ESKOM requires all service providers to complete a paye classification questionnaire to determine their tax status as independent contractors, personal service providers, labour brokers, or dependent contractors. The questionnaire applies to companies, close corporations, trusts, and individuals supplying services or labour to the ESKOM group for the 2026/2027 tax year. Bidders must answer a series of tests covering residence, employee count, connected persons, income concentration, place of work, control, and dominant impression, then sign the corresponding affidavits or declarations. Failure to submit signed required documents will result in paye being withheld from payments.
Key Requirements
Complete Evaluation Pack A (companies/CCs/trusts) or Pack B (individuals) with all mandatory fields marked *.
Answer all questions truthfully; the answers determine which appendices must be signed.
Sign and submit the required affidavits (Appendices 1–5) or declarations (Appendices 6–9) based on questionnaire outcomes.
Labour brokers must provide a valid IRP30 exemption certificate; otherwise PAYE will be withheld until supplied.
Return the completed pack to Eskom and copy [email protected]; unsigned required documents trigger PAYE withholding.
Notify Eskom in writing immediately if any declared information changes during the contract period.
The questionnaire is valid from 1 March 2026 to 28 February 2027 and is subject to tax legislation changes.
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Provision of comprehensive waste management services for National Transmission Company South Africa SOC Ltd across Simmerpan Complex, Apollo, Hume, VLI, Tower Testing, Bernina Houses and Zwavelpoort in Gauteng over a 60-month period. The contractor must supply all labour, supervision, equipment, transport, PPE, bins, skips and spill kits, and ensure full compliance with OHS, NEMWA, NEMA and municipal by-laws.
OHS Tender Evaluation for Waste Contract Management.pdf
Provision of waste management services for Eskom National Transmission Company of South Africa in Gauteng. The contract is classified as low risk work under an OHS tender evaluation framework effective 23 November 2023, with a review date of November 2026. Bids close on 15 December 2026 at 11:00 South Africa Standard Time.
The department requires provision of waste management services for Eskom National Transmission Company of South Africa in Gauteng, with the contract to close on 15 December 2026 at 11:00 SAST.
Provision of waste management services for Eskom's Transmission business in Gauteng. Bidders must complete a method statement setting out how the scope of work will be delivered, covering quality management, competencies and training, PPE, tools and equipment, risk, and stakeholder management.
240-12248652_List of Tender Returnables_Cat 4_ Rev 7_Waste Man_20260806.pdf
Eskom National Transmission Company of South Africa requires the provision of waste management services in Gauteng. Bids close on 15 December 2026 at 11:00. Suppliers are evaluated on their quality management system and supporting returnable documents.
Eskom requires suppliers to develop, implement, maintain and continually improve a quality management system (QMS) based on ISO 9001 for the provision of waste management services. The specification sets out minimum quality requirements for supplier selection, evaluation, vendor registration, monitoring, assessment and auditing, and applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers.
Supply and delivery of waste management services for Eskom National Transmission Company of South Africa. The procurement closes on 15 December 2026 at 11:00 South Africa Standard Time.
Link_Non-compulsory clarification meeting Provision of Waste Management..pdf
Provision of waste management is required. The procurement covers waste management services for Eskom National Transmission Company of South Africa in Gauteng. The closing date is 15 December 2026 at 11:00.
Transmission Real Estate Waste Management Tender Pricelist.xlsx
Supply and provision of waste management services for Eskom National Transmission Company Transmission Real Estate in Gauteng. The scope covers waste bin supply and rental, collection and disposal, recycling, separation, consumables, transport and management. The closing date is 15 December 2026 at 11:00.
559-343110581_Post contract award SHEQ Requirements Waste Contract Services and Management.pdf
The department requires the provision of waste management and waste contract services and management for the Eskom National Transmission Company of South Africa in Gauteng. Bidders must submit and obtain approval for a comprehensive Safety, Health, Environment, and Quality (SHEQ) compliance file, which includes specific plans, registers, and personnel appointments, before being authorized to commence work.
Eskom National Transmission Company of South Africa requires waste management providers to deliver services in Gauteng. The tender for provision of waste management closes on 15 December 2026 at 11:00 SAST and must be submitted electronically through the eTendering system or Tender Bulletin Public website.
240-68099512 Form A Rev 10_ Provision of Waste Management_20260806.pdf
Provision of waste management services for Eskom National Transmission Company of South Africa at Simmerpan complex, Hume, VLI, Tower testing, Apollo, Zwavelpoort and other areas around Gauteng. Bidders must submit by 15 December 2026 at 11:00 South Africa Standard Time and accept Eskom Supplier Quality Requirements 240-105658000 and ISO 9001.
Provision of waste management services for Eskom National Transmission Company of South Africa in Gauteng. Bids close on 15 December 2026 at 11:00 South Africa Standard Time. The pack carries an Environmental Management Declaration that the contractor must sign and accept.
Eskom Standard Conditions of Tender on e-tendering.pdf
Eskom requires the provision of waste management services under a tender issued by the Eskom National Transmission Company of South Africa in Gauteng. The scope covers waste management services to be delivered under a contract arising from this invitation to tender.
Provision of waste management services is required for Eskom National Transmission Company of South Africa in the Gauteng area. The contract period is 60 months (5 years).
Final SHE Spec for Provision of Waste Management Services.pdf
Provision of waste management services across NTCSA's Gauteng sites, covering the collection, disposal, recycling and safe handling of general, hazardous and specialist waste streams on a scheduled frequency basis with ad hoc call-outs. The service includes the supply, servicing and labelling of bins, skips, drums and refuse bags, plus daily waste sorting and segregation at the waste area.
Environmental Requirements for Contractors and or Suppliers.pdf
Waste management services are required for Eskom National Transmission Company of South Africa in Gauteng. Bidders must operate under a documented environmental management system and comply with Eskom's six-phase contractor environmental management model across design, tender, registration, mobilisation, execution and post-contract phases. The closing date is 15 December 2026 at 11:00 South Africa Standard Time.
PAYE Questionnaire for Service Contracts 2026_2027.doc
Eskom National Transmission Company of South Africa requires the provision of waste management services. Bidders must complete the PAYE Questionnaire for Service Contracts to determine their tax classification and ensure proper tax handling.
Provision of waste management is required. The procurement covers waste management for Eskom National Transmission Company of South Africa operations in Gauteng and is supported by the Eskom Safety, Health, Environment and Quality Policy. The policy requires compliance, management system integration, continual improvement and environmental risk management.
Provision of waste management services for Eskom National Transmission Company of South Africa in Gauteng over a sixty-month period. The contract carries skills development targets for waste collectors, waste pickers, and refuse removal operators, together with B-BBEE improvement obligations and a 100% local procurement content target.
Eskom National Transmission Company of South Africa requires provision of waste management services in Gauteng. Bidders must comply with the Contractor OHS Management Standard (32-726) to ensure occupational health and safety throughout the contract lifecycle.
NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf
Provision of waste management services is required by Eskom National Transmission Company of South Africa. The procurement is located in Gauteng and bids must be submitted by 15 December 2026 at 11:00. Tenderers must also complete the e-tendering training acknowledgement form to confirm their ability to use the e-tendering system.
Provision of waste management services for a period of 60 months. The contractor must implement a comprehensive waste management plan and environmental management system to meet Eskom's environmental compliance standards.
240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf
Provision of waste management services for Eskom National Transmission Company of South Africa in Gauteng. The appointed contractor must align its occupational health and safety processes to Eskom's OHS requirements and manage its own contractors and suppliers accordingly.
PAYE Questionnaire for Service Contracts - 2026_2027.xls
The department requires the provision of waste management services for Eskom National Transmission Company of South Africa in Gauteng. Bidders must complete the company particulars, evaluation questionnaires, and appendices in the tender pack and submit their bids by 15 December 2026 at 11:00.
NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf
Provision of waste management services for the National Transmission Company South Africa SOC Ltd (NTCSA) in the Gauteng area, covering waste collection, transport and disposal under an NEC contract. The service requires accredited waste management permits, qualified waste supervisors and sorters, and a site-specific waste management plan.
Eskom National Transmission Company of South Africa
Google
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
APPOINTMENT OF A SERVICE PROVIDER OR CONSORTIUM OF SERVICE PROVIDERS FOR PROVISIONING OF SERVICES ON THE EARLY CHILDHOOD DEVELOPMENT NUTRITION SUPPORT PROGRAMME OF THE DEPARTMENT OF BASIC EDUCATION FOR A PERIOD OF THREE YEARS
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Eskom selects the applicable quality category and records it in Form A.
Only one quality category applies to a procurement process.
Category 1 requires: a valid ISO 9001 certificate; latest internal and external audit reports; a draft contract quality plan; an example inspection and test plan or quality control plan where applicable; documented control of externally provided processes, products and services; documented QMS roles, responsibilities and authorities; and management review records.
Category 2 requires: documented evidence of an implemented and maintained QMS, including a QMS manual or equivalent, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, and nonconformity and corrective action procedure; latest internal audit reports; a draft contract quality plan; an example inspection and test plan or quality control plan where applicable; control of externally provided processes; QMS roles and responsibilities; and management review records.
Category 3 requires: documented evidence of a developed QMS, including a QMS manual or equivalent, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, and nonconformity and corrective action procedure; a draft contract quality plan; an example inspection and test plan or quality control plan where applicable; control of externally provided processes; and QMS roles and responsibilities.
Category 4 requires: a quality method statement based on ISO 9001 and specific to the scope; a signed or approved quality policy; quality objectives; control of externally provided processes; and roles, responsibilities and authorities specific to the project or scope.
Capability and capacity assessment: Eskom may assess potential suppliers before award where the work involves high risk to operational sustainability, critical plant or equipment, critical plant items or components, or special processes.
Applies to Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of Eskom requests for information, quotations, proposals and contracts.
Suppliers must develop, implement, maintain and continually improve a quality management system based on ISO 9001.
Where required by the selected quality category, suppliers must provide a contract quality plan and a quality control plan or inspection and test plan.
Contract quality plans must address quality assurance, records, access for inspection, final documentation, special processes, personnel competency, storage, preservation and sub-supplier monitoring.
Inspection and test plans must identify operations, acceptance criteria, inspection and test activities, hold points, witness points, records and responsibilities.
Eskom may appoint inspection agencies or resident inspectors, require access to premises and records, and audit suppliers and sub-suppliers.
Where resident inspectors are appointed, the supplier must provide workspace at no cost to Eskom.
Suppliers must manage nonconformities, corrective actions, preservation of materials and equipment, and special processes that cannot be fully verified before delivery or use.
Sub-suppliers must be controlled through quality plans, performance management, audits, surveillance and capability assessments.
Suppliers must prepare quality control plans or inspection and test plans that describe each activity, location, reference procedure, acceptance criterion, inspection or test, and record.
Plans must include Eskom and supplier intervention points, such as hold, witness, surveillance, review and verification points.
A quality kick-off meeting is required at the start of the contract and, where applicable, at the start of each phase.
Coordination meetings with Eskom before placing orders for items or equipment require 14 days' advance notice.
Suppliers must control sub-supplier inspection and testing, review reports, and assess sub-supplier facilities and programmes.
A documented preservation programme must cover identification, storage, handling, maintenance and protection of materials and equipment before operation.
Form A (240-68099512) must be completed and signed.
Unless excluded for the selected quality category, the supplier, relevant sub-suppliers and any applicable manufacturing third-party organisation must hold a valid ISO 9001 certificate from an accredited certification body and maintain a documented quality management system.
The applicable quality category determines the quality evidence required, as set out in Eskom document 240-12248652.
Suppliers providing high-risk services, critical plant, critical components or special processes may be subject to capability and capacity assessment before award.
Preservation requirements for systems, equipment, materials and procured goods must be documented in purchase orders, work authorisations and supplier-sub-supplier communications.
Sub-supplier input into preservation protocols must be recorded where used.
Preservation responsibilities must be assigned to the project team and implemented at all work locations.
Eskom must have unrestricted access to preservation records for inspection and audit.
Signed quality control plans and inspection and test plans become contract addendums and may be reviewed by Eskom.
The quality category selected in Form A determines the required quality documentation.
Categories 1 to 4 require different levels of quality management system evidence, audit reports, contract quality plans, inspection and test plans, and control of externally provided processes.
Capability and capacity assessments may be applied before award for high-risk, critical plant, critical components or special processes.
The receiving party may not disclose or use the disclosing party's confidential information for any purpose other than the project, without prior written consent.
Disclosure to representatives (employees, agents, officers, directors, subsidiaries, shareholders, advisers) is permitted only on a need-to-know basis and for the project; the receiving party must ensure those representatives are bound by equivalent confidentiality terms.
The receiving party must protect the information with at least the same care it applies to its own proprietary information, and no less than a reasonable standard of care.
The receiving party indemnifies the disclosing party against losses arising from unauthorised use or disclosure.
Exclusions from confidentiality
Information already known to the receiving party before disclosure.
Information that becomes public through no breach by the receiving party.
Information independently developed by the receiving party without breach.
Information required to be disclosed by court order or law, provided the receiving party notifies the disclosing party and discloses only the required portion.
Information disclosed with the disclosing party's prior written authorisation.
Information received from a third party without breach.
Return or destruction of information
On request, the receiving party must return or destroy all confidential material within 7 business days and provide a written statement confirming no copies are retained.
Term
The agreement commences on the date of signature and continues for 3 years after the relationship between the parties ends, or as specified in a subsequent agreement.
Breach
If the receiving party fails to remedy a breach within 7 business days of written notice, the disclosing party may pursue all legal remedies, including urgent court proceedings and damages.
Other terms
Amendments must be in writing and signed by both parties.
Neither party may assign rights or obligations without the other's prior written consent, except NTCSA may cede to its departments or restructured entities in the electricity supply industry.
Neither party may make public announcements about the agreement without the other's consent.
The agreement is governed by South African law.
