Tender Type
Request for Proposal
Delivery Location
1 Jones Road - Kempton Park - Gauteng - 1632
Organization Type
GOVERNMENT
Published
22 Sept 2026
OCDS Reference
ocds-9t57fa-171236
Airports company south africa requires a multi-disciplinary professional engineering consultancy — mechanical, electrical and civil/structural engineers — for the reconfiguration of the 3rd and 4th floor offices at o.R. Tambo international airport under an nec3 professional services contract running 48 months. The scope covers design, documentation and procurement support through to contract administration, plus full-time level 3 site supervision for 16 months, against an estimated construction value of r66 429 000 excluding VAT. bids close on 21 october 2026 at 12:00. The decisive bidder considerations are the named key personnel assessed against annexure c, a minimum b-bbee level 3, and a 10% performance bond due within 14 calendar days of receiving the signed contract.
Closing: 21 October 2026 at 12:00; the offer is the signed Form of Offer and Acceptance (C1.1) stating the total price inclusive of VAT, with any deviation recorded only in the Schedule of Deviations.
Key personnel: a Mechanical Engineer, an Electrical Engineer and a Civil/Structural Engineer must be named and are evaluated against the minimum requirements and criteria in Annexure C; they form part of the basis of appointment and may not be replaced without the Employer's prior written approval.
B-BBEE: minimum Level 3, with a compliant certificate presented annually; failure is a material breach that may lead to cancellation of the contract.
Performance bond: 10% of the total of the Prices, unconditional and payable on demand, to be provided within 14 calendar days of receiving the signed contract; failure allows the Employer to deduct 10% from payments, hold it in retention or treat it as material breach. Delay damages are 1% per week capped at 10% of the professional fees.
Occupational health and safety: the Section 37(2) OHS Act and Construction Regulation 5.1(k) agreement must be concluded before any work starts, signed by a Section 16.2 appointee authorised in writing by the CEO; a COID good-standing letter and a baseline risk assessment by a competent person are required, and safety documentation including the Construction Regulation 8 Construction Manager appointment must be submitted 7 days before work commences.
Pricing: NEC3 Main Option A priced contract with activity schedule; the original pricing schedule may not be altered and any additional items must be listed separately as optional or supplementary. Disbursements are 5% of Subtotal 1, contingencies 10% of Subtotals 1 to 3, and 15% VAT is added to the total fee.
Professional registration: personnel must be registered under the Engineering Profession Act and work within their ECSA categories and Continuing Professional Development requirements.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Wednesday, 21 October 2026 - 12:00
Venue
https://teams.microsoft.com/meet/37646407128382?p=Gbuptc4nkKjphYcuTz Meeting ID: 376 464 071 283 82
Request for Proposal
1 Jones Road - Kempton Park - Gauteng - 1632
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Important Dates
Source: Contract Health and Safety Consultant Services 2621 (002).pdf (unknown)22 Sept
2026
Tender Published
Tender was published
21 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Contract Quantity Surveying Services.pdf
The Airports Company of South Africa (ACSA) is procuring professional quantity surveying consultant services for the 3rd and 4th Floor Office Reconfiguration Project at OR Tambo International Airport for a 48-month period under an NEC3 Professional Services Contract.
Contract Health and Safety Consultant Services 2621 (002).pdf
Analysis completed but response format was invalid
Architect's Contract.pdf
Airports Company South Africa SOC Limited invites bids for professional architectural, engineering, quantity surveying and construction health and safety services for the 3rd and 4th floor office reconfiguration project at O.R. Tambo International Airport over a 48‑month period under an NEC3 Professional Services Contract.
RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdf
Airports Company South Africa is procuring professional services for the reconfiguration of the 3rd and 4th floor offices at O.R. Tambo International Airport, including architectural, multi-disciplinary engineering, quantity surveying, and construction health and safety agent services, under a four-year contract. The project involves converting closed offices to open-plan layouts, security upgrades, and relocation of a control room, with separate NEC contracts for each discipline.
