SENTECH limited is appointing a structural engineering service provider to assess the roof of the oc building in bloemfontein, design the remedial solution and recommend the work required. The appointment is procured as a request for quotation under reference rfx 60000003737, with bids closing on 30 october 2026 at 12:00. The most consequential bidder consideration is the mandatory bidder's disclosure: the bid must be accompanied by a complete and truthful sbd 4 declaration, and any bidder or person listed on the register for tender defaulters or the list of restricted suppliers is automatically excluded from the process.
Key Requirements
Scope of work: structural engineering assessment of the Bloemfontein OC building roof, design of remedial work and recommendations on the remedial work to be carried out.
Closing: 30 October 2026 at 12:00, submitted against RFX 60000003737 (Request for Quotation, Free State).
SBD 4 (Bidder's Disclosure) is a returnable form and must be completed and signed, declaring whether the bidder or any director, trustee, shareholder, member, partner or person holding a controlling interest is employed by the state.
Connected-person disclosure: any relationship between the bidder or its people and a person employed by the procuring institution must be declared.
Related-enterprise disclosure: any interest held by the bidder or its directors, trustees, shareholders, members, partners or controlling-interest holders in another related enterprise must be declared, whether or not that enterprise is bidding.
Disqualification: the bid is disqualified if the disclosure is found not to be true and complete, and a false declaration may lead to rejection of the bid and action under the PFMA supply chain management instruction on preventing abuse in the SCM system.
Automatic exclusion: a bidder or person listed on the Register for Tender Defaulters or the List of Restricted Suppliers is excluded from the bid process.
APPOINTMENT OF A SERVICE PROVIDER STRUCTURAL ENGINEER TO ASSESS, DESIGN AND RECOMMEND REMEDIAL WORK TO BE CARRIED OUT AT THE BLOEMFONTEIN OC BUILDING ROOF
Tender context
Return to this tender’s issuing organisation, province, or category.
Appointment of a service provider structural engineer to assess, design and recommend remedial work to be carried out at the bloemfontein oc building roof
Professional Services & Consulting Industry Profile
Regulatory Bodies
SAGCSAICA
Tenders in this industry often require registration with these bodies.
Typical Documents
5 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentConfirmation of Attendance.docxReview complete
Description
Source: Confirmation of Attendance.docx
Important Dates
16 Oct
2026
PUBLICATION
Tender Published
Tender was published
30 Oct
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Sentech Limited requires a registered professional structural engineer to assess, design and recommend remedial work for the roof of the Bloemfontein OC Building on Naval Hill, a three-storey circular structure of approximately 320 m². The engineer must assess the current timber roof structure, recommend refurbishment versus replacement, design a new roof if required, compile a bill of quantities and scope of works, and oversee construction to sign-off.
Standard Bidding Document (SDB) 4_Annexure A (00B) (002).pdf
Sentech Limited requires a structural engineer to assess, design, and recommend remedial work for the roof of the Bloemfontein OC Building. The appointed service provider will carry out a structural assessment and produce design and remediation recommendations.
Sentech Limited requires the appointment of a structural engineer to assess, design, and recommend remedial work for the roof of the Bloemfontein OC Building. The service provider will be responsible for structural evaluation and providing design recommendations for repairs.
Sentech Limited seeks to appoint a structural engineer to assess, design, and recommend remedial work for the roof of the Bloemfontein OC Building. The service provider will be responsible for evaluating the existing roof structure, developing remedial designs, and providing recommendations for necessary repairs.
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Based on 5 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Annexure 1 (Confirmation of Site Visit): a form recording the contractor's details, the hosting Sentech employee, the purpose and date of the visit, the site visited and the contractor's signature.
Submission Guidelines
Source: Confirmation of Attendance.docx (unknown)
Returnable document:
Annexure 1 (Confirmation of Site Visit): must be completed and signed by the contractor to confirm attendance at the site visit.
Technical Specifications
Source: Confirmation of Attendance.docx (unknown)
Scope:
Appointment of a structural engineer to assess the OC building roof in Bloemfontein, design remedial work and recommend the remedial work required.
Deliverables: structural assessment of the roof, remedial design, and recommendations for the remedial work to be carried out.
Site visit:
Attendance is recorded on Annexure 1, which captures the contractor's name, the hosting Sentech employee, the purpose of the visit, the date, the site or office visited and the contractor's signature.
Compliance Requirements
Source: Confirmation of Attendance.docx (unknown)
Eligibility:
Registered on the Central Supplier Database (CSD).
Valid SARS tax clearance certificate.
Bidder must be a professional structural engineer, or a firm holding the relevant professional registration (e.g. ECSA).
Experience in structural assessment and remedial design.
Annexure 1 (Confirmation of Site Visit) must be completed.
Sentech Supplier Consent Form: must be signed by the supplier's authorised representative, who warrants that they are duly authorised to bind the supplier.
Consent terms
Signing consents to Sentech processing the supplier's personal information, including special personal information, to assess the bid and to register the supplier on Sentech's supplier database.
The information may be shared with third parties within and outside South Africa for verification, background screening and FICA Know Your Customer checks.
Consent may be withdrawn in writing, but withdrawal may prevent the bid from being processed or the supplier from staying on Sentech's supplier database.
Special Conditions
Source: SENTECH SUPPLIER CONSENT FORM.pdf (RFP)
Supplier consent
The signed Sentech Supplier Consent Form is a condition for the bid to be considered and for the supplier to be listed on Sentech's supplier database.
Signing authorises Sentech to process the supplier's personal information, including special personal information, for assessing the bid and for current and future service requirements.
Information may be disclosed to Sentech's affiliates, service providers and associates, some located outside South Africa, for verification, background screening and FICA obligations.
Consent can be withdrawn on written notice to Sentech; withdrawal may leave Sentech unable to process the bid or retain the supplier's details on its database.
DocumentStandard Bidding Document (SDB) 4_Annexure A (00B) (002).pdfReview complete
Submission Guidelines
Source: Standard Bidding Document (SDB) 4_Annexure A (00B) (002).pdf (TENDER)
Returnable form
SBD 4 (Bidder's Disclosure / Declaration of Interest): must be completed and signed, disclosing whether the bidder or any of its directors, trustees, shareholders, members, partners or anyone holding a controlling interest is employed by the state, is connected to a person employed by the procuring institution, or holds an interest in another related enterprise.
Disqualification risks
The bid is disqualified if the disclosure proves untrue or incomplete.
A bidder or person listed on the Register for Tender Defaulters or the List of Restricted Suppliers is automatically excluded from the bid process.
A false declaration may lead to rejection of the bid and action under the PFMA supply chain management instruction on preventing abuse in the SCM system.
Compliance Requirements
Source: Standard Bidding Document (SDB) 4_Annexure A (00B) (002).pdf (TENDER)
SBD 4 (Bidder's Disclosure): mandatory declaration covering state employment of the bidder's directors, shareholders, members or partners, any relationship with staff of the procuring institution, and any interest in a related enterprise.
Register for Tender Defaulters and List of Restricted Suppliers: listing results in automatic disqualification.
Truthfulness of the disclosure is a condition of the bid; an untrue or incomplete declaration disqualifies the bid.
Quotations must be on the bidder's company letterhead, fully completed and signed in black ink.
Bids must be received on or before the closing date and time; late quotations are not accepted.
Document A additionally requires the priced and completed quotation pack to be placed in a sealed envelope endorsed on the outside with the quotation number.
Returnable documents
Priced bill of quantities / completed Schedule of Cost.
Signed company letterhead showing the quoted prices and availability to perform the works.
Programme showing lead times and duration from receipt of a purchase order to completion.
Table 1: References, completed with client name, service provided, contact person, contact number and contractual commencement and completion dates, with reference letters attached.
Form 1 (Certificate of Authority for Signatory/Signatories): board resolution authorising the signatory to bind the company.
Form 2 (Certificate of Non-Collusive Quotation): certifies the quotation is bona fide and was set without collusion with other bidders.
Form 4 (Occupational Health and Safety Act clause): the contractor accepts OHS duties and liability under the Act.
All forms must be completed in black ink; failure to complete and sign the required forms may result in rejection.
Disqualification risks
Quotation received after the closing time.
Any mandatory form left unsigned or omitted.
Approaching a Sentech representative or any other person to influence the award.
Failure to meet the administrative responsiveness criteria.
Non-conformance with the quotation conditions.
Validity
90 days is stated on the RFQ cover; Document A requires quotations to remain valid for 60 days after the closing date.
Completed Schedule of Cost (an example is provided and may be expanded at the engineer's discretion).
Signed company letterhead showing the quoted prices and availability to conduct the works.
Programme showing lead times and duration from receipt of a purchase order to completion.