Notices must be sent to the addresses set out in the agreement; changes require 30 business days' written notice.
One method statement completed on the issued template, headed with the tender or RFQ title as advertised.
Cover details to be captured: supplier representative's full name, compiler's designation, contact number and date, together with originator, reviewer and approver where these roles apply.
Client division, operating unit or business unit and the tender, RFQ or contract number must be entered.
Every activity listed must carry a reference document or procedure number and the relevant area, department or discipline.
Scope of work: an outline of the works described in the Works Information of the NEC document, order or tender, with the governing document reference and applicable discipline noted.
Objectives: two to three SMART objectives tied to the scope outputs.
Customer focus: how client needs are established and communicated to affected personnel.
Competence: skills, training and levels of authority needed to deliver the scope.
PPE: protective clothing and equipment required to execute the work.
Infrastructure: tools, equipment and infrastructure required, including any testing or measurement to be performed.
Organisation: mission, vision and shared values.
Risk management: risks affecting outputs and overall outcomes, with the actions planned to minimise and mitigate each.
Process improvement: how gaps in business processes are identified and addressed to meet or exceed client and regulatory requirements.
Data and analysis: data gathered under the contract and the analysis used to support future decisions.
Relationship management: other stakeholders affected by the product or service, their impact rated low, medium or high, and the actions taken; whether outsourcing forms part of delivery; and how suppliers are identified, selected, evaluated and performance-monitored.
DocumentSDL&I Provision of Waste Management.pdfReview complete
Description
Source: SDL&I Provision of Waste Management.pdf
The procurement covers waste management services for the Transmission business unit over a 60-month period.
Important Dates
Source: SDL&I Provision of Waste Management.pdf (unknown)
Key dates
Closing: 15 December 2026 at 09:00.
B-BBEE improvement or retention plan: within 30 days after contract signature.
SDL&I Implementation Schedule: return for acceptance within 28 days after contract award.
SDL&I compliance reports: quarterly using the Data Collection Template.
NTCSA review of each SDL&I report: within 30 days of receipt.
Corrective measures: required before the next reporting period if obligations are missed.
Contact Information
Source: SDL&I Provision of Waste Management.pdf (unknown)
Document contact
Name: Dorothy Kgoete
Role: Officer, Supplier Development Localisation & Industrialisation (SDL&I)
Buyer
Name: Matshipi Mosima
Evaluation Criteria
Source: SDL&I Provision of Waste Management.pdf (unknown)
Evaluation and award
Preference points require valid B-BBEE evidence: a SANAS-accredited certificate, a sworn affidavit, or a CIPC affidavit.
A valid B-BBEE certificate or sworn affidavit is a condition of contract award.
Revenue up to R10 million: an Exempted Micro Enterprise may use a sworn affidavit.
Revenue up to R50 million: a Qualifying Small Enterprise must meet the applicable scorecard elements unless it is at least 51% black-owned; then a sworn affidavit is acceptable.
Revenue above R50 million: a valid B-BBEE certificate is required.
SDL&I targets are not scored. Missing NTCSA targets does not by itself disqualify a bidder, but accepted commitments become contractual obligations.
Failure to meet objective criteria may result in the next-ranked bidder being recommended for award.
Technical Specifications
Source: SDL&I Provision of Waste Management.pdf (unknown)
Scope and service requirements
Waste management services for the Transmission business unit.
Contract period: 60 months.
Skills development linked to waste operations: 3 waste collectors, 3 waste pickers and 3 refuse removal operators.
Candidates must be sourced from all provinces and reflect South African demographics.
Preference is given to previously disadvantaged candidates, especially those local to the site.
Eskom employees and registered learners do not count toward these skills targets.
The bidder must bear the full cost of the required skills development.
Pricing Schedule
Source: SDL&I Provision of Waste Management.pdf
If local and imported content are combined, the tender response must split pricing into components according to the price schedule. The local procurement content target is 100%.
Financial Requirements
Source: SDL&I Provision of Waste Management.pdf (unknown)
Pricing and financial conditions
Where an offer contains both local and imported content, the pricing response must be separated into components using the tender price schedule.
Local procurement content target: 100%.
SDL&I penalty: 2.5% of the invoice amount for failure to meet SDL&I obligations.
SDL&I retention: 2.5% of each invoice, excluding VAT, withheld as security.
Retention release: after SDL&I progress reports are received, all SDL&I obligations are met, and an approved SDL&I compliance report is submitted.
Compliance Requirements
Source: SDL&I Provision of Waste Management.pdf (unknown)
Compliance requirements
B-BBEE evidence: a valid SANAS-accredited certificate, a sworn affidavit, or a CIPC affidavit.
Revenue thresholds: up to R10 million may use a sworn affidavit; up to R50 million must meet applicable Qualifying Small Enterprise scorecard elements unless at least 51% black-owned; above R50 million requires a valid certificate.
B-BBEE status must be maintained throughout the contract.
Sworn affidavits must show deponent identity and authority, enterprise details, ownership percentages, revenue, financial year-end, B-BBEE level and empowering supplier status.
The deponent and Commissioner of Oaths must sign on the same date; the Commissioner must be independent of the bidder.
Local procurement content target: 100%.
Skills development targets: 3 waste collectors, 3 waste pickers and 3 refuse removal operators; the bidder bears the cost.
Procurement spend targets, as a share of local procurement content: 4.0% black owned, 3.0% black women owned, 2.0% black youth owned and 1.0% black persons with disability.
Proposals must be submitted for jobs created and retained.
SDL&I commitments are contractual and may attract penalties and retention if missed.
Section
Source: SDL&I Provision of Waste Management.pdf
Preference points depend on valid B-BBEE evidence. A Qualifying Small Enterprise with revenue up to R50 million must meet the relevant scorecard elements unless it is at least 51% black-owned, in which case a sworn affidavit is acceptable.
Document240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdfReview complete
Description
Source: 240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf
The main supplier must notify Eskom before appointing any contractor or supplier and before that party starts work.
Submission Guidelines
Source: 240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)
Returnable document:
Eskom Acknowledgement Form for OHS Legal and Other Requirements (Annexure B, template 240-77471499 Rev 4): signed by the CEO, Director or Managing Director and witnessed, confirming access to and understanding of the listed OHS requirements and the consequences of non-compliance.
Supporting evidence:
Testimonials, references and client contact details (including Eskom) may be requested for similar work previously performed.
Technical Specifications
Source: 240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)
Contractor and supplier management obligations:
Maintain a documented contractor and supplier selection process covering competency, compliance and OHS performance.
Notify Eskom before appointing any contractor or supplier and before work starts.
Confirm that contractors and suppliers have the resources and competencies needed for the work scope.
Accept accountability for managing and overseeing contractors and suppliers, including compliance with legal, regulatory and contractual requirements.
Run a programme of audits and assessments to verify OHS compliance throughout execution.
Manage non-conformances and non-compliances at all tiers under the agreed performance and penalty mechanisms, aligned to Eskom processes.
Eskom may verify any action taken on contractors or suppliers at any tier.
Quality Management
Source: 240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf
Contractor and supplier oversight:
Documented selection process covering competency, compliance and OHS performance.
Eskom notified before any contractor or supplier is appointed and before work begins.
Contractors and suppliers must have the resources and competencies required for the scope.
The main supplier is accountable for managing and overseeing its contractors and suppliers against all applicable legal, regulatory and contractual requirements.
A programme of audits and assessments verifies OHS compliance throughout execution.
Non-conformances and non-compliances at all tiers are handled under the agreed performance and penalty mechanisms, aligned to Eskom processes.
Eskom may verify any action taken on contractors or suppliers at any tier.
Compliance Requirements
Source: 240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)
Legal and OHS framework:
Occupational Health and Safety Act, 1993 and its Regulations.
Compensation for Occupational Injuries and Diseases Act, 1993, as amended.
OHS specification 559-489525752.
Eskom SHEQ Policy 32-727.
Eskom Contract and Contractor OHS Management 32-726.
Eskom Incident Management 32-95.
Post-award obligation:
The contractor must align its company processes fully with Eskom's OHS policies, procedures and standards after contract award.
Induction:
All employees of contractors and suppliers must complete the relevant Eskom induction and their own company induction.
Penalties:
Contractual penalties apply to the main supplier for non-compliance with statutory or other requirements, including Eskom OHS requirements, whether the non-compliance arises in the main supplier, its contractors or its suppliers.
DocumentPAYE Questionnaire for Service Contracts - 2026_2027.xlsReview complete
Submission Guidelines
Source: PAYE Questionnaire for Service Contracts - 2026_2027.xls (unknown)
Returnable documents
Completed PAYE questionnaire for service contracts.
Contractor particulars: trading name, ID or passport number, income tax number, telephone number, physical address, postal address and banking details.
Evaluation questionnaire and appendices.
DocumentTransmission Real Estate Waste Management Tender Pricelist.xlsxReview complete
Description
Source: Transmission Real Estate Waste Management Tender Pricelist.xlsx
Terminology: wherever the schedule refers to a Bill of Quantities, it means the Price Schedule.
Submission Guidelines
Source: Transmission Real Estate Waste Management Tender Pricelist.xlsx (unknown)
Summary sheet: tenderer signature and name, with section totals for SHEQ and waste management carried to the total excluding VAT.
The schedule states no submission channel, address or closing time; the tender notice governs.
Technical Specifications
Source: Transmission Real Estate Waste Management Tender Pricelist.xlsx (unknown)
Scope
Total waste management for the Employer's Transmission Real Estate division: placement of bins and containers, monthly rental, collection, disposal, recycling, consumables, sorting labour and management, priced against the schedule.
The schedule must be read with the Scope of Works; wherever it says Bill of Quantities, it means Price Schedule.
Placement (once-off)
4-set 21L labelled recycle bins; 10L mesh steel office bins; 15L parking-mounted litter bins; 6m3 lidded skip; 18m3 and 35m3 marked bins; 1100 x 1000 x 720mm scrap metal bin; 130L colour-coded wheelie bins (green, red, yellow); 240L marked wheelie bins; 240L site and kitchen waste separation bins; 240L lidded cartridge and electronic waste containers; 25L soda ash and low-voltage battery containers; 3-bin office separation sets; 4ft, 5ft and 8ft fluorescent tube boxes (50, 100 and 500 tube loads).
Monthly rental
Same bin range plus 300 x 1000 sorting table and platform scale/weighing machine.
Collection and disposal (per kg, L, each or km)
General waste, garden refuse, building rubble, wood rubble, tree rubble, electronic waste, soda ash, low-voltage batteries, toxic liquid waste and toxic liquid transport.
Pads 40 x 50cm, socks 4m x 80mm, cushions 40 x 40cm, 15kg SDSORB, HD waste bags/ties, goggles/gloves, brooms, plastic shovels, 10kg vermiculite, garden refuse bags, sorting racks/bags.
Rebates and monthly charges
Rebates per kg: tins, plastic/containers, steel, glass, newspaper, cardboard, white, coloured, mixed and clear paper, food waste, oil waste, cartridges.
Monthly: team leader for sorters, sorter labour for waste separation, transport (km), management fee.
SHEQ preliminaries to price
PPE for all workers (2-piece overalls, safety boots, plastic PVC gloves, dust masks, winter jackets, surgical gloves, N95 masks), first aid kits, SHEQ officer with environmental knowledge, pre-employment/periodical/exit medical surveillance, training (first aid level 2, basic fire, RCAT/incident investigation, HIRA, SHE rep, legal liability for supervisors).
Site conditions
Samples of materials and workmanship for Service Manager approval; all commodities new; workmanship to National Building Regulations, latest SABS or British Standard.
New company PPE per job description; no firearms, explosives, liquor or narcotics on site; staff security checks; unauthorised persons excluded; signage in English.
Weekly labour and plant records; daily triplicate record book countersigned by the Service Manager.
Minimum disturbance, regular cleaning, vermin-free site, protection of existing/occupied works.
Advertising rights on site and hoardings reserved for the Employer; no media statements without written consent.
Employer may appoint direct contractors; no percentage or profit on their work; free use of site latrines, water and power.
Guarantees and maintenance manuals handed over; warranties ceded to the Employer.
Contractor bears encroachment, negligence and damage costs; temporary works removed and made good.
Financial Requirements
Source: Transmission Real Estate Waste Management Tender Pricelist.xlsx (unknown)
Pricing rules
Contract amount stated excluding VAT; section totals carried to the summary with cumulative totals per certificate.
New-work rates must include material, labour, plant, wastage, transport and profit, and require NTCSA Service Manager approval before work starts.
Toll fees for material delivery from Simmerpan to other sites must be allowed for in tendered rates.
Overtime at the contractor's cost unless the Service Manager authorises it in writing beforehand.
PPE for all employees for the contract duration, reimbursed once a year.
Summary tracks certificates 1 to 14; certificates 9 to 14 are labelled July 2022 to December 2022.
DocumentContract and Contractor OHS Management.pdfReview complete
Description
Source: Contract and Contractor OHS Management.pdf
General scope
The requirements set minimum OHS standards for Eskom suppliers and contractors from tender through contract closeout.
They apply to Eskom Holdings SOC Ltd, its divisions, subsidiaries and entities where Eskom has controlling interest or influence.
The model covers project initiation and design, tender enquiry and award, supplier registration, site mobilisation, performance monitoring, contract completion and post-contract review.
OHS requirements must be integrated into procurement documents, supplier evaluation and contract conditions.
Submission Guidelines
Source: Contract and Contractor OHS Management.pdf (unknown)
OHS returnables
Scope-specific OHS specification or requirements, including the baseline risk assessment.
Annexure B acknowledgement of Eskom OHS legal and other requirements.
32-136 Contractor Health and Safety Requirements.
OHS tender evaluation criteria.
Applicable Eskom procedures relevant to the scope, such as 32-418 for work at heights, Plant Safety Regulations, or high-voltage operating regulations.