Contract Multi-Disciplinary Engineering Services Services.pdf
Airports Company South Africa requires a multi-disciplinary professional services team (architect, engineers, quantity surveyors, and construction health and safety agent) for the third and fourth floor office reconfiguration at O.R. Tambo International Airport, under an NEC3 Professional Services Contract for 48 months.
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Closing date: 21 October 2026 at 12:00 (from tender record).
No briefing session or site visit is mentioned in the document.
Contact Information
Source: Contract Health and Safety Consultant Services 2621 (002).pdf (unknown)Employer:
Employer's Agent:
No email addresses are provided in the document.
Submission Guidelines
Source: Contract Health and Safety Consultant Services 2621 (002).pdf (unknown)Returnable documents:
Submission method: as per the tender data (not specified in the document).
Disqualification risks:
Evaluation Criteria
Source: Contract Health and Safety Consultant Services 2621 (002).pdf (unknown)Evaluation stages and percentage points per project stage:
No minimum qualifying score or preference point system (80/20 or 90/10) is stated in the document.
Technical Specifications
Source: Contract Health and Safety Consultant Services 2621 (002).pdf (unknown)Scope of services:
Project background:
Key personnel requirements:
Financial Requirements
Source: Contract Health and Safety Consultant Services 2621 (002).pdf (unknown)Pricing format:
Payment terms:
Performance bond:
Delay damages:
Insurance:
Liability:
Compliance Requirements
Source: Contract Health and Safety Consultant Services 2621 (002).pdf (unknown)Professional registration:
B-bbee:
Occupational Health and Safety:
General compliance:
Description
Source: Contract Quantity Surveying Services.pdfThe 3rd and 4th Floor Office Reconfiguration Project at O.R. Tambo International Airport (ORTIA) is a strategic initiative to modernise and optimise office spaces to align with ACSA's operational and security requirements. Originally initiated in 2014 and reprioritised after a 2024 security audit, the project addresses spatial and compliance shortcomings while enhancing workplace functionality.
The Quantity Surveyor will provide comprehensive professional services in accordance with SACQSP standards, working collaboratively with appointed architects, engineers and other consultants to ensure accurate cost planning, effective procurement and financial control throughout the project lifecycle.
Scope includes: cost estimation and budget preparation, preparation of Bills of Quantities and tender documentation, tender evaluation and recommendation, contract administration and financial reporting, progress valuations and interim payment certificates, final account preparation and close-out.
Relevant project types for experience: office reconfiguration and fit-out, building services upgrades, multi-storey office renovations, airport terminal construction/upgrades, public sector building projects (excluding schools).
Important Dates
Source: Contract Quantity Surveying Services.pdf (unknown)Closing date: 21 October 2026 at 12:00.
No briefing or site visit dates are stated in the document.
Contact Information
Source: Contract Quantity Surveying Services.pdf (unknown)Employer: Airports Company South Africa SOC Limited
Address: O.R. Tambo International Airport, Private Bag X1, Kempton Park, 1627
Telephone: +27 11 921 6911
Fax: +27 11 390 1012
Employer's Agent: Kamogelo Molawa
Address: O.R. Tambo International Airport, Private Bag X1, Kempton Park, 1627
No email addresses are stated in the document.
Submission Guidelines
Source: Contract Quantity Surveying Services.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Submission method and address: not stated in the document.
Closing time: 12:00 (from tender record).
Evaluation Criteria
Source: Contract Quantity Surveying Services.pdf (unknown)Evaluation stages and scoring split are not stated in the document.
Stage percentage points (basis for fee payment, not evaluation):
No minimum qualifying score is stated.
Technical Specifications
Source: Contract Quantity Surveying Services.pdf (unknown)Scope: Provision of professional quantity surveying services for the 3rd and 4th floor office reconfiguration project at O.R. Tambo International Airport (ORTIA).
Services to be rendered across all project stages:
Additional responsibilities: comply with SACQSP ethical standards, maintain auditable records, attend project meetings, collaborate with other consultants.
Estimated cost of construction work: R66 429 000,00 (excl. VAT).
Contract period: 48 months (4 years).
Experience & Qualifications
Source: Contract Quantity Surveying Services.pdfKey personnel identified in Clause 22.1 and Annexure C form part of the basis for evaluation and appointment.
