Betha/Ogies Road - Kriel - Kriel - 2271
Organization Type
GOVERNMENT
Published
20 Nov 2026
OCDS Reference
ocds-9t57fa-178977
Supply of a quality control plan / inspection test plan (qcp or itp) for the reduction of partial load losses (pll) and trips at kriel power station over a 10-month period. The plan must define all activities, inspection and test methods, acceptance criteria, and intervention points, and must be approved by the contractor, ESKOM, and any applicable approved inspection authority before work begins. The most consequential consideration is that the qcp must be fully completed and approved prior to commencement, as IT governs all quality and inspection activities.
Returnable document: a completed Quality Control Plan / Inspection Test Plan (QCP or ITP) template must be submitted.
The QCP must be approved by the contractor/supplier, Eskom, and any applicable Approved Inspection Authority (AIA) before work commences.
The QCP must cover all activities, plant/material descriptions, inspection and test methods, acceptance criteria, and records.
Intervention points (hold, witness, document review, surveillance, verification) and inspection categories (statutory/non-statutory) must be defined.
The scope is reduction of Partial Load Losses (PLL) and trips at Kriel Power Station for a period of 10 months.
No specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB) are stated in the provided document; bidders must follow Eskom's standard contractual and quality control requirements.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Check the registered grade against the tender conditions, or estimate a possible grade. Check CIDB registration · Estimate a CIDB grade.
Date & Time
Monday, 14 December 2026 - 10:00
Venue
Microsoft Teams meeting
Categories
Request for Bid(Open-Tender)
Betha/Ogies Road - Kriel - Kriel - 2271
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Description
20 Nov
2026
Tender Published
Tender was published
14 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure B.pdf
Eskom requires a contractor to reduce partial load losses (PLL) and trips at Kriel Power Station in Mpumalanga over a 10-month period. The work involves compliance with Eskom's OHS legal and other requirements, including the acknowledgement form and associated standards.
Safety Returnables.pdf
Annex-d_Imports Declaration-Supporting schedule to Annex C - Copy.pdf
Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf
Tax Evaluation Questionnair.pdf
Eskom requires contractors to reduce partial load losses (PLL) and trips at Kriel Power Station in Mpumalanga over a 10-month period. The scope involves technical services to improve plant performance and reliability.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx
Eskom requires a contractor to reduce partial load losses (PLL) and trips at Kriel Power Station in Mpumalanga over a 10-month period. The scope involves identifying and mitigating causes of partial load losses and unplanned trips to improve plant performance and availability.
240-68099512 Form A Rev 10 - Reduction Partial Load Losses (PLL) and Trips .pdf
Eskom requires a supplier to reduce partial load losses (PLL) and trips at Kriel Power Station in Mpumalanga over a 10-month period. The contract includes pre- and post-award quality requirements aligned with ISO 9001, with Category 3 quality requirements applicable.
E-tendering Help Manual for supplier - 27 January 2025.docx
Eskom requires the reduction of partial load losses (PLL) and trips at Kriel Power Station in Mpumalanga over a 10-month period. Bidders must submit their tender documents electronically via the Eskom eTendering system.
240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Eskom requires a supplier to reduce partial load losses (PLL) and trips at Kriel Power Station in Mpumalanga over a 10-month period. The contract will be governed by Eskom's Supplier Quality Management specification (QM 58), which mandates a compliant quality management system and submission of quality documentation.
Annex-c_Local content Declaration-Summary Schedule.pdf
SOW for Partial Load Losses (PLL) and Trip reduction at Kriel Power Station_Signed.pdf
Final_ NEC 3 ECSC Contract_rev0.docx
Eskom requires a contractor to reduce partial load losses (PLL) and trips at Kriel Power Station over a 10-month period. The contractor will develop a thermo-hydraulic digital twin model, assess plant performance, conduct root cause analysis, and provide implementation support. The contract is based on the NEC3 Engineering and Construction Short Contract.
SDL&I Strategy for Reduction Partial Load Losses (PLL) and Trips.pdf
Eskom requires a contractor to reduce partial load losses (PLL) and trips at Kriel Power Station in Mpumalanga over a 10-month period. The contract includes specific goals for B-BBEE preference points and SDL&I commitments covering transformation, local procurement, job creation, and skills development.
Tender Returnables CAT 3 - Reduction Partial Load Losses (PLL) and Trips .pdf
Eskom requires a contractor to reduce partial load losses (PLL) and trips at Kriel Power Station in Mpumalanga over a 10-month period. The work involves implementing quality management and control measures to improve plant reliability.
Technical Evaluation Strategy_Kriel PLL and Trip reduction_Rev1 (005).pdf
Eskom requires a service provider to reduce partial load losses (PLL) and trips at Kriel Power Station over a 10-month period. The work involves investigating causes, developing and commissioning a thermo-hydraulic model (digital twin) for each generating unit, assessing plant and auxiliary system performance, and implementing process optimisation measures based on real-time analysis and simulation.
Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdf
Eskom requires a contractor to reduce partial load losses (PLL) and trips at Kriel Power Station over a 10-month period. The work involves supplying and delivering spares and related services, with a signed OEM support letter and proof of previous similar work required.
