Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
george - George - George - 6529
Organization Type
GOVERNMENT
Published
04 Sept 2026
OCDS Reference
ocds-9t57fa-169203
SENTECH limited invites suppliers to tender for the supply, delivery and installation of a concrete palisade fence at the c5 site under the george operational centre. Bidders must consent to the processing of their personal information in line with sentech's privacy policy for the tender to be considered and for inclusion in sentech's supplier database.
Bidders must complete and sign the Sentech Supplier Consent Form, authorising Sentech to process the supplier's personal information, including special personal information, for the purpose of assessing the bid and including the bidder in Sentech's supplier database.
Bidders must be aware that personal information may be shared with third parties for verification and background checks in line with the Financial Intelligence Centre Act.
A signed consent form from an authorised representative is required for the bid to be considered.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 28 September 2026 - 12:00
Venue
null
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Appointment of a service provider to supply, deliver and install a concrete palisade fence at c5 george site under the george operational centre
Categories
Request for Quotation
george - George - George - 6529
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: SENTECH SUPPLIER CONSENT FORM.pdf04 Sept
2026
Tender Published
Tender was published
28 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFQ - C5 George site Perimeter Fence (1)zz.pdf
Sentech Limited is procuring a service provider to supply, deliver and install a reinforced concrete palisade fence, including gates, concertina wire and associated civil works, at the C5 George site under the George Operational Centre in the Western Cape. The contract period is eight weeks from approval of the health and safety file and site handover, with a twelve-month defects liability period and a sixty-month workmanship warranty.
Standard Bidding (SDB) 4_Annexure A.pdf
Sentech Limited is appointing a service provider to supply, deliver and install a concrete palisade fence at the C5 George site under the George Operational Centre in the Western Cape.
SENTECH SUPPLIER CONSENT FORM.pdf
Sentech Limited is appointing a service provider to supply, deliver and install a concrete palisade fence at the C5 George site under the George Operational Centre in the Western Cape. The tender requires bidders to consent to the processing of their personal information for evaluation and supplier registration purposes.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 5 112 763
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
internally for the purposes of assessing current and future services required by Sentech. We may
Evaluation Criteria
Source: SENTECH SUPPLIER CONSENT FORM.pdf (RFP)Bidders must sign the Sentech Supplier Consent Form, agreeing to Sentech's processing of personal information for RFP evaluation, verification, background checks, and FICA compliance. The authorised representative must warrant that they are duly authorised to sign. Withdrawal of consent may prevent the bid from being processed.
Technical Specifications
Source: SENTECH SUPPLIER CONSENT FORM.pdf (RFP)internally for the purposes of assessing current and future services required by Sentech. We may
Compliance Requirements
Source: SENTECH SUPPLIER CONSENT FORM.pdf (RFP)No specific requirements found
Description
Source: RFQ - C5 George site Perimeter Fence (1)zz.pdf (RFQ)APPOINTMENT OF A SERVICE PROVIDER TO SUPPLY, DELIVER AND INSTALL A CONCRETE PALISADE FENCE AT C5 GEORGE SITE UNDER THE GEORGE OPERATIONAL CENTRE. BACKGROUND: Sentech SOC Ltd is a State-Owned Company and South Africa's leading provider of digital communication services throughout the country. A suitably qualified and experienced Contractor is required to supply, deliver and install a reinforced concrete palisade fence at the C5 George Site under the George Operational Centre, necessary to provide a complete, secure and operational perimeter security fence.
Important Dates
Source: RFQ - C5 George site Perimeter Fence (1)zz.pdf (RFQ){"closingDate":"28 September 2026","closingTime":"12h00","briefingSession":"{"date":"28 September 2026","time":"08:45","venue":"09:10 at George Sentech Site.(Call 0662595397)","is_compulsory":false}"}
Contact Information
Source: RFQ - C5 George site Perimeter Fence (1)zz.pdf (RFQ){"name":null,"email":"[email protected]","phone":"0662595397","department":null,"address":"validity stated in the RFQ, or other period"}
Evaluation Criteria
Source: RFQ - C5 George site Perimeter Fence (1)zz.pdf (RFQ)Bidders must be registered on the Sentech Supplier Database and be tax compliant. Quotations must be on company letterhead, fully completed and signed in black ink, and submitted by email before the closing date and time. Mandatory documents: valid COIDA Letter of Good Standing (construction industry) and valid CIDB certificate of 2 SQ or higher. Bidders must submit a valid B-BBEE certificate to claim preference points. Bidders must provide a valid construction/project public liability insurance, COID/FEM registration, and a health and safety compliance undertaking by the CEO/Managing Director. Bidders must submit a completed Form of Offer and Acceptance with the offered total inclusive of VAT, and a Schedule of Deviations if any. Bidders must also submit the pricing schedule as per the pricing instruction.