Key personnel may not be replaced without prior written approval of the Employer.
Any replacement must possess qualifications, professional registration, experience and competencies equal to or exceeding the individual being replaced and the minimum requirements in Annexure C.
The proposed replacement's CV, qualifications, proof of professional registration and experience records must be submitted for review and approval before deployment.
The Employer may reject any proposed replacement that does not meet these requirements.
Quality Management
Source: Contract Quantity Surveying Services.pdfQuality policy statement and quality plan must be provided within 4 weeks of the Contract Date.
Defects date: 52 weeks after completion of the whole of the services.
Defects correction period: 2 weeks.
Pricing Schedule
Source: Contract Quantity Surveying Services.pdfPricing basis: Priced contract with activity schedule (NEC3 Main Option A).
Fees: standard fees and stages per the Guideline Scope of Services and Recommended Guideline Tariff of Fees for Persons Registered under the Quantity Surveying Profession Act.
Activity Schedule: covers activities and items to be priced. Costs not expressly provided for are deemed included. Bidders may insert additional line items, quantities and rates.
Stage 5 fee payable monthly, pro rata to certified value of works.
Original pricing schedule must not be altered; additional items must be listed separately and marked optional/supplementary.
Prices must be inclusive of all risks, liabilities, obligations, profit, expenses, costs and bonuses.
Disbursements: statutory fees, permits and mandatory charges reimbursable without prior approval; all other disbursements require written approval. Excludes travel, accommodation, vehicle hire, fuel, toll fees, parking, subsistence and per diem costs.
Variations: measured and priced at rates in the Price Schedule; non-scheduled items agreed and priced separately.
Quantities are provisional; balance deducted from contract sum. No claim if quantities are partially or totally removed.
Estimated cost of construction work: R66 429 000,00 excl. VAT.
Partial payment: 60% of stage fee on acceptance of deliverable, remaining 40% on completion of internal governance approval (not applicable to Stage 5).
Price Schedule structure:
Financial Requirements
Source: Contract Quantity Surveying Services.pdf (unknown)Pricing format: Priced contract with activity schedule (NEC3 Main Option A).
Price Schedule structure:
Payment terms:
Performance bond:
Delay damages: 1% per week, up to maximum 10% of total professional fees.
Interest rate: prime lending rate of Nedbank Bank.
Currency: South African Rand.
Disbursements: statutory fees, permits and mandatory charges reimbursable without prior approval; all other disbursements require written approval. Excludes travel, accommodation, vehicle hire, fuel, toll fees, parking, subsistence and per diem costs.
Compliance Requirements
Source: Contract Quantity Surveying Services.pdf (unknown)Professional registration: Quantity Surveyor must be professionally registered with SACQSP as a Professional Quantity Surveyor.
Experience requirement: Proof that the Quantity Surveyor has completed relevant projects with a construction value of R40 million or above (incl. VAT) per project. Relevant project types: office reconfiguration and fit-out, building services upgrades, multi-storey office renovations, airport terminal construction/upgrades, public sector building projects (excluding schools).
B-BBEE: Annual compliant B-BBEE certificate required; failure is a material breach and may lead to contract cancellation.
Insurance:
Occupational Health and Safety:
Key personnel: Key personnel identified in Clause 22.1 and Annexure C form part of the evaluation basis. Replacement requires prior written approval and must meet or exceed the original qualifications and experience.
B-BBEE Requirements
Source: Contract Quantity Surveying Services.pdf (unknown)The Consultant must annually present a compliant B-BBEE certificate.
Failure to adhere to this requirement is a material breach of the contract and may result in cancellation of the contract.
Health & Safety
Source: Contract Quantity Surveying Services.pdfAn Occupational Health and Safety Agreement under Section 37(2) of the OHS Act and Construction Regulation 5.1(k) must be concluded before any work commences.
Mandatory requirements:
Contractual Terms
Source: Contract Quantity Surveying Services.pdfContract form: NEC3 Professional Services Contract, April 2013, Main Option A (Priced contract with activity schedule), with dispute resolution Option W1 and secondary options X7, X10, X11, X13, X18 and Z.
