The social housing regulatory authority requires a service provider to supply, configure and implement enterprise network switching and wireless infrastructure. The successful bidder will deliver the equipment, perform installation and commissioning, and provide associated support services. Bids close on 15 january 2027 at 09:00, and the most consequential consideration for bidders is that NO contract may be awarded unless the bidder's tax affairs are in order and an original SARS tax clearance certificate is in the department's possession before award.
Key Requirements
Closing date and time: 15 January 2027 at 09:00; late submissions will not be accepted.
Tax compliance: no contract may be awarded unless the bidder's tax affairs are in order and an original SARS tax clearance certificate is in the department's possession before award.
Returnable forms: SBD 1 (Invitation to Bid), SBD 3 (Pricing Schedule), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 7 (Contract Form), SBD 8 (Declaration of Past SCM Practices) and SBD 9 (Certificate of Independent Bid Determination) must be completed and signed.
Prohibited conduct: corrupt, fraudulent, collusive or restrictive practices may lead to disqualification, contract termination and restriction from public-sector business for up to 10 years.
Subcontracting and assignment: the purchaser's prior written consent is required before assigning obligations or subcontracting.
Performance security: the successful bidder must furnish a performance security within 30 days of receiving the award notification, in the amount specified in the Special Conditions of Contract.
Warranty: supplied goods must be new, unused and of the most recent models, with a warranty valid for 12 months after delivery and acceptance or 18 months after shipment, whichever ends earlier, unless the Special Conditions of Contract state otherwise.
32 Princess of Wales Terrace - Park Town - Johannesburg - 2193
Professional Services & Consulting Industry Profile
Regulatory Bodies
SAGCSAICA
Tenders in this industry often require registration with these bodies.
Typical Documents
5 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentRFB Document.pdfReview complete
Description
Source: RFB Document.pdf
Important Dates
18 Nov
2026
PUBLICATION
Tender Published
Tender was published
15 Jan
2027
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Supply, configuration and implementation of enterprise-grade network switching and wireless infrastructure for the Social Housing Regulatory Authority's Parktown office, replacing end-of-life Cisco switches and access points. The scope covers five access switches, ten Wi-Fi 6/6E access points, a centralised wireless controller, a secure SSL-encrypted guest Wi-Fi service, network management, training and documentation.
Supply, configuration and implementation of enterprise network switching and wireless infrastructure for the Social Housing Regulatory Authority in Gauteng. The successful service provider will deliver the equipment and carry out installation, commissioning and related services under the National Treasury General Conditions of Contract.
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
BIDDERS LIST - CALIBRATION, SERVICE AND AD HOC MAINTENANCE OF CHEMICAL SERVICES LABORATORY EQUIPMENT FOR A PERIOD OF FIVE (5) YEARS AT LETHABO POWER STATION
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
The Social Housing Regulatory Authority (SHRA) is a national public entity under Schedule 3A of the PFMA, established under the Social Housing Act and accountable to the Minister of Human Settlements. It regulates, invests in and capacitates the social housing sector, working through accredited Social Housing Institutions and other delivery agents. This bid is for the supply, configuration and installation of enterprise network switching and wireless infrastructure at SHRA's Parktown offices.
Important Dates
Source: RFB Document.pdf (TENDER)
Compulsory site visit
Date: 08 December 2026 at 11:00
Venue: Social Housing Regulatory Authority, Sunnyside Office Park, 3rd Floor, Sentinel House, 32 Princess of Wales Terrace, Parktown
Attendance is compulsory; bidders who do not attend will not be considered.
One hard copy plus a soft copy on USB, delivered by hand to the bid box.
The USB must be sealed in an envelope marked with the bidder's company name, the bid description and the bid number.
The soft copy must be saved as PDF.
Faxed or emailed bids will not be accepted.
Bids are deemed received at the time of arrival at the SHRA premises; anything arriving after 11:00 on the closing date is late.
Submission address
Supply Chain Management
Social Housing Regulatory Authority
Sunnyside Office Park
3rd Floor, Sentinel House
32 Princess of Wales Terrace
Parktown
Returnable documents
SBD 1 (Invitation to Bid): bidder details and signed offer.
SBD 3.3 (Pricing Schedule – Professional Services): ceiling price, hourly and daily rates, and cost per project phase.
SBD 4 (Declaration of Interest): each party to the bid must disclose any state employment or connection to SHRA.
SBD 6.1 (Preference Points Claim): claims specific-goals points under the Preferential Procurement Regulations 2022.
B-BBEE certificate (original or certified copy), or a sworn affidavit or accounting officer/auditor letter for EMEs with turnover up to R10 000 000.
General Conditions of Contract (Annexure A): initial every page.
Technical approach and project plan, team CVs (maximum two pages each) and an organisation chart.
Minimum three signed reference letters for similar enterprise network deployments completed in the past five years.
OEM partner or reseller certificate or letter.
Wireless heatmap showing coverage and access point locations.
CSD registration report showing a valid and active registration.
SARS tax compliance status PIN or printed TCS certificate; each consortium, joint venture or subcontractor party must submit its own.
Proof of authority to sign, such as a company resolution.
Disqualification risks
Late submission, including arrival one second after 11:00.
Omission of any mandatory returnable document or an unsigned form.
Failure to attend the compulsory site visit.
Bids from persons in the service of the state, or companies with directors or members in the service of the state.
Evaluation Criteria
Source: RFB Document.pdf (TENDER)
Evaluation stages
Compliance check: bids with obvious deviations from the bidding requirements and conditions are eliminated.
Functionality evaluation: scored out of 100 against the weighted criteria below.
Minimum qualifying score: 70/100 for overall functionality, including any presentation score. Bids below 70 are eliminated and receive no points for price or specific goals.
Presentation (if held): only bidders meeting the minimum functionality score are invited. The final functionality score is 50% of the original evaluation plus 50% of the average presentation score.
Price and preference points: 80/20 system applies because the estimated bid value does not exceed R50 000 000.
Objective criteria: where the points difference between the highest and second-ranked bidder is within 15%, SHRA may award to the bidder scoring highest on specific goals. A tie is resolved proportionately.
Adjudication: the Adjudication Committee makes the final award to a bidder that meets the 70% functionality threshold and is tax compliant as reflected on the CSD.
Functionality criteria and weights
Compliance with the technical requirements (section 3.6): 40%.
Signed and relevant reference letters for similar enterprise network deployments in the past five years: 30%. Scored from 1 (one letter) to 5 (five or more letters); a minimum of three is mandatory.
Implementation methodology and project plan: 10%. Scored from 1 (not submitted) to 5 (comprehensive plan covering site assessment, design, installation, configuration, testing, migration, risk management, handover, timelines, roles and responsibilities, with a realistic schedule and measures to minimise downtime).
Key personnel, skills and certifications: 20%. Scored from 1 (OEM certificate with less than two years' experience) to 5 (more than five years' experience in similar projects).
Presentation
SHRA may require compulsory presentations by shortlisted bidders.
At least three days' notice will be given if no date is stated.
Presentations are made to the full Evaluation Committee and affect only the functionality score.
Technical Specifications
Source: RFB Document.pdf (TENDER)
Purpose
Replace end-of-life Cisco switching and wireless equipment with a modern, secure and scalable enterprise network.
Improve performance, reliability and resilience.
Provide a segregated, SSL-secured guest Wi-Fi service.
Centralise management and strengthen security through modern encryption and access control.
Current environment
Five Cisco 48-port PoE switches in the Parktown communications cabinet: two Cisco 3850 48 PoE+ and two Cisco 3750 48 PoE+.
Switches interconnected by 1 Gbps CAT6E links and provide PoE to VoIP telephones and access points.
Five Cisco AIR AP2801 K9 access points operating as a Cisco 2800 Series Mobility Express network, each connected by 1 Gbps CAT6E.
Floor plan is Annexure B; a diagram of the four existing switches is included.
Captive portal-based guest access with SSL encryption.
Multiple SSIDs with role-based access.
High availability or redundancy options.
Security requirements
WPA3 and 802.1X encryption support.
