Kusile Power Station - Witbank - Kusile Power Station -
Organization Type
GOVERNMENT
Published
20 Nov 2026
OCDS Reference
ocds-9t57fa-179271
Summary
The department requires mechanical maintenance services for coal, ash, limestone and gypsum facilities at kusile power station over a fiveβyear period. The bid is open to qualified south african suppliers. The most critical factor is providing fully compliant OHS documentation and evidence of competency, as failure to submit the required OHS returnables will result in a nonβrecommended outcome.
Key Requirements
Closing date β bid must be submitted by 20 January 2027 at 08:00 (UTC).
Mandatory OHS documentation β must include Annexure B (signed acknowledgement), Health and Safety Plan, detailed OHS costing, Baseline OHS Risk Assessment, Letter of Good Standing (COIDA or equivalent), CEOβsigned OHS policy complying with OHS Act Sectionβ―7, and competency evidence (CVs, certificates and required competencies).
Eligibility β must provide a valid Letter of Good Standing and demonstrate the OHS competencies required for the fiveβyear maintenance scope.
Evaluation β bids are judged solely on the completeness of OHS returnables; no price or functionality weighting is applied, and a nonβrecommended outcome disqualifies the bid.
Disqualifying omission β failure to submit any required OHS document by the closing time results in nonβrecommendation.
Kusile Power Station - Witbank - Kusile Power Station -
Construction & Civil Engineering Industry Profile
Critical Requirements
CIDB Contractor Grading
Regulatory Bodies
ECSASACPCMPCIDBSAIA
Tenders in this industry often require registration with these bodies.
CIDB Registration
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Typical Documents
10 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
CIDB Registration Certificate
NHBRC Registration (if applicable)
Health & Safety Plan
Insurance Certificates
Previous Project Completion Certificates
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards β PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement β so nothing critical is missed before you start your bid response.
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
11 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 β Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Kusile Power Station Environmental Specification Coal ASH Limestone and Gypsum Mechanical Maintenance Services Rev 1.pdf
Eskom requires coal, ash, limestone and gypsum mechanical maintenance services at Kusile Power Station in Mpumalanga over a five-year period. The work is governed by Environmental Specification KUS-20250797 Rev 1, which sets the minimum environmental requirements contractors and suppliers must meet for the duration of the contract. The detailed scope of work is contained in document KUS20251084.
SHE Specification Coal, Ash Limestone and Gypsum.pdf
Eskom requires a five-year mechanical maintenance services contract at Kusile Power Station covering coal, ash, limestone and gypsum handling plants, including conveyor systems, drive systems, transfer chutes and associated electrical and C&I maintenance labour. The successful bidder must comply with extensive occupational health and safety specifications aligned to the OHS Act, Eskom life-saving rules and Kusile site requirements.
A five-year mechanical maintenance service is required for the coal, ash, limestone and gypsum plant at Kusile Power Station. The service covers mechanical maintenance for the coal, ash, gypsum and limestone plant for a period of 60 months. The procuring authority is Eskom Holdings SOC Ltd.
Coal, ash, limestone and gypsum mechanical maintenance services at Kusile Power Station in Mpumalanga, contracted by Eskom for a period of five years. Bids close on 20 January 2027 at 10:00. The procurement carries Eskom's Supplier Quality Management specification (240-105658000 / QM 58, Revision 3), which fixes the quality management system and quality documentation a bidder must return.
Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders - August 2023 (00B).docx
Eskom requires coal, ash, limestone and gypsum mechanical maintenance services at Kusile Power Station in Mpumalanga for a period of five years. The contract carries B-BBEE preference scoring and contractual SDL&I obligations for local procurement, job creation and skills development.
KUS-20260759 Kusile Power Station TES Coal Ash Limestone and Gypsum Mechanical Maintenance Services Rev 1 - Final Signed.pdf
Eskom requires mechanical maintenance services for the coal, ash, limestone and gypsum handling plants at Kusile Power Station over a five-year term. The scope covers conveyor belt systems and associated equipment, including gearboxes, pulleys, motors, winches and scrapers. Tenders are assessed on a weighted technical scorecard with a minimum qualifying threshold of 70%.
240-77433139 Annexure A supplier risk category.docx
Mechanical maintenance services for coal, ash, limestone and gypsum systems at Kusile Power Station in Mpumalanga for a period of five years. Eskom requires bidders to undergo an occupational health and safety evaluation and submit COID-compliant documentation. The tender closes on 20 January 2027 at 10:00 South African Standard Time.
240-77471651 Annexure C 1 (3) High risk tender 2026.docx
Eskom requires mechanical maintenance services for coal, ash, limestone and gypsum handling systems at Kusile Power Station in Mpumalanga, for a contract period of five years. Bidders must comply with extensive occupational health and safety (OHS) requirements, including submitting a health and safety plan, baseline risk assessment, and detailed OHS costing.
Eskom requires mechanical maintenance services for coal, ash, limestone and gypsum handling systems at Kusile Power Station in Mpumalanga, for a contract period of five years. The successful bidder must provide a Contract Quality Plan (CQP) that complies with SANS 466:2005 / ISO 10005:2005, covering all quality management aspects of the maintenance work.
Eskom requires mechanical maintenance services for coal, ash, limestone and gypsum handling systems at Kusile Power Station in Mpumalanga for a five-year period. The contract covers cleaning, unblocking, conveyor maintenance, ash handling, coal stockpile management, and related plant maintenance activities, with a strong emphasis on occupational health and safety compliance.
Eskom Kusile Power Station requires mechanical maintenance services for coal, ash, limestone and gypsum handling equipment, including conveyor belting systems, drives, take-up systems, belt cleaners and transfer chutes, for a five-year contract. The successful bidder will be the Main Contractor and must comply with a comprehensive OHS specification, including statutory appointments, life-saving rules, risk assessments and safety file requirements.
240-12248652_Catergory 3 List of Tender Returnables Rev 7 (1).pdf
Eskom requires mechanical maintenance services for the coal, ash, limestone and gypsum handling plant at Kusile Power Station in Mpumalanga over a five-year term. Bidders are evaluated on a set of quality management returnables, scored across five sections for a total of 12 points.
Five-year mechanical maintenance service for the coal, ash, limestone and gypsum plant at Kusile Power Station in Mpumalanga, covering the contractor's health and safety obligations for the duration. Bidders must acknowledge Eskom's OHS requirements and accept accountability for their own contractors and suppliers.
Eskom Standard Conditions of Tender - January 2023.pdf
Eskom requires mechanical maintenance services for coal, ash, limestone and gypsum handling systems at Kusile Power Station in Mpumalanga, for a five-year contract period. The tender is open to eligible tenderers who must comply with Eskom's standard conditions, including submission of a complete original tender plus one hard copy, and must not subcontract 100% of the scope.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
The department requires coal, ash, limestone and gypsum mechanical maintenance services at Kusile Power Station for a period of five years. The services must be performed by a qualified contractor in accordance with the specified scope and quality requirements.
Eskom requires mechanical maintenance services for coal, ash, limestone and gypsum handling systems at Kusile Power Station in Mpumalanga, for a five-year contract. Bidders must accept Eskom's Supplier Quality Requirements (specification 240-105658000) and comply with ISO 9001 quality management standards.
E-tendering Help Manual for supplier - 27 January 2025.pdf
Eskom requires mechanical maintenance services for coal, ash, limestone and gypsum handling systems at Kusile Power Station in Mpumalanga, for a five-year period. Bidders must register on the Eskom eTendering system and submit their tender documents electronically before the closing date.
Eskom requires full-time mechanical maintenance services for the pulse jet fabric filter (PJFF) and smokestack systems at Kusile Power Station, covering coal, ash, limestone and gypsum handling, over a five-year period. The work is delivered under a confidentiality agreement governing how Eskom's project information is handled.
Invitation to Tender Coal Ash limestone mechenical maintenance.pdf
Eskom is procuring mechanical maintenance services for coal, ash, limestone, and gypsum handling systems at Kusile Power Station in Mpumalanga, for a five-year period. The contract will be governed by the NEC3 Term Service Contract and requires a CIDB grading of 9ME or higher.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Supplies: GeneralFind supplies: general tenders and contract opportunities in South Africa. Browse active government procurement opportunities updated daily.
Based on 9 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Document read
Compliance review
Bid-ready summary
Quality requirements purpose
Sets out minimum quality requirements for current and prospective suppliers and sub-suppliers.
Applies across the purchaser's divisions, subsidiaries, suppliers and sub-suppliers, and is incorporated into requests for information, quotations, proposals and contracts.
Requires an ISO 9001-based quality management system to be developed, implemented, maintained and continually improved.
Form A (240-68099512): the bidder must complete and sign it to accept the purchaser's supplier quality requirements.
List of Tender Returnables (240-12248652): identifies the quality documents required for the selected quality category.
Quality category: only one category (1, 2, 3 or 4) applies to a procurement; the applicable category is identified in Form A.
Category 1: requires an ISO 9001 certificate, internal and external audit reports, a draft Contract Quality Plan, an Inspection and Test Plan or Quality Control Plan example, control of externally provided processes, quality roles and responsibilities, and management review records.
Category 2: requires documented quality management system information, quality policy and objectives, internal audit reports, a draft Contract Quality Plan, an Inspection and Test Plan or Quality Control Plan example, control of externally provided processes, quality roles and responsibilities, and management review records.
Category 3: requires documented quality management system information, quality policy and objectives, a draft Contract Quality Plan, an Inspection and Test Plan or Quality Control Plan example, control of externally provided processes, and quality roles and responsibilities.
Category 4: requires a quality method statement, quality policy, quality objectives, control of externally provided processes, and quality roles and responsibilities.
Bidders are assessed against the purchaser's supplier quality requirements (240-105658000/QM 58).
The applicable quality category (1 to 4) is selected in Form A and determines the quality evidence required.
Assessment covers the supplier's quality management system, quality plans, inspection and test arrangements, and ability to meet the required quality outcomes.
Pre-award capability and capacity assessments may be conducted for suppliers providing high-risk services, working on critical plant or equipment, supplying critical plant items or components, or performing special processes.
Procurement context: mechanical maintenance services for coal, ash, limestone and gypsum at Kusile Power Station over five years.
The purchaser's supplier quality requirements set minimum quality management expectations for suppliers and sub-suppliers.
Suppliers must establish, implement, maintain and improve a quality management system aligned with ISO 9001.
Where required by the selected quality category, a valid ISO 9001 certificate from an accredited certification body must be provided.
Contract Quality Plans must explain how the required quality will be delivered, including records, access, final documentation, special processes, training, preservation and monitoring.
Quality Control Plans and Inspection and Test Plans must set out inspection and test activities, acceptance criteria, hold and witness points, records and responsibilities.
The purchaser may add intervention points, witness or hold points, and may audit supplier and sub-supplier facilities.
Special processes such as welding, non-destructive examination, coating and heat treatment require suitably qualified personnel and statutory registration where applicable.
Preservation controls must cover storage, handling, maintenance and protection of materials and equipment, with records available to the purchaser.
Supplier selection and evaluation are based on conformity with the purchaser's quality requirements and the quality category selected in Form A.
The assessment considers the supplier's quality management system, quality planning, inspection and test arrangements, and capability to meet the scope.
Capability and capacity reviews may be carried out before award for high-risk services, critical plant, critical components or special processes.
Document240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docxReview complete
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)
Scope: mechanical maintenance services for coal, ash, limestone and gypsum systems at Kusile Power Station.
Contract period: five years.
DocumentNEC3 Term Service.pdfReview complete
Description
Source: NEC3 Term Service.pdf
Mechanical maintenance of coal, ash, limestone and gypsum conveyor plants at Kusile Power Station for 60 months. The service must support station performance targets of 92% UCF, 6% PCLF and 2% UCLF. The contractor must provide preventative, predictive and corrective maintenance, plant performance improvement, cost reduction, safety, environmental compliance and skills transfer.
Important Dates
Source: NEC3 Term Service.pdf (unknown)
Service start date: 01 December 2026
Service period: 60 months
First contractor plan: within two weeks of the Contract Date
Task Order programme: within 7 days of receiving a Task Order
B-BBEE status change notification: within 7 days of the change
Updated B-BBEE verification certificate: within 30 days of notification
Payment assessment interval: between the 25th day of each successive month
C1.1 Form of Offer and Acceptance: complete and include in the returnable pack.
C1.2b Contract Data Part 2: provide contractor details, key personnel, price list location and tendered total.
Technical Specifications
Source: NEC3 Term Service.pdf (unknown)
Scope
Mechanical maintenance services for coal, ash, limestone and gypsum plants, including conveyor belt plants, at Kusile Power Station.
Contract duration: 60 months.
Performance context: station expected to operate at 92% UCF, 6% PCLF and 2% UCLF; maintenance strategy must support these targets.
Maintenance scope
Preventative, predictive and corrective maintenance, including breakdown repairs.
All mechanical maintenance required by the employer's instructions, processes and systems.
Equipment alignment within the scope.
Improvement programmes to enhance plant performance and reduce costs, subject to employer approval.
Complementary services may include project management, procedures and work instructions, documentation, approved plant modifications, spares management, technical advice and component failure analysis reporting.
Maintain accurate spare parts descriptions in employer stores and recommend changes.
Ensure work does not interfere with scheduled work and aligns with employer work control.
Work is non-exclusive and only performed after a task order; all work is subject to inspection.
Equipment becomes part of the works after commissioning and handover; start date may shift if handover is delayed.
Maintain an agreed year-round base crew at Kusile Power Station; crew changes must be negotiated with the employer.
Use SAP rotable process for refurbishable spares.
Clean spillage caused by the contractor.
Inspect, report and repair responsible plant areas; raise defects on the Flip system.
Maintain KKS plant labelling integrity and report deficiencies immediately.
Provide responsible persons for PSR and ORHVS work; these persons must pass written and oral examinations.
Indicative resources
Site Manager: 1
Safety Officer: 2
Mechanical Supervisor: 6
Mechanical Technician: 3
Site Clerk: 2
Planner: 2
Quality Control Technician: 2
Artisan Fitter: 30
Artisan Boilermaker: 6
Artisan Welder: 3
Artisan Rigger: 4
Storeman: 2
Mechanical Semi-Skilled: 32
Hoist and crane operator: 2
Drivers: 5
Cleaner: 6
Site establishment and logistics
Offices, tea rooms, change rooms with showers, steel storage containers, crane mounted truck, site fencing, power, water and waste-water connections.
Medicals, police clearances, safety file, transport, plant and tools/equipment as listed in the price schedule.
Experience & Qualifications
Source: NEC3 Term Service.pdf
Key personnel and qualifications
Site Manager: NQF Level 7, B-Tech Mechanical Engineering, 3-5 years supervisory experience; 1 position.
Safety Officer: National Diploma in Safety, 2 years safety management experience; 2 positions.
Mechanical Supervisor: National Diploma in Mechanical Engineering, 5 years relevant experience; 6 positions.
Mechanical Technician: National Diploma in Mechanical Engineering, 5 years relevant experience; 3 positions.
Site Clerk: Matric and NQF Level 4 in Office Management, 2 years office management experience; 2 positions.
Planner: Matric/N3 plus trade test or N6 in Engineering, 5 years relevant experience; 2 positions.
Quality Control Technician: Matric/N3 plus trade test or N6 in Engineering, 3-5 years relevant experience; 2 positions.
Artisan Fitter: Matric/N3 plus trade test or N6 in Mechanical Engineering, 3-5 years experience; 30 positions.
Artisan Boilermaker: Matric/N3 plus trade test or N6 in Mechanical Engineering, 3-5 years experience; 6 positions.
Artisan Welder: Matric/N3 plus trade test or N6 in Mechanical Engineering, 3-5 years experience; 3 positions.
Artisan Rigger: Matric/N3 plus trade test or N6 in Mechanical Engineering, 3-5 years experience; 4 positions.
Storeman: Matric/N3 in Engineering, 1 year experience; 2 positions.
Mechanical Semi-Skilled: Matric/N3 in Engineering, 1 year experience; 32 positions.
Hoist and Crane Operator: Matric/N3 in Engineering plus competency certificate in lifting machinery, 1 year experience; 2 positions.
Drivers: 1 x 23-seater and 4 x 15-seater; 5 positions.
Cleaner: 6 positions.
Contractor must also identify key persons authorised to bind joint ventures and provide CVs.
Quality Management
Source: NEC3 Term Service.pdf
Quality and service performance
Service levels are measured against maintenance programme slippage, rework after completion, overdue NCR responses and SHEQ audit findings.
Target for each measure is zero.
Penalty thresholds
Maintenance programme slippage: 1 day = 3%; 5 days = 5%; 10 days or more = 10%.
Rework after completion: 1 = 3%; 3 = 5%; 5 = 10%.
Overdue NCR responses: 1 = 3%; 2 = 5%; 3 = 10%.
SHEQ audit findings: 1 = 3%; 2 = 5%; 3 = 10%.
Penalty percentage is applied to the specific Task Order value or current month assessment.
Contractor must provide Quality Control Technician resources with Matric/N3 plus trade test or N6 in Engineering and 3-5 years relevant experience.
Pricing Schedule
Source: NEC3 Term Service.pdf
Pricing schedule
Pricing must be submitted on the TSC3 Option A price list.
Price list items include Preliminaries and General, Resources, and Tools and Equipment.
Preliminaries include site establishment, facilities, medicals, security and safety compliance, transport, plant and logistics.
Resources are priced by labour category and time type: normal time, overtime and Saturdays at 1.5, Sundays and public holidays at 2.0, and standby allowance.
Tools and Equipment include sockets, spanners, drilling machines, welding machines, measuring tools, clamps, grinders and related items.
Bidders must enter units, number off, expected quantities, rates and amounts; lump sum items are not adjusted if actual quantities differ.
The tendered total of the Prices must be completed.
Financial Requirements
Source: NEC3 Term Service.pdf (unknown)
Contract pricing
NEC3 Term Service Contract Option A: priced contract with a price list.
Prices may be lump sums, rates multiplied by expected quantities, or time-based items.
Currency: South African Rand.
Payment
Assessment interval: between the 25th day of each successive month.
Payment period: 60 days.
Contractor must submit a tax invoice within one week of receiving a payment certificate; invoice must show the certified amount and include employer VAT number 4740101508.
Late or incorrect tax invoice extends the payment date by the delay period.
Interest on late payment: Standard Bank prime rate for ZAR; LIBOR for other currencies.
Price adjustment
Base date for indices: April 2024.
Fixed: 15%.
Labour: SEIFSA Table 55%, C-3(A).
Transport: SEIFSA Table 5%, L-2(A).
Material: SEIFSA Table 25%, G-1.
Service damages
Low service damages apply under Option X17.
Penalty levels: 3%, 5% and 10% of the current month assessment or relevant Task Order value.
Measured items: maintenance programme slippage, rework after completion, overdue NCR responses and SHEQ audit findings.
Liability and insurance
Contractor liability for indirect or consequential loss: R0.
Total liability generally limited to the total Prices, except additional excluded matters.
End of liability date: 12 months after the end of the service period.
Contractor must provide additional insurances and cover employer insurance deductibles; employer provides insurances listed in Format TSC3.
Minimum indemnity for employee death or bodily injury: R500,000 per event.
Compliance Requirements
Source: NEC3 Term Service.pdf (unknown)
B-bbee
Minimum B-BBEE level: 4.
Any change in legal status, ownership or business composition affecting B-BBEE status must be notified to the employer within 7 days.
Updated verification certificate and supporting documents must be submitted within 30 days of notification.
A decreased B-BBEE status may lead to renegotiation or termination; failure to notify may be grounds for termination.
Contracting compliance
Cession, delegation or assignment requires written employer consent.
Joint ventures, consortia or unincorporated groupings are jointly and severally liable; key authorised person must be notified within two weeks of the Contract Date; composition cannot change without written consent.
Corrupt or illegal practices may lead to termination and other action.
Confidentiality obligations apply; images of the affected property require prior written consent.
Health, safety and environment
Contractor must comply with the Construction Regulations 2014, Occupational Health and Safety Act and applicable health, safety and environmental laws.
Employer may appoint contractor as Principal Contractor for the affected property.
Contractor must ensure subcontractors, employees and others under its control comply.
Tax
Contractor must comply with the Value Added Tax Act and include employer VAT number 4740101508 on invoices.
Health & Safety
Source: NEC3 Term Service.pdf
Health and safety
Contractor must take all reasonable precautions to protect health and safety.
Employer may appoint contractor as Principal Contractor under Construction Regulations 2014.
Prices must include sufficient allowance for Construction Regulations, OHS Act and contract HSE rules.
Contractor must ensure subcontractors, employees and others comply.
Site HSE requirements
Safety file.
Entry and exit medicals; police clearance certification.
Price schedule includes 109 entry medicals and 109 police clearances.
Safety training: confined space, working at heights, first aid, basic fire fighting, OHS Act, legal liability, supervisory safety, planned job observation, HIRA and incident investigation.
PPE: standard and job-specific items, arc flash protection, welding protection, respiratory protection, gas monitors and consumables.
Occupational hygiene surveys: illumination and indoor air quality.
Environmental
Source: NEC3 Term Service.pdf
Environmental compliance
Contractor must comply with all applicable environmental laws, regulations, rules, guidelines and procedures.
Contractor must ensure subcontractors, employees and others under its control also comply.
Spillage caused by the contractor must be cleaned; plant housekeeping is important.
Contractual Terms
Source: NEC3 Term Service.pdf
Contract form
NEC3 Term Service Contract April 2013, TSC3.
Main Option A: priced contract with price list.
Secondary options: W1 dispute resolution, X1 inflation adjustment, X2 changes in law, X17 low service damages, X18 limitation of liability, X19 task orders, Z1-Z11 additional conditions.
Key dates and terms
Service start date: 01 December 2026.
Service period: 60 months.
Contractor first plan: within two weeks of Contract Date.
Task Order programme: within 7 days of receiving Task Order.
Payment: 60 days after assessment; tax invoice within one week of payment certificate.
Dispute resolution
Adjudicator selected from ICE-SA panel; if no agreement, AFSA appoints.
Arbitration under Association of Arbitrators (Southern Africa) rules; place South Africa.
Additional conditions
Cession, delegation and assignment require written consent.
Joint ventures are jointly and severally liable and must notify key authorised person.
B-BBEE status changes must be notified and updated certificate submitted.
Ethics, confidentiality, waiver, health and safety, environmental compliance, tax invoicing and compensation event rules apply.
Employer may terminate for corrupt practices, B-BBEE status decrease, business rescue order or other specified events.
Contractor liability is limited as set out in X18; indirect loss limited to R0.
Section
Source: NEC3 Term Service.pdf
Quality Control Technician requirement: Matric/N3 plus trade test or N6 in Engineering; 3-5 years relevant experience; 2 positions.
Document240-77471499 Annexure B 2026.docxReview complete
Description
Source: 240-77471499 Annexure B 2026.docx
Annexure B is an acknowledgement form covering Eskom occupational health and safety legal and other requirements.
Submission Guidelines
Source: 240-77471499 Annexure B 2026.docx (unknown)
Returnable form
Annexure B: signed acknowledgement of Eskom occupational health and safety legal and other requirements, signed by the CEO, director or managing director and witnessed by two people.
Technical Specifications
Source: 240-77471499 Annexure B 2026.docx (unknown)
OHS requirements for work at Eskom
The supplier must comply with Eskom contractor health and safety standard 32-136, any supplied OHS specifications, the Occupational Health and Safety Act 85 of 1993 and the Compensation for Occupational Diseases and Illnesses Act 130 of 1993.
After contract award, the supplier must align its OHS policies, procedures and standards with Eskom requirements.
Employees must complete Eskom induction and the supplier's own induction.
OHS non-conformance may result in penalties.
Compliance Requirements
Source: 240-77471499 Annexure B 2026.docx (unknown)
Contractor and supplier management
The main supplier must demonstrate its contractor and supplier selection process and criteria to Eskom.
Eskom must be notified before contractors or suppliers are appointed to start work.
The supplier must ensure contractors and suppliers have sufficient resources and competence.
The supplier is accountable for legal and Eskom OHS compliance by its contractors and suppliers.
The supplier must audit and assess contractor and supplier OHS compliance.
The supplier must provide grounds for terminating contractor or supplier work.
Non-conformances must be handled through performance and penalty processes.
Eskom may verify compliance and request references, testimonials and client contact details for similar work.
DocumentEskom Standard Conditions of Tender - January 2023.pdfReview complete
Description
Source: Eskom Standard Conditions of Tender - January 2023.pdf
The enquiry relates to the works, services or supply identified in the specification and/or works information; bidders must indicate whether they are bidding for the whole or part.
Important Dates
Source: Eskom Standard Conditions of Tender - January 2023.pdf (TENDER)
Closing: 20 January 2027 at 10:00 SAST
Clarification queries: must be submitted before the clarification closing time stated in the enquiry
Compulsory site visit or clarification meeting: where cited, attendance is compulsory and failure to attend disqualifies the bid
Time basis: South African Standard Time, determined by the Telkom time signal
Addenda and deadline changes: published on the Eskom Tender Bulletin and National Treasury e-Tender Portal; bidders must monitor these sources
Submission Guidelines
Source: Eskom Standard Conditions of Tender - January 2023.pdf (TENDER)
Submission format
Provide one complete original bid and one complete hard copy, in English, completed in ink.
An additional electronic copy may be requested.
Seal the original and copy separately, mark them ORIGINAL and COPY, and show the Eskom address, tender number, bidder name and contact details on each inner package.
Seal all packages in an outer package marked CONFIDENTIAL, showing only the Eskom address and tender number.
Deliver to the tender box, address, fax number or email address specified in the enquiry; fax or email is acceptable only where expressly allowed.
Late bids will not be accepted, and courier or postal proof is not proof of receipt.
Alternative bids are allowed only where a main bid is also submitted and the enquiry permits alternatives.
Disqualification risks
Missing the complete hard copy.
Missing mandatory returnables by the closing deadline.
Failing to attend a compulsory site visit or clarification meeting where one is required.
Subcontracting 100% of the scope.
Submitting after the deadline.
Returnables
Acknowledgement Form confirming whether the bid is for the whole or part of the scope.
All mandatory forms, data and schedules required by the enquiry, completed without exception.
Mandatory returnables cannot be added after the closing deadline.
Valid certificates or registration proofs required for the bid and, if successful, up to award.
Authenticated authority where an agent submits for a principal.
CIDB registration proof where applicable; if only proof of application exists at closing, provide it by closing and the CIDB printout by award.
Evidence of SHEQ systems, policies and capability, with related costs and personnel included in the bid.
Evaluation Criteria
Source: Eskom Standard Conditions of Tender - January 2023.pdf (TENDER)
Evaluation sequence
Basic compliance is checked first; a non-compliant bid is non-responsive.
A bid missing mandatory returnables by the required deadline is non-responsive.
Where functionality applies, the bid must reach the minimum functionality threshold stated in the enquiry before further evaluation.
Eskom assesses financial risk and may disqualify a bid where the risk is too high.
Price is evaluated according to the enquiry, taking account of factors such as CPA, FOREX, commodity increases, discounts, NPV and invoicing forecasts.
Specific Goals are scored from the required supporting documents.
If Specific Goals proof is missing or not met by closing, an otherwise responsive bid receives 80/90 points for Price and zero points for Specific Goals.
Price and Specific Goals scores are combined and bids are ranked under the PPPFA.
A contract may be awarded to a lower-ranked bidder only where objective criteria under section 2(1)(f) of the PPPFA are stated in the enquiry.
Failure to meet local-content requirements for dtic-designated materials makes the bid non-responsive.
If a reverse e-auction is used, bids must be submitted without prices; any prices included will be ignored.
Technical Specifications
Source: Eskom Standard Conditions of Tender - January 2023.pdf (TENDER)
Scope
Mechanical maintenance services for coal, ash, limestone and gypsum facilities at Kusile Power Station.
Contract duration: five years.
Bidders must state whether the offer covers the whole or part of the works, services or supply described in the specification or works information.
Quality Management
Source: Eskom Standard Conditions of Tender - January 2023.pdf
Bidders must provide reasonable proof that safety, health, environmental and quality systems, policies and capabilities are in place by contract award.
All SHEQ-related costs and personnel must be included in the bid for Eskom assessment.
Testing costs needed to demonstrate compliance are not reimbursed.
Pricing Schedule
Source: Eskom Standard Conditions of Tender - January 2023.pdf
Prices must be submitted in South African Rand unless otherwise instructed.
Rates and prices are fixed for the contract duration, subject only to any adjustment mechanism in the enquiry.
Prices must include all applicable duties, taxes and levies.
Arithmetical errors may be corrected; where figures and words differ, the words govern.
Eskom may correct decimal errors, pricing schedule omissions, line-item extensions and totals, and the corrected total becomes binding if accepted.
Bidders must not alter the pricing documents except to correct their own errors, with alterations initialled.
Financial Requirements
Source: Eskom Standard Conditions of Tender - January 2023.pdf (TENDER)
Pricing
Rates and prices must include all duties, taxes, including VAT, and levies payable by the successful bidder, based on those applicable 14 days before the submission deadline.
Prices are fixed for the contract period and are not subject to adjustment except where the enquiry allows.
Prices must be in South African Rand unless the enquiry directs otherwise.
No compensation is payable for bid preparation, submission, negotiation or testing costs.
Security and risk
Where performance security is required, the bidder must name at least two financial institutions it may approach; Eskom may reject an unsuitable institution.
Eskom insurance may not cover the full risk required under the contract, so bidders should seek independent advice.
Eskom may disqualify a bid if the financial risk is considered too high.
Compliance Requirements
Source: Eskom Standard Conditions of Tender - January 2023.pdf (TENDER)
Statutory and procurement compliance
Bidders must meet the eligibility criteria in the enquiry and must not be restricted from doing business with Eskom or state-owned companies.
Comply with National Treasury instructions, including CSD requirements, CIDB requirements for construction works, PPPFA, the Amended B-BBEE Codes, COIDA, the OHS Act and Eskom SHEQ requirements.
Where CIDB applies, registration proof is mandatory at closing; if only proof of application is available, submit it by closing and the registration printout by award.
CIDB skills development goals apply to works above R60 million or service contracts above R5 million where duration is at least 12 months.
CIDB participation goals apply to Grade 7-9 General Building or Civil Engineering contracts of at least 6 months and certain works where at least 25% may be subcontracted; at least 5% targeted enterprise participation is required.
B-BBEE evidence must be valid; fraudulent certificates or affidavits and fronting will be reported and may lead to disqualification.
Failure to meet local-content requirements for dtic-designated materials renders the bid non-responsive.
100% subcontracting of the scope is prohibited.
Misrepresentation or falsification of any information, certificate, affidavit or document may lead to disqualification.
Health & Safety
Source: Eskom Standard Conditions of Tender - January 2023.pdf
Bidders must comply with the OHS Act and Eskom safety, health, environment and quality requirements.
Evidence of SHEQ systems, policies and capability must be available at contract award.
SHEQ costs and personnel must be reflected in the bid.
Contractual Terms
Source: Eskom Standard Conditions of Tender - January 2023.pdf
Eskom may accept or reject any tender, accept part of a tender, cancel the process before contract formation, or negotiate with selected bidders.
The successful bidder must sign the Form of Agreement and any contract documents issued or revised by Eskom.
Tender validity must be maintained for the stated period and extended if requested; a lapsed validity may require a new procurement.
Tender information and documents must be treated as confidential and used only for preparing the bid.
Contract documents may be revised to include addenda, returnables, negotiated changes and other agreed revisions.
Section
Source: Eskom Standard Conditions of Tender - January 2023.pdf
Basic compliance is assessed before detailed evaluation.
Functionality, where applicable, has a minimum threshold that must be met.
Status: compulsory. The form must be completed in full and submitted to Eskom within the prescribed period.
Consequence of non-compliance: a form that is incomplete or not submitted in time renders the bidder non-responsive and disqualifies them from the procurement process.
What signing confirms: the tenderer has self-trained using Eskom's e-Tendering Noddy Guide or video, or has attended a clarification meeting, and is satisfied they can operate the e-Tendering system.
Details the bidder must enter: enquiry number, business name or joint venture name, contact person, landline, cellphone, email address, tenderer's name, authorised signature, designation, date and annexure number.
Form version: Rev 1, effective August 2023, with a review date of August 2026.
Document240-68099512 Form A_Cat 2_ Rev 9.docxReview complete
Description
Source: 240-68099512 Form A_Cat 2_ Rev 9.docx
General scope: mechanical maintenance services for coal, ash, limestone and gypsum systems at Kusile Power Station over five years, subject to Category 2 supplier quality requirements and ISO 9001.
Submission Guidelines
Source: 240-68099512 Form A_Cat 2_ Rev 9.docx (unknown)
Required returnable: signed Supplier Quality Requirements acknowledgement form (Form A, Category 2), confirming acceptance of specification 240-105658000 and ISO 9001.
Signatory: the tenderer's quality representative must complete and sign the acknowledgement.
Technical Specifications
Source: 240-68099512 Form A_Cat 2_ Rev 9.docx (unknown)
Scope: mechanical maintenance services for coal, ash, limestone and gypsum systems at Kusile Power Station for five years.
Quality category: Category 2 applies.
Quality standard: specification 240-105658000 and ISO 9001.
Quality coverage: pre-award requirements, contract execution, performance monitoring, access, information, preservation, audits, nonconformities and special processes.
Compliance Requirements
Source: 240-68099512 Form A_Cat 2_ Rev 9.docx (unknown)
Mandatory acknowledgement: the bidder must accept specification 240-105658000 and ISO 9001.
Quality category: Category 2 must be selected.
Authorised signatory: the tenderer's quality representative must sign the acknowledgement.
Document240-77433139 Annexure A supplier risk category.docxReview complete
Description
Source: 240-77433139 Annexure A supplier risk category.docx
The supplier risk category annexure is a guideline for classifying services and commodities by occupational health and safety risk. It applies to work classified as construction work under the Construction Regulations, 2014. The categories are not exhaustive. If a service or commodity is not listed, the project manager, project leader, contract manager or end-user must conduct a risk assessment with the responsible OHS functionary to assign the correct risk category. The OHS requirements apply to local and international companies.
Submission Guidelines
Source: 240-77433139 Annexure A supplier risk category.docx (unknown)
Returnable OHS documents
Signed acknowledgement of Eskom OHS rules and requirements (Annexure B).
OHS plan or OHS manual appropriate to the scope and risk category.
Baseline OHS risk assessment covering routine and non-routine tasks.
OHS management costing, broken down from the bill of quantities.
Valid COID letter of good standing or accepted equivalent.
Signed OHS policy.
Proof of OHS competency for relevant personnel.
SACPCMP registration for safety professionals where required by the risk category.
COID alternatives
A single-employee employer without a COID letter may provide insurance covering accidental death and disability of at least R500 000.
Proof of assessment by the Compensation Commissioner and corresponding payment may be accepted.
International suppliers may provide an equivalent from their country of origin or the relevant legislation; a COID certificate is still required if they have South African offices and employ South African citizens.
Joint ventures
All documents must show the joint venture name, or each joint venture member must provide its own COID letter.
Evaluation Criteria
Source: 240-77433139 Annexure A supplier risk category.docx (unknown)
Bidders must undergo Eskom's occupational health and safety evaluation.
The evaluation depends on the risk category assigned to the services.
Mechanical maintenance, plant maintenance, boiler maintenance, ash handling and similar work are listed as high-risk activities.
High-risk bidders must provide the OHS returnables applicable to that category, including SACPCMP registration for safety professionals.
The OHS requirements are mandatory and non-negotiable.
Technical Specifications
Source: 240-77433139 Annexure A supplier risk category.docx (unknown)
Scope
Mechanical maintenance services for coal, ash, limestone and gypsum plant at Kusile Power Station for five years.
Risk classification
Eskom classifies services by OHS risk as high, medium or low.
The classification list is not exhaustive; unlisted work requires a risk assessment by the responsible project or contract manager together with the OHS functionary.
Mechanical maintenance, plant maintenance, boiler maintenance, ash handling, work at heights, outage work, lifting, rigging, scaffolding and similar activities are examples of high-risk work.
OHS deliverables
The OHS plan or manual must be scope or project based and show how OHS risks will be managed through the project lifecycle.
The baseline risk assessment must cover routine and non-routine tasks.
OHS costing must reflect the scope and risk and include PPE, OHS training, OHS professionals, first aid equipment, ablution facilities, safety signs, safety campaigns, OHS equipment and medical examinations.
Financial Requirements
Source: 240-77433139 Annexure A supplier risk category.docx (unknown)
OHS costing
Bidders must provide OHS management costing.
The costing must form part of the bill of quantities and reflect the funds allocated to OHS when the project starts.
It must be based on the scope of work and the associated risk.
Insurance and COID evidence
A single-employee employer without a COID letter of good standing must provide insurance covering accidental death and disability to at least R500 000.
Where a letter of good standing is not submitted, proof of assessment by the Compensation Commissioner and proof of payment may be required.
Compliance Requirements
Source: 240-77433139 Annexure A supplier risk category.docx (unknown)
Mandatory OHS compliance
Bidders must be COID registered and compliant, or hold a Department of Labour certificate of exemption.
A valid COID letter of good standing or accepted equivalent must be submitted.
Bidders must complete Eskom's OHS evaluation to be registered on the Eskom vendor database.
The OHS policy must be signed.
Safety professionals must be registered with SACPCMP where required by the risk category.
Joint ventures
All documents must reflect the joint venture name, or each member must submit its own COID letter.
International suppliers
An equivalent COID document from the country of origin may be accepted, or the relevant legislation where no equivalent exists.
A COID certificate is required if the supplier has South African offices and employs South African citizens.
Consequence
If a contractor or labour broker is not registered with the Compensation Commissioner or does not pay assessments, the client may be deemed the employer of the contractor's employees.
DocumentKusile Power Station Environmental Specification Coal ASH Limestone and Gypsum Mechanical Maintenance Services Rev 1.pdfReview complete
Description
Source: Kusile Power Station Environmental Specification Coal ASH Limestone and Gypsum Mechanical Maintenance Services Rev 1.pdf
Purpose and application
The specification sets minimum environmental requirements for the coal, ash, limestone and gypsum mechanical maintenance contract at Kusile Power Station.
It applies to contractors, suppliers, partners and subcontractors working in areas under Kusile Power Station control.
It covers procurement and operational stages of the works and takes effect from the signature date.
The detailed scope of work is contained in document KUS20251084, and the contractor must retain a copy.
Environmental protection includes noise, air emissions, odours, waste separation and collection, spill clean-up and rehabilitation.
Contact Information
Source: Kusile Power Station Environmental Specification Coal ASH Limestone and Gypsum Mechanical Maintenance Services Rev 1.pdf (unknown)
Department: Supply Chain Management
Document contacts:
Name: Muwanwa Sinthumule
Role: Eskom Environmental Management Officer
Name: Thami Simelane
Role: Eskom Contract/Project Manager
Service location:
Kusile Power Station
Submission Guidelines
Source: Kusile Power Station Environmental Specification Coal ASH Limestone and Gypsum Mechanical Maintenance Services Rev 1.pdf (unknown)
Required tender submission documents:
Environmental policy aligned with ISO 14001:2015, signed by the chief executive officer or chief operating officer.
Aspect and impact register, or an environmental management plan relevant to the scope of work.
Environmental management system certificate if certified; if not certified, an environmental management system manual or documented procedures.
Waste management procedure or work instruction.
Proof of training for personnel performing activities that may significantly affect the environment.
Evaluation Criteria
Source: Kusile Power Station Environmental Specification Coal ASH Limestone and Gypsum Mechanical Maintenance Services Rev 1.pdf (unknown)
Environmental compliance is assessed during tender evaluation, ad-hoc inspections and internal audits.
The Kusile Senior Environmental Advisor or Environmental Management Officer evaluates compliance with the environmental specification and applicable environmental legislation.
Technical Specifications
Source: Kusile Power Station Environmental Specification Coal ASH Limestone and Gypsum Mechanical Maintenance Services Rev 1.pdf (unknown)
Scope and site
The services cover coal, ash, limestone and gypsum mechanical maintenance at Kusile Power Station for five years.
The detailed scope of work is in document KUS20251084, and the contractor must keep a copy.
The specification applies to contractors, suppliers, partners and subcontractors working in areas controlled by Kusile Power Station.
Environmental performance requirements
Controls must cover noise, air emissions, odours, separation and collection of liquid and solid waste, spill response and restoration of affected areas.
The contractor must observe duty of care, polluter-pays principles and the zero liquid effluent discharge policy through reuse and recycling.
Waste must be stored in marked and labelled containers, kept off the ground, not mixed or burned, and removed only with Environmental Department authorisation.
Waste must be disposed of at a permitted site, with disposal records and safe disposal certificates retained.
Spills and emergency incidents must be reported immediately to the supervisor and environmental officer, investigated, and cleaned up or rehabilitated under Kusile procedure 240-110383662.
Oils must be stored in bunded areas or impermeable tanks; oil disposal certificates must be submitted to the Environmental Department.
Hazardous substances must be stored in bunded areas with 110% capacity, with safety data sheets on site, a hazardous substance register, and spill kits or absorbents nearby.
Environmental management system
The contractor must maintain a documented and implemented environmental management system, including policy, procedures and registers.
An aspect and impact register must identify activities, impacts, mitigation measures and an environmental management plan aligned with Kusile's Operational Environmental Management Plan and legislation.
The register must include an aspect rating matrix; significant aspects require environmental objectives.
Aspects and impacts must be communicated to employees, with proof retained.
Employees must receive environmental induction before work starts, and proof must be kept.
Training needs must be identified in a training matrix, with training and awareness records maintained.
Trained and competent personnel responsible for environmental implementation must be appointed in writing.
Incidents, audits and improvements
Environmental incidents must be reported within 24 hours or immediately, investigated within 24 hours with a Kusile environmental representative, and remediated by the contractor.
Non-conformance reports must state the cause and proposed corrective and preventive actions.
Kusile may issue non-conformances where work deviates from station procedures or environmental requirements.
The Environmental Department may conduct audits and inspections; recorded non-conformances require a corrective action plan.
Audit reports and close-out records must be maintained.
Environmental objectives must be developed for each financial year, updated, communicated and include significant aspects.
The contractor must identify environmental improvement opportunities.
Emergency and policy controls
The contractor must prepare emergency preparedness and response arrangements, include local authority involvement where relevant, and conduct periodic emergency drills with records available on request.
A safety, health and environmental policy must be displayed prominently, filed, communicated to employees, and proof of communication retained.
Minimum site records
Site records must include the site-specific environmental management plan, aspect and impact register with communication proof, incident registers and investigation reports, non-conformance register, public complaints register, waste disposal register, hazardous substance registers and safety data sheets, audit reports and close-outs, inspection records, environmental training matrix, environmental awareness proof, SHEQ policy communication proof, and emergency drill reports.
Quality Management
Source: Kusile Power Station Environmental Specification Coal ASH Limestone and Gypsum Mechanical Maintenance Services Rev 1.pdf
Incident and non-conformance control
Immediate action must be taken to prevent or minimise environmental pollution after an incident, such as containing spills or extinguishing fires.
Incidents must be investigated within 24 hours, with a Kusile environmental representative involved.
The contractor must remediate environmental impacts caused by incidents.
Non-conformance reports must identify the cause and propose corrective and preventive actions.
Kusile may issue non-conformances where work deviates from station procedures or environmental requirements.
Good housekeeping must be maintained in laydown and work areas.
Audit and objectives
The Environmental Department conducts regular audits and inspections.
Where non-conformance is recorded, the contractor must submit a corrective and preventive action plan.
Audit reports must be retained.
Environmental objectives must be developed for each financial year and communicated to employees.
Compliance Requirements
Source: Kusile Power Station Environmental Specification Coal ASH Limestone and Gypsum Mechanical Maintenance Services Rev 1.pdf (unknown)
Environmental compliance requirements:
Environmental policy aligned with ISO 14001:2015 and signed by the CEO or CO.
Aspect and impact register or environmental management plan relevant to the scope.
Environmental management system certificate if certified; otherwise an environmental management system manual or procedures.
Waste management procedure or work instruction.
Proof of training for personnel performing activities with significant environmental impact.
Applicable legislation and standards include ISO 14001, NEMA, the National Environmental Management Waste Act 2008, the Hazardous Substances Act 1973, Eskom's Safety, Health, Environmental and Quality Policy, Kusile's Operational Environmental Management Plan 240-96626258, Kusile Power Station Environmental Requirements for Contractors and Suppliers 240-106963417, Kusile waste management work instruction 240-105776552, and Kusile oil/chemical spill clean-up and rehabilitation process 240-110383662.
Health & Safety
Source: Kusile Power Station Environmental Specification Coal ASH Limestone and Gypsum Mechanical Maintenance Services Rev 1.pdf
Hazardous substances and emergency controls
Hazardous substances must be stored in bunded areas with 110% capacity.
Safety data sheets must be kept on site for all hazardous substances.
Oil spill kits or absorbents must be kept near hazardous storage areas.
A hazardous substance register must be maintained.
The contractor must develop emergency response arrangements for its work premises, make employees aware of emergency processes and assembly points, involve local authorities where applicable, and conduct periodic emergency drills with records available on request.
A safety, health and environmental policy must be displayed prominently, filed, communicated to employees, and proof of communication retained.
Minimum site records include incident registers, non-conformance registers, waste disposal registers, hazardous substance registers and safety data sheets, audit reports, inspection records, training matrix, awareness proof, SHEQ policy communication proof and emergency drill reports.
Environmental
Source: Kusile Power Station Environmental Specification Coal ASH Limestone and Gypsum Mechanical Maintenance Services Rev 1.pdf
Environmental governance
The specification supports Eskom's Safety, Health, Environmental and Quality Policy and legislative duties.
It applies to all contractors, partners and suppliers working at Kusile Power Station.
The contractor must implement the specification, keep environmental documentation safe and available, and comply with environmental legislation.
The Kusile Senior Environmental Advisor or Environmental Management Officer evaluates compliance and conducts audits.
Compliance is monitored during tender evaluation, ad-hoc inspections and internal audits.
Key environmental controls
Duty of care requires reasonable measures to prevent, stop or minimise pollution and environmental degradation.
The polluter-pays principle applies to remediation and prevention costs.
The zero liquid effluent discharge policy must be followed through reuse and recycling.
Waste must be stored in labelled containers, disposed of at permitted sites, and supported by disposal records and certificates.
Spills must be reported immediately, investigated, cleaned up and rehabilitated under Kusile procedures.
Oil must be stored in bunded or impermeable containment, and disposal certificates submitted.
Hazardous substances require bunded storage at 110% capacity, safety data sheets, registers and spill response materials.
The contractor must maintain an environmental management system, aspect and impact register, mitigation plan, training matrix, induction records, incident and non-conformance registers, audit records and emergency drill reports.
Section
Source: Kusile Power Station Environmental Specification Coal ASH Limestone and Gypsum Mechanical Maintenance Services Rev 1.pdf
Environmental compliance is monitored during tender evaluation, ad-hoc inspections and internal audits.
The Kusile Senior Environmental Advisor or Environmental Management Officer assesses compliance with the specification and applicable environmental legislation.
Procurement for mechanical maintenance services at Kusile Power Station covering coal, ash, limestone and gypsum systems over five years. The supplier must prepare a Contract Quality Plan that sets out quality management arrangements, responsibilities, supplier/sub-supplier control, inspection and testing, records, non-conformance management, and post-delivery support.
Scope: mechanical maintenance services for coal, ash, limestone and gypsum systems at Kusile Power Station for five years.
Quality planning: the supplier must provide a Contract Quality Plan covering scope definition, communication channels, organogram, interfacing documents, suppliers and sub-suppliers, monitoring, items to be manufactured/refurbished/purchased, inspection and test plans, special controls, records, concessions/non-conformance, databook, tools and equipment, customer property, preservation, traceability, and commissioning/post-delivery activities.
DocumentInvitation to Tender Coal Ash limestone mechenical maintenance.pdfReview complete
Description
Source: Invitation to Tender Coal Ash limestone mechenical maintenance.pdf
Tender pack components: scope of work, NEC or other contract, pricing schedule/BOQ, CIDB Contract Skills Development Goals forms, and the standard returnable annexures covering authorisation, acknowledgement, bidder particulars, integrity, local content and preference points.
Important Dates
Source: Invitation to Tender Coal Ash limestone mechenical maintenance.pdf (RFP)
Closing date and time: 20 January 2027 at 10:00.
Compulsory site clarification meeting: 2 December 2026 at 08:00 at Kusile Power Station.
Attendance notice: notify the Eskom Representative by 30 November 2026 with each attendee's name, position and contact details.
Clarification queries: submit at least 10 working days before the closing deadline.
Tender validity: 90 days from closing; the tender data also states 12 weeks.
Contact Information
Source: Invitation to Tender Coal Ash limestone mechenical maintenance.pdf (RFP)
Source: Invitation to Tender Coal Ash limestone mechenical maintenance.pdf (RFP)
Submission method: electronic upload through the Eskom e-tendering site; no hard-copy submission and no public opening.
Upload structure: place documents in the Technical, Commercial, Financial and Other folders.
File requirements: all documents in PDF; the pricing schedule must be provided in PDF and Excel.
Size limits: 500 MB per document and 4 GB for the total submission; zipped or condensed files are not accepted.
Version control: if a bid is resubmitted, only the latest version is considered and earlier versions are void.
Closing control: the upload must be completed before the closing time; late bids are rejected.
Mandatory returnables:
Annexure A Authorisation Form: identifies the authorised signatory and requires the applicable resolution or power of attorney.
Annexure B Acknowledgement Form: provides the bidder's acknowledgement of the tender.
Annexure C Tenderer's Particulars: provides bidder details.
Annexure D Integrity Declaration: commits the bidder to the Supplier Integrity Pact.
Annexure E CPA for local goods/services: required where local goods or services are offered.
Annexure F CPA(IG) for foreign goods/services: required where imported goods or services are offered.
Annexure G1 to G4 / SBD 6.2: local production and content declaration where designated materials apply.
Annexure H / SBD 1: invitation to bid, required from all tenderers.
Annexure I / SBD 6.1: PPPFA preference points claim; missing evidence results in zero specific-goal points.
Annexure J / SBD 4: declaration of interest.
E-tendering help manual acknowledgement form, where applicable.
CIDB grading proof: required at closing, or within 21 working days after closing if agreed.
Completed NEC or other contract and pricing schedule/BOQ.
Tax clearance certificate where no SARS PIN or CSD number is provided.
Tax Evaluation Questionnaire for PAYE personal-service-provider assessment.
Employment Equity proof for designated employers.
JV letter of intent or agreement, joint and several liability confirmation, single-business-entity confirmation and designated JV bank account, where applicable.
COIDA certificate of good standing or proof of application for South African tenderers.
Latest approved annual financial statements and related due-diligence documents.
Disqualification risks:
Missing, incomplete or unsigned mandatory returnables.
Non-attendance at the compulsory site clarification meeting.
Late submission or an incomplete e-tendering status.
Restricted status, conflict of interest, unauthorised signature, multiple bids, or 100% subcontracting of the scope.
Failure to meet the CIDB grading or functionality threshold.
Evaluation Criteria
Source: Invitation to Tender Coal Ash limestone mechenical maintenance.pdf (RFP)
Evaluation sequence:
Eligibility and basic compliance: the bidder must be eligible, not restricted, not from a sanctioned country, free of conflict of interest, and must submit a complete electronic tender signed by an authorised person.
Mandatory returnables: required documents must be submitted by the closing deadline.
Functionality: the minimum weighted technical score is 70%; bids below this threshold are disqualified.
Price: scored out of 90 points.
Specific goals: scored out of 10 points under the PPPFA 90/10 system.
Price evaluation basis:
Prices are evaluated inclusive of VAT.
Arithmetical errors are corrected.
Contingencies in any bill of quantities or activity schedule are excluded.
Unconditional discounts are included in the evaluation; conditional discounts are not scored.
Specific goals:
If preference evidence is not submitted, the bid is not disqualified but receives zero for that specific goal.
Contractual requirements:
CSD registration and other contractual requirements are assessed after ranking.
Proof must be submitted before award; failure can render the bidder ineligible.
Pricing Schedule
Source: Invitation to Tender Coal Ash limestone mechenical maintenance.pdf
Pricing submission: completed pricing schedule/BOQ must be uploaded in PDF and Excel.
CSDG: the applicable Contract Skills Development Goal is 0.25% for Mechanical Engineering 9ME and is included in the BOQ/pricing schedule.
Cataloguing: if cataloguing is required, a separate line item must be quoted.
Price scoring: prices are scored out of 90 points after functionality qualification.
File limits: 500 MB per document and 4 GB total; zipped files are not accepted.
Financial Requirements
Source: Invitation to Tender Coal Ash limestone mechenical maintenance.pdf (RFP)
Pricing format: completed pricing schedule/BOQ, submitted in PDF and Excel.
Price evaluation: inclusive of VAT, corrected for arithmetical errors, excluding contingencies, and adjusted for unconditional discounts.
Payment terms:
Contracts below R50 000 000 including VAT: payment within 30 days of receipt of undisputed invoices.
Contracts above R50 000 000 including VAT: payment within 60 days of receipt of undisputed invoices.
Performance security: if a performance bond or demand guarantee is required, the bidder must select at least two Eskom-approved financial institutions.
Financial due diligence: latest approved annual financial statements are required; draft statements and management accounts are not accepted.
Additional financial evidence: unaudited South African entities must provide a signed public interest score and ITA34C returns for the current and previous years.
JV/SPV financials: each partner in an unincorporated JV or SPV must submit its own annual financial statements.
CIDB financial analysis: compulsory for CIDB-related transactions from R30 000 excluding VAT.
CSDG: a Contract Skills Development Goal of 0.25% applies to the Mechanical Engineering 9ME contract and is reflected in the pricing schedule.
Compliance Requirements
Source: Invitation to Tender Coal Ash limestone mechenical maintenance.pdf (RFP)
CSD registration: mandatory; provide the CSD number or CSD report.
Restricted status: bidders must not be under restriction to do business with Eskom or state-owned companies, must not be restricted by National Treasury or Eskom, must not be on the Tender Defaulters list, and must not be from a sanctioned country.
Conflict of interest: any conflict of interest disqualifies the bid.
Tax compliance: provide a SARS e-filing PIN or CSD number; otherwise provide a certified tax clearance certificate.
Foreign suppliers: those without a South African footprint complete SBD 1 but do not need tax clearance proof.
B-BBEE: provide a B-BBEE status level certificate, sworn affidavit or other prescribed evidence for PPPFA specific goals.
CIDB grading: minimum 9ME or higher, or capable of registration within 21 working days from closing.
JV CIDB requirements: every JV member must be CIDB registered; the lead partner must meet the required Mechanical Engineering grading or be no more than one level below with recognition status; the combined grading must meet the requirement.
Employment Equity: designated employers must provide proof of compliance and evidence of EE report submission.
COIDA: South African tenderers must provide an original certificate of good standing or proof of application.
Local content: SBD 6.2 and Annexures G1 to G4 apply only where designated materials are included.
Integrity: the Supplier Integrity Pact declaration is required.
Contract form: NEC3 Term Service Contract.
Professional/technical documents: ECSA, SACPCMP, CVs, permits, licences or specific registrations where applicable to the scope.
Health & Safety
Source: Invitation to Tender Coal Ash limestone mechenical maintenance.pdf
Site attendance: attendees at the compulsory clarification meeting must bring full PPE, including safety shoes, helmet, earplugs, goggles and reflector vest.
COIDA: South African tenderers must provide an original certificate of good standing or proof of application from the Compensation Fund or a licensed compensation insurer.
SHEQ: safety, health, environment and quality requirements may apply as part of the contractual requirements.
Scope-specific documents: safety, quality and environmental documents are required where indicated by the scope of works.
Contractual Terms
Source: Invitation to Tender Coal Ash limestone mechenical maintenance.pdf
Contract form: NEC3 Term Service Contract.
Duration: five years.
Scope: the whole contract must be tendered; alternative tenders are not allowed.
General conditions: Eskom Standard Conditions of Tender apply; the Tender Data prevails over the standard conditions if there is inconsistency.
Payment: 30 days for contracts below R50 000 000 including VAT; 60 days for contracts above R50 000 000 including VAT.
Security: a performance bond or demand guarantee may be required; if so, the bidder must approach at least two Eskom-approved financial institutions.
Cataloguing: the successful bidder may need to provide cataloguing information and label materials to Eskom specifications.
Subcontracting: subcontracting with subsidiaries must be declared; 100% subcontracting of the scope is not allowed.
Price negotiation: Eskom may negotiate with preferred bidders after competitive bidding if prices are not market-related.
Section
Source: Invitation to Tender Coal Ash limestone mechenical maintenance.pdf
Additional evaluation notes:
Functionality is a pass/fail threshold at 70% before price scoring.
Price and specific goals are combined under the 90/10 preference points system.
Contractual requirements are not scored but must be satisfied before award.
Document240-12248652_Catergory 3 List of Tender Returnables Rev 7 (1).pdfReview complete
Description
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7 (1).pdf
The quality requirements include documented criteria for controlling externally provided processes, products and services, covering evaluation, selection, performance monitoring and re-evaluation.
Contact Information
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7 (1).pdf (TENDER)
Contact
Name: Veronica Mpe
Role: Representative
Submission Guidelines
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7 (1).pdf (TENDER)
Category 3 quality returnables β the bid must contain the following scored quality documents:
A quality management system manual or equivalent document defining the system and its scope.
A quality policy approved by top management.
Quality objectives approved by top management.
A procedure for controlling documents and records.
A procedure for controlling nonconforming outputs.
A procedure for handling nonconformities and corrective actions.
A procedure for internal audits.
An organisation chart and responsibility matrix that includes the quality management function.
Criteria for assessing, choosing, monitoring and re-evaluating external providers.
A draft contract quality plan tailored to the scope of work.
A draft inspection and test plan or quality control plan covering all NEC scope-of-work activities.
Form A, completed and signed.
Evaluation Criteria
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7 (1).pdf (TENDER)
Evaluation is based on scored quality deliverables:
Section A β quality management system requirements: 7 points under option 2.
Section B β evidence that the quality system is operating: 2 points.
Section C β draft contract quality plan: 1 point.
Section D β draft quality control plan, checklist or inspection and test plan: 1 point.
Section E β completed and signed Form A: 1 point.
The category is identified as quality requirements deliverables to be evaluated, with indicator = 1.
Technical Specifications
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7 (1).pdf (TENDER)
Scope context β the quality requirements relate to mechanical maintenance services at Kusile Power Station for coal, ash, limestone and gypsum systems.
The quality plans and inspection documents must address all NEC scope-of-work activities.
The bidder must define how external products, processes and services will be controlled, including evaluation, selection, performance monitoring and re-evaluation.
Compliance Requirements
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7 (1).pdf (TENDER)
Quality compliance
The bidder must provide documented proof that its quality management system meets ISO 9001:2015; certification is not mandatory.
Required documented controls include document and record control, nonconforming outputs, corrective action and internal audit.
The organisation chart and responsibility matrix must identify the quality management role.
A draft contract quality plan must be specific to the tender scope and should align with ISO 10005.
A draft inspection and test plan or quality control plan must cover all NEC scope-of-work activities and should align with ISO 10005.
Form A must be completed and signed.
Section
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7 (1).pdf
Scored quality deliverables:
Section A: quality management system requirements, 7 points under option 2.
Section B: evidence of an operating quality system, 2 points.
Section C: draft contract quality plan, 1 point.
Section D: draft inspection and test plan or quality control plan, 1 point.
Section E: completed and signed Form A, 1 point.
DocumentSupplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders - August 2023 (00B).docxReview complete
Description
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders - August 2023 (00B).docx
Scope and preference scoring
The procurement covers coal, ash, limestone and gypsum mechanical maintenance services at Kusile Power Station for five years.
Bidders may earn up to 10 specific-goal points under the 90/10 system or 20 under the 80/20 system.
Specific-goal points are added to price points, rounded to two decimals, and the highest total score wins, subject to the Preferential Procurement Policy Framework Act.
Important Dates
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders - August 2023 (00B).docx (unknown)
Post-award milestones
B-BBEE improvement or retention plan: within 30 days after contract signature.
SDL&I Implementation Schedule: return for acceptance within 28 days after contract award.
SDL&I compliance reports: quarterly using the required data collection template.
Purchaser review of SDL&I reports: within 30 days of receipt.
Submission Guidelines
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders - August 2023 (00B).docx (unknown)
Returnable documents
SBD 6.2 and Annex C: mandatory where local production and content thresholds apply.
Preference-point evidence: valid B-BBEE certificate, sworn affidavit or CIPC affidavit; ownership/shareholding proof; certified identity documents of shareholders; disability proof where claimed.
Responsiveness risks
A mandatory CIDB CSDG percentage must be met; failure makes the bid non-responsive.
Applicable local production and content thresholds require full compliance.
If preference-point evidence is missing, the bid is not disqualified, but it scores zero for specific goals and price is assessed only out of 80 or 90.
Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders - August 2023 (00B).docx (unknown)
Evaluation and award
Specific-goal points: maximum 10 under the 90/10 system or 20 under the 80/20 system.
Total score: specific-goal points are added to price points and rounded to two decimals.
Award: the highest-scoring bidder wins, subject to the Preferential Procurement Policy Framework Act.
B-BBEE points
Level 1: 10 points under 90/10 or 20 points under 80/20.
Level 2: 9 or 18 points.
Level 3: 6 or 14 points.
Level 4: 5 or 12 points.
Level 5: 4 or 8 points.
Level 6: 3 or 6 points.
Level 7: 2 or 4 points.
Level 8: 1 or 2 points.
Non-compliant: 0 points.
Objective criteria and mandatory thresholds
Objective criteria are not required for responsiveness but are a condition of award; failure may lead to the next-ranked bidder being recommended.
An applicable CIDB CSDG mandatory percentage must be met; failure renders the bid non-responsive.
Applicable local production and content thresholds require full compliance; SBD 6.2 and Annex C are mandatory returnables.
Contract award requires a valid B-BBEE certificate or sworn affidavit.
Financial Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders - August 2023 (00B).docx (unknown)
Pricing and financial security
Price schedule: where local and imported goods or services are combined, the response must separate local and imported components.
Retention: 1% to 5% of each invoice, excluding VAT, will be retained as security for SDL&I obligations.
Release: retained amounts are released only after all SDL&I obligations are fulfilled.
Penalty: failure to meet SDL&I obligations attracts a penalty of 1% to 5% of contract value.
Corrective action: written notice of SDL&I non-compliance requires corrective measures before the next reporting period; unresolved failures may trigger retention.
Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders - August 2023 (00B).docx (unknown)
B-BBEE and ownership
Contract award requires a valid B-BBEE certificate or sworn affidavit.
Annual total revenue up to R10 million: a qualifying sworn affidavit may be used.
Annual total revenue up to R50 million: a qualifying small enterprise must comply with the applicable scorecard elements unless at least 51% black-owned, in which case a sworn affidavit is required.
Annual total revenue above R50 million: a valid B-BBEE certificate is required.
Preference claims require B-BBEE evidence, ownership/shareholding proof, certified shareholder identity documents and disability proof where applicable.
Sworn affidavit validity
The affidavit must record the deponent's identity and designation, enterprise name and address, ownership percentages, designated-group status, revenue, financial year-end, B-BBEE level and empowering-supplier status.
All fields must be completed.
The deponent and Commissioner of Oaths must sign on the same date.
The Commissioner of Oaths must be independent of the bidder.
CIDB and local content
An applicable CIDB CSDG mandatory percentage must be met; failure makes the bid non-responsive.
Applicable local production and content thresholds require full compliance; SBD 6.2 and Annex C are mandatory.
Where local content applies, the bidder must meet the purchaser's targets in full.
SDL&I commitments
A B-BBEE improvement or retention plan is due within 30 days after contract signature.
Level 4 bidders must reach Level 3 by the end of Year 1 and then improve by at least one level.
Level 5 to Level 8 or non-compliant bidders must reach Level 4 by the end of Year 1 and improve by at least one level each year from Year 2.
Level 1 bidders must maintain their status; Level 2 or Level 3 bidders must improve or maintain their status over the contract period.
Failure to meet SDL&I targets does not disqualify the bid, but the commitments remain contractual.
DocumentKUS-20260759 Kusile Power Station TES Coal Ash Limestone and Gypsum Mechanical Maintenance Services Rev 1 - Final Signed.pdfReview complete
Description
Source: KUS-20260759 Kusile Power Station TES Coal Ash Limestone and Gypsum Mechanical Maintenance Services Rev 1 - Final Signed.pdf
Mechanical maintenance services for the coal, ash, limestone and gypsum handling facilities at Kusile Power Station (Eskom), Mpumalanga, covering conveyor belt systems and associated equipment, for a 5-year contract.
Employer: Eskom, Kusile Power Station.
Advertised to the market through the Eskom Tender Bulletin.
Related scope document: Kusile Coal, Ash, Limestone and Gypsum Mechanical Maintenance Services (KUS-20251084).
Governing references: ISO 9001; National Environmental Management Waste Act; National Environment Management Act; Occupational Health and Safety & Regulations Act; Kusile Waste Management Work Instruction (240-105776552); National Key Points Act; SANS 1700 (fasteners); 32-726 (S.H.E. requirements for Eskom SCM); GGR 0992 (Plant Safety Regulations); GGS 0462 (Eskom engineering and construction quality).
Certified copies of qualifications and ID must be under 3 months old.
Signed QCPs/ITPs for previous similar work β 20%: one each for installation of gearbox, pulley, motor, winch and scraper.
Standard conveyor belt maintenance schedule β 10%: every mechanical activity listed with realistic, sequential start and completion dates showing logical flow.
Method statement for the full scope β 25%: comprehensive and above minimum = 25%; consistent with scope = 15%; poor/not reflective = 5%; no submission = 0%.
Disqualifying / unacceptable
Any exclusion of the employer's specified scope.
Alternative tenders are not accepted.
Failure to make a returnable available for compliance verification.
Deviations submitted without technical qualification (deviations with technical qualification may be accepted).
Technical Specifications
Source: KUS-20260759 Kusile Power Station TES Coal Ash Limestone and Gypsum Mechanical Maintenance Services Rev 1 - Final Signed.pdf (unknown)
Scope
Mechanical maintenance of the coal, ash, limestone and gypsum handling facilities at Kusile Power Station (Eskom), Mpumalanga.
Focus on conveyor belt systems and associated equipment within the bulk material handling plants.
Contract period: 5 years.
Advertised to the market through the Eskom Tender Bulletin.
Related scope reference: KUS-20251084.
Equipment/component coverage
Gearbox, pulley, motor, winch and scraper installations fall within the maintenance scope.
Planning deliverables
A standard maintenance schedule covering every mechanical maintenance activity, with sequential start and completion dates.
A method statement detailing execution of the full scope.
Applicable standards
ISO 9001 (quality management); ISO 3834 Part 2 (fusion welding); SANS 1700 (fasteners); GGS 0462 (Eskom engineering and construction quality).
Methodology
Source: KUS-20260759 Kusile Power Station TES Coal Ash Limestone and Gypsum Mechanical Maintenance Services Rev 1 - Final Signed.pdf
Required methodology deliverables
Method statement (25%): must describe how the entire scope will be executed; a comprehensive statement exceeding the minimum scores highest (25%), one consistent with the scope scores 15%, a poor statement scores 5%, and no submission scores 0%.
Maintenance schedule (10%): a standard conveyor belt maintenance schedule listing every mechanical maintenance activity with realistic, sequential start and completion dates that show a logical flow of work.
Experience & Qualifications
Source: KUS-20260759 Kusile Power Station TES Coal Ash Limestone and Gypsum Mechanical Maintenance Services Rev 1 - Final Signed.pdf
Experience and personnel
Minimum 5 years uninterrupted conveyor belt and associated equipment maintenance in coal, ash, limestone and gypsum (or equivalent bulk material handling) plants; contracts not older than 10 years, with completion certificates and verifiable references.
Technical support professional: ECSA-registered Pr Eng or Pr Tech Eng with at least 6 years' experience, available for the contract; provide CV, qualifications, valid ECSA certificate and appointment letter.
Site Supervisor x2: National Technical Diploma (NQF 6) Mechanical Engineering.
Artisans x8: trade-tested Fitters.
Certified copies of qualifications and identity documents must be under 3 months old.
Quality Management
Source: KUS-20260759 Kusile Power Station TES Coal Ash Limestone and Gypsum Mechanical Maintenance Services Rev 1 - Final Signed.pdf
Quality evidence and standards
Signed Quality Control Plans (QCPs) / Inspection Test Plans (ITPs) for previous similar work are scored (20%): one each for installation of gearbox, pulley, motor, winch and scraper.
Company must hold ISO 3834 Part 2 accreditation (fusion welding of metallic materials); a certified copy is required.
Work must align with ISO 9001 (quality management systems) and GGS 0462 (Eskom quality requirements for engineering and construction works in Generation).
Fasteners must comply with SANS 1700.
Compliance Requirements
Source: KUS-20260759 Kusile Power Station TES Coal Ash Limestone and Gypsum Mechanical Maintenance Services Rev 1 - Final Signed.pdf (unknown)
Mandatory (pass/fail) requirements β all must be met
Proven similar experience: minimum 5 years uninterrupted mechanical maintenance of conveyor belt systems and associated equipment in coal, ash, limestone and gypsum handling plants or equivalent bulk material handling facilities.
Evidence: contracts for the same scope with completion certificates and verifiable reference letters; contracts not older than 10 years.
Technical support resource: an ECSA-registered Professional Engineer (Pr Eng) or Professional Engineering Technologist (Pr Tech Eng) with at least 6 years' experience, available for the full contract.
Evidence: detailed CV, copies of qualifications, valid ECSA registration certificate, and an appointment letter confirming availability.
Company certification: ISO 3834 Part 2 accreditation (quality requirements for fusion welding of metallic materials).
Evidence: certified copy of the ISO 3834 certificate.
Certified copies of qualifications and identity documents must be no older than 3 months.
Health & Safety
Source: KUS-20260759 Kusile Power Station TES Coal Ash Limestone and Gypsum Mechanical Maintenance Services Rev 1 - Final Signed.pdf
Safety and SHE compliance
Contractor must comply with the Occupational Health and Safety & Regulations Act and the National Key Points Act.
Plant safety is governed by GGR 0992 (Plant Safety Regulations).
SHE obligations follow 32-726 (S.H.E. Requirements for the Eskom Procurement and Supply Chain Management Process).
Environmental
Source: KUS-20260759 Kusile Power Station TES Coal Ash Limestone and Gypsum Mechanical Maintenance Services Rev 1 - Final Signed.pdf
Environmental compliance
Work must comply with the National Environmental Management Waste Act and the National Environment Management Act.
Waste handling must follow the Kusile Power Station Waste Management Work Instruction (240-105776552).
DocumentSHE Specification Coal, Ash Limestone and Gypsum.pdfReview complete
Description
Source: SHE Specification Coal, Ash Limestone and Gypsum.pdf
OHS requirements purpose
Sets minimum health, safety, environmental and quality requirements for contractors working at Kusile Power Station for the contract duration.
The contractor must develop an OHS plan that meets these requirements and all applicable legislation.
Eskom does not assume the contractor's legal duties; the contractor remains accountable for its OHS programme and appointed contractors.
Requirements are minimum and not exhaustive; existing organisational OHS requirements must be incorporated, and additional Kusile or legislative requirements must be addressed.
Applicability
Applies to contracting organisations responding to Kusile Coal, Ash, Limestone and Compressor Plant Electrical Maintenance Services, BMH ERI C&I Maintenance Labour Service, and Coal, Ash, Limestone and Gypsum Mechanical Maintenance Services scopes.
Covers legislative, Eskom Kusile, local authority, municipal by-law and environmental requirements where applicable.
Contact Information
Source: SHE Specification Coal, Ash Limestone and Gypsum.pdf (unknown)
Contacts stated
Name: Thami Simelane
Role: Eskom Contract's Manager
Name: Mapuleng Kobo
Role: Eskom Health and Safety Manager
Name: Nhlanhla Mthembu
Role: Eskom Procurement Manager
Name: Nkhetheni Ramukosi
Role: Eskom Safety Officer
Project address
Kusile Power Station
R45 Kendal/Balmoral Road
Haartebeesfontein farm
Technical Specifications
Source: SHE Specification Coal, Ash Limestone and Gypsum.pdf (unknown)
Contract period
Five years.
Scope and location
Mechanical maintenance of conveyor plants at Kusile Power Station, R45 Kendal/Balmoral Road, Haartebeesfontein farm.
Work includes inspection, assessment and repair to original installed specifications, following the station maintenance strategy.
Equipment covered includes conveyor belting and mechanical components such as pulleys, magnets, idlers and moving heads; drive system; take-up system and winches; belt cleaners, including scrapers and belt washing systems; and transfer chute.
The OHS requirements also apply to related Kusile electrical and C&I maintenance labour scopes where contractors respond to those scopes.
The detailed scope is set out in the NEC contract, and the contractor must retain a copy.
Contractor OHS deliverables
The contractor must prepare an OHS plan that meets the requirements and applicable legislation for the contract duration.
The OHS plan must address legal compliance, risk assessments, safe work procedures and method statements, emergency preparedness, training, induction, inspections, incident reporting and OHS files.
The contractor remains legally responsible for the health and safety of its employees and appointed contractors; Eskom does not assume those responsibilities.
Standards and references
Compliance is required with the OHS Act and regulations, Basic Conditions of Employment Act, National Environmental Management Act, National Water Act, National Road Traffic Act, COID Act, Plant Safety Regulations, applicable SANS standards and ISO 45001:2018.
Relevant Eskom procedures include 32-136 Contractor Health and Safety Requirements, 32-520 Risk Assessment, 32-418 Working at Heights, 32-37 Substance Abuse, 32-95 Incident Management, 240-62196227 Life-saving Rules and 240-62946386 Vehicle and Driver Safety Management.
Experience & Qualifications
Source: SHE Specification Coal, Ash Limestone and Gypsum.pdf
Contractor competence
The main contractor and appointed contractors must have the appropriate qualifications and certificates for the work.
Employees must always be under competent supervision.
Quality Management
Source: SHE Specification Coal, Ash Limestone and Gypsum.pdf
Substance, vehicle and inspection controls
The allowable alcohol and drug level is 0%; contractors must follow Kusile substance abuse procedure 32-37, and site entrants may be tested ad hoc.
Contractor vehicles may be inspected, and vehicles that are not roadworthy may not be used on site.
Light delivery vehicles must keep at least 30 metres clear from machines when stopping or parking.
Inspection results must be documented and records kept for viewing.
Incident investigation reports, non-conformances, near miss/injury/damage announcements and follow-up on recommendations must be managed.
Financial Requirements
Source: SHE Specification Coal, Ash Limestone and Gypsum.pdf (unknown)
OHS costing
OHS costs must be itemised according to the project scope and included in the bill of quantities.
Cost items include safety training, PPE, safety equipment purchases, medical surveillance, occupational hygiene assessment and health risk assessment.
Compliance Requirements
Source: SHE Specification Coal, Ash Limestone and Gypsum.pdf (unknown)
Statutory and regulatory compliance
The contractor and appointed contractors must comply with the OHS Act and regulations, Basic Conditions of Employment Act, National Environmental Management Act, National Water Act, National Road Traffic Act, COID Act, SANS standards and applicable municipal or environmental legislation.
An up-to-date copy of the OHS Act and regulations must be available to all employees.
Child labour is prohibited; any permitted work not prohibited by the Constitution must follow the regulations on hazardous work by children.
Company OHS system
The contractor must have a SHEQ policy signed by the CEO or Section 16(2) appointee, displayed prominently, filed in the OHS files and annexed to the OHS plan; it must align with OHS Act Section 7 and ISO 45001:2018 Clause 5.2.
The contractor must provide an organogram on company letterhead showing responsibility levels from CEO to supervisors, signed by the 16(1) or 16(2) appointee, kept updated and filed.
Coid
The contractor and appointed contractors must be registered with the Compensation Commissioner and hold a valid Letter of Good Standing.
Renewal letters must be provided during the contract and copies filed in the OHS files.
Section 37(2) agreements
A Section 37(2) agreement must be signed between Eskom and the main contractor when the safety file is submitted.
The main contractor must also conclude Section 37(2) agreements with all appointed contractors, and copies must be kept in the OHS files.
Appointments and competence
Statutory appointments required: incident investigator under GAR 9(2); first aiders under GSR 3(4) with US 119567; Section 16(2) appointee; health and safety committee members under section 19(3); health and safety representatives under section 17; machinery supervisors under General Machinery Regulation 2(1); portable gas container inspectors under Pressure Equipment Regulations 11 and 12; and competent persons for stacking and storing under General Safety Regulation 8(a).
Non-statutory appointments required: site supervisor, risk assessor, safety officer, working at heights planner, hazardous chemical agent coordinator, fall protection planner, emergency planning coordinator, health and safety committee chairperson, fire equipment inspector and vehicle/mobile plant inspector.
Appointees must receive appropriate training before accepting appointments, and training records must be kept.
Site rules
Life-saving rules apply: isolate, test, earth, bond or insulate before touching plant above 1000 V; hook up at heights; buckle up; be sober; obtain a permit to work where required; ensure safe live working; and do not reverse without a spotter or flagman.
The allowable alcohol and drug level is 0%; contractors must follow Kusile substance abuse procedure 32-37, and site entrants may be subject to ad hoc testing.
Life-saving rules must be included in induction, and employees must sign the life-saving rule pledge before work starts.
Risk assessments, method statements, incident investigations, medical fitness certificates, induction records, training records and OHS files are required.
Environmental
Source: SHE Specification Coal, Ash Limestone and Gypsum.pdf
Site establishment and training controls
The contractor must comply with Facilities Regulations, SANS 10400 and CR 30 for non-construction work.
A site establishment walkdown must be conducted before the contractor starts, records retained for audit, and actions tracked and closed by the contracts manager.
Each site must have a layout plan, fencing or physical demarcation, signage with company details, visitor directions and required PPE, and vegetation must be maintained.
Health and safety committee minutes must be kept: statutory minutes for the project duration or at least 3 years; non-statutory minutes for the project duration or at least 12 months; other OHS meeting minutes for at least 12 months.
Minutes must be signed by the chairperson and endorsed by the relevant project manager and main contractor within 14 calendar days.
Pre-job meetings and toolbox talks are required before work, with topics and attendance registers kept.
OHS induction is required before site access; visitors must be inducted and hosted; pre-employment medical fitness is required; training records must be kept.
Contractual Terms
Source: SHE Specification Coal, Ash Limestone and Gypsum.pdf
Statutory appointments required under the contract
Incident investigator trained under OHS Act General Administrative Regulation 9(2).
First aiders with first aid US 119567 under General Safety Regulation 3(4).
Section 16(2) appointee trained in legal liability and the OHS Act.
Health and safety committee members under section 19(3).
Health and safety representatives under section 17.
Supervision of machinery under General Machinery Regulation 2(1).
Portable gas container inspectors under Pressure Equipment Regulations 11 and 12.
Competent person for stacking and storing under General Safety Regulation 8(a).
Non-statutory appointments include site supervisor, risk assessor, safety officer, working at heights planner, hazardous chemical agent coordinator, fall protection planner, emergency planning coordinator, committee chairperson, fire equipment inspector and vehicle/mobile plant inspector.
Section
Source: SHE Specification Coal, Ash Limestone and Gypsum.pdf
OHS file evaluation before work
The signed Section 37(2) agreement must be placed in the OHS file for evaluation before work starts.
Eskom OHS department issues the agreement to the project manager or end user, who arranges signature by Eskom and contractor representatives.
DocumentE-tendering Help Manual for supplier - 27 January 2025.pdfReview complete
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)
Submission channel
Bids must be uploaded through the eTendering system rather than delivered physically.
Access is available at https://eTendering.eskom.co.za or through the eTendering link on https://tenderbulletin.eskom.co.za.
Upload requirements
Each file must be given a name and assigned to the correct category, such as Technical, Commercial or Finance.
A single file must not exceed 50 MB.
The total size of all uploaded files must not exceed 900 MB.
Finalisation
The bidder must review the uploaded documents and complete the finalisation steps.
The confirmation email containing the submission ID should be retained for future enquiries.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)
Scope
Mechanical maintenance services for coal, ash, limestone and gypsum facilities at Kusile Power Station.
Service period: five years.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)
Access requirements
A valid CSD number is required to access the eTendering system.
Suppliers must register before submitting.
Registration requires email verification and a one-time pin sent to the registered cellphone and email address.
Contact numbers must include the international prefix, for example +27.
Eskom Holdings SOC Ltd is the disclosing party; the bidder is the receiving party.
The purpose is to exchange confidential information for the PJFF and smokestack maintenance project.
The agreement does not commit either party to continue discussions or enter into a business relationship.
Confidential information
Covers technical, commercial, financial, marketing, operational and project-related information disclosed by Eskom.
Information remains Eskom's property and gives the bidder no ownership or licence rights.
Use and disclosure
The bidder may use the information only for the project and under the agreement.
Disclosure to employees, advisers or other representatives is allowed only on a need-to-know basis and if they are bound by confidentiality.
Any other disclosure or use requires Eskom's prior written consent.
Care and return
The bidder must protect the information with at least reasonable care.
On Eskom's request, the bidder must return or permanently destroy the information within 7 business days and provide written confirmation.
Exclusions
Obligations do not apply to information already known, publicly available, independently developed, lawfully received from a third party, or disclosed under prior written approval.
If disclosure is required by law or court order, the bidder must notify Eskom and disclose only the legally required portion.
Term
The agreement starts on signature or first disclosure, whichever is earlier.
It continues for 3 years after the relationship ends, unless a later agreement specifies otherwise.
Breach and remedies
A breach must be remedied within 7 business days of written notice.
If not remedied, Eskom may seek urgent relief, damages or other legal remedies.
Liability
The bidder indemnifies Eskom for losses caused by unauthorised use or disclosure.
Eskom warrants that its disclosure will not breach another agreement or infringe third-party rights and indemnifies the bidder for related third-party claims.
Assignment and publicity
Neither party may assign rights or obligations without written consent.
Eskom may cede or delegate to subsidiaries, divisions or restructuring entities.
Neither party may make public announcements about the agreement without written consent.
Notices and general
Notices are sent to the chosen domicilium addresses; address changes require 30 business days' written notice.
Amendments must be written and signed by both parties.
The agreement is governed by South African law and does not create a partnership, joint venture or employment relationship.
Occupational Health and Safety Baseline Risk Assessment for Kusile Power Station, template revision 5, revision date 30 April 2025.
Review cycle: every two years.
Assessment method set by Eskom risk assessment procedure 32-520.
Rating method
Consequence scored 1 to 5; likelihood scored A to E; the combination gives a risk class of I to V.
Control effectiveness is rated from A (fully effective) through to E.
Each line records the activity, the hazard, the risk type, the possible consequence, the existing controls, the control owner and the applicable legal requirement.
Controls are grouped as elimination, substitution, engineering, administrative and PPE.
Principal hazards by activity
Dust from fly ash, coal and ash: respiratory disease, silicosis, eye irritation and reduced visibility.
Conveyors, rotating equipment, locking pins and moving machinery: entanglement, nip and pinch points, struck-by injuries.
Elevated positions, restricted workspaces, confined spaces, overhead and protruding structures.
Noise from machinery and trucks: noise-induced hearing loss.
Hand-arm vibration from vibrating tools and equipment.
Hazardous chemicals: chlorine and ammonia gas, biocides, antiscalant, caustic, corrosive and flammable liquids, hot surfaces.
Biological agents and waterborne pathogens at sewage, effluent and water treatment systems; drowning risk at dams and water systems.
Mobile plant and vehicles: collisions, overturning, run-overs, machine sinking on wet ash, poor visibility.
Manual handling and ergonomics: muscle strain, back trauma, musculoskeletal disorders.
Slips, trips and falls on slippery, uneven or obstructed surfaces.
Heat stress, cold stress, fatigue and psychosocial stress.
Snake, animal and insect bites while moving around the plant and ash dump.
Controls required
Task-specific PPE: dust masks, hearing protection, goggles, gloves, safety boots, full body harness, reflector jackets, acid-resistant overalls and face protection.
Permit to work, isolation and LAR system; barricading and warning signs.
Medical surveillance, periodic screening, annual medicals and eye tests under procedure 32-285.
Dust suppression at intervals, vehicle lights on, designated driving routes and traffic management.
Emergency medical response, emergency equipment and rinse facilities for chemical exposure.
Employee assistance programme and counselling for work-related stress.
Accountability
Every risk line carries a named responsible manager as control owner.
DocumentOHS SPEC ASH LIMESTONE.pdfReview complete
Description
Source: OHS SPEC ASH LIMESTONE.pdf
Purpose and application
Sets minimum occupational health and safety requirements for contractors providing coal, ash, limestone and gypsum mechanical maintenance services at Kusile Power Station.
Applies to any contracting organisation intending to tender for or enter into the scope of work.
The contractor must develop an OHS plan that meets the specification and relevant legislation.
Eskom does not assume the contractor's legal responsibilities; the contractor remains accountable for its OHS programme.
The specification is not all-encompassing; existing organisational requirements and additional Eskom or legislative requirements must be included.
Contact Information
Source: OHS SPEC ASH LIMESTONE.pdf (unknown)
Contacts
Contract's Manager: Thami Simelane
Health and Safety Manager: Mapuleng Kobo
Procurement Manager: Matshidiso Kgafane
Safety Officer: Nkhetheni Ramukosi
Project address
Kusile Power Station
R45 Kendal / Balmoral Road
Haartebeesfontein farm
Technical Specifications
Source: OHS SPEC ASH LIMESTONE.pdf (unknown)
Scope
Mechanical maintenance services for coal, ash, limestone and gypsum handling at Kusile Power Station.
Work covers inspection, assessment and repair of conveyor plant equipment to original installed specifications and the station maintenance strategy.
Equipment includes conveyor belting and mechanical components such as pulleys, magnets, idlers and moving heads; drive and take-up systems; moving-head winches; belt cleaners including scrapers and belt-washing systems; and transfer chutes.
Detailed scope is in the NEC contract; the contractor must keep a copy.
The successful bidder becomes the main contractor; any subcontractor is an appointed contractor.
OHS plan and accountability
The contractor must prepare an OHS plan that meets this specification and all applicable legislation.
The specification sets minimum requirements and is not exhaustive.
Existing organisational OHS requirements must be incorporated; additional Eskom and legislative requirements must also be addressed.
The contractor remains legally responsible for the quality and execution of its health and safety programme.
Legal and SHEQ compliance
A Section 37(2) agreement must be signed between Eskom and the main contractor when the safety file is submitted.
The main contractor must also put Section 37(2) agreements in place with all appointed contractors.
Originals are retained by the contractor; copies go to the responsible project manager/end user and the OHS file.
Child labour is prohibited.
The main contractor and appointed contractors must comply with the Constitution, OHS Act and regulations, National Environmental Management Act, Environment Conservation Act, National Water Act, National Road Traffic Act, Compensation for Occupational Injuries and Diseases Act, applicable SANS standards and Eskom OHS requirements.
A SHEQ policy signed by the CE or delegated 16(2) appointee must be compiled, displayed, filed in the OHS file and annexed to the OHS plan, in line with OHS Act section 7 and ISO 45001:2018 clause 5.2.
COID and statutory appointments
The main contractor and appointed contractors must be registered with the Compensation Commissioner and hold a valid Letter of Good Standing, kept valid throughout the contract.
Statutory appointments must include, as applicable: incident investigator; first aiders; 16.2 appointee; health and safety committee member; health and safety representative; machinery supervisor; portable gas container inspector; and competent person for stacking and storage.
Non-statutory appointments include site supervisor, risk assessor, safety officer, working-at-heights planner, hazardous chemical agent co-ordinator, fall protection planner, emergency planning co-ordinator, health and safety committee chairperson, fire equipment inspector and vehicle/mobile plant inspector.
Appointees must be trained before accepting appointments.
Life-saving rules and substance abuse
Eskom life-saving rules apply to all contractor work on site.
Rules cover: isolate/test/earth/bond/insulate before touching plant above 1000 V; hook up at heights; wear seat belts; be sober; obtain required permits; ensure safe live working; and no reversing without a spotter/flagman.
Breach is serious misconduct and may lead to dismissal.
Alcohol and drug level is 0%; ad hoc testing may occur; contractors must follow Eskom procedure 32-37 and include the rules in induction; employees must sign the life-saving pledge before work.
Organisation and responsibilities
The main contractor must provide an organogram on company letterhead showing responsibility from CE to supervisors, signed by the 16(1) or 16(2) appointee; appointed contractors must provide equivalent organograms.
Contractors must keep records of employees, inductions, skills and licences; ensure appointees understand duties; comply with legislation and Eskom OHS requirements; cooperate with Eskom project managers; compile OHS files for each site; provide COID letters; appoint competent staff; coordinate appointed contractors; ensure safety costs are included; stop unsafe work; assess appointed contractors' OHS files; appoint full-time competent supervisors; avoid supervising other sites; not victimise employees for raising safety issues; and apply disciplinary action for breaches.
OHS plan content
The OHS plan must address risk assessments, safe work procedures/method statements, roof work, fire equipment, flammable/combustible liquids and hazardous chemicals, first aid, OHS communication, toolbox talks/pre-job meetings, OHS training, site establishment, site roads, vehicle management, housekeeping, stacking/storage, signage/colour coding, tools/equipment, ladders, scaffolding, auditing, smoking, cellular phones, occupational health/hygiene/rehabilitation, working at heights, PPE, confined spaces, incident investigation, emergency management, non-conformance/compliance, OHS files, work stoppage, hours of work, barricading and contractor performance monitoring.
OHS costs must be itemised in the BOQ, including safety training, PPE, safety equipment, medical surveillance, occupational hygiene assessment and health risk assessment.
The main contractor must provide an OHS training breakdown and costing with its bid; appointed contractors must do the same when bidding with the main contractor.
Employees must receive induction before site access; visitors must receive site-specific induction and remain with an inducted host.
Training records, medical fitness certificates, induction registers and toolbox talk registers must be kept in the OHS file.
Experience & Qualifications
Source: OHS SPEC ASH LIMESTONE.pdf
Experience and qualifications
The main contractor and appointed contractors must have appropriate qualifications and certificates for the work.
Employees must work under competent supervision.
Appointees must receive required training before accepting appointments.
Training and qualification records must be kept in the OHS file.
Contractors must demonstrate competence and resources to perform work safely before appointment.
Quality Management
Source: OHS SPEC ASH LIMESTONE.pdf
Quality and assurance
The contractor must maintain a SHEQ policy aligned with ISO 45001:2018 and OHS Act section 7.
OHS records, inspection results and training records must be documented and kept available for review.
Inspections must be documented and records maintained.
Non-conformances, corrective actions, audits and inspection schedules must be managed through the OHS file.
Training must be unit-standard based and certified by QCTO/SETA accredited and DoEL approved providers.
First aid training must include US 120496 and US 376480 where applicable.
Vehicles must be roadworthy and subject to inspection; light vehicles must keep at least 30 metres clear from machines.
Pricing Schedule
Source: OHS SPEC ASH LIMESTONE.pdf
Pricing schedule requirements
OHS costs must be itemised in the bill of quantities.
Cost items include safety training, PPE, safety equipment, medical surveillance, occupational hygiene assessment and health risk assessment.
The main contractor must provide an OHS training breakdown and costing with its bid.
Appointed contractors must provide equivalent training breakdowns and costing when bidding with the main contractor.
Financial Requirements
Source: OHS SPEC ASH LIMESTONE.pdf (unknown)
Pricing and OHS costs
OHS costs must be itemised in the bill of quantities.
Items include safety training, PPE, safety equipment purchases, medical surveillance, occupational hygiene assessment and health risk assessment.
The main contractor must submit a breakdown and costing of OHS training requirements with its bid.
Appointed contractors must provide the same training breakdown and costing when bidding with the main contractor.
Compliance Requirements
Source: OHS SPEC ASH LIMESTONE.pdf (unknown)
Compliance requirements
B-BBEE minimum level: 1.
COID: registration with the Compensation Commissioner and a valid Letter of Good Standing before work starts; renewals must be provided.
Section 37(2): signed agreement with Eskom and all appointed contractors; copies kept in OHS files.
OHS Act: compliance with the Act and regulations; up-to-date copy available to employees.
SHEQ policy: signed by CE or 16(2) appointee, displayed, filed and annexed to OHS plan; aligned to OHS Act section 7 and ISO 45001:2018.
Statutory appointments: competent, trained appointees for incident investigation, first aid, 16.2, health and safety committee/representative, machinery, pressure equipment and stacking/storage.
Organogram: signed by 16(1) or 16(2) appointee and kept updated.
Life-saving rules and substance abuse: zero tolerance; 0% alcohol/drug level; pledge signed before work.
Legislation: Constitution, OHS Act, NEMA, Environment Conservation Act, National Water Act, National Road Traffic Act, COIDA, SANS standards and Eskom procedures.
Child labour: prohibited.
OHS file: must be maintained for each site with required records.
Health & Safety
Source: OHS SPEC ASH LIMESTONE.pdf
Health and safety requirements
The contractor must implement an OHS plan covering risk assessments, method statements, permits, PPE, working at heights, confined spaces, hazardous chemicals, fire equipment, first aid, emergency preparedness, incident investigation and emergency management.
Statutory appointments and competent supervision are required.
A valid COID Letter of Good Standing must be maintained.
Life-saving rules and substance abuse controls apply; alcohol and drug level is 0%.
Toolbox talks and pre-job meetings must be held and attendance recorded.
Induction and medical fitness are required before site access.
OHS files must be maintained and available for audit.
Environmental
Source: OHS SPEC ASH LIMESTONE.pdf
Environmental obligations
Contractors must comply with the National Environmental Management Act, Environment Conservation Act, National Water Act and applicable environmental legislation.
The contractor must take reasonable measures to prevent, minimise or rectify pollution or environmental degradation.
Work must be stopped if there is a threat to health and safety or risk of environmental degradation.
Environmental requirements must be addressed in the OHS plan where applicable.
Contractual Terms
Source: OHS SPEC ASH LIMESTONE.pdf
Contractual OHS obligations
Contract period: five years.
The main contractor must sign a Section 37(2) agreement with Eskom when submitting the safety file.
The main contractor must ensure appointed contractors also sign Section 37(2) agreements.
The contractor must retain originals; copies must be held by the project manager or end user and included in OHS files.
The contractor remains accountable for health and safety performance for its employees and appointed contractor employees.
Section
Source: OHS SPEC ASH LIMESTONE.pdf
OHS compliance evaluation
The OHS file must be evaluated before work starts.
The OHS department issues the Section 37(2) agreement to the project manager or end user for signature by Eskom and contractor representatives.
An appointed subcontractor's safety file must be submitted with the main contractor's evaluation report for verification before an authorisation letter is issued.
Document240-77471651 Annexure C 1 (3) High risk tender 2026.docxReview complete
Submission Guidelines
Source: 240-77471651 Annexure C 1 (3) High risk tender 2026.docx (unknown)
Returnable OHS documents β submit with the bid for evaluation before contract award:
Annexure B: signed acknowledgement of Eskom's OHS legal and other requirements.
Health and Safety Plan: must address the OHS risks of the project/scope and align with the health and safety specification or requirements.
OHS costing: detailed cost breakdown, not a lump sum, based on the overall scope of work.
Baseline OHS Risk Assessment: identifies, assesses and manages OHS risks for the scope; include the assessment methodology.
Letter of Good Standing: valid COIDA letter or equivalent.
OHS policy: signed by the CEO and compliant with section 7 of the Occupational Health and Safety Act.
OHS competency evidence: CVs, qualifications/certificates and a list of competencies required for the scope.
Evaluation Criteria
Source: 240-77471651 Annexure C 1 (3) High risk tender 2026.docx (unknown)
Evaluation basis β OHS tender returnables:
Bidders are assessed on the listed OHS returnables.
Outcome: Recommended or Not Recommended.
No scoring split, minimum qualifying score, preference point system or price/functionality weighting is stated.
Technical Specifications
Source: 240-77471651 Annexure C 1 (3) High risk tender 2026.docx (unknown)
Scope β mechanical maintenance services for coal, ash, limestone and gypsum facilities at Kusile Power Station for five years.
OHS requirements:
OHS controls must address the risks of the project/scope.
Explanatory notes for listed OHS items are in Annexure A: Supplier Risk Category.
The Health and Safety Plan, Baseline OHS Risk Assessment and OHS costing must be based on the overall scope of work.
Required OHS competencies must be identified according to the scope, risks and OHS plan.
Financial Requirements
Source: 240-77471651 Annexure C 1 (3) High risk tender 2026.docx (unknown)
OHS pricing requirement:
Submit detailed costing for health and safety management.
Costs must be itemised, not presented as a lump sum.
Costing must cover the overall scope of work/service.
The scope of work and risk assessment may guide the costing.
Compliance Requirements
Source: 240-77471651 Annexure C 1 (3) High risk tender 2026.docx (unknown)
OHS compliance requirements:
Signed Annexure B acknowledging Eskom's OHS legal and other requirements.
Valid COIDA Letter of Good Standing or equivalent.
OHS policy signed by the CEO and compliant with section 7 of the Occupational Health and Safety Act.
OHS competency evidence: CVs, qualifications/certificates and required competencies.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Kusile Power Station - Witbank - Kusile Power Station -
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
21
Last checked
21 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.