ESKOM requires remedial maintenance works at the drakensberg pumped storage scheme, covering the lift shaft, machine hall, exploratory tunnel, and workshop and stores. The scope includes sealing water leaks, replacing gutters and downpipes, repairing walls and drainage, replacing corroded steel supports and brackets, and various building repairs. Bidders must attend a compulsory site clarification meeting and pass a technical evaluation with a minimum score of 70%, with key personnel required to hold specific professional registrations.
Key Requirements
Attendance of the compulsory site clarification meeting is mandatory; failure to attend disqualifies the bid.
Bidders must submit five or more completed projects within the last five years from tender closing, in structural concrete repairs and/or structural steel works, with completion or reference letters from previous clients.
The technical evaluation requires a minimum score of 70%; the scoring scale is 0β5 with no scores of 1 or 3.
Key personnel must meet registration and experience requirements: Construction Manager professionally registered with SACPCMP (more than three years post-registration preferred), Pr Eng / Pr Tech Eng Civil/Structural professionally registered with ECSA (more than three years post-registration preferred), and foremen with at least five years' experience (more than ten preferred).
The method statement must cover rope access methodology, water ingress remediation, HDPE butt welding, NDT testing, and concrete repairs, among other specified items.
A quality control plan covering material approval and quality assurance for concrete and structural steel works is required.
The programme must show critical path, sequencing, hold points, resourcing plan, and duration; incomplete or infeasible programmes will be scored low or rejected.
Tenders in this industry often require registration with these bodies.
CIDB Registration
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Typical Documents
10 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
CIDB Registration Certificate
NHBRC Registration (if applicable)
Health & Safety Plan
Insurance Certificates
Previous Project Completion Certificates
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards β PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement β so nothing critical is missed before you start your bid response.
DocumentOHS Spec.pdfReview complete
Description
Source: OHS Spec.pdf
Important Dates
20 Nov
2026
Tender published
Tender Published
Tender was published
11 Dec
2026
Submission deadline
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
11 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 β Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Eskom requires remedial and refurbishment works at the Drakensberg Pumped Storage Scheme, covering water ingress remediation, gutter and downpipe replacement, handrail repairs, drainage and cable rack inspections, machine hall cavern drainage, workshop and stores repairs, structural steel replacement in the exploratory tunnel, and replacement of the potable water pipeline and tank. The work is within a live power station environment and includes inspections, reporting, and acceptance by the Employer's Representative.
Remedial maintenance works at the Drakensberg Pumped Storage Scheme, covering four areas: lift shaft (gutter and downpipe replacement, concrete repairs, handrail repairs), machine hall cavern (drainage system, concrete repairs and repainting), workshop and stores (removal of aircon units, brickwork, waterproofing, door replacement, painting), and exploratory tunnel (replacement of corroded steel supports for sewer pipe and light cables). The contract is an NEC3 Engineering and Construction Short Contract with a completion date of 31 March 2027.
Eskom requires remedial maintenance works at the Drakensberg Pumped Storage Scheme in KwaZulu-Natal, covering four areas: the lift shaft (sealing water leaks, replacing gutters and downpipes, inspecting pipe supports and cable racks), the machine hall (roof drainage system, wall repairs, cleaning and unblocking drainage lines), the workshop and stores (re-painting, removing redundant aircon units, bricking up voids, waterproofing), and the exploratory tunnel (replacing corroded steel supports, light brackets and cable ladders). The contract is governed by a comprehensive Occupational Health and Safety specification that bidders must comply with.
Eskom requires remedial works at the Drakensberg Pumped Storage Scheme. The tenderer must accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard, and complete the associated quality acknowledgement form.
Invitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdf
Eskom is procuring remedial works at the Drakensberg Pumped Storage Scheme. The contract will be a single NEC3 Engineering and Construction Short Contract, with the possibility of multiple suppliers if one cannot fulfil the entire scope. The tender is open to eligible contractors, with a compulsory site briefing and a 70% technical threshold.
240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx
Eskom is procuring remedial works at the Drakensberg Pumped Storage Scheme. The tender includes a quality management evaluation scorecard that bidders must complete, with categories determining the required quality documentation.
Eskom requires remedial maintenance works at the Drakensberg Pumped Storage Scheme, covering the lift shaft, machine hall, exploratory tunnel, and workshop/stores buildings. The works include sealing water leaks, replacing gutters and downpipes, establishing roof drainage, repairing damaged walls and concrete, replacing corroded steel supports and brackets, and bricking up openings. Bidders must attend a compulsory site clarification meeting and meet mandatory and qualitative technical evaluation criteria.
240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Eskom is procuring remedial works at the Drakensberg Pumped Storage Scheme. The specification sets out the supplier quality management requirements, mandating a quality management system conforming to ISO 9001, and requires bidders to complete and sign Form A and submit quality documentation according to one of four categories (1-4) selected for the tender.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Draw, Fabricate, Supply, Deliver, Replace, and Install new pipework with fittings inside the cable tunnels and pipe trenches at Kriel Power Station for a period of
six months
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Document read
Compliance review
Bid-ready summary
This is an OHS specification for remedial works at Drakensberg Pumped Storage Scheme. It sets minimum SHE requirements for the contract, applicable to any contracting organisation intending to tender. The contractor must develop a SHE plan meeting these requirements and all applicable legislation. Eskom does not assume the contractor's legal responsibilities.
Important Dates
Source: OHS Spec.pdf (unknown)
Closing date: 11 December 2026 at 08:00 (from tender record).
No briefing session or site visit is specified in the document.
Contact Information
Source: OHS Spec.pdf (unknown)
Eskom Safety Representative: Sibusiso Mbuyisa
Contract Manager/End User: Rowan Francis
Project address: Eskom Drakensberg Pumped Storage Scheme, Off R74 between Bergville and Harrismith, Jagersrust, KwaZulu-Natal, 3354
Evaluation Criteria
Source: OHS Spec.pdf (unknown)
Bidders must comply with the Occupational Health and Safety Act and Regulations, and Eskom's SHE requirements. Mandatory requirements include:
Registration with the Compensation Commissioner and provision of a valid letter of good standing (certified copy) before work commences.
Appointment of a safety officer registered with SACPCMP.
Implementation of a substance abuse programme.
Medical fitness certificates and medical surveillance for employees.
Compliance with Eskom Life-Saving Rules.
The document does not specify CSD registration, tax clearance, B-BBEE level, CIDB grading, or other pre-qualification criteria.
Technical Specifications
Source: OHS Spec.pdf (unknown)
Scope of work at Drakensberg Pumped Storage Scheme:
Lift Shaft: sealing water leaks, replacing gutters and downpipes, inspecting dewatering and inwatering pipe supports and cable racks.
Machine Hall: establishing drainage system on roof, repairing damaged walls, cleaning and unblocking drainage lines.
Workshop & Stores: re-painting, removing redundant aircon units, bricking up and plastering voids, applying waterproofing before painting in water-exposed areas.
Exploratory Tunnel: replacing corroded vertical and horizontal steel supports to sewer pipe, replacing corroded light brackets and cable ladders with new steelwork.
Quality Management
Source: OHS Spec.pdf
Quality management requirements include inspection of dewatering and inwatering pipe supports and cable racks in the Lift Shaft. Non-conformances, corrective actions, audits and inspection schedules are to be reported to the Department of Employment and Labour in the first instance and then to the Eskom project manager.
Financial Requirements
Source: OHS Spec.pdf (unknown)
No specific financial requirements (bid security, bonds, guarantees, retention, payment terms, turnover) are stated in the document.
Compliance Requirements
Source: OHS Spec.pdf (unknown)
No specific compliance requirements beyond OHS and COID are stated. The document does not specify CSD registration, tax clearance, B-BBEE level, CIDB grading, or other pre-qualification criteria.
Health & Safety
Source: OHS Spec.pdf
The document is an OHS specification listing legislative and Eskom SHE requirements. Key obligations include:
Compliance with OHS Act and Construction Regulations.
Notification of construction work to the provincial director of the Department of Employment and Labour if required.
Compilation of a SHE file and handover to Eskom on completion.
Risk assessments before work and daily pre-task risk assessments.
Health and safety induction for all workers and visitors.
Appointment of competent supervisors and safety officers.