Governing law: Republic of South Africa. Language: English.
Period of reply: 7 days.
Retention period: 7 years after completion or termination.
Starting date: date the Employer signs the contract.
Completion date: 4 years from signing; automatic termination on that date unless extended by mutual written agreement.
Programme: first (preliminary) programme within 14 days of contract date; revised programmes at intervals no longer than 4 weeks.
Quality: quality policy statement and quality plan within 4 weeks of contract date.
Defects date: 52 weeks after completion of the whole of the services. Defects correction period: 2 weeks.
Payment: assessment every 4 weeks on the 25th; payment within 4–6 weeks of tax invoice; interest at Nedbank prime rate.
Insurance: joint names of parties, cover from starting date until Defects Certificate or termination certificate. Minimum limit for employee injury/death per COID Act.
Delay damages: 1% per week, max 10% of total professional fees.
Performance bond: 10% of total Prices, unconditional, payable on demand, within 14 calendar days of signed contract. Failure allows deduction, retention or termination.
Limitation of liability:
Additional conditions (Z clauses):
Section
Source: Contract Quantity Surveying Services.pdfNo additional evaluation criteria beyond the stage percentage points are stated in the document.
Description
Source: Architect's Contract.pdfThe project involves the reconfiguration and refurbishment of the 3rd and 4th floor office spaces at O.R. Tambo International Airport (ORTIA), North Wing. The scope includes design, documentation, coordination, and oversight of all architectural interventions to transform the existing closed-plan office layout into a modern, open-plan configuration in accordance with the ACSA Office Manual and applicable statutory requirements. The services cover all six SACAP work stages, including integration of enhanced security features for executive offices (AGM and GM), provision of dedicated fire escape routes, and coordination with associated engineering and specialist disciplines.
Important Dates
Source: Architect's Contract.pdf (unknown)Closing date: 21 October 2026 at 12:00 (as per tender record).
No briefing session or site visit is stated in the document.
Contact Information
Source: Architect's Contract.pdf (unknown)Employer's Agent:
Employer (ACSA) general contact:
Submission address: not stated in the document.
Submission Guidelines
Source: Architect's Contract.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Disqualification risks:
Evaluation Criteria
Source: Architect's Contract.pdf (unknown)Evaluation stages:
Minimum qualifying score: not stated in the document.
Preference points: B-BBEE level will be used to claim preference points under the PPPFA.
Stage percentage points (for fee allocation):
Technical Specifications
Source: Architect's Contract.pdf (unknown)Scope of work:
Project personnel requirements:
Experience & Qualifications
Source: Architect's Contract.pdfExperience requirements:
Professional registration:
Key personnel:
Pricing Schedule
Source: Architect's Contract.pdfPricing structure:
Financial Requirements
Source: Architect's Contract.pdf (unknown)Pricing format:
Payment terms:
Bid security / guarantees:
Insurance:
Interest rate: prime lending rate of Nedbank Bank as determined from time to time.
Currency: South African Rand.
Compliance Requirements
Source: Architect's Contract.pdf (unknown)Mandatory requirements:
Occupational Health and Safety:
Contractual compliance:
Health & Safety
Source: Architect's Contract.pdfOccupational Health and Safety Agreement (Section 37(2) of OHS Act and Construction Regulation 5.1(k)):
Section
Source: Architect's Contract.pdfAdditional evaluation criteria:
Description
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdfProcurement
Background
Location
Objectives
Important Dates
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdf (RFP)Closing
Briefing session (not compulsory)
Site inspection
Clarification queries
Bid issue date
Briefing Session
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdf (RFP)Briefing session — not compulsory
Site inspection
Contact Information
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdf (RFP)Bidding procedure enquiries
General ACSA switchboard
Contact restrictions
Fraud and corruption reporting (Tip-Offs Anonymous)
Submission address
Tender Box C
3rd Floor North Wing Offices
OR Tambo International Airport
1 Jones Road
Kempton Park
ACSA head office
Western Precinct, Aviation Park
O.R. Tambo International Airport
1 Jones Road
Kempton Park, 1632
Postal: PO Box 75480, Gardenview, 2047
Submission Guidelines
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdf (RFP)Submission method
Returnable documents — mandatory items omitted disqualify the bid
Disqualification risks
Returnable Documents
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdf (RFP)Submission
Mandatory returnable documents — non-submission disqualifies
Other returnable documents
Validity
Evaluation Criteria
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdf (RFP)Staged evaluation — each stage must be passed before the next
Functionality
Multi-Disciplinary Engineers (100 points)
Architect (100 points)
Quantity Surveyor (100 points)
Construction Health and Safety Agent (100 points)
Accepted project types for all disciplines
Price and preference
Technical Specifications
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdf (RFP)Services procured
3rd and 4th floor offices, North Wing, ORTIA
Parking offices, Multi-Storey Parkade 1 (MSP 1)
Project objectives
Background
Methodology
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdfEvaluation is staged, and each stage must be passed before the next:
ACSA may allow bidders reasonable time to submit information required at Stage 1.