Technical Specifications
Source: RFQ - C5 George site Perimeter Fence (1)zz.pdf (RFQ)Appointment of a service provider to supply, deliver and install
A concrete palisade fence at c5 george site under the george
Operational centre 1. Background
Sentech SOC Ltd is a State-Owned Company and South Africa's leading provider of
broadcasting signal distribution services. Sentech is licensed as an Electronic
Communications Network Service (ECNS) provider and operates numerous
telecommunications networks supporting television, radio, satellite, broadband and
digital communication services throughout the country.
To improve the physical security of its infrastructure, Sentech intends appointing a
suitably qualified and experienced Contractor to supply, deliver and install a reinforced
concrete palisade fence at the C5 George Site under the George Operational Centre
(Oc).
The works comprise the replacement of the existing perimeter fence where applicable,
construction of reinforced concrete foundations, installation of reinforced concrete
palisade fencing, access gates, concertina wire and all associated civil works
necessary to provide a complete, secure and operational perimeter security fence.
The Contractor shall provide all labour, supervision, plant, equipment, transport,
materials, consumables and incidentals necessary for the successful completion of
the works.
3.1 Preliminary and General
The Contractor shall:
commencement.
required.
where required.
3.2 Removal of Existing Fence
Where applicable, the Contractor shall:
3.3 Earthworks and Excavation
The Contractor shall:
Foundation excavations shall generally be:
unless instructed otherwise by Sentech Representative ie. IS Manager or Construction
Team Leader.
3.4 Concrete Foundations
The Contractor shall:
3.5 Supply and Installation of Concrete Palisade Fence
The Contractor shall supply, deliver and install reinforced concrete palisade fencing
comprising:
o 3000 mm long
o 230 × 150 mm tapering to 80 mm
o 2400 mm long
o Reinforced
o Chamfered at 45°
o 1990 mm long
o Pre-stressed
Posts shall be installed at 2 metre centres and securely embedded into reinforced
concrete foundations.
3.6 Concertina Wire
Supply and install 700 mm diameter galvanised concertina razor wire over the entire
fence length including:
3.7 Prefabricated Concrete Components
All precast concrete products shall:
3.8 Reinforcement
All reinforcing steel shall:
3.9 Quality Assurance
The Contractor shall implement a Quality Control System including:
3.10 Occupational Health and Safety
The Contractor shall comply with:
Prior to commencement, the Contractor shall submit:
No work shall commence until the Health and Safety File has been approved by
Sentech.
3.11 Localisation of Labour
The Contractor shall:
Failure to submit the required reports may delay payment certification.
3.12 Constraints
The Contractor shall allow for:
Adverse weather conditions.
Restricted access.
Material delivery lead times.
Operational requirements of the telecommunications site.
Extensions of time due to adverse weather shall be considered in accordance with
Gcc 2025.
3.13 Programme and Progress Reporting
Within ten (10) days after award, the Contractor shall submit a detailed construction
programme showing:
Weekly progress reports shall include:
Concrete Palisade Fence
o 40 MPa (precast components)
o 30 MPa (foundations)
Gate
Double swing gate
5 metres wide
Heavy-duty hinges
Anti-vandal lock
Hot dip galvanised finish
PVC coated clear-view mesh
Foundation
Personnel
The Contractor shall provide as a minimum:
Region Site
Southern Region C5 George Site – George Operational Centre
GPS Coordinates on the photo
The scope of work entails removal and
replacing palisade fence with new concrete
palisade fence.
All pricing to include supply and delivery,
labour, profit, and markup.
Section1
Preliminary and General
Sum 1
1 Allow for P&Gs for the establishment
and de-establishment of the site, and all
other unmeasurable items like toilet
facilities, water, storage facilities, and
removal of debris after completion.