SSL-encrypted captive portal for guest access.
Guest and internal traffic segregated using VLANs and firewall policies.
Management interfaces secured with HTTPS and role-based access control.
Compliance with recognised enterprise security standards and best practices.
Licensing and support
All software licences and subscriptions must be clearly specified.
Minimum three years' OEM support and maintenance.
Access to software updates, security patches and technical support during the support period.
Manufacturer-backed hardware replacement with next-business-day replacement.
Deliverables
Fully installed and operational wired and wireless network infrastructure.
Secure guest Wi-Fi service with SSL encryption.
Centralised network management platform.
As-built documentation and configuration backups.
Training and knowledge transfer to SHRA ICT staff.
Methodology
Source: RFB Document.pdf
Bidders must submit an implementation methodology and project plan covering site assessment, design, installation, configuration, testing, migration, risk management, handover and timelines. The plan must show roles and responsibilities, a realistic implementation schedule, and practical measures to minimise downtime and disruption to SHRA operations. It is scored out of 5 and carries 10% of the functionality score.
Experience & Qualifications
Source: RFB Document.pdf
Reference letters
A minimum of three signed reference letters is mandatory.
References must demonstrate successful enterprise network deployments of similar work completed within the past five years.
The criterion carries 30% of the functionality score and is rated from 1 (one letter) to 5 (five or more letters).
Key personnel
Provide a CV of no more than two pages for each team member, highlighting experience, qualifications and OEM certificates.
The key personnel criterion carries 20% of the functionality score and is rated from 1 (OEM certificate with less than two years' experience in similar projects) to 5 (more than five years' experience).
OEM status
A valid certificate or letter confirming partner or reseller status with the OEM is mandatory.
Quality Management
Source: RFB Document.pdf
Technical compliance
The proposed solution must meet or exceed all technical requirements in section 3.6 of the terms of reference.
All software licences and subscriptions must be clearly specified.
A minimum of three years' OEM support and maintenance is required, including software updates, security patches and technical support.
Hardware replacement must be manufacturer-backed with next-business-day service.
Documentation and handover
The service provider must deliver as-built documentation, configuration backups, updated network diagrams and operational manuals.
Administrator training and knowledge transfer must be provided to SHRA ICT staff.
Pricing Schedule
Source: RFB Document.pdf
Pricing is submitted on SBD 3.3 (Pricing Schedule – Professional Services). Bidders must provide:
an all-inclusive ceiling price in RSA currency, including all applicable taxes and professional fees, based on the estimated quantities in the detailed pricing schedule;
hourly and daily rates for each person and position involved, against which certified invoices will be rendered;
the cost per project phase and the man-days to be spent on each phase;
separate pricing for any additional value-added services.
The offer must remain valid for 120 days from the closing date.
Financial Requirements
Source: RFB Document.pdf (TENDER)
Pricing format
SBD 3.3 (Pricing Schedule – Professional Services) must be completed.
Provide an all-inclusive ceiling price in RSA currency, including all applicable taxes and professional fees, based on the estimated quantities in the detailed pricing schedule.
Provide hourly and daily rates for each person and position involved; certified invoices must be rendered on this basis.
Provide the cost per project phase and the man-days to be spent on each phase.
Additional value-added services must be priced separately in the pricing schedule.
Travel and disbursements
Travel costs are claimed at the rates agreed at contracting.
Only economy class flights may be booked.
Group B rental or hire vehicles are preferred.
Accommodation must follow the National Treasury allowable rates in the applicable Instruction Note.
Bid value and preference system
Estimated value: not exceeding R50 000 000, all applicable taxes included.
Preference point system: 80/20.
Bid validity
The offer must remain valid for 120 days from the closing date.
Security and guarantees
No bid security, performance guarantee or retention percentage is stated in the bid document.
Compliance Requirements
Source: RFB Document.pdf (TENDER)
Eligibility
Bidders must be registered on the National Treasury Central Supplier Database (CSD) and submit CSD registration proof.
A valid SARS tax compliance status PIN or printed TCS certificate is required; each consortium, joint venture or subcontractor party must submit its own.