Health and safety plan responding to the issued health and safety specification; for construction work, a construction health and safety specification and plan.
For non-construction work, an auditable OHS system or manual meeting site, legal and Eskom requirements.
Submission control
Outstanding OHS documents may be requested once, with submission required within seven working days.
Suppliers that fail to submit requested OHS documents within the stated time may be treated as non-responsive.
Disqualification risks
Starting work before the OHS file or health and safety plan is accepted.
Submitting incomplete, unsigned, or non-compliant OHS documentation.
Evaluation Criteria
Source: Contract and Contractor OHS Management.pdf (unknown)
Evaluation sequence
Mandatory compliance is assessed first.
Functionality is then assessed; the OHS functionality threshold is 70%.
Only suppliers that pass mandatory and functionality thresholds proceed to OHS contractual evaluation.
OHS evaluation process
Technical, procurement and OHS teams conduct the initial evaluation, including desktop and, where applicable, on-site supplier assessments.
An initial OHS evaluation report records compliance gaps and recommends or does not recommend the supplier.
The procurement practitioner contacts the supplier once for outstanding documents, allowing no more than seven working days.
A final OHS evaluation report is compiled after resubmission.
Unresolved compliance gaps may be addressed at the negotiation meeting and become contract conditions.
A supplier's OHS tender documents are evaluated no more than twice before contract award, unless further evaluation is motivated and approved.
Technical Specifications
Source: Contract and Contractor OHS Management.pdf (unknown)
Scope
OHS compliance requirements for suppliers or contractors providing goods or services to Eskom, including waste management services where delivered on Eskom sites.
The requirements cover the full contract lifecycle: initiation and design, tender, supplier registration, site access, execution monitoring, completion, and post-contract review.
OHS deliverables
A project-specific health and safety plan or OHS manual that satisfies the issued specification, site conditions, legislation and Eskom requirements.
A baseline risk assessment and scope-specific OHS specification.
An OHS file for site mobilisation, including risk assessments, method statements, inspection records, training records, incident records and legal compliance documents.
Evidence of inductions for contractor employees before work starts.
Material handling and storage procedures where relevant to delivery or receipt inspection.
Site controls
Each Eskom site may have different OHS requirements; approval at one site does not authorise work at another.
The supplier must comply with Eskom OHS requirements and applicable South African legislation at all times.
International suppliers must submit OHS documents in English and comply with South African law.
Experience & Qualifications
Source: Contract and Contractor OHS Management.pdf
Personnel competence
Persons performing work must have the training, knowledge, experience and, where applicable, qualifications required for the task.
Qualifications and training must be registered under the National Qualifications Framework Act where appropriate.
Personnel must be familiar with the Occupational Health and Safety Act and applicable regulations.
A construction health and safety agent must be competent and registered with SACPCMP where the role applies.
Quality Management
Source: Contract and Contractor OHS Management.pdf
Quality and performance monitoring
Eskom conducts risk-based inspections, audits and blitz inspections to verify OHS compliance.
Construction contractors are audited according to legal and other requirements; non-construction audit frequency is risk-based.
The contract custodian must institute monitoring mechanisms, supported by OHS professionals.
Non-conformances are managed through approved contractor management processes, including supplier reconsideration review committees.
Post-contract OHS performance is reviewed against KPIs communicated before work starts; Annexure D may guide the review.
A supplier review committee may consider suspension or blacklisting for abuse of the supply chain system or misconduct, but rehabilitation should be attempted first.
Financial Requirements
Source: Contract and Contractor OHS Management.pdf (unknown)
Pricing
OHS costs must be informed by the risks associated with the scope and included in the bill of quantities or pricing schedule.
Bidders must allow for OHS specification, plan, file, audits, inductions and compliance costs.
The health and safety specification is issued with the enquiry so bidders can price OHS obligations.
Compliance Requirements
Source: Contract and Contractor OHS Management.pdf (unknown)
Legal and regulatory compliance
Compliance with the Occupational Health and Safety Act and Regulations, Construction Regulations 2014 where construction work applies, COIDA, and applicable environmental legislation.
Construction principal contractors must be registered and in good standing with the compensation fund or a licensed compensation insurer.
A construction health and safety agent must be registered with SACPCMP where required.
Contractual OHS documents
Annexure A: supplier risk category.
Annexure B: acknowledgement of Eskom OHS legal and other requirements.
32-136: Contractor Health and Safety Requirements.
Annexure C1: supplier OHS tender evaluation template for high and medium risk.
Annexure C2: supplier OHS tender evaluation template for medium risk.
Annexure C3: supplier OHS tender evaluation template for low risk.
Annexure C4: supplier OHS tender evaluation template for construction work.
37(2) agreement: COIDA indemnity and employer responsibility acknowledgement.
Health and safety specification templates for professional services, high-risk services, construction services, manufacturers, general services, and supply and delivery.
OHS system requirements
The supplier must provide valid and authentic OHS documentation.
The supplier must be conversant with OHS legal obligations for the tendered work.
The supplier must meet site-specific OHS requirements before work starts.
Health & Safety
Source: Contract and Contractor OHS Management.pdf
OHS non-negotiables
No work may start before the health and safety file or document is evaluated and accepted by the allocated OHS professional.
The supplier must allow its employees to undergo Eskom induction and its own risk-based induction before activities begin.
The health and safety plan must be signed by the Eskom OHS professional, approved by the contract custodian, and initialled on each page by the supplier.
Eskom may stop work or issue safety interventions for unsafe acts, unsafe conditions, serious incidents, or government instructions.
Contractors must comply with site-specific OHS requirements, Eskom life-saving rules, and applicable OHS legislation.
The OHS file must be maintained and available for inspection by employees, inspectors or contractors.
Environmental
Source: Contract and Contractor OHS Management.pdf
Environmental controls
Environmental aspects and impacts associated with the scope must be identified, assessed, controlled and monitored.
Environmental professionals must manage environmental issues affecting the site or project.
Applicable environmental legislation and approvals must be considered when determining OHS risk controls and contract conditions.
Contractual Terms
Source: Contract and Contractor OHS Management.pdf
Contract OHS obligations
OHS requirements become enforceable after contract award and must be included in the contract.
The contract must state that no work starts before the OHS file or health and safety plan is approved.
The 37(2) agreement must be signed at contract signature; it makes the contractor the employer of its employees and indemnifies Eskom for contractor OHS contraventions.
Contractor employee insurance certificates must be in English and comply with South African law.
For construction work requiring a construction work permit, at least 30 days must be allowed for the Department of Employment and Labour permit process; work starts only after the permit is issued.
Eskom may stop unsafe work, suspend services, or terminate a contract where there is a history of poor safety and health compliance.
Before contract end, a final OHS demobilisation inspection is carried out; the OHS file is handed over 10 days before contract expiry and retained by Eskom for at least 40 years.
Section
Source: Contract and Contractor OHS Management.pdf
OHS functionality assessment
The OHS functionality threshold is 70%.
Evaluation considers scope-specific OHS requirements, baseline risk assessment, health and safety plan, legal compliance and evidence of OHS capability.
Desktop and on-site supplier assessments may be used.
Compliance gaps are recorded in an OHS tender evaluation report and may be closed through negotiation or contract conditions.
Eskom Holdings SOC Ltd is South Africa's main electricity supplier and is wholly owned by the state. The SHEQ policy sets safety, health, environmental and quality principles for Eskom, its subsidiaries and entities under Eskom control or influence. It links SHEQ management to legal compliance, ESG commitments, climate change response and continual improvement.
Contractors and suppliers must meet Eskom safety, health, environmental and quality obligations.
Work must comply with applicable South African law and Eskom requirements, including OHS Act, NEMA, COIDA, Climate Change Act, ISO 9001, ISO 14001 and ISO 45001.
Contractors must support zero harm outcomes: no fatalities, no injuries or ill-health, no environmental incidents and no defects.
Eskom life-saving rules apply to contractors and visitors: isolate, test, earth or insulate before contact; work at heights safely; wear restraints; remain sober; use permits; ensure safe live working.
Contractors should maintain a management system aligned with ISO 9001, ISO 14001 and ISO 45001 or equivalent standards.
External service providers must fulfil safety, health, environmental and quality compliance duties.
Compliance must cover legal obligations and Eskom organisational requirements.
Contractors and suppliers must establish and maintain management arrangements consistent with ISO 9001, ISO 14001, ISO 45001 or other applicable standards.
SHEQ performance is expected to support continual improvement and risk-based management.
Dial-in: +27 21 834 0825,,555519905# South Africa, Cape Town
Phone conference ID: 555 519 905#
Technical Specifications
Source: Link_Non-compulsory clarification meeting Provision of Waste Management..pdf (unknown)
Scope: Provision of waste management services.
DocumentNTCSA_E-tendering Help Manual for supplier.pdfReview complete
Description
Source: NTCSA_E-tendering Help Manual for supplier.pdf
eTendering portal
The eTendering system is a web-based portal for uploading tender documents instead of delivering them physically to Eskom tender offices.
Suppliers can access published tenders through https://tenderbulletin.ntcsa.co.za or directly through https://eTendering.eskom.co.za.
Registration is required before access is granted.
A one-time pin is sent to the supplier’s cellphone and email address.
The portal supports uploading documents under categories such as Technical, Commercial and Finance.
Closed tenders are sent directly to selected suppliers by email and are not listed as normal tenders.
Submission Guidelines
Source: NTCSA_E-tendering Help Manual for supplier.pdf (TENDER)
Submission method
Bids must be uploaded electronically through the Eskom eTendering portal at https://eTendering.eskom.co.za.
Suppliers must register on the portal and verify their email address before accessing a tender.
A one-time pin is sent to the registered cellphone number and email address during login.
Access to the eTendering system requires a valid CSD number.
Each document must be named, assigned to the correct category such as Technical, Commercial or Finance, and uploaded before finalisation.
The maximum size for any single file is 50MB.
The combined size of all uploaded files must not exceed 900MB.
Bidders must check that all required documents are uploaded before selecting Finalize Submission.
After finalisation, the system issues a confirmation email containing the submission ID and submitted file list.
Bidders should retain the confirmation email and submission ID for future enquiries.
System problems should be reported to the buyer responsible for the published tender.
Compliance Requirements
Source: NTCSA_E-tendering Help Manual for supplier.pdf (TENDER)
Access and registration
A valid CSD number is required to gain access to the eTendering system.
Suppliers must register their details on the portal before submitting documents.
Registration requires a contact number with a country prefix, such as +27.
Email verification and one-time pin authentication are required before tender documents can be uploaded.
Section
Source: NTCSA_E-tendering Help Manual for supplier.pdf
Closed tender process
Closed tenders are not published as normal tenders.
They are sent directly to relevant and potential suppliers that meet the selection and evaluation criteria.
Suppliers receive a link by email to bid privately.
DocumentNTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdfReview complete
Submission Guidelines
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)
Returnable document
E-Tendering Training Acknowledgement Form: the bidder confirms that it has completed self-training on the e-Tendering solution (via the Noddy Guide, video or clarification meeting) and can operate the system.
Form details to complete
Enquiry number.
Business name or joint venture.
Contact person, landline, cellphone and email address.
Authorised signature, designation and date.
Compliance Requirements
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)
E-tendering capability
The bidder must confirm it has undergone self-training on the e-Tendering solution and is able to operate it.
Evidence: a signed E-Tendering Training Acknowledgement Form submitted with the bid.
DocumentNTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdfReview complete
Description
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf
Waste management services for NTCSA Transmission in the Gauteng Area, tied to the Ermelo Lines and Servitudes Office Lease.
Mandatory technical gate: bidders must hold valid waste accreditation, waste management and waste transport permits, and provide an up-to-date UIF/Provident Fund confirmation letter (not older than one month at closing).
The bidder must run compliant quality, environmental and OHS management systems and submit a site-specific waste management plan.
Important Dates
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf (RFP)
Issue date: 23 November 2026.
Clarification meeting (non-compulsory): 02 December 2026 at 11:00, via MS Teams; attendance does not affect eligibility.
Clarification query deadline: 10 working days before the submission deadline (includes extension requests).
Closing date and time: 15 December 2026 at 11:00.
Tender validity: 120 days from closing.
Contact Information
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf (RFP)
NTCSA Representative (first contact for all queries)
Clarification meeting attendance: confirm to [email protected] with each attendee's name, position and contact details.
Standard Conditions of Tender: www.ntcsa.co.za
Service location
NTCSA Transmission, Gauteng Area
(Ermelo Lines and Servitudes Office Lease)
Submission Guidelines
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf (RFP)
Submission method: electronic upload via the Eskom E-tendering site (NTCSA tender bulletin page); no hard copies accepted.
Upload folders: Technical, Commercial, Financial and Other.
File format: PDF and Excel; the price list must be provided in both PDF and Excel.
File size limits (stated inconsistently): one clause sets 50MB per file and 900MB per submission; another sets 500MB per document and 4GB per submission.
Compressed/zip files are not accepted.
Resubmissions: only the latest version is accepted; earlier submissions are voided.
Bidders must confirm the submission status reads complete.
Disqualifiable returnables (must be complete, signed where required and uploaded by closing):
Authorisation Form (Annexure A)
Acknowledgement Form (Annexure B)
Tenderer's Particulars (Annexure C)
Integrity Declaration (Annexure D)
CPA Requirements for Local Goods/Services (Annexure E)
SBD 1 (Invitation to Bid): the signed offer (Annexure H)
Tax clearance certificate, or SARS e-filing PIN / CSD number for verification
Tax evaluation questionnaire (personal service provider check for PAYE)
Employment Equity Act compliance proof, including EE report submission (designated employers, SA bidders only)
E-tendering Help Manual acknowledgement form
NEC Contract, Pricing Schedule and Standard Terms and Conditions
Supplier Non-Disclosure Agreement and SDL&I Undertaking
Proof of valid, current CSD registration
COIDA certificate of good standing or proof of application (SA bidders)
Quality, safety and environmental documents per the tender advert
Audited financial statements for the previous 18 months (each JV/SPV participant)
Technical/functionality evaluation documents
Non-disqualifiable returnable:
SBD 4 (Bidders Disclosure): if missing or unsigned, NTCSA allows 5 working days to remedy before disqualification.