Occupational Health and Safety
2 obligations in terms of Sentech Health Sum 1
and Safety specifications. (Safety File)
Section 1 Sub Total
Section 2
3 Supplying, Delivering and installation m 530
Concrete Palisade Fence as per the
scope
4 Supplying and installation of concertina m 530
coil@700d
5 Concrete works: footings and M3 15
foundations
6 Excavation of foundations M3 15
Section 2: Sub Total R R
Totals: Section1 and Section2 R R
Excl Vat
Contingencies @ 15% R R
Totals Including Contingencies R R
VAT at 15% R R
Total Including Vat R R
the roads may be paved with a bituminous surface in other instances maybe
concrete or concrete strips roads. The contractors are requested to use 4 x 4
vehicles to access our sites.
paved and concrete roads cannot be accessed with an ordinary vehicle.
difficult for ordinary vehicles.
unauthorized entry.
Experience & Qualifications
Source: RFQ - C5 George site Perimeter Fence (1)zz.pdfBidders to attach CVs for site foreman with 3 years of experience in
construction industry (Fencing or Civils)
Foreman with 3 years and more experience...................20 points
Foreman with 2 years of experience.............................10 points
Foreman with one year and less years of experience .......5 points
suitably qualified and experienced Contractor to supply, deliver and install a reinforced
concrete palisade fence at the C5 George Site under the George Operational Centre
(Oc).
Quality Management
Source: RFQ - C5 George site Perimeter Fence (1)zz.pdfcommencement.
required.
where required.
3.2 Removal of Existing Fence
3.9 Quality Assurance
Labour.
Plant.
Materials.
Transport.
Supervision.
Temporary works.
Health and Safety compliance.
Quality Control.
Testing.
Waste disposal.
Overheads.
Profit.
Any other costs necessary to complete the Works in accordance with this
13.1.1. Site hand over meeting
contract. This is the first meeting on site of all the relevant parties who will be
involved in the contract for its entire duration.
13.1.2. Progress meetings
over meeting. The Infrastructure Services Manager shall carry out additional
intermediate site inspections.
13.1.3. SENTECH line of reporting problems
immediately to the Infrastructure Services Manager.
the Operations Manager.
13.2. Quality assurance
milestones established at the site handover meeting.
out site inspections before, during and upon completion of the contract.
13.3. Execution programme
Timeous completion of the project is of utmost importance for Sentech.
To ensure and to assist the contractor to monitor his or her own progress, he
or she will be required to provide Sentech with a detailed execution schedule
when providing a quotation.
This schedule should be in the Bar Chart format.
It should highlight the following key information but not limited to:
❖ Name of site
❖ Activity description
❖ Activity duration
❖ Dates for key milestones during the execution of the
by the contractor
❖ Milestone 1:
When the surface preparation has been completed.
Milestone 2:
❖ Quality inspection must be conducted on completion of each coat of paint
before applying the next coat.
❖ As soon as one section received its final coat of paint, a quality inspection
should be conducted before moving to the next section.
Pricing Schedule
Source: RFQ - C5 George site Perimeter Fence (1)zz.pdf (RFQ)Pricing: All bid prices quoted shall be in South African Rands (ZAR). If prices are in a foreign currency, the rate of exchange will be applied at the time of evaluation. Unless written approval has been obtained from Sentech, no adjustment in contract prices will be made. Applications for price adjustment must be accompanied by documentary evidence in support of any such request. If market-related prices are not agreed to, Sentech reserves the right to cancel the Bid. Pricing Schedule: Occupational Health and Safety obligations in terms of Sentech Health and Safety – Sum. Section 1 Sub Total. Concrete Palisade Fence as per the specification – Section 2: Sub Total.
Compliance Requirements
Source: RFQ - C5 George site Perimeter Fence (1)zz.pdf (RFQ)Completion certificates to be attached)
completion certificates will be accepted for
Valid COIDA Certificate Attach a valid Letter of Good
Labour/FEM. COIDA’s Nature of
Valid CIDB Certificate Attach a valid CIDB Certificate: 2
contractor in erecting fencing. (Completion certificates to be attached).
B-BBEE Details: ble below.
Evaluation Method 1. Stage 1 – Administrative Responsiveness Evaluation
All the Quotations will be evaluated against the Administrative
responsiveness requirements as set out in section 2 of the RFQ Data.
The proposals that COMPLY with the Mandatory evaluation criteria be
evaluated against the Functional Criteria. Suppliers meeting the minimum
requirement will be evaluated further.
Suppliers with the lowest Price offered will score the highest points. Only
Suppliers that submit a valid B-BBEE Certificate can claim preference
points in line with the 80/20
Suppliers with the highest number of points will be recommended for the award of
this quotation, unless there are compelling and justifiable reasons not to do so.
7.1. Mandatory Evaluation Criteria
Reference proof
supplied by
What Proof is required to show
Compliant reference the page
Mandatory Eligibility compliance to Mandatory
(Indicate number where the
Criteria Eligibility Criteria
Yes or No) information is
located in your
Tender submission
Valid COIDA Certificate Attach a valid Letter of Good
Standing from the Department of
Labour/FEM. COIDA’s Nature of
Business to be aligned to
Construction Industry
Valid CIDB Certificate Attach a valid CIDB Certificate: 2
SQ and above
NOTE: Bidders that do not comply with all the above criteria will not be evaluated further.
7.2 Functional Evaluation Criteria
Functional criteria Points
The service provider must attach a list of completed projects as the main
contractor in erecting fencing. (Completion certificates to be attached).
Health & Safety
Source: RFQ - C5 George site Perimeter Fence (1)zz.pdfin line with Sentech requirements which will be communicated upon
appointment, and such should be submitted to the Sentech OHS Specialist
within 7 days after issue of the Purchase Order/Safety File Specification
(instruction to be received from the Infrastructure Services Manager via
email).
to be signed to the project.
Medical Practitioner only for all employees to be assigned to the project
task in line with the requirements
Public liability – valid construction/project public liability insurance
Health and safety compliance assurance – Company’s Health and Safety
compliance undertaking by the CEO/Managing Director
13.1.1. Site hand over meeting
contract. This is the first meeting on site of all the relevant parties who will be
involved in the contract for its entire duration.
13.1.2. Progress meetings
over meeting. The Infrastructure Services Manager shall carry out additional
intermediate site inspections.
13.1.3. SENTECH line of reporting problems
immediately to the Infrastructure Services Manager.
the Operations Manager.
13.2. Quality assurance
milestones established at the site handover meeting.
out site inspections before, during and upon completion of the contract.
13.3. Execution programme
Timeous completion of the project is of utmost importance for Sentech.
To ensure and to assist the contractor to monitor his or her own progress, he
or she will be required to provide Sentech with a detailed execution schedule
when providing a quotation.
This schedule should be in the Bar Chart format.
It should highlight the following key information but not limited to:
❖ Name of site
❖ Activity description
❖ Activity duration
❖ Dates for key milestones during the execution of the
Projects.
The key milestones are of paramount importance. Key dates will determine the dates
on which Sentech’s responsible Infrastructure Services Manager and local Sentech
Rigger will conduct site inspections.
by the contractor
❖ Milestone 1:
When the surface preparation has been completed.
Milestone 2:
❖ Quality inspection must be conducted on completion of each coat of paint
before applying the next coat.
❖ As soon as one section received its final coat of paint, a quality inspection
should be conducted before moving to the next section.
unpredictable.
be performed under specific weather conditions.
completion of mast painting projects.
sites may be affected by high winds and mist at certain times of the day.
prevailing weather conditions of the specific region.
theirs schedule. Any inclement weather days and consequential inclement
weather days accumulated during this contract will be granted as extension of
time as there will be no monetary compensation.
Rules for external contractors working on a Sentech site.
must be disposed of at a designated landfill site where required.
Contractor to provide own safe drinking water
Contractor to provide own electricity for the use of project
Contractor to provide own water for the use of project
Contractor to provide own safe and reliable ablution facilities
Occupational Health and Safety Act, Act .
Construction Regulations.
Applicable South African National Standards (SANS).
Manufacturer's specifications for all concrete, steel, gates, galvanizing,
fasteners and security fencing materials.
2.1 Defects Liability Period
The Defects Liability Period shall be twelve (12) months from the date of Practical
A minimum sixty (60) month workmanship warranty.
Manufacturer warranties for precast concrete components.
Manufacturer warranties for gate hardware and locking mechanisms.
Manufacturer warranties for galvanised steel components.
Manufacturer warranties for concertina wire and associated accessories where
applicable.
2.3 Project Duration
The Contract Period shall be eight (8) weeks from the date of approval of the Health
and Safety File and formal site handover.
3.3 Earthworks and Excavation
comprising:
o 3000 mm long
o 230 × 150 mm tapering to 80 mm
o 2400 mm long
o Reinforced
o Chamfered at 45°
o 1990 mm long
o Pre-stressed
Posts shall be installed at 2 metre centres and securely embedded into reinforced
concrete foundations.
