TRANSNET pipelines seeks an engineering consultant to provide strategic planning and project support for the rollout of renewable energy (solar pv) across its pipeline sites for a three‑year period. The service covers design, procurement, construction, commissioning and handover phases. Bidders must attend a compulsory clarification meeting on 1 october 2026 and submit a signed attendance certificate; failure to attend results in disqualification. The most consequential consideration is achieving at least 70 points in the technical/functional evaluation, which gates eligibility for the 80/20 price and b‑bbee scoring.
Closing date and time: 16 October 2026 at 16h00 via Transnet e‑Tender Submission Portal; late submissions not accepted.
Compulsory briefing: Attendance required on 1 October 2026 at 11:00 at Jameson Park Depot; signed certificate T2.2‑01 must be submitted with the bid.
Returnable documents: T2.2‑01 attendance certificate; T2.2‑02 professional registration certificates for Electrical Engineer (ECSA Pr.Eng), Structural Engineer (ECSA Pr.Eng), Project Manager (SACPCMP PrCPM), Safety Manager (SACPCMP CHSM); T2.2‑03 Management & CVs; T2.2‑04 Method Statement; T2.2‑05 Programme; T2.2‑06 Previous Experience; CSD registration proof; SARS TCS PIN; valid B‑BBEE certificate or sworn affidavit; Compulsory Enterprise Questionnaire; Form of Offer and Acceptance; Pricing Schedule.
Professional registration: Key personnel must be professionally registered as Electrical Engineer (ECSA Pr.Eng), Structural Engineer (ECSA Pr.Eng), Project Manager (SACPCMP PrCPM) and Safety Manager (SACPCMP CHSM).
B‑BBEE evidence: Valid SANAS‑accredited B‑BBEE certificate or sworn affidavit confirming turnover and black ownership; for joint ventures a consolidated scorecard per DTIC guidelines.
Functionality threshold: Minimum qualifying score of 70/100 in the technical/functional evaluation; failure to meet this threshold disqualifies the bid irrespective of price.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Friday, 16 October 2026 - 16:00
Venue
null
Request for Bid(Open-Tender)
Various Sites - Durban - Transnet Pipelines - 4001
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Professional Engineering Technologist (Pr.Tech Eng), CESA Membership
AI Document Analysis Stages
Important Dates
Source: TPL202609061311281RFP Solar PV TPL Sites Tender Document.pdf (RFP)16 Sept
2026
Tender Published
Tender was published
16 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Market Analysis Template End - User Input.pdf
Analysis completed but response format was invalid
Technical Evaluation Sheet Version 2.pdf
Transnet Pipelines requires an engineering consultant for strategic planning and project support for its renewable energy rollout over a three-year period. The consultant must provide key personnel including electrical and structural engineers, a project manager, and a safety manager, and demonstrate relevant experience on similar projects.
TPL Business Case Various Sites Solar PV Project - May 2026.pdf
Transnet Pipelines requires an engineering consultant for strategic planning and project support for a three-year renewable energy rollout, covering the installation of grid-tied solar PV systems at 12 operational sites. The consultant will act as EPCM, managing feasibility studies, design, procurement, and oversight of EPC contractors.
EPCM_SCOPE_OF_SERVICES-Version_4.pdf
Transnet Pipelines seeks an engineering consultant for strategic planning and project support for its renewable energy rollout, covering solar PV systems at 12 depot sites over a 3-year period. The consultant will provide EPCM-type services including feasibility studies, conceptual design, procurement support, construction supervision, commissioning, and handover, while the contractor handles detailed design and construction.
Eligibility Critea.pdf
Transnet Pipelines requires an engineering consultant and management services provider to support the design, procurement, construction, commissioning, and handover phases of a solar PV renewable energy project at various sites, for a period of three years.
TPPP MA DOC- 07 AUG 2026.pdf
Provision of Engineering, Procurement, and Construction Management (EPCM) services to support Transnet Pipelines (TPL) in the design, procurement, construction, commissioning, and handover of solar PV renewable energy projects across 12 TPL sites over a three-year period, aligned with TPL's Net Zero initiative.
Technical Evaluation Sheet - Solar PV.xlsx
Transnet Pipelines requires an engineering consultant for strategic planning and project support for its renewable energy rollout over three years. The consultant will provide project management, electrical and structural engineering, and safety management services, including oversight of solar PV installations with battery storage across multiple sites.
4. Part C2 - Pricing Data -Rev 02.pdf
Provision of professional engineering consultancy services for strategic planning and project support for Transnet Pipelines' renewable energy rollout over a 3-year period, under an NEC3 Professional Services Contract (Option G, term service). The consultant will manage project planning, feasibility studies, procurement support, construction supervision, quality management, HSE compliance, and commissioning oversight, with payment based on time charges and lump sums per the Task Schedule.
Technical_Evaluation_Sheet_Version_2.pdf
Transnet Pipelines is procuring professional engineering consulting services for a three-year renewable energy rollout programme in KwaZulu-Natal. The consultant will provide strategic planning and project support, with key personnel holding professional registrations and experience on solar PV systems above 85 kWp.
Annexure 4 - Programme - Updated.pdf
Transnet Pipelines seeks a professional engineering consultant for strategic planning and project support for its renewable energy rollout over a three-year period. The tender requires a detailed Level 4 programme in Primavera P6 or MS Project format, demonstrating alignment with the works information and scoring 15 points under the technical evaluation.
BSC Resolution- Solar PV Energy various sites - 20 August 2026.pdf
Transnet Pipelines requires an engineering consultant to provide strategic planning and project support for a renewable energy rollout, covering the design, procurement, construction, commissioning and handover of solar PV projects at 12 Transnet Pipelines sites, for a period of three years.
BSC minutes - 20 August 2026 Solar PV Renewable Energy Rollout.pdf
Transnet Pipelines requires an engineering consultant for strategic planning and project support for its renewable energy rollout over three years, covering design, procurement, construction, commissioning and handover of solar PV projects at 12 sites.
TPPP Market Analysis - Rev 2.pdf
Provision of Engineering, Procurement, and Construction Management (EPCM) services to support Transnet Pipelines (TPL) in the design, procurement, construction, commissioning, and handover of solar PV renewable energy projects across 12 TPL sites over a three-year period, aligned with TPL's Net Zero initiative.
Technical Evaluation Sheet - Solar PV.xlsx
Transnet Pipelines requires an engineering consultant for strategic planning and project support for its renewable energy rollout over three years. The consultant will provide project management, electrical and structural engineering, and safety management services, including oversight of solar PV installations with battery storage across multiple sites.
4._Part_C2_-_Pricing_Data_-Rev_02.pdf
Provision of professional engineering consultancy services for strategic planning and project support for Transnet Pipelines' renewable energy rollout over a 3-year period, under an NEC3 Professional Services Contract (Option G, term service). The consultant will manage project planning, feasibility and concept design, procurement support, construction management, quality management, health/safety/environment compliance, and commissioning oversight.
EPCM SCOPE OF SERVICES-Version 4.pdf
Transnet Pipelines (TPL) requires an engineering consultant to provide strategic planning and project support for the rollout of solar PV renewable energy systems at 12 depot sites across South Africa, over a 3-year period. The consultant will act as the Employer's technical representative and NEC Supervisor, delivering feasibility studies, conceptual designs, procurement support, construction supervision, commissioning oversight, and handover coordination, while the contractor handles detailed design and construction.
Annexure 5 - Method Statement.pdf
Transnet Pipelines seeks an engineering consultant to provide EPCM services for the rollout of solar PV installations across multiple sites over a three-year period. The successful bidder will manage contractors, ensure compliance with technical and statutory requirements, integrate SHE and quality management, and handle risk, stakeholder engagement, documentation, and concept designs. The method statement, weighted at 20 points, must address six minimum requirements and not exceed 15 pages.
Strategic Procurement Plan Final Version 07-09-2026.pdf
Transnet Pipelines (TPL) seeks to appoint a single engineering consultant for strategic planning and project support for its Solar PV renewable energy rollout across multiple sites for a 36-month period. The consultant will provide technical, management, and execution support, including site assessments, system design, regulatory compliance, project execution planning, and performance monitoring, to support TPL's Net Zero Carbon Emissions strategy.
Annexure 3 - Company Experience.pdf
Transnet Pipelines requires an engineering consultant for strategic planning and project support for its renewable energy rollout over a three-year period. The consultant must demonstrate previous experience in at least two completed solar PV projects with battery storage, each exceeding 85 kWp, and provide detailed references.
Advice to Procurement - EPCM Solar PV Renewable.pdf
Transnet Pipelines requires an engineering consultant to provide professional services in strategic planning and project support for its renewable energy rollout, covering the design, procurement, construction, commissioning, and handover phases of Solar PV projects at various sites, under a 36-month NEC Professional Services Contract (PSC) with an approved budget of R16,730,000 excl. VAT.
T1.2 Construction Procurement Tender Data.pdf
Transnet Pipelines requires professional engineering consultancy services for strategic planning and project support for its renewable energy rollout over a three-year period. The contract covers services such as electrical and structural engineering, project management, and safety management, with a focus on solar PV installations above 85 kWp. Bidders must attend a compulsory clarification meeting and meet strict pre-qualification criteria, including professional registration of key personnel, before being evaluated on functionality, price, and specific goals.
T1.1 Construction Procurement Tender Notice AIA.pdf
Transnet Pipelines requires an engineering consultant for strategic planning and project support for its renewable energy rollout over a three-year period. The consultant will provide professional services to support the planning and implementation of renewable energy projects across Transnet Pipelines' operations.
Annexure 2 - Key People Qualification and Experience.pdf
Transnet Pipelines requires an engineering consultant for strategic planning and project support for its renewable energy rollout over a three-year period, covering solar PV system design, structural assessment, project management, and safety oversight. The contract will be awarded based on the qualifications and experience of key personnel, with a 35% weighting for management and CVs.
