed and submitted with the bid):
Disqualification risks:
Evaluation Criteria
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks.pdf (TENDER)Evaluation is based on the 90/10 preference point system (price 90 points, specific goals 10 points) or the 80/20 system (price 80 points, specific goals 20 points). The specific goal for this tender is B-BBEE status level. Points for price and specific goals are added and rounded to two decimal places. The contract is awarded to the tenderer scoring the highest total points, subject to the Preferential Procurement Policy Framework Act.
B-BBEE points table:
If a tenderer fails to provide B-BBEE documentation, they are not disqualified but score only on price (out of 90 or 80) and receive 0 for specific goals.
Objective criteria (not mandatory but a condition for contract award):
SDL&I objectives (RDP goals) do not form part of scoring but become contractual obligations once committed.
Technical Specifications
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks.pdf (TENDER)Supply and delivery of refractory cast cement and refractory factory bricks.
No quantities, specifications, or delivery locations are stated in the document.
Methodology
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks.pdfSkills development methodology:
Pricing Schedule
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks.pdfPricing must be submitted in the Price Schedule included with the tender documents. Where the contract involves a combination of local and imported goods, the tender response must be separated into its components as per the Price Schedule. Local procurement content is total spending minus the imported component.
Financial Requirements
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks.pdf (TENDER)Pricing must be submitted in the Price Schedule included with the tender documents. Where the contract involves a combination of local and imported goods, the tender response must be separated into its components as per the Price Schedule.
SDL&I penalty and performance security:
Compliance Requirements
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks.pdf (TENDER)B-BBEE requirements:
B-BBEE improvement or retention plan:
Sworn affidavit validity requirements:
Local procurement content:
SDL&I objectives (RDP goals):
Reporting and monitoring:
B-BBEE Requirements
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks.pdf (TENDER)B-BBEE requirements:
B-BBEE improvement or retention plan:
Sworn affidavit validity requirements:
Contractual Terms
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks.pdf (TENDER)SDL&I penalty and performance security:
Section
Source: SDLI Strategy 2 for supply and delivery of Refactory cast cement and Refacory bricks.pdfEvaluation is based on the 90/10 or 80/20 preference point system. Price points plus specific goal points (B-BBEE status) are added and rounded to two decimal places. Contract awarded to highest scorer per PPPFA. B-BBEE points table provided. Failure to provide B-BBEE documentation means only price points are scored (90/80) and 0 for specific goals.
Important Dates
Source: NEC3 Chromecast and Factory Bricks .pdf (unknown)Closing date: 21 October 2026 at 10:00 (from tender record).
No briefing or site visit dates are stated.
Contact Information
Source: NEC3 Chromecast and Factory Bricks .pdf (unknown)Supply Manager:
Purchaser:
Delivery address:
Main Stores, Hendrina Power Station, Pullenshope, Mpumalanga
Submission Guidelines
Source: NEC3 Chromecast and Factory Bricks .pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Submission method: not stated in the document.
Disqualification risks:
Evaluation Criteria
Source: NEC3 Chromecast and Factory Bricks .pdf (unknown)No evaluation criteria are stated in the document. The contract is a priced contract under NEC3 Supply Contract (SC3), with prices derived from the Price Schedule. No preference point system (80/20 or 90/10) or minimum qualifying score is mentioned.
Technical Specifications
Source: NEC3 Chromecast and Factory Bricks .pdf (unknown)Scope: Supply and delivery of refractory cast cement and factory bricks on an 'as and when required' basis to Hendrina Power Station (Materials Management Department) for a period of 5 years.
Items and quantities (from Price Schedule):
Delivery requirements:
Quality Management
Source: NEC3 Chromecast and Factory Bricks .pdfQuality requirements:
Pricing Schedule
Source: NEC3 Chromecast and Factory Bricks .pdfPricing format:
Financial Requirements
Source: NEC3 Chromecast and Factory Bricks .pdf (unknown)Pricing: Priced contract with a price list (NEC3 SC3). Prices are derived from the Price Schedule; lump sum items or rates multiplied by quantities.
Payment terms:
Insurance and liability:
Delay damages:
Compliance Requirements
Source: NEC3 Chromecast and Factory Bricks .pdf (unknown)B-bbee:
General compliance:
Health & Safety
Source: NEC3 Chromecast and Factory Bricks .pdfHealth and safety:
Environmental
Source: NEC3 Chromecast and Factory Bricks .pdfEnvironmental compliance:
Contractual Terms
Source: NEC3 Chromecast and Factory Bricks .pdfContract type: NEC3 Supply Contract (SC3) with core clauses and secondary options X1 (price adjustment for inflation), X2 (changes in law), X7 (delay damages), X17 (low performance damages), and additional conditions Z1 to Z12.
Key terms:
Special Conditions
Source: NEC3 Chromecast and Factory Bricks .pdf (unknown)Special conditions:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
1 IMPALA ROAD - Pullens Hope - Pullens Hope - 1096
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
13
Last checked
30 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Median Estimate
R 240 000
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
A guide for general suppliers. Understanding the RFQ process (under R1 million), local content for furniture, and the 'Commodity Checklist'.
Guide to general commodities procurement in South Africa. Covers furniture, cleaning materials, uniform supply tenders, local content rules, and managing quality and cash flow.
Not every job is a 'tender.' Learn how to access the high-volume world of small orders (RFQs) and how to get invited to bid on jobs under R200k.
A high-stakes guide to food procurement. Learn about R638 compliance, cold chain logistics, and how to win provincial hospital supply contracts.
💡 Want more tendering tips and strategies?
Explore Our Blog