3.6 Concertina Wire
Supply and install 700 mm diameter galvanised concertina razor wire over the entire
fence length including:
3.7 Prefabricated Concrete Components
3.8 Reinforcement
3.10 Occupational Health and Safety
Occupational Health and Safety Act.
Construction Regulations.
Sentech Health and Safety Specifications.
Approved Health and Safety File.
Risk Assessments.
Method Statements.
Fall Protection Plan (where applicable).
Proof of employee competency.
Medical Certificates where required.
Updated programme.
Progress photographs.
Labour employed.
Plant utilised.
Safety statistics.
Delays and mitigation measures.
Planned activities for the following week.
2 obligations in terms of Sentech Health Sum 1
and Safety specifications. (Safety File)
Section 1 Sub Total
Section 2
3 Supplying, Delivering and installation m 530
the roads may be paved with a bituminous surface in other instances maybe
concrete or concrete strips roads. The contractors are requested to use 4 x 4
vehicles to access our sites.
paved and concrete roads cannot be accessed with an ordinary vehicle.
difficult for ordinary vehicles.
unauthorized entry.
in line with Sentech requirements which will be communicated upon
appointment, and such should be submitted to the Sentech OHS Specialist
within 7 days after issue of the Purchase Order/Safety File Specification
(instruction to be received from the Infrastructure Services Manager via
email).
to be signed to the project.
Medical fitness – Valid certificate of fitness (medical) issued by Occupational
Due to the location of many of Sentech’s sites weather conditions are
unpredictable.
be performed under specific weather conditions.
completion of mast painting projects.
sites may be affected by high winds and mist at certain times of the day.
prevailing weather conditions of the specific region.
theirs schedule. Any inclement weather days and consequential inclement
weather days accumulated during this contract will be granted as extension of
time as there will be no monetary compensation.
Contractual Terms
Source: RFQ - C5 George site Perimeter Fence (1)zz.pdfThe Works shall be executed in accordance with:
Edition.
fasteners and security fencing materials.
2.1 Defects Liability Period
The Defects Liability Period shall be twelve (12) months from the date of Practical
Completion.
2.2 Warranties
The Contractor shall provide:
A minimum sixty (60) month workmanship warranty.
Manufacturer warranties for precast concrete components.
Manufacturer warranties for gate hardware and locking mechanisms.
Manufacturer warranties for galvanised steel components.
Manufacturer warranties for concertina wire and associated accessories where
applicable.
2.3 Project Duration
The Contract Period shall be eight (8) weeks from the date of approval of the Health
and Safety File and formal site handover.
of Deviations (if any), contact the Employer’s agent to arrange the delivery of any securities, bonds, guarantees,
proof of insurance and any other documentation to be provided in terms of the conditions of contract identified in
the RFQ. Failure to fulfil any of these obligations in accordance with those terms shall constitute a repudiation of
this agreement.
task in line with the requirements
Public liability – valid construction/project public liability insurance
Health and safety compliance assurance – Company’s Health and Safety
compliance undertaking by the CEO/Managing Director
Special Conditions
Source: RFQ - C5 George site Perimeter Fence (1)zz.pdf (RFQ)SITE HAND OVER MEETING: This is the first meeting on site of all the relevant parties who will be involved in the project. The Infrastructure Services Manager shall carry out additional site inspections as required. SENTECH LINE OF REPORTING: All communication and reporting must be directed to the designated Sentech representative. SENTECH HOUSE RULES: Rules for external contractors working on a Sentech site. The site must be kept clean at all times. All debris and any other foreign material must be removed regularly.
Requirements
Source: RFQ - C5 George site Perimeter Fence (1)zz.pdf (RFQ)Mandatory Evaluation Criteria: Valid CIDB Certificate (attach a valid CIDB Certificate). Bidders that do not comply with all the above criteria will not be evaluated further.
Section
Source: RFQ - C5 George site Perimeter Fence (1)zz.pdfThe evaluation criteria are stipulated in 7 below. It is the Bidder’s responsibility to ensure that they have
responded to the evaluation criteria. Failure to meet the evaluation criteria will result in the Bidder not
being evaluated further. Bidders must ensure that they have included all supporting documentation
required to support their response to the Bid
This RFQ will be evaluated as described in the table below.
Evaluation Method 1. Stage 1 – Administrative Responsiveness Evaluation
All the Quotations will be evaluated against the Administrative
responsiveness requirements as set out in section 2 of the RFQ Data.