Medical surveillance programme and pre-employment/periodic/exit medicals.
Substance abuse programme and prohibition of alcohol/intoxicants on site.
Compliance with Eskom Life-Saving Rules.
Use of PPE and training on its use.
Incident reporting and investigation.
Establishment of health and safety committees and toolbox talks.
Work stoppage if work is not in accordance with the health and safety plan.
Environmental
Source: OHS Spec.pdf
Contractors must comply with environmental legislation and Eskom's duty of care to the environment. An Environmental Management Plan should be adhered to if in place, and minimal environmental damage is required.
Contractual Terms
Source: OHS Spec.pdf
Key personnel requirements for contracts longer than 3 years: SAMTRAC, HIRA, Incident Investigation Training, legal liability knowledge, understanding of ISO 45001, minimum 2 years work experience, and an OHS Diploma. For other roles: HIRA, Incident investigation training, Supervisor training, and legal liability.
Document240-68099512 Form A_Cat 3_ Rev 9.docxReview complete
Description
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx
The tenderer must complete and sign the quality acknowledgement form to accept Eskom Supplier Quality Requirements (specification 240-105658000) and ISO 9001 Standard.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)
The tenderer must complete and sign the quality acknowledgement form to accept Eskom Supplier Quality Requirements (specification 240-105658000) and ISO 9001 Standard. The tenderer must select the applicable quality category (Category 3) and indicate whether site assessment is applicable. The tenderer must also confirm applicability of all listed quality clauses and principles.
Document240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsxReview complete
Description
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx
The document is a supplier quality management tender evaluation scorecard template (Rev 7, effective 21/01/2022) for the Drakensberg Pumped Storage Scheme remedial works. It defines the quality documentation requirements and evaluation criteria for the tender.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)
Returnable documents: complete and sign Form A. Depending on the category selected, submit either a valid ISO 9001:2015 certificate from an accredited certification body, or evidence of an implemented Quality Management System. Category 3 is the applicable category, requiring an implemented QMS, internal audit report, draft Contract Quality Plan (CQP) and Inspection and Test Plan (ITP).
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)
Quality evaluation is weighted across five sections:
Section A (Quality Management System Requirements, ISO 9001:2015): 25% weight. Either Option 1 (valid ISO 9001:2015 certificate with relevant scope, from an accredited and internationally recognised certification authority, valid at time of evaluation) or Option 2 (QMS manual or quality method statement, quality policy approved by top management, quality objectives, control of documented information, control of nonconforming outputs, nonconformity and corrective action, internal audit documentation).
Section B (Evidence of QMS in operation): 25% weight. Requires documented roles, responsibilities and authorities (organisation chart and responsibility matrix), control of externally provided processes, products and services, and latest internal management system audit report with nonconformity and corrective action reports.
Section C (Contract Quality Plan): 20% weight. Requires a draft Contract Quality Plan specific to the scope of work (ref ISO 10005).
Section D (Quality Control Plan): 20% weight. Requires a QCP/Checklist/ITP as per scope of works, with example of an ITP or QCP on similar work.
Section E (User defined additional requirements): 10% weight. Requires Form A completed and signed, and any other requirements per scope of work.
Standard section weights are 25%, 25%, 20%, 20%, 10%. The template allows modifying weights and scoring indicators, but the default is to use standard weights.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)
The tender is for remedial works at the Drakensberg Pumped Storage Scheme. The document provided is a quality evaluation scorecard template; the detailed scope of works is referenced in specification 240-105658000 and related documents.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)
No specific compliance requirements (such as CSD registration, tax clearance, or B-BBEE level) are stated in the provided document.
DocumentInvitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdfReview complete
Description
Source: Invitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdf
The tender is for remedial works at the Drakensberg Pumped Storage Scheme. The scope of work is detailed in Attachment 1 (Scope of Work). The contract will be a single contract to a single supplier, with the possibility of multiple awards if needed.
Important Dates
Source: Invitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdf (RFP)
Closing date: 11 December 2026 at 10:00 (SAST)
Compulsory site briefing: 2 December 2026 at 10:00
Venue: Drakensberg Pumped Storage Scheme, Visitors Centre, Jagersrust, 3354
Clarification queries deadline: 5 working days before tender closing (i.e., by 4 December 2026)
Tender validity period: 12 weeks from closing date
Contact Information
Source: Invitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdf (RFP)
Source: Invitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdf (RFP)
Submission method: electronic via the Eskom E-tendering site (Eskom Tender Bulletin). No hard copies accepted.
Upload documents under the folders: Technical, Commercial, Financial, and Other.
All documents in PDF format; price list in PDF and a copy in Excel.
Upload size per document: 500 MB; total submission limited to 4 GB. No zip/condensed files.
If resubmitting, the latest version is accepted; previous submissions become null and void.
Ensure submission status is marked complete.
Closing time: 11 December 2026 at 10:00 (SAST). Late tenders not accepted.
Returnable forms (mandatory at closing, disqualifiable if missing):
Annexure A: Authorisation Form β confirms the signatory is authorised to bind the bidder; attach certified resolution/power of attorney as applicable.
Annexure B: Acknowledgement Form β acknowledges receipt and understanding of tender conditions.
Annexure C: Tenderer's Particulars β bidder identification and contact details.
Annexure D: Integrity Declaration Form β confirms adherence to the Supplier Integrity Pact.
Annexure G1-G4: SBD 6.2 Declaration for Local Production and Content (with supporting schedules) β required if designated materials are included.
Annexure H: SBD 1 Invitation to Bid β completed and submitted by all tenderers.
Annexure I: SBD 6.1 Preference Points Claim Form (PPPFA 2022) β claim for preference points.
Annexure J: SBD 4 Bidders Disclosure β discloses any state employment or connections.
E-tendering Help Manual acknowledgement form.
Completed NEC or other Contract.
Completed pricing schedule in the NEC format (not on company letterhead).
CIDB proof of grading (or within 21 working days from closing if agreed).
Tax clearance certificate (if not on CSD or no SARS PIN provided).
Tax Evaluation Questionnaire (for services contracts) to determine personal service provider status.
Employment Equity compliance proof (for designated employers, SA tenderers).
COIDA certificate of good standing or proof of application (SA tenderers).
Quality: Form A β Category 3, List of Tender Returnables β Category 3, Supplier Quality Management Specification.
Safety/quality documents as per scope: Baseline Risk Assessment, Work at Height Standard, Management of Substance Abuse Procedure, OHS Incident Management Procedure, Contractor Health and Safety Requirements, OHS Risk Assessment, High Risk Safety File, SHE Spec, Eskom PPE Standard, Life Saving Rules, Emergency Planning.
Annual financial statements (latest approved, not draft) for due diligence (see compliance).
Technical Evaluation Criteria document.
Non-disqualifiable returnables (if missing at closing, 5 working days to submit):
Specific Goals evidence (if not submitted, score zero for that goal).
Disqualification risks:
Missing or incomplete mandatory returnables at closing.
Not attending the compulsory site briefing.
Failing eligibility criteria (see evaluation).
Submitting more than one tender (except as JV with joint liability).
Tender signed by unauthorised person.
Subcontracting 100% of the scope.
Evaluation Criteria
Source: Invitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdf (RFP)
Evaluation stages:
Eligibility check β must meet all criteria, else disqualified.
Qualitative technical evaluation (functionality) β weighted scoring; minimum threshold 70% to be technically acceptable. Tenderers below 70% disqualified.
Pre-award due diligence β for technically compliant tenderers scoring β₯70%; risk-based verification before award.
Price evaluation β scored out of 80 points.
Specific Goals β scored out of 20 points under PPPFA 80/20 system.
Ranking β total of price + specific goals; highest ranked wins.
Eligibility criteria (disqualifying):
No restriction from doing business with Eskom or State-Owned Companies.
Not on international sanctions list (applies to subcontractors/suppliers too).
Not submit more than one tender (unless as JV with joint and several liability).
No conflict of interest (e.g., common controlling partner, access to competitor info).
Tender signed by authorised person.
Not restricted by National Treasury or on Tender Defaulters list.
Not restricted by Eskom.
Must not subcontract 100% of scope.
Price evaluation:
Inclusive of VAT.
Corrected for arithmetical errors.
Excluding contingencies in BOQ/activity schedule.
Adjusted for variations/deviations.
Net Present Value comparison based on programme, price adjustment factors, exchange rates.
Unconditional discounts considered; conditional discounts applied at payment.
Specific Goals:
Scored out of 20 points.
Failure to submit evidence results in 0 points for that goal (not disqualification).
Contractual requirements (not evaluation criteria, assessed after ranking):
CSD registration (mandatory).
SHEQ requirements (if applicable).
Financial viability β financial statements compulsory for CIDB-related transactions from R30,000 excl. VAT.
Technical Specifications
Source: Invitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdf (RFP)
Scope: Remedial works at Drakensberg Pumped Storage Scheme.
The enquiry is for the whole of the service; single contract to a single supplier (Eskom may split award if one supplier cannot fulfil entire scope).
Contract type: NEC3 Engineering and Construction Short Contract (ECSC).
Contract Skills Development Goals (CSDG) applicable.
Contract Participation Goals (CPG) not applicable.
No alternative tenders allowed.
No performance security required.
No reverse e-auction.
No public opening of tenders; prices not read out.
Subcontracting with subsidiary companies discouraged; must be declared if done.
Quality Management
Source: Invitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdf
Quality requirements:
Submit Form A β Category 3, List of Tender Returnables β Category 3, and Supplier Quality Management Specification.
Due diligence may include verification with OEMs or recognised certification bodies.
Quality management specification is part of the tender returnables.
Pricing Schedule
Source: Invitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdf
Pricing schedule:
Complete pricing schedule in NEC format (do not submit on company letterhead).
Submit price list in PDF and Excel.
Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies.
Unconditional discounts considered; conditional discounts applied at payment.
Price scored out of 80 points.
Financial Requirements
Source: Invitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdf (RFP)
Payment terms:
Contracts below R50,000,000 (incl. VAT): payment within 30 days of receipt of undisputed invoices.
Contracts above R50,000,000 (incl. VAT): payment within 60 days of receipt of undisputed invoices.
Pricing:
Completed pricing schedule in NEC format (do not submit on company letterhead).
Price list to be submitted in PDF and Excel.
Prices evaluated inclusive of VAT, corrected for errors, excluding contingencies.
Financial viability:
Financial statements required for CIDB-related transactions from R30,000 excl. VAT.
Due diligence requires latest approved annual financial statements (no drafts) of the tendering company (not parent), including: background, signed director's report, signed auditor's/reviewer's/compiler's report, statement of financial position, statement of comprehensive income, statement of changes in equity, statement of cash flows, notes.
For unincorporated JV or SPV, each partner must submit its own AFS.
For SA entities not audited: signed public interest score, ITA34C for current and previous years.
Due diligence documents to be submitted within 5 calendar days of written notice; possible one-time extension up to 3 calendar days.
Compliance Requirements
Source: Invitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdf (RFP)
Joint ventures: every member registered with CIDB; lead partner grading 3CE or not lower than one level below required; combined grading 4CE or higher.
Tenderers must be registered with CIDB or capable of being registered within 21 working days from closing.
Tax compliance:
Tax clearance certificate required from foreign tenderers (with SA footprint but not on CSD) and local tenderers not providing SARS PIN.
Foreign suppliers with no SA footprint: no tax compliance proof required.
B-bbee:
Proof of B-BBEE status level required (certificate, sworn affidavit, or other prescribed).
Specific Goals claimed via SBD 6.1; failure to submit evidence results in 0 points for that goal.
Employment Equity:
Designated employers must provide proof of compliance, including EE report submission to Department of Labour (SA tenderers only).
Safety:
COIDA certificate of good standing or proof of application (SA tenderers only).
Quality:
Form A β Category 3, List of Tender Returnables β Category 3, Supplier Quality Management Specification.
Other:
No restriction from doing business with Eskom or State-Owned Companies.
Not on international sanctions list.
Not restricted by National Treasury or on Tender Defaulters list.
Not restricted by Eskom.
Health & Safety
Source: Invitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdf
Health and safety requirements:
COIDA certificate of good standing or proof of application (SA tenderers).
Submit safety documents as per scope: Baseline Risk Assessment, Work at Height Standard, Management of Substance Abuse Procedure, OHS Incident Management Procedure, Contractor Health and Safety Requirements, OHS Risk Assessment, High Risk Safety File, SHE Spec, Eskom PPE Standard, Life Saving Rules, Emergency Planning.
SHEQ requirements may be applicable as additional contractual requirement.
Contractual Terms
Source: Invitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdf
Contract type: NEC3 Engineering and Construction Short Contract (ECSC).
Single contract to a single supplier; Eskom may split award if needed.
Tender validity: 12 weeks from closing.
No performance security required.
Payment terms: 30 days for contracts below R50m (incl. VAT); 60 days for above R50m.
Eskom reserves right to negotiate with preferred bidders if prices not market-related.
Subcontracting with subsidiaries discouraged; must be declared.
No alternative tenders allowed.
Section
Source: Invitation to Tender (ITT) - Drakensberg Remedial Works (20-11-2026).pdf
4 = compliant with acceptable risks/exceptions/conditions
2 = non-compliant
0 = totally deficient or non-responsive
Tenderer's experience (30%):
Submit five or more completed projects within the last five years from tender closing, in structural concrete repairs and/or structural steel works.
Each reference must include project name, contactable reference, detailed description of work performed, project value (for scope performed), and start/end dates.
References must be completion or reference letters from previous clients.
Scoring: 0 = none/unrelated; 2 = fewer than three relevant projects; 4 = three to five relevant projects; 5 = more than five relevant projects.
Technical approach and methodology (30%):
Provide a high-level method statement covering at minimum: rope access methodology, water ingress remediation, installation of gutters/downpipes/weepholes drilling, HDPE butt welding procedure, NDT testing, maintaining potable water supply during buffer tank cleaning and pipe replacement, inspection and reporting on defects, concrete repairs (including rope access and scaffolding areas), installation of structural steelwork, and temporary works.
Scoring: 0 = no method statement; 2 = incomplete or major deviation; 4 = detailed with minor deviation; 5 = comprehensive, project-specific with risk controls and testing regimes.
Quality management (10%):
Provide a quality control plan covering material approval procedures and quality assurance for concrete and structural steel works.
Scoring: 0 = no QCP or QCP addresses none of the tasks; 2 = high-level with major deviations; 4 = minor deviations but shows activities, procedures, risks and intervention points; 5 = detailed QCP with check sheets/checklists.
Key personnel (20%):
Construction Manager (25% of this section): must be professionally registered with SACPCMP; more than three years post-registration scores 5; less than three years scores 4; candidate registration scores 2; no CV or proof scores 0.
Pr Eng / Pr Tech Eng Civil/Structural (25%): must be professionally registered with ECSA; more than three years post-registration scores 5; less than three years scores 4; candidate registration scores 2; no CV or proof scores 0.
Structural Steel Foreman (20%): more than ten years' experience scores 5; five to ten years scores 4; less than five years scores 2; no CV scores 0.
Concrete Foreman (20%): same experience bands as structural steel foreman.
Organogram (10%): must show all key personnel, roles, and reporting lines; scoring 0 = no organogram; 2 = not relevant to scope; 4 = in line with scope and shows links; 5 = shows all key personnel, roles, and reporting lines.
Programme and resourcing (10%):
Provide a feasible programme showing critical path, sequencing, hold points, resourcing plan, and duration.
Scoring: 0 = no programme; 2 = partial deficiency or non-compliance; 4 = partial deficiency and compliance; 5 = complete compliance.
Verification: The employer may verify submitted information through desktop review, physical verification, interviews with key personnel, site/plant inspections, reference checks, and confirmation with OEMs or certification bodies. False or misleading information leads to disqualification regardless of score.
Technical Specifications
Source: Annexure 3 - TES (1).pdf (unknown)
Scope of remedial works at Drakensberg Pumped Storage Scheme (DPSS), applicable to Drakensberg Power Station only.
Lift Shaft:
Seal water leaks.
Replace gutters and downpipes.
Inspect dewatering and inwatering pipe supports and cable racks; produce inspection reports.
Machine Hall:
Establish a drainage system along the roof of the Machine Hall cavern.
Repair damaged walls.
Clean and unblock drainage lines.
Exploratory Tunnel:
Replace corroded vertical and horizontal steel supports to sewer pipe with new steelwork.
Replace corroded light brackets and cable ladders with new steelwork.
Workshop and Stores:
Remove decommissioned air conditioning units and brick up openings.
Apply waterproof plastering and paint damaged areas.
Replace damaged doors at the stores building.
Methodology
Source: Annexure 3 - TES (1).pdf
Technical approach and methodology is a scored criterion (30% of technical evaluation).
Bidders must provide a high-level method statement for execution of the works, covering at minimum:
Rope access methodology.
Water ingress remediation.
Installation of gutters, downpipes and weepholes drilling.
HDPE butt welding procedure.
NDT testing.
Maintaining potable water supply during cleaning of the buffer tank and replacing the pipe.
Inspection and reporting on defects.
Concrete repairs, including in areas requiring rope access and scaffolding.
Installation of structural steelwork.
Temporary works.
Scoring: 0 = no method statement; 2 = incomplete or major deviation; 4 = detailed with minor deviation; 5 = comprehensive, project-specific methodology with risk controls, testing regimes, and best-practice detailing.
Experience & Qualifications
Source: Annexure 3 - TES (1).pdf
Tenderer's experience (30% of technical evaluation):
Submit five or more completed projects within the last five years from tender closing, in structural concrete repairs and/or structural steel works.
Each reference must include project name, contactable reference (phone/email), detailed description of work performed, project value (for scope performed), and project start and end dates.
References must be completion or reference letters from previous clients.
Scoring: 0 = none/unrelated; 2 = fewer than three relevant projects; 4 = three to five relevant projects; 5 = more than five relevant projects.
Key personnel (20% of technical evaluation):
Construction Manager (25% of this section): professional registration with SACPCMP; more than three years post-registration scores 5; less than three years scores 4; candidate registration scores 2; no CV or proof scores 0.
Pr Eng / Pr Tech Eng Civil/Structural (25%): professional registration with ECSA; more than three years post-registration scores 5; less than three years scores 4; candidate registration scores 2; no CV or proof scores 0.
Structural Steel Foreman (20%): more than ten years' experience scores 5; five to ten years scores 4; less than five years scores 2; no CV scores 0.
Concrete Foreman (20%): same experience bands as structural steel foreman.
Organogram (10%): must show all key personnel, roles, and reporting lines; scoring 0 = no organogram; 2 = not relevant to scope; 4 = in line with scope and shows links; 5 = shows all key personnel, roles, and reporting lines.
Quality Management
Source: Annexure 3 - TES (1).pdf
Quality management is a scored criterion (10% of technical evaluation).
Bidders must provide a quality control plan covering:
Material approval procedures.
Quality assurance for concrete and structural steel works.
The plan must address all tasks required for the works and all inspections, showing intervention points, check sheets/checklists for work activities and procedures. A detailed QCP scores highest; a high-level QCP with major deviations scores low; no QCP scores zero.
Compliance Requirements
Source: Annexure 3 - TES (1).pdf (unknown)
Mandatory: attendance of compulsory site clarification meeting.
Key personnel registrations:
Construction Manager: professional registration with SACPCMP.
Pr Eng / Pr Tech Eng Civil/Structural: professional registration with ECSA.
No CIDB grading, B-BBEE, CSD, or tax compliance requirements are stated in this document.
Document240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfReview complete
Description
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
This specification (QM 58) defines the minimum quality requirements for all existing and potential Eskom suppliers. It applies to all Eskom divisions, subsidiaries, suppliers, and sub-suppliers, and forms part of all RFIs, RFQs, RFPs, and contracts for procurement of products and services. The specification covers quality management system requirements, quality plans, contract quality plans, quality control plans, pre-contract award quality requirements, post-contract award monitoring, and standard conditions including rights of access, preservation, and management of nonconformities.
Important Dates
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Closing date: 11 December 2026 at 08:00 (from tender record)
No briefing or site visit dates are stated in this document.
Contact Information
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
No specific contact details are provided in this specification. The document lists the following as authors/approvers (not for enquiries):
Sipho A Sambo, Middle Manager (Acting), Procurement and Supply Chain Management
Bathusi Montwedi, Senior Manager (Acting), Procurement and Supply Chain Management
Gerhard Van Der Walt, General Manager, Procurement and Supply Chain Management, Corporate Services
No email, telephone, or address is provided.
Submission Guidelines
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Returnable documents (as selected per the applicable category in Form A and the List of Tender Returnables):
Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001): completed and signed, acknowledging and committing to comply with Eskom's quality requirements.
Valid ISO 9001 certificate (or applicable QMS certificate) from an accredited certification body, unless excluded by the category.
Latest internal and external audit reports, including nonconformities and corrective actions.
Draft Contract Quality Plan (CQP) specific to the scope of work, addressing ISO 10005 minimum requirements.
Documented information for control of externally provided processes, products and services.
Documented information for roles, responsibilities and authorities in relation to the QMS (e.g., org charts, job descriptions, procedures).
Records of management review meetings (agenda, minutes, attendance registers, reports).
Where applicable, an example of an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) from similar/previous work.
Disqualification risks:
Incomplete or unsigned returnable documents.
Failure to comply with the applicable quality category (1, 2, 3 or 4) as indicated in Form A.
Submission after the closing time.
Evaluation Criteria
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Evaluation is based on the supplier's ability to meet Eskom's quality requirements as per the applicable category (1, 2, 3 or 4) indicated in Form A. The specific evaluation criteria and scorecard are referenced in the Tender Evaluation Scorecard (240-168873697) and the Guideline for QM 58 Selection Criteria (240-125473040). Bidders must complete and sign Form A to acknowledge and accept the quality requirements. The quality assessment criteria are selected by Eskom's Quality representative using the selection guideline. No minimum qualifying score or preference point split is stated in this specification.
Technical Specifications
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
This is a quality management specification (QM 58) that applies to all Eskom suppliers and sub-suppliers. It sets minimum quality requirements for the development, implementation, maintenance, and continual improvement of a Quality Management System (QMS) conforming to ISO 9001. Key requirements include:
Supplier and sub-supplier must have a formal QMS conforming to the latest ISO 9001 standard (or applicable QMS standard).
Unless excluded by the category, a valid ISO 9001 certificate from an accredited certification body is required.
A Contract Quality Plan (CQP) must be developed and submitted prior to the initial scope of work kick-off or pre-fabrication meeting, whichever is earlier.
A Quality Control Plan (QCP) / Inspection and Test Plan (ITP) must be developed, reviewed, and accepted by Eskom before work commences.
QCP/ITP must include intervention points (hold, witness, surveillance) and be signed by all parties.
Special processes (e.g., welding, NDT, coating, heat treatment) require qualified personnel with documented qualifications.
The supplier must manage sub-supplier quality, including performance management, audits, and assessments.
Preservation management programme required for storage, transit, and pre-operation preservation of materials and equipment.
Eskom reserves the right to conduct audits, appoint resident quality inspectors, and assess sub-supplier facilities.
Methodology
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Methodology requirements include:
Preservation work plan development and execution performance evaluation for all parties engaged in material transportation, handling, or storage.
Oversight of material quality preservation plan preparation and execution at all work locations.
Development of a preservation programme records management process in compliance with Eskom information management requirements.
A documented programme for identification of all physical asset pre-operation preservation of quality requirements.
Clear communication of preservation requirements to sub-suppliers.
Compliance monitoring of preservation requirements from engineering instruction through procurement, fabrication, logistics, and construction.
Compliance evaluation frequency must anticipate transfer of responsibility between project functional areas and subcontracted service providers.
Preservation requirements must be documented and communicated to project procurement, logistics, construction management, quality, security, and other functions.
Preservation programme must address temporary, long-term, and in-transit preservation, including protection against atmospheric conditions, sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, and detailed procedures for coatings, coverings, fasteners, and lines.
Quality Management
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Quality management requirements:
Supplier and sub-supplier must develop, implement, maintain, and improve a QMS conforming to ISO 9001 (latest revision).
QMS must include documented information such as quality manual, quality plans, work procedures, work instructions, method statements.
Valid ISO 9001 certificate from an accredited certification body required unless excluded by category.
