Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Limited-Tender
Delivery Location
Eskom Academy of Learning - Midrand - Johannesburg -
Organization Type
GOVERNMENT
Published
09 Oct 2026
OCDS Reference
ocds-9t57fa-173667
Eskom's gauteng operating unit in the distribution division requires a once-off supply of smart meters, procured through a closed invitation to tender open only to teap-listed suppliers, so NO technical or functionality evaluation is performed. The scope of work sits on the price schedule, and successful products must be fully integrated with an approved ESKOM smart metering hes, supported by a commitment letter confirming comprehensive training on meters and dcs. Scoring follows the PPPFA at 90/10 where the lowest acceptable tender per material number exceeds r50 million and 80/20 otherwise, with award shared between a minimum of one and a maximum of twenty suppliers. The decisive risks are the closing-time disqualifiable returnables (annexure a, annexure d, sbd 4 and the completed price schedule), the csd registration and financial due diligence required before award, and electronic-only submission on the ESKOM e-tendering portal by 16 october 2026 at 10:00 sast.
Closing and submission: bids close on 16 October 2026 at 10:00 SAST and must be uploaded to https://etendering.eskom.co.za/ only — no hard copies and no zipped or condensed files, 500 MB per document and 4 GB per submission, late tenders rejected, tender validity 4 months (120 days), and clarification queries in writing 3 working days before the deadline.
TEAP listing: only TEAP-listed suppliers may bid and no technical or functionality evaluation is performed, but products must be fully integrated with one of Eskom's approved smart metering HES systems and a commitment letter must be submitted confirming comprehensive training on meters and DCs.
Disqualification at closing: Annexure A (Authorisation Form), Annexure D (Integrity Declaration), SBD 4 (Bidder's Disclosure) and the completed Price Schedule must be fully completed and signed by the closing time, along with the electronic PDF tender, or the bid is disqualified.
Five-day remedy and zero-score items: SBD 1, SBD 6.1, acceptance of the enquiry's terms and conditions and the E-tendering Help Manual acknowledgement form can be corrected within 5 working days of a written request; missing Annexures B and C, Annexures G1–G4 (SBD 6.2 local content), B-BBEE certificate, tax clearance or Employment Equity proof scores zero but does not disqualify.
Prior to award: a valid CSD registration number or CSD report is required, plus financial due diligence covering the Public Interest Score and its calculation, approved annual financial statements issued within 18 months of year-end (draft, bi-annual, management and unsigned statements are rejected), a signed director's or member's report and the applicable audit, independent review or compilation report — failure to answer a finance query within 5 working days closes the financial evaluation.
Scoring: price is scored out of 80 or 90 points and specific goals out of 20 or 10, with 90/10 applying where the lowest acceptable tender per material number exceeds R50 million and 80/20 otherwise; a level 1 B-BBEE contributor earns 20 points (90/10) or 10 points (80/20), and a bidder without B-BBEE evidence scores zero for specific goals while keeping its price points.
Award and disqualifiers: Eskom will appoint between 1 and 20 suppliers, splitting qualifying bidders into three allocation tiers when more than 10 succeed; bids are disqualified for nationality of a sanctions-listed country, conflicts of interest, National Treasury or Tender Defaulters restrictions, unauthorised signatories, submitting more than one bid, JV agreements without joint and several liability, and subcontracting 100% of the scope of work.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Friday, 16 October 2026 - 10:00
Venue
null
Categories
Request for Bid(Limited-Tender
Eskom Academy of Learning - Midrand - Johannesburg -
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
Source: Quality.zip09 Oct
2026
Tender Published
Tender was published
16 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure M Non-Disclosure Agreement (NDA).docx
Supply of smart meters for Eskom's Gauteng Operating Unit in the Distribution Division, procured on a once-off basis. The bid pack includes a confidentiality agreement that suppliers and tenderers must sign before receiving Eskom's confidential information.
Eskom General Conditions of Purchase - 31 May 2024.pdf
Supply of smart meters for all the Gauteng Operating Unit in Eskom's Distribution Division, on a once-off basis. The order is placed under Eskom's General Conditions of Purchase (240-59385009 Rev 3, effective 31 May 2024), which govern price and payment, delivery, acceptance, risk, ownership, warranty, rejection, indemnity and termination.
SDL&I.zip
Eskom requires the once-off supply of smart meters for all Gauteng Operating Unit sites in the Distribution Division. The contract carries six Socio-Economic Development and Localisation (SD&L) obligations — B-BBEE, localisation, industrialisation, skills development, job creation and supplier development — that bind the successful bidder for the contract's duration.
E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdf
Supply of smart meters for all of Eskom's Gauteng Operating Unit within the Distribution Division, procured on a once-off basis that will result in once-off order placement. The requirement is known and award will be made to a minimum of one and a maximum of 20 suppliers.
E3665DXGOU Smart Meter- Price Schedule.xlsx
Supply of smart meters and data concentrator interfaces to Eskom's Gauteng Operating Unit in the Distribution Division, on a once-off basis. Pricing is submitted on price schedule E3665DXGOU against two line items with estimated quantities.
Annexure L E-tendering Help Manual for supplier.pdf
Supply of smart meters for Eskom's Gauteng Operating Unit in the Distribution Division, procured on a once-off basis. Bids are submitted electronically through Eskom's eTendering portal rather than at a physical tender office.
Quality.zip
Eskom requires the once-off supply of smart meters for all Gauteng Operating Unit sites in the Distribution Division. Bidders must operate a quality management system conforming to ISO 9001 and comply with Eskom's Supplier Quality Management specification, including submission of a contract quality plan and, where applicable, a quality control plan or inspection and test plan.
Annexure K- eTendering Training Acknowledgement Form.pdf
Supply of smart meters for all Gauteng Operating Unit sites in Eskom's Distribution Division, procured on a once-off basis. Bidders submit through Eskom's e-Tendering solution and must first confirm they can operate that system.
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Eskom requires the once-off supply of smart meters for all operating units in its Gauteng Distribution Division. The pack issued is Eskom's Standard Conditions of Tender (Rev 12), which governs how the tender is submitted, evaluated and awarded.
E3665DXGOU Smart Meter- Price Schedule.pdf
Supply of smart meters and data concentrator interfaces for ESKOM's Gauteng Operating Unit in the Distribution Division on a once-off basis. The order covers 175,000 smart DIN meters (80A, G3 PLC) and 1,750 G3-PLC/GSM data concentrator interfaces. Pricing is requested per unit excluding VAT under price schedule E3665DXGOU.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 422 698
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Eskom requires the supply of smart meters for all Gauteng Operating Unit sites in the Distribution Division, on a once-off basis.
The specification (240-105658000, revision 4, alternative reference QM 58) sets the minimum quality requirements for existing and potential Eskom suppliers and the criteria for evaluation, selection, vendor registration, assessment, performance monitoring and auditing. It applies across Eskom Holdings divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all Eskom RFIs, RFQs and RFPs for products and services.
Eskom's stated position is to work with suppliers that demonstrate commitment to developing, implementing and maintaining a QMS conforming to ISO 9001, and to continually improve service delivery and customer satisfaction.
Document control
Important Dates
Source: Quality.zip (unknown)Closing: 16 October 2026 at 10:00
Specification dates
Contact Information
Source: Quality.zip (unknown)Department: Supply Chain Management, Eskom Holdings SOC Ltd
No named contact, email address or telephone number is stated in the specification.
Submission Guidelines
Source: Quality.zip (unknown)Returnable quality documentation
Disqualification risks
Evaluation Criteria
Source: Quality.zip (unknown)Quality requirements are selected by the assigned Eskom Quality representative using guideline 240-125473040 (QM 58 Selection Criteria) and Form A.
Quality categories
ISO 9001 certification
Form A
Personnel
Technical Specifications
Source: Quality.zip (unknown)Scope
Quality management system
Contract Quality Plan (CQP)
Quality Control Plan / Inspection and Test Plan (QCP/ITP)
Meetings
Eskom oversight
Definitions relevant to delivery
Compliance Requirements
Source: Quality.zip (unknown)Quality management system
Returnable forms and documents
Personnel
B-bbee
Section
Source: Quality.zipQuality requirements for each procurement are selected by the assigned Eskom Quality representative using guideline 240-125473040 (QM 58 Selection Criteria) and Form A.
Submission Guidelines
Source: E3665DXGOU Smart Meter- Price Schedule.xlsx (unknown)Returnable documents
Pricing schedule format
Technical Specifications
Source: E3665DXGOU Smart Meter- Price Schedule.xlsx (unknown)Supply of smart electricity meters for the Gauteng Operating Unit, Distribution Division, on a once-off basis.
Line items
Delivery
Financial Requirements
Source: E3665DXGOU Smart Meter- Price Schedule.xlsx (unknown)Pricing
Description
Source: Annexure M Non-Disclosure Agreement (NDA).docxThe document is a confidentiality agreement between Eskom Holdings SOC Ltd (registration number 2002/015527/06, Megawatt Park, Maxwell Drive, Sunninghill Ext 3, Sandton) as the disclosing party and the supplier or tenderer as the receiving party.
Submission Guidelines
Source: Annexure M Non-Disclosure Agreement (NDA).docx (unknown)The only returnable document identified in this pack is the Non-Disclosure Agreement (NDA) template (file 240-63152171 Rev 5), which the supplier/tenderer must sign and return.
Submission Guidelines
Source: Annexure K- eTendering Training Acknowledgement Form.pdf (unknown)Returnable document — Annexure K (E-Tendering Training Acknowledgement Form):
Returnable Documents
Source: Annexure K- eTendering Training Acknowledgement Form.pdf (unknown)Annexure K — E-Tendering Training Acknowledgement Form:
Evaluation Criteria
Source: Annexure K- eTendering Training Acknowledgement Form.pdf (unknown)Responsiveness check:
Compliance Requirements
Source: Annexure K- eTendering Training Acknowledgement Form.pdf (unknown)Mandatory returnable:
Description
Source: Annexure L E-tendering Help Manual for supplier.pdfThe eTendering system is a web-based platform for uploading bid documents for tenders advertised on the Tender Bulletin, replacing manual submission at Eskom tender offices.
Contact Information
Source: Annexure L E-tendering Help Manual for supplier.pdf (TENDER)System support
Submission portal
Submission Guidelines
Source: Annexure L E-tendering Help Manual for supplier.pdf (TENDER)Submission channel
Registration and access
Uploading a bid
System support
Evaluation Criteria
Source: Annexure L E-tendering Help Manual for supplier.pdf (TENDER)No evaluation criteria, scoring split, preference point system or minimum qualifying score is stated in this document.
Technical Specifications
Source: Annexure L E-tendering Help Manual for supplier.pdf (TENDER)Purpose
Access
Closed tenders
System requirements
Methodology
Source: Annexure L E-tendering Help Manual for supplier.pdf (TENDER)Submitting a bid on the eTendering portal
Compliance Requirements
Source: Annexure L E-tendering Help Manual for supplier.pdf (TENDER)CSD registration
Registration data
No other compliance, B-BBEE, CIDB, tax or local content requirements are stated in this document.
Special Conditions
Source: Annexure L E-tendering Help Manual for supplier.pdf (TENDER)Closed tenders
Section
Source: Annexure L E-tendering Help Manual for supplier.pdfNo scoring, preference point system or minimum qualifying score is set out in this document.
Description
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfThe tender is issued under Eskom's Procurement and Supply Chain Management Procedure 32-1034. An open invitation is advertised on the Eskom Tender Bulletin and the National Treasury e-Tender Portal; a closed invitation is sent directly to identified bidders. Addenda are published or issued in the same manner as the invitation and form part of the tender documents. All communication between Eskom and bidders must be in writing, in English, through the Eskom Representative only.
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Closing
Compulsory meetings
Clarification requests
Briefing Session
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)A site visit and/or clarification meeting applies where the Tender Data identifies it as compulsory.
Attendance is compulsory; failure to attend results in disqualification from participation.