TPL202609061311281RFP Solar PV TPL Sites Tender Document.pdf
Transnet Pipelines requires an engineering consultant for strategic planning and project support for its renewable energy rollout over three years. The consultant will support the design, procurement, construction, commissioning, and handover phases of solar PV projects at various sites. The contract follows a multi-stage evaluation with mandatory briefing attendance, professional registration of key personnel, a 70-point functionality threshold, and an 80/20 preference point system.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
TransnetSecure Transnet tenders using AI Matching & Recommendations, logistics infrastructure intelligence, compliance analysis, and application support for rail, ports, and pipelines.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 4 857 393
Range
Based on 8 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Compulsory Tender Clarification Meeting: 1 October 2026 at 11:00
Venue: Jameson Park Depot, off R42 & Poortjie Rd (to Nigel), Heidelberg (Coordinates: S 26°28'0.07" E 28°25'38.68")
Duration: ±2 hours
Attendance mandatory; certificate T2.2-01 must be signed by Employer's representative
Non-Compulsory Briefing: 2 October 2026 at 12:00
Venue: Langlaagte, 46 Main Reef Rd, Industria, Langlaagte (Coordinates: S 26°12'17.7" E 27°58'31.0")
Duration: ±2 hours
Tender Closing: 16 October 2026 at 16h00
Tender Validity Period: 180 days after closing date (may be extended on same terms)
Site visit/walk conducted during compulsory meeting; PPE required (safety shoes, goggles, long sleeves, high-visibility vest, hard hat); breathalyser testing at access; no firearms; ID documents required
Contact Information
Source: TPL202609061311281RFP Solar PV TPL Sites Tender Document.pdf (RFP)Employer's Agent (Commodity Manager): Jabulani Ngonyama
Email: [email protected]
Telephone: 031 361 2238
Address: 202 Anton Lembede
Document marking attention: Mandlenkosi Mjoli
Fraud/Corruption Reporting: TIP-OFFS ANONYMOUS 0800 003 056 or [email protected]
Submission Portal: https://esupplierportal.transnet.net/portal/advertisedTenders
Tender Download: www.etenders.gov.za or https://esupplierportal.transnet.net/portal/advertisedTenders (use Google Chrome)
Submission Guidelines
Source: TPL202609061311281RFP Solar PV TPL Sites Tender Document.pdf (RFP)Submission method: Electronic only via Transnet e-Tender Submission Portal
Submission portal: https://esupplierportal.transnet.net/portal/advertisedTenders (also referenced as https://transnetetenders.azurewebsites.net)
Closing time: 16 October 2026 at 16h00
Late submissions: Not accepted under any circumstances
Upload limits: 30 MB per upload; multiple uploads permitted
Recommended: Upload at least one day before closing to avoid technical issues
Returnable documents (all must be completed, signed and submitted):
Disqualification risks: Non-attendance at compulsory briefing; any returnable form unsigned or omitted; submission after closing time; failure to meet professional registration requirements; functionality score below 70 points
Evaluation Criteria
Source: TPL202609061311281RFP Solar PV TPL Sites Tender Document.pdf (RFP)Evaluation follows a 7-step process:
Step 1 - Administrative Responsiveness: On-time submission; all returnable documents completed and returned; validity of returnables verified; bid signed by authorised respondent. Must pass to proceed.
Step 2 - Substantive Responsiveness: General pre-qualification criteria met; priced offer included; material compliance with scope; compulsory clarification meeting attended; professional registrations for all four key personnel verified. Must pass to proceed.
Step 3 - Technical/Functional Evaluation (minimum qualifying score: 70/100):
Electrical Engineer (PrEng): 10 points (scored on years relevant experience: 7+ years = 100%)
Structural Engineer (PrEng): 10 points (7+ years = 100%)
Project Manager (PrCPM): 10 points (NEC3 and renewable energy experience required)
Safety Manager (CHSM): 5 points
Step 4 - Price and Specific Goals (80/20 preference point system):
B-BBEE Level 1 or 2: 10 points
Qualifying Black Women Owned Entities (30% ownership): 10 points
Non-compliant or B-BBEE Level 3-8: 0 points
Step 5 - Objective Criteria (due diligence: restrictions, financial standing, legal capacity, conflicts, commercial risk)
Step 6 - Post Tender Negotiations (sequential with highest ranked bidder first)
Step 7 - Award and Contract Conclusion
Functionality scored by minimum 3 evaluators, averaged per CIDB Practice Note #9
Technical Specifications
Source: TPL202609061311281RFP Solar PV TPL Sites Tender Document.pdf (RFP)Scope: Professional engineering consultant services for strategic planning and project support for Transnet Pipelines' renewable energy rollout (Solar PV) at various sites for 3 years
Phases covered: Design, procurement, construction, commissioning, handover
Key Personnel (mandatory professional registrations):
Company Experience: Minimum 2 projects >85 kWp for any score; 6+ projects for maximum 20 points
Deliverables: Detailed organogram; certified qualifications and registration certificates (certified within 3 months); comprehensive CVs with roles, responsibilities, recent assignments, education, training (including NEC3), professional memberships
Method Statement and Programme required
Site access requirements: PPE mandatory; breathalyser testing; ID documents; no firearms
Financial Requirements
Source: TPL202609061311281RFP Solar PV TPL Sites Tender Document.pdf (RFP)Tender validity: 180 days after closing date (16 October 2026); may be extended on same terms if evaluation not finalised
Pricing format: Pricing Schedule (C2.2) with Pricing Instructions (C2.1)
No bid security, performance bond, guarantee or retention percentages specified in document
Payment terms not specified in extracted text
Financial capacity: Transnet reserves right to request audited financial statements for due diligence
No minimum annual turnover threshold stated
Price evaluation: 80 points under 80/20 system (applicable where responsive tenders ≤ R50 million inclusive of VAT)
Compliance Requirements
Source: TPL202609061311281RFP Solar PV TPL Sites Tender Document.pdf (RFP)Mandatory compliance:
Electrical Engineer: ECSA Pr.Eng
Structural Engineer: ECSA Pr.Eng
Project Manager: SACPCMP PrCPM
Safety Manager: SACPCMP CHSM
CIDB grading: Not specified (professional services, not construction works)
Local content: Not specified
Description
Source: T1.1 Construction Procurement Tender Notice AIA.pdfProvision of professional services for an engineering consultant in strategic planning and project support for Transnet Pipelines' renewable energy rollout, for a period of 3 years.
Important Dates
Source: T1.1 Construction Procurement Tender Notice AIA.pdf (RFP)Closing date: 16 October 2026 at 16:00 (per tender record).
Briefing Session
Source: T1.1 Construction Procurement Tender Notice AIA.pdf (RFP)Compulsory Tender Clarification Meeting via Microsoft Teams, date to be confirmed, at 10:00. Bidders must email the Commodity Manager (Jabulani Ngonyama) at [email protected] by 16:00 on a date to be confirmed to receive the meeting invitation. Attendance is compulsory; the Certificate of Attendance (T2.2-01) must be submitted with the tender.
Contact Information
Source: T1.1 Construction Procurement Tender Notice AIA.pdf (RFP)Enquiries and clarification meeting registration:
Submission Guidelines
Source: T1.1 Construction Procurement Tender Notice AIA.pdf (RFP)Submission method: Transnet e-Tender Submission Portal at https://esupplierportal.transnet.net/portal/advertisedTenders (use Google Chrome).
Evaluation Criteria
Source: T1.1 Construction Procurement Tender Notice AIA.pdf (RFP)Evaluation is conducted in parallel stages; passing one stage does not guarantee passing earlier or later stages.
Technical Specifications
Source: T1.1 Construction Procurement Tender Notice AIA.pdf (RFP)Scope: Provision of professional services for an engineering consultant in strategic planning and project support for Transnet Pipelines' renewable energy rollout.
Pricing Schedule
Source: T1.1 Construction Procurement Tender Notice AIA.pdfNo pricing schedule details are provided in this document. Transnet may not accept changes to tender rates after closing date and may go to the open market if quoted rates are deemed unreasonable.
Financial Requirements
Source: T1.1 Construction Procurement Tender Notice AIA.pdf (RFP)No pricing format, bid security, guarantees, retention, or payment terms are stated in this document.
Compliance Requirements
Source: T1.1 Construction Procurement Tender Notice AIA.pdf (RFP)CSD registration: mandatory. Self-register on the National Treasury Central Supplier Database at https://secure.csd.gov.za/ and provide the supplier number and unique registration reference number to Transnet for verification.
Contractual Terms
Source: T1.1 Construction Procurement Tender Notice AIA.pdfTransnet reserves the right to: award to the highest scoring tenderer unless objective criteria justify otherwise; not accept the lowest priced tender; go to the open market if rates are unreasonable; terminate the contract if information provided is later proved incorrect; request audited financial statements for due diligence; not accept changes to tender rates after closing; verify any information supplied; conduct evaluation in parallel; not accept any offer at its sole discretion; not be liable if tenderers provide incorrect contact details; exclude tenderers convicted of a serious breach of law in the past 5 years; perform a risk analysis on the preferred tenderer. Transnet will not reimburse preparatory costs.
Requirements
Source: T1.1 Construction Procurement Tender Notice AIA.pdf (RFP)Bidders must self-register on the National Treasury Central Supplier Database (CSD) at https://secure.csd.gov.za/ and provide their supplier number and unique registration reference number to Transnet for verification.
Section
Source: T1.1 Construction Procurement Tender Notice AIA.pdf (RFP)Contact: Jabulani Ngonyama, Commodity Manager, Email: [email protected]
Important Dates
Source: BSC minutes - 20 August 2026 Solar PV Renewable Energy Rollout.pdf (RFP)Bid Specification Committee meeting held 20 August 2026 at 10:00–12:30 on MS Teams. No closing date or time for the tender is stated in this document.
Contact Information
Source: BSC minutes - 20 August 2026 Solar PV Renewable Energy Rollout.pdf (RFP)Bid Specification Committee Chairperson: Khaya Dyala, Senior Manager: Corporate Finance. No email or telephone provided. Meeting held on MS Teams.
Technical Specifications
Source: BSC minutes - 20 August 2026 Solar PV Renewable Energy Rollout.pdf (RFP)Transnet Pipelines requires an engineering consultant and management services provider to support the design, procurement, construction, commissioning and handover of solar PV renewable energy projects at 12 Transnet Pipelines (TPL) sites. The contract period is 3 years. The scope of work was reviewed and accepted by the Bid Specification Committee, with previous issues resolved.
Financial Requirements
Source: BSC minutes - 20 August 2026 Solar PV Renewable Energy Rollout.pdf (RFP)Pricing schedule: The initial development of the risk register and its ongoing monitoring should be priced separately to avoid ambiguity.
Special Conditions
Source: BSC minutes - 20 August 2026 Solar PV Renewable Energy Rollout.pdf (RFP)The Bid Specification Committee approved the submission for the provision of professional services for engineering consultants in strategic planning and project support for Transnet Pipelines' renewable energy rollout for a period of 3 years, subject to minor changes recommended.
Evaluation Criteria
Source: Technical Evaluation Sheet Version 2.pdf (unknown)Functionality evaluation with a minimum qualifying score of 75 out of 100. Scoring split: Management & CVs of Key Persons (35 points), Previous Experience on Similar Projects (30 points), Programme (15 points), Method Statement (20 points). Experience points are awarded based on the number of similar projects completed in the last ten years: two projects (4 points), three (8), four (12), five (16), six or more (20).
Technical Specifications
Source: Technical Evaluation Sheet Version 2.pdf (unknown)The scope involves engineering consultant services for strategic planning and project support for Transnet Pipelines' renewable energy rollout. Key personnel requirements include: Electrical Engineer (PrEng), Structural Engineer (PrEng), Project Manager (PrCPM), and Safety Manager (CSM).
Experience & Qualifications
Source: Technical Evaluation Sheet Version 2.pdfKey personnel required: Electrical Engineer (PrEng) – 10 points, Structural Engineer (PrEng) – 10 points, Project Manager (PrCPM) – 10 points, Safety Manager (CSM) – 5 points. Company experience: no relevance to scope scores 0; two projects in last ten years (more than 85 kWp) scores 4; three projects scores 8; four projects scores 12; five projects scores 16; six or more projects scores 20.
Section
Source: Technical Evaluation Sheet Version 2.pdfFunctionality sub-criteria weightings: Management & CVs of Key Persons (35 points), Previous Experience on Similar Projects (30 points), Programme (15 points), Method Statement (20 points). Minimum qualifying score is 75.
Description
Source: Annexure 5 - Method Statement.pdfThe procurement is for professional services of an engineering consultant to provide strategic planning and project support for Transnet Pipelines' renewable energy rollout, for a period of 3 years. This annexure covers the method statement for EPCM services for solar project implementation across TPL sites.
Submission Guidelines
Source: Annexure 5 - Method Statement.pdf (RFP)Returnable documents: Annexure 5 (Compulsory Technical Returnables) must be completed, signed and submitted with the bid. The method statement must not exceed 15 pages. Submission method and address are not stated in the provided document.