Supplier must inform Eskom of any proposed changes to QMS or staff affecting quality before implementation.
Supplier must develop and implement a performance management programme for sub-suppliers, including verification of QMS, audits, surveillance, assessment of CQPs, NC and defect management, inspection and test plans, risk management, documentation, and awareness.
Quality Plan (CQP) must be developed per ISO 10005 and include management of records, access for inspection, final documentation submission, special processes (welding, NDT, etc.), personnel qualifications, storage/preservation instructions, and quality monitoring activities.
QCP/ITP must be reviewed and accepted by Eskom before work commences; changes require Eskom agreement.
QCP/ITP must include contract number, order number, description of work, sequence of operations, acceptance criteria, intervention points, and sign-off by all parties.
Quality kick-off meeting at start of contract; coordination meetings with 14 days' notice.
Mandatory pre-inspection meetings convened by Eskom or its inspection agency.
Eskom may appoint resident quality inspectors at supplier premises; workspace to be provided at no cost.
Eskom may appoint any organisation as AIA or inspection agency; supplier may not obstruct them.
Pricing Schedule
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
No pricing schedule or rates are provided in this specification. The document is a quality management specification, not a pricing document.
Financial Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
No specific financial requirements (bid security, guarantees, retention, payment terms, turnover) are stated in this specification.
Compliance Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Compliance requirements:
ISO 9001 certification (or applicable QMS certificate) from an accredited certification body, unless excluded by the applicable category.
Compliance with the applicable quality category (1, 2, 3 or 4) as indicated in Form A.
Compliance with ISO 10005 for quality plans.
Compliance with Eskom's SHEQ Policy (32-727) and Procurement and Supply Chain Management Policy (32-1033) and Procedure (32-1034).
Compliance with PPPFA (Preferential Procurement Policy Framework Act, 2000).
Compliance with CIDB 1004 (Best Practice Guideline A4: Evaluating Quality in Tender Submissions).
Compliance with SANS 10845-1 (Construction Procurement Part 1).
No specific B-BBEE level or CIDB grade is stated in this specification.
Health & Safety
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Health and safety requirements are referenced through Eskom's SHEQ Policy (32-727) and the IAEA Safety Standard GS-R-3.1. No specific OHS plan or HSE compliance details are stated in this specification.
Contractual Terms
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Contractual conditions include:
Preservation management programme must cover all stages from transfer of ownership through storage and transit to final installation.
Storage and control of materials must follow manufacturer recommendations and project-specific requirements.
Special precautions for valves, electrical motors, rotating equipment, piping, instrumentation, flange faces, gaskets, coatings, insulation, etc.
Preservation requirements must be documented in purchase orders and work authorisations.
Sub-supplier input into preservation protocols must be documented.
Preservation requirements must be communicated to project logistics, construction, quality, security, and other functions.
Sub-supplier responsibility for preservation execution must be clearly designated.
Project team responsibilities for preservation oversight must be defined at every stage.
Eskom has free and unrestricted access to all preservation records for inspection and audit.
Section
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
The evaluation criteria are based on the supplier's compliance with the quality requirements specified in this document. The specific evaluation criteria and scorecard are referenced in the Tender Evaluation Scorecard (240-168873697) and the Guideline for QM 58 Selection Criteria (240-125473040). Bidders must complete and sign Form A to acknowledge and accept the quality requirements. The quality assessment criteria are selected by Eskom's Quality representative using the selection guideline. No minimum qualifying score or preference point split is stated in this specification.
DocumentAnnexure 2 - ECSC NEC.pdfReview complete
Description
Source: Annexure 2 - ECSC NEC.pdf
The works comprise remedial maintenance at the Drakensberg Pumped Storage Scheme (DPSS) to address deterioration, corrosion, and water ingress affecting underground and surface infrastructure. The primary areas are the Lift Shaft, Machine Hall Cavern, Workshop and Stores Building, and Exploratory Tunnel. The purpose is to restore affected assets to a condition suitable for continued safe, reliable and efficient operation.
Existing site conditions:
Lift Shaft: water ingress through concrete surfaces causing lift isolation, unfavourable working environment, increased operational costs and carbon footprint. Dimensions: concrete thickness 0.5 m, internal diameter 5.8 m, length approx. 192 m. Corrosion of steel components (handrails, pipe supports, services).
Machine Hall Cavern: water ingress from roof and service penetrations; inadequate drainage causing ponding on floors; deterioration of concrete surfaces, cracking, delamination. Dimensions: width 16.3 m, height 20.1 m, length 194.8 m.
Workshop and Stores Building: redundant air-conditioning units, damaged external doors, internal wall finishes in Paint Store affected by moisture ingress.
Exploratory Tunnel: severe corrosion of structural steelwork supporting sewer pipeline, predominantly lower portions of vertical elements, likely due to periodic flooding and water seepage; steel brackets and cable ladders deteriorated.
The works are not fully predefined; remedial interventions are subject to inspection findings and execution is strictly controlled through instruction and acceptance by the Employer's Representative.
Important Dates
Source: Annexure 2 - ECSC NEC.pdf (unknown)
Starting date: 1 August 2026 (subject to confirmation).
Completion date: 31 March 2027 (subject to confirmation).
Registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg
Submission Guidelines
Source: Annexure 2 - ECSC NEC.pdf (unknown)
Returnable documents β all must be completed, signed and submitted with the bid:
C1.1 Form of Offer and Acceptance: the signed offer, including the offered total (excl. VAT), VAT amount, and total incl. VAT.
C1.2B Contract Data provided by the Contractor: completed with contractor details, overheads and profit percentages, and the offered total.
Schedule of Deviations (if any): signed by both parties; only deviations recorded here are valid.
Tenderer's CIDB registration number must be stated on the Form of Offer and Acceptance.
Submission method: not stated in the document.
Disqualification risks:
Failure to complete and sign any returnable document.
Submitting an offer after the closing time.
Any deviation not recorded in the Schedule of Deviations is invalid.
Evaluation Criteria
Source: Annexure 2 - ECSC NEC.pdf (unknown)
Evaluation criteria are not stated in the document. The bid is an open tender under the NEC3 Engineering and Construction Short Contract. Bidders must complete the Form of Offer and Acceptance and the Contract Data provided by the Contractor, including pricing percentages for overheads and profit. No scoring split, minimum qualifying score, or preference point system (80/20 or 90/10) is specified in the document.
Technical Specifications
Source: Annexure 2 - ECSC NEC.pdf (unknown)
The works comprise remedial maintenance at the Drakensberg Pumped Storage Scheme (DPSS) across four areas:
Lift Shaft:
Carry out abseiling inspection of concrete surfaces, prepare defect report and method statement.
Seal and repair water ingress, seepage points, major cracks and other concrete defects.
Drill 50 mm diameter weepholes through the 0.5 m concrete shaft (approx. 100 holes) with 90-degree outlets directing water into gutters.
Remove all existing gutters and downpipes.
Install aluminium epoxy-coated gutters (150x150x140x1 mm) with supports at 1.5 m intervals, minimum fall 1:250, along the shaft circumference (approx. 900 m).
Install 100 mm wide bituthene membrane or similar at gutter joints/interfaces (approx. 900 m).
Install minimum 110 mm aluminium epoxy-coated downpipes with clamps at 3 m intervals (approx. 200 m).
Repair corroded galvanised carbon steel handrails (approx. 400 m) and replace heavily corroded mild steel tubular handrails (approx. 100 m) with corrosion protection; new/repaired handrails painted black-and-yellow safety colours.
Inspect six DN250 dewatering pipelines and their spring-loaded pipe supports (approx. 300β360 supports) and submit photographic report.
Inspect cable racks and support systems and submit photographic report.
Supply a spare Grundfos water pump (model PN-SN A-96516671-10000519).
Supply and install 250 m of PN25, 50 mm diameter HDPE pipe (buttwelded) with supports.
Clean and apply solvent-free epoxy coating to the inside of the 2 mΒ³ potable water buffer tank.
Provide a temporary water supply solution while tank and pipe works are carried out.
Machine Hall Cavern:
Assess water ingress and propose a drainage system to intercept, contain and manage seepage water; submit detailed report and marked-up proposal.
Implement accepted drainage/interception measures (approx. 100 m) and connect to existing station drainage.
Repair concrete defects (cracks, delaminated areas) and repaint repaired areas to match existing.
Where reinforcement corrosion is found: expose, clean to sound steel, apply re-passivating coating, reinstate with low-shrinkage repair mortar.
Workshop & Stores:
Remove 9 redundant air-conditioning units and reinstate brick wall.
Brick up voids with 230 mm collar-jointed wall (approx. 4 mΒ²) using 14 MPa bricks, internal face plastered and painted, external face facebrick to match existing (plum white chip rockface concrete facebricks).
Hack off defective plaster and apply waterproof plaster system with Sika-1 admixture (approx. 200 mΒ²) at the paint store.
Apply Sikaflex-Pro 2HP around all doors (approx. 355 m) per drawing 0.48/5283.
Remove 4 damaged external doors and supply/install weatherproof doors per drawing 0.48/5283, complete with locks and accessories.
Prepare and apply one primer, one undercoat, and two coats of exterior quality PVA paint to internal plastered walls (approx. 205 mΒ²), colour to match existing.
Exploratory Tunnel:
Survey existing sewer pipe and light cables, including as-built condition, before, during and after construction.
Remove corroded vertical Unistrut members (50 No) and horizontal members (200 m) supporting the sewer pipe; cart away to scrapyard area adjacent to sewer treatment plant.
Temporarily support sewer pipe (200 m) and lights/cables (20 m) during removal.
Remove corroded brackets (6 No) and cable ladder members (80 m) supporting lights and cables.
Clean existing cable ladder members (60 m) removing white stains.
Isolate, protect, reconnect and test existing lights and cables.
Supply and fabricate steelwork per drawings 18.48/6471-1, 18.48/6471-2, 18.48/6471-3, using Grade 350WA steel, hot dip galvanised, including base plates, gusset plates, Unistrut channels, brackets, cable ladder.
Deliver and erect steelwork (0.8 t).
Supply hot dip galvanised bolts and nuts (Grade 4.4 bolts 0.018 t, Grade 8.8 nuts 0.007 t).
Supply and install holding-down bolts: M12 FIS A hot dip galvanised grade 8.8 bolts epoxied with FIS EM epoxy mortar (200 No, 110 mm deep) and with FIS V 360 chemical mortar (14 No, 150 mm deep).
Perform weld testing, NDT and related testing.
Grout with 20 mm non-shrinkage grout, 40 MPa (2.1 mΒ²).
General:
All access, including abseiling, per approved method statements and safety requirements.
Contractor responsible for all temporary works, access systems and safety measures.
Repair materials and specifications must be submitted for acceptance before implementation.
No remedial work to commence until inspection findings and proposed scope are accepted by the Employer's Representative.
Finishes to match existing in appearance and quality unless otherwise instructed.
Materials and workmanship for brickwork to comply with SANS 50197, SANS 1090, ASTM C494, SANS 523, SANS 227, SANS 2001-CM1.
Quality Management
Source: Annexure 2 - ECSC NEC.pdf
Quality requirements:
Contractor must submit Quality Control Plans / Inspection and Test Plans (QCP/ITPs) as part of preliminary and general items.
Materials and workmanship for brickwork must comply with SANS 50197 (cement), SANS 1090 (sand), ASTM C494 (admixtures), SANS 523 (lime), SANS 227 (face bricks), SANS 2001-CM1 (masonry).
Repair materials and specifications must be submitted for acceptance before implementation.
Weld testing, NDT and related testing required by Works Information.
Grouting with 20 mm non-shrinkage grout, 40 MPa per drawing 18.48/6471-1.
All finishes to match existing in appearance and quality unless otherwise instructed.
Inspection reports (photographic) required for lift shaft, dewatering pipe supports, cable racks, and machine hall water ingress.
As-built documentation and completion dossiers required at handover.
Pricing Schedule
Source: Annexure 2 - ECSC NEC.pdf
Pricing schedule:
Price List (Part C2.2) with items priced as lump sums or rates multiplied by quantities.
All prices shown excluding VAT unless instructed otherwise.
Contractor to complete in Contract Data Part 2: overheads and profit percentages for Defined Cost (people and other), and offered total of Prices (excluding VAT).
Price List includes items for:
Preliminary & Generals: contractual and safety documentation, mobilisation, demobilisation, handover documentation, site supervision (7 months), compliance costs (7 months), temporary facilities (7 months), accommodation (7 months), light transport (7 months).
Lift Shaft: removal of gutters (40 No), downpipes (192 m), installation of aluminium gutters (900 m), bituthene membrane (900 m), downpipes (200 m), abseiling inspection (1 sum), water ingress inspection (1 sum), pipe support inspection (1 sum), handrail repair (400 m), handrail replacement (100 m), weepholes (100 No), spare pump (1 No), HDPE pipe (250 m), epoxy coating (2 mΒ³), temporary water supply (1 sum).
Machine Hall Cavern: water ingress assessment (1 sum), drainage measures (100 m), concrete repair (1 sum), repainting (1 sum).
Workshop & Stores: removal of aircon units (9 No), brickwork (4 mΒ²), waterproofing (200 mΒ²), sealant (355 m), doors (4 No), painting (205 mΒ²).
Exploratory Tunnel: survey (1 sum), removal of vertical Unistrut (50 No), horizontal Unistrut (200 m), temporary support (200 m), removal of brackets (6 No), cable ladder (80 m), temporary support lights (20 m), cleaning (60 m), isolation/testing (1 sum), shop drawings (1 sum), fabrication of steelwork (various), delivery (0.8 t), erection (0.8 t), bolts/nuts, holding-down bolts, testing (1 sum), grouting (2.1 mΒ²).
Pricing format: Price List (Part C2.2) with items priced as lump sums or rates multiplied by quantities. All prices shown excluding VAT unless instructed otherwise.
Contractor to complete in Contract Data Part 2:
Percentage for overheads and profit added to Defined Cost for people.
Percentage for overheads and profit added to other Defined Cost.
Offered total of the Prices (excluding VAT).
Payment terms:
Assessment day: 25th of each month.
Interest rate on late payment: 0%.
Retention: 10% of Contract Value.
Delay damages: R2,500 per calendar day, up to a maximum of 10% of Contract Value.
If delay damages reach the limit, the Employer may terminate the Contractor's obligation to Provide the Works.
Insurance:
Contractor to provide insurances per Insurance Table A (loss/damage to works, equipment, plant, materials, liability for property damage and bodily injury) from starting date until Completion or termination.
Employer provides insurances per Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation, Motor Fleet, Terrorism, Cyber Liability, Nuclear Material Damage and Business Interruption).
On request, each party provides certificates from insurer/broker confirming insurances are in force.
Tax invoice:
Contractor must provide a tax invoice per Employer's procedures; late submission extends payment due date.
Invoices must include Employer's VAT number 4740101508.
Employer's limitation of liability:
Employer's liability for Contractor's indirect or consequential loss is limited to R0.00.
Compliance Requirements
Source: Annexure 2 - ECSC NEC.pdf (unknown)
CIDB: Tenderer's CIDB registration number must be stated on the Form of Offer and Acceptance. No minimum grade specified in the document.
B-bbee:
Contractor must notify Eskom within 7 days of any change in B-BBEE status.
Updated verification certificate and supporting documentation must be submitted within 30 days of notification.
If B-BBEE status decreases since starting date, Eskom may re-negotiate or terminate the contract.
Failure to notify may constitute a reason for termination.
Health, Safety and Environment:
Contractor must comply with Construction Regulations 2014 (under OHSA) and all applicable health, safety and environmental laws.
Eskom may appoint the Contractor as Principal Contractor for the Site.
Prices must include sufficient amount for compliance with health & safety laws and regulations.
Contractor must ensure subcontractors and employees comply.
Asbestos:
Contractor must comply with Eskom's Asbestos Standard 32-303 and Asbestos Regulations (GNR February 2002 under OHSA).
OEL for asbestos: 0.2 regulated fibres per ml as 4-hour TWA; short-term limit 0.6 fibres per ml as 10-minute TWA.
If asbestos identified, risk assessment and control measures required; personnel may stop work and leave contaminated area until declared safe.
Removal and disposal of asbestos must be done by a registered asbestos contractor instructed by the Employer at Employer's expense.
