Tender Type
Request for Proposal
Delivery Location
Port of Durban - Durban - Durban - 4001
Organization Type
GOVERNMENT
Published
27 Nov 2026
OCDS Reference
ocds-9t57fa-180306
TRANSNET national ports authority requires structural repairs to the c-berth quay wall at the port of durban, to be completed within six months. The work involves maintaining and improving port infrastructure within the port environment and must comply with the national ports act, 2005. Bidders must be able to operate under port authority jurisdiction; NO specific pre-qualification criteria are stated in the available document.
Closing date: 14 December 2026 at 12:00 (submission method and address not stated in the available document).
Scope: structural repairs to the C-Berth quay wall at the Port of Durban, over a six-month period.
Compliance: bidders must comply with the National Ports Act, 2005, including any regulations and directives issued under it.
Operating environment: bidders must be able to work within the port environment under the jurisdiction of the National Ports Authority.
No pre-qualification criteria (e.g., CIDB grading, B-BBEE level, CSD registration) are stated in the available document; bidders should confirm requirements directly with the authority.
No mandatory briefing, site visit, pricing format, evaluation split, or financial requirements are stated in the available document.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Check the registered grade against the tender conditions, or estimate a possible grade. Check CIDB registration · Estimate a CIDB grade.
Venue
237 Mahatma Gandhi, Queens Warehouse Building, Durban
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Proposal
Port of Durban - Durban - Durban - 4001
AI Document Analysis Stages
Description
Source: HEALTH AND SAFETY SPECIFICATION- C-Berth Repairs.pdf27 Nov
2026
Tender Published
Tender was published
14 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
2B0904-005-00.tif
2B0904-011-00.tif
2B0904-003-00.tif
2B0904-002-00.tif
2B0904-012-00.tif
Port of Durban Berthing Guidelines 2017 - Signed.pdf
2B0904-001-00.TIF
Proposed repair method to C Berth-A0.pdf
Structural repairs to the C-Berth quay wall at the Port of Durban, including caisson wall and foundation reinforcement, dowelling, concrete repair, and underwater grouting, to be completed over a six-month period.
Standard Generic EMPr DBN.pdf
Structural repairs to the C-Berth quay wall at the Port of Durban, undertaken over a six-month period. The works fall under a standard Environmental Management Programme for minor maintenance works, requiring strict compliance with environmental controls, reporting, and monitoring.
Annexure A3- Principal Controlled Insurance.pdf
Structural repairs to the C-Berth quay wall at the Port of Durban, to be completed over six months. The work is covered under Transnet's Principal Controlled Insurance programme, which provides Contract Works and Contractors Public Liability cover on behalf of the contractor and subcontractors.
Minimum Environmental Requirements for Construction.pdf
Structural repairs to the C-Berth quay wall at the Port of Durban over a six-month period, procured by Transnet National Ports Authority. The tender includes extensive environmental management obligations, requiring bidders to comply with Transnet's Minimum Environmental Requirements for Construction (MERC), submit an Environmental Management Plan (EMP), appoint a qualified Environmental Officer (EO), and follow strict waste, spill, and site management protocols.
Port Rules GG31986 060309 (2).pdf
Structural repairs to the C-Berth quay wall at the Port of Durban, to be completed over a six-month period. The work is procured by Transnet National Ports Authority and is subject to the National Ports Act and Port Rules.
Baseline Risk Assessment Analysis -C-Berth Repairs.pdf
Transnet National Ports Authority requires structural repairs to the C-Berth quay wall at the Port of Durban over a six-month period. The work includes underwater surveys, diving inspections, breaking out damaged concrete, installing new reinforcement, placing tremie concrete, and sealing caisson joints, all within an operational port environment.
Annexure B2.pdf
Structural repairs to the C-Berth quay wall at the Port of Durban, to be completed over a six-month period for Transnet National Ports Authority.
National Ports Act 12 of 2005 (2).pdf
Structural repairs to the C-Berth quay wall at the Port of Durban, to be completed over a six-month period. The National Ports Authority (Transnet) is the contracting authority, and the work falls under the National Ports Act, 2005, which governs port infrastructure maintenance and safety.
HEALTH AND SAFETY SPECIFICATION- C-Berth Repairs.pdf
Structural repairs to the C-Berth quay wall at the Port of Durban, to be completed over six months. The contractor must comply with a comprehensive health and safety specification, including risk assessments, training, and emergency procedures, and must adhere to TNPA's rules of conduct and safety rules.
Annexure B3.pdf
Transnet National Ports Authority requires structural repairs to the C-Berth quay wall at the Port of Durban, to be completed over six months. The work involves concrete repairs in a marine environment, with strict durability requirements, including specific cement types, mix designs, curing methods, and quality assurance.
Annexure B1.pdf
Structural repairs to the C-Berth quay wall at the Port of Durban, undertaken over a six-month period within an operational port environment. The contractor must comply with port restrictions, safety regulations, and environmental specifications while carrying out works near existing berths, pipelines, and a National Key Point area.
Consolidated Inspection Report - 22 Sept 2026.pdf
Transnet National Ports Authority requires structural repairs to the C-Berth quay wall at the Port of Durban, following a vessel impact incident on 31 August 2026 that damaged the quay wall and associated berthing infrastructure between Bollards 45 and 46. The repairs must be completed over a six-month period and include both landside and underwater remedial works.
TNPA Asbestos Management Plan.pdf
Structural repairs to the C-Berth quay wall at the Port of Durban, to be completed over six months. The work is subject to Transnet National Ports Authority's Asbestos Management Plan, which imposes strict controls on soil-disturbing activities due to historical asbestos contamination in the port area.
Contractor Environmental and Sustainable Specifications (TRN-IMS-GRP-GDL-014.4) signed.pdf
Structural repairs to the C-Berth quay wall at the Port of Durban, to be completed over six months. The contractor must comply with Transnet's environmental and sustainability specification, including appointing an Environmental Officer, submitting an Environmental Management Plan and method statements, and managing waste, spills, and site establishment in line with the specification.
RFP STRUCTURAL REPAIRS TO C-BERTH QUAY WALL.pdf
Transnet National Ports Authority requires a contractor for structural repairs to the C-Berth quay wall at the Port of Durban, with a contract period of six months. The works are procured under an NEC3 Engineering and Construction Contract, and the tender is subject to the CIDB Standard for Indirect Targeting for Enterprise Development (BUILD Programme).
External_how_to_guide_E-Tender Submission Portal.pdf
Transnet National Ports Authority requires structural repairs to the C-Berth quay wall at the Port of Durban, with work to be completed over a six-month period. Bidders must register and submit their bids through the Transnet E-Tenders Portal.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
TransnetSecure Transnet tenders using AI Matching & Recommendations, logistics infrastