Issuing Organization
Development Bank of Southern Africa (DBSA)Location
Gauteng
Closing Date
11 Dec 2026
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
1258 Lever Road - Headway Hill - Midrand - 1685
Organization Type
GOVERNMENT
Published
19 Nov 2026
OCDS Reference
ocds-9t57fa-178962
The development bank of southern africa (DBSA) seeks a professional service provider to develop architectural design guidelines for top structures within the fetakgomo tubatse special economic zone (ftsez). The successful bidder will enter into a CIDB standard professional services contract and must meet strict pre-qualification criteria, including compulsory briefing attendance, relevant project experience, and professional registration. The most consequential consideration is the mandatory pre-qualification requirements—failure to meet any one of them results in immediate disqualification.
Compulsory briefing: Attend the online MS Teams webinar on 27 November 2026 at 11:00; non-attendance is a pre-qualifier and leads to immediate disqualification.
Experience: Provide evidence of at least two projects of similar nature (architectural design guidelines, precinct development guidelines, or building project designs) completed in the last 10 years, each with a contract award value above R1 million, supported by a dated and signed letter of appointment or SLA and a contactable reference letter.
Professional registration: Offer a Professional Architect or Senior Architectural Technologist registered with SACAP with a minimum of 10 years post-registration experience; submit detailed CVs and valid registration documents for each resource.
Insurance: Submit proof of professional indemnity insurance of R10,000,000.00 with no limit on the number of claims, covering all professional disciplines.
Compliance documents: Complete and sign all returnable forms including SBD2, SBD4, SBD6.1, SBD8, SBD9, Declaration of Default and Termination, and submit CSD summary report, valid SARS tax pin, CIPC registration or share certificates, financial statements, and B-BBEE certificate (or affidavit for EMEs).
Submission: Request the OneDrive submission link by email no later than 8 December 2026 (3 days before closure); upload only files (compressed folders) correctly labelled, and submit one original plus one copy and a flash drive before the closing time of 11 December 2026 at 23:55 Telkom Time.
Evaluation: Price and B-BBEE preference points are scored under the 80/20 system; B-BBEE levels earn up to 20 points (Level 1: 20, Level 2: 18, Level 3: 14, Level 4: 12, Level 5: 8, Level 6: 6, Level 7: 4, Level 8: 2, non-compliant: 0).
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Friday, 11 December 2026 - 11:00
Venue
Microsoft Teams - Refer to DBSA Website for the link to register be able to join
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Proposal
1258 Lever Road - Headway Hill - Midrand - 1685
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Important Dates
Source: Annexure A - Health and Safety Specification.pdf (unknown)19 Nov
2026
Tender Published
Tender was published
11 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure A - Health and Safety Specification.pdf
The Development Bank of Southern Africa (DBSA) seeks to appoint a Professional Service Provider (PSP) to develop Architectural Design Guidelines and Engineering Design Guidelines for top structures at the Fetakgomo Tubatse Special Economic Zone (FTSEZ). The scope covers project stages 1–3 (strategic briefing, concept and viability, design development) and includes compliance with the Occupational Health and Safety Act and Construction Regulations 2014, with the PSP acting as designer and health and safety agent.
1RFP19~1.PDF
The Development Bank of Southern Africa (DBSA) is appointing a Professional Service Provider (PSP) to develop architectural design guidelines for top structures within the Fetakgomo Tubatse Special Economic Zone (FTSEZ). The contract will be awarded under the 80/20 preference point system, with price and B-BBEE status determining the final score.
Annexure C - DBSA SHEQ Policy.pdf
Annexure B - Baseline Risk Assessment.pdf
The Development Bank of Southern Africa (DBSA) requires the appointment of a Professional Service Provider (PSP) to develop architectural and engineering design guidelines for top structures at the Fetakgomo Tubatse Special Economic Zone (FTSEZ). The contract covers project stages 1 to 3 (initiation, concept/feasibility, and design development), with the PSP also expected to contribute to health and safety risk management in line with the Construction Regulations 2014.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Development Bank of Southern Africa (DBSA)Secure DBSA tenders with AI Matching Engine, development finance intelligence, compliance analysis, and bid support for infrastructure and consulting.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 572 510
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Briefing session: attendance of briefing meeting required (date, time, venue not specified).
Evaluation Criteria
Source: Annexure A - Health and Safety Specification.pdf (unknown)The PSP must be a competent person registered with a statutory body approved by the Chief Inspector (SACPCMP) as a Professional Construction Health and Safety Agent (Pr.CHSA). The PSP must have the necessary competencies and resources to carry out the work safely. The PSP must comply with the Occupational Health and Safety Act and Construction Regulations 2014. The PSP must ensure that the principal contractor is registered and in good standing with the Compensation Fund or a licensed compensation insurer.
Scope of work covers Stages 1-3 of the Fetakgomo Tubatse Special Economic Zone (FTSEZ). Deliverables per stage:
Stage Gate Notification / Client Approval to Proceed to Next Stage required at each stage.
Technical Specifications
Source: Annexure A - Health and Safety Specification.pdf (unknown)The DBSA requires a team of suitably qualified professionals to undertake due diligence and/or appointment of professional service providers to conduct site evaluation, concept and viability or feasibility, design development, design documentation, as part of the combined FIDPM S1-S4 for the development of Architectural Design Guidelines and Engineering Design Guidelines for Top structures for the Fetakgomo Tubatse Special Economic Zone (FTSEZ).
The winning bidder must familiarise and comply with the gazetted regulations and specifications of public infrastructure facilities and the relevant Acts.
Scope of work for RFP191/2026 covers Stages 1-3 of FTSEZ.
Deliverables per stage:
Design requirements:
Methodology
Source: Annexure A - Health and Safety Specification.pdfThe document includes requirements for identification of hazards and development of risk assessments, standard working procedures (SWP) and method statements. It also includes arrangements for monitoring and review, site rules and other restrictions, and project/site specific requirements.
Experience & Qualifications
Source: Annexure A - Health and Safety Specification.pdfCVs with detailing experience, and the Proof of Registration with a recognized professional body/institution, are part of the Pre-Qualifier. All resources should be professionally registered as stipulated and valid.
Quality Management
Source: Annexure A - Health and Safety Specification.pdfThe document is a Health and Safety Baseline Specification prepared in terms of Construction Regulation 5(1)(b). It sets out the health and safety requirements for the intended construction work, including the management of health and safety during Stages 4 and 5 of the project life cycle. The specification must be read in conjunction with the Occupational Health and Safety Act and its Regulations, specifically Construction Regulations 2014. The stipulations in this specification do not cancel or nullify any stipulation of the Act, Regulations and Safety Standards.
Compliance Requirements
Source: Annexure A - Health and Safety Specification.pdf (unknown)The PSP must be a competent person registered with a statutory body approved by the Chief Inspector (SACPCMP) as a Professional Construction Health and Safety Agent (Pr.CHSA).
The PSP must have the necessary competencies and resources to carry out the work safely.
The PSP must comply with the Occupational Health and Safety Act and Construction Regulations 2014.
The PSP must ensure that the principal contractor is registered and in good standing with the Compensation Fund or a licensed compensation insurer.
All resources must be professionally registered as stipulated and valid. Proof of registration with a recognized professional body/institution is part of the Pre-Qualifier.
CVs with detailing experience and proof of registration are required. All (8) CVs must explicitly indicate which resource CV is offered for the tender required discipline - only one (1) resource CV per discipline will be assessed.
Health & Safety
Source: Annexure A - Health and Safety Specification.pdfThe Health and Safety Specification is prepared to obtain a benchmark of Health and Safety requirements for the intended construction work to ensure the health and safety of persons. It is prepared in line with the Baseline Risk Assessment.
The specification applies to the appointment of a PSP for Architectural Design Guidelines and Engineering Design Guidelines for Top structures for the Fetakgomo Tubatse Special Economic Zone (FTSEZ).
The PSP must comply with the Occupational Health and Safety Act and Construction Regulations 2014.
The PSP must ensure that the principal contractor is registered and in good standing with the Compensation Fund or a licensed compensation insurer.
The PSP must ensure that the principal contractor implements and maintains the agreed and approved Health and Safety Plan.
The PSP must ensure that all employees have a valid medical certificate of fitness specific to the construction work to be performed and issued by an occupational health practitioner.
The PSP must ensure that all visitors to a construction site undergo health and safety induction and have the necessary personal protective equipment.
The PSP must ensure that periodic health and safety audits and document verification are conducted at intervals mutually agreed upon between the Principal Contractor and any contractor, but at least once every 30 days.
The PSP must ensure that a copy of the health and safety audit report is provided to the Principal Contractor within seven days after the audit.
The PSP must stop any contractor from executing a construction activity which poses a threat to the health and safety of persons or which is not in accordance with the client's health and safety specifications and the Principal Contractor health and safety plan for the site.
The PSP must ensure that the health and safety file is kept and maintained by the Principal Contractor.
The PSP must ensure that the Principal Contractor hands over a consolidated health and safety file to the client upon completion of the construction work.
The PSP must ensure that the Principal Contractor provides the Provincial Director with a report contemplated in Section 24 of the Act where a fatality or permanent disabling injury occurs on a construction site.
The PSP must ensure that the Principal Contractor submits all Construction Work Permit application documents as per the Construction Health and Safety Agents request, for review and approval. The Construction Health and Safety Agent will submit the permit application to Department of Employment and Labour to notify of the intended construction work in terms of Construction Regulation 3 at least 30 days prior to commencement of work.
The PSP must ensure that the Principal Contractor provides and demonstrates to the client a suitable, sufficiently documented and coherent site specific health and safety plan, based on the client's documented health and safety specifications, which plan must be applied from the date of commencement of and for the duration of the construction work and which must be reviewed and updated by the Principal Contractor as work progresses.
The PSP must ensure that the Principal Contractor opens and keeps on site a health and safety file, which must include all documentation required in terms of the Act and these Regulations.
The PSP must ensure that the Principal Contractor appoints each contractor in writing for the part of the project on the construction site.
The PSP must ensure that the Principal Contractor takes reasonable steps to ensure co-operation between all contractors appointed by the Principal Contractor to enable each of those contractors to comply with these Regulations.
The PSP must ensure that no contractor may allow or permit any employee or person to enter any site, unless that employee or person has undergone health and safety induction training pertaining to the hazards prevalent on the site at the time of entry.
The PSP must ensure that all his or her employees have a valid medical certificate of fitness specific to the construction work to be performed and issued by an occupational health practitioner in the form of Annexure 3.
The PSP must ensure that the Principal Contractor provides the Client/Professional Service Provider with an organogram of all contractors that he/she has appointed or intends to appoint and keep this list updated and prominently displayed on site.
Communication and Liaison:
Environmental
Source: Annexure A - Health and Safety Specification.pdfEnvironmental management shall receive due attention. The specification covers health, safety and environmental issues pertaining to the site of the project.
Description
Source: 1RFP19~1.PDFThe DBSA is procuring the services of a Professional Service Provider (PSP) to develop Architectural Design Guidelines for top structures for the Fetakgomo Tubatse Special Economic Zone (FTSEZ). The scope includes preparing design guidelines for top structures within the SEZ. The contract will be a CIDB Standard Professional Services Contract.
Important Dates
Source: 1RFP19~1.PDF (RFP)Advertisement: 19 November 2026
Compulsory briefing: 27 November 2026 at 11:00 (online MS Teams webinar)
Clarification questions deadline: 30 November 2026 at 12:00 (one consolidated email per bidder)
DBSA response to clarifications: 01 December 2026
Closing date: 11 December 2026 at 23:55 (Telkom Time)
Contact Information
Source: 1RFP19~1.PDF (RFP)Tender Manager: Lihle Nyide
Role: DBSA Supply Chain Unit
Email: [email protected]
Telephone: Not provided (no telephonic questions accepted)
Submission link: Microsoft OneDrive link provided on request (request by email to the Tender Manager).
