Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Eskom Road - Brackenfell - Cape Town - 7560
Organization Type
GOVERNMENT
Published
10 Nov 2026
OCDS Reference
ocds-9t57fa-177694
ESKOM requires debt collection services for active and terminated accounts of large power users (lpu), small power users (spu), and sundry debtors in the cape coastal cluster. Bidders must submit electronically via the ESKOM etendering system by the closing date. The most critical consideration is that the provided document is only a system user manual; the actual tender specifications, returnable forms, and evaluation criteria are not included, so bidders must obtain the full tender documentation to prepare a compliant bid.
Closing date: 1 December 2026 at 08:00.
Submission method: electronic only via Eskom eTendering system at https://eTendering.eskom.co.za.
CSD registration: a valid CSD number is required to access the eTendering system.
File size limits: each file up to 50 MB; total upload not exceeding 900 MB.
Documents must be uploaded under the correct category (Technical, Commercial, Finance) and submission must be finalised before the closing time.
The full tender documentation (specifications, returnable forms, evaluation criteria) is not included in the provided user manual; bidders must obtain the complete tender pack to identify all requirements.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Tuesday, 01 December 2026 - 10:00
Venue
MS Teams- Please see appointment on Eskom Tender Bulletin
Request for Quotation
Eskom Road - Brackenfell - Cape Town - 7560
Recommended Certifications
Having these can improve your winning chances: NERSA Registration, PV GreenCard (Solar Installation)
AI Document Analysis Stages
Description
10 Nov
2026
Tender Published
Tender was published
01 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.docx
Eskom seeks to appoint a service provider for debt collection services on active and terminated accounts for Large Power Users (LPU), Small Power Users (SPU), and sundry debtors in the Cape Coastal Cluster, Western Cape. The contract covers both active and terminated accounts and requires a quality control plan with defined inspection and testing intervention points.
240-68099512 Form A_Cat 3_Rev 10.pdf
Eskom requires debt collection services for active and terminated accounts of Large Power Users (LPU), Small Power Users (SPU), and sundry debtors in the Cape Coastal Cluster. The contract includes pre- and post-award quality requirements aligned with ISO 9001, with Category 3 quality classification.
Non-Disclosure Agreement (NDA) Vendors Template.pdf
Eskom is procuring debt collection services for active and terminated accounts of Large Power Users (LPU), Small Power Users (SPU), and sundry debtors in the Cape Coastal Cluster. The tender requires bidders to sign a Non-Disclosure Agreement (NDA) before accessing confidential information.
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf
Eskom requires the provision of debt collection services for active and terminated accounts of Large Power Users (LPU), Small Power Users (SPU), and sundry debtors in the Cape Coastal Cluster. The tender is an open invitation, and bidders must comply with Eskom's Standard Conditions of Tender, including submission requirements and evaluation criteria.
Eskom General Conditions of Purchase - 31 May 2024_Rev.pdf
Eskom requires debt collection services for active and terminated accounts of Large Power Users (LPU), Small Power Users (SPU), and sundry debtors in the Cape Coastal Cluster. The service covers both active and terminated accounts and is governed by Eskom's General Conditions of Purchase.
240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf
Provision of debt collection services for active and terminated accounts of Large Power Users (LPU), Small Power Users (SPU), and sundry debtors in the Cape Coastal Cluster, issued by Eskom. The contract requires a documented Quality Management System (QMS) compliant with ISO 9001, a draft Contract Quality Plan, and a Quality Control Plan or Inspection and Test Plan.
240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Eskom requires the provision of debt collection services for active and terminated accounts of Large Power Users (LPU), Small Power Users (SPU), and sundry debtors in the Cape Coastal Cluster. The contract will be governed by Eskom's Supplier Quality Management specification (QM 58), which mandates a quality management system conforming to ISO 9001 and includes pre- and post-contract quality requirements.
Consolidated TSC_NEC3.pdf
Eskom requires a contractor to provide debt collection services for active and terminated accounts of Large Power Users (LPU) and Small Power Users (SPU), and sundry debtors, in the Cape Coastal Cluster. The contract is a 36-month NEC3 Term Service Contract (TSC3) with a priced contract (Option A), starting 01 November 2026. Payment is based on a percentage of revenue collected for most items, with fixed rates for litigation and tracing services.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
Eskom requires debt collection services for active and terminated accounts of Large Power Users (LPU), Small Power Users (SPU), and sundry debtors in the Cape Coastal Cluster, Western Cape. Bidders must complete e-tendering self-training and submit the mandatory acknowledgement form.
E-tendering Help Manual for supplier - 27 January 2025.pdf
Eskom seeks a service provider for debt collection services on active and terminated accounts for Large Power Users (LPU), Small Power Users (SPU), and sundry debtors in the Cape Coastal Cluster. The service covers both active and terminated accounts within the specified geographic area.
Technical and Bill of Quantities.xlsx
Eskom seeks a debt collection agency to collect outstanding debt on active and terminated Large Power User (LPU), Small Power User (SPU), and sundry debtor accounts in the Cape Coastal Cluster. The contract covers a range of collection activities including call centre contact, tracing, adverse listing, and litigation, with pricing based on a percentage of revenue collected and fixed rates per activity. The contract is scheduled to run from 18 February 2026 to 17 February 2031, with an estimated total value of R9,800,000.
Invitation to Tender_Debt Collection_10 NOV 2026.pdf
Eskom requires debt collection services for active and terminated accounts of Large Power Users (LPU), Small Power Users (SPU), and sundry debtors in the Cape Coastal Cluster. The contract will be an NEC3 Term Service short contract, with a non-compulsory clarification meeting and electronic tender submission.
240-109253698 CQP Template 2021.docx
Eskom requires the provision of debt collection services for active and terminated accounts of Large Power Users (LPU), Small Power Users (SPU), and sundry debtors in the Cape Coastal Cluster, Western Cape. The contract includes a mandatory Contract Quality Plan (CQP) that the successful bidder must develop and maintain, covering quality management, communication, sub-supplier control, and documentation.
Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026 (1).pdf
Eskom requires debt collection services for active and terminated accounts of Large Power Users (LPU), Small Power Users (SPU), and sundry debtors within the Cape Coastal Cluster. The contract covers the Western Cape and is open for bidding until 1 December 2026.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document: Supplier Quality Management Specification (QM 58), unique identifier 240-105658000, revision 4, 30 pages.
Applicability: Eskom Holdings SOC Ltd, all divisions, subsidiaries, suppliers, sub-suppliers; forms part of all Eskom RFIs, RFQs, RFPs and contracts.
Purpose: Specify minimum quality requirements for existing/potential suppliers; define quality criteria for evaluation, selection, registration, assessment, performance monitoring, auditing.
Core philosophy: Partner with suppliers demonstrating commitment to develop, implement, maintain, continually improve a QMS per ISO 9001.
Effective date: Date of authorisation (1 July 2026).
Next review: May 2030.
Normative references: ISO 9001, ISO 10005.
Informative references: ISO 9000, ISO 10006, ISO 9004, Eskom SHEQ Policy (32-727), Eskom Procurement Policy (32-1033) and Procedure (32-1034), PPPFA, CIDB 1004, List of Tender Returnable (240-12248652), Tender Evaluation Scorecard (240-168873697), Guideline for QM 58 Selection Criteria (240-125473040), IAEA GS-R-3.1, SANS 10845-1.
Structure: Introduction, Supporting Clauses (scope, references, definitions, abbreviations, roles, monitoring process, related documents), Supplier Quality Management Requirements (QMS, quality plan, CQP, QCP), Pre-Contract Award (categories 1-4, capability/capacity assessment), Post-Contract Award (execution, monitoring, audit), Standard Conditions (access, information, preservation, audit conditions, nonconformity management, special processes), Acceptance, Revisions, Development Team, Acknowledgements.
Key definitions: Component, Contract Quality Plan, Hold Point, Intervention Points, Inspection Agency, Level 1/2/3 Plant Items, Nonconformity, Quality Plan, Quality Control Plan, Requirement, Primary/Secondary Plant, Special Process, Supplier, Sub-supplier, Witness Point.
Abbreviations: AIA, CA, CFT, CQP, FIDIC, FMECA, HAZOP, ISO, ITP, NC, NDT/NDE, PMI, QCP, QMS, PQP, RFI, RFQ, RFP, SHEQ, WPS, WQR.
Important Dates
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Tender closing date: 1 December 2026 at 08:00 (from tender record).
Specification effective date: 1 July 2026 (date of authorisation).
No compulsory briefing or site visit dates mentioned in this document.
Contact Information
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Document authors (for quality specification enquiries):
Tender enquiries: Eskom Supply Chain Management (contact details not provided in this document; see tender invitation).
Submission Guidelines
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Submission method and address: not specified in this document; refer to the tender invitation.
Returnable documents (per quality category indicated in Form A and the List of Tender Returnable 240-12248652):
All returnables must be submitted with the bid; omission or incomplete forms may lead to disqualification.
Evaluation Criteria
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Evaluation uses the Supplier Quality Management Tender Evaluation Scorecard (240-168873697) and the Guideline for QM 58 Selection Criteria (240-125473040).
Stages:
Minimum qualifying score: not stated in this specification; will be defined in the tender invitation.
Price/quality split: not stated; refer to tender document.
Technical Specifications
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Scope: This specification (QM 58, rev 4) sets minimum quality requirements for all existing and potential Eskom suppliers and sub-suppliers, forming part of every Eskom RFI, RFQ, RFP and contract.
Core requirements:
Key definitions: Hold Point (work cannot proceed without Eskom written authorisation), Witness Point (work may proceed after notification if inspection waived), Intervention Points (inspection, hold, witness, surveillance, review, verification), Special Process (results cannot be fully verified before delivery).
Methodology
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfPreservation programme methodology:
Protection against atmospheric conditions, sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres.
Detailed procedures for application, use, monitoring, maintenance of coatings, coverings, fasteners, linings for internal/external weather protection.
Quality Management
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfQuality Management System (QMS):
Quality Plans:
Personnel competence:
Monitoring and audit:
Nonconformity management:
Preservation:
Pricing Schedule
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfNo pricing schedule, rates, bill of quantities or payment terms specified in this document. Pricing details will be in the tender invitation and associated pricing forms (SBD 3.1/3.2/3.3).
Compliance Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Mandatory compliance:
Health & Safety
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfReference to SHEQ Policy (32-727) and IAEA Safety Standard GS-R-3.1.
No detailed health and safety requirements specified in this document; refer to project-specific SHEQ requirements and applicable legislation.
Contractual Terms
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfPreservation management programme:
Nonconformity management:
Special processes:
Eskom rights:
Section
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfEvaluation criteria detailed in separate documents:
Assessment by assigned Eskom Quality representative/professional part of Cross Functional Team (CFT).
Form A (Sections A & E) completed by Eskom quality representative and signed by supplier to acknowledge/accept quality requirements.
Criteria cover: QMS conformity to ISO 9001, audit results, quality plan adequacy, sub-supplier quality management, nonconformity management, preservation programme, special process controls, personnel competence.
Preference points per PPPFA (80/20 or 90/10) via SBD 6.1.
Minimum qualifying score not stated in this specification.
Description
Source: 240-109253698 CQP Template 2021.docxThe document is a Contract Quality Plan (CQP) template that assists the supplier in identifying and planning for meeting the client's quality expectations. It references SANS 466:2005 / ISO 10005:2005. The template is to be completed by the tenderer and will be reviewed by Eskom.
Submission Guidelines
Source: 240-109253698 CQP Template 2021.docx (unknown)The Contract Quality Plan (CQP) template must be completed and submitted with the bid.
The CQP must be approved by Eskom after award.
Technical Specifications
Source: 240-109253698 CQP Template 2021.docx (unknown)The document is a Contract Quality Plan (CQP) template that outlines the quality management requirements for the contract.
The template includes sections for:
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Mandatory returnable: the E-Tendering Training Acknowledgement Form (document 240-9722574 Rev 1) must be completed in full and submitted to Eskom within the prescribed period. The form requires the enquiry number, business name or joint venture name, contact person, landline telephone, cellphone number, email address, authorized signature, designation and date. A tenderer that fails to fully complete and submit the form is non-responsive and is disqualified from the procurement process.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Mandatory requirement: submission of the fully completed E-Tendering Training Acknowledgement Form. Failure to submit the form within the prescribed period renders the tenderer non-responsive and results in disqualification from the procurement process.
Technical Specifications
Source: Non-Disclosure Agreement (NDA) Vendors Template.pdf (unknown)Eskom requires debt collection services on active and terminated accounts for Large Power Users (LPU) and Small Power Users (SPU) and sundry debtors in the Cape Coastal Cluster.
Contractual Terms
Source: Non-Disclosure Agreement (NDA) Vendors Template.pdfThe document provided is a standard Non-Disclosure Agreement (NDA) template. Key obligations for the bidder (Receiving Party) include:
Description
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdfThe scope is the provision of debt collection services on active and terminated accounts for Large Power Users (LPU), Small Power Users (SPU), and sundry debtors in the Cape Coastal Cluster.
Contact Information
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Eskom Representative: Xola Klaas
Date issued: 24 August 2026
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Bidders must provide objective evidence of a documented Quality Management System (QMS) that complies with ISO 9001 (certification is not mandatory). The QMS must cover the clauses listed in Sections A and B of the tender returnables. Bidders must complete and sign Form A.
Evaluation is based on the following sections and scores:
No other pre-qualification criteria (e.g., CSD registration, tax clearance, B-BBEE level) are stated in the provided document.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Bidders must provide objective evidence of a documented QMS that complies with ISO 9001 (certification not mandatory). No other compliance requirements (e.g., CSD, tax clearance, B-BBEE) are stated in the provided document.
Section
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdfBidders must provide objective evidence of a documented QMS that complies with ISO 9001 (certification not mandatory). The QMS must cover the clauses listed in Sections A and B of the tender returnables. Bidders must complete and sign Form A.
Evaluation is based on the following sections and scores:
Important Dates
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.docx (unknown)Closing: 1 December 2026 at 10:00 (UTC+2)
Important Dates
Source: Invitation to Tender_Debt Collection_10 NOV 2026.pdf (TENDER)Closing date: 1 December 2026 at 10:00
Tender validity period: 120 days from closing date
Clarification meeting (non-compulsory): 16 November 2026, 09:00–11:00, via MS Teams
Clarification queries deadline: 5 working days before tender submission deadline (i.e., by 24 November 2026).
All queries and responses will be loaded on the Eskom Tender Bulletin after the clarification meeting.
Contact Information
Source: Invitation to Tender_Debt Collection_10 NOV 2026.pdf (TENDER)Eskom Representative (SCM contact):
Procurement Manager:
Submission method: electronic via Eskom E-tendering site (Eskom Tender Bulletin)
Fraud and corruption reporting:
Submission Guidelines
Source: Invitation to Tender_Debt Collection_10 NOV 2026.pdf (TENDER)Submission method: electronic via Eskom E-tendering site.
Returnable forms required at tender closing (disqualifiable if missing):
Returnable forms required at tender closing (non-disqualifiable, 5 working days to remedy):
Returnable forms required prior to contract award:
Disqualification risks:
Evaluation Criteria
Source: Invitation to Tender_Debt Collection_10 NOV 2026.pdf (TENDER)Evaluation stages:
Tie-breaking: If two or more tenderers score equal total points, the tenderer with higher points for Specific Goals is recommended. If still equal, drawing of lots.
B-BBEE documentation required for points:
Failure to submit B-BBEE documentation: bidder scores 0 out of 20 for B-BBEE but is not disqualified; price scored out of 80.
All tenderers must maintain their B-BBEE status throughout the contract period.
Experience & Qualifications
Source: Invitation to Tender_Debt Collection_10 NOV 2026.pdfFunctionality evaluation includes proven track record in the collection industry (25% weight):
Call centre resources: At least 1 qualified service agent with minimum 3 years experience.
Debt collection agency must have:
Quality Management
Source: Invitation to Tender_Debt Collection_10 NOV 2026.pdfQuality requirements: Category 3.
Section A: Quality Management System Requirements (ISO 9001):
Section B: Evidence of QMS in operation:
Section C: Contract Quality Plan Requirements:
Section D: Quality Control Plan Requirements:
Section E: User defined additional requirements:
Compliance with quality requirements is mandatory before contract award; failure to provide within stipulated period results in non-responsive tender.
Pricing Schedule
Source: Invitation to Tender_Debt Collection_10 NOV 2026.pdfPricing Schedule/BOQ: Refer to NEC3 contract documents loaded on Eskom Tender Bulletin – Technical folder.
Prices evaluated:
Cataloguing: Not applicable in this instance.
Financial Requirements
Source: Invitation to Tender_Debt Collection_10 NOV 2026.pdf (TENDER)Pricing format:
Payment terms:
Security for performance:
Financial evaluation:
Eskom reserves the right to negotiate with preferred bidders if tendered prices are not market-related.
Compliance Requirements
Source: Invitation to Tender_Debt Collection_10 NOV 2026.pdf (TENDER)CSD registration: Required (MAAA number).
Tax compliance:
B-bbee:
Employment Equity:
Coida:
Quality management:
CIDB: Not applicable.
Local content: Not applicable (designated sectors not applicable).
Contract Participation Goals: Not applicable.
Contract Skills Development Goals: Not applicable.
Health & Safety
Source: Invitation to Tender_Debt Collection_10 NOV 2026.pdfCOIDA: Original certificate of good standing or proof of application issued by the Compensation Fund (COID) or a licensed compensation insurer required from South African tenderers.
Other safety/quality documents as required per scope of work.
Contract Skills Development Goals (CSDG): Not applicable.
Contract Participation Goals (CPG): Not applicable.
Contractual Terms
Source: Invitation to Tender_Debt Collection_10 NOV 2026.pdfContract type: NEC3 Term Service Short Contract.
Eligibility criteria (disqualifying):
Security for performance: Performance bond or demand guarantee may be required; bidder must select at least 2 Eskom-approved financial institutions.
Payment terms:
Eskom reserves the right to negotiate with preferred bidders if prices are not market-related.
Main contractors discouraged from subcontracting with subsidiary companies; if done, must be declared.
Cataloguing: Not applicable in this instance.
Reverse e-auction: Not applicable.
Alternative tenders: Not allowed.
Tender validity: 120 days from closing date.
Section
Source: Invitation to Tender_Debt Collection_10 NOV 2026.pdfAdditional evaluation criteria:
Description
Source: Technical and Bill of Quantities.xlsxEskom's Cape Coastal Cluster requires a debt collection agency to recover outstanding electricity debt from Large Power Users (LPU), Small Power Users (SPU) and sundry debtors on active and terminated accounts. The agency must be affiliated to ADRA, hold Council for Debt Collectors membership or comply with the LSSA Code of Conduct, and must provide call centre, tracing, credit bureau adverse listing and litigation capabilities.
Submission Guidelines
Source: Technical and Bill of Quantities.xlsx (unknown)Returnable documents
Mandatory supporting documents
Evaluation Criteria
Source: Technical and Bill of Quantities.xlsx (unknown)Evaluation stages
Minimum qualifying score: 75/100.
Alternative functionality criteria (separate sheet, minimum threshold 80%):
Technical Specifications
Source: Technical and Bill of Quantities.xlsx (unknown)Scope
Capacity and capability requirements
Financial Requirements
Source: Technical and Bill of Quantities.xlsx (unknown)Pricing format
Rates
Indicative contract value
Compliance Requirements
Source: Technical and Bill of Quantities.xlsx (unknown)Mandatory eligibility
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Closing date: 1 December 2026 at 08:00 (refer to Tender Data for timezone).
Compulsory site visit or clarification meeting: if stipulated in Tender Data, attendance is mandatory. Details to be provided.
Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)All communication must be directed in writing to the Eskom Representative identified in the Invitation to Tender. No specific contact details provided in this document.
Submission Guidelines
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Submission method: Paper (original plus one hard copy) or electronic via Eskom Tender Bulletin site.
Packaging: For paper, place original and copy in separate sealed packages marked 'ORIGINAL' and 'COPY', then seal both in an outer envelope marked 'Confidential' with the tender number and tenderer's details.
Language: English, written in ink.
Returnable forms (must be completed and submitted by closing date unless noted):
Disqualification risks:
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Evaluation stages:
Quality Management
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfBidders must provide proof of quality management systems as part of SHEQ requirements.
Pricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfThe pricing schedule must be completed with rates and prices in South African Rand, inclusive of all duties, taxes, and VAT. Prices are fixed for the contract duration. Arithmetical errors will be corrected; the amount in words prevails.
Financial Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Pricing:
Insurance: Eskom's insurance may not provide full cover; bidders should obtain independent advice.
Security for performance: if required, bidder must name at least two financial institutions from which it will obtain the security.
Financial analysis: Eskom may assess the bidder's financial statements; if risk is too high, the bidder may be excluded.
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Mandatory registrations and evidence:
Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfBidders must provide proof of health and safety systems as part of SHEQ requirements. Compliance with OHS Act is required.
Contractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfEskom may accept or reject any tender, cancel the process, or negotiate with selected tenderers. Eskom is not liable for any losses from participation. Tender validity period applies; bidders may be asked to extend. Confidentiality of tender process. Standardised specifications are incorporated by reference. Compulsory site visit/clarification meeting may be required. Clarification requests must be in writing to Eskom Representative. Insurance advice. Pricing rules. No alterations to documents except as instructed. Alternative tenders only with main tender. Post-submission clarification may not change prices. Contract signing required. Agent authority must be provided. Compliance with all relevant legislation. SHEQ, CIDB, CSDG, CPG requirements apply. Security for performance may be required.
Section
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfAdditional evaluation details: Functionality criteria may apply with a minimum threshold. Financial analysis assesses risk. Price evaluation considers factors like CPA, FOREX, commodity exposure. B-BBEE and Specific Goals are scored within the 90/10 or 80/20 system. Objective criteria may be used if stated.
Important Dates
Source: 240-68099512 Form A_Cat 3_Rev 10.pdf (unknown)Closing date: 1 December 2026 at 10:00 SAST (08:00 UTC).
No mandatory briefing or site visit is mentioned in the provided document.
Contact Information
Source: 240-68099512 Form A_Cat 3_Rev 10.pdf (unknown)Quality enquiries (Form A):
SCM and technical enquiries: Not provided in the attached document. Refer to the full RFQ.
Submission Guidelines
Source: 240-68099512 Form A_Cat 3_Rev 10.pdf (unknown)Returnable documents:
Submission method: Not stated in the provided document.
Closing time: 1 December 2026 at 10:00 SAST (08:00 UTC).
Evaluation Criteria
Source: 240-68099512 Form A_Cat 3_Rev 10.pdf (unknown)The provided document does not specify the evaluation criteria (e.g., 80/20 or 90/10 split, minimum qualifying scores). Bidders must refer to the full RFQ document for the evaluation methodology.
Mandatory requirement: Acknowledgment and acceptance of Eskom Supplier Quality Requirements (240-105658000) and ISO 9001 via signed Form A.
Technical Specifications
Source: 240-68099512 Form A_Cat 3_Rev 10.pdf (unknown)Scope: Debt collection services for Eskom's Large Power Users (LPU), Small Power Users (SPU), and sundry debtors.
Account types: Active and terminated accounts.
Location: Cape Coastal Cluster, Western Cape.
Quality category: Category 3 (as per Eskom specification 240-105658000).
Methodology
Source: 240-68099512 Form A_Cat 3_Rev 10.pdfThe bidder's quality management system must align with the following ISO 9001 principles as indicated in Form A:
Quality Management
Source: 240-68099512 Form A_Cat 3_Rev 10.pdfBidders must acknowledge and accept Eskom's Supplier Quality Requirements (specification 240-105658000) and the ISO 9001 standard.
Compliance Requirements
Source: 240-68099512 Form A_Cat 3_Rev 10.pdf (unknown)Mandatory compliance:
Other compliance requirements (CSD registration, tax clearance, B-BBEE, CIDB, etc.): Not specified in the provided document. Refer to the full RFQ.
Section
Source: 240-68099512 Form A_Cat 3_Rev 10.pdfThe source text for this section contains only the boilerplate of Form A (Tender & Contract Quality Requirements). No specific evaluation criteria for the bid are provided in this document. The completion of Form A is a mandatory submission requirement.
Description
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdfThe agreement covers the supply of goods or execution of works/services as described in the order documents, specifications, schedules, and drawings approved by Eskom.
Evaluation Criteria
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdf (unknown)Acceptance of Eskom's General Conditions of Purchase is required; non-acceptance must be indicated in writing.
Services must be provided in the Cape Coastal Cluster.
Compliance with all statutory requirements of South Africa is required.
Bidders must not be bankrupt or in financial circumstances that prejudice performance.
Adherence to Eskom's ethical standards is required.
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdfIf the supplier fails to comply, Eskom may reject goods or work by written notice, specifying reason and whether replacement or rework is required.
For goods, Eskom may return rejected goods at the supplier's risk and expense. The supplier must repay any money paid for goods not replaced and cover costs of returning and obtaining replacements.
For works/services, the supplier must correct non-conformances as indicated by Eskom. If delayed, Eskom may have the work corrected by a third party at the supplier's cost.
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdfPrices or rates may include an amount for price adjustment calculated according to a formula stated in the agreement.
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdf (unknown)Prices may include a price adjustment calculated according to a formula stated in the agreement.
Payment will be made within 30 days after receipt of a correct tax invoice.
Eskom's VAT registration number (4740101508) must appear on the tax invoice.
The CPA (IG) form must be completed.
Payment may be in any currency, with one exchange rate used to convert to ZAR.
Late deliveries may be subject to a penalty as stated in the agreement.
Health & Safety
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdfPrice and payment: Prices may include a price adjustment calculated by a formula in the agreement. Payment may be in any currency, with one exchange rate to ZAR. Payment in non-ZAR currency shall not exceed the amounts stated. The CPA (IG) form must be completed. Eskom pays within 30 days after receipt of a correct tax invoice. Eskom's VAT registration number (4740101508) must appear on the tax invoice.
Delivery and documents: Delivery means delivery of goods or completion of work at the specified point on or before the stated date. Late delivery may incur a penalty. No payment if goods/services/works not provided as agreed. The supplier must mark packages, send an advice note, send a detailed tax invoice after delivery, state the agreement number on all communications, and state whether delivery cost is included in the price (if not, it is deemed included).
Containers/packing: No payment for containers or packing materials unless otherwise stated.
Acceptance: Goods/works/services are subject to Eskom's approval. Eskom may inspect/test at any stage. If Eskom does not notify acceptance, it is deemed accepted.
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdfIndemnity: The supplier indemnifies Eskom against claims arising from negligence, infringement, or breach of statutory duty by the supplier, subcontractors, agents, or servants.
Warranty: The supplier warrants that goods/works/services are fit for purpose and free from defects for one year from acceptance (unless otherwise stated). Defects must be rectified free of cost within an agreed period.
Assignment and subcontracting: Neither party may cede or delegate rights or obligations without the other's written consent. Eskom may cede to subsidiaries or restructured entities on written notice.
Statutory requirements: The supplier must adhere to all relevant statutory requirements. The agreement is governed by South African law.
Breach: If either party breaches and fails to remedy after written notice, the non-defaulting party may terminate.
Termination: Eskom may terminate if the supplier defaults, becomes bankrupt, or is in financial circumstances that prejudice performance.
Ethics: Eskom expects the highest standard of ethical behaviour from suppliers.
Important Dates
Source: Consolidated TSC_NEC3.pdf (unknown)Closing date: 1 December 2026 at 08:00 (from tender record).
Starting date: 1 November 2026.
Service period: 36 months.
Base date for price adjustment indices: August 2026.
Period for reply to communications: one week.
Assessment interval: between the 10th working day of each successive month.
Payment period: 30 days upon submission of a certified tax compliant invoice.
No compulsory briefing or site visit is mentioned.
Contact Information
Source: Consolidated TSC_NEC3.pdf (unknown)Employer: Eskom Holdings SOC Ltd
Service Manager: (to be inserted at award stage)
Engineering Contract Strategies (for document availability):
No specific SCM or technical enquiry contacts are provided in the document.
Submission Guidelines
Source: Consolidated TSC_NEC3.pdf (unknown)Returnable documents — all must be completed, signed and submitted:
Disqualification risks:
Evaluation Criteria
Source: Consolidated TSC_NEC3.pdf (unknown)The document does not state a formal evaluation scoring split or minimum qualifying score. The contract is a priced contract (Option A) under NEC3 TSC3, so price is the primary award criterion. B-BBEE status is relevant for preference points under the PPPFA (likely 80/20 or 90/10 system, but thresholds not stated). The bidder must complete all returnable documents and meet all eligibility requirements to be considered.
Experience & Qualifications
Source: Consolidated TSC_NEC3.pdfThe bidder must provide key personnel details in Contract Data Part Two, including names, jobs, responsibilities, qualifications, and experience. CVs for key personnel must be submitted. No minimum years of experience or specific qualifications are stated in the provided document.
Quality Management
Source: Consolidated TSC_NEC3.pdfThe document references quality assurance requirements in the Employer's Service Information (section 3.3), but no specific quality standards, certifications, or QA/QC procedures are detailed in the provided text. The contractor must comply with the quality assurance requirements stated in the Service Information.
Pricing Schedule
Source: Consolidated TSC_NEC3.pdfPricing is under Option A (priced contract with price list). The price list (C2.2) contains the following items:
Items may be priced as lump sums or as rates multiplied by expected quantities. The tendered total of the Prices is entered in the price list. No adjustment to lump sum prices except through compensation events.
Financial Requirements
Source: Consolidated TSC_NEC3.pdf (unknown)Pricing format: Option A — priced contract with a price list. Items may be priced as lump sums or as rates multiplied by expected quantities.
Price list items:
Payment: assessment between the 10th working day of each successive month; payment within 30 days of submission of a certified tax compliant invoice to Eskom Finance Shared Services.
Interest on late payment: publicly quoted prime rate of interest (Standard Bank of South Africa), calculated on a 365-day year.
Tax invoice: must include Eskom's VAT number 4740101508; must be provided within one week of receiving a payment certificate.
Bid security, bonds, guarantees: not specified in the document, but the contract requires delivery of any such securities within two weeks of contract award.
No turnover or financial capacity thresholds are stated.
Compliance Requirements
Source: Consolidated TSC_NEC3.pdf (unknown)CSD registration: required (Central Supplier Database).
Tax clearance: valid tax compliance status PIN required.
B-BBEE: a valid B-BBEE certificate or sworn affidavit (EME/QSE) is required to claim preference points. Any change in B-BBEE status must be notified to Eskom within seven days; an updated certificate must be submitted within thirty days. A decrease in B-BBEE status may lead to contract renegotiation or termination.
CIDB grading: not stated; not required for this service.
CIPC registration: not explicitly stated but implied for a legal entity.
Professional registrations: not stated.
Local content: not stated.
Joint ventures: if bidding as a joint venture or consortium, all members are jointly and severally liable; the key person with authority to bind must be notified within two weeks of contract date; composition cannot be altered without Eskom's written consent.
Cession, delegation, assignment: not permitted without Eskom's written consent.
Ethics: no corrupt, fraudulent, collusive, coercive, or obstructive actions permitted; breach may lead to termination.
Confidentiality: all contract-related information must be kept confidential; images of the affected property require prior written consent.
Health, safety, and environment: the contractor must comply with all applicable OHS and environmental laws, including the Construction Regulations 2014 if appointed as Principal Contractor.
Asbestos: the employer manages asbestos; the contractor may stop work if unsafe levels are detected; removal and disposal are done by a registered contractor at Eskom's expense.
Insurance: the contractor must maintain insurance as per Insurance Table A (loss/damage to employer's property, plant, materials, equipment, public liability, employee liability). The employer provides insurance as per Insurance Table B.
Low service damages: capped at R3,000 per day (Option X17).
Key Performance Indicators: performance measured every 3 months on dimensions including reliability, order accuracy, delivery/timeliness, quality, business relations, personnel, responsiveness, customer support.
Health & Safety
Source: Consolidated TSC_NEC3.pdfThe contractor must take all reasonable precautions to maintain health and safety of persons in and about the execution of the service.
Eskom may appoint the contractor as Principal Contractor under the Construction Regulations 2014.
The total of the Prices includes a sufficient amount for compliance with all applicable health and safety laws, regulations, and rules.
The contractor must comply with the Construction Regulations and all applicable health and safety laws, and ensure subcontractors and employees do the same.
Asbestos: the employer ensures ambient air conforms to prescribed standards (OEL 0.2 fibres/ml as 4-hour TWA, short-term limit 0.6 fibres/ml as 10-minute TWA). The contractor may perform parallel measurements at its own expense. If asbestos is identified, a risk assessment is conducted, and if exposure exceeds the action level, immediate control measures and air monitoring are implemented. Contractor's personnel may stop work and leave the contaminated area until declared safe. Removal and disposal of asbestos is done by a registered contractor at Eskom's expense.
Environmental
Source: Consolidated TSC_NEC3.pdfThe contractor must comply with all applicable environmental laws and regulations, and rules, guidelines, and procedures provided for under the contract. The contractor must ensure that subcontractors, employees, and others under its direction and control likewise comply.
Contractual Terms
Source: Consolidated TSC_NEC3.pdfContract type: NEC3 Term Service Contract (TSC3) with main Option A (priced contract with price list), dispute resolution Option W1, and secondary Options X1 (price adjustment for inflation), X2 (changes in law), X17 (low service damages), X20 (key performance indicators), and Z additional conditions (Z1 to Z14).
Duration: 36 months, starting 1 November 2026.
Law of contract: Republic of South Africa.
Language: English.
Period for reply: one week.
Termination: Eskom may terminate if the contractor takes prohibited actions (corrupt, fraudulent, collusive, coercive, obstructive) or if a business rescue order is granted against the contractor.
Employer's limitation of liability: zero rand for indirect or consequential loss.
Nuclear liability: Eskom (operator of Koeberg Nuclear Power Station) indemnifies the contractor against nuclear damage, except where caused by unlawful intent or unauthorised presence.
Asbestos: employer manages asbestos; contractor may stop work if unsafe levels detected; removal by registered contractor at Eskom's expense.
Confidentiality: all contract information confidential; images of affected property require prior written consent.
Cession, delegation, assignment: not permitted without Eskom's written consent.
Joint ventures: jointly and severally liable; key person must be notified within two weeks; composition cannot be altered without consent.
B-BBEE status change: must be notified within seven days; updated certificate within thirty days; decrease may lead to renegotiation or termination.
Insurance: contractor must maintain insurance per Insurance Table A; employer provides insurance per Insurance Table B.
Low service damages: capped at R3,000 per day.
Key Performance Indicators: measured every 3 months on 8 dimensions.
Compensation events: must be notified within eight weeks of becoming aware, or entitlement is lost.
Section
Source: Consolidated TSC_NEC3.pdfThe document does not provide a formal evaluation criteria breakdown. The contract is a priced contract, so price is a primary factor. B-BBEE status will be used for preference points under the PPPFA. The bidder must complete all returnable documents and meet all eligibility requirements.
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfThe document is a user manual for the Eskom eTendering system, not the tender specification document. It describes how suppliers register, log in, and upload tender documents electronically. The actual tender is for debt collection services in the Cape Coastal Cluster, but no scope details are in this manual.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)For system problems, contact the buyer responsible for the published tender.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Submission method: electronic via the Eskom eTendering system at https://eTendering.eskom.co.za
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)The document does not state the evaluation criteria for this specific tender. It mentions that closed tenders are sent to suppliers who meet selection and evaluation criteria, but no details are given.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)CSD registration: a valid CSD number is required to access the eTendering system.
Section
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfThe document mentions that closed tenders are sent to suppliers who meet selection and evaluation criteria, but no specific criteria for this tender are provided.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 4 of 2006
Relevant to electricity, generation, transmission, distribution and energy-service procurement.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 28 of 2002
Relevant to mineral resources, mining rights, prospecting and mining-related procurement.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 40 of 2004
Relevant to regulated electricity, piped-gas and petroleum-pipeline activities.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance.
Address
Eskom Road - Brackenfell - Cape Town - 7560
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
14
Last checked
11 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Median Estimate
R 5 103 284
Range
Based on 8 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Electricity, gas, steam and air conditioning. Unlock full pricing strategies, bid frequency, and historical win rates.