Experience & Qualifications
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdfKey personnel registration
Project values
Evidence
Other returnable items
Pricing Schedule
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdfPricing format
Financial Requirements
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdf (RFP)Pricing
Price validity
Compliance Requirements
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdf (RFP)Eligibility
Tax and registration
Professional registration — all key persons
Statutory and other
Declarations
B-BBEE Requirements
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdf (RFP)Preference points are scored out of 20 under the PPP Regulations 2022/2023. A bidder that does not meet a specific goal, or does not submit proof, scores zero for that goal but is not disqualified.
Specific goals under the 80/20 system
Evidence
Health & Safety
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdfObjective
Scope items with safety implications
Construction Health and Safety Agent discipline
Contractual Terms
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdfACSA's rights
Validity
Confidentiality
Security
RFP conditions
Dispute resolution
Joint ventures
Section
Source: RFP Third and Fourth Floor Office Reconfiguration Project at ORTIA.pdfStaged evaluation — each stage must be passed before the next
Stage 1
Stage 2 — functionality
Multi-Disciplinary Engineers (100 points)
Architect (100 points)
Quantity Surveyor (100 points)
Construction Health and Safety Agent (100 points)
Accepted project types for all disciplines
Stage 3 — price and preference
Description
Source: Contract Multi-Disciplinary Engineering Services Services.pdfScope of work
Important Dates
Source: Contract Multi-Disciplinary Engineering Services Services.pdf (unknown)Closing: 21 October 2026 at 12:00.
Contract milestones
Contact Information
Source: Contract Multi-Disciplinary Engineering Services Services.pdf (unknown)Employer
Employer's Agent
Adjudicator and arbitrator panel
Submission Guidelines
Source: Contract Multi-Disciplinary Engineering Services Services.pdf (unknown)Returnable documents
Evaluation Criteria
Source: Contract Multi-Disciplinary Engineering Services Services.pdf (unknown)Evaluation basis
Technical Specifications
Source: Contract Multi-Disciplinary Engineering Services Services.pdf (unknown)Scope
Risk register
Experience & Qualifications
Source: Contract Multi-Disciplinary Engineering Services Services.pdfKey personnel
Contract data
Quality Management
Source: Contract Multi-Disciplinary Engineering Services Services.pdfQuality requirements
Pricing Schedule
Source: Contract Multi-Disciplinary Engineering Services Services.pdfPricing instructions
Price schedule
Financial Requirements
Source: Contract Multi-Disciplinary Engineering Services Services.pdf (unknown)Pricing format
Price schedule build-up
Payment
Security and damages
Insurance
Compliance Requirements
Source: Contract Multi-Disciplinary Engineering Services Services.pdf (unknown)Mandatory
Health & Safety
Source: Contract Multi-Disciplinary Engineering Services Services.pdfOccupational Health and Safety Agreement
Contractual Terms
Source: Contract Multi-Disciplinary Engineering Services Services.pdfContract data (Part one)
Section
Source: Contract Multi-Disciplinary Engineering Services Services.pdfStage weighting
Quality
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
1 Jones Road - Kempton Park - Gauteng - 1632
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
5
Last checked
16 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Median Estimate
R 793 500
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Professional, scientific and technical activities. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog