Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Ugi - Ugi - Ugi Eastern cape - 5999
Organization Type
GOVERNMENT
Published
04 Sept 2026
OCDS Reference
ocds-9t57fa-169198
The department requires the rehabilitation of the ugie gravel access road to the SENTECH site in the eastern capeais. Bidders must be experienced contractors able to complete the work to SENTECH specifications. The closing time is 11:00 on 2026-09-30, and bids must be submitted electronically via the national treasury etender publication portal.
Bidders must have a valid CSD registration.
Bidders must submit a valid tax pin (CSD consolidated report shows tax compliance).
Bidders must be registered on the National Treasury Central Supplier Database (CSD).
The bid must be submitted electronically via the National Treasury eTender Publication Portal before 11:00 on 30 September 2026.
Pricing must be in South African Rand and all amounts must be VAT inclusive.
Bidders must declare any conflict of interest as required by SBD 4.
Bidders must certify no collusive bidding by signing SBD 9.
Bidders must claim preference points using SBD 6.1, with the 90/10 preference point system applicable.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 25 September 2026 - 12:00
Venue
Ugi
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Quotation
Ugi - Ugi - Ugi Eastern cape - 5999
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: RFX 6000003598 - Ugie Access Road Repairs.pdf (RFQ)04 Sept
2026
Tender Published
Tender was published
25 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Standard Bidding (SDB) 4_Annexure A.pdf
Sentech Limited is procuring an experienced contractor for the rehabilitation of the gravel access road to its site in Ugie, Eastern Cape. The tender requires bidders to complete the standard SBD 4 disclosure form and comply with applicable procurement regulations.
SENTECH SUPPLIER CONSENT FORM.pdf
Sentech Limited is appointing an experienced contractor to rehabilitate the gravel access road to its Ugie site in the Eastern Cape. The work involves upgrading or repairing the existing gravel road to ensure reliable access to the Sentech facility.
Scope of Works Ugie Access Road Repairs - RFX 6000003594.pdf
No summary available
RFX 6000003598 - Ugie Access Road Repairs.pdf
Sentech Limited is procuring a contractor to rehabilitate the gravel access road to its Ugie site in the Eastern Cape. The contract involves civil works on an access road, with a compulsory site briefing and a 90-day validity period for quotations.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Appointment of an Experienced Contractor for the Rehabilitation of the Ugie Gravel Access Road – Sentech Site (Eastern Cape). RFX 6000003594.
Important Dates
Source: RFX 6000003598 - Ugie Access Road Repairs.pdf (RFQ){"closingDate":"25 September 2026","closingTime":"12:00","briefingSession":"{"date":"15 September 2026","time":"10:00","venue":"e: 25 September 2026","is_compulsory":false}"}
Briefing Session
Source: RFX 6000003598 - Ugie Access Road Repairs.pdf (RFQ)No mandatory briefing session mentioned. A site visit may be required; refer to the RFQ document for details.
Contact Information
Source: RFX 6000003598 - Ugie Access Road Repairs.pdf (RFQ){"name":null,"email":"[email protected]","phone":"083 644 5066","department":"of of Good Standing","address":"validity stated in the RFQ, or other period"}
Evaluation Criteria
Source: RFX 6000003598 - Ugie Access Road Repairs.pdf (RFQ)Bidders must be registered on the Sentech Supplier Database and be tax compliant. Must provide valid proof of CIDB registration (Grade 2CE) and a valid COIDA/FEM letter of good standing. Bidders failing any mandatory criterion will not be evaluated further. Bidders must submit a valid B-BBEE certificate to claim preference points. Quotations must be received by the closing date and time.
Technical Specifications
Source: RFX 6000003598 - Ugie Access Road Repairs.pdf (RFQ)Appointment of an Experienced Contractor for the Rehabilitation of
Project
Experience & Qualifications
Source: RFX 6000003598 - Ugie Access Road Repairs.pdfin Built Environment with relevant experience as a Site
relevant Experience.
Compliance Requirements
Source: RFX 6000003598 - Ugie Access Road Repairs.pdf (RFQ)completion certificate, or 30
appointment letter,
confirmation with CIDB CIDB, clearly reflecting
in terms of the CIDB Act the contractor’s CRS
CIDB registration
Valid COIDA / FEM Valid Workmen’s
certificate or a letter from Compensation Letter
Employment and Labour (COIDA/FEM) aligned
(COIDA). to the Construction
Bidders must submit a detailed CV of a Site Agent or Site
Manager with relevant Qualifications.
Cv
B-BBEE Details: valuation Method 1. Stage 1 – Administrative Responsiveness Evaluation
All the Quotations will be evaluated against the Administrative
responsiveness requirements as set out in section 1 of the RFQ Data.
The proposals that COMPLY with the Mandatory evaluation criteria be
evaluated against the Functional Criteria. Suppliers meeting the minimum
requirement will be evaluated further.
Suppliers with the lowest Price offered will score the highest points. Only
Suppliers that submit a valid B-BBEE Certificate can claim preference
points in line with the 80/20
Suppliers with the highest number of points will be recommended for the award of
this quotation, unless there are compelling and justifiable reasons not to do so.
Reference proof
What Proof is
supplied by
required to show
Compliant reference the page
Mandatory Eligibility compliance to
(Indicate Yes or number where the
Criteria Mandatory Eligibility
No) information is
Criteria
located in your
Tender submission
Bidders must provide Valid proof of
details and registration registration with the
confirmation with CIDB CIDB, clearly reflecting
in terms of the CIDB Act the contractor’s CRS
number on the . The bidder
certificate. must provide proof of
CIDB registration:
Grade 2CE
Valid COIDA / FEM Valid Workmen’s
certificate or a letter from Compensation Letter
the Department of of Good Standing
Reference proof
What Proof is
supplied by
required to show
Compliant reference the page
Mandatory Eligibility compliance to
(Indicate Yes or number where the
Criteria Mandatory Eligibility
No) information is
Criteria
located in your
Tender submission
Employment and Labour (COIDA/FEM
B-BBEE Requirements
Source: RFX 6000003598 - Ugie Access Road Repairs.pdf (RFQ)Preference points allocation (80/20): Historically disadvantaged on basis of race – 8 points for ≥51% black ownership, 3 for 25.1-50%, 1 for 5-25%, 0 for <5%; gender (women) – 10 for ≥51% women ownership, 6 for 25.1-50%, 2 for 5-25%, 0 for <5%; disability – 2 points with doctor's note. Price calculation formula: Ps = 80(1 - (Pt - Pmin)/Pmin).
Contractual Terms
Source: RFX 6000003598 - Ugie Access Road Repairs.pdfof Deviations (if any), contact the Employer’s agent to arrange the delivery of any securities, bonds, guarantees,
proof of insurance and any other documentation to be provided in terms of the conditions of contract identified in
the RFQ. Failure to fulfil any of these obligations in accordance with those terms shall constitute a repudiation of
this agreement.
Special Conditions
Source: RFX 6000003598 - Ugie Access Road Repairs.pdf (RFQ)Sentech may appoint one or more suppliers, in whole or in part, or not appoint any supplier at all, and/or cancel the bid in its entirety, at Sentech’s sole and exclusive discretion. Prices quoted in ZAR; foreign currency rates fixed; bidders bear currency fluctuation risk. No price adjustment without written approval; price negotiations allowed; Sentech may cancel if market-related prices not agreed.
Requirements
Source: RFX 6000003598 - Ugie Access Road Repairs.pdf (RFQ)Administrative Responsiveness Criteria: Suppliers must be tax compliant, registered on the Sentech Supplier Database, quotations on company letterhead, received before closing date/time, fully completed and signed in black ink, submitted via email or specified method. Confidentiality of RFQ terms required.
Section
Source: RFX 6000003598 - Ugie Access Road Repairs.pdfThe evaluation criteria are stipulated in 7 below. It is the Bidder’s responsibility to ensure that it has
responded to the evaluation criteria. Failure to meet the evaluation criteria will result in the Bidder not
being evaluated further. Bidders must ensure that they have included all supporting documentation
required to support their response to the Bid
This RFQ will be evaluated as described in the table below.
Evaluation Method 1. Stage 1 – Administrative Responsiveness Evaluation
All the Quotations will be evaluated against the Administrative
responsiveness requirements as set out in section 1 of the RFQ Data.
The proposals that COMPLY with the Mandatory evaluation criteria be
evaluated against the Functional Criteria. Suppliers meeting the minimum
requirement will be evaluated further.
Suppliers with the lowest Price offered will score the highest points. Only
Suppliers that submit a valid B-BBEE Certificate can claim preference
points in line with the 80/20
Suppliers with the highest number of points will be recommended for the award of
this quotation, unless there are compelling and justifiable reasons not to do so.
Reference proof
What Proof is
supplied by
required to show
Compliant reference the page
Mandatory Eligibility compliance to
(Indicate Yes or number where the
Criteria Mandatory Eligibility
No) information is
Criteria
located in your
Tender submission
Bidders must provide Valid proof of
details and registration registration with the
confirmation with CIDB CIDB, clearly reflecting
in terms of the CIDB Act the contractor’s CRS
number on the . The bidder
certificate. must provide proof of
CIDB registration:
Grade 2CE
Valid COIDA / FEM Valid Workmen’s
certificate or a letter from Compensation Letter
the Department of of Good Standing
Reference proof
What Proof is
supplied by
required to show
Compliant reference the page
Mandatory Eligibility compliance to
(Indicate Yes or number where the
Criteria Mandatory Eligibility
No) information is
Criteria
located in your
Tender submission
Employment and Labour (COIDA/FEM) aligned
(COIDA). to the Construction
industry
NOTE: Bidders that do not comply with all the above criteria will not be evaluated further.
Annexure 1 to be fully completed. If not completed, bidders will be disqualified
Functional Criteria
Proof
Functionality criteria Points
Required
Bidders must submit a detailed CV of a Site Agent or Site
Manager with relevant Qualifications.
The Site Agent should have a minimum of a National Diploma
in Built Environment with relevant experience as a Site
Agent/Manager
Cv
Site Agent with 4 years 20 Points
Site Agent with 3 years 15 Points
Site Agent with 2 years 10 Points
Site Agent with 0-1 years 5 Points
Bidders must submit a detailed CV of a Site Foreman with
relevant Experience.
CV of a Site Foreman with relevant experience in construction
projects
Points
Cv
Points 25
Points
Points
Points
Proof
Functionality criteria Points
Required
Proof of Construction experience
The company must supply references for similar projects for the Company
class and grade for which they are tendering. Points will be reference
allocated based on the number of relevant references supplied
table: (Table A:
References).
reference
letters on a
client's
certificate, or 30
an affidavit
(should be
accompanied
by supporting
documents
such as
appointment
letter,
purchase
order, etc)
Proof
Functionality criteria Points
Required
Bidders to submit a CV of a Safety Officer with relevant
Qualifications.
SAFETY OFFICER REGISTERED WITH SACPCMP (South
African Council for the Project and Construction Management
Professions) – CR 8.5 Appointee a CV
The Safety Officer should have a minimum of a National Qualification
Diploma in Safety Management with relevant experience in the
(minimum construction sector.
National
diploma) points
Sacpcmp
points
to the project, or less than 1 year of experience = 0
points
Total Points: 100
Total minimum qualifying functional score is 85 points.
Sentech’s Specific goals emanate from the section 2(1)d of the Preferential Procurement
Policy Act which may include contracting with persons or categories of persons, historically
disadvantaged by unfair discrimination on the basis of race, gender and disability. The
Reconstruction and Development Programme as published in Government Gazette No 16085
dated 23 November 1994
Sentech will award preference points as follows:
Goal Points Evidence required
Historically disadvantaged by unfair discrimination on 8 A valid BBBEE
the basis of Race Certificate showing at
least 51% black
ownership
3 A valid BBBEE
Certificate showing at
least 25.1 – 50% black
ownership
1 Black owned company
showing at least 5 –
25% black ownership
0 Below 5%
Historically disadvantaged by unfair discrimination on 10 A valid BBBEE
the basis of Gender (women) Certificate showing at
least 51% women
ownership
6 A valid BBBEE
Certificate showing at
least 25.1 – 50%
women ownership
2 A valid BBBEE
Certificate showing at
least 5-25% women
ownership
0 A valid BBBEE
Certificate showing at
less than 5% women
ownership
Historically disadvantaged by unfair discrimination on 2 A doctor’s note
the basis of disability confirming disability
Total Points 20
a. Price Calculation 80/20
The following formula will be used to calculate the points for price.