Eskom General Conditions of Purchase - 31 May 2024.pdf
Eskom requires the reduction of partial load losses (PLL) and trips at Kriel Power Station in Mpumalanga over a 10-month period. The contract is governed by Eskom's General Conditions of Purchase, covering delivery, acceptance, warranty, and termination terms.
Commercial Code of Ethics 32-527 Rev 0.pdf
Eskom requires a contractor to reduce partial load losses (PLL) and trips at Kriel Power Station in Mpumalanga over a 10-month period. The work involves improving operational reliability and performance of the power station.
Eskom - Standard Conditions of Tender (August 2024).pdf
Eskom requires a contractor to reduce partial load losses (PLL) and trips at Kriel Power Station in Mpumalanga over a 10-month period. The work involves identifying and mitigating causes of partial load losses and unplanned trips to improve plant performance and availability.
240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdf
Eskom requires the reduction of partial load losses (PLL) and trips at Kriel Power Station in Mpumalanga over a 10-month period. The work involves improving plant reliability and performance to minimise partial load losses and unplanned trips.
240-109253698 CQP Template 2021.docx
Eskom requires a supplier to reduce partial load losses (PLL) and trips at Kriel Power Station in Mpumalanga over a 10-month period. The contract includes a mandatory Contract Quality Plan (CQP) that the supplier must complete and maintain, covering quality management, communication, sub-supplier control, and documentation.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
Eskom requires a contractor to reduce partial load losses (PLL) and trips at Kriel Power Station in Mpumalanga over a 10-month period. The work involves identifying and mitigating causes of partial load losses and unplanned trips to improve plant availability and performance.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 795 166
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This document is the Eskom Supplier Quality Management Specification (240-105658000, Revision 4). It defines the minimum quality requirements for all existing and potential Eskom suppliers, including the criteria for evaluation, selection, registration, assessment, performance monitoring and auditing. The specification applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all Eskom RFIs, RFQs, RFPs and contracts for products and services.
Important Dates
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Closing date: 14 December 2026 at 08:00
Contact Information
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)No specific contact details are provided in the document.
Submission Guidelines
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Disqualification risks:
Evaluation Criteria
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Evaluation is based on the quality requirements set out in this specification. Bidders are assessed against the selected quality category (1, 2, 3 or 4) as indicated in Form A. The evaluation scorecard is referenced as 240-168873697. The quality criteria cover the supplier's QMS, quality plans, and capability to meet Eskom's quality requirements. No minimum qualifying score is stated.
Technical Specifications
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)The specification applies to all Eskom suppliers and sub-suppliers. It requires suppliers to develop, implement, maintain and continually improve a quality management system (QMS) based on ISO 9001. The QMS must conform to the latest ISO 9001 standard or applicable QMS standard. Suppliers must comply with the quality requirements for the duration of the contract. The specification defines four categories of quality requirements (Category 1, 2, 3 and 4) that determine the level of quality documentation required. Suppliers must submit quality documentation as per the category indicated in Form A.
Methodology
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfThe supplier must develop a preservation work plan and execute it across all work locations. The plan must include a records management process compliant with Eskom information management requirements. The supplier must ensure clear communication of preservation requirements to sub-suppliers and monitor compliance throughout the project. Compliance evaluation must anticipate transfers of responsibility between project functional areas.
Quality Management
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfThe supplier must develop, implement, maintain and continually improve a QMS based on ISO 9001. The QMS must include documented information such as a quality manual, quality plans, work procedures and method statements. A valid ISO 9001 certificate from an accredited certification body is required unless excluded by the category. The supplier must submit a draft Contract Quality Plan (CQP) and Quality Control Plan (QCP)/Inspection and Test Plan (ITP) as applicable. The supplier must manage sub-supplier quality, including audits, surveillance and performance management. Eskom may appoint resident quality inspectors and requires the supplier to provide workspace at no cost. Quality kick-off meetings and pre-inspection meetings are mandatory.
Pricing Schedule
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfNo pricing schedule or financial details are provided in the document.
Financial Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)No specific financial requirements are stated in the document.
Compliance Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)ISO 9001 certification or objective evidence of a compliant QMS is required, depending on the category. Sub-suppliers must also meet the same quality requirements. Eskom reserves the right to assess sub-supplier facilities. No B-BBEE, CIDB, or other compliance requirements are stated in the document.
Health & Safety
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfThe specification references the Safety, Health, Environment and Quality (SHEQ) Policy (32-727) as an informative reference. No specific OHS requirements are detailed in the document.
Contractual Terms
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfThe supplier must implement a preservation management programme covering all physical assets, from transfer of ownership through storage and transit to final installation. The programme must address protection against environmental conditions, maintenance of coatings and coverings, and compliance monitoring. Preservation requirements must be clearly documented in purchase orders and communicated to all relevant project functions. Eskom has free and unrestricted access to all preservation records for inspection and audit.
Section
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfThe evaluation criteria are based on the quality requirements of this specification. Bidders are assessed against the selected quality category (1, 2, 3 or 4) as indicated in Form A. The evaluation scorecard is referenced as 240-168873697. The quality criteria cover the supplier's QMS, quality plans, and capability to meet Eskom's quality requirements. No minimum qualifying score is stated.
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.docxThe document is the Eskom eTendering System Suppliers Help Manual, which explains how suppliers upload tender documents electronically instead of submitting them at Eskom tender offices. It covers registration, login, OTP verification, uploading files, finalising submissions, editing registration, logging off, and password reset. It does not contain any details about the Kriel Power Station tender itself.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Submission method: online via the Eskom eTendering system at https://eTendering.eskom.co.za. Bidders must register on the system and verify their email address; an OTP is sent to the registered cellphone and email for authentication. Upload each required document under the correct category (technical, commercial, finance, etc.). A single file may not exceed 50MB and the total of all uploaded files may not exceed 900MB. After uploading all documents, click "Finalize Submission" and then "Finalise and Close Submission" to complete the bid. A confirmation email with the submission ID is sent; keep it for future enquiries. Bidders must have a valid CSD number to access the system.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)No evaluation criteria are stated in the provided document. The document only describes how to use the eTendering system.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)The document is a user manual for the Eskom eTendering system, not a specification for the reduction of partial load losses and trips at Kriel Power Station. No technical requirements, quantities, locations, or service levels are provided.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Access to the eTendering system requires a valid CSD number. Bidders must register on the system and complete email verification and OTP authentication. No other compliance requirements are stated.
Evaluation Criteria
Source: Annexure B.pdf (unknown)Bidders must sign and submit the Acknowledgement Form for Eskom OHS legal and other requirements (Annexure B), confirming they have obtained copies of the listed OHS documents and understand the consequences of non-compliance. The form must be signed by an authorised person (CEO, Director, or Managing Director) and witnessed by two witnesses.
Compliance Requirements
Source: Annexure B.pdf (unknown)OHS compliance requirements:
Health & Safety
Source: Annexure B.pdfOHS legal and other requirements (Annexure B):
Contractual Terms
Source: Annexure B.pdfContractor management obligations:
Description
Source: Final_ NEC 3 ECSC Contract_rev0.docxThe contract is for the reduction of partial load losses (PLL) and trips at Kriel Power Station. The service provider will investigate causes of PLL and trips, develop and commission a thermo-hydraulic model tailored to each generating unit, and implement process optimisation measures based on real-time analysis and simulation. The contract period is from 15 March 2026 to 14 November 2026 (10 months), with a 12-month on-site presence noted in the scope.
Important Dates
Source: Final_ NEC 3 ECSC Contract_rev0.docx (unknown)Starting date: 15 March 2026
Completion date: 14 November 2026
Defects date: 52 weeks after Completion of the whole of the works
Defect correction period: 2 weeks
Assessment day: 20th day of each successive month
Site inaugural meeting: date to be reflected on the programme
Closing date and time: not stated in the document (tender record indicates 14 December 2026 at 08:00 UTC).
Contact Information
Source: Final_ NEC 3 ECSC Contract_rev0.docx (unknown)Employer's representative:
Site contact (for authorizations and access, at least 14 days before work commences):
Employer address:
Kriel Power Station
Private Bag X5009
Kriel 2271
Site address:
Kriel Power Station
Bethal / Ogies Road
Kriel 2271
Employer's General Manager (signatory):
Submission Guidelines
Source: Final_ NEC 3 ECSC Contract_rev0.docx (unknown)Returnable documents:
Submission method and address: not stated in the document.
Disqualification risks:
Evaluation Criteria
Source: Final_ NEC 3 ECSC Contract_rev0.docx (unknown)Evaluation criteria not detailed in the document. The contract is subject to the NEC3 Engineering and Construction Short Contract (June 2005) with additional conditions Z1 to Z11. B-BBEE recognition Level 4 is the minimum that the contract should achieve. The offered total of the Prices (exclusive of VAT) is stated in the Pricing Data.
Technical Specifications
Source: Final_ NEC 3 ECSC Contract_rev0.docx (unknown)Scope of work:
Project execution:
Employer responsibilities:
Contractor responsibilities:
Standards and specifications:
Site information:
Financial Requirements
Source: Final_ NEC 3 ECSC Contract_rev0.docx (unknown)Pricing format:
Bonds and guarantees:
Payment terms:
Delay damages:
Insurance:
Overheads and profit percentages:
Compliance Requirements
Source: Final_ NEC 3 ECSC Contract_rev0.docx (unknown)B-bbee:
CIDB:
Health and safety:
Other:
Description
Source: SDL&I Strategy for Reduction Partial Load Losses (PLL) and Trips.pdfSDL&I objectives align with RDP goals. Tenderers who submit objectives but do not meet Eskom's targets are not disqualified. SDL&I objectives do not form part of scoring but commitments become contractual obligations.
Contact Information
Source: SDL&I Strategy for Reduction Partial Load Losses (PLL) and Trips.pdf (unknown)Buyer: Mataboge Mogashoa
Department: Kriel Power Station
Compiled by: Thomas Chuene, Senior Advisor, Supplier Development, Localisation and Industrialisation
Submission Guidelines
Source: SDL&I Strategy for Reduction Partial Load Losses (PLL) and Trips.pdf (unknown)Returnable documents: valid B-BBEE certificate (SANAS accredited), sworn affidavit, or CIPS affidavit; proof of ownership/shareholding (preferably CIPC documentation) with shareholding breakdown; certified ID copies of shareholders; proof of disability (where applicable); consolidated B-BBEE certificate for trusts, consortia, or joint ventures. Bidders failing to provide B-BBEE documentation are not disqualified but score 0 points for specific goals and may only score out of 90/80 for price.
Evaluation Criteria
Source: SDL&I Strategy for Reduction Partial Load Losses (PLL) and Trips.pdf (unknown)Evaluation: price and specific goals (B-BBEE status level points). Points for specific goals are added to price points, total rounded to two decimal places. Contract awarded to highest scoring tenderer. B-BBEE points table: Level 1: 10 (90/10) or 20 (80/20); Level 2: 9 or 18; Level 3: 6 or 14; Level 4: 5 or 12; Level 5: 4 or 8; Level 6: 3 or 6; Level 7: 2 or 4; Level 8: 1 or 2; Non-compliant: 0. SDL&I objectives do not form part of scoring but commitments become contractual obligations.
Technical Specifications
Source: SDL&I Strategy for Reduction Partial Load Losses (PLL) and Trips.pdf (unknown)Scope: Reduction of Partial Load Losses (PLL) and trips at Kriel Power Station.
Duration: 12 months (tender record states 10 months; document states 12 months).
Budget: not disclosed (marked XXXXXX).
Methodology
Source: SDL&I Strategy for Reduction Partial Load Losses (PLL) and Trips.pdfSkills development: tenderers must submit proposals for developing skills of unemployed candidates, targeting Mechanical Engineer (National Diploma in Mechanical or equivalent) and Control Specialist (B.Sc. in Mechanical Engineering, Mechatronics, or Control Systems). Candidates must be from all provinces, representative of population demographics. Excludes Eskom employees and registered learners. Tenderers bear full cost; Eskom makes no financial contribution. Tenderers may approach SETAs for grants and SARS for tax rebates.
Pricing Schedule
Source: SDL&I Strategy for Reduction Partial Load Losses (PLL) and Trips.pdfPrice Schedule must separate local and imported components. Local procurement content is total spending minus imported component.
Financial Requirements
Source: SDL&I Strategy for Reduction Partial Load Losses (PLL) and Trips.pdf (unknown)SDL&I penalty: 1.5% of contract value for failure to meet SDL&I obligations.
Retention: 1.5% of every invoice (excluding VAT) retained as security for SDL&I obligations, released upon fulfilment.
Local procurement content: tender response must be separated into local and imported components as per Price Schedule; local content is total spending minus imported component.
Compliance Requirements
Source: SDL&I Strategy for Reduction Partial Load Losses (PLL) and Trips.pdf (unknown)B-BBEE evidence required to claim preference points: valid B-BBEE certificate, sworn affidavit, or CIPS affidavit.
Revenue thresholds: R10 million or less (EME) may submit sworn affidavit; R50 million or less (QSE) must comply with QSE scorecard unless at least 51% black-owned, then sworn affidavit; above R50 million must submit valid B-BBEE certificate.
Sworn affidavit validity: must include deponent's name and ID number, designation (director/owner/member), enterprise name and address, percentage of black ownership, black female ownership, designated group, total revenue and basis, financial year end, B-BBEE status level, empowering supplier status, same signature date for deponent and Commissioner of Oaths, Commissioner must not be employee or ex officio of enterprise.
B-BBEE improvement plan: mandatory, submit within 30 days of contract signature. Level 4 must reach Level 3 by end of first year; Level 5-8 or non-compliant must reach Level 4 by end of first year, then improve one level each year.
Health & Safety
Source: SDL&I Strategy for Reduction Partial Load Losses (PLL) and Trips.pdfNo health and safety requirements stated in the document.
Section
Source: SDL&I Strategy for Reduction Partial Load Losses (PLL) and Trips.pdfSpecific goals: maximum 10/20 points for specific goals, added to price points. B-BBEE status level points table as per 90/10 or 80/20 system. Bidders failing to provide B-BBEE documentation score 0 for specific goals and may only score out of 90/80 for price.
Description
Source: 240-68099512 Form A Rev 10 - Reduction Partial Load Losses (PLL) and Trips .pdfThe tender is for reducing partial load losses (PLL) and trips at Kriel Power Station over a 10-month period. The document is a quality requirements form (Form A) that the tenderer must complete and sign.
Contact Information
Source: 240-68099512 Form A Rev 10 - Reduction Partial Load Losses (PLL) and Trips .pdf (unknown)Eskom quality representative:
No email, telephone, or address provided.
Submission Guidelines
Source: 240-68099512 Form A Rev 10 - Reduction Partial Load Losses (PLL) and Trips .pdf (unknown)Returnable documents:
Submission method and address: not stated in the document.
Closing time: not stated in the document.
Evaluation Criteria
Source: 240-68099512 Form A Rev 10 - Reduction Partial Load Losses (PLL) and Trips .pdf (unknown)The only stated requirement is that bidders must complete and sign Form A to accept the quality requirements. No scoring, preference points, or minimum qualifying score are specified in this document.
Technical Specifications
Source: 240-68099512 Form A Rev 10 - Reduction Partial Load Losses (PLL) and Trips .pdf (unknown)Scope: Reduction of partial load losses (PLL) and trips at Kriel Power Station, Mpumalanga, for a period of 10 months.
Quality category: Category 3 applies (per clause 4.1 of specification 240-105658000). Only one category may be selected; site assessment applicability must be indicated.
Post-contract award quality requirements apply:
Standard conditions apply:
ISO 9001 clauses and principles apply: context of the organisation, leadership, planning, support, operation, performance evaluation, improvement, customer focus, engagement of people, process approach, evidence-based decision making, relationship management.
Methodology
Source: 240-68099512 Form A Rev 10 - Reduction Partial Load Losses (PLL) and Trips .pdfThe document references ISO 9001 clauses and principles that the tenderer's quality management system must align with: context of the organisation, leadership, planning, support, operation, performance evaluation, improvement, customer focus, engagement of people, process approach, evidence-based decision making, and relationship management.
Quality Management
Source: 240-68099512 Form A Rev 10 - Reduction Partial Load Losses (PLL) and Trips .pdfQuality management requirements:
Compliance Requirements
Source: 240-68099512 Form A Rev 10 - Reduction Partial Load Losses (PLL) and Trips .pdf (unknown)Bidders must accept and comply with Eskom Supplier Quality Requirements (specification 240-105658000) and the ISO 9001 standard, as acknowledged by signing Form A.
Section
Source: 240-68099512 Form A Rev 10 - Reduction Partial Load Losses (PLL) and Trips .pdfNo evaluation criteria are stated beyond the requirement to complete and sign Form A to accept the quality requirements.
Submission Guidelines
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Returnable documents: a completed Quality Control Plan / Inspection Test Plan (QCP or ITP) template, as provided, must be submitted. The QCP must be approved by the contractor/supplier, Eskom, and any applicable Approved Inspection Authority (AIA) before work commences.
Evaluation Criteria
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Evaluation criteria are not detailed in the provided document. Bidders must comply with Eskom's standard contractual and quality control requirements as outlined in the QCP template.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Scope: Reduction of Partial Load Losses (PLL) and trips at Kriel Power Station for a period of 10 months. The QCP must cover all activities, plant/material descriptions, inspection and test methods, acceptance criteria, and records. Intervention points (hold, witness, document review, surveillance, verification) and inspection categories (statutory/non-statutory) must be defined.
Compliance Requirements
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)No specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB) are stated in the provided document. Bidders must follow Eskom's standard contractual and quality control requirements.
Description
Source: Tax Evaluation Questionnair.pdfThis document is the Eskom PAYE Questionnaire for service contracts. It determines whether a contractor (individual, company, close corporation, or trust) is classified as an independent contractor, personal service provider, labour broker, or dependent contractor for tax purposes. The classification affects whether PAYE is withheld from payments. The questionnaire applies to contractors supplying services to Eskom Holdings SOC Ltd and its subsidiaries. It is based on the 2024/2025 tax year legislation and is subject to change. The completed pack must be returned to Eskom Group Tax via email.
Contact Information
Source: Tax Evaluation Questionnair.pdf (unknown)Enquiries:
Submission Guidelines
Source: Tax Evaluation Questionnair.pdf (unknown)Returnable documents:
Submission method: email the completed pack to [email protected].
Disqualification risks:
Evaluation Criteria
Source: Tax Evaluation Questionnair.pdf (unknown)The PAYE Questionnaire determines the contractor's tax classification for withholding purposes. Bidders must answer all questions truthfully and sign the applicable appendices based on their responses.
For companies/CCs/trusts (Evaluation Pack A):
For individuals (Evaluation Pack B):
Technical Specifications
Source: Tax Evaluation Questionnair.pdf (unknown)The tender is for the reduction of partial load losses (PLL) and trips at Kriel Power Station for a period of 10 months.
This document is the Eskom PAYE Questionnaire for service contracts. It establishes whether the contractor is an independent contractor, personal service provider, labour broker, or dependent contractor for tax purposes.
Applicable to contractors supplying services to Eskom Holdings SOC Ltd and its subsidiaries, including Eskom Rotek Industries, National Transmission Company SA, Eskom Enterprises, Pebble Bed Modular Reactor, Escap, Eskom Development Foundation, and Eskom Finance Company.
Pricing Schedule
Source: Tax Evaluation Questionnair.pdfPAYE withholding implications:
No pricing schedule or bill of quantities is included in this document.
Financial Requirements
Source: Tax Evaluation Questionnair.pdf (unknown)PAYE withholding:
No other financial requirements (bid security, guarantees, retention, payment terms) are stated in this document.
Compliance Requirements
Source: Tax Evaluation Questionnair.pdf (unknown)Tax registration:
Residency:
Employee status:
Required forms (each must be signed where applicable):
Failure to sign required appendices results in PAYE withholding.
Section
Source: Tax Evaluation Questionnair.pdfThe evaluation is based on the contractor's tax classification determined by the questionnaire. The classification determines whether PAYE is withheld and the applicable IRP5/IT3(a) code. Contractors must answer all questions truthfully and sign the appropriate appendices. Failure to sign required appendices results in PAYE withholding.
Description
Source: Technical Evaluation Strategy_Kriel PLL and Trip reduction_Rev1 (005).pdfThe service provider will identify causes of partial load losses (PLL) and trips at Kriel Power Station through investigations, development, commissioning, and application of a thermo-hydraulic model tailored to each generating unit. The scope includes a comprehensive assessment of the entire power station plant performance, focusing on trips and load losses, including auxiliary systems, and implementation of process optimisation measures based on real-time analysis and simulation.
Contact Information
Source: Technical Evaluation Strategy_Kriel PLL and Trip reduction_Rev1 (005).pdf (unknown)Technical evaluation team members:
Document authorisation:
Submission Guidelines
Source: Technical Evaluation Strategy_Kriel PLL and Trip reduction_Rev1 (005).pdf (unknown)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Technical Evaluation Strategy_Kriel PLL and Trip reduction_Rev1 (005).pdf (unknown)Technical evaluation threshold: minimum weighted final score of 70%.
Qualitative criteria scoring matrix (scores: 5=100%, 4=80%, 2=40%, 0=0%; scores 1 and 3 not used):
Qualitative criteria and weightings:
Mandatory criterion:
Technical Specifications
Source: Technical Evaluation Strategy_Kriel PLL and Trip reduction_Rev1 (005).pdf (unknown)Scope: Reduction of partial load losses (PLL) and trips at Kriel Power Station.
Work includes:
Applicability: Eskom Kriel Power Station.
Related documents:
Methodology
Source: Technical Evaluation Strategy_Kriel PLL and Trip reduction_Rev1 (005).pdfMethod statement requirements:
Scoring levels:
Experience & Qualifications
Source: Technical Evaluation Strategy_Kriel PLL and Trip reduction_Rev1 (005).pdfRelevant track record and experience (35% weighting):
Scoring levels:
Technical and multidisciplinary capability (35% weighting):
Scoring levels:
Compliance Requirements
Source: Technical Evaluation Strategy_Kriel PLL and Trip reduction_Rev1 (005).pdf (unknown)Mandatory technical criterion:
No other compliance requirements (e.g., CSD, tax, B-BBEE) are stated in this document.
Section
Source: Technical Evaluation Strategy_Kriel PLL and Trip reduction_Rev1 (005).pdfTechnical evaluation threshold: minimum weighted final score of 70%.
Qualitative criteria scoring matrix (scores: 5=100%, 4=80%, 2=40%, 0=0%; scores 1 and 3 not used):
Qualitative criteria and weightings:
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Returnable documents:
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Mandatory returnable: E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1). Failure to fully complete and submit this form within the prescribed period will result in disqualification from the procurement process.
Description
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdfThe tender is for the reduction of Partial Load Losses (PLL) and trips at Kriel Power Station for a period of 10 months. The scope includes supply and delivery of spares as and when required, with associated services such as quality verifications, storage, handling, and technical support.
Important Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdf (RFP)Closing date: 14 December 2026 at 10:00
Clarification meeting (non-compulsory): 02 December 2026 at 14:00 via Microsoft Teams
Clarification queries deadline: 7 working days before tender submission deadline.
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdf (RFP)Eskom Representative (SCM):
Procurement Manager (signatory):
Fraud and corruption reporting:
Submission: via Eskom E-Tendering site (no physical address provided).
Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdf (RFP)Submission method: electronic only via the Eskom E-Tendering site (Eskom Tender Bulletin). No hard copies accepted.
Returnable forms (disqualifiable if not completed, signed where required, and submitted by closing):
Returnables required at closing for evaluation (non-disqualifiable, but zero score if not submitted):
Returnables required prior to contract award:
Disqualification risks:
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdf (RFP)Evaluation stages:
Minimum qualifying score: 70% for technical evaluation.
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdf (RFP)Scope: Reduction of Partial Load Losses (PLL) and trips at Kriel Power Station for a period of 10 months.
Methodology
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdfMethodology requirements (weighted 40% of technical evaluation):
Experience & Qualifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdfExperience requirements (part of technical evaluation):
Quality Management
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdfQuality management requirements:
Pricing Schedule
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdfPricing schedule requirements:
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdf (RFP)Payment terms:
Pricing:
Security:
Financial viability:
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdf (RFP)Mandatory contractual requirements (prior to award):
Additional contractual requirements (if applicable):
Eligibility criteria:
Tax compliance:
Employment Equity:
B-bbee:
CIDB: Not applicable for this tender.
Safety:
Quality:
Health & Safety
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdfSafety requirements:
Environmental
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdfEnvironmental requirements: Documents may be required as per scope of work. No specific environmental criteria were detailed in the tender document.
Contractual Terms
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdfContract conditions: NEC (New Engineering Contract) is the governing contract.
Section
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. RPLL.pdfAdditional evaluation criteria:
Description
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdfThe Eskom Supplier Integrity Pact applies to Eskom Holdings SOC Ltd and all wholly owned subsidiaries, and to all existing and potential suppliers. Its purpose is to prescribe ethical behaviour in interactions with Eskom. Eskom commits to procurement aligned with South African laws and constitutional principles of fairness, transparency, equity, cost-effectiveness and competitiveness. Suppliers must read the pact, complete, sign and submit the Integrity Declaration Form whenever participating in any Eskom procurement process. Both parties commit to refraining from dishonesty, fraud, corruption, and anti-competitive practices such as under-pricing, collusion and bid rigging.
Contact Information
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdf (unknown)Ethics reporting:
Submission Guidelines
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdf (unknown)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdf (unknown)Bidders must be registered on the Eskom Vendor Database.
Bidders must complete and submit the Integrity Declaration Form.
Bidders must disclose any interest or relationship with Eskom employees or directors.
Bidders must not have any director or shareholder who is an Eskom employee or director without full disclosure.
Bidders must not have been restricted by National Treasury or suspended from the Eskom Vendor Database.
Technical Specifications
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdf (unknown)This document is the Eskom Supplier Integrity Pact, applicable to all existing and potential suppliers of Eskom Holdings SOC Ltd and its wholly owned subsidiaries. It supplements all other commercial and ethics policies, codes and procedures. Suppliers must maintain an impeachable standard of integrity in all business and personal dealings, and prevent dishonest, unfair, fraudulent, corrupt or illegal practices during any stage of the procurement process, including contract execution and modifications.
Financial Requirements
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdf (unknown)Business courtesies or gifts offered to Eskom employees/directors must not exceed R1,500.00 in value.
Contractual Terms
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdfSuppliers are subject to a supplier discipline process and may face sanctions if found guilty of misconduct. Suppliers must report any dishonest, fraudulent or inappropriate behaviour by Eskom employees/directors to the Eskom Ethics office ([email protected]), the Eskom Forensic email ([email protected]), or the toll-free hotline 0800 11 27 22, with confidentiality guaranteed. Eskom will treat all tenderers fairly and transparently. Eskom employees/directors must complete annual Declarations of Interest and additional DOIs and NDAs when involved in procurement. Eskom employees/directors involved in tender evaluation or negotiation may not accept money, gifts, rewards, gratuities or favours from tenderers. Eskom will exclude any employee/director with a conflict of interest from the evaluation/negotiation process. Eskom may suspend a supplier from the Vendor Database and refer names to National Treasury for inclusion on the List of Restricted Suppliers.
Section
Source: 240-113650212 Eskom Supplier Integrity Pact Rev 2 June 2028.pdfBidders must not engage in unethical or fraudulent dealings with any Eskom employee/director involved in the evaluation, adjudication or negotiation of a transaction in which the bidder participates. No business courtesy, bribe, gift, fee, commission or inducement may be offered to or requested by such an Eskom employee/director.
Description
Source: 240-109253698 CQP Template 2021.docxThe tender is for the reduction of partial load losses (PLL) and trips at Kriel Power Station, for a period of 10 months. The supplier must provide a Contract Quality Plan (CQP) that meets Eskom's quality management expectations.
Submission Guidelines
Source: 240-109253698 CQP Template 2021.docx (unknown)Returnable documents:
Submission method and address: not stated in the document.
Evaluation Criteria
Source: 240-109253698 CQP Template 2021.docx (unknown)Evaluation is based on the completeness and quality of the submitted Contract Quality Plan (CQP).
Technical Specifications
Source: 240-109253698 CQP Template 2021.docx (unknown)The supplier must prepare a Contract Quality Plan (CQP) for the reduction of partial load losses (PLL) and trips at Kriel Power Station, for a period of 10 months.
Compliance Requirements
Source: 240-109253698 CQP Template 2021.docx (unknown)No specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB) are stated in the document.
Description
Source: Eskom - Standard Conditions of Tender (August 2024).pdfThe tender is for the reduction of partial load losses (PLL) and trips at Kriel Power Station for a period of 10 months. The scope is professional services. Detailed scope is not provided in the available document.
Contact Information
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Contact: Eskom Representative (name not provided)
Submission Guidelines
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Submission method: paper tender, original plus one complete copy, each in a separate sealed package marked "ORIGINAL" and "COPY". If an electronic copy is required, package it separately and mark "ELECTRONIC COPY".
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Evaluation stages:
Technical Specifications
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Scope: Reduction of partial load losses (PLL) and trips at Kriel Power Station for a period of 10 months.
Quality Management
Source: Eskom - Standard Conditions of Tender (August 2024).pdfQuality management: Eskom requires proof of safety, health, environmental, and quality (SHEQ) systems, policies, and capabilities to its satisfaction by the deadline stipulated in the Enquiry. All costs and personnel associated with SHEQ must be reflected in the tender. No specific quality standards or certifications are stated in the provided document.
Financial Requirements
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Pricing format:
Compliance Requirements
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Eligibility:
Health & Safety
Source: Eskom - Standard Conditions of Tender (August 2024).pdfHealth and safety: Bidders must comply with the OHS Act and Eskom's requirements for Safety, Health, Environment and Quality (SHEQ). Proof of SHEQ systems, policies, and capabilities must be provided to Eskom's satisfaction by the deadline stipulated in the Enquiry. All costs and personnel associated with SHEQ must be included in the tender. No specific safety plan format is specified in the provided document.
Contractual Terms
Source: Eskom - Standard Conditions of Tender (August 2024).pdfTender validity: tender must remain valid for acceptance within the validity period after closing; Eskom may request extension, and a tenderer that does not agree is excluded. If validity expires before contract conclusion, the process is deemed concluded without award.
Section
Source: Eskom - Standard Conditions of Tender (August 2024).pdfAdditional evaluation criteria: functionality may be a criterion; if so, a minimum threshold must be met to proceed. Financial analysis may be conducted to assess risk; if risk is too high, the tenderer may be excluded. Price evaluation considers factors such as CPA, FOREX, commodity increases, discounts, NPV, and forecasted invoicing rates. Specific Goals are scored with supporting documentation; failure to submit proof by closing results in zero points for Specific Goals within the 90/10 or 80/20 allocation. Ranking is based on combined Price and Specific Goals scores. Objective criteria under Section 2(1)(f) of the PPPFA may be applied only if stipulated; functionality and B-BBEE elements cannot be used as objective criteria. Reverse e-auction may be used if indicated; if used, tenderers must submit a complete tender without prices.
Description
Source: Tender Returnables CAT 3 - Reduction Partial Load Losses (PLL) and Trips .pdfThe tender is for the reduction of partial load losses (PLL) and trips at Kriel Power Station, for a period of 10 months. The document provided focuses on quality requirements (Category 3) that bidders must meet.
Contact Information
Source: Tender Returnables CAT 3 - Reduction Partial Load Losses (PLL) and Trips .pdf (TENDER)Eskom representative: Zama Sabela (name only; no role, email, or telephone provided).
Submission Guidelines
Source: Tender Returnables CAT 3 - Reduction Partial Load Losses (PLL) and Trips .pdf (TENDER)Returnable documents (Category 3 – Quality Requirements) must be completed and submitted. Required items include:
Submission method and address are not stated in the provided document.
Evaluation Criteria
Source: Tender Returnables CAT 3 - Reduction Partial Load Losses (PLL) and Trips .pdf (TENDER)Quality requirements are evaluated as Category 3 deliverables, with each item scored (indicator = 1). Bidders must meet the quality requirements to be considered. The evaluation covers:
No minimum qualifying score or preference point system (80/20 or 90/10) is stated in the provided document.
Technical Specifications
Source: Tender Returnables CAT 3 - Reduction Partial Load Losses (PLL) and Trips .pdf (TENDER)The scope is the reduction of partial load losses (PLL) and trips at Kriel Power Station, for a period of 10 months. The tender requires a quality management system and quality planning deliverables as described in the evaluation criteria. No further technical specifications are provided in the document.
Compliance Requirements
Source: Tender Returnables CAT 3 - Reduction Partial Load Losses (PLL) and Trips .pdf (TENDER)Quality management system compliance is required, either via valid ISO 9001 certification (with relevant scope, issued by an accredited certification authority) or documented QMS compliance with ISO 9001:2015. No other compliance requirements (CSD, tax, B-BBEE, CIDB) are stated in the provided document.
Section
Source: Tender Returnables CAT 3 - Reduction Partial Load Losses (PLL) and Trips .pdfThe evaluation is based on quality requirements deliverables, scored per item (indicator = 1). Sections A to E are assessed as described in the main evaluation criteria. No minimum qualifying score is stated.
Description
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfThe agreement covers the supply of goods or execution of works/services as described in the order documents, specifications, schedules, and drawings approved by Eskom.
Contact Information
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Fraud and corruption reporting: [email protected], telephone 0800 11 2722.
Evaluation Criteria
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)The supplier must accept Eskom's General Conditions of Purchase; if the supplier does not indicate non-acceptance, acceptance is deemed. The supplier must complete Eskom's CPA (IG) form. The supplier must comply with all statutory requirements under South African law. The supplier must not cede, delegate, or subcontract without Eskom's written consent. The supplier must indemnify Eskom against claims arising from negligence, IP infringement, or breach of statutory duty. The supplier must warrant that goods/works/services are fit for purpose and free from defects for one year from acceptance.
Technical Specifications
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)The scope is the supply of goods or execution of works/services as described in the agreement. The agreement includes order documents, specifications, schedules, and drawings approved by Eskom.
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfEskom may inspect and test goods/works/services at any stage. If the supplier fails to comply, Eskom may reject goods or require re-work. For goods, rejected goods may be returned at the supplier's risk and expense; the supplier must refund money paid and cover costs of obtaining replacements. For works/services, the supplier must correct non-conformances; if delayed, Eskom may have them corrected by a third party at the supplier's cost.
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Prices or rates may include a price adjustment calculated per the formula in the agreement. Payment may be made in any currency; one exchange rate converts to ZAR. Payment in non-ZAR currency shall not exceed amounts stated in the agreement. Eskom pays within 30 days after receipt of a correct tax invoice. The tax invoice must show Eskom's VAT registration number (4740101508) for payment. Delivery costs must be stated in the tender; if not stated, they are deemed included. No payment is made for containers or packing materials unless otherwise stated.
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfThe supplier indemnifies Eskom against claims arising from negligence, IP infringement, or breach of statutory duty by the supplier, its subcontractors, agents, or servants. The supplier warrants that goods/works/services are fit for purpose and free from defects for one year from acceptance (unless otherwise stated). The supplier must rectify defects within an agreed time at no cost to Eskom. Neither party may cede or delegate rights without written consent, except Eskom may cede to its subsidiaries or divisions. The agreement is governed by South African law. On breach, the non-defaulting party may terminate after written notice and failure to remedy. Eskom may terminate if the supplier defaults, becomes bankrupt, or is in financial circumstances prejudicing performance. The supplier must adhere to high ethical standards.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Betha/Ogies Road - Kriel - Kriel - 2271
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
22
Last checked
20 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.