Scored but not disqualifying:
Specific Goals evidence: absence scores zero for specific goals but does not disqualify.
Joint venture bidders must also submit a letter of intent or JV agreement stating rights, obligations and profit-sharing; written confirmation the JV operates as a single incorporated entity; and details of a single JV bank account.
Disqualification risks:
Late submission (no late tenders accepted).
Any disqualifiable returnable missing, incomplete or unsigned at closing.
Zip files or hard-copy submissions.
Submitting more than one tender, or subcontracting 100% of the scope.
Evaluation Criteria
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf (RFP)
Evaluation runs in stages.
Stage 1 — Mandatory (pass/fail; any 'No' disqualifies immediately):
Updated UIF and Provident Fund confirmation letter or account statement showing contributions up to date, dated no more than one month before closing.
Valid Waste Management Permits: Waste Accreditation Permit, Waste Management Permit and Waste Transport Permit.
Company profile: 20% (20% if submitted, 0% if not).
Company track record: 40% — points by number of compliant waste-management contracts in the last 5 years: 4+ = 40%, 3 = 30%, 2 = 20%, 1 = 10%. Contracts must cover an airport, tertiary institution, municipality or state-owned company, with values, scope, signed completion certificates and contactable references.
Competency — site supervisors: 20% — 2 supervisors with waste-management certificates, matric certificates, 3 years' relevant experience, SETA-accredited training and contactable references (2 = 20%, 1 = 10%, none qualifying = 0%).
Waste sorters: 10% — 2 sorters with 3 years' relevant experience and contactable references (2 = 10%, 1 = 5%).
Waste management plan specific to the Transmission Gauteng Area: 10%.
Price: scored out of 80 points (VAT-inclusive, corrected for arithmetic errors, contingencies excluded, unconditional discounts applied).
Specific goals: scored out of 20 points under the PPPFA.
Preference system: 80/20 for tenders valued at or below R50 million.
Ranking: price score plus specific-goals score, highest to lowest.
Post-evaluation: functional shortfalls are communicated and the bidder may correct them within 7 calendar days of the clarification session or email.
Methodology
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf
Method statements are required: a quality method statement based on the scope of work, plus safe work procedures/method statements under the OHS requirements.
Skills development candidates should be sourced from previously disadvantaged local communities; bidders are advised to seek SETA grants and incentives and SARS tax rebates, and bear the full skills-development cost themselves.
Experience & Qualifications
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf
Track record: between one and four compliant waste-management contracts from the last 5 years, each with contract value, scope, signed completion certificates and contactable client references; contracts must involve an airport, tertiary institution, municipality or state-owned company.
Key personnel:
2 site supervisors with waste-management certificates, matric certificates, at least 3 years' relevant experience, SETA-accredited training and contactable references.
2 waste sorters with at least 3 years' relevant experience and contactable references.
Quality Management
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf
Quality management (Category 4, ISO 9001:2015):
Section A (Option 3): quality method statement based on the scope; quality policy and quality objectives approved by top management.
Section B (score 2): documented roles, responsibilities and authorities with an organisation chart and responsibility matrix (Clause 5.3); documented control of externally provided processes and services, including evaluation, selection, monitoring and re-evaluation of providers (Clause 8.4).
Section E: Form A completed and signed; proof of similar or previous work.
Supporting documents: signed quality policy, quality method statement, top-management-approved objectives, quality plan, quality organogram and management review.
Pricing Schedule
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf
Pricing is submitted on the attached Pricing Schedule, in PDF and Excel, inclusive of VAT.
Price evaluation: corrected for arithmetic errors, contingencies excluded, unconditional discounts applied; conditional discounts applied only at payment.
Where local and imported content are combined, the response must be split into components per the price schedule.
Ranking uses the 80/20 preference system (price out of 80, specific goals out of 20) for tenders at or below R50 million.
Financial Requirements
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf (RFP)
Payment terms:
Contracts below R50,000,000 incl VAT: payment within 30 days of an undisputed invoice.
Contracts above R50,000,000 incl VAT: payment within 60 days of an undisputed invoice.
Pricing: inclusive of VAT; evaluated net of contingencies and after correcting arithmetic errors.
Financial capacity: audited financial statements for the previous 18 months; start-ups formed within the last 12 months are exempt until after award.
SDL&I retention: NTCSA retains 2.5% of every invoice (excl VAT) as security for SDL&I obligations, released only once SDL&I reports and an approved compliance report are received.
SDL&I penalty: 2.5% of the invoice amount for failure to meet SDL&I obligations.
Bid security / performance guarantee: none required (provision of security marked not applicable).
Compliance Requirements
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf (RFP)
CSD registration: mandatory; proof of valid, current registration (CSD number/report) required from all local-origin bidders and foreign bidders with a local footprint.
Tax status: SARS e-filing PIN or CSD number for verification; otherwise a certified tax clearance certificate. Foreign bidders with no SA footprint complete SBD 1 with no tax proof.
B-BBEE: a valid B-BBEE certificate (SANAS-accredited) or sworn/CIPC affidavit is a condition of award — EME (revenue up to R10m) may use a sworn affidavit; QSE (revenue up to R50m) must meet the QSE scorecard unless at least 51% black-owned; revenue above R50m requires a valid certificate. B-BBEE status must at least be maintained through the contract.
COIDA: original certificate of good standing or proof of application (SA bidders).
Employment Equity: designated employers must prove EE Act compliance and EE report submission.
UIF and Provident Fund: contributions must be up to date.
Waste permits: accreditation, management and transport permits must be valid.
CIDB grading: not applicable.
Affidavit validity: deponent's name and ID, designation, enterprise name and address, black ownership percentages, total revenue and financial year-end, a single B-BBEE level and empowering-supplier status; deponent and Commissioner of Oaths sign on the same date and the Commissioner must be independent of the bidder.
Health & Safety
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf
OHS requirements (OHS Act):
Appointment letters with legal liability and incident-investigation competency: 16(2) appointee, principal contractor, site/responsible manager (Sec 8), assistant site manager, supervisor (Sec 8(2) with HIRA), safety officer (National Diploma in Safety Management or Advanced SAMTRAC plus HIRA), risk assessor, incident investigator (GAR 9(2), Sec 24/25), first aider (Level 2), vehicle operator/inspector, and SHE representative where more than 20 employees.
OHS documentation: contractor OHS policy signed by the CEO, OHS plan, H&S costing, baseline OHS risk assessment, letter of good standing (COIDA), OHS competency, method statement/safe work procedure, emergency management plan, medical fitness certificates, incident management and SHE communication procedures.
Registers and checklists: safety induction, PPE issue and matrix, toolbox talks, first aid, vehicle, fire equipment, head count, training matrix and site-specific OHS organogram.
Environmental
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf
Environmental management (ISO 14001:2015, Option 2 — documented EMS conforming but not certified):
Section A (weight 30%): EMS manual, signed environmental policy, project environmental objectives, roles and authorities, interested-party needs, environmental communication, nonconformity/corrective action, emergency preparedness, internal audit programme and management review.
Section B (weight 20%): environmental management programme covering hazardous substances, site establishment, water management, noise control, dust/air quality, rehabilitation, competence and training, incident reporting, grievance management, compliance obligations and environmental HR.
Section C (weight 20%): waste management plan — waste streams, applicable legislation, segregation and minimisation, on-site handling and disposal, and a reporting template.
Section D (weight 20%): project-specific environmental aspect and impact register with ratings.
Section E (weight 10%): waste activities, pollution control, land management, an environmental officer, and the signed Environmental Requirements Proforma (240-110600836).
Contractual Terms
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf
Contract form: NEC; the tender covers the whole of the contract.
Payment: within 30 days of undisputed invoices for contracts below R50m incl VAT, and within 60 days for contracts above R50m incl VAT.
SDL&I obligations: 2.5% of each invoice (excl VAT) retained as security; 2.5% invoice penalty for non-compliance; quarterly SDL&I reporting; SDL&I Implementation Schedule due within 28 days of award.
No performance security, insurance deductibles or list of guarantors apply.
Alternative tenders are not permitted.
Contractual (SHEQ) requirements are assessed after ranking; the recommended bidder must prove compliance before award, and failure by the deadline renders the bid non-responsive.
Section
Source: NTCSA Invitation_to_Tender_(ITT)_Waste Management service signed.pdf
The Tender Data takes precedence over the Standard Conditions of Tender where the two conflict or are ambiguous.
The Standard Conditions of Tender are not attached and must be downloaded from www.ntcsa.co.za; submitting a tender is deemed acceptance of them.
Document240-68099512 Form A Rev 10_ Provision of Waste Management_20260806.pdfReview complete
Description
Source: 240-68099512 Form A Rev 10_ Provision of Waste Management_20260806.pdf
General requirement
Provision of waste management services at the listed sites and other locations around Gauteng.
Quality requirements are split into pre-contract and post-contract stages, with Category 4 applying before award.
Contact Information
Source: 240-68099512 Form A Rev 10_ Provision of Waste Management_20260806.pdf (unknown)
Quality representative
Name: Prudence Maimane
Role: Quality Officer
Capacity: purchaser's quality representative for Form A
Submission Guidelines
Source: 240-68099512 Form A Rev 10_ Provision of Waste Management_20260806.pdf (unknown)
Returnable form
Form A: the tenderer must complete and sign, providing quality representative details, to accept the purchaser's supplier quality requirements and ISO 9001.
Evaluation Criteria
Source: 240-68099512 Form A Rev 10_ Provision of Waste Management_20260806.pdf (unknown)
Quality compliance check
Signed Form A confirming acceptance of the purchaser's supplier quality requirements and ISO 9001.
DocumentEskom Standard Conditions of Tender on e-tendering.pdfReview complete
Description
Source: Eskom Standard Conditions of Tender on e-tendering.pdf
The employer requires provision of waste management. The detailed specification, works information, quantities and locations must be taken from the enquiry documents and Tender Data.
Contact Information
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)
Enquiries
Contact: Employer's Representative
Channel: written communication only
Language: English
Submission Guidelines
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)
Submission method
Electronic submission only through the employer's e-tendering portal; physical tender boxes are not accepted.
Bids must be uploaded, finalised and submitted before the closing time; late submissions are rejected automatically.
Submission must be in English and signed electronically by an authorised signatory.
Documents must be placed in the correct technical, commercial and financial folders on the e-tendering page.
Returnable documents
Acknowledgement Form: confirms whether the offer covers the whole or part of the required works, services or supply.
Mandatory returnables: all forms, data and schedules required for evaluation must be submitted by the closing deadline.
Authority to act: authenticated proof is required where an agent submits for a principal.
CIDB registration proof: required at closing where CIDB applies; where only proof of application is available at submission, it must be provided by closing and the registration printout by contract award.
B-BBEE proof: certificate, CSD number or CSD report must be submitted at closing where B-BBEE level is a pre-qualification criterion.
SD&L Undertaking: must be completed and submitted by contract award.
Performance security details: where security is required, the bidder must name at least two financial institutions likely to provide it.
Disqualification risks
Missing or incomplete mandatory returnables.
Late or unfinalised electronic submission.
Failure to attend a compulsory site visit or clarification meeting where one is prescribed.
100% subcontracting of the scope of work.
Misrepresentation or falsified documents.
Evaluation Criteria
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)
Evaluation sequence
Basic compliance: the bid must meet the enquiry's basic requirements before detailed evaluation.
Mandatory returnables: bids missing required documents or information by the deadline are non-responsive.
Pre-qualification: where stated, bidders must meet pre-qualification criteria; criteria are not measured twice.
Designated materials: required local-content thresholds must be met; failure makes the bid non-responsive.
Functionality: where applicable, technical functionality is scored and a minimum threshold in the Tender Data must be met before further evaluation.
Financial risk: the employer may assess financial statements and disqualify a bidder if risk is too high and no acceptable mitigation exists.
Price: price is evaluated according to the Tender Data, considering factors such as CPA, FOREX, commodity increases, discounts, NPV and forecasted invoicing.
B-BBEE: the B-BBEE level is scored from the CSD report or certificate/affidavit. If B-BBEE is a pre-qualification criterion, missing, fraudulent or expired proof leads to disqualification. For PPPFA points, missing or invalid B-BBEE proof results in zero points but not automatic disqualification if otherwise responsive.
Ranking: price and B-BBEE scores are added and bids are ranked from highest to lowest under the PPPFA.
Objective criteria: award to a lower-scoring bidder is only possible under PPPFA section 2(1)(f) where objective criteria are stated; functionality and B-BBEE scorecard elements cannot be objective criteria.
Reverse e-auction: may be used where indicated; bidders must submit a complete bid without prices, and any prices included will be disregarded.
Thresholds
Minimum functionality score: as stated in the Tender Data.
Preference point system: price and B-BBEE scores are combined under the PPPFA; the applicable split is in the Tender Data.
Minimum qualifying score: as stated in the Tender Data.
Technical Specifications
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)
Scope
Provision of waste management.
The detailed specification, works information, quantities and locations must be taken from the enquiry documents and Tender Data.
Bidders must state in the Acknowledgement Form whether the offer covers the whole or part of the required works, services or supply.
Quality Management
Source: Eskom Standard Conditions of Tender on e-tendering.pdf
Quality-related submission requirements
The bidder must check the enquiry documents on receipt and notify the employer's representative of discrepancies or omissions.
The Acknowledgement Form must be completed and submitted with the bid.
All mandatory forms, data and schedules must be completed without exception.
Certificates, registrations or proofs required as returnables must be valid, current and, where stipulated, original for the tender validity period and until contract award.