Evaluation Criteria
Source: Annexure 5 - Method Statement.pdf (RFP)Method Statement scoring (weight: 20 points):
Technical Specifications
Source: Annexure 5 - Method Statement.pdf (RFP)Scope: EPCM services for solar project implementation across multiple Transnet Pipelines (TPL) sites, as part of TPL's renewable energy rollout. The method statement must address:
Methodology
Source: Annexure 5 - Method Statement.pdfConcept designs: outline conceptual solar PV system designs and their integration into existing TPL infrastructure.
Quality Management
Source: Annexure 5 - Method Statement.pdfThe method statement must include a strategy for overseeing and coordinating contractors for seamless solar installations across multiple TPL sites; a structured methodology to achieve project objectives, including data sourcing, constraint identification and risk mitigation; a stakeholder engagement and communication plan; and the techniques, tools and project management systems to monitor contractor performance, quality control and project milestones. It must also cover a structured document management process, including review, approval routes, distribution and adherence to codes and standards, and identification of key hold points for inspections, approvals and quality assurance.
Compliance Requirements
Source: Annexure 5 - Method Statement.pdf (RFP)The method statement must demonstrate compliance with technical, statutory and administrative management requirements, and adherence to solar PV design standards and TPL infrastructure needs. No other eligibility criteria (CSD, tax, B-BBEE, CIDB, etc.) are stated in the provided document.
Health & Safety
Source: Annexure 5 - Method Statement.pdfThe method statement must include a plan for managing contractors to ensure compliance with technical, statutory and administrative requirements, and oversight of adherence to industry best practices and solar PV design standards. It must integrate Safety, Health and Environmental (SHE) principles into all project phases, ensure compliance with safety regulations, and include strategies for monitoring contractor safety performance.
Section
Source: Annexure 5 - Method Statement.pdfThe method statement is scored out of 20 points based on coverage of the 6 minimum requirements: execution strategy and compliance; integration of SHE and quality management; risk management and mitigation; stakeholder engagement and communication; document control and compliance management; and concept designs and work planning. Scores range from 0 (no relevance) to 100 (all 6 requirements with clear understanding).
Description
Source: EPCM_SCOPE_OF_SERVICES-Version_4.pdfThe project involves evaluating and implementing solar PV systems at 12 depot sites across various provinces. For each site, the average daily energy consumption (kWh) and proposed generation capacity (kWp) are recorded, considering spatial constraints. All proposed capacities are preliminary and will be finalised by the Consultant following feasibility studies, detailed assessments, load profiling, and spatial or structural validation. The Consultant must verify and refine the proposed capacities, optimise system sizing within site and operational constraints, conduct all required feasibility studies, and prepare the conceptual design, including conceptual electrical layouts, structural considerations, system integration, and the Scope of Works to be issued to the contractor. All feasibility and conceptual design deliverables must be formally accepted by the Employer's Agent before any subsequent phase may proceed. The contractor will be responsible for the detailed engineering design and construction activities based on the accepted conceptual design and the Scope of Works. The contractor may not modify or introduce alternative designs without explicit written authorisation from the Employer's Agent.
Site information:
Important Dates
Source: EPCM_SCOPE_OF_SERVICES-Version_4.pdf (RFP)Closing date: 16 October 2026 at 16:00 (from tender record).
No briefing session or site visit is stated in the document.
Submission Guidelines
Source: EPCM_SCOPE_OF_SERVICES-Version_4.pdf (RFP)Returnable documents — all must be completed, signed and submitted with the bid:
Disqualification risks:
Evaluation Criteria
Source: EPCM_SCOPE_OF_SERVICES-Version_4.pdf (RFP)Evaluation stages:
Minimum qualifying score: not stated in the document.
Bidders must undergo security screening and provide:
Note: SSA screening takes 3-4 weeks once all documentation is submitted.
Technical Specifications
Source: EPCM_SCOPE_OF_SERVICES-Version_4.pdf (RFP)Scope of services: Engineering, Procurement and Construction Management (EPCM) for Transnet Pipelines' renewable energy rollout — solar PV systems at 12 depot sites across various provinces.
Contract period: 3 years.
Sites and proposed generation capacities (preliminary, to be finalised by the Consultant):
Consultant responsibilities:
Consultant must NOT undertake detailed engineering design, procurement of equipment, construction activities, temporary works, or commissioning execution — these remain with the contractor.
All key deliverables (feasibility reports, designs, tender documentation, commissioning records) must be submitted to the Employer's Agent for review and formal acceptance. No dependent activity may proceed until written acceptance is obtained.
Employer's Agent has a minimum of 2 weeks to review submitted documentation.
All engineering drawings must comply with TPL-TECH-DO-STD-004 (PL103) and other Transnet Pipelines drafting standards.
Document management must comply with TPL-DM-P-0001 (Document Management Procedure).
Methodology
Source: EPCM_SCOPE_OF_SERVICES-Version_4.pdfMethodology and execution plan:
Planning and scheduling:
Risk management:
Design review and validation:
Regulatory and environmental compliance:
Stakeholder coordination:
Procurement phase:
Construction phase:
Commissioning phase:
Handover phase:
Quality Management
Source: EPCM_SCOPE_OF_SERVICES-Version_4.pdfQuality management requirements:
Financial Requirements
Source: EPCM_SCOPE_OF_SERVICES-Version_4.pdf (RFP)Bid security: not stated in the document.
Performance guarantees: not stated in the document.
Payment terms: not stated in the document.
Financial capacity thresholds: not stated in the document.
Note: The Consultant must provide one suitably qualified Quantity Surveyor per project package to support payment verification and certification.
Compliance Requirements
Source: EPCM_SCOPE_OF_SERVICES-Version_4.pdf (RFP)Mandatory compliance:
Security screening:
Health & Safety
Source: EPCM_SCOPE_OF_SERVICES-Version_4.pdfHealth and safety requirements:
Security screening:
Environmental
Source: EPCM_SCOPE_OF_SERVICES-Version_4.pdfEnvironmental requirements:
Waste management:
Hazardous substances:
Incident reporting:
Contractual Terms
Source: EPCM_SCOPE_OF_SERVICES-Version_4.pdfCopyright and intellectual property:
Communications:
Section
Source: EPCM_SCOPE_OF_SERVICES-Version_4.pdfAdditional evaluation criteria: not stated beyond the general evaluation stages. The document does not specify a minimum qualifying score or the exact preference point split (80/20 or 90/10).
Description
Source: Strategic Procurement Plan Final Version 07-09-2026.pdfTransnet Pipelines (TPL) requires engineering consultant and management services to support its Solar PV Renewable Energy Projects across multiple sites, aligned with its Net Zero Carbon Emissions strategy. The contract period is 36 months.
Important Dates
Source: Strategic Procurement Plan Final Version 07-09-2026.pdf (RFP)Briefing session: non-compulsory, via Microsoft Teams. Date and time not stated. Bidders must email [email protected] to receive the meeting link.
Closing date: 16 October 2026 at 16:00 (from tender record).
Briefing Session
Source: Strategic Procurement Plan Final Version 07-09-2026.pdf (RFP)Non-compulsory briefing session via Microsoft Teams. Bidders must send email details to [email protected] to receive the meeting link. Date and time not stated.
Contact Information
Source: Strategic Procurement Plan Final Version 07-09-2026.pdf (RFP)Briefing contact:
No other contact details provided.
Submission Guidelines
Source: Strategic Procurement Plan Final Version 07-09-2026.pdf (RFP)Returnable documents and schedules must be completed and returned by the closing date and time. The bid must be lodged on time and signed by an authorised respondent. All returnable documents must be valid. Bids failing administrative responsiveness will not progress to further evaluation. The bid must contain a priced offer and materially comply with the scope and specification. Technical prequalification criteria must be met. The specific goals preference points claim form must be completed. Bidders must send their email details to [email protected] to receive the Microsoft Teams briefing link.
Evaluation Criteria
Source: Strategic Procurement Plan Final Version 07-09-2026.pdf (RFP)Evaluation is in stages: Stage 1 Prequalification (administrative responsiveness, substantive responsiveness, minimum technical threshold of 70 points). Stage 2 Weighted scoring: Price (80 points) and Specific Goals (20 points). Stage 3 Post-tender negotiations, objective criteria, and award.
Technical criteria (100 points total, minimum qualifying score 70):
Price formula: PS = 80 (1 - (Pt - Pmin)/Pmin). Final price scores rounded to 2 decimal places.
Specific Goals (20 points): B-BBEE Level 1 or 2 contributor (10 points), Majority Black Women Owned (10 points).
Transnet may conduct post-tender negotiations if price is not market-related, negotiating sequentially with the highest ranked bidder, then 2nd and 3rd if needed. Objective criteria may justify award to a bidder other than the highest scorer, including skills transfer, ROI impact, supplier rotation, and bidder's legal/professional standing.
Technical Specifications
Source: Strategic Procurement Plan Final Version 07-09-2026.pdf (RFP)Scope: Provision of engineering consultant and management services to support Transnet Pipelines' Solar PV Renewable Energy Projects across multiple sites.
Duration: 36 months.
Deployment: Transnet Pipelines various sites.
Key deliverables:
Standards referenced: OHS Act/PER/SANS 347, API 650, ASME B31.4, ASME B31.3, and TPL Specifications during construction of solar panels.
Methodology
Source: Strategic Procurement Plan Final Version 07-09-2026.pdfKey deliverables include site assessments and feasibility studies, system design and optimization, regulatory compliance, project execution and timeline planning, and performance monitoring and maintenance strategies.
Experience & Qualifications
Source: Strategic Procurement Plan Final Version 07-09-2026.pdfKey personnel requirements: Electrical Engineer (PrEng), Structural Engineer (PrEng), Project Manager (PrCPM), Safety Manager (CSM). Company experience: must have experience in projects relating to scope of services of more than 85 kWp, with points awarded for 2 projects (4), 3 (8), 4 (12), 5 (16), 6+ (20).
Pricing Schedule
Source: Strategic Procurement Plan Final Version 07-09-2026.pdfApproved procurement value: R14,543,991.27 (Excl. VAT). Price evaluation uses formula PS = 80 (1 - (Pt - Pmin)/Pmin). Final price scores rounded to 2 decimal places.
Financial Requirements
Source: Strategic Procurement Plan Final Version 07-09-2026.pdf (RFP)Approved procurement value: R14,543,991.27 (Excl. VAT).
Price evaluation formula: PS = 80 (1 - (Pt - Pmin)/Pmin).
No bid security, bonds, guarantees, retention, or payment terms stated.
Compliance Requirements
Source: Strategic Procurement Plan Final Version 07-09-2026.pdf (RFP)Bidders must comply with all applicable Transnet and government policies and procedures, including PFMA, environmental and safety regulations.
Bidders must adhere to all requirements stipulated by the Transnet Environmental Department.
Specific goals preference points claim form must be completed.
No CSD, tax, CIDB, or CIPC registration requirements stated in the document.
Health & Safety
Source: Strategic Procurement Plan Final Version 07-09-2026.pdfBidders must adhere to health and safety regulations. Mitigation for non-compliance includes developing training plans and continuous training.
Environmental
Source: Strategic Procurement Plan Final Version 07-09-2026.pdfBidders must adhere to all requirements stipulated by the Transnet Environmental Department. Environmental Impact Assessments are referenced as part of project requirements.