Date, time and venue: as stated in the Tender Data.
Bidders may ask questions for clarity during the site visit or clarification meeting.
Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Enquiries
Communication rules
Submission address
Service delivery address
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Submission method
Packaging and marking
Format
Returnable documents
Disqualification risks
Returnable Documents
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Acknowledgement Form: must be completed and submitted with the tender, stating whether the tender covers the whole or part of the works, services or supply; bidders must also check the tender documents on receipt and report discrepancies or omissions to the Eskom Representative.
Mandatory tender returnables: must be returned by the closing date and time for evaluation, and those required for award before contract award; all documents must be fully completed. Certificates, documents and proof of registration must be valid, current and, where stipulated, original for the entire tender validity period.
Submission format: a complete original tender in paper form plus one complete copy in paper form must be submitted by closing; failure to submit either results in disqualification. Eskom may request an additional electronic copy. For e-tendering, submit via the Eskom Tender Bulletin e-tendering page in English, completed in ink and not pencil.
Signing: the original tender (or electronic tender for e-tendering) must be signed; the named signatory is held liable for the tender.
Packaging: the original and copy must be separate packages marked "ORIGINAL" and "COPY"; an electronic copy, if required, must be packaged separately and marked "ELECTRONIC COPY". Each package must state the Eskom address, Invitation to Tender number, bidder's name and physical address, and the email address and telephone number of the authorised representative. Packages are sealed together in an outer package marked "Confidential" with the same details. For e-tendering, documents go into the Technical, Commercial and Financial folders.
Proof of authority to act as agent: an authenticated copy of the authority is required where an agent submits on behalf of a principal.
SDL&I Undertaking: must be completed and submitted by no later than contract award, failing which the tender is not considered for award.
Mandatory returnables: a tender missing stipulated mandatory documents or information by the closing date and time is disqualified from further evaluation.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Evaluation stages
Preference points
Other evaluation rules
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Scope
Delivery and labelling
Standards and references
Sub-contracting
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfBidders must provide proof satisfactory to Eskom that safety, health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the closing date and time and/or contract award, with all SHEQ costs and personnel reflected in the tender.
Bidders must check the tender documents on receipt and notify the Eskom Representative of any discrepancy or omitted document.
The Acknowledgement Form must be completed and submitted with the tender, stating whether the tender covers the whole or part of the works, services or supply.
Eskom does not compensate bidders for tender preparation, submission, testing or negotiation costs.
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfPricing format
Corrections and clarification
Evaluation
Financial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Pricing
Costs and insurance
Security for performance
Financial capacity
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eligibility
Legislation and standards
Sheq
CIDB
B-bbee
CSD and tax
Skills and participation goals
Misrepresentation
B-BBEE Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)B-BBEE level is scored as stated on the CSD report or as per the certificate or affidavit provided.
Where the B-BBEE level is a pre-qualification criterion, proof (certificate, CSD number or CSD report) must be submitted at the closing date and time or the tender is disqualified. Where sub-contracting to designated groups is a pre-qualification criterion under the PPPFA Regulations, the sub-contractor's CSD number or B-BBEE certificate/affidavit must be submitted at closing. Fraudulent or expired information leads to disqualification.
For PPPFA point allocation only, a missing, fraudulent or expired B-BBEE certificate or affidavit does not disqualify an otherwise responsive bidder but scores zero points.
Specific Goals are scored against supporting documentation; failure to meet the goals or submit proof by closing scores zero points within the 90/10 or 80/20 allocation without disqualification.
Designated material and threshold information must be submitted by no later than contract award, failing which the tender is not considered for award.
Misrepresentation or falsification of any information, certificate, affidavit or document may lead to disqualification, reporting to the B-BBEE Commission for B-BBEE fraud or fronting, suspension from business with any State-Owned Company for up to 10 years, and prosecution.
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfCompliance is required with the OHS Act, COIDA and Eskom's SHEQ requirements, together with National Treasury Instruction Notes, CIDB Regulations, dtic designated local content and/or production requirements, PPPFA Regulations and the Amended B-BBEE Codes.
Bidders must provide proof satisfactory to Eskom that SHEQ systems, policies and capabilities are in place at the closing date and time and/or contract award, and must reflect all SHEQ costs and personnel in the tender.
Where CIDB grading is a qualification criterion, registration or capability of registration within 21 working days of closing is required, with proof of registration mandatory at closing where applicable.
Contract Skills Development Goals apply to contracts of 12 months or more and to professional service or service contracts of R5 million or more, or engineering, construction or design-and-build contracts of CIDB grade 7 or higher.
Contract Participation Goals apply to General Building and Civil Engineering construction works contracts of at least 6 months where at least 25% of the main contract could reasonably be subcontracted in the CE, EB, GB or ME classes.
Clarification requests must be directed in writing to the Eskom Representative only; responses are published to all bidders. Addenda are published on the same platform and bidders must monitor the Eskom Tender Bulletin and NT e-Tender Portal.
Eskom returns late tenders unopened and does not accept late submissions. Tender names are published on the Eskom Tender Bulletin and NT e-Tender Portal; prices may be announced if stated in the Tender Data. Evaluation and award information is not disclosed before award unless required by law. Eskom may reject a tender on proof of influence, collusion, bid rigging or fraudulent or illegal activity.
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfTender validity
Confidentiality and copyright
Eskom's rights
Contract documents
Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eligibility: bidders must meet the eligibility criteria in the Tender Data and must not be restricted from doing business with Eskom or State-Owned Companies. Ineligible bidders are disqualified. Sub-contracting 100% of the scope of work is not permitted and renders a tender ineligible.
Closing: Eskom must receive the complete original tender and one complete hard copy at the specified address, tender box or email by the closing date and time. Proof of posting or courier delivery is not proof of delivery. For e-tendering, the tender must be uploaded and finalised on the Eskom Tender Bulletin e-tendering page by closing; the bidder is responsible for ensuring documents are accessible, not corrupt or unreadable, and that submission is finalised. Late tenders are not accepted. Eskom is not responsible for misplacement or premature opening of unsealed or incorrectly marked packages, courier delays or network problems. Eskom employees may not deposit tenders on a bidder's behalf.
Time: all times are South African Standard Time (GMT+2); the tender office clock is synchronised to the Telkom time signal and the closing time is strictly applied.
Extensions: if Eskom extends the closing date and time, the same requirements apply; bidders must monitor the Eskom Tender Bulletin and NT e-Tender Portal for changes and addenda.
Cost of tendering: Eskom does not compensate bidders for tender preparation, submission, testing or negotiation costs.
Standardised specifications: bidders must obtain and familiarise themselves with the latest revisions of the standardised specifications and other documents incorporated by reference into the Invitation to Tender.
Alterations: no alterations or additions to the tender documents are permitted except to follow Eskom instructions or correct the bidder's own errors; all alterations must be initialed by all signatories, and correction fluid or tape may not be used.
Alternative tenders: accepted only if a main tender is also submitted and the Invitation to Tender permits alternatives, and only on the criteria stated in the Tender Data.
Legislation: compliance is required with National Treasury Instruction Notes, CIDB Regulations, PPPFA Regulations, the Amended B-BBEE Codes, COIDA, the OHS Act, Eskom's SHEQ requirements and any other applicable instruments indicated in the Invitation to Tender.
CIDB: where CIDB grading is a qualification criterion, registration at closing or capability of registration within 21 working days is required; proof of registration is mandatory at closing where applicable, failing which the tender is disqualified. If only proof of application is available at closing, it must be submitted by closing and the actual registration printout by contract award.
CSDG: the contractor must achieve the Contract Skills Development Goals for contracts of 12 months or more and for professional service or service contracts of R5 million or more, or engineering, construction or design-and-build contracts of CIDB grade 7 or higher.
CPG: the contractor must achieve the Contract Participation Goals for General Building and Civil Engineering construction works contracts of at least 6 months where at least 25% of the main contract could reasonably be subcontracted in the CE, EB, GB or ME classes.
Late tenders: tenders received after closing are returned unopened; the e-tendering system does not allow changes or finalisation after closing.
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfClarification and correction of prices: bidders must provide clarification and documents required during evaluation. Mandatory returnables due at closing will not be requested after closing. Clarification requiring a breakdown of rates or prices may not change prices or the substance of the tender, except to confirm correction of arithmetical errors; the corrected total of the prices, accepted by the bidder, is binding.
Tender opening: tenders are opened in the presence of attending bidder representatives at the time and place in the Tender Data; tenders with a notice of withdrawal are not opened. For e-tendering there is no public opening and tenders are downloaded electronically; Eskom publishes the names of bidders received on the Eskom Tender Bulletin and NT e-Tender Portal.
Tender prices: Eskom announces the names of bidders; prices may be announced if stated in the Tender Data.
Non-disclosure: evaluation and comparison information and award recommendations are not disclosed before award unless required by law.
Grounds for rejection: Eskom may reject a tender on proof of influence over the tender process or award, collusion or bid rigging, or fraudulent or illegal activity connected to the Invitation to Tender.
Clarification of a tender: Eskom may seek clarification on any unclear or ambiguous matter; mandatory returnables due at closing will not be requested but may be clarified.
Basic compliance: assessed before detailed evaluation; failure renders the tender non-responsive. Failure to submit the original tender or copy in paper form results in disqualification. For e-tendering, failure to submit or upload documents renders the tender non-responsive.
Pre-qualification criteria: bidders meeting basic compliance and mandatory returnables must meet any stipulated pre-qualification criteria; no criterion is measured twice across phases.
Functionality: where applied, bidders are scored against the functionality criteria and must meet the minimum threshold in the Tender Data to proceed.
Financial analysis: Eskom assesses the financial risk of contracting with the bidder; if suitable mitigating factors do not exist, are insufficient, the risk is too high, or the bidder does not accept them, the bidder is not considered for award.
Price evaluation: assessed against the Tender Data criteria, taking into account CPA, FOREX, commodity exposure, unconditional discounts, technical adjustment, present value and forecast invoicing rates.
Arithmetical errors: where figures and words differ, the words prevail. Eskom checks the highest-ranked tenders for decimal point errors, pricing schedule or bill of quantities omissions, line-item multiplication errors, addition errors, and exchange rates used with fewer than 4 decimal places or incorrectly. The bidder must confirm the tendered prices or accept Eskom's corrections; refusal leads to rejection. Where the bidder confirms the tendered prices, the line-item total prevails over the rate, the quoted line-item total prevails over a misplaced decimal point, and the total of the prices prevails with selected item prices revised.
Ranking: pricing and Specific Goals scores are added and suppliers ranked highest to lowest under the PPPFA.
Objective criteria: may be applied only under PPPFA Section 2(1)(f) and only if stipulated in the Invitation to Tender; functionality and B-BBEE scorecard elements may not be used.
Reverse e-auction: may be used, applying the 90/10 or 80/20 system; bidders submit a complete tender without prices and any prices included are disregarded.
Acceptance: the successful bidder is notified before the validity period expires; all bidders are informed only after approval by the Eskom Adjudication Authority, and open tender outcomes are published on the Eskom Tender Bulletin and NT e-Tender Portal.
Contact Information
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Fraud and corruption reporting
Technical Specifications
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Supply of smart meters for the Gauteng Operating Unit, Distribution Division, on a once-off basis.
Delivery obligations
Acceptance and inspection
Risk and ownership
Rejection and defects
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfInspection and acceptance
Rejection
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfPricing
Payment
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Pricing
Payment
Late delivery
Compliance Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Statutory compliance
Warranty
Indemnity
Assignment and subcontracting
Ethics
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfEskom General Conditions of Purchase (Rev 3, effective 31 May 2024) govern the agreement: formation of the contract, price and payment including currency and 30-day payment terms, delivery and documents, containers and packing, acceptance, risk, ownership, rejection, indemnity, a one-year warranty, assignment and subcontracting, statutory requirements, breach, termination and ethics. The agreement is governed by South African law, and Eskom holds approval and inspection rights.
Description
Source: E3665DXGOU Smart Meter- Price Schedule.pdfOnce-off supply of smart electricity meters and associated data concentrator interfaces for the Gauteng Operating Unit within the Distribution Division.
Scope items
Technical Specifications
Source: E3665DXGOU Smart Meter- Price Schedule.pdf (unknown)Supply of smart metering equipment for the Gauteng Operating Unit, Distribution Division, on a once-off basis.
Deliverables
Quantities
Unit of measure: each, for both line items.
Pricing Schedule
Source: E3665DXGOU Smart Meter- Price Schedule.pdf (unknown)Price schedule E3665DXGOU — quote per unit, excluding VAT.
Line items
Unit of measure for both items: each.
Financial Requirements
Source: E3665DXGOU Smart Meter- Price Schedule.pdf (unknown)Pricing
Description
Source: SDL&I.zipSupply of smart meters for the Gauteng Operating Unit in the Distribution Division, on a once-off basis.
Important Dates
Source: SDL&I.zip (TENDER)Closing
Local content exemption
Enterprise development
Contact Information
Source: SDL&I.zip (TENDER)Local content enquiries
Technical enquiries
SDL&I execution support
Business unit
Submission Guidelines
Source: SDL&I.zip (TENDER)Submission channel
Returnable documents
Disqualification risks
Evaluation Criteria
Source: SDL&I.zip (TENDER)Preference point system
Specific goals
Ownership and award structure
B-BBEE preference
Technical Specifications
Source: SDL&I.zip (TENDER)Scope
Local content thresholds
Manufacturing activities that must take place in South Africa
Localisation
Skills development
Job creation
Supplier and enterprise development
Industrialisation
Financial Requirements
Source: SDL&I.zip (TENDER)Enterprise development spend
Penalty
Pricing
Compliance Requirements
Source: SDL&I.zip (TENDER)Registration and tax
B-bbee
Local content
Sdl&i
Description
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdfEskom Holdings SOC Ltd invites tenders for the supply of smart meters for the Gauteng Operating Unit, Distribution Division, on a once-off basis. The requirement is known and will result in once-off order placement. Tender number E3665DXGOU, issued 09 October 2026, closing 16 October 2026 at 10:00 SAST, with a validity period of 4 months (120 days) from closing. No clarification meeting applies — TEAP-listed suppliers. Tenders are submitted electronically via the Eskom e-tendering site.
Important Dates
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdf (TENDER)Closing
Issue date
Tender validity
Clarification queries
Briefing / clarification meeting
Contact Information
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdf (TENDER)Eskom Representative (all queries and clarifications)
Procurement Manager, Gauteng Operating Unit
Fraud and corruption reporting
Submission portal
Submission Guidelines
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdf (TENDER)Submission method
Returnable documents — required at closing (disqualification if missing or unsigned)
Returnable documents — required at closing (5 working days to remedy, then disqualification)
Returnable documents — required at closing for evaluation (no disqualification, but score zero if missing)
Required prior to award
Joint ventures / consortiums — additional documents
Disqualification risks
Returnable Documents
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdf (TENDER)Disqualifiable at closing: electronic tender copy in PDF (price list in PDF and/or Excel), Annexure A Authorisation Form, Annexure D Integrity Pact Declaration, SBD 4 Bidder's Disclosure, Price Schedule.
Non-disqualifiable at closing, with 5 working days to remedy: SBD 1 Invitation to Bid, SBD 6.1 Preference Points Claim Form, acceptance of terms and conditions, E-tendering Help Manual acknowledgement form.
Required prior to award: CSD registration number or report.
Required at closing for evaluation, scoring zero if missing: Annexure I SBD 6.1, B-BBEE certificate, tax clearance certificate (foreign tenderers with a South African footprint not on CSD, and local tenderers without a SARS PIN), Employment Equity compliance proof for designated employers, pricing schedule.
Joint ventures: letter of intent or valid JV agreement, written confirmation of single-entity operation, and details of a single designated JV bank account.
Annexures G1–G4 (SBD 6.2 local production and content) apply where designated materials are included.