Ps= 80 1- (Pt – Pmin)
Pmin
Where:
Ps = Points scored for price of bid under consideration
Pt = Rand value of bid under consideration
Pmin = Rand value of lowest acceptable bid
Description
Source: Scope of Works Ugie Access Road Repairs - RFX 6000003594.pdfThe work involves repairing the Ugie access road, including a rocky section of approximately 200 m requiring excavation and rock removal, placement of gravel material where existing material is insufficient, grading of approximately 800 m of existing road, and compaction of the entire surface. Stormwater drainage must be constructed or reinstated, including earth side drains and pipe culverts. The contractor must provide all plant, equipment, labour, and materials, and ensure the road is left safe, stable, and trafficable with adequate drainage.
Important Dates
Source: Scope of Works Ugie Access Road Repairs - RFX 6000003594.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"erials, tools, equipment and transport.","is_compulsory":true}"}
Briefing Session
Source: Scope of Works Ugie Access Road Repairs - RFX 6000003594.pdf (unknown)Site hand-over meeting is compulsory and serves as the official start of the contract. It is the first meeting on site of all relevant parties. No specific date or time is provided in the document.
Contact Information
Source: Scope of Works Ugie Access Road Repairs - RFX 6000003594.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Estimated Amount","address":null}
Evaluation Criteria
Source: Scope of Works Ugie Access Road Repairs - RFX 6000003594.pdf (unknown)No eligibility criteria specified
Technical Specifications
Source: Scope of Works Ugie Access Road Repairs - RFX 6000003594.pdf (unknown)Ugie gravel road rehabilitation
Methodology
Source: Scope of Works Ugie Access Road Repairs - RFX 6000003594.pdf (unknown)Contractor to attend site inspection, verify quantities, provide supervision, labour, materials, tools, equipment, transport, maintain site safety, protect infrastructure, remove waste.
Quality Management
Source: Scope of Works Ugie Access Road Repairs - RFX 6000003594.pdfi. SITE HAND OVER MEETING
contract. This is the first meeting on site of all the relevant parties who will be
involved in the contract for its entire duration.
ii. PROGRESS MEETINGS
meeting. The Infrastructure Services Manager shall carry out additional
intermediate site inspections.
iii. SENTECH LINE OF REPORTING PROBLEMS
immediately to the Infrastructure Services Manager.
the Operations Manager.
b. QUALITY ASSURANCE
milestones established at the site handover meeting.
out site inspections before, during and upon completion of the contract.
c. EXECUTION PROGRAMME
Timeous completion of the project is of utmost importance for Sentech.
To ensure and to assist the contractor to monitor his or her own progress, he
or she will be required to provide Sentech with a detailed execution schedule
when providing a quotation.
This schedule should be in the Bar Chart format.
It should highlight the following key information but not limited to:
❖ Name of site
❖ Activity description
❖ Activity duration
❖ Dates for key milestones during the execution of the
by the contractor
❖ Milestone 1:
When the surface preparation has been completed.
Milestone 2:
❖ Quality inspection must be conducted on completion of each coat of paint
before applying the next coat.
❖ As soon as one section received its final coat of paint, a quality inspection
should be conducted before moving to the next section.
Pricing Schedule
Source: Scope of Works Ugie Access Road Repairs - RFX 6000003594.pdfUgie gravel road rehabilitation
Road Length: Approximately 1,000 m
Road Width: Approximately 4 m
Location: Ugie
Pricing: Rates to include labour, plant, equipment, fuel, supervision and all
incidental costs unless otherwise stated.
Unit
Estimated Amount
Item Description Unit Rate
Qty (R)
(R)
A preliminary and general
Mobilisation and demobilisation of plant,
A1 ls 1
equipment and personnel to site
Site establishment, inspection and setting
A2 ls 1
out of approximately 1 km gravel road
B stormwater drainage
Construct/reinstate earth side drains along
B1 the road, including excavation, shaping m 1,000
and disposal of unsuitable material
Excavate for 450 mm diameter storm
B2 water crossings, including preparation of m3 20
bedding
Supply and install 4 × 450 mm diameter
B3 Class 75D reinforced concrete stormwater No 4
pipes, SANS 677 Type SC.
Backfill and compact material around and
B4 m3 20
over culvert pipes
Construct/provide erosion protection at
B5 No. 4
culvert inlet and outlet
Rocky road sections – approx.
C
200 m
Scrub, loosen and remove protruding
C1 rocks using excavator to prepare road m 200
formation
Remove and dispose of unsuitable/excess
C2 m3 100
rock and material
Prepare and trim road formation following
C3 m2 800
rock removal
D gravel material
Supply/load suitable gravel material from
D1 m3 400
approved source
D2 Haul and transport gravel material to road m3 400
Place, spread and shape gravel material
D3 m3 400
on rocky/low sections
Grading and road
E
REHABILITATION – APPROX. 800 m
Scarify and rework existing gravel road
E1 m2 3,200
surface
Grade and shape approximately 800 m of
E2 m2 3,200
gravel road, including camber/crossfall
Fill and repair potholes, ruts and low areas
E3 m3 100
using suitable existing/reworked material
F watering and compaction
Watering of road surface and gravel
F1 kL 150
material during construction
Compact completed gravel road using
F2 m2 4,000
suitable vibratory/smooth-drum roller
G final works
Final trimming, shaping and finishing of
G1 m2 4,000
approximately 1 km road
Clean-up and removal of excess
G2 ls 1
construction material from site
Subtotal r
Contingency @15% r
Total excluding VAT r
VAT @ 15% r
Total including VAT r
Notes to boq
execution.
scrub/loosen and remove protruding rocks.
using suitable road construction plant.
removal results in insufficient road material.
according to actual site requirements.
according to the actual drainage requirements and road profile.
SANS 677 Type SC with the final locations confirmed on site.
tools and incidental costs necessary to complete each item.
approval from the Employer.
shaped and drained and is suitable for normal operational vehicle access.
the roads may be paved with a bituminous surface in other instances maybe
concrete or concrete strips roads. The contractors are requested to use 4 x 4
vehicles to access our sites.
paved and concrete roads cannot be accessed with an ordinary vehicle.
difficult for ordinary vehicles.
unauthorized entry.
completed works provide adequate protection against stormwater erosion and
improve the long-term serviceability of the road.
Bill of quantities
Road Length: Approximately 1,000 m
Road Width: Approximately 4 m
Location: Ugie
Pricing: Rates to include labour, plant, equipment, fuel, supervision and all
incidental costs unless otherwise stated.
Compliance Requirements
Source: Scope of Works Ugie Access Road Repairs - RFX 6000003594.pdf (unknown)No specific requirements found
Health & Safety
Source: Scope of Works Ugie Access Road Repairs - RFX 6000003594.pdfin line with Sentech requirements which will be communicated upon
appointment, and such should be submitted to the Sentech OHS Specialist
within 7 days after issue of the Purchase Order/Safety File Specification
(instruction to be received from the Infrastructure Services Manager via email).
be signed to the project.
Medical Practitioner only for all employees to be assigned to the project
task in line with the requirements
Public liability – valid construction/project public liability insurance
Health and safety compliance assurance – Company’s Health and Safety
compliance undertaking by the CEO/Managing Director
i. SITE HAND OVER MEETING
contract. This is the first meeting on site of all the relevant parties who will be
involved in the contract for its entire duration.
ii. PROGRESS MEETINGS
meeting. The Infrastructure Services Manager shall carry out additional
intermediate site inspections.
iii. SENTECH LINE OF REPORTING PROBLEMS
immediately to the Infrastructure Services Manager.
the Operations Manager.
b. QUALITY ASSURANCE
milestones established at the site handover meeting.
out site inspections before, during and upon completion of the contract.
c. EXECUTION PROGRAMME
Timeous completion of the project is of utmost importance for Sentech.
To ensure and to assist the contractor to monitor his or her own progress, he
or she will be required to provide Sentech with a detailed execution schedule
when providing a quotation.
This schedule should be in the Bar Chart format.
It should highlight the following key information but not limited to:
❖ Name of site
❖ Activity description
❖ Activity duration
❖ Dates for key milestones during the execution of the
Projects.
The key milestones are of paramount importance. Key dates will determine the dates
on which Sentech’s responsible Infrastructure Services Manager and local Sentech
Rigger will conduct site inspections.
by the contractor
❖ Milestone 1:
When the surface preparation has been completed.