Contractual Terms
Source: Strategic Procurement Plan Final Version 07-09-2026.pdfNo specific contractual terms beyond the 36-month duration and standard compliance with Transnet policies and procedures.
Section
Source: Strategic Procurement Plan Final Version 07-09-2026.pdfEvaluation stages: Prequalification (administrative, substantive, minimum technical threshold 70), Weighted scoring (Price 80, Specific Goals 20), Post-tender negotiations, objective criteria, and award. Technical criteria: Management & Key personnel (35), Company experience (20), Programme (10), Method Statement (35). Minimum qualifying score 70.
Description
Source: Advice to Procurement - EPCM Solar PV Renewable.pdfProvision of Engineering Consultant and Management Services to support Transnet Pipelines (TPL) in the Design, Procurement, Construction, Commissioning, and Handover Phases for the Solar PV Renewable Energy Project at various sites. Project/Package Number: TBC. Contract duration: 36 months. NEC Contract type: PSC contract.
Contact Information
Source: Advice to Procurement - EPCM Solar PV Renewable.pdf (RFP)Cross Functional Sourcing Team (CSFT):
No email addresses or telephone numbers are provided in the document.
Submission Guidelines
Source: Advice to Procurement - EPCM Solar PV Renewable.pdf (RFP)Returnable documents: The RFP pack must include the Works Information/Scope (approved by the applicable DOA – Engineering Manager, Project Execution/Project Director), Site Information, Bills of Quantities/Activity Schedule/Task Order Schedule (as applicable), all specifications (including Health and Safety and Environmental requirements), drawings, and the Project Registration Form.
Submission method: Not stated in the document.
Closing time: Not stated in the document.
Evaluation Criteria
Source: Advice to Procurement - EPCM Solar PV Renewable.pdf (RFP)Evaluation will be based on technical, quality, and functionality criteria, with weighting and threshold as per the attached evaluation criteria (not included in the document).
No pre-qualifications in terms of preferential procurement are applicable.
Technical Specifications
Source: Advice to Procurement - EPCM Solar PV Renewable.pdf (RFP)Provision of Engineering Consultant and Management Services to support Transnet Pipelines (TPL) in the Design, Procurement, Construction, Commissioning, and Handover Phases for the Solar PV Renewable Energy Project at various sites.
Project/Package Number: TBC.
Contract duration: 36 months.
Contract type: NEC PSC (Professional Services Contract).
Financial Requirements
Source: Advice to Procurement - EPCM Solar PV Renewable.pdf (RFP)Approved Contract Budget: R16 730 000 excl. VAT.
Estimated value of proposed contract: R16 730 000 excl. VAT.
Compliance Requirements
Source: Advice to Procurement - EPCM Solar PV Renewable.pdf (RFP)No specific compliance requirements are stated in the document.
Pre-qualifications in terms of Preferential Procurement: Not Applicable.
Health & Safety
Source: Advice to Procurement - EPCM Solar PV Renewable.pdfThe RFP must include all specifications, inclusive of Health and Safety and Environmental requirements. The Works Information/Scope must be approved by the applicable DOA – Engineering Manager, Project Execution/Project Director.
Special Conditions
Source: Advice to Procurement - EPCM Solar PV Renewable.pdf (RFP)No procurement process shall commence without a SAP Requisition released by the relevant Delegation of Authority (DOA) and an approved Cost Sheet. SAP Requisition No. TBC. Cost Sheet to be attached to ATP. Proposed Contract Included in Approved Project Procurement Plan: Yes (ticked).
Section
Source: Advice to Procurement - EPCM Solar PV Renewable.pdfTechnical/Quality/Functionality criteria, weighting and threshold: Reference to the attached evaluation criteria.
Description
Source: Market Analysis Template End - User Input.pdfEPCM services for solar PV project implementation across 12 Transnet Pipelines (TPL) sites over three years, including engineering oversight, procurement coordination, construction supervision, quality assurance, and compliance monitoring. The provider must ensure cost control, risk management, and alignment with TPL's Net Zero initiative.
Contact Information
Source: Market Analysis Template End - User Input.pdf (unknown)Completed by: Ndabezinhle Ndlovu, Energy Engineering Technician. Recommended by: Hlompho Mafusing, Acting Principal Electrical Engineer. No email, telephone, or submission address provided.
Submission Guidelines
Source: Market Analysis Template End - User Input.pdf (unknown)Submission method: Open Tender. No alternative procurement options exist. No association or registration bodies are specified. Returnable forms and submission details are not stated in the source document.
Evaluation Criteria
Source: Market Analysis Template End - User Input.pdf (unknown)Evaluation will consider company experience and key personnel experience. No scoring split, minimum qualifying score, or preference point system is stated.
Technical Specifications
Source: Market Analysis Template End - User Input.pdf (unknown)Scope: EPCM services for solar PV project implementation across 12 Transnet Pipelines (TPL) sites over three years. Services include engineering oversight, procurement coordination, construction supervision, quality assurance, and compliance monitoring. The provider must ensure cost control, risk management, and alignment with TPL's Net Zero initiative, delivering energy cost savings and enhanced energy security. Sub-contracting opportunity: Structural Engineer, 5% of estimated contract value.
Experience & Qualifications
Source: Market Analysis Template End - User Input.pdf (unknown)Known market players: LESEDI, ZEAL, SOLA Group, Juwi Renewable Energy, Lamo Solar (all locally based). No companies tendered for this type of supply in the last instance. Evaluation will consider company experience and key personnel experience.
Quality Management
Source: Market Analysis Template End - User Input.pdfQuality assurance and compliance monitoring are part of the EPCM services. No specific quality standards or certifications are stated.
Financial Requirements
Source: Market Analysis Template End - User Input.pdf (unknown)Estimated contract value (excluding VAT): R16 729 656.00. Cost breakdown (excluding VAT): Project management R3 405 539.00; Feasibility and Concept Design R3 709 763.00; Procurement Support R770 106.00; Construction Management R4 551 262.00; Quality Management R415 800.00; Health, Safety and Environmental R359 920.00; Commissioning R456 390.00; Provisional Sums R1 540 000.00; Contingencies R1 520 876.00. Contract duration: 3 years. Contracting strategy: NEC – PSC with pricing option G.
Compliance Requirements
Source: Market Analysis Template End - User Input.pdf (unknown)Technical pre-qualification criteria: Pr. Eng Certified Electrical Engineer; Pr. Eng Certified Structural Engineer; PrCPM Project Manager; CSM Safety Manager. No CIDB grading, B-BBEE, CSD, or tax compliance requirements are stated.
Health & Safety
Source: Market Analysis Template End - User Input.pdfHealth, Safety and Environmental cost element: R359 920.00. No specific OHS requirements are stated.
Contractual Terms
Source: Market Analysis Template End - User Input.pdf (unknown)Contracting strategy: NEC – PSC (Professional Services Contract) with pricing option G. Contract duration: 3 years.
Special Conditions
Source: Market Analysis Template End - User Input.pdf (unknown)Procurement mechanism: Open Tender. No alternative options exist. No association or registration bodies specified.
Requirements
Source: Market Analysis Template End - User Input.pdf (unknown)Technical pre-qualification criteria: Pr. Eng Certified Electrical Engineer; Pr. Eng Certified Structural Engineer; PrCPM Project Manager; CSM Safety Manager. Evaluation methodologies include company experience and key personnel experience.
Section
Source: Market Analysis Template End - User Input.pdf (unknown)Risks identified: Delayed contractor performance (mitigation: strict contractor monitoring and milestone-based payments); Budget overruns (mitigation: cost control mechanisms and contingency planning).
Description
Source: Annexure 4 - Programme - Updated.pdfThe tenderer must provide a Level 4 programme that demonstrates alignment with the tasks in the Tenderer's Task Schedule and Method Statement submission, providing the order and timing of activities to carry out the works in terms of the Employer's requirements and within the stipulated timeframes. The programme must comply with the minimum requirements listed in the technical specifications.
Submission Guidelines
Source: Annexure 4 - Programme - Updated.pdf (RFP)Submission method: The programme must be submitted in two parts:
Format: Only MS Project or Primavera P6 format will be accepted. No other format will be accepted. Primavera P6 must be in the latest version, in both hard and soft copy (XER) format.
OneDrive link: The link will be made available to all tenderers who submitted a tender on or before the tender closing date.
Returnable forms: Annexure 4 (Programme) is a compulsory technical returnable. The index of documentation is attached to the schedule.
Evaluation Criteria
Source: Annexure 4 - Programme - Updated.pdf (RFP)The Programme is evaluated as part of the technical evaluation with a weighting of 15 points.
Scoring:
Technical Specifications
Source: Annexure 4 - Programme - Updated.pdf (RFP)The tenderer must provide a Level 4 programme that demonstrates alignment with the tasks in the Tenderer's Task Schedule and Method Statement submission, providing the order and timing of activities to carry out the works in terms of the Employer's requirements and within the stipulated timeframes.
Minimum requirements for the programme:
Attention is drawn to Core Clause 31 of the NEC3 ECC regarding the items to be shown on the programme.
Compliance Requirements
Source: Annexure 4 - Programme - Updated.pdf (RFP)B-BBEE Minimum Level: 4
Health & Safety
Source: Annexure 4 - Programme - Updated.pdfThe programme must include SHERQ submissions as part of the project activities. Time Risk Allowance for Employer's review and approval activities must be included.
Environmental
Source: Annexure 4 - Programme - Updated.pdfThe programme must include a narrative describing basis of programme, risks and risk mitigations. Interfaces with other construction packages must be clearly shown.
Section
Source: Annexure 4 - Programme - Updated.pdfThe Programme is evaluated with a weighting of 15 points. Scoring: 0 points for inadequate information; 40 points for programme reflecting start/end dates and durations for Level 2 activities, no distinctions between Engineering, Procurement, and Construction, critical path not identifiable, and not adequately reflecting order and timing of works; 60 points for programme reflecting start/end dates and critical path for Level 4 activities, distinctions between Engineering, Procurement and Construction clearly shown, and reflecting order and timing of works as detailed in Works Information; 100 points for programme reflecting start/end dates and critical path for Level 4 activities, distinctions between Engineering, Procurement and Construction clearly shown, reflecting order and timing of works, interfaces with other construction packages clearly shown, and narrative describing basis of programme, risks and risk mitigations provided.
Evaluation Criteria
Source: Annexure 3 - Company Experience.pdf (RFP)Previous Experience is weighted at 30 points.
Scoring:
Minimum requirement: at least two completed projects in the design, supply, installation, commissioning and handover of solar PV systems with battery storage, each with a generation capacity of more than 85 kWp.
Failure to submit references (reference letters, contracts, or completion certificates) to validate experience results in a score of zero for this criterion.
Technical Specifications
Source: Annexure 3 - Company Experience.pdf (RFP)Scope: professional services for an engineering consultant in strategic planning and project support for Transnet Pipelines' renewable energy rollout.
Contract period: 3 years.
Required experience: at least two completed projects in the design, supply, installation, commissioning and handover of solar PV systems with battery storage.
Each referenced project must have a generation capacity of more than 85 kWp.
Projects must include technical analysis, design, and implementation of renewable energy infrastructure within a strategic and regulatory framework.
Bidders must provide a list of past or ongoing comparable solar PV projects, including client name and contact details, project description, duration, and contract value.
Bidders must complete Table 1 with project details: client, title of project, scope of services, solar PV project size (kWh), project value (Rands), start and end date, and client contact details (name, email, number).
Experience & Qualifications
Source: Annexure 3 - Company Experience.pdfBidders must demonstrate performance in comparable projects by supplying:
Failure to submit references (reference letters, contracts, or completion certificates) will result in a score of zero.
Compliance Requirements
Source: Annexure 3 - Company Experience.pdf (RFP)Mandatory: submit references to validate experience (reference letters, contracts, or completion certificates). Failure to do so results in a score of zero for the Previous Experience criterion.
Section
Source: Annexure 3 - Company Experience.pdf (RFP)Previous Experience is weighted at 30 points. Scoring: 0 points if no relevance; 20 points for two projects; 40 points for three projects; 60 points for four projects; 80 points for five projects; 100 points for six or more projects, each relating to the scope of services of more than 85 kWp.
Description
Source: TPL Business Case Various Sites Solar PV Project - May 2026.pdfThe project is a Solar PV Renewable Energy Project for various Transnet Pipelines operational sites. It seeks capital approval from the Transnet Pipelines Capital Investment Committee (CAPIC) for the installation of grid-tied Solar PV systems at 12 sites: Klerksdorp, Langlaagte, Rustenburg, Tarlton, Airport, Sasolburg, Coalbrook, Quagga, Newcastle, Ladysmith, Jameson Park and Mnambithi. The estimated overall project cost is R154.429 million (R177.594 million incl. VAT). The Pre-Feasibility phase starts in the 2026/2027 financial year, with expected completion by the end of the 2029/2030 financial year. The CAN will remain valid until 4 October 2030.
Important Dates
Source: TPL Business Case Various Sites Solar PV Project - May 2026.pdf (unknown)Procurement Process - EPCM: 03 March 2026 to 16 October 2026
Project Kick-off meeting: 30 October 2026
Project Execution: 30 November 2026 to 25 October 2029
Procurement Process - EPC: 5 April 2027 to 7 September 2027
Project Execution: 4 October 2027 to 5 October 2029
Final Defects Period: 5 October 2029 to 4 October 2030 (52 weeks)
Evaluation Criteria
Source: TPL Business Case Various Sites Solar PV Project - May 2026.pdf (unknown)Bidders must be suitably qualified solar PV specialists with experience in multi-site delivery and system integration, including centralized monitoring. Procurement will follow Transnet's approved procurement strategy and comply with applicable legislation including the Preferential Procurement Policy Framework Act, Public Finance Management Act, and Broad-Based Black Economic Empowerment Act. Bidders must adhere to Transnet Procurement Procedures and relevant National Treasury Instruction Notes.
Technical Specifications
Source: TPL Business Case Various Sites Solar PV Project - May 2026.pdf (unknown)The project involves the capital approval and implementation of a Solar Photovoltaic (PV) renewable energy plant at 12 Transnet Pipelines operational sites: Klerksdorp, Langlaagte, Rustenburg, Tarlton, Airport, Sasolburg, Coalbrook, Quagga, Newcastle, Ladysmith, Jameson Park and Mnambithi.
Methodology
Source: TPL Business Case Various Sites Solar PV Project - May 2026.pdfThe preferred implementation strategy is the appointment of an external Engineering, Procurement, and Construction Management (EPCM) consultant, enabling concurrent design and implementation across all identified sites. The EPCM consultant will verify site electrical demand profiles, confirm optimal solar PV capacity, and assess existing electrical infrastructure. The EPCM scope includes feasibility studies, scope of work development, conceptual and detailed engineering designs, procurement documentation, and EPC cost estimates. The project will be implemented through two EPC work packages, with the EPCM supporting TPL as NEC Project Manager and Supervisor. Solar PV system sizing assumes an average of 5 sun-hours per day, with annual production estimated using a 60% performance factor. Implementation timelines are estimated at 1-2 months per site.
Quality Management
Source: TPL Business Case Various Sites Solar PV Project - May 2026.pdfThe EPCM consultant will act as NEC Project Manager and Supervisor, with responsibilities including design reviews, technical approvals, quality assurance, safety oversight, and verification of compliance with approved capacity and performance requirements. The EPC contracts include detailed design, supply, installation, testing, and commissioning of the Solar PV systems. Maintenance activities are limited to periodic inspections and panel cleaning (2-4 times per year) plus routine inverter and electrical checks.
Pricing Schedule
Source: TPL Business Case Various Sites Solar PV Project - May 2026.pdfThe capital cost estimate comprises two components: the EPCM contract (covering prefeasibility, scope development, procurement packages, and ongoing support) and the EPC contracts (detailed design, supply, installation, testing, and commissioning). EPCM cost estimate is based on anticipated professional resource requirements and applicable hourly rates. EPC cost estimates are based on proposed energy generation capacities per site. Main items in the capital cost estimate excluding VAT: EPCM R13.041m, EPC Work Package R108.488m, Owner's cost 12% R9.269m, Contingency 10% R10.888m, Escalations (CPI forecast pre-4.30%, post-4.50%) R12.743m, Estimated Total Cost R154.429m.
Financial Requirements
Source: TPL Business Case Various Sites Solar PV Project - May 2026.pdf (unknown)Estimated total project cost: R154.429 million (R177.594 million incl. VAT).
Capital cost estimate (excluding VAT):
Capital cash flows (Rm):
Financial evaluation indicators:
Capital allowances of R41.696 million claimed under Section 12B of the Income Tax Act (photovoltaic solar energy >1MW).
Company taxation rate: 27%.
Projected annual savings: R10.7 million; total projected savings over 30 years: R662.386 million (escalated at CPI).
Procurement packages:
Compliance Requirements
Source: TPL Business Case Various Sites Solar PV Project - May 2026.pdf (unknown)Procurement will comply with:
Health & Safety
Source: TPL Business Case Various Sites Solar PV Project - May 2026.pdfAll installations must comply with applicable safety standards and regulatory requirements. Existing fire detection and suppression systems at TPL sites are adequate to manage fire risks associated with the Solar PV installations, provided routine maintenance is maintained. The EPCM approach offers enhanced quality and safety control. The EPCM consultant will assess existing electrical infrastructure to ensure compliance with operational and safety requirements. The project manager must engage TPL management early to assign site agents and ensure continuous communication and training to maintain oversight and safety.
Environmental
Source: TPL Business Case Various Sites Solar PV Project - May 2026.pdfThe project supports Transnet's Net Zero Initiative, aiming to reduce carbon emissions and enhance energy efficiency. Expected environmental benefits over the 30-year life span: reduction of 3,944 tons of CO2 emissions, savings of 5.62 million litres of water, and decrease in ash waste by 586 tons. Solar PV has relatively low environmental impact and minimal disruption to operations compared to alternatives.
Contractual Terms
Source: TPL Business Case Various Sites Solar PV Project - May 2026.pdfThe project is classified as Type A. The execution strategy involves engaging a contractor for detailed design and installation at each site, but is not a turnkey solution; internal teams remain responsible for feasibility assessments and alignment with project requirements. The project is not dependent on any other project; each site is independent with its own budget and timeline. The CAN validity period is determined by the project's scheduled completion date of 4 October 2030.
Section
Source: TPL Business Case Various Sites Solar PV Project - May 2026.pdfFinancial evaluation indicators: Net Present Value R115.166 million, Profitability Index 2.08, Internal Rate of Return (Nominal) 26.80%, Internal Rate of Return (Real) 21.44%, Modified Internal Rate of Return 15.60%, Payback Period 6 years, Discount factor (WACC) 13.10%. The project is classified as Type A. Procurement will follow Transnet's approved procurement strategy and comply with applicable legislation including the Preferential Procurement Policy Framework Act, Public Finance Management Act, and Broad-Based Black Economic Empowerment Act.
Description
Source: TPPP MA DOC- 07 AUG 2026.pdfProvision of Engineering, Procurement, and Construction Management (EPCM) services for solar PV renewable energy projects across 12 Transnet Pipelines (TPL) sites. The service provider will manage contractors for design, procurement, installation, and commissioning, and provide engineering oversight, procurement coordination, construction supervision, quality assurance, and compliance monitoring. The contract is a once-off project-based engagement for 3 years, with an estimated value of R16,729,656.00 (incl. VAT).
Contact Information
Source: TPPP MA DOC- 07 AUG 2026.pdf (RFP)Market research contact:
Submission Guidelines
Source: TPPP MA DOC- 07 AUG 2026.pdf (RFP)Returnable documents: none specified in the market analysis document. The tender is an open Request for Bid (RFP). Submission method and address are not stated in this document.
Evaluation Criteria
Source: TPPP MA DOC- 07 AUG 2026.pdf (RFP)Evaluation uses the 80/20 preference point system (project value below R50 million).
Preference points (80/20 system):
No minimum qualifying score is stated.
Technical Specifications
Source: TPPP MA DOC- 07 AUG 2026.pdf (RFP)Scope: Provision of Engineering, Procurement, and Construction Management (EPCM) services to support Transnet Pipelines (TPL) in the design, procurement, construction, commissioning, and handover phases for solar PV renewable energy projects.
Quality Management
Source: TPPP MA DOC- 07 AUG 2026.pdfThe EPCM services must ensure quality assurance and compliance monitoring to meet technical, regulatory, and sustainability requirements.
Financial Requirements
Source: TPPP MA DOC- 07 AUG 2026.pdf (RFP)Estimated contract value: R16,729,656.00 (incl. VAT).
Pricing format, bid security, bonds, guarantees, retention, and payment terms are not stated in this document.
Compliance Requirements
Source: TPPP MA DOC- 07 AUG 2026.pdf (RFP)B-BBEE: Bidders must be B-BBEE Status Level 1 or 2 contributor to claim the 10 preference points (mandatory goal).
Black Women-Owned: Bidders must be at least 30% Black Women-Owned to claim the 10 preference points.
Local content: Designated sectors require 100% local content for Cement and for Steel products & Construction Components.
Construction Skills Development Goals: Not triggered (contract duration is 3 years, but CIDB grading is not 7 or higher).
CSD registration, tax clearance, CIDB grading, and other compliance requirements are not stated in this document.
B-BBEE Requirements
Source: TPPP MA DOC- 07 AUG 2026.pdf (RFP)Preference points are awarded for B-BBEE Status Level 1 or 2 contributor (10 points) and for 30% Black Women-Owned entities (10 points). Market research indicates 80% of potential market players have B-BBEE Level 1 or 2, and 50% have qualifying Black Women-Owned status. Goals are pursued only if mandatory, aligned to TPL's transformation objectives with sufficient enterprises (minimum 33% of sample), or represent an opportunity for transformation.
Environmental
Source: TPPP MA DOC- 07 AUG 2026.pdfThe project aligns with TPL's Net Zero initiative, aiming to enhance energy efficiency, reduce carbon emissions, and lower electricity costs.
Special Conditions
Source: TPPP MA DOC- 07 AUG 2026.pdf (RFP)Structural engineering work (30%) was identified for potential TPPP subcontracting, but the estimated value is only 5% of the contract, below the 30% threshold, so it does not meet the TPPP subcontracting requirement. The tenderer may decide to subcontract. Designated sectors require 100% local content for Cement and for Steel products & Construction Components. Construction Skills Development Goals are not triggered because the contract duration is 3 years (not 12 months or more) and the CIDB grading is not 7 or higher.
Section
Source: TPPP MA DOC- 07 AUG 2026.pdfThe project falls below R50 million, so the 80/20 preference point system applies. Specific goals: B-BBEE Status Level 1 or 2 (10 points) and 30% Black Women-Owned entities (10 points).
Submission Guidelines
Source: Eligibility Critea.pdf (RFP)Returnable documents:
Submission method and closing time are not stated in the provided document.
Evaluation Criteria
Source: Eligibility Critea.pdf (RFP)Bidders must submit Annexure 1 – Eligibility Criteria, which requires proof of registration for the following key personnel:
Each registration certificate must be attached. The form must be signed by the respondent and a witness.
Compliance Requirements
Source: Eligibility Critea.pdf (RFP)Mandatory eligibility requirements (Annexure 1):
Proof of registration certificates must be attached.
Health & Safety
Source: Eligibility Critea.pdfA Safety Manager must be registered with SACPCMP as a Construction Health and Safety Manager (CHSM). Proof of registration must be attached.
Requirements
Source: Eligibility Critea.pdf (RFP)Annexure 1 – Eligibility Criteria requires proof of registration for key personnel: Electrical Engineer (ECSA Pr.Eng), Structural Engineer (ECSA Pr.Eng), Project Manager (SACPCMP PrCPM), and Safety Manager (SACPCMP CHSM). Certificates must be attached.
Description
Source: Technical Evaluation Sheet - Solar PV.xlsxThe department requires professional services for an engineering consultant in strategic planning and project support for Transnet Pipelines' renewable energy rollout, for a period of 3 years.
Submission Guidelines
Source: Technical Evaluation Sheet - Solar PV.xlsx (unknown)Returnable documents: the completed technical evaluation scoresheet, the programme (electronic copy in MS Project at Level 3 detail), the organogram, certified qualifications and registration certificates, detailed CVs, and the method statement. All qualifications and registration certificates must be certified by a Commissioner of Oaths within the last three months.
Evaluation Criteria
Source: Technical Evaluation Sheet - Solar PV.xlsx (unknown)Technical evaluation (100 points total) with the following weightings:
Description
Source: 4. Part C2 - Pricing Data -Rev 02.pdfThe tender is for professional engineering consultancy services to support Transnet Pipelines' renewable energy rollout over a 3-year period. Services cover project management, feasibility and concept design, procurement support, construction management, quality management, health, safety and environment, and commissioning.
Submission Guidelines
Source: 4. Part C2 - Pricing Data -Rev 02.pdf (RFP)Returnable documents: complete and sign the Form of Offer, the Pricing Data (Part C2) including the Task Schedule and Staff Rates and Expenses, and any standard SBD forms required by the tender (e.g., SBD 4 Declaration of Interest, SBD 6.1 Preference Points Claim, SBD 8 Past SCM Practices, SBD 9 Independent Bid Determination).
Submission method and address: not stated in this document.
Closing time: 16:00 on 16 October 2026.
Evaluation Criteria
Source: 4. Part C2 - Pricing Data -Rev 02.pdf (RFP)Evaluation criteria are not detailed in this document. The contract is priced under NEC3 PSC Option G (Term Service). Bidders must be registered on the Central Supplier Database (CSD) and have a valid SARS tax clearance. No specific CIDB grading or B-BBEE level is stated in this document.
Technical Specifications
Source: 4. Part C2 - Pricing Data -Rev 02.pdf (RFP)Scope of services (over a 3-year period):
Experience & Qualifications
Source: 4. Part C2 - Pricing Data -Rev 02.pdfStaff experience categories (ECSA):
Quality Management
Source: 4. Part C2 - Pricing Data -Rev 02.pdfQuality management tasks include: prepare and maintain a Quality Management Plan, inspection and surveillance, review contractor QMP/QCP/ITPs (12 site visits), quality audits (12 site visits), manage NCR process, witness factory and site acceptance tests, design reviews and quality reports (24 months), material and equipment verification, management of technical deviations, testing and commissioning oversight (12 site visits).
Pricing Schedule
Source: 4. Part C2 - Pricing Data -Rev 02.pdfPricing data (Part C2) includes:
Staff roles to be priced: Project Manager, Senior Structural Engineer, Senior Electrical Engineer, Mechanical Engineer, Quantity Surveyor, Site Safety Officer (H&S), Project Administrator, QA/QC Inspectors, Document Controllers, Cost Control Engineers, Project Planner.
Financial Requirements
Source: 4. Part C2 - Pricing Data -Rev 02.pdf (RFP)Pricing basis: NEC3 Professional Services Contract (PSC) Option G (Term Service).
Staff rates: must include all costs to the consultant (basic salary, benefits, social costs, overheads, administrative support). Hourly rates for salaried professional/technical staff must not exceed that payable to a professionally qualified person. Rates exclude VAT.
Payment: based on Task Schedule. Issue for Client Approval qualifies for 60% pro rata payment; Confirmation of Acceptance for Implementation qualifies for 100% pro rata payment. Total of Prices is not a guaranteed minimum; payment only for instructed and completed activities.
Provisional sums: R870,000 for disbursements (allowance only, actual costs with documentary evidence, no mark-up) and R670,000 for escalation (allowance, adjusted per Contract Price Adjustment provisions).
Expenses: subsistence allowance per night away from home; travel costs from usual place of business to jobsite; air travel economy class on scheduled low-cost airline; accommodation limited to bed and breakfast, guest house, self-catering, or 1-3 star hotel (per National Treasury limits); hired car engine capacity not exceeding 1600cc; private car/MPV and pick-up van/bakkie rates per km for engine capacity ≤1600cc.
VAT: add 15% to total.
Compliance Requirements
Source: 4. Part C2 - Pricing Data -Rev 02.pdf (RFP)CSD registration: required.
SARS tax clearance: required.
B-BBEE: not stated in this document.
CIDB grading: not stated in this document.
ECSA categories: staff must be classified per ECSA categories (A: >20 years' experience, recognised expert; B: >10 years' experience, partner/director/member bearing business risk; C: salaried professional staff with 3-15 years' experience; D: other salaried technical staff under direction of A/B/C).
Health & Safety
Source: 4. Part C2 - Pricing Data -Rev 02.pdfHealth, safety and environment tasks: ensure adherence to all safety regulations (12 site visits), environmental compliance monitoring. A Site Safety Officer (H&S) is a required staff role.
Environmental
Source: 4. Part C2 - Pricing Data -Rev 02.pdfEnvironmental compliance is part of the feasibility and concept design phase (confirm alignment with Transnet Pipelines standards and ensure regulatory and environmental compliance) and includes environmental compliance monitoring during construction.
Contractual Terms
Source: 4. Part C2 - Pricing Data -Rev 02.pdfContract type: NEC3 Professional Services Contract (PSC), June 2005 (with amendments June 2006 and April 2013), Option G (Term Service).
Payment terms: as described in financial requirements.
Provisional sums: disbursements and escalation are allowances only, adjusted per contract provisions.
Evaluation Criteria
Source: Technical_Evaluation_Sheet_Version_2.pdf (unknown)Minimum qualifying score: 75 out of 100.
Functionality sub-criteria weightings:
Total weighting: 100 points.
Experience & Qualifications
Source: Technical_Evaluation_Sheet_Version_2.pdfKey personnel required (with professional registrations):
Company experience: bidders must demonstrate previous experience on similar projects (renewable energy, >85 kWp) within the last 10 years. Points are awarded on a sliding scale from 0 (no relevant experience) to 20 (six or more projects).
Important Dates
Source: T1.2 Construction Procurement Tender Data.pdf (RFP)Closing date: 12 October 2026 at 16:00.
Compulsory clarification meeting: date, time and venue as stated in the Tender Notice and Invitation to Tender (not provided in this document). Attendance is compulsory; bidders must sign the attendance register and have their T2.2-01 certificate signed by the Employer's authorised representative.
Tender validity period: 180 days after closing date.
Contact Information
Source: T1.2 Construction Procurement Tender Data.pdf (RFP)Employer's Agent (Commodity Manager):
Employer's Agent (for marking documents):
Submission portal: https://transnetetenders.azurewebsites.net
Submission Guidelines
Source: T1.2 Construction Procurement Tender Data.pdf (RFP)Submission method: Transnet e-Tender Submission Portal (https://transnetetenders.azurewebsites.net).
Closing time: 16:00 on 12 October 2026.
No late tenders accepted. Telephonic, telegraphic, facsimile or e-mailed tenders not accepted.
Tender offers must be in English.
Tender documents must be uploaded with: name of tenderer, contact person and details, tender number TPL/2026/09/0613/11281/RFP, and tender description.
Documents must be marked for the attention of the Employer's Agent: Mandlenkosi Mjoli.
Returnable documents (all must be completed, signed and submitted):
Disqualification risks:
Evaluation Criteria
Source: T1.2 Construction Procurement Tender Data.pdf (RFP)Evaluation stages:
Step One – Administrative responsiveness: bid lodged on time, all returnable documents completed and returned, documents valid, bid signed by authorised respondent.
Step Two – Substantive responsiveness: general pre-qualification criteria met, priced offer included, material compliance with scope, compulsory clarification meeting attendance, professional registration of key personnel.
Step Three – Technical/Functional evaluation: minimum qualifying score is 75 points (out of 100). Scoring is done by at least 3 evaluators, averaged.
Functionality sub-criteria and weightings:
Total weighting: 100 points. Minimum qualifying score: 75.
Step Four – Price and specific goals: 80/20 preference points system (applicable when value ≤ R50 million).
Step Five – Objective criteria: Transnet may apply objective criteria (e.g., restrictions, solvency, legal capacity, conflicts of interest, commercial risk) to justify award to another bidder.
Step Six – Post-tender negotiations: Transnet may negotiate with highest-ranked bidder to achieve market-related price; if negotiations fail, may cancel or negotiate with 2nd and 3rd ranked bidders.
Step Seven – Award: successful bidder informed by Letter of Award; final contract concluded upon acceptance.
Technical Specifications
Source: T1.2 Construction Procurement Tender Data.pdf (RFP)Provision of professional services for an engineering consultant in strategic planning and project support for Transnet Pipelines' renewable energy rollout.
Contract period: 3 years.
Key personnel required (must be professionally registered):
Previous experience: tenderer must demonstrate experience on similar projects relating to the scope of services, with projects of more than 85 kWp (points awarded based on number of such projects).
Method statement and programme required as part of functionality evaluation.
Financial Requirements
Source: T1.2 Construction Procurement Tender Data.pdf (RFP)Pricing: priced offer required; evaluated under 80/20 preference points system (applicable when value ≤ R50 million).
No bid security, bond, guarantee, retention or payment terms stated in the document.
Tender validity: 180 days after closing date; may be extended on same terms if Transnet's processes are not finalised.
Compliance Requirements
Source: T1.2 Construction Procurement Tender Data.pdf (RFP)Eligibility criteria (Stage One):
Prequalifying criteria (Stage Two):
Mandatory submissions:
Disqualification:
No CIDB grading requirement stated (not construction works).
Description
Source: Annexure 2 - Key People Qualification and Experience.pdfThe document is Annexure 2 – Compulsory Technical Returnable for the RFP. It specifies the requirements for key personnel qualifications and experience, which carry a weight of 35 points in the evaluation.
Submission Guidelines
Source: Annexure 2 - Key People Qualification and Experience.pdf (RFP)Returnable documents (Annexure 2 – Compulsory Technical Returnable):
Disqualification risks:
Evaluation Criteria
Source: Annexure 2 - Key People Qualification and Experience.pdf (RFP)Evaluation of key personnel qualifications and experience (Total weighting: 35 points).