Evaluation Criteria
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdf (TENDER)Evaluation stages
Preference point system
B-BBEE preference points
Price evaluation basis
Award structure
Technical Specifications
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdf (TENDER)Scope
Supplier status
Product and integration requirements
Quality
Quality Management
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdf (TENDER)Quality requirements apply as additional contractual requirements. Suppliers must ensure their products are fully integrated with one of Eskom's approved smart metering HES systems.
Pricing Schedule
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdfThe Price Schedule must be submitted in Excel and PDF format. The scope of work is included on the Price Schedule. For e-tendering, the price schedule may be submitted in PDF and/or Excel; where the versions differ, the PDF version is accepted as the submitted price.
Financial Requirements
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdf (TENDER)Pricing
Payment terms
Security
Financial due diligence (assessed after ranking, before award)
Mitigating measures if financial viability is unfavourable
Compliance Requirements
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdf (TENDER)Eligibility
Registration and tax
B-bbee
Employment equity
Local content
Forms to submit
Contractual Terms
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdfThe tender validity period is 4 months from the closing date and time. Eskom's Conditions of Purchase apply. A performance bond may be required. JV or consortium parties must be jointly and severally liable for contract execution. Main contractors must declare any subcontracting to subsidiaries. A NIPP obligation agreement with the dtic is required before contract signature where foreign content is USD 5 million or more.
Special Conditions
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdf (TENDER)This is a closed invitation to tender and alternative tenders are not allowed. Eskom's Conditions of Purchase apply. The National Industrial Participation Programme applies where foreign content is USD 5 million or more; the winning bidder must conclude a NIPP obligation agreement with the dtic before signing with Eskom. Payment is within 30 days for contracts below R50 million and within 60 days for contracts above R50 million, including VAT. Eskom may negotiate with preferred bidders where tendered prices are not market-related. Main contractors are discouraged from subcontracting to subsidiaries, which may be treated as fronting; any such subcontracting must be declared. A performance bond may be required.
Requirements
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdf (TENDER)Eligibility: tenderers must not be restricted from doing business with Eskom or State-Owned Companies. Ineligible: nationality of a sanctions-listed country; more than one tender submitted individually or as a JV partner; JV/consortium agreements without joint and several liability; conflict of interest; tenders signed by unauthorised persons; National Treasury restrictions; Tender Defaulters list; subcontracting 100% of the scope of work. Suppliers must be TEAP-listed, must have products fully integrated with an approved Eskom smart metering HES, and must submit a commitment letter for comprehensive training on meters and DCs. Eskom may apportion a percentage of meters to the installed base where interoperability is absent.
Section
Source: E3665DXGOU Invitation to Tender - Smart Meters Multiple Sourcing.pdfPrices are evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for acceptable variations, and compared on Net Present Value taking account of price adjustment factors and exchange rate fluctuations. Unconditional discounts count for evaluation; conditional discounts are applied at payment. Price is scored out of 80/90 points and specific goals out of 20/10 points under the PPPFA. B-BBEE points: Level 1 = 10/20, Level 2 = 9/18, Level 3 = 6/14, Level 4 = 5/12, Level 5 = 4/8, Level 6 = 3/6, Level 7 = 2/4, Level 8 = 1/2, non-compliant = 0. The 90/10 system applies above R50 million and 80/20 at or below R50 million, determined per material number by the lowest acceptable tender. Total score is price plus specific goals, rounded to two decimals, and the highest scorer wins. Award goes to between 1 and 20 suppliers; fewer than 10 qualifying suppliers triggers Option 1, more than 10 triggers Option 2 with three tiers.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Eskom Academy of Learning - Midrand - Johannesburg -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
10
Last checked
09 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
A strategic guide for medical equipment suppliers, maintenance companies, and healthcare technology providers bidding for tenders across South Africa's nine provincial health departments. Covers SAHPRA registration, OEM authorisation, service level agreements, and technical evaluation criteria.
A comprehensive guide to securing medical equipment maintenance tenders in South African public hospitals. Learn about SLA management, OEM certifications, and clinical engineering requirements.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Electrical Equipment. Unlock full pricing strategies, bid frequency, and historical win rates.