The proposals that COMPLY with the Mandatory evaluation criteria be
evaluated against the Functional Criteria. Suppliers meeting the minimum
requirement will be evaluated further.
Suppliers with the lowest Price offered will score the highest points. Only
Suppliers that submit a valid B-BBEE Certificate can claim preference
points in line with the 80/20
Suppliers with the highest number of points will be recommended for the award of
this quotation, unless there are compelling and justifiable reasons not to do so.
7.1. Mandatory Evaluation Criteria
Reference proof
supplied by
What Proof is required to show
Compliant reference the page
Mandatory Eligibility compliance to Mandatory
(Indicate number where the
Criteria Eligibility Criteria
Yes or No) information is
located in your
Tender submission
Valid COIDA Certificate Attach a valid Letter of Good
Standing from the Department of
Labour/FEM. COIDA’s Nature of
Business to be aligned to
Construction Industry
Valid CIDB Certificate Attach a valid CIDB Certificate: 2
SQ and above
NOTE: Bidders that do not comply with all the above criteria will not be evaluated further.
7.2 Functional Evaluation Criteria
Functional criteria Points
The service provider must attach a list of completed projects as the main
contractor in erecting fencing. (Completion certificates to be attached).
Client References
Reference letters from contactable references for similar projects that were
listed on the above criteria in scope and contract value.
Three (3) reference letters submitted................ 30 Points
Two reference letters submitted....................... 15 Points 30
One reference letter............................................5 Points
No Reference letters......................................... ..0 Points
NB: No letters of appointment or completion certificates will be accepted for
this purpose as these do not sufficiently elaborate on principles such as
workmanship and work ethic.
Experience of Key Personnel
Bidders to attach CVs for site foreman with 3 years of experience in
construction industry (Fencing or Civils)
Foreman with 3 years and more experience...................20 points
Foreman with 2 years of experience.............................10 points
Foreman with one year and less years of experience .......5 points
Construction Programme
Project programme with realistic time frames, key tasks clearly defined and
critical path depicted. (The programme may be presented in any format)
Compressive Realistic Project Programme submitted .........20 Points 20
Average unrealistic Project Programme submitted............... 5 Points
Project Programme not submitted.....................................0 Points
Total Points. 100
The minimum threshold for the functionality will be points
Proof Required Functionality criteria Points
Total Points:
Total minimum qualifying functional score is ###### points.
Sentech’s Specific goals emanate from the section 2(1)d of the Preferential Procurement
Policy Act which may include contracting with persons or categories of persons, historically
disadvantaged by unfair discrimination on the basis of race, gender and disability. The
Reconstruction and Development Programme as published in Government Gazette No
16085 dated 23 November 1994
Sentech will award preference points as follows:
Goal Points Evidence required
Historically disadvantaged by unfair discrimination on 8 A valid BBBEE
the basis of Race Certificate showing at
least 51% black
ownership
3 A valid BBBEE
Certificate showing at
least 25.1 – 50% black
ownership
1 Black owned company
showing at least 5 –
25% black ownership
0 Below 5%
Historically disadvantaged by unfair discrimination on 10 A valid BBBEE
the basis of Gender (women) Certificate showing at
least 51% women
ownership
6 A valid BBBEE
Certificate showing at
least 25.1 – 50%
women ownership
2 A valid BBBEE
Certificate showing at
least 5-25% women
ownership
0 A valid BBBEE
Certificate showing at
less than 5% women
ownership
Historically disadvantaged by unfair discrimination on 2 A doctor’s note
the basis of disability confirming disability
Total Points 20
The following formula will be used to calculate the points for price.
Ps= 80 1- (Pt – Pmin)
Pmin
Where:
Ps = Points scored for price of bid under consideration
Pt = Rand value of bid under consideration
Pmin = Rand value of lowest acceptable bid
Contact Information
Source: Standard Bidding (SDB) 4_Annexure A.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"SUPPLY CHAIN MANAGEMENT","address":null}
Submission Guidelines
Source: Standard Bidding (SDB) 4_Annexure A.pdf (TENDER)Returnable documents: Complete, sign and submit SBD 4 (Bidder's Disclosure) with the quotation. The form requires the bidder to declare any state employment, relationships with state employees, and interests in related enterprises. Bidders listed on the Register for Tender Defaulters or the List of Restricted Suppliers are disqualified. The bid must be submitted before the closing time; late submissions are not accepted.