Pricing Schedule
Source: Eskom Standard Conditions of Tender on e-tendering.pdf
Pricing requirements
Rates and prices must include all duties, taxes, including VAT, and levies payable by the successful bidder, based on those applicable 14 days before the submission deadline.
Prices must be fixed for the contract duration and not subject to adjustment except as allowed in the enquiry.
Prices must be in South African Rand unless otherwise instructed.
Alternative tenders are allowed only if a main tender is submitted and only if permitted.
Clarifications may require a breakdown of rates or prices but cannot change the substance of the bid, except to correct arithmetical errors.
Arithmetical errors may be corrected by the employer; the corrected total becomes binding if accepted.
Bidders must not alter tender documents except to comply with instructions or correct their own errors; alterations must be initialled and correction fluid is not allowed.
Financial Requirements
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)
Pricing and financial conditions
Rates and prices must include all duties, taxes, including VAT, and levies payable by the successful bidder, based on those applicable 14 days before the submission deadline.
Prices must be fixed for the contract duration and not subject to adjustment except as allowed in the enquiry.
Prices must be in South African Rand unless otherwise instructed.
Alternative tenders are allowed only if a main tender is submitted and only if permitted.
The employer does not compensate bidders for tender preparation, submission, negotiation or testing costs.
Where performance security is required, the bidder must identify at least two financial institutions likely to provide it; the employer may reject an unsuitable institution.
The employer's insurance may not provide full cover required under the contract; bidders should seek professional advice.
Financial risk assessment may lead to disqualification if the risk is too high and no acceptable mitigation exists.
Compliance Requirements
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)
Eligibility and statutory compliance
Bidder must be eligible under the Tender Data and must not be restricted from doing business with the employer or state-owned companies.
100% subcontracting of the scope is prohibited and makes the bid ineligible.
Compliance is required with National Treasury instructions, CSD, CIDB, designated materials, PPPFA, B-BBEE and SHEQ requirements.
Registration and certification
CSD registration and tax compliance: as required by National Treasury instructions.
CIDB: where applicable, proof of registration is mandatory at closing; where only proof of application is available at submission, it must be provided by closing and the registration printout by contract award.
B-BBEE: where B-BBEE level is a pre-qualification criterion, valid certificate, CSD number or CSD report must be submitted at closing; fraudulent or expired proof disqualifies.
Professional or other registrations: where required by the enquiry.
Development and localisation
SD&L Undertaking: must be completed and submitted by contract award; failure means the bid will not be considered for award.
CSDG: applies to works above R60 million with contract duration of 12 months or more, and to professional services/service contracts above R5 million with duration of 12 months or more.
CPG: applies to Grade 7-9 General Building or Civil Engineering contracts of 6 months or more where at least 25% of the main contract can reasonably be subcontracted in CE, EB, GB or ME classes; the contractor must achieve at least a 5% contract participation goal with targeted enterprises.
CPG value: the contract participation goal must be expressed in rands and must not be less than the contract amount multiplied by the prescribed percentage factor.
Sheq
Bidders must provide reasonable proof at contract award that safety, health, environmental and quality systems, policies and capabilities are in place.
SHEQ costs and personnel must be reflected in the bid.
Integrity
Misrepresentation or falsified information, certificates, affidavits or documents may lead to disqualification and suspension from state-owned company business for up to 10 years.
Health & Safety
Source: Eskom Standard Conditions of Tender on e-tendering.pdf
Safety, health, environment and quality
Bidders must comply with applicable safety, health, environmental and quality legislation and instructions.
At contract award, bidders must provide reasonable proof that SHEQ systems, policies and capabilities are in place.
All SHEQ costs and personnel must be included in the bid for assessment.
Contractual Terms
Source: Eskom Standard Conditions of Tender on e-tendering.pdf
Contract formation and employer rights
The employer may accept or reject variations, deviations or alternative tenders and may accept the whole or part of a tender.
The employer may cancel the tender process before contract formation and, on written request, provide reasons.
The employer may enter mandated negotiations with one or more tenderers.
The employer is not liable for losses arising from participation, amendment, termination or suspension of the tender process.
Contract documents
The successful bidder must sign the contract documents and the Form of Agreement.
Contract documents may be revised to include addenda, agreed changes and required returnables.
The Standard Conditions of Tender and Tender Data do not form part of the resulting contract.
Validity and confidentiality
Tenders must remain valid for acceptance for the validity period and any requested extension.
If validity lapses without contract conclusion or extension, the procurement must restart.
Tender information must be treated as confidential and used only for preparing the bid.
Insurance and security
The employer's insurance may not provide full cover required under the contract; bidders should seek professional advice.
Where performance security is required, the bidder must identify at least two suitable financial institutions.
Section
Source: Eskom Standard Conditions of Tender on e-tendering.pdf
Additional evaluation considerations
Basic compliance and mandatory returnables are assessed before detailed evaluation.
Designated materials and local-content thresholds are gatekeepers.
Functionality threshold must be met where applicable.
Financial risk may lead to disqualification.
Price evaluation may consider CPA, FOREX, commodity increases, discounts, NPV and forecasted invoicing.
B-BBEE level and PPPFA ranking determine final preference scoring.
Source: AM OHS Contractor Baseline risk assessment 27 July 2026 (2).xlsx
The material is an OHS baseline risk assessment template for contractor work. It provides a structured register for identifying activities, hazards, risks, consequences, controls, risk ratings, control owners, legal requirements, target dates, status and IRM references. It includes separate guides for consequence ratings, likelihood ratings, risk control effectiveness and risk priority.
Contact Information
Source: AM OHS Contractor Baseline risk assessment 27 July 2026 (2).xlsx (unknown)
Source: AM OHS Contractor Baseline risk assessment 27 July 2026 (2).xlsx (unknown)
Occupational health and safety baseline risk assessment
The contractor must complete a baseline OHS risk assessment for the relevant operating unit and contractor activities.
The assessment must record each activity, whether routine or non-routine, and link it to hazards, associated risks, possible consequences, exposed persons, risk owners, exposure patterns, existing controls, additional controls, monitoring methods, control owners, legal or Eskom requirements, target dates, current status and IRM references.
Controls must consider preventative and reactive measures, including elimination, substitution, engineering controls, administrative controls and PPE.
Risks must be rated for consequence, likelihood and risk control effectiveness, then assigned a priority.
Consequence ratings range from 1 for no injuries or near misses to 6 for multiple fatalities; likelihood ratings range from A for highly unlikely to E for unavoidable; risk control effectiveness ranges from fully effective to none.
Priority I requires immediate action and IRM capture; Priority II requires strong mandatory action and IRM capture; Priority III requires action, possibly administrative; Priority IV requires minor or no action.
The assessment must be reviewed at least every two years.
Document control details: template identifier 240-70044602; contractor baseline document identifier 240-180200030; revision 1; revision date 31 May 2024; assessment date 27 July 2026.
Activity groups covered include driving to site, office cleaning, dishwashing, mopping, hazardous chemical handling, battery electrolyte, hydraulic oil and diesel, painting, work at heights, scaffolding, roof work, tower climbing, tree pruning, gutter cleaning, manual handling, hand tools, generator electrical work, emergency preparedness, office environment, lifts, air-conditioning plant, plumbing, rigging, food receiving and preparation, grass cutting, SHE bin servicing, and removal of snakes, bees and wasps.
Compliance Requirements
Source: AM OHS Contractor Baseline risk assessment 27 July 2026 (2).xlsx (unknown)
OHS compliance references
Controls must align with applicable legislation and Eskom requirements.
Legislation and standards referenced include the Occupational Health and Safety Act 85 of 1993, General Safety Regulations, Hazardous Chemical Agents Regulations, Noise Induced Hearing Loss Regulations, Ergonomics Regulations, Driven Machinery Regulations, Electrical Machinery Regulations, Construction Regulations, National Building Regulations, SANS 10083, SANS 10400, National Road Traffic Act 93 of 1996, Air Quality Act 39 of 2004, and Foodstuffs Disinfect Act regulations R638.
Eskom references include SHEQ policy 32-727, OHS baseline risk assessment procedure 32-520, vehicle safety specifications procedure 32-345, substance abuse procedure 32-37, working at heights standard 32-418, emergency procedures 32-132 and 32-123, and life-saving rules 240-62196227.
Stage 1: mandatory pass/fail checks; any failure disqualifies the bid.
Stage 2: weighted technical scoring; minimum qualifying score is 80/100.
Mandatory checks
UIF and Provident Fund compliance: updated confirmation letter or account statement, no older than one month before closing.
Waste permits: valid waste accreditation, waste management and waste transport permits.
Weighted technical criteria
Company profile: 20 points for a waste-management-specific profile; 0 if absent.
Track record: 40 points maximum. Four or more compliant waste-management contracts completed in the last five years score 40; three score 30; two score 20; one scores 10; none or non-compliant score 0. Each contract must show value, name, scope, signed completion certificate and contactable client landline and email.
Site waste supervisors: 20 points maximum. Two supervisors meeting all requirements score 20; one scores 10; none score 0. Requirements: waste-management certificates, matric certificates, CVs showing three years' relevant experience, contactable work landline and email references, and SETA-accredited training certificates.
Waste sorters: 10 points maximum. Two sorters meeting all requirements score 10; one scores 5; none score 0. Requirements: CVs showing three years' relevant experience and contactable work landline and email references.
Waste management plan: 10 points for a site-specific plan for the Transmission area in Gauteng; 0 if absent or generic.
Track record: up to 40 points for completed waste-management contracts in the last five years. Four or more compliant contracts score 40; three score 30; two score 20; one scores 10. Each contract needs value, name, scope, signed completion certificate and contactable client landline and email.
Site waste supervisors: up to 20 points. Two fully compliant supervisors score 20; one scores 10. Each supervisor needs waste-management certificates, matric certificate, CV with three years' relevant experience, contactable work landline and email references, and SETA-accredited training certificates.
Waste sorters: up to 10 points. Two fully compliant sorters score 10; one scores 5. Each sorter needs a CV with three years' relevant experience and contactable work landline and email references.
UIF and Provident Fund: submit an updated confirmation letter or account statement showing monthly contributions are up to date; the document must be no older than one month before closing and may be verified.
Waste permits: submit valid waste accreditation permit, waste management permit and waste transport permit.
Consequence
Failure to meet any mandatory compliance item disqualifies the bid.
Mandatory pass/fail stage must be cleared before weighted scoring.
Weighted criteria total 100 points: company profile 20, track record 40, supervisors 20, waste sorters 10, waste management plan 10.
Minimum technical threshold: 80 points.
DocumentEnvironmental Requirements for Contractors and or Suppliers.pdfReview complete
Description
Source: Environmental Requirements for Contractors and or Suppliers.pdf
Transmission requires suppliers, contractors and subcontractors to operate under an environmental management framework covering design, tender evaluation, registration, site access, execution, close-out and post-contract review. The aim is consistent environmental compliance for goods, works and services.
Submission Guidelines
Source: Environmental Requirements for Contractors and or Suppliers.pdf (unknown)
Bid returnables
Completed Environmental Acknowledgement Form (Appendix E) must be included in the bid.
Bidders must provide genuine environmental records for assessment.
Where a site visit applies, it must be attended before tendering under supervision of the contract custodian and commercial practitioner.
Clarification channel
Environmental queries must be directed through the Eskom representative named in the tender; direct contact with environmental practitioners is not allowed.
Post-award submissions
Environmental management documents must be submitted to Transmission for evaluation within 7 days after contract award.
A completed and signed Contractor Environmental Requirements Pro-Forma (Appendix E) is required before site mobilisation.
Evaluation Criteria
Source: Environmental Requirements for Contractors and or Suppliers.pdf (unknown)
Environmental evaluation
Environmental requirements form part of the tender assessment and are evaluated by the allocated environmental practitioner.
High-risk environmental contracts require full points; partial scores do not count.
If full points are not achieved, the bidder has 7 days to submit outstanding documents; failure leaves the original score unchanged.
Environmental non-compliance does not automatically disqualify a bid; it is recorded and may be addressed during negotiations or after award.
Medium- and low-risk environmental requirements are treated as contractual requirements.
Outstanding clarification issues must be included in the contract with a post-award period for completion.
Post-contract consequence
Environmental performance is reviewed after contract completion and recorded on the supplier database.
Technical Specifications
Source: Environmental Requirements for Contractors and or Suppliers.pdf (unknown)
Environmental management system
Suppliers must establish and maintain an environmental management system, preferably based on ISO 14001:2015.
New suppliers may show compliance through policies, procedures, training records, audit reports and monitoring reports.
The system must cover site establishment, access control, construction and installation, manufacturing, storage, waste management, hazardous substances, site management, rehabilitation and demobilisation.
Site controls
Suppliers must manage water use, dust, noise, landowner liaison, final site release, dispute settlement and rehabilitation.
A waste management plan must address waste segregation, minimisation, disposal records, expected waste streams and applicable legal duties.
Hazardous chemicals require registers and safety data sheets.
Records and registers
Site records must include environmental authorisations and permits, project environmental management plan or programme, aspects and impacts register, incident register, non-conformance register, complaints register, waste statistics, water-use records, audit and inspection reports, ECO reports where applicable, energy-efficiency checklists and appointment letters.
The aspects and impacts register must be revision-controlled, identify aspects and impacts, assess controls, rate significance and define programmes or procedures.
Personnel
The supplier's organisational structure must show environmental responsibilities, SHEQ representatives, appointed persons and the management representative.
A qualified person with a National Diploma or degree in environmental sciences or management, nature conservation or related natural sciences must monitor environmental planning and activities.
For low-risk projects, an environmental representative with two weeks' environmental training may be sufficient.
Monitoring and completion
Environmental practitioners may inspect and audit compliance during the contract.
Before contract closure, a final environmental inspection and rehabilitation sign-off are required.
Completion documents must include certificates of conformance, test certificates, inspection release reports, ECO close-out report, final rehabilitation report and final site close-out audit, inspection or NCR close-out.