Submission Guidelines
Source: 1RFP19~1.PDF (RFP)Submission method: electronic upload to a Microsoft OneDrive link. Bidders must request the submission link by email no later than 3 days before tender closure.
Returnable documents (all must be completed, signed and included; omission may lead to disqualification):
Disqualification risks:
Evaluation Criteria
Source: 1RFP19~1.PDF (RFP)Evaluation stages:
Pre-qualifiers (failure leads to immediate disqualification):
Clarification responsiveness (48 hours to respond, else deemed non-responsive):
Price and preference scoring:
Risk analysis and objective criteria:
Technical Specifications
Source: 1RFP19~1.PDF (RFP)The Development Bank of Southern Africa (DBSA) requires the appointment of a Professional Service Provider (PSP) to prepare Architectural Design Guidelines for top structures for the Fetakgomo Tubatse Special Economic Zone (FTSEZ).
Experience & Qualifications
Source: 1RFP19~1.PDFBidder experience:
Key personnel:
Quality Management
Source: 1RFP19~1.PDFNo specific quality management requirements are stated beyond the general requirement to provide accurate and complete information. The DBSA may disregard illegible content and may seek clarification. Bidders must ensure their submissions are readable and complete.
Pricing Schedule
Source: 1RFP19~1.PDFPricing must follow the Pricing Instructions in the tender; failure to adhere may render the offer non-compliant.
Financial Requirements
Source: 1RFP19~1.PDF (RFP)Professional indemnity insurance: R10,000,000.00 with no limit on number of claims, covering all professional disciplines.
Pricing: Price points formula (80 points) as per evaluation criteria. Pricing instructions must be followed; unpriced items may be clarified but not amended.
Financial health assessment: DBSA may assess bidder's financial health (accounts receivable/payable turnover, liquidity, solvency).
Order book limits (if CIDB classification applicable):
Unrealistic pricing: DBSA may disqualify tenders with unduly high or low rates (CIDB Inform Practice Note #5).
Payment terms: Not specified in the document.
Compliance Requirements
Source: 1RFP19~1.PDF (RFP)CSD registration: Must be registered on the National Treasury Central Supplier Database (CSD) and submit a CSD summary report.
Tax: Valid SARS tax pin required.
B-BBEE: Submit a valid B-BBEE status level certificate (SANAS accredited) or sworn affidavit for EMEs (annual revenue ≤ R6 million per Construction Code). Non-submission results in 0 preference points.
CIPC: Submit CIPC registration documents (for close corporations) or latest share certificates (for companies).
Professional registration: SACAP registration for Professional Architect / Senior Architectural Technologist.
Local content: Not specified.
Standard forms (each to be completed and signed):
Health & Safety
Source: 1RFP19~1.PDFNo specific health and safety requirements are stated in the document. The scope is for professional services (architectural design guidelines), so OHS requirements are not detailed.
Contractual Terms
Source: 1RFP19~1.PDFContract will be the CIDB Standard Professional Services Contract (July 2009 Edition 3, CIDB Document 1014) including the Scope of Work.
Section
Source: 1RFP19~1.PDFAdditional evaluation criteria:
Description
Source: Annexure B - Baseline Risk Assessment.pdfThis is Annexure B – a draft Baseline Risk Assessment prepared under Construction Regulation 5(1)(a) of the OHS Act, 2014.
It covers the appointment of a PSP for Architectural Design Guidelines and Engineering Design Guidelines for top structures for the Fetakgomo Tubatse Special Economic Zone (FTSEZ).
The assessment identifies major and significant risks and informs the project Health and Safety Specification.
Evaluation Criteria
Source: Annexure B - Baseline Risk Assessment.pdf (unknown)The PSP must be a registered Professional Construction Health and Safety Agent (Pr. CHSA) with SACPCMP.
The PSP must comply with the OHS Act and Construction Regulations 2014, including Construction Regulation 5(1)(a) and 6.
The PSP must have the competency, knowledge, and experience to manage occupational health and safety risks in the design phase.
The PSP must verify that all designers and specialists are registered with their respective statutory bodies.