Milestone 2:
❖ Quality inspection must be conducted on completion of each coat of paint
before applying the next coat.
❖ As soon as one section received its final coat of paint, a quality inspection
should be conducted before moving to the next section.
unpredictable.
be performed under specific weather conditions.
completion of mast painting projects.
sites may be affected by high winds and mist at certain times of the day.
prevailing weather conditions of the specific region.
theirs schedule. Any inclement weather days and consequential inclement
weather days accumulated during this contract will be granted as extension of
time as there will be no monetary compensation.
Rules for external contractors working on a Sentech site.
must be disposed of at a designated landfill site where required.
Provide own water and electricity
Provide own ablution facilities
Occupational Health and Safety Act (Act ).
Construction Regulations.
Applicable SANS Standards.
Employer's specifications and instructions.
Project Duration shall be 7 weeks from the date of safety file approval
Grade the existing road surface.
Remove potholes, ruts and corrugations.
Redistribute existing gravel material.
Shape the road to provide a suitable camber/crossfall.
Correct uneven sections and low areas.
Tie the road into the repaired rocky sections.
Ensure that the finished road drains effectively into the side drains.
including but not limited to:
Excavator.
Dozer and/or grader.
Water tanker.
Roller.
TLB where required.
Tipper trucks.
Labour and hand tools.
Access to Sentech sites is mostly by means of gravel roads. In some instances,
the roads may be paved with a bituminous surface in other instances maybe
concrete or concrete strips roads. The contractors are requested to use 4 x 4
vehicles to access our sites.
paved and concrete roads cannot be accessed with an ordinary vehicle.
difficult for ordinary vehicles.
unauthorized entry.
in line with Sentech requirements which will be communicated upon
appointment, and such should be submitted to the Sentech OHS Specialist
within 7 days after issue of the Purchase Order/Safety File Specification
(instruction to be received from the Infrastructure Services Manager via email).
be signed to the project.
Medical fitness – Valid certificate of fitness (medical) issued by Occupational
Due to the location of many of Sentech’s sites weather conditions are
unpredictable.
be performed under specific weather conditions.
completion of mast painting projects.
sites may be affected by high winds and mist at certain times of the day.
prevailing weather conditions of the specific region.
theirs schedule. Any inclement weather days and consequential inclement
weather days accumulated during this contract will be granted as extension of
time as there will be no monetary compensation.
Contractual Terms
Source: Scope of Works Ugie Access Road Repairs - RFX 6000003594.pdfThe Works shall be executed in accordance with:
Edition.
Project Duration
Preliminary and General
The Contractor shall:
The Contractor shall be responsible for the rehabilitation of approximately 1 km of
existing gravel road at Ugie.
The road is approximately 4 m wide and consists of sections that are steep and heavily
rocky, with exposed/protruding rocks affecting the existing road surface. The road also
requires improved stormwater management to prevent further erosion and
deterioration.
The works shall generally comprise the following:
management.
pipes, SANS 677 Type SC
the road.
removed or where additional material is required to reinstate the road profile.
a dozer/grader.
surface.
The Contractor shall first attend to the stormwater drainage along the road before
commencing the main road rehabilitation works.
The Contractor shall construct/reinstate earth side drains along the road where
required, particularly on the steep sections, to ensure that stormwater is diverted away
from the road surface and does not cause erosion.
The drains shall be shaped to allow water to flow freely to suitable discharge points.
The Contractor shall also install 4 × 525 mm diameter Class 75D reinforced concrete
stormwater pipes, SANS 677 Type SC at locations identified on site where stormwater
needs to cross underneath the road.
Culvert installation shall include:
stormwater pipes, SANS 677 Type SC.
The final locations of the culverts shall be confirmed on site based on the natural flow
of stormwater.
Approximately 200 m of the road is heavily rocky and requires mechanical treatment
before the road can be properly graded.
The Contractor shall use an excavator to scrub, loosen, break down and remove
protruding rocks from the existing road surface and formation.
The Contractor shall:
Remove loose and protruding rocks from the road.
Break down rocks where practical using the excavator.
Remove unsuitable rock/material from the road formation.
Reuse suitable material where possible.
Prepare the affected areas for placement of gravel material.
Where rocks are too large or cannot reasonably be removed by the excavator, the
Contractor shall advise the Employer and provide for suitable additional gravel
material to cover and reinstate these sections.
Suitable gravel material shall be placed in areas where the existing road material is
insufficient, particularly on the rocky sections where removal of rocks creates low
areas.
The material shall be spread and shaped to tie into the existing road profile.
The Contractor shall allow for the loading, transportation, placement, spreading,
watering and compaction of the required material.
Approximately 800 m of the road is generally suitable for grading.
The Contractor shall use a suitable dozer/grader to:
The Contractor shall ensure that the road is graded to a smooth and uniform profile
suitable for normal vehicle access.
After grading and placement of additional material, the complete road surface shall be
properly compacted using a suitable roller.
The Contractor shall water the road as required to achieve proper compaction.
Compaction shall include all repaired rocky sections, newly placed gravel material and
the approximately 800 m graded section.
The finished road shall be firm, stable and free from loose material, excessive rutting
and soft spots.
The Contractor shall provide all plant and equipment necessary to complete the works,
including but not limited to:
All plant shall be suitable for the terrain and condition of the road.
The Contractor shall:
period.
All works shall be carried out in accordance with applicable SANS standards,
Occupational Health and Safety requirements and good civil engineering
practice.
Upon completion, the Contractor shall leave the approximately 1 km gravel road in a
safe, stable and trafficable condition, with the road properly graded, compacted and
drained.
Particular attention shall be given to the steep and rocky sections to ensure that the
completed works provide adequate protection against stormwater erosion and
improve the long-term serviceability of the road.
task in line with the requirements
Public liability – valid construction/project public liability insurance
Health and safety compliance assurance – Company’s Health and Safety
compliance undertaking by the CEO/Managing Director
Section
Source: Scope of Works Ugie Access Road Repairs - RFX 6000003594.pdfQuality assurance inspections will be carried out at key milestones: when surface preparation is completed, after each coat of paint (if applicable), and after final coat per section. Site inspections will be conducted before, during, and upon completion. Contractor must provide a detailed execution schedule in bar chart format, highlighting activity, durations, and milestones.
Description
Source: SENTECH SUPPLIER CONSENT FORM.pdfThe tender is for the appointment of an experienced contractor to rehabilitate the Ugie Gravel Access Road at the Sentech site in the Eastern Cape. The provided document is a supplier consent form only; no further scope details are included.
Evaluation Criteria
Source: SENTECH SUPPLIER CONSENT FORM.pdf (RFP)Bidders must sign and submit the Sentech Supplier Consent Form, which includes consent to processing of personal information for verification, background checks, and Know Your Customer obligations under the Financial Intelligence Centre Act. Bidders must be willing to be registered on Sentech's supplier database. No other eligibility criteria (e.g., CIDB grading, B-BBEE level, tax clearance) are stated in the provided document.
Technical Specifications
Source: SENTECH SUPPLIER CONSENT FORM.pdf (RFP)internally for the purposes of assessing current and future services required by Sentech. We may
Description
Source: Standard Bidding (SDB) 4_Annexure A.pdfSupply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
Contact Information
Source: Standard Bidding (SDB) 4_Annexure A.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"SUPPLY CHAIN MANAGEMENT","address":null}
Evaluation Criteria
Source: Standard Bidding (SDB) 4_Annexure A.pdf (TENDER)Bidders must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers. Bidders must disclose any state employment or relationships with procuring institution personnel as required by SBD 4. No other eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE, CIDB grading) are stated in the provided document.
Technical Specifications
Source: Standard Bidding (SDB) 4_Annexure A.pdf (TENDER)Supply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
Section
Source: Standard Bidding (SDB) 4_Annexure A.pdfagreements or arrangements with any competitor regarding the quality,
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Ugi - Ugi - Ugi Eastern cape - 5999
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
22 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Median Estimate
R 2 510 966
Range
Based on 16 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
A practical guide for small and medium building contractors on winning government tenders for schools, clinics, housing, and municipal buildings in South Africa.
How small and medium construction contractors use Joint Ventures to combine CIDB grades, win larger infrastructure projects, and grow beyond their current grading ceiling.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.