Ethics:
Contractor must not engage in any Prohibited Action (coercive, collusive, corrupt, fraudulent, obstructive).
Eskom may terminate if a Prohibited Action occurs and Contractor did not take timely appropriate action.
General:
Contractor must not cede, delegate or assign rights/obligations without written consent.
Contractor must comply with confidentiality obligations; images of works require prior written consent.
Contractor must comply with VAT Act and include Employer's VAT number on invoices.
Contractor must provide tax invoice per Employer's procedures.
Health & Safety
Source: Annexure 2 - ECSC NEC.pdf
Health and safety requirements:
Contractor must comply with Construction Regulations 2014 (under OHSA) and all applicable health and safety laws.
Eskom may appoint Contractor as Principal Contractor for the Site.
Prices must include sufficient amount for compliance with health & safety laws and regulations.
Contractor must ensure subcontractors, employees and others under its control comply.
Contractor must provide Health and Safety File, risk assessments, method statements, QCP/ITPs, and programme before starting works.
Ongoing compliance costs for health, safety and environmental management during execution are priced as monthly items.
Asbestos: comply with Asbestos Standard 32-303 and Asbestos Regulations; OEL 0.2 fibres/ml (4-hour TWA), short-term 0.6 fibres/ml (10-minute TWA). If asbestos identified, risk assessment and control measures required; personnel may stop work and leave contaminated area until declared safe. Removal/disposal by registered asbestos contractor at Employer's expense.
Access to lift shaft including abseiling must be per approved method statements and safety requirements.
Contractor responsible for all temporary works, access systems and safety measures.
Environmental
Source: Annexure 2 - ECSC NEC.pdf
Environmental requirements:
Contractor must comply with all applicable environmental laws and regulations, and rules, guidelines and procedures under the contract.
Contractor must ensure subcontractors, employees and others under its control comply.
Ongoing compliance costs for environmental management during execution are priced as monthly items.
Disposal of waste materials to appropriate disposal site (excluding materials carted to Employer's scrapyard area) is a priced item.
Asbestos waste removal and disposal must be done by a registered asbestos contractor at Employer's expense, in line with South African legislation.
Contractual Terms
Source: Annexure 2 - ECSC NEC.pdf
Contract type: NEC3 Engineering and Construction Short Contract (April 2013) with additional conditions Z1 to Z14.
Key conditions:
Cession, delegation and assignment: Contractor may not cede, delegate or assign rights/obligations without written consent. Eskom may cede to subsidiaries or divisions.
B-BBEE change: Contractor must notify Eskom within 7 days of any change in B-BBEE status; updated verification certificate within 30 days. If status decreases, Eskom may re-negotiate or terminate.
Confidentiality: Contractor must not disclose information arising from the contract; images of works require prior written consent; all rights in images vest in Eskom.
Waiver and estoppel: any extension, concession, waiver or relaxation does not constitute a waiver unless agreed in writing.
Health, safety and environment: Contractor must comply with Construction Regulations 2014 and all applicable laws; may be appointed Principal Contractor; prices include sufficient amount for compliance.
Tax invoice: Contractor must provide tax invoice per Employer's procedures; late submission extends payment due date; include Employer's VAT number 4740101508.
Compensation events: clause 61.1 amended to delete 'unless the event arises from an instruction of the Employer.'
Employer's limitation of liability: liability for indirect or consequential loss limited to R0.00.
Termination: business rescue order added as a termination reason.
Delay damages: if delay damages reach limit, Employer may terminate.
Ethics: Prohibited Actions (coercive, collusive, corrupt, fraudulent, obstructive) may lead to termination.
Insurance: Contractor provides insurances per Insurance Table A; Employer provides per Insurance Table B; certificates on request.
Intellectual property: Foreground IP vests in Eskom; Contractor must provide manufacturing documents on completion; Contractor indemnifies Eskom against third-party IP claims.
Asbestos: Contractor must comply with Asbestos Standard 32-303 and Asbestos Regulations; OEL 0.2 fibres/ml (4-hour TWA), short-term 0.6 fibres/ml (10-minute TWA); removal/disposal by registered asbestos contractor at Employer's expense.
Dispute resolution:
Adjudicator: selected from ICE-SA Division of SAICE Panel of Adjudicators; if not agreed, appointed by AFSA.
Tribunal: arbitration under Rules for the Conduct of Arbitrations by the Association of Arbitrators (Southern Africa); place: South Africa.
Adjudicator nominating body: Chairman of ICE-SA.
Period for reply: one week.
Defects date: 52 weeks after Completion.
Defect correction period: 2 weeks.
Assessment day: 25th of each month.
Delay damages: R2,500 per calendar day up to 10% of Contract Value.
Retention: 10% of Contract Value.
Interest on late payment: 0%.
Starting date: 1 August 2026 (TBC).
Completion date: 31 March 2027 (TBC).
Section
Source: Annexure 2 - ECSC NEC.pdf
No additional evaluation criteria are stated in the document. The document does not specify scoring, weighting, or minimum qualifying scores.
DocumentAnnexure 1 - Scope of Works (1).pdfReview complete
Description
Source: Annexure 1 - Scope of Works (1).pdf
The Drakensberg Pumped Storage Scheme (DPSS) requires remedial maintenance works following deterioration observed during inspections and condition assessments. Water ingress, corrosion, structural deterioration, and serviceability issues have been identified across the Lift Shaft, Machine Hall Cavern, Workshop & Stores building, and the Exploratory Tunnel structures. The work consists of remedial and refurbishment works on existing DPSS infrastructure, including repairs, replacements, inspections, drainage improvements, steelwork rehabilitation, waterproofing, concrete repairs, and replacement of potable water systems. No new construction is included; all work is within existing structures in a live power station environment. The purpose is to restore deteriorated components, address water ingress, repair structural and mechanical supporting elements, and ensure safe and efficient ongoing operation in the affected areas. The work is within Eskom Peaking Generation.
Evaluation Criteria
Source: Annexure 1 - Scope of Works (1).pdf (unknown)
Bidders must be suitably qualified and competent for underground and structural steel works, compliant with the Occupational Health and Safety Act (1993) and Construction Regulations (2014).
Submit a project-specific organogram identifying personnel responsible for execution, quality assurance, and quality control.
Provide qualifications, experience, and roles of key personnel as part of the Safety Plan.
Submit detailed procedures and method statements describing how the Works will be executed.
Acceptance of submissions does not relieve the Contractor of responsibility for workmanship, sequencing, safety, or fitness for purpose.
No specific CIDB grading, B-BBEE level, or CSD registration is stated in the provided document.
Technical Specifications
Source: Annexure 1 - Scope of Works (1).pdf (unknown)
Scope of Work: Remedial and refurbishment works at the Drakensberg Pumped Storage Scheme (DPSS), a live power station environment. No new construction; all work within existing structures.
Lift Shaft:
Water Ingress Remediation and Weepholes:
Conduct detailed abseiling inspection of concrete surfaces to identify water ingress and seepage.
Submit inspection report to Employer's Representative identifying locations, extent, defects, and proposed remedial approach.
No repair works commence until remedial approach is accepted.
Seal and repair excessive groundwater seepage; clean surfaces to remove efflorescence, calcium deposits, contaminants.
Drill 50 mm diameter weepholes through concrete shaft at ingress locations; approximately 100 weepholes total.
Weepholes on all four sides per level where ingress identified, fitted with 90-degree outlet directing water into gutters.
Submit all repair materials and specifications for acceptance prior to implementation.
Replacing Gutters and Downpipes:
Remove and replace all existing gutters and downpipes within lift shaft.
New gutters: aluminium, epoxy-coated for C5 environmental classification, nominal section 150mm Γ 150mm Γ 140mm Γ 1mm, follow circular geometry, minimum fall 1:250.
Downpipes: minimum diameter 110 mm, drain from each gutter level individually, discharge into existing drainage system.
Install gutters at every horizontal construction joint and additional locations where leakage occurs.
Seal gutter-concrete interface with 100 mm wide bituminous membrane or accepted alternative.
Where vertical cables obstruct, install open HDPE or similar gutters.
Repairs to Handrails:
Repair or replace corroded handrails; surface preparation to sound metal, spot repairs, replacement with tubular mild steel, corrosion protection coatings.