The PSP must comply with all applicable environmental legislation, including NEMA.
Technical Specifications
Source: Annexure B - Baseline Risk Assessment.pdf (unknown)This document is Annexure B – a draft Baseline Risk Assessment prepared under Construction Regulation 5(1)(a) of the OHS Act, 2014.
It covers the appointment of a PSP for Architectural Design Guidelines and Engineering Design Guidelines for top structures for the Fetakgomo Tubatse Special Economic Zone (FTSEZ).
The assessment covers the full project lifecycle, but this tender is for Stages 1, 2 and 3 only; Stages 4, 5 and 6 are provided as guidance.
The assessment identifies health, safety, environmental and quality hazards and risks, and informs the project Health and Safety Specification.
The PSP must implement 'Safety in Design' principles under Construction Regulation 6 to eliminate or reduce hazards during the design stage.
Methodology
Source: Annexure B - Baseline Risk Assessment.pdfConstruction methodology and planning must be considered during the tender stage to inform planning, costing and sequencing, without detailing contractor-specific methods.
Excavation work must be supervised by a competent person; employees must be trained in working near mobile plant.
Flag persons must control movement of plant within areas; only competent and appointed operators may operate machinery.
Experience & Qualifications
Source: Annexure B - Baseline Risk Assessment.pdfThe PSP must be a competent person with the knowledge, training, experience and qualifications specific to the work.
The PSP must ensure that correct structures and appointments are in place to assign accountability, authority, responsibility and roles.
The PSP must utilise the knowledge, skills, experience, insight and creativity of people close to the risks in the design and risk assessment process.
Quality Management
Source: Annexure B - Baseline Risk Assessment.pdfThe draft Baseline Risk Assessment is prepared under Construction Regulation 5(1)(a) of the OHS Act, 2014.
It identifies and categorises significant health, safety, environmental and quality hazards and risks across the project lifecycle.
The assessment informs the project Health and Safety Specification and must be communicated to designers, PSPs and the Principal Contractor.
It supports 'Safety in Design' principles under Construction Regulation 6.
Health & Safety
Source: Annexure B - Baseline Risk Assessment.pdfHealth and safety requirements must be clearly defined and included in the Bill of Quantities and tender pricing.
Adequate budget must be allocated for health and safety to avoid non-compliance, unsafe conditions, project delays and financial losses.
Work may not commence until the Health and Safety Plan and file are approved.
Principal Contractors must have a valid Letter of Good Standing (LOGS) – presented at tender stage – and valid COID registration.
A Construction Work Permit application must be submitted to the Department of Employment and Labour at least 30 days before planned commencement.
Principal Contractor must notify the Department of Employment and Labour at least 7 days before commencement of works.
Risk assessments and method statements must be conducted, site-specific, approved by a competent person, and communicated to all affected employees.
No work may commence without a suitable and sufficient risk assessment and method statement.
Trucks must be loaded according to safe load capacity; appointed spotters and traffic management plans are required.
All employees must have valid competencies, medicals, and work permits as required.
Environmental
Source: Annexure B - Baseline Risk Assessment.pdfEnvironmental impact must be considered during planning and approval; failure may cause project cancellation, financial losses and reputational damage.
A draft risk profile must be prepared by a Professional Registered Construction Health and Safety Agent in consultation with all appointed professionals.
Social facilitators must be appointed to manage community needs and expectations, and stakeholder engagement meetings must be held.
Feasibility studies must include environmental impact assessments and obtain required environmental approvals (e.g. NEMA) prior to project approval.
Water resource assessments and hydrogeological surveys must be conducted; consult with Eskom regarding electricity availability.
Contractual Terms
Source: Annexure B - Baseline Risk Assessment.pdfOHS requirements must be met; non-compliant contractors may be terminated. Expired documentation (e.g. competencies, medicals, work permits) must be provided to each Principal Contractor or Contractor.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
1258 Lever Rd, Headway Hill, Midrand, 1685, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
20 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
011-313-3827[email protected]www.dbsa.org1258 Lever Rd, Headway Hill, Midrand, 1685, South Africa
Key Personnel
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.