The IDC, acting for infrastructure south africa, requires service providers to assess the condition of about 1,036 km of prioritised free state agricultural roads and prepare rehabilitation plans across four clusters (R59a/R59b, R57/R714, R708/R505 and r26). The work covers road inventory verification, tmh 9 condition and tmh 12 distress assessment, traffic surveys, preliminary engineering and cost estimates, and digital road visualisation, delivered within six months of appointment. Bidders may bid for one cluster only and must field a registered professional team led by a sacpcmp prcpm or ecsa pr eng with eight years' post-registration experience. The decisive hurdle is functionality: bids must score at least 70 out of 100 before price and specific goals are considered.
Key Requirements
Cluster limit: bidders may mark one cluster only; if more than one is marked, only the first cluster number is considered and the rest disregarded.
Functionality threshold: technical evaluation is out of 100 (experience 25, methodology 35, project plan 10, team 30) and any bid scoring below 70 is excluded from price and specific goals.
Key personnel: Team Lead must be SACPCMP PrCPM or ECSA Pr Eng with 8 years' post-registration experience and may not double as condition-assessment technical lead; the Pavement Rehabilitation and Traffic Engineers each need ECSA Pr Eng with 7 years' post-registration experience, the GIS specialist NQF 7 plus 7 years, and the Cost Estimator PrQS plus 7 years; no person may fill more than two roles.
Experience evidence: three contactable references not older than 10 years with name, designation, relationship, email and telephone; references without full contact details are invalid.
Submission: electronic upload only to the IDC SharePoint tender folder by 30 November 2026 at 11:00, in Microsoft Office or PDF format within the 50MB limit; bids sent elsewhere, late or in inaccessible formats are disqualified.
B-BBEE and tax: B-BBEE certificate, or sworn affidavit for EMEs under R10 million and QSEs between R10 million and R50 million annual revenue, plus written confirmation of SARS tax compliance and CSD vetting.
Non-compulsory briefing: 19 November 2026 at 10:30 on Microsoft Teams; enquiries close 20 November 2026 at 16:00 and bid validity is 120 days.
Appointment of service provider(s) to conduct technical condition assessments and prepare road rehabilitation plans for prioritised agricultural roads in the free state province (cluster 1, 2, 3 & 4)
Professional Services & Consulting Industry Profile
Regulatory Bodies
SAGCSAICA
Tenders in this industry often require registration with these bodies.
Typical Documents
5 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentT631126_FS Roads.pdfReview complete
Description
Source: T631126_FS Roads.pdf
Important Dates
16 Nov
2026
PUBLICATION
Tender Published
Tender was published
30 Nov
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
The IDC, acting on behalf of Infrastructure South Africa, requires service providers to conduct technical condition assessments and prepare road rehabilitation plans for prioritised agricultural roads in the Free State Province. The Phase 1 priority network of approximately 1,036 km is split into four clusters, with up to four providers to be appointed, one per cluster. Work covers road inventory verification, TMH 9 and TMH 12 condition assessments, traffic assessment, preliminary engineering and cost estimation, digital road network visualisation, and final reporting.
Industrial Development Corporation of South Africa Limited
Google
Win IDC tenders with AI-Powered Matching, industrial finance intelligence, compliance analysis, and application support for advisory and professional services.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Publication of Names of Bidders in Respect of Advertised Competitive for the Appointment of a Specialist Quality Control Inspectorate (QCI) Service Provider for a Period of six (06) years.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Supplier performance
The successful bidder must conclude a Service Level Agreement with the IDC on award; the SLA forms part of the supply agreement.
The SLA is used to measure and monitor delivery, quality and value-add.
The bidder must provide a scorecard showing how its service will be measured against the SLA objectives.
Successful bidders may be required to mentor SMMEs and/or youth-owned businesses, with terms negotiated with the IDC.
Important Dates
Source: T631126_FS Roads.pdf (RFP)
Closing
30 November 2026 at 11:00
Briefing session
19 November 2026 at 10:30
Non-compulsory
Microsoft Teams: https://teams.microsoft.com/meet/3196597812836853?p=KoW2zPWyGFOBXRmXuN
Enquiries
Close 20 November 2026 at 16:00
Consolidated responses posted on the IDC website within two days after the last enquiry day
Electronic submission only, uploaded to the IDC SharePoint tender folder: https://idcza-my.sharepoint.com/:f:/g/personal/moitlisim_idc_co_za/IgBOw3F5iHAuSrwCiOY6UQ7IAYswxHjt42URD_hrgb8o8Bg
Bids sent anywhere else are disqualified.
Files must be in standard formats (Microsoft Office or PDF); inaccessible formats are disqualified.
Upload capacity is 50MB; submit at least 30 minutes before the 11:00 deadline.
Amended bids may be lodged before the closing time, marked "Amendment to bid".
All documents in English; bidders carry their own bid costs.
Returnable documents
Cover page showing RFP number T63/11/26, the bid description and the bidder's name.
Schedule 1: Executive Summary setting out understanding of the requirement and the proposed solution.
Schedule 2: certified Board Resolution; originally certified ID copy of the company representative; Annexure 2 Acceptance of Bid Conditions and Bidder's Details; Annexure 3 Tax Compliance Requirements; Annexure 4 Bidder's Disclosure; Annexure 5 Shareholders and Directors Information; Annexure 6 BEE Commitment Plan with B-BBEE certificate or sworn affidavit; Annexure 7 Disclosure Statement; Annexure 8 POPIA requirements; latest audited or independently reviewed financial statements, or a cashflow budget for new entities; signed JV, consortium or subcontracting agreement where applicable.
Schedule 3: response to Section 2 in the Annexure 1 format, completed and signed.
Schedule 4: price proposal lodged as a separate file.
JV, consortium and subcontracting bids must lodge the full Schedule 2 set for every member and every subcontractor.
Disqualification risks
Late or incomplete bids, or bids sent to the wrong address.
Non-standard file formats or files above 50MB.
Missing or unsigned returnable schedules.
Non-compliant tax status, fraudulent or inaccurate information, POPIA non-compliance.
A prime contractor holding a smaller share of contract value than a subcontractor.
Evaluation Criteria
Source: T631126_FS Roads.pdf (RFP)
Phase 1 — Compliance screening
CSD vetting of company registration and tax status.
Certified ID copy, B-BBEE certification and all returnable schedules completed.
Prime contractor share not lower than any subcontractor.
Failure may disqualify the bid.
Phase 2 — Functionality (100 points, minimum qualifying score 70)
Relevant experience: 25
Methodology and approach: 35
Project plan (WBS and Gantt chart): 10
Qualifications, skills and experience of the team: 30
Bids below 70 are not evaluated further on price or specific goals.
Phase 3 — Preference points (80/20 system)
Price: 80
Specific goals: 20
Black ownership: 10 (100% black owned scores 10; 51% to 99.99% black owned scores 4)
30% black women ownership: 5
Ownership by black designated groups: 2
SMME promotion (EME or QSE): scored within the 20 points
Only direct black shareholding through exercisable voting rights, black women voting rights, black designated group voting rights, or ESOPs with direct shareholding qualifies.
Phase 4 — Objective criteria
Award normally goes to the highest scoring bidder unless objective criteria justify another award.
Risk assessed on reputational risk (disclosure statement and CRAD screening), concentration risk, financial capability and past performance on IDC contracts.
Transformation partnership
Bidders are encouraged to partner with a 50%+1 black owned and controlled entity through a JV or subcontracting arrangement, submitting a proposal showing the portion of work outsourced and the partner's level of involvement, with a B-BBEE certificate or sworn affidavit.
Technical Specifications
Source: T631126_FS Roads.pdf (RFP)
Programme
Road inventory verification, condition and traffic assessment, preliminary engineering intervention planning, indicative cost estimation and digital visualisation for prioritised Free State agricultural roads, delivered for Infrastructure South Africa.
Phase 1 network: approximately 1,036 km across four clusters.
Cluster 1: R59a and R59b, 364 km
Cluster 2: R57 and R714, 304 km
Cluster 3: R708 and R505, 200 km
Cluster 4: R26, 168 km
Route start and end coordinates in the road inventory schedule define the assessment limits.
Up to four service providers may be appointed, one per cluster; a bidder may win more than one cluster only with dedicated capacity for concurrent work.
Bidders may bid for one cluster only; if more than one is marked, only the first cluster number is considered.
Task 1 — Inception and existing information review
Validate available road, traffic and infrastructure data; verify the inventory and segment the network to TMH 9.
Consult stakeholders including the Free State Department of Community Safety, Roads and Transport.
Deliver an Inception Report with verified inventory, segmentation and data collection methodology, Stakeholder Engagement Plan, project programme, Quality Assurance Plan and risk register.
No fieldwork may start before ISA approves the Inception Report.
Task 2 — Road condition assessment and digital road survey
Georeferenced photographic and video survey, spatial condition mapping and a condition database.
Engage the provincial department on the Road Asset Management System (RAMS).
Deliver a Road Condition Assessment Report with findings, distress interpretation, database, survey records, maps and key constraints.
Task 3 — Traffic assessment
Traffic volumes, vehicle classification, heavy vehicle movements, seasonal agricultural traffic, generators and freight corridors, safety and operational constraints.
Deliver a Traffic Assessment Report with volume and composition analysis, logistics routes, loading impacts, constraints and recommendations.
Task 4 — Preliminary engineering intervention and cost assessment
Identify interventions per segment, develop restoration and rehabilitation strategies, indicative quantities and cost estimates, and prioritise sections.
Deliver a Preliminary Engineering and Investment Prioritisation Report including a Prioritised Road Restoration and Investment Programme.
Task 5 — Digital visualisation and final reporting
Interactive geospatial visualisation, virtual road corridor/fly-through, GIS and spatial data package, consolidated cluster final report and stakeholder presentation.
General requirements
Establish a Project Working Committee with ISA and stakeholders; provide secretariat support and attend bi-weekly meetings.
Obtain ISA approval before engaging any third party.
Incorporate consolidated comments and resubmit within 7 working days.
Submit reports in editable Word and PDF; spatial data in the agreed GIS format.
All data, reports, photographs, videos and GIS outputs remain ISA property and must be handed over on completion; confidentiality applies during and after the project.
Duration: work starts on award and must not exceed 6 months.
Methodology
Source: T631126_FS Roads.pdf
Methodology requirements
Demonstrate understanding of the objectives, scope and deliverables through a structured methodology aligned to the five work stages.
For each stage set out activities, deliverables, milestones and expected outcomes.
Explain how TMH 9 condition assessments and TMH 12 pavement distress interpretation will be applied.
Describe data capture methods, tools and technologies, plus QA and validation procedures.
Identify key project risks and practical mitigation measures.
Submit a project plan as a Work Breakdown Structure with a Gantt chart, aligned to the methodology and to a final report within 6 months of appointment.
Submit one technical proposal covering methodology, resources, experience and capacity for the selected cluster.
Experience & Qualifications
Source: T631126_FS Roads.pdf
Bidder experience
Experience in road condition assessment and preliminary rehabilitation planning for rural, agricultural, municipal, provincial or low-volume road networks.
Advantageous: TMH 9 assessments, pavement distress evaluation, traffic assessments, cost estimation, GIS-based mapping and digital road surveys.
Three contactable references not older than 10 years with name, designation, relationship to the project, email address and telephone number; references without full contact details are invalid.
Respond in the Table (a) format in Annexure 1.
Key personnel
Team Lead: SACPCMP PrCPM or ECSA Pr Eng; 8 years post-registration leading multidisciplinary infrastructure assessment and feasibility assignments in public sector frameworks; may not also act as technical lead for the condition assessment.
Pavement Rehabilitation Engineer: ECSA Pr Eng; 7 years post-registration in road condition assessment, rehabilitation or low-volume road engineering; demonstrable TMH 9 fieldwork on rural or low-volume roads.
Traffic Engineer: ECSA Pr Eng; 7 years post-registration in traffic surveys, vehicle classification, heavy vehicle assessment, agricultural freight demand and traffic analysis.
GIS and Spatial Data Specialist: NQF level 7 in Geomatics or Geoinformatics; 7 years in georeferenced digital survey, GIS database development, road condition mapping, chainage integration and spatial data management.
Cost Estimator/Quantity Surveyor: PrQS; 7 years post-registration in bills of quantities for road infrastructure.
Additional resources may be proposed.
No key resource may fill more than two functional roles.
Submit the team structure in the Table (b) Annexure 1 format, CVs highlighting qualifications and relevant experience, and proof of professional registration.
Quality Management
Source: T631126_FS Roads.pdf
Quality assurance
The Inception Report must include a Quality Assurance Plan and a risk register; no fieldwork starts before ISA approval.
Proposed data capture methods, tools and technologies must be described, with QA and validation procedures.
Where technology-assisted data collection is used, the bidder must explain how outputs are reviewed, validated and presented in a TMH 9-compliant format.
Assessment findings must be validated and professionally certified.
Deliverables are subject to ISA and stakeholder review; consolidated comments must be incorporated and revised deliverables resubmitted within 7 working days.
Reports in editable Word and PDF; spatial data in the agreed GIS format; other datasets in native electronic formats.
Pricing Schedule
Source: T631126_FS Roads.pdf
Pricing schedule
Quote in South African Rand, VAT inclusive where applicable.
State whether rates are firm for the full contract period; if not, give the adjustment basis such as CPI.
Specify all additional costs and include them in the total bid price.
State whether the price is linked to the exchange rate and identify the linked portion.
Confirm whether payment tied to approved deliverables within 30 days of invoice is accepted.
Confirm whether rates comply with the National Treasury Cost Containment Measures and the DPSA Guide on Hourly Fee Rates for Consultants or professional body guidelines, with substantiation.
Costing model per cluster: activity or deliverable, resources, number of hours, hourly rate (VAT excl.) and total cost, covering Tasks 1 to 5.
Financial Requirements
Source: T631126_FS Roads.pdf (RFP)
Pricing
All prices in South African Rand and VAT inclusive where applicable.
Rates must be firm for the contract period; if not, state the adjustment basis such as CPI.
All additional costs must be specified and included in the total bid price.
State whether the price is linked to the exchange rate and, if so, which portion.
Costing model per cluster: activity or deliverable, resources, number of hours, hourly rate (VAT excl.) and total cost, structured across Tasks 1 to 5.
Rates should align with the National Treasury Cost Containment Measures and the DPSA Guide on Hourly Fee Rates for Consultants, or professional body remuneration guidelines.
Payment
Payments are tied to approved deliverables and made within 30 days of invoice.
Financial evidence
Latest audited financial statements where required by the Companies Act, and/or independently reviewed statements, or a cashflow budget for new entities without financial records.
Compliance Requirements
Source: T631126_FS Roads.pdf (RFP)
Registration and tax
CSD registration used by the IDC for company registration and tax compliance vetting.
Tax affairs with SARS must be in order, with written confirmation submitted.
B-bbee
B-BBEE verification certificate required.
EMEs with annual revenue below R10 million and QSEs between R10 million and R50 million may submit a sworn affidavit confirming annual revenue and level of black ownership.
Misrepresentation is a criminal offence under the B-BBEE Act as amended.
Annexure 6 BEE Commitment Plan must be completed.
Authorisation and identity
Certified Board Resolution authorising the signatory.