Quality Management
Source: Environmental Requirements for Contractors and or Suppliers.pdf
Quality and environmental assurance
Suppliers must maintain an environmental management system, preferably based on ISO 14001:2015.
Compliance is monitored through inspections, audits, checklists, registers and close-out reports.
Records must include monitoring, measurement, analysis and evaluation of compliance, natural resource consumption, findings and corrective actions.
Final completion requires environmental inspection, rehabilitation sign-off and handover of the environmental file.
Financial Requirements
Source: Environmental Requirements for Contractors and or Suppliers.pdf (unknown)
Financial and contractual cost points
Environmental costs must be budgeted according to the contract scope and included in the Bills of Quantities.
Temporary work stoppages for environmental reasons do not attract financial compensation.
Compliance Requirements
Source: Environmental Requirements for Contractors and or Suppliers.pdf (unknown)
Environmental compliance
Suppliers must comply with applicable environmental legislation and Transmission environmental requirements.
Required authorisations, permits and licences must be held for the scope of work.
Bidders must provide genuine environmental documentation and may need to complete the Environmental Acknowledgement Form (Appendix E).
Suppliers must meet minimum environmental requirements determined in the tender returnable for the scope.
Main suppliers remain accountable for subcontractors' and suppliers' environmental compliance.
Exemptions
Independent electricity generators and demand-response rebate suppliers.
Venue and accommodation services where no Transmission contract exists.
Municipalities and organisations providing services such as water and sanitation.
Consumables bought from established retailers.
Urgent procurement due to extreme weather, emergencies or disasters.
Other services assessed as not requiring environmental market conditions.
Investigation triggers
Three major environmental non-conformances in one financial year.
Two or more contraventions of environmental legislation or approval conditions, including government compliance notices.
Violation of Eskom Life-saving Rules.
Submission of fraudulent environmental documents.
Consequence
A guilty finding can lead to removal from the Eskom database and no future Transmission business; clearance allows reinstatement.
No Transmission employee may directly suspend or terminate a supplier; the matter must go to the Reconsideration of Supplier Status Committee.
Health & Safety
Source: Environmental Requirements for Contractors and or Suppliers.pdf
Health, safety and environmental controls
Suppliers must prevent harm to people, assets and the environment and comply with SHEQ obligations.
Any person may stop work that threatens health or risks environmental degradation.
Violations of Eskom Life-saving Rules trigger supplier status reconsideration.
Contractors must manage hazardous substances, safety data sheets, water, dust, noise and site rehabilitation.
Environmental
Source: Environmental Requirements for Contractors and or Suppliers.pdf
Environmental obligations
Suppliers must identify environmental aspects and impacts, assess significance, implement controls and maintain registers.
Environmental authorisations, permits, waste plans, hazardous substance controls and rehabilitation measures must be in place.
Environmental performance is monitored during execution and reviewed after contract completion.
Non-compliance can lead to corrective action, work stoppage, contract consequences or removal from the supplier database.
Contractual Terms
Source: Environmental Requirements for Contractors and or Suppliers.pdf
Contractual environmental terms
Environmental requirements are contractual obligations.
Work may be stopped or suspended for environmental threats, unauthorised work, missing authorisations or non-compliant acts.
Stoppages for environmental interventions by Transmission management, environmental practitioners or government authorities do not carry financial compensation.
Suppliers must address outstanding environmental issues within the period stated in the contract.
Serious or repeated non-compliance can lead to suspension or termination through the supplier status reconsideration process.
Section
Source: Environmental Requirements for Contractors and or Suppliers.pdf
Environmental risk categories
High risk: potential widespread or permanent ecological damage, remediation longer than one year, possible major public health hazard; full points are required.
Medium risk: regional or local impact that could cause a major uncontained release but is remediable within one year; requirements are contractual.
Low risk: little or no ecological effect and no measurable human health impact; requirements are contractual.
Evaluation administration
Environmental evaluations are compiled by the responsible environmental practitioner and submitted to commercial.
Bidders have 7 days to remedy missing environmental requirements; failure keeps the original score.
DocumentScope of work_Provision of Waste Management.pdfReview complete
Description
Source: Scope of work_Provision of Waste Management.pdf
NTCSA requires a single contractor to deliver comprehensive waste management services at its Gauteng properties for 60 months.
Sites covered
Simmerpan Complex
Apollo
Hume
VLI (Victoria Lake Inn)
Tower Testing
Bernina Houses
Zwavelpoort
Objectives
Ensure proper waste management across NTCSA.
Reduce waste and increase recycling.
Comply fully with OHS regulations, NEMWA and NEMA.
Meet national, provincial and local environmental legislation.
Keep sites clean, professional and presentable in line with NTCSA standards.
The contractor must supply all supervision, labour, equipment, tools, consumables and materials needed to deliver the service.
Important Dates
Source: Scope of work_Provision of Waste Management.pdf (unknown)
Contract period: 60 months.
Closing date and time: 15 December 2026 at 09:00.
Briefing or site visit: none stated in the scope of work.
Contact Information
Source: Scope of work_Provision of Waste Management.pdf (unknown)
Compiled by
Name: Leonard Moahloli
Role: Senior Supervisor Facilities
Functional responsibility
Name: Tshepo Mahlophe
Role: Facilities Manager
Authorised by
Name: Bertram Jordaan
Role: Middle Manager Real Estate
Service sites
Simmerpan Complex
Apollo
Hume
VLI (Victoria Lake Inn)
Tower Testing
Bernina Houses
Zwavelpoort
All in Gauteng.
Submission Guidelines
Source: Scope of work_Provision of Waste Management.pdf (unknown)
Submission method: not stated in the scope of work.
Returnable documents: not listed in the scope of work. Bidders should obtain the bid pack from the Eskom tender portal for the full returnable schedule.
Evaluation Criteria
Source: Scope of work_Provision of Waste Management.pdf (unknown)
Evaluation method: not stated in the scope of work.
Performance monitoring: the employer evaluates contractor performance through ad hoc monitoring during the contract period.
Compliance records required: waste transporter certification (renewed annually), landfill or treatment facility environmental authorisations and permits, SAWIS and/or GWIS registration, and a municipal letter permitting operation in the relevant jurisdiction.
Technical Specifications
Source: Scope of work_Provision of Waste Management.pdf (unknown)
Scope: all-inclusive waste management services across NTCSA sites in Gauteng for 60 months.
Objectives
Proper waste management within NTCSA.
Waste minimisation and recycling.
Full compliance with OHS regulations, NEMWA and NEMA.
Compliance with national, provincial and local environmental legislation.
Clean, professional and presentable site environment.
Services required
Collection and disposal of solid waste, including building rubble.
Emptying and disposal of fat-trap waste.
Composting of garden waste.
Collection and disposal of general waste, steel, metal waste, battery waste and hazardous or chemical waste.
Oil spill clean-up and rehabilitation of contaminated areas.
Collection and disposal of contaminated soil, measured in cubic metres.
Collection and disposal of air-conditioning units using a 6 m³ non-compactable skip.
Collection and disposal of toxic water, measured in litres.
Collection and disposal of fluorescent tube waste.
Collection and disposal of electronic waste.
Collection and testing of samples for asbestos confirmation.
Supply of colour-coded recycling wheelie bins.
Supply of 15-litre parking-mounted bins with lids.
Supply of garden refuse bags and black refuse bags.
Supply of sorting racks and bags.
Supply of colour-coded bins for recyclable and non-recyclable waste.
Labelling of recyclable bins and skips.
Supply of compactable skip bins with lids.
Supply of 6 m³ non-compactable skip bins with lids.
Supply of 4 sets of 21-litre labelled plastic recycling bins with lids for office use.
Supply and cleaning of drums for hazardous or chemical waste.
Recycling of paper waste boxes from offices.
Collection and recycling of shredded paper waste from offices.
Daily waste sorting and segregation at the waste area.
SHEQ Officer: National Diploma in Safety Management, Environmental Health or SAMTRAC full course, environmental law training, ISO 9001 implementation, minimum 2 years' experience.
All sorters and the supervisor must be on site full-time.
Safety officer, responsible manager and truck drivers on site as required.
All personnel must hold valid medical fitness certificates.
Criminal and site clearance checks before employment offers.
Safety induction and NTCSA SHEQ induction before starting work.
Weekly roster for weekend or public holiday work submitted to the Service Manager for approval.
Minimum 2 sets of normal PPE per year plus seasonal PPE.
Uniforms must carry the company logo and be replaced when worn out.
PPE inspection records available for audit.
Transport
Contractor provides transport for personnel, tools, equipment and materials.
Vehicles must comply with Eskom Vehicle Safety Specifications 32-345 and South African road legislation.
Vehicles must be roadworthy, licensed, insured and fitted with seatbelts.
Drivers must hold valid licences and follow site traffic rules.
Transport used for waste removal to landfill and treatment facilities, movement of equipment, personnel transport and emergency response.
Employer may inspect vehicles at any time; non-compliance may lead to removal from site or contractual penalties.
Reporting
Daily, weekly and monthly reports.
Monthly report must include waste manifest, disposal certificate, waste control register, man-hours and timesheets, site-specific performance trends, non-conformance incidents and resolution, safety observations and incidents, and internal audit findings.
Immediate reporting of injuries, ill health and SHEQ threats to the Service Manager.
Monthly progress report on the works programme, with delays explained.
Waste management plan
Contractor must develop a waste management plan for employer approval.
Quality assurance
Complete QA plan in accordance with ISO 9001:2015 for employer approval, covering inspection and test plans, material quality inspections and quality records.
Quality Management
Source: Scope of work_Provision of Waste Management.pdf
Quality assurance plan
Contractor must provide a complete QA plan in accordance with ISO 9001:2015 for employer approval.
The plan must ensure integrated quality service as part of the contract.
Execution of all quality-related activities, including inspection and test plans, material quality inspections and quality record keeping, is part of the contractor's scope.
Workmanship
Workmanship must be of the best practice grade for the trade and comply with recognised standards, unless exceeded by the specification.
The employer determines the acceptability of workmanship.
Standards
ISO 9001 Quality Management Systems.
ISO 14001 Environmental Management Systems.
ISO 45001 Occupational Health and Safety Management Systems.
ISO 41001 Facility Management Systems.
Records
Quality records must be kept and made available.
PPE inspection records must be maintained for audit.
Monthly reports must include internal audit findings.
Compliance Requirements
Source: Scope of work_Provision of Waste Management.pdf (unknown)
Mandatory compliance
CSD registration: not stated in the scope of work.
Tax compliance status: not stated in the scope of work.
B-BBEE: minimum Level 2.
CIDB grading: not applicable.
Statutory and standards compliance
Occupational Health and Safety Act 85 of 1993 and its regulations.
Eskom 32-726 Contract and Contractor Occupational Health and Safety Standard.
Eskom Life Saving Rules (240-62196227).
Eskom Substance Abuse Procedure (32-37).
Eskom Working at Heights Procedure (32-418).
Eskom Vehicle and Driver Safety Management Procedure (240-62946386).
Eskom Vehicle Safety Specifications (32-345).
Eskom colour coding, symbolic safety signs and demarcation standard (34-1168).
SANS 10400 National Building Regulations.
National Environmental Management: Waste Act (NEMWA).
National Environmental Management Act (NEMA).
National Key Points Act.
Applicable municipal waste management and waste collection by-laws.
Landfill or waste treatment facility environmental authorisations and permits.
Landfill or waste treatment facility SAWIS and/or GWIS registration.
Municipal letter permitting operation within the relevant jurisdiction.
Personnel compliance
Valid medical fitness certificates for all personnel.
Criminal and site clearance checks before employment.
Training, testing and verification of key personnel qualifications.
Compliance with NTCSA policies, procedures and site regulations, including no cell phone use in restricted areas, no smoking and adherence to life-saving rules.
Health & Safety
Source: Scope of work_Provision of Waste Management.pdf
Statutory compliance
Occupational Health and Safety Act 85 of 1993 and its regulations.
Eskom 32-726 Contract and Contractor Occupational Health and Safety Standard.
Eskom Life Saving Rules (240-62196227).
Eskom Substance Abuse Procedure (32-37).
Eskom Working at Heights Procedure (32-418).
Eskom Vehicle and Driver Safety Management Procedure (240-62946386).
Eskom Vehicle Safety Specifications (32-345).
Eskom colour coding, symbolic safety signs and demarcation standard (34-1168).
Site rules
No cell phone use in restricted areas.
No smoking policy applies.
Adherence to Eskom life-saving rules.
Safety induction and NTCSA SHEQ induction before starting work.
Personnel
All personnel must hold valid medical fitness certificates.
Criminal and site clearance checks before employment.
Training, testing and verification of key personnel qualifications.
SHEQ Officer: National Diploma in Safety Management, Environmental Health or SAMTRAC full course, environmental law training, ISO 9001 implementation, minimum 2 years' experience.
Landfill or waste treatment facility environmental authorisations and permits.
Landfill or waste treatment facility SAWIS and/or GWIS registration.
Municipal letter permitting operation within the relevant jurisdiction.
Documentation of all clean-up activities, including date and description of waste, treatment and disposal methods, and certificates from licensed waste management facilities.
Recycling of paper, shredded paper, steel, metal, batteries, electronic waste and fluorescent tubes.
Composting of garden waste.
Collection and disposal of hazardous and chemical waste.
Oil spill clean-up and rehabilitation of contaminated areas.
Collection and disposal of contaminated soil, measured in cubic metres.
Collection and testing of samples for asbestos confirmation.
Daily waste sorting and segregation.
Colour-coded bins and labelling for recyclable and non-recyclable waste.
Contractual Terms
Source: Scope of work_Provision of Waste Management.pdf
Contract period: 60 months.
Key personnel requirements
Site Supervisor: Matric or Grade 12, supervisory training certificate, HIRA, legal liability, incident investigation, minimum 3 years' experience.