New/repaired handrails match existing form, painted black and yellow safety colouring; paint specifications submitted for acceptance.
Drainage and Dewatering Pipe Support:
Inspect six DN250 dewatering pipelines and spring-loaded pipe supports from drainage gallery (approx. level 1154 m) to level 1297 m.
Inspect bolts, springs, hangers, channel beams, corrosion protection condition.
Submit photographic report showing most severely corroded and best condition supports with levels indicated.
Supports spaced at 2β3 m intervals, estimated 300β360 supports; report forms basis for subsequent remedial works.
Cable Racks:
Inspect cable racks and support systems throughout lift shaft from drainage gallery to surface building.
Focus on cable tray anchors, trays, strapping, support systems.
Submit photographic report with representative examples of worst and best conditions.
Machine Hall Cavern:
Install aluminium gutters (150 Γ 150 Γ 140 Γ 1 mm) along approximately 100 m of cavern roof.
Establish effective drainage system directing water to existing station drainage.
Intercept and control seepage water from cavern walls.
Replace damaged or corroded gutters and drainage pipes.
Flush and clean all groundwater drainage systems across all cavern levels.
Clean, repair, and repaint areas affected by seasonal water ingress (delaminated paint, efflorescence, calcification, algae, mould).
Where reinforcement corrosion identified: expose, clean to sound steel, apply re-passivating coating, reinstate with low-shrinkage repair mortar.
Submit repair methodologies and material specifications for acceptance prior to execution.
Workshop & Stores:
Remove redundant air-conditioning units and loose/damaged surrounding brickwork.
Brick infill to match existing construction; comply with SANS 50197 (cement), SANS 1090 (sand), ASTM C494 (admixtures), SANS 523 (lime), SANS 227 (face bricks), SANS 2001-CM1 (masonry).
Mortar Class II, mixed 1:6, brick force at every course; bricks minimum compressive strength 14 MPa, water absorption β€ 7%.
Internal plastering to match existing finishes; comply with SANS 2001; layers β€ 10 mm per coat; fibre mesh reinforcement where risk of cracking.
Plastered surfaces plumb, straight, flush; free of cracks, hollows, delamination.
Painting: only after plaster cured and moisture acceptable; appropriate primers; minimum two coats approved paint; match existing colour, finish, sheen.
Submit paint and primer specifications for acceptance; works inspected and accepted by Employer's Representative.
Contractor must be suitably qualified, competent, compliant with OHS Act (1993) and Construction Regulations (2014) for underground and structural steel works.
Survey, Verification and Setting Out:
Perform detailed site inspection to verify as-built conditions.
Verify condition, location, alignment of corroded steel Unistrut members supporting sewer pipe; corroded steel brackets and cable ladders supporting lights and cables.
Surveys before, during, after construction to confirm vertical and horizontal alignment.
Establish and maintain reference control points.
Report discrepancies to Employer's Representative without delay.
Bolts and fasteners: minimum Grade 4.8 (bolts) and Grade 8.8 (nuts), hot-dip galvanised, comply with manufacturer specs.
Verify quantities prior to fabrication; submit fabrication and shop drawings for acceptance.
Bundle, pack, transport, handle, store steel to prevent distortion and surface damage; store clear of ground.
Installation, Grouting and Protection of Existing Services:
Steelwork erection per SANS 2001-CS1.
Prevent damage to existing sewer pipe, lights, light cables; provide temporary propping/support; no load transferred to permanent works until installation and grouting complete.
Grouting per manufacturer specs; complete prior to loading; minimum characteristic compressive strength 40 MPa at 28 days.
Inspection, Testing and Acceptance:
Implement comprehensive inspection and testing regime: dimensional checks, conformity with approved drawings, qualification of welders.
NDT: 20% magnetic particle inspection of fillet welds; 100% ultrasonic testing of butt welds and full penetration welds.
Permissible deviations per Tables 3 to 9 of SANS 2001-CS1; submit all test results and inspection records as part of quality documentation.
Replacement of Potable Water Pipe and Tank Remedial Works:
Replace existing potable water pipeline within lift shaft from high-lift pump outlet to surface building.
Replacement pipeline: HDPE Class PN25, nominal diameter 50 mm, approximate length 250 m, butt-welded at all joints.
Support and anchor pipeline to concrete structure at intervals β€ 6 m; supports designed by Contractor, galvanised steel.
Submit pipe support and anchorage details for acceptance prior to installation.
Potable water buffer tank: internally clean to remove corrosion products and contaminants; coat internally and externally with solvent-free epoxy coating approved for potable water.
Coating system approved for potable water contact; applied per manufacturer's specs; provide long-term corrosion protection.
Submit material specifications and product data sheets for acceptance.
Supply one spare high-lift pump: Grundfos model PN-SN A-96516671-10000519 or accepted equivalent.
Maintain potable water supply throughout works; no complete shutdown permitted; plan and implement temporary water supply measures; remove temporary arrangements upon completion.
Quality Management
Source: Annexure 1 - Scope of Works (1).pdf
Quality management requirements:
Comply with ISO 9001 Quality Management Systems.
Comply with SANS 2001 Construction Works, SANS 1200 Civil Engineering Construction, SANS 10120 Structural Steelwork Specifications, SANS 10305 Painting of Buildings.
Submit project-specific organogram identifying personnel responsible for execution, quality assurance, and quality control.
Implement comprehensive inspection and testing regime for structural steel works, including dimensional checks, conformity with approved drawings, and qualification of welders.
NDT requirements: 20% magnetic particle inspection of fillet welds; 100% ultrasonic testing of butt welds and full penetration welds.
Submit all test results and inspection records as part of quality documentation.
All repair materials and specifications must be submitted for acceptance prior to implementation.
Financial Requirements
Source: Annexure 1 - Scope of Works (1).pdf (unknown)
Pricing must be submitted on the provided Price List (Appendix A), with rates and prices for each item. The total of prices excluding VAT is required.
Pricing items include: Preliminary & Generals (health and safety file, staff medicals and induction, site establishment, transport, accommodation), Lift Shaft scope (gutter removal/installation, downpipe removal/installation, weephole drilling, handrail repairs, inspections, potable water pipe and tank works), Machine Hall Cavern drainage, Workshop & Stores works (aircon removal, brickwork, waterproofing, doors, painting), Exploratory Tunnel steelwork (survey, removal, supply/fabrication, erection, bolts, grouting, testing), as-built information, inspection equipment, rope access, lighting, and waste disposal.
No bid security, bonds, guarantees, retention, or payment terms are stated in the provided document.
Compliance Requirements
Source: Annexure 1 - Scope of Works (1).pdf (unknown)
Compliance with normative references:
ISO 9001 Quality Management Systems
SANS 2001 Construction Works
SANS 1200 Civil Engineering Construction
SANS 10120 Structural Steelwork Specifications
SANS 10305 Painting of Buildings
OHS Act & Construction Regulations 2014
Eskom SHEQ Policy 32-727 (informative)
Eskom Waste Management Standard 32-245 (informative)
South African Structural Steel Detailing Manuals (Yellow & Green Books) (informative)
No specific CIDB grading, B-BBEE level, or CSD registration is stated in the provided document.
Health & Safety
Source: Annexure 1 - Scope of Works (1).pdf
Health and safety requirements:
Comply with the Occupational Health and Safety Act (1993) and Construction Regulations (2014).
Submit a Safety Plan including qualifications, experience, and roles of key personnel.
Provide health and safety file and documentation as part of pricing.
Staff medicals and induction required.
Work in a live power station environment; special precautions required to prevent damage to existing services.
Use of PPE and rope access for inspections.
Ensure continuity of potable water supply; no complete shutdown permitted.
Section
Source: Annexure 1 - Scope of Works (1).pdf
Bidders must be suitably qualified and competent for underground and structural steel works, compliant with the Occupational Health and Safety Act (1993) and Construction Regulations (2014). Must submit project-specific organogram, key personnel qualifications, and detailed method statements. Must comply with normative references including ISO 9001, SANS 2001, SANS 1200, SANS 10120, SANS 10305, and OHS Act & Construction Regulations 2014. No specific CIDB grading, B-BBEE level, or CSD registration is stated in the provided document.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.