Originally certified ID copy of the company representative.
Ownership and structure
Annexure 5 shareholders and directors information.
Annexure 4 bidder's disclosure and Annexure 7 disclosure statement.
Annexure 8 POPIA declaration.
A prime contractor must not hold a smaller share of contract value than any subcontractor.
Experience
Demonstrable road condition assessment and preliminary rehabilitation planning experience on rural, agricultural, municipal, provincial or low-volume networks.
TMH 9 assessment, pavement distress evaluation, traffic assessment, cost estimation, GIS mapping and digital road survey experience is advantageous.
Three contactable references not older than 10 years, each with name, designation, relationship to the project, email address and telephone number; incomplete references are invalid.
Key personnel (minimum)
Team Lead: SACPCMP PrCPM or ECSA Pr Eng, 8 years post-registration leading multidisciplinary infrastructure assessment and feasibility work in public sector frameworks; may not also be the technical lead for the condition assessment.
Pavement Rehabilitation Engineer: ECSA Pr Eng, 7 years post-registration in road condition assessment, rehabilitation or low-volume roads, with TMH 9 fieldwork on rural or low-volume roads.
Traffic Engineer: ECSA Pr Eng, 7 years post-registration in traffic surveys, vehicle classification, heavy vehicle assessment, agricultural freight demand and traffic analysis.
GIS and Spatial Data Specialist: NQF level 7 in Geomatics or Geoinformatics, 7 years in georeferenced digital survey, GIS database development, condition mapping, chainage integration and spatial data management.
Cost Estimator/Quantity Surveyor: PrQS, 7 years post-registration developing bills of quantities on road infrastructure.
No key resource may fill more than two functional roles.
Submit the team structure, CVs highlighting qualifications and relevant experience, and proof of professional registration.
Contractual Terms
Source: T631126_FS Roads.pdf
Contract duration
Work starts immediately on award and must be completed within 6 months.
Bid validity
120 days from the closing date.
Undertakings
Submitting a bid constitutes an offer on the RFP terms.
The IDC may require a presentation or practical demonstration within 5 days of notification.
Prices and rates must cover all work and obligations under the resulting contract; arithmetic errors are at the bidder's risk.
Bid preparation, presentation and demonstration costs are for the bidder's account; supporting documentation and manuals become IDC property unless stated otherwise.
Contract management
The successful bidder is fully liable for fulfilling the supply agreement and SLA.
Deliverables are reviewed by ISA and stakeholders; agreed comments must be incorporated and resubmitted within 7 working days.
All data, reports, photographs, videos and GIS datasets remain ISA property and must be handed over at completion.
Confidentiality obligations continue after completion.
IDC rights
May amend conditions, specifications or the closing date before closing, with amendments posted on the IDC website.
Not obliged to accept the lowest or any bid, and may award in part or in whole.
May conduct site visits at bidder or client premises and verify information, including FICA and background checks on the entity and its directors, trustees, shareholders or members.
May appoint multiple vendors to a panel where applicable.
May take into account its own experience of the bidder over the past 5 years.
Final interpretation of requirements rests with the IDC.
Section
Source: T631126_FS Roads.pdf
Functionality scoring (100 points, minimum 70)
Relevant experience: 25
Methodology and approach: 35
Project plan: 10
Team qualifications, skills and experience: 30
Bids below 70 are excluded from price and specific goals evaluation.
Preference points (80/20)
Price: 80
Specific goals: 20, made up of black ownership (10), 30% black women ownership (5), black designated group ownership (2) and SMME promotion (EME or QSE).
100% black owned entities score the full 10 points for black ownership; 51% to 99.99% black owned score 4.
Award
The highest scoring bid is normally awarded unless objective criteria justify another bidder.
Objective criteria cover reputational risk, concentration risk, financial capability and past performance on IDC contracts.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
19 Fredman Dr, Sandown, Sandton, 2031, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
16 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.