SHEQ Officer: National Diploma in Safety Management, Environmental Health or SAMTRAC full course, environmental law training, ISO 9001 implementation, minimum 2 years' experience.
Staffing
All sorters and the supervisor must be on site full-time.
Safety officer, responsible manager and truck drivers on site as required.
Contractor must submit a weekly roster for weekend or public holiday work to the Service Manager for approval.
Reporting
Daily, weekly and monthly reports.
Monthly progress report on the works programme, with delays explained.
Immediate reporting of injuries, ill health and SHEQ threats.
Meetings
Contractor must attend scheduled coordination meetings.
Safety induction and NTCSA SHEQ induction required before starting work.
Performance evaluation
Ad hoc monitoring by the employer and Service Manager during the contract period.
Vehicle compliance
Employer may inspect contractor vehicles at any time; non-compliance may result in removal from site or contractual penalties.
Section
Source: Scope of work_Provision of Waste Management.pdf
Contractor performance is evaluated through ad hoc monitoring by the employer and the Service Manager during the contract period.
Monthly reporting required for monitoring:
Waste manifest
Disposal certificate
Waste control register
Man-hours and timesheets
Site-specific performance trends
Non-conformance incidents and resolution
Safety observations and incidents
Internal audit findings
Document559-343110581_Post contract award SHEQ Requirements Waste Contract Services and Management.pdfReview complete
Description
Source: 559-343110581_Post contract award SHEQ Requirements Waste Contract Services and Management.pdf
General scope
Waste contract services and management.
The contractor must provide a SHE file and SHE plan for approval, covering occupational health and safety, environmental management and quality management.
Technical Specifications
Source: 559-343110581_Post contract award SHEQ Requirements Waste Contract Services and Management.pdf (unknown)
Scope
Waste contract services and management.
The contractor must submit a SHE file and SHE plan for review and approval before work starts.
OHS file
Contractor OHS policy, tender SHE specification, tender Annexure B, Letter of Good Standing, contract SHE plan and signed section 37(2) agreement.
Appointment letters for principal contractor, contractor, section 16(2) appointment, site or responsible manager under OHS Act section 8, assistant site manager, supervisor under section 8(2), safety officer, risk assessor, incident investigator under GAR 9(2) including sections 24 and 25, Level 2 first aider, vehicle operator and inspector, and SHE representative where more than 20 employees are employed.
Safety officer must hold a National Diploma in Safety Management or Advanced SAMTRAC and HIRA competency.
Registers for safety induction, PPE issue, PPE matrix, PPE awareness, toolbox talks, first aid, vehicles and fire equipment.
Headcount, training matrix, OHS organogram, incident management procedure, method statement or safe work procedure, risk assessment monitoring and review plan, baseline risk assessment, OHN medical fitness certificate with Annexure 3, emergency management plan, proof of competency, job profiles, SHE communication system, pre-start job assessment or talk process, and COID Act documents.
Environmental file
Waste management plan, environmental management plan and compliance obligations, environmental aspect and impact register, environmental policy, environmental training, environmental officer, waste transporter registration, waste treatment facility licence and registration, waste manifest template, environmental incident management procedure, non-compliance procedure, hazardous waste handling training for sorters, municipal authorisation letter and signed environmental requirements proforma.
Quality file
Signed quality policy, quality method statement, quality objectives signed by top management, control of documented information, signed roles and responsibilities, proof of previous work completed, quality plan, quality organogram signed by top management, management review schedule and work instruction checklist.
Approval
Safety, environmental and quality files must be approved, and work may start only after a formal work authorisation letter is issued.
Methodology
Source: 559-343110581_Post contract award SHEQ Requirements Waste Contract Services and Management.pdf
Methodology documentation
Signed quality policy, quality method statement and quality objectives signed by top management.
Quality Management
Source: 559-343110581_Post contract award SHEQ Requirements Waste Contract Services and Management.pdf
Quality management file
Proof of previous work completed and a quality plan are required.
Compliance Requirements
Source: 559-343110581_Post contract award SHEQ Requirements Waste Contract Services and Management.pdf (unknown)
Mandatory compliance
Valid Letter of Good Standing.
Waste transporter registration certificate.
Licence and registration for waste treatment facilities.
COID Act applicable documents.
OHN Medical Fitness for Duty Certificate with Annexure 3.
Proof of competency certificates and qualifications.
Municipal authorisation letter for operation within the relevant jurisdiction.
Signed section 37(2) agreement.
B-BBEE minimum level: 2.
Health & Safety
Source: 559-343110581_Post contract award SHEQ Requirements Waste Contract Services and Management.pdf
Occupational health and safety file
Contractor OHS policy, tender SHE specification, tender Annexure B, Letter of Good Standing, contract SHE plan and signed section 37(2) agreement.
Appointment letters for principal contractor, contractor, section 16(2) appointment, site or responsible manager, assistant site manager, supervisor, safety officer, risk assessor, incident investigator, Level 2 first aider, vehicle operator and inspector, and SHE representative where more than 20 employees are employed.
Safety induction, PPE, toolbox talk, first aid, vehicle and fire equipment registers.
Headcount, training matrix, OHS organogram, incident management procedure, safe work procedure, risk assessment plan, baseline risk assessment, medical fitness certificate, emergency plan, competency proof, job profiles, SHE communication system, pre-start assessment and COID documents.
Environmental
Source: 559-343110581_Post contract award SHEQ Requirements Waste Contract Services and Management.pdf
Environmental management file
Waste management plan, environmental management plan, environmental aspect and impact register, environmental policy, environmental training, environmental officer, waste transporter registration, waste treatment facility licence, waste manifest template, environmental incident procedure, non-compliance procedure, hazardous waste training for sorters and municipal authorisation letter.
Contractual Terms
Source: 559-343110581_Post contract award SHEQ Requirements Waste Contract Services and Management.pdf
Contractual SHEQ obligations
Appointment letters are required for supervisors and safety officers, with legal liability, supervisory training, incident investigation and HIRA competency.
Section
Source: 559-343110581_Post contract award SHEQ Requirements Waste Contract Services and Management.pdf
Quality approval requirements
The quality file must include a signed quality policy, quality method statement, quality objectives signed by top management, quality plan and quality organogram.
Document32-95 rev 9.pdfReview complete
Description
Source: 32-95 rev 9.pdf
OHS incident management scope
Applies across the organisation, its groups, divisions, subsidiaries and entities where it has a controlling interest.
Covers employees, contractors and members of the public affected by its activities.
Effective from 1 April 2021; next review is March 2027.
Focuses on reducing risk, preventing recurrence, correct classification and record keeping, prompt investigation, near-miss reporting, information sharing and trend analysis.
Incident management is for learning and risk reduction, not blame or staff performance monitoring.
Quality Management
Source: 32-95 rev 9.pdf
Investigation and corrective action requirements
Health and safety incidents must be investigated, except non-work-related events that occur away from the workplace.
Repeat incidents must consider whether earlier corrective actions were ineffective.
Investigation reports must cover incident details, consequences, recurrence risk, immediate causes, root causes, system failures, corrective actions, lessons learnt and recommendations.
Contractors must cooperate with investigations; if they do not, further steps must be taken to identify causes and implement controls.
Corrective actions must be tracked to closure, and risk assessments must confirm that improvements do not create new or greater risks.
Health & Safety
Source: 32-95 rev 9.pdf
Health and safety incident controls
Reportable events cover near misses, property damage, injuries, work-related diseases and fatalities.
Responsible managers must implement the controls, communicate compliance and safety duties, monitor understanding and ensure compliance.
Emergency response must cover rescue, scene safety, first aid, medical assistance, evidence preservation and completion of employer report forms where required.
Fatalities and serious incidents require immediate escalation to senior management and the sustainability systems function.
Occupational diseases require confirmation by an occupational medicine practitioner before the incident process proceeds.
Environmental
Source: 32-95 rev 9.pdf
Environmental scope
Environmental requirements are outside the scope of these OHS incident controls.
The revision history clarifies investigation processes for serious incidents and fatalities, including alignment between employer and corporate investigations.
Earlier reviews raised concerns about the practicality of managing complex incident processes at operational level.
Contractual Terms
Source: 32-95 rev 9.pdf
Legal and investigation obligations
Notifications under sections 31 or 32 of the OHS Act, National Prosecuting Authority summonses or incidents with possible liability must be referred immediately to the Legal Department.
If legal representation is not required, the operating unit must provide a prompt detailed motivation for assessment.
Serious incident investigations may include separate technical reports where needed.
Where potential liability exists, the Legal Department and Sustainability Systems must receive a motivation to advise the operating unit.
For employee or contractor fatalities, Sustainability Systems initiates a corporate investigation after a preliminary investigation by the operating unit; where the Mine Health and Safety Act applies, its process governs.
Bidders must submit the completed and signed environmental tender returnable schedule.
The returnable must include the signed Environmental Requirements Proforma 240-110600836.
Supporting documentation must be provided for the environmental management system, environmental management programme or method statements, waste management plan, aspect and impact register, and additional buyer requirements.
Provision of waste management services for 60 months.
Waste streams must be identified, segregated, minimised, handled, stored, transported and disposed of lawfully.
A waste management plan or method statement must be prepared and maintained.
Hazardous chemical substances and contaminated waste must be controlled.
Site establishment, access control, access routes and landowner liaison must be managed.
Vegetation management, environmental noise control and dust/air-quality control must be addressed.
Water use, stormwater, rehabilitation, erosion control, access-road maintenance, no-go fencing and vegetation clearing must be covered where relevant.
Environmental incidents, oil spills, fire, biodiversity impacts, complaints and grievance handling must be reported and managed.
Environmental compliance obligations must be monitored.
A site-based environmental officer or representative, with CV and competences, must be responsible for environmental monitoring, reporting and incident management; for low-risk projects, two weeks' environmental training may be sufficient.
An environmental bill of quantities must reflect the environmental aspects of the work.
Compliance with the National Environmental Management: Waste Act (Act No. 59 of 2008).
Compliance with the Transmission Industry Waste Management Plan.
Compliance with the Environmental Requirements for Contractors and/or Suppliers (240-180100134).
A completed and signed Environmental Requirements Proforma 240-110600836.
A documented environmental management system, supported by an EMS manual or equivalent document defining its scope; certification is not required but the system must conform to the stated EMS requirements.
The environmental management system must cover a signed environmental policy, objectives, roles and responsibilities, communication, emergency preparedness and response, performance evaluation, internal audit, management review, nonconformity and corrective action.
A project-specific aspect and impact register, including ratings, must be provided.
DocumentOHS Tender Evaluation for Waste Contract Management.pdfReview complete
Description
Source: OHS Tender Evaluation for Waste Contract Management.pdf
Waste management contract for Eskom Transmission, assessed as low-risk work.
The OHS evaluation is carried out on the Annexure T1 Transmission OHS Tender Evaluation template for low-risk work.
The template is reviewed on a three-year cycle, with the next review due November 2026.
Submission Guidelines
Source: OHS Tender Evaluation for Waste Contract Management.pdf (unknown)
Returnable OHS documents — all must be completed, signed and submitted with the bid:
Annexure B: acknowledgement of Eskom's OHS legal and other requirements.
Health and Safety Plan: must address the OHS risks of the waste management scope and align with the health and safety specification.
Baseline OHS Risk Assessment (BRA): identifies, assesses and manages the SHE risks of the scope, and must include the risk assessment methodology used.
Valid Letter of Good Standing: COIDA registration or equivalent.
OHS policy: signed by the CEO and compliant with Section 7 of the OHS Act.
Assessment
Each returnable item is marked Yes or No by Eskom's OHS representative, with comments recorded against any shortfall.
The outcome is recorded as Recommended or Not Recommended.
Submission channel, address and closing time are not set out in this evaluation template.
Evaluation Criteria
Source: OHS Tender Evaluation for Waste Contract Management.pdf (unknown)
OHS compliance screening, not a points-scored evaluation.
Stage: each of the five returnable OHS items is assessed individually as Yes or No.
Stage: Eskom's OHS representative records comments on any item not met and signs off the assessment.
Outcome: an overall recommendation of Recommended or Not Recommended.
No price, functionality or preference point weighting, minimum score or 80/20 or 90/10 split is stated in this template.
Technical Specifications
Source: OHS Tender Evaluation for Waste Contract Management.pdf (unknown)
Scope
Waste management contract for Eskom Transmission.
Classified as low-risk work under Eskom's OHS tender evaluation framework.
OHS plan alignment
The plan must address the OHS risks arising from the waste management scope of work.
It must align with the health and safety specification issued for the contract.
The risk assessment methodology must be submitted together with the Baseline OHS Risk Assessment.
Compliance Requirements
Source: OHS Tender Evaluation for Waste Contract Management.pdf (unknown)
Statutory and client OHS compliance
Valid Letter of Good Standing with COIDA, or an equivalent proof of registration.
OHS policy signed by the CEO, meeting the requirements of Section 7 of the OHS Act.
Signed acknowledgement of Eskom's OHS legal and other requirements (Annexure B).
Baseline OHS Risk Assessment covering the scope of work, with the methodology used.
Health and Safety Plan aligned to the contract's health and safety specification.
No CSD, tax, B-BBEE, CIDB or local content requirements are stated in this evaluation template.
Health & Safety
Source: OHS Tender Evaluation for Waste Contract Management.pdf
Health and Safety Plan — required content
The plan must address the OHS risks of the waste management scope and align with the contract's health and safety specification. It must cover:
OHS organisation within the company, with assigned responsibility and accountability.
SHE incident management.
Planning of work activities, including planning for changes and emergency work.
SHE communication procedure.
Personal protective equipment.
Emergency planning and fire risk management.
Vehicle and driver behaviour safety.
Contractor or supplier selection and management.
Design and specifications.
Safe work procedures and method statements.
Competency, training and appointments.
Communication and awareness.
Medical surveillance programme.
Management of non-compliance and non-conformities.
Risk assessment process, with a monitoring and review plan.
Process for setting objectives and programmes.
Process for reviewing the SHE plan.
Performance management and monitoring.
Internal audit process.
Document and records management.
Supporting OHS submissions
Baseline OHS Risk Assessment identifying, assessing and managing the SHE risks of the scope, submitted with the methodology used.
Valid Letter of Good Standing with COIDA or equivalent.
OHS policy signed by the CEO and compliant with Section 7 of the OHS Act.
Signed acknowledgement of Eskom's OHS legal and other requirements (Annexure B).
Section
Source: OHS Tender Evaluation for Waste Contract Management.pdf
Each returnable OHS item is assessed as Yes or No by Eskom's OHS representative, with comments recorded where an item is not met, and an overall recommendation of Recommended or Not Recommended is made.
A signed environmental management declaration is required, showing the organisation name, vendor number, contract number and scope of work.
The contractor signs with full name, designation, contact number and date; the Eskom Project Manager countersigns.
Undertakings accepted on signature
Work must comply with the project Environmental Management Plan/Programme and/or the Environmental Authorisation, and with Eskom's Environmental Requirements for Organisations (240-18100134).
All applicable environmental legal and other requirements must be met.
Eskom's environmental standards, policies and procedures apply where relevant.
Environmental best practice must be maintained on site throughout the contract.
All staff must be informed of their role in managing on-site environmental impacts.
Non-conformances issued to the contractor must be addressed promptly.
Incident reporting
Environmental incidents must be reported within 24 hours of occurrence.
Registers to be kept on site where applicable and submitted to the Eskom Project Manager on project completion
Copy of the approved project-specific Environmental File
Incident and complaint register
Herbicide and pesticide register
Hazardous substances register, including solvents
DocumentFinal SHE Spec for Provision of Waste Management Services.pdfReview complete
Description
Source: Final SHE Spec for Provision of Waste Management Services.pdf
The contract covers waste management services at NTCSA Real Estate sites in Gauteng: Simmerpan Complex, Victoria Lake Inn, Apollo, Hume, Bernina Houses, Tower Testing, Zwavelpoort and other Gauteng sites. Services are provided on a scheduled frequency and on an ad hoc basis when requested by the employer.
The contractor must prepare a SHE Plan that meets the specification and all applicable legal requirements. NTCSA Real Estate does not assume the contractor's legal responsibilities; the contractor remains accountable for the health and safety of its employees and sub-contractors.
The specification sets minimum requirements and does not replace the contractor's own organisational SHE requirements, which must also be addressed in the SHE plans.
Important Dates
Source: Final SHE Spec for Provision of Waste Management Services.pdf (unknown)
Closing date: 15 December 2026 at 09:00.
SHE and Environmental file submission: 4 weeks before the agreed project commencement date.
Document effective date: 26 March 2026.
Document review date: 26 March 2029.
Briefing session: none stated.
Contact Information
Source: Final SHE Spec for Provision of Waste Management Services.pdf (unknown)
SCM contact: not stated.
Technical contacts:
Name: Mangaka Magaoga
Role: Eskom SHEQ Officer
Name: Albert Shai
Role: Eskom SHEQ Senior Advisor
Name: Tshepo Mahlophe
Role: Eskom Facilities Manager
Name: Tshegofatso Nnene
Role: Eskom Environmental Officer
Email: not stated.
Telephone: not stated.
Project address:
Eskom National Transmission Company of South Africa
Simmerpan
Cnr Power and Refinery Road
Germiston
14001
Submission Guidelines
Source: Final SHE Spec for Provision of Waste Management Services.pdf (unknown)
Submission method: not stated in the document.
Submission address: not stated.
Closing time: not stated.
Returnable documents:
SHE and Environmental file package: must be submitted electronically and in hard copy to the SHE department 4 weeks before the agreed project commencement date.
Section 37(2) agreement: signed by the contractor and the NTCSA Real Estate project manager; a copy must be kept by the contractor and the project manager.
Compensation Commissioner Letter of Good Standing: certified copy for the contractor and all sub-contractors, with the nature of business aligned to the scope.
SHE Plan and Environmental Management Plan: must be approved in writing by the NTCSA Real Estate Contract Manager before work starts.
Site-specific Waste Management Plan: must form part of the SHE file.
Baseline risk assessment and Environmental Aspect and Impact register: must be included in the SHE Plan and Environmental Management Plan.
Organograms: principal contractor and contractor organograms required.
Training records and licences: must be available on request.
Disqualification risks:
Work may not commence without written approval of the SHE file.
No work may commence without a signed Section 37(2) agreement.
Sub-contractors may not start work without written notification to and approval from the project manager.
Evaluation Criteria
Source: Final SHE Spec for Provision of Waste Management Services.pdf (unknown)
Evaluation stages:
Pre-contract compliance check: valid Letter of Good Standing, signed Section 37(2) agreement, approved SHE Plan and Environmental Management Plan, and SHE file submitted 4 weeks before commencement.
Competence assessment: SHE Officer, site/project managers and supervisors must meet the stated training and experience requirements.
Minimum qualifying score: not stated.
Preference point system: not stated.
B-BBEE: not stated.
Quality Management
Source: Final SHE Spec for Provision of Waste Management Services.pdf
Quality requirements are set out in section 3.32 of the specification.
Sites covered: Simmerpan Complex, Victoria Lake Inn, Apollo, Hume, Bernina Houses, Tower Testing, Zwavelpoort and other Gauteng sites.
Services include:
Provision of waste disposal certificates where applicable.
Collection and disposal of general waste, building rubble, steel and metal waste, hazardous/chemical waste, contaminated soil, toxic water, fluorescent tubes, electronic waste, battery waste and air-conditioning units.
Emptying and disposal of fat-trap waste.
Composting of garden waste.
Oil spill clean-up and rehabilitation of contaminated areas; supply of oil spill kits.
Asbestos sampling and confirmation testing.
Substance abuse:
Zero tolerance for alcohol and drugs; permissible level is 0%.
Compliance with Eskom Substance Abuse Procedure 32-37 and Life-saving Rule 4 (BE SOBER).
Ad hoc alcohol testing may be conducted.
Test records are confidential and kept in the employee's personal file.
Financial Requirements
Source: Final SHE Spec for Provision of Waste Management Services.pdf (unknown)
Pricing format: not stated.
Bid security: not stated.
Bonds or guarantees: not stated.
Retention: not stated.
Payment terms: not stated.
Financial capacity thresholds: not stated.
Compliance Requirements
Source: Final SHE Spec for Provision of Waste Management Services.pdf (unknown)
Legal compliance:
OHS Act and regulations: up-to-date copy must be available to all employees.
NEMA and NEMWA: compliance required.
Basic Conditions of Employment Act: compliance required.
Section 37(2) agreement: must be signed with NTCSA Real Estate and with each sub-contractor.
Compensation Commissioner Letter of Good Standing: certified copy for the contractor and all sub-contractors, with nature of business aligned to the scope.
COID Act: compliance required.
Child labour: prohibited.
Standards:
ISO 9001 (quality management)
ISO 45001:2018 (occupational health and safety)
ISO 14001:2015 (environmental management)
Eskom Life-saving Rules (240-62196227)
Eskom Substance Abuse Procedure (32-37)
Eskom Contract and OHS Contractor Management Standard (32-726)
Eskom Incident Management (32-95)
Eskom Risk Assessment Procedure (32-520)
Eskom Vehicle and Driver Safety Management Procedure (240-62946386)
B-BBEE: not stated.
CIDB: not applicable.
CSD registration: not stated.
Tax compliance: not stated.
Health & Safety
Source: Final SHE Spec for Provision of Waste Management Services.pdf
SHE roles and responsibilities:
Principal contractor: accountable for the safety and health of employees and sub-contractors; must keep a record of all employees including induction dates, skills and licences; must compile a SHE file for each work site; must hand over a consolidated SHE file on completion; must provide certified Letters of Good Standing for itself and all sub-contractors; must appoint competent staff and supervisors in writing; must appoint a full-time safety officer as per project risk; must conduct daily pre-task risk assessments; must establish health and safety committees and appoint representatives; must ensure all incidents are reported and investigated; must implement a substance abuse programme.
Site managers: assist with induction training; must have valid legal liability and incident investigation training; must communicate hazards; must stop unsafe work; must ensure PPE is issued and worn; must conduct daily risk assessments and toolbox talks; must report incidents.
Supervisors: must have supervisory, legal liability, hazard identification and risk assessment, and incident investigation training, plus 3 years' supervision experience; must inspect work and ensure compliance; must participate in incident investigations and emergency planning.
SHE Officer: recognised safety qualification, minimum 2 years' experience and Environmental Law training; part-time on site as per project risk; must conduct audits and inspections at least monthly; must conduct behaviour observations at least monthly; must assist in developing the SHE Plan and SHE policy.
SHE file and approvals:
SHE and Environmental file packages must be submitted electronically and in hard copy 4 weeks before the agreed commencement date.
The SHE Plan and Environmental Management Plan must be approved in writing by the NTCSA Real Estate Contract Manager before work starts.
A site-specific Waste Management Plan must form part of the SHE file.
A baseline risk assessment and Environmental Aspect and Impact register must be included.
Written approval authorises site establishment.
Medical and training:
Pre-employment, periodic and exit medicals by a registered Occupational Health Practitioner.
Medical certificates valid for one year.
Induction training for all employees, site-specific induction and visitor induction.
Training records must be available on request.
Substance abuse:
Zero alcohol and drug tolerance.
Compliance with Eskom Substance Abuse Procedure 32-37 and Life-saving Rule 4 (BE SOBER).
Ad hoc alcohol testing may be conducted.
Test records are confidential.
Child labour:
Prohibited. Work by children must comply with the Constitution and the Basic Conditions of Employment Act.
Environmental
Source: Final SHE Spec for Provision of Waste Management Services.pdf
Environmental management requirements:
Comply with NEMA principles and NEMWA.
Implement the Zero Liquid Effluent Discharge (ZLED) policy.
Manage waste in accordance with the site-specific Waste Management Plan.
Keep records on site for environmental management.
Comply with local authority by-laws and environmental legislation.
The Environmental Management Plan must include a site-specific Environmental Aspect and Impact register and a monitoring and review plan.
The contractor must take prime responsibility for environmental management of its activities and minimise damage to the environment.
Contractual Terms
Source: Final SHE Spec for Provision of Waste Management Services.pdf
Site and project managers must hold valid training in legal liability and incident investigation.
Section
Source: Final SHE Spec for Provision of Waste Management Services.pdf
Quality requirements are addressed in section 3.32 of the specification. The contractor remains accountable for the quality and execution of its health and safety programme.
DocumentPAYE Questionnaire for Service Contracts 2026_2027.docReview complete
Description
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc
The pack is used by Eskom Group to classify service providers for PAYE purposes. It covers companies, close corporations, trusts and individuals that supply services or labour to Eskom Group. The questionnaire determines tax status and the PAYE treatment of payments. It is based on the 2026/2027 tax year and may change with legislation.
Important Dates
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)
Questionnaire validity: 1 March 2026 to 28 February 2027.
Contact Information
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)
Submission method: return the completed pack to Eskom and copy [email protected].
Required contents: signed summary sheet, signed appendices or declarations required by the answers, and representative particulars.
Contractor route: companies, close corporations and trusts complete Evaluation Pack A; individuals complete Evaluation Pack B.
Mandatory entries: entries marked with an asterisk are compulsory.
Non-resident contractors: sign Appendix 9 and submit through the Eskom representative to Group Tax.
Labour broker route: sign Appendix 6 and provide a valid IRP30 exemption certificate; without it, PAYE is withheld until the certificate is supplied.
Consequence: unsigned required affidavits or declarations result in PAYE being withheld from payments.
Technical Specifications
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)
Scope: PAYE classification questionnaire for service contracts and individual labour supplied to Eskom Group.
Applies to: companies, close corporations, trusts and individuals providing services or people to Eskom Group.
Purpose: determine whether the contractor is an independent contractor, personal service provider, labour broker or dependent contractor, and the PAYE treatment.
Validity: 1 March 2026 to 28 February 2027, subject to tax law changes.
Financial Requirements
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)
Payment withholding: Eskom may withhold PAYE from payments where required affidavits or declarations are not signed.
IRP30: if a valid IRP30 exemption certificate is not provided, PAYE is withheld until it is provided.
Disclosure codes: where Appendix 7 applies, the relevant PAYE code must be shown on the IRP5; code 3601 applies to certain dependent contractor outcomes, and code 3616 applies where Appendix 7 was already signed under the income or place and control tests.
Compliance Requirements
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)
Mandatory completion: the contractor or authorised representative must confirm that all answers are truthful and sign the representative particulars.
Company, close corporation or trust route: complete Evaluation Pack A; individual route: complete Evaluation Pack B.
Appendix 1: affidavit confirming at least three full-time employees who are not connected persons.
Appendix 2: affidavit confirming no connected person will personally render services to Eskom.
Appendix 3: affidavit confirming services are not mainly performed at Eskom and are not controlled or supervised by Eskom.
Appendix 4: affidavit confirming no more than 80% of income is or is likely to be received from one client or associated institution.
Appendix 5: affidavit confirming an individual provides a service rather than people.
Appendix 6: declaration that the contractor is a labour broker.
Appendix 7: declaration that the contractor is a dependent contractor or personal service provider.
Appendix 8: declaration that the contractor is an independent supplier or contractor.
Appendix 9: declaration that the contractor is a non-resident of South Africa.
IRP30: labour brokers must provide a valid IRP30 exemption certificate; otherwise PAYE is withheld until supplied.
Definitions: connected person, associated institution, labour broker, personal service provider, remuneration and resident are set out in Appendix 10.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Lake Street, Germiston, Johanessburg, 1401, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
27
Last checked
23 Nov 2026
AI status
Enhanced
Data conflicts
None detected