Table 1: References completed with customer/client name, service provided, contact person, contact number and contractual commencement and completion dates, with reference letters attached.
Stage 1: Administrative responsiveness — quotations checked against the administrative requirements; non-compliant bids are not evaluated further.
Stage 2: Functional evaluation — only bids meeting all mandatory criteria are scored.
Stage 3: Price and preference — 80/20 system; the highest total points is recommended for award.
Mandatory criteria (pass/fail)
ECSA-registered structural engineer with a valid ECSA certificate.
Valid COIDA/FEM certificate or letter from the Department of Employment and Labour, i.e. a Workmen's Compensation Letter of Good Standing aligned to the construction industry.
Proof of at least five completed timber-related roof projects listed in Table 1, supported by signed reference letters on client letterhead, completion certificates or affidavits with supporting documents.
Bids failing any mandatory criterion are not evaluated further.
Functional scoring (100 points)
Registered Professional Engineer with more than 5 years' post-qualification experience: 100 points.
3–4 years: 80 points.
1–2 years: 60 points.
Less than 1 year: 40 points.
Evidence: clear copy of the engineer's CV with relevant qualifications.
Minimum qualifying functional score: 80/100.
Price (80 points)
Formula: Ps = 80 × [1 − (Pt − Pmin) / Pmin], where Pt is the bid price and Pmin the lowest acceptable bid.
Preference points (20 points, 80/20 system)
Race: 8 points for at least 51% black ownership; 3 points for 25.1–50%; 1 point for 5–25%; 0 below 5%.
Gender (women): 10 points for at least 51% women ownership; 6 points for 25.1–50%; 2 points for 5–25%; 0 below 5%.
Disability: 2 points on submission of a doctor's note confirming disability.
Only bidders submitting a valid B-BBEE certificate can claim preference points.
Appointment of a registered professional structural engineer experienced in timber rafters, bracings and trusses roof structures.
Assess the roof at the Bloemfontein OC Building and recommend a detailed remedial solution.
The report must cover proposed upgrade measures, an order-of-magnitude cost estimate in the form of an explicit bill of quantities, and a construction time estimate.
Site
Multi-storey (3 floors) circular building, radius 10.1 m (±320 m²), at the top of Naval Hill, Bloemfontein.
The roof was previously refurbished through waterproofing and strengthening of roof rafters; the report must assess the practicality and economic viability of refurbishment versus replacement.
Live environment; site security is of paramount importance; normal working hours are assumed.
Deliverables
Assess the current roof structure and compile a detailed report with remedial recommendations.
Design a new roof and all its components if the final analysis recommends replacement.
Compile a bill of quantities and scope of works for issue to the market.
Assist in sourcing a highly competent contractor to carry out the work.
Outline the sequence of works, monitor and police the construction phase, and sign off on completion.
Maintain continuous communication with the Office Manager on progress and developments.
Ensure all work complies with health and safety standards.
Timing
The site is available immediately once Sentech issues a purchase order; the project must start on receipt of the purchase order.
A registered Professional Engineer must be proposed, with a clear copy of the CV and relevant qualifications submitted.
Minimum 5 years' post-qualification experience as an engineer is required.
Functional scoring
More than 5 years: 100 points.
3–4 years: 80 points.
1–2 years: 60 points.
Less than 1 year: 40 points.
Minimum qualifying score: 80 of 100.
Company experience
At least five completed timber-related roof projects must be listed in Table 1, with signed reference letters, completion certificates or affidavits supported by appointment letters or purchase orders.
Quotation must be all-inclusive: site establishment, overheads, labour, materials, transport, constructional plant, VAT and everything else needed to execute the works.
Pricing schedule (bill of quantities):
1.1 Overheads, administration and site visits — Sum, quantity 1.
2.1 Assess the extent of the current roof structural failure — m², quantity 320.
2.2 Generate new roof drawings (roof replacement) — Sum.
2.3 Compile a report on the best economic solution for refurbishment versus demolition and rebuilding — Sum.
2.4 Outline the sequence of works, monitor and police the construction phase and sign off on completion — Sum.
Sub-total, VAT at 15%, total cost of refurbishment.
A priced bill of quantities must be attached to the quotation.
Payment
Payment within 30 days of receipt of a tax invoice, unless other terms are stated on the invoice.
Price adjustment and currency
No contract price adjustment without Sentech's written approval; applications must be supported by documentary evidence.
Foreign currency prices must use a fixed exchange rate for the contract term; the bidder carries all currency fluctuation risk.
Sentech may negotiate market-related prices and discounts and may cancel the bid if agreement is not reached.
Bidders must be registered on the Sentech Supplier Database.
Bidders must be tax compliant and submit all required information to Sentech.
Mandatory eligibility
ECSA-registered structural engineer, with a valid ECSA certificate.
Valid COIDA/FEM certificate or a letter from the Department of Employment and Labour, i.e. a Workmen's Compensation Letter of Good Standing aligned to the construction industry.
Proof of at least five completed timber-related roof projects, listed in Table 1 and supported by signed reference letters on client letterhead, completion certificates or affidavits with supporting documents such as appointment letters or purchase orders.
Failure to meet all mandatory criteria ends the evaluation.
B-bbee
A valid B-BBEE certificate is required to claim preference points.
Ownership thresholds and points are set out in the evaluation criteria.
Insurance and statutory cover
Public liability insurance must be in place.
Employees must be covered under COIDA for the duration of the contract.
A signed Section 37.2 agreement with Sentech is required.
Returnable forms
Form 1 (Certificate of Authority for Signatory/Signatories) with a board resolution.
Form 2 (Certificate of Non-Collusive Quotation).
Form 4 (Occupational Health and Safety Act clause).
All forms to be completed in black ink; incomplete or unsigned forms may cause rejection.
Confidentiality
Bidders must keep the RFQ terms and Sentech's confidential information confidential and use it only for this quotation.
The bidder must allow for compiling and submitting a Health and Safety File for Sentech's approval before site work starts.
File contents
OHS and environmental policy.
Legal appointments: 16.1 appointee (CEO/MD/GM); 16.2 or CR6.1 safety representative; CR8.1 site manager with competency proof; CR9.1 risk assessor; CR29 fire fighter and equipment inspector; GAR9.2 incident investigator; GSR3.4 first aider, with training proof.
Training records supporting the legal appointments.
Scope of operation.
Operator medical fitness certificate issued by an OMP.
Signed Section 37.2 agreement.
Valid public liability insurance.
Valid letter of good standing.
Safety plan with risk assessment and assessment criteria, and checklists for portable electrical tools, hand tools, ladders (A-frame) and PPE.
Emergency plan: first aid box with standard contents, IOD reporting procedure or routing diagram, IOD forms WCL1/WCL2, incident investigation procedure and forms, emergency numbers.
Induction and toolbox talks with registers and minutes template.
Waste disposal plan covering wooden material, cable wires, steel material and hazardous substances.
On-site obligations
OHS discipline is strictly enforced; PPE must be issued and worn at all times.
The contractor must report hazardous situations, investigations, complaints or criminal charges to Sentech.
Work must be supervised by trained supervisory staff; Sentech officials may inspect the site and records.
A written acceptance by Sentech creates a binding contract.
The contractor must submit a works programme within two days of receiving the letter of acceptance, showing the commencement date and the practical and final completion dates.
Payment is made within 30 days of a tax invoice.
The contractor protects the works and makes good all loss or damage at its own cost until final completion.
The contractor indemnifies Sentech against injury or damage to persons or property and must report any site accident within 24 hours.
All notices and instructions must be in writing; no oral agreement varies the contract.
Work is confined to the site, approved campsite and access routes; campsite and storage locations need Sentech's approval.
The contractor provides temporary electricity, potable water, latrines, accommodation and communications.
No fires on Sentech property; no welding inside transmitter buildings without written permission; access gates kept closed at all times.
Work must comply with the OSH Act, relevant SABS standards and accepted good engineering practice.
Warranties and indemnity
Employees must be covered under COIDA for the duration of employment or the agreement, whichever is longer.
Public liability insurance and any other cover needed for losses arising from the contractor's acts or omissions must remain in force while on Sentech premises.
The contractor indemnifies Sentech against all losses and claims for injury or damage arising from the work, and against claims arising from use of Sentech vehicles.
The OHS agreement forms part of the main agreement; non-compliance may be treated as material breach.
ECSA-registered structural engineer with a valid ECSA certificate.
Valid COIDA/FEM certificate or letter from the Department of Employment and Labour, i.e. a Workmen's Compensation Letter of Good Standing aligned to the construction industry.
Proof of at least five completed timber-related roof projects, listed in Table 1 and supported by signed reference letters on client letterhead, completion certificates or affidavits with supporting documents such as appointment letters or purchase orders.
Bidders not meeting all criteria are not evaluated further.
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.