Scoring bands (applied to each role):
Sub-weights per role:
Required professional registrations:
Experience & Qualifications
Source: Annexure 2 - Key People Qualification and Experience.pdfBidders must submit:
Key personnel requirements:
Health & Safety
Source: Annexure 2 - Key People Qualification and Experience.pdfSafety Officer role: Must hold a relevant qualification in occupational health and safety, have experience in renewable energy projects, and be responsible for ensuring compliance with safety regulations, conducting risk assessments, implementing safety protocols, and overseeing design safety.
Section
Source: Annexure 2 - Key People Qualification and Experience.pdf (RFP)Scoring of Project Organogram, Management & CVs (Total weighting: 35).
Scoring keys (same bands for all roles):
Sub-weights:
Description
Source: BSC Resolution- Solar PV Energy various sites - 20 August 2026.pdfThe purpose of this submission is to request approval of the specifications for the provision of professional services for engineering consultants in strategic planning and project support for Transnet Pipelines' renewable energy rollout for a period of 3 years.
Important Dates
Source: BSC Resolution- Solar PV Energy various sites - 20 August 2026.pdf (unknown)Closing date: 20 August 2026 (BSC decision date; actual bid closing date not stated in this document)
Technical Specifications
Source: BSC Resolution- Solar PV Energy various sites - 20 August 2026.pdf (unknown)Scope: Provision of professional services for engineering consultants in strategic planning and project support for Transnet Pipelines' renewable energy rollout.
Duration: 3 years.
Specific projects: Design, procurement, construction, commissioning and handover of solar PV renewable energy projects at 12 Transnet Pipelines sites.
Purpose: Support Transnet Pipelines in the rollout of renewable energy across its sites.
Description
Source: TPPP Market Analysis - Rev 2.pdfProvision of Engineering Consultant and Management Services to support Transnet Pipelines (TPL) in the design, procurement, construction, commissioning, and handover phases for the Solar PV Renewable Energy Project at various sites. Project Number: TPL/2025/02/0005/88487/RFP. The EPCM services involve managing contractors for the design, procurement, installation, and commissioning of solar PV projects across 12 Transnet Pipelines (TPL) sites over three years. The service provider will ensure engineering oversight, procurement coordination, construction supervision, quality assurance, and compliance monitoring to meet technical, regulatory, and sustainability requirements. The EPCM services will also manage cost control, risk management, and contractor performance while aligning with TPL's Net Zero initiative to enhance energy efficiency, reduce carbon emissions, and lower electricity costs. This is a once-off (one-time project-based contract) with a period of 3 years and an estimated contract value of R16,729,656.00 (Incl. VAT).
Evaluation Criteria
Source: TPPP Market Analysis - Rev 2.pdf (RFP)The 80/20 preference point system applies because the estimated contract value is below R50 million.
Preference points are awarded as follows:
Bidders must hold a B-BBEE Status Level 1 or 2 contributor certificate to qualify for the mandatory goal.
No CIDB grading requirement is triggered.
Bidders must comply with designated sector local content requirements for cement and steel products/construction components.
Technical Specifications
Source: TPPP Market Analysis - Rev 2.pdf (RFP)Scope: Provision of Engineering, Procurement, and Construction Management (EPCM) services to support Transnet Pipelines (TPL) in the design, procurement, construction, commissioning, and handover phases for the Solar PV Renewable Energy Project at various sites.
Project Number: TPL/2025/02/0005/88487/RFP
Contract type: Once-off (one-time project-based contract)
Contract period: 3 years
Key responsibilities:
Designated sectors (local content):
Financial Requirements
Source: TPPP Market Analysis - Rev 2.pdf (RFP)Estimated contract value: R16,729,656.00 (Incl. VAT)
No bid security, guarantees, retention, or payment terms are stated in the document.
Compliance Requirements
Source: TPPP Market Analysis - Rev 2.pdf (RFP)B-BBEE: Bidders must hold a B-BBEE Status Level 1 or 2 contributor certificate to qualify for the mandatory goal.
Local content: Bidders must comply with designated sector local content requirements for cement and steel products/construction components (100% local content).
Subcontracting: Structural engineering work is estimated at 5% of the contract value, which is below the 30% TPPP subcontracting threshold, so it does not meet the threshold. However, the tenderer may decide to subcontract.
No CIDB grading requirement is triggered.
No other specific compliance requirements are stated in the document.
B-BBEE Requirements
Source: TPPP Market Analysis - Rev 2.pdf (RFP)The project falls below R50 million, therefore the 80/20-point preference system will be applied. TPPP goals selected for the procurement event are based on the following considerations: For transactions of R5m and above, 1 or more specific goals may be selected; BBBEE Status level 1 or 2 is a mandatory goal; This procurement transaction is specialised services involving engineering oversight, procurement coordination, construction supervision, quality assurance, and compliance monitoring to meet technical, regulatory, and sustainability requirements. Possibility of sub-contracting is minimal. Structural engineering work does not meet the 30% requirement for sub-contracting to one or more designated groups under Transnet's Preferential Procurement Policy. The application of TPL's preferential strategy for the 25/26 year (i.e., increase spend with BWO & BYO suppliers, suppliers that have BBBEE Levels 1 or 2 and LC for designated sectors). Market research indicated: 8 market players (80%) have the minimum BBBEE level 1 or 2; 5 suppliers (50%) have qualifying BWO; 0 suppliers (0%) have black youth ownership; 0 suppliers (0%) have PWD ownership. Therefore, the TPPP goals selected are: B-BBEE Status Level of Contributor 1 or 2 (10 points) and 30% Black Women-Owned entities (10 points) under the 80/20 system. It should be noted that while there are other goals that may be pursued, a goal will only be pursued if it is: 1) mandatory; or 2) aligned to TPL's transformation objectives and there must be a sufficient number of enterprises falling within the category of those targeted to advance a specific goal/s (minimum requirement for a preferential goal to be pursued is 33% of the sample); 3) The project represents opportunity for a transformation objective to be achieved.
Environmental
Source: TPPP Market Analysis - Rev 2.pdfThe EPCM services must align with TPL's Net Zero initiative to enhance energy efficiency, reduce carbon emissions, and lower electricity costs.
Requirements
Source: TPPP Market Analysis - Rev 2.pdf (RFP)Any goods that fall under designated sectors: Cement - 100%; Steel products & Construction Components - 100%. The identified subcontracting area (Structural Engineering) is estimated at 5% of the contract, which is below the 30% TPPP subcontracting threshold, so it does not meet the threshold, but the tenderer may decide to subcontract. The contract duration is 12 months or more, and the CIDB grading designation is 7 or higher (R20 million plus excluding VAT).
Description
Source: Technical Evaluation Sheet - Solar PV.xlsxProfessional services for engineering consultant in strategic planning and project support for Transnet Pipelines' renewable energy rollout, for a period of 3 years.
Submission Guidelines
Source: Technical Evaluation Sheet - Solar PV.xlsx (unknown)Returnable documents:
Submission method: as per the tender document (not specified in the extracted text).
Evaluation Criteria
Source: Technical Evaluation Sheet - Solar PV.xlsx (unknown)Technical evaluation (100 points total):
No minimum qualifying score stated in the extracted text.
Technical Specifications
Source: Technical Evaluation Sheet - Solar PV.xlsx (unknown)Scope: Professional services for engineering consultant in strategic planning and project support for Transnet Pipelines' renewable energy rollout.
Duration: 3 years.
Key personnel required:
Programme requirements:
Previous experience:
Method statement must cover:
Compliance Requirements
Source: Technical Evaluation Sheet - Solar PV.xlsx (unknown)Certified copies (within last 3 months) of qualifications, training certificates, and professional registrations for key persons must be appended to the tender.
Evaluation Criteria
Source: 4._Part_C2_-_Pricing_Data_-Rev_02.pdf (RFP)No explicit evaluation criteria (e.g., scoring split, minimum qualifying score, preference point system) are stated in the provided document. The document is Part C2 (Pricing Data) of the tender pack, which focuses on pricing instructions and the task schedule. Bidders must comply with the NEC3 Professional Services Contract (June 2005, amended June 2006 and April 2013) and the pricing instructions. Staff rates must not exceed those payable to professionally qualified staff responsible for the service. Expense claims must adhere to National Treasury limits and specified vehicle/accommodation restrictions.
Technical Specifications
Source: 4._Part_C2_-_Pricing_Data_-Rev_02.pdf (RFP)The scope of services is defined by the Task Schedule, which is divided into sections. The consultant will provide professional engineering services for strategic planning and project support for Transnet Pipelines' renewable energy rollout over a 3-year period. Key tasks include:
Experience & Qualifications
Source: 4._Part_C2_-_Pricing_Data_-Rev_02.pdfStaff are categorised by ECSA categories based on experience:
Pricing Schedule
Source: 4._Part_C2_-_Pricing_Data_-Rev_02.pdfPricing is under NEC3 Professional Services Contract Option G (Term Service). The Task Schedule provides the basis for valuations and progress monitoring. The Total of the Prices is the sum of the prices entered in the Task Schedule, but does not represent a guaranteed or minimum amount payable. Payment is made against tangible deliverables and transmittals issued to TPL, with verification of progress: Issue for Client Approval qualifies for 60% pro rata payment; Confirmation of Acceptance for Implementation qualifies for 100% pro rata payment. Provisional sums are included: H1 R870,000.00 for disbursements (allowance only; payment limited to actual, reasonable, properly incurred costs supported by documentary evidence; no mark-up, profit, attendance, or overheads unless expressly stated); H2 R670,000.00 for estimated escalation (allowance only; amount due determined by Contract Price Adjustment provisions). Staff rates must include all costs to the consultant (basic salary, benefits, social costs, overheads, administrative support). Hourly rates for salaried professional or technical staff must not exceed that payable to a professionally qualified person responsible for the service. Rates include protective clothing and standard equipment. Staff rates exclude VAT. Expense claims are restricted: subsistence allowance only per night away from home; travel expenses only for transportation from usual place of business to jobsite and return; all air travel economy class on a scheduled low cost airline; accommodation limited to bed and breakfast, guest house, self catering, or 1-3 star hotel (charged at proven costs within National Treasury limits); a lodge, country house, or 4-star or higher hotel is not claimable; breakfast not included in accommodation is not an expense; hired car engine capacity not more than 1600cc; private car or MPV and pick-up vans/bakkies with engine capacity ≤1600cc claimable at cost per km, greater than 1600cc not claimable. Staff rates are to be provided for the following roles: Project Manager, Senior Structural Engineer, Senior Electrical Engineer, Mechanical Engineer, Quantity Surveyor, Site Safety Officer (H&S), Project Administrator, QA/QC Inspectors, Document Controllers, Cost Control Engineers, Project Planner. Expenses are to be provided for: subsistence allowance (amount per day), transportation costs (hired car not exceeding Group B, economy class airfares), accommodation costs (any 3-star equivalent), private car or MPV (engine capacity ≤1600cc, cost per km), pick-up vans and bakkies (engine capacity ≤1600cc, cost per km).
Financial Requirements
Source: 4._Part_C2_-_Pricing_Data_-Rev_02.pdf (RFP)Pricing is under NEC3 Professional Services Contract Option G (Term Service). The consultant is paid for services performed. The Task Schedule provides the basis for valuations and progress monitoring. The Total of the Prices is the sum of the prices entered in the Task Schedule, but does not represent a guaranteed or minimum amount payable. The employer is only liable for activities instructed and completed in accordance with the Scope and contract.