Evaluation Criteria
Source: Standard Bidding (SDB) 4_Annexure A.pdf (TENDER)Complete and submit SBD 4 (Bidder's Disclosure). Bidders on the Register for Tender Defaulters or the List of Restricted Suppliers are disqualified. Bidders must declare any state employment or relationship with Sentech employees, and any interest in related enterprises.
Technical Specifications
Source: Standard Bidding (SDB) 4_Annexure A.pdf (TENDER)Supply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
Section
Source: Standard Bidding (SDB) 4_Annexure A.pdf (TENDER)Any person (natural or juristic) may make an offer or offers in terms of this invitation to bid. In line with the principles of transparency, accountability, impartiality, and ethics as enshrined in the Constitution of the Republic of South Africa and further expressed in various pieces of legislation, it is required for the bidder to make this declaration in respect of the details required hereunder.
Where a person/s are listed in the Register for Tender Defaulters and / or the List of Restricted Suppliers, that person will automatically be disqualified from the bid process.
2.1 Is the bidder, or any of its directors / trustees / shareholders / members / partners or any person having a controlling interest1 in the enterprise, employed by the state? YES/NO
2.1.1 If so, furnish particulars of the names, individual identity numbers, and, if applicable, state employee numbers of sole proprietor/ directors / trustees / shareholders / members/ partners or any person having a controlling interest in the enterprise, in table below.
institution
2.2 Do you, or any person connected with the bidder, have a relationship
1 the power, by one person or a group of persons holding the majority of the equity of an enterprise, alternatively, the person/s having the deciding vote or power to influence or to direct the course and decisions of the enterprise.
Sbd4
with any person who is employed by the procuring institution? YES/NO
2.2.1 If so, furnish particulars:
2.3 Does the bidder or any of its directors / trustees / shareholders / members / partners or any person having a controlling interest in the enterprise have any interest in any other related enterprise whether or not they are bidding for this contract? YES/NO
2.3.1 If so, furnish particulars:
3 declaration
I, the undersigned, (name) in submitting the accompanying bid, do hereby make the following statements that I certify to be true and complete in every respect:
3.1 I have read and I understand the contents of this disclosure;
3.2 I understand that the accompanying bid will be disqualified if this disclosure is found not to be true and complete in every respect;
3.3 The bidder has arrived at the accompanying bid independently from, and without consultation, communication, agreement or arrangement with any competitor. However, communication between partners in a joint venture or consortium2 will not be construed as collusive bidding.
3.4 In addition, there have been no consultations, communications, agreements or arrangements with any competitor regarding the quality, quantity, specifications, prices, including methods, factors or formulas used to calculate prices, market allocation, the intention or decision to submit or not to submit the bid, bidding with the intention not to win the bid and conditions or delivery particulars of the products or services to which this bid invitation relates.
3.4 The terms of the accompanying bid have not been, and will not be, disclosed by the bidder, directly or indirectly, to any competitor, prior to the date and time of the official bid opening or of the awarding of the contract.
3.5 There have been no consultations, communications, agreements or arrangements made by the bidder with any official of the procuring
the purpose of combining their expertise, property, capital, efforts, skill and knowledge in an activity for the execution of a contract.
Sbd4
institution in relation to this procurement process prior to and during the bidding process except to provide clarification on the bid submitted where so required by the institution; and the bidder was not involved in the drafting of the specifications or terms of reference for this bid.
3.6 I am aware that, in addition and without prejudice to any other remedy provided to combat any restrictive practices related to bids and contracts, bids that are suspicious will be reported to the Competition
penalties in terms of section 59 of the Competition Act No
and or may be reported to the National Prosecuting Authority (NPA) for criminal investigation and or may be restricted from conducting business with the public sector for a period not exceeding ten (10) years in terms of the Prevention and Combating of Corrupt Activities Act No
or any other applicable legislation.
1, 2 and 3 ABOVE IS CORRECT.
Against me in terms of paragraph 6 of PFMA SCM
Instruction /22 on preventing and combating
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
george - George - George - 6529
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
22 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Learn how to submit a winning bid with these related articles
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
A practical guide for small and medium building contractors on winning government tenders for schools, clinics, housing, and municipal buildings in South Africa.
How small and medium construction contractors use Joint Ventures to combine CIDB grades, win larger infrastructure projects, and grow beyond their current grading ceiling.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.