Bids from persons in the service of the state, or companies with directors or members in the service of the state, will not be considered.
Mandatory technical compliance
Valid OEM partner or reseller certificate or letter.
Minimum three signed reference letters for similar enterprise network deployments completed in the past five years.
Wireless heatmap showing coverage and access point locations.
Failure to submit any of these mandatory items results in disqualification.
B-bbee
A valid original or certified B-BBEE certificate is required to claim preference points.
EMEs with annual turnover up to R10 000 000 may submit a sworn affidavit or an accounting officer/auditor letter.
A trust, consortium or joint venture qualifies for points as a legal entity on submission of a B-BBEE certificate, accounting officer/auditor letter or EME affidavit; as an unincorporated entity it must submit a consolidated B-BBEE scorecard prepared for this bid.
CIDB
No CIDB grading is required for this bid.
Returnable forms
SBD 1 (Invitation to Bid): signed offer and bidder details.
SBD 3.3 (Pricing Schedule): priced offer.
SBD 4 (Declaration of Interest): discloses state employment or connections; each party must complete it.
General Conditions of Contract (Annexure A): initial every page.
Proof of authority to sign, such as a company resolution.
Contractual Terms
Source: RFB Document.pdf
Contract form
The successful bidder must sign a written contract; the contract is concluded only when signed by SHRA's Chief Executive Officer or an authorised delegate.
Additional information
SHRA may request further information in writing during evaluation; replies must be provided within five working days unless otherwise stated, failing which the bid may be disregarded.
Confidentiality and intellectual property
All bid information must be kept confidential and used only to prepare the bid.
Bidders are bound by a confidentiality agreement and may not disclose SHRA information without written approval.
All intellectual property arising from the contract, including deliverables, software, documentation and data, vests in SHRA; the service provider assigns all such rights to SHRA.
The service provider must sign a confidentiality agreement and comply with the POPI Act.
Delivery and retention
The service provider must notify SHRA immediately in writing if it cannot deliver on time or at the bid price; SHRA may apply remedies under the General Conditions of Contract.
On termination, all documentation, information and software must be handed to SHRA on demand, with no right of retention.
No amendment or variation is valid unless in writing and signed by both parties.
SHRA's rights
SHRA may appoint more than one service provider, cancel or delay the process, decline to select any bidder, or exclude certain services, without explanation.
SHRA may negotiate any terms, including price, with a preferred bidder.
Fraud, bribery or corruption will result in disqualification and may be reported to National Treasury.
Section
Source: RFB Document.pdf
Functionality is scored out of 100 with a minimum qualifying score of 70. The criteria and weights are:
Compliance with the technical requirements: 40%.
Signed reference letters for similar enterprise network deployments in the past five years: 30% (minimum three letters; scored 1 to 5).
Implementation methodology and project plan: 10% (scored 1 to 5).
Key personnel, skills and certifications: 20% (scored 1 to 5 based on OEM-certified experience).
If a presentation is held, the final functionality score is 50% of the original evaluation and 50% of the average presentation score. Bids scoring below 70% are eliminated and receive no points for price or specific goals. The 80/20 preference system applies, and where the top two bidders are within 15% of each other, SHRA may award to the bidder with the highest specific-goals score.
DocumentAnnexure_A.PDFReview complete
Quality Management
Source: Annexure_A.PDF
Standards and inspection
Goods supplied must conform to the standards stated in the bid documents and specifications.
Where inspection, testing or analysis is a bid condition, the bidder's premises must be open at reasonable hours for inspection by the department or its representative.
Pre-bid testing is at the bidder's cost.
If inspection shows compliance, the purchaser bears the cost; if not, the supplier bears the cost and the supplies may be rejected.
Rejected supplies are held at the supplier's cost and risk and must be removed and replaced at the supplier's expense; if not replaced, the purchaser may buy substitutes and charge the supplier.
The supplier must permit the purchaser to inspect and audit records relating to performance when required.
Warranty
Goods must be new, unused, of the most recent or current model and free of defects in design, materials and workmanship.
The warranty runs for 12 months after delivery and acceptance at the final destination, or 18 months after shipment from the source country, whichever ends first, unless the Special Conditions state otherwise.
The supplier must repair or replace defective goods at its own cost within the period stated in the Special Conditions.
If the supplier fails to remedy a defect, the purchaser may do so at the supplier's risk and expense.
Compliance Requirements
Source: Annexure_A.PDF (TENDER)
Tax compliance
No contract may be awarded to a bidder whose tax affairs are not in order.
An original tax clearance certificate issued by SARS must be in the department's possession before award.
Returnable forms
SBD 1 (Invitation to Bid): bidder and contact details, signed as the offer cover page.
SBD 3 (Pricing Schedule): the priced offer.
SBD 4 (Declaration of Interest): discloses state employment or connections to the department.
SBD 7 (Contract Form): binds the successful bidder to the contract terms.
SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices): discloses past SCM conduct.
SBD 9 (Certificate of Independent Bid Determination): certifies the price was set independently, without collusion.
Conduct
Corrupt, fraudulent, collusive or restrictive practices are prohibited and may lead to disqualification, contract termination and restriction from public-sector business for up to 10 years.
Assignment of obligations and subcontracting require the purchaser's prior written consent.
Contractual Terms
Source: Annexure_A.PDF
Governing terms
The National Treasury General Conditions of Contract (July 2010) form part of the bid documents and may not be amended.
Special Conditions of Contract, where issued, supplement the general conditions and prevail where the two conflict.
Performance security
The successful bidder must furnish the performance security stated in the Special Conditions within 30 days of notification of award.
Acceptable forms: a bank guarantee or irrevocable letter of credit from a reputable bank, or a cashier's or certified cheque.
The security is released within 30 days after completion of all performance obligations, including warranty obligations.
Delivery, delays and penalties
Delivery and performance must follow the schedule set by the purchaser.
The supplier must notify the purchaser in writing of any delay, its likely duration and its cause; the purchaser may extend the period with or without penalties.
Late delivery or unperformed services attract a penalty calculated on the delivered price of the delayed goods or unperformed services at the current prime interest rate for each day of delay.
Termination and restriction
The purchaser may terminate for failure to deliver, failure to meet any other obligation, or corrupt or fraudulent conduct.
On termination the purchaser may procure replacement goods or services and recover the excess cost from the supplier.
A restriction penalty may bar the supplier from public-sector business for up to 10 years; the supplier has 14 days to give reasons why it should not be imposed.
A person convicted under sections 12 or 13 of the Prevention and Combating of Corrupt Activities Act may be listed on the Register for Tender Defaulters and barred for 5 to 10 years.
Prices, payment and amendments
Prices are fixed at the bid prices, subject only to adjustments authorised in the Special Conditions or in a bid validity extension.
Payment is due within 30 days of invoice or claim, in Rand unless the Special Conditions state otherwise.
Invoices must be accompanied by a copy of the delivery note and evidence that other contractual obligations are met.
No contract variation is valid unless made by written amendment signed by both parties.
Disputes and law
Disputes are first referred to mutual consultation; if unresolved after 30 days, either party may give notice of mediation, and failing mediation the dispute goes to a South African court.
The contract is written in English and governed by South African law.
The supplier's aggregate liability is capped at the total contract price, except for criminal negligence, wilful misconduct, patent infringement and the cost of repairing or replacing defective equipment.
Force majeure and insolvency
Neither party is liable for delay caused by a force majeure event beyond the supplier's control; the supplier must notify the purchaser in writing and continue performance as far as reasonably possible.
The purchaser may terminate without compensation if the supplier becomes bankrupt or insolvent.
Notices and taxes
Written acceptance and notices are posted to the address given in the bid or later notified in writing; time periods run from the date of posting.
A foreign supplier bears all taxes and duties imposed outside South Africa; a local supplier bears all taxes, duties and licence fees up to delivery.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
32 Princess of Wales Terrace, Parktown, Johannesburg, 2193, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
18 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Get deep intelligence on Other professional, scientific and technical activities. Unlock full pricing strategies, bid frequency, and historical win rates.