Payment is made against tangible deliverables and transmittals issued to TPL, with verification of progress:
Provisional sums are included in the Task Schedule:
Staff rates must include all costs to the consultant (basic salary, benefits, social costs, overheads, administrative support). Hourly rates for salaried professional or technical staff must not exceed that payable to a professionally qualified person responsible for the service. Rates include protective clothing and standard equipment. Staff rates exclude VAT.
Expense claims are restricted: subsistence allowance only per night away from home; travel expenses only for transportation from usual place of business to jobsite and return; all air travel economy class on a scheduled low cost airline; accommodation limited to bed and breakfast, guest house, self catering, or 1-3 star hotel (charged at proven costs within National Treasury limits); a lodge, country house, or 4-star or higher hotel is not claimable; breakfast not included in accommodation is not an expense; hired car engine capacity not more than 1600cc; private car or MPV and pick-up vans/bakkies with engine capacity ≤1600cc claimable at cost per km, greater than 1600cc not claimable.
Compliance Requirements
Source: 4._Part_C2_-_Pricing_Data_-Rev_02.pdf (RFP)No specific compliance requirements (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document. The document is Part C2 (Pricing Data) and focuses on pricing instructions and the task schedule. Bidders must comply with the NEC3 Professional Services Contract and the pricing instructions.
Health & Safety
Source: 4._Part_C2_-_Pricing_Data_-Rev_02.pdfHealth, safety and environment tasks include: ensure adherence to all safety regulations (12 sites), environmental compliance monitoring. A Site Safety Officer (H&S) is listed as a staff resource.
Environmental
Source: 4._Part_C2_-_Pricing_Data_-Rev_02.pdfEnvironmental compliance is required: confirm alignment with Transnet Pipelines standards and ensure integration with existing infrastructure by ensuring regulatory and environmental compliance. Environmental compliance monitoring is a task (F2).
Contractual Terms
Source: 4._Part_C2_-_Pricing_Data_-Rev_02.pdfThe contract is under the NEC3 Professional Services Contract (June 2005, amended June 2006 and April 2013) Option G (Term Service). The consultant is paid for services performed. The employer is only liable for activities instructed and completed in accordance with the Scope and contract. Payment is made against tangible deliverables and transmittals issued to TPL, with verification of progress: Issue for Client Approval qualifies for 60% pro rata payment; Confirmation of Acceptance for Implementation qualifies for 100% pro rata payment. Provisional sums are allowances only and are adjusted as per contract provisions. Disbursements are paid at actual, reasonable, properly incurred costs supported by documentary evidence, with no mark-up, profit, attendance, or overheads unless expressly stated. Escalation is determined by Contract Price Adjustment provisions.
Description
Source: EPCM SCOPE OF SERVICES-Version 4.pdfThe project involves evaluating and implementing solar PV systems at 12 depot sites across various provinces. Proposed generation capacities are preliminary and will be finalised by the Consultant following feasibility studies, detailed assessments, load profiling, and spatial or structural validation. The Consultant shall verify and refine capacities, optimise system sizing, conduct feasibility studies, and prepare conceptual design including electrical layouts, structural considerations, system integration, and Scope of Works. All feasibility and conceptual design deliverables must be formally accepted by the Employer's Agent before any subsequent phase may proceed. The contractor will be responsible for detailed engineering design and construction based on the accepted conceptual design and Scope of Works.
Important Dates
Source: EPCM SCOPE OF SERVICES-Version 4.pdf (RFP)No specific dates for briefing sessions, site visits, or clarification deadlines are stated in the document.
Submission Guidelines
Source: EPCM SCOPE OF SERVICES-Version 4.pdf (RFP)Returnable documents:
Communication protocol:
Evaluation Criteria
Source: EPCM SCOPE OF SERVICES-Version 4.pdf (RFP)Bidders must undergo security screening and provide the required company and personnel documentation.
Key personnel must be registered with the Engineering Council of South Africa (ECSA) as Professional Engineer (Pr Eng) or Professional Engineering Technologist (Pr Tech).
The Consultant must comply with all applicable codes and standards, including SANS, IEC, NRS, and NERSA.
The Consultant is not responsible for construction means, methods, or temporary works; these remain with the contractor.
Evaluation will consider technical compliance and the ability to deliver the full scope of services.
Methodology
Source: EPCM SCOPE OF SERVICES-Version 4.pdfThe Consultant shall execute services in a logically sequenced manner, maintaining a project schedule reflecting dependencies across design, procurement, construction, commissioning, and handover.
Prepare Employer's Requirements, Concept Design, Design Basis Report, and Performance Specifications.
Planning and scheduling: create comprehensive project plan schedule; monitor progress; implement corrective actions; align with Employer's operational priorities; regular meetings with Employer's owners' team.
Risk management: conduct thorough risk assessment; develop mitigation strategies; continuously monitor and update risk register.
Design review and validation:
Regulatory and environmental compliance: lead conceptual-phase regulatory engagements; confirm connection feasibility with utility; ensure designs adhere to SANS, IEC, and environmental guidelines; confirm alignment with Transnet Pipelines standards.
Stakeholder coordination: develop Stakeholder Communication Matrix; coordinate communication between Employer's Agent, contractor, regulatory authorities; facilitate and document regular project coordination meetings; maintain records of communications and decisions; document and track design changes.
Development of procurement specifications: review and align with Employer's Procurement Procedures; develop detailed scope of work for all sites to issue tender; specify performance criteria, warranties, certifications.
Procurement phase: support Employer's Agent in procurement process; prepare scope of works; participate in technical evaluation of bids; recommendations on technical grounds only; final selection rests with Employer's Agent; do not enter contractual or financial arrangements unless instructed; evaluation procedures aligned with Employer's procurement governance.
Construction phase: oversee contractor's work; supervise, monitor, verify compliance with accepted design and contract specifications; not responsible for construction means, methods, or temporary works.
Commissioning phase: oversee and validate testing and commissioning of solar PV systems; ensure functionality, performance, compliance; identify and address deficiencies; collaborate with contractors to rectify issues; verify commissioning documentation.
Handover phase: review and verify contractor's training package; coordinate training implementation; monitor and witness training; coordinate interface during initial operational period; verify post-handover support mechanisms; review and recommend acceptance of complete handover documentation package; prepare Handover Verification Report.
Quality Management
Source: EPCM SCOPE OF SERVICES-Version 4.pdfThe Consultant must prepare and maintain a project-specific Quality Management Plan (QMP) for the duration of the project, submitted to the Employer's Agent for acceptance before commencement of works.
Inspection and surveillance at key milestones: design, procurement, manufacturing, construction, testing, commissioning, and handover.
Contractor quality requirements:
Quality audit programme to be established and implemented; Employer may participate or witness audits.
Non-conformance management: All NCRs submitted to Employer's Agent; no NCR closed without Employer's Agent acceptance.
FAT and SAT to be witnessed, monitored, reviewed, and recommended for acceptance by Consultant in collaboration with Employer's Agent.
Design assurance: Consultant reviews contractor's design deliverables for compliance.
Quality reporting at defined intervals to Employer's Agent.
Material and equipment quality verification: review quality documentation and verify records before installation, commissioning, and handover.
Management of change and technical deviations: all deviations affecting scope, quality, performance, or compliance submitted to Employer's Agent for acceptance before implementation.
Testing and commissioning: coordinate and monitor contractor's activities; verify completion requirements; review results; monitor punch items; provide recommendations on readiness.
Handover: verify all quality records, test certificates, as-built drawings, O&M manuals, warranties, commissioning records, and statutory compliance certificates are complete in final handover data package.
Financial Requirements
Source: EPCM SCOPE OF SERVICES-Version 4.pdf (RFP)Bid bond and performance guarantees are mentioned but no specific amounts or percentages are stated.
Compliance Requirements
Source: EPCM SCOPE OF SERVICES-Version 4.pdf (RFP)Security screening required before access to Transnet premises.
Required documentation:
Key personnel must be registered with ECSA as Pr Eng or Pr Tech.
Compliance with Occupational Health and Safety Act and relevant regulations.
Compliance with Transnet contractor Management Procedure (TIMS-GRP-PROC-014).
SHE Compliance File required before site entry, including:
All personnel must wear full flame-retardant PPE on site.
All personnel must have valid medical certificates of fitness issued by an occupational health practitioner.
Health & Safety
Source: EPCM SCOPE OF SERVICES-Version 4.pdfComply with Occupational Health and Safety Act and relevant regulations.
All personnel must wear full flame-retardant PPE at all times on Employer's sites.
Comply with Transnet contractor Management Procedure (TIMS-GRP-PROC-014).
No person may enter any Transnet Pipelines site without undergoing safety, health, and environmental induction.
All employees working on site must have valid medical certificates of fitness issued by an occupational health practitioner.
Submit a comprehensive SHE Compliance File to the Employer's Agent for review and acceptance before commencing any site activities.
SHE Compliance File must include:
Environmental
Source: EPCM SCOPE OF SERVICES-Version 4.pdfComply with National Environmental Management Act, National Water Act, National Environmental Management: Waste Act, and other applicable environmental legislation.
Consult Employer's Environmental Department on matters requiring specialist environmental input.
Responsibilities include:
Consultant does not assume responsibility for implementing environmental controls, waste disposal, spill response, or environmental remediation; these remain with contractor.
Waste management: monitor and verify contractor implements waste management practices per approved EMP and legislation.
Hazardous substances: monitor contractor's storage, transport, and handling per approved EMP and relevant legislation (Hazardous Substances Act, OHSA, local bylaws).
Incident reporting: record, monitor, and report environmental incidents and verify corrective actions.
Contractual Terms
Source: EPCM SCOPE OF SERVICES-Version 4.pdfCopyright and licensing:
Deliverable acceptance:
Requirements
Source: EPCM SCOPE OF SERVICES-Version 4.pdf (RFP)Security screening required before access to Transnet premises. Required documents: company registration number, CIPC registration, company tax clearance (TCS PIN), certified copies of directors' IDs, fingerprints of directors (SAP 91) from local SAPS, certified copies of IDs of employees working on site, fingerprints of employees (SAP 91). SSA screening takes 3–4 weeks once all documentation is submitted.
Section
Source: EPCM SCOPE OF SERVICES-Version 4.pdfBidders must undergo security screening and provide required documentation. Key personnel must be registered with ECSA as Pr Eng or Pr Tech. The Consultant must comply with applicable codes and standards. The Consultant is not responsible for construction means, methods, or temporary works.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve architectural, building design, or professional built-environment services.
Act 44 of 2000
Relevant where architectural work or professional building-design services may be required.
Relevant because this tender appears to involve architectural, building design, or professional built-environment services.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve architectural, building design, or professional built-environment services.
Address
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
24
Last checked
07 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
subsidiary of Transnet
Contact
031-361-2239[email protected]www.transnet.netLevel 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
How consulting engineers, engineering firms, and multidisciplinary practices can win public sector infrastructure contracts in South Africa — from ECSA registration and CESA membership to fee proposals, QBS scoring, and building a winning tender response.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
A professional guide for consulting engineers on bidding for government infrastructure projects. Understanding percentage-based fees, discounting ECSA guidelines, and managing professional indemnity risk.
How Tenders-SA built a forensic analysis workbench that detects procurement irregularities across 80+ indicators spanning 8 families — from market concentration and single-bidder patterns to OCPO restricted supplier cross-referencing and AI-generated case narratives.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Architectural and engineering activities; technical testing and analysis. Unlock full pricing strategies, bid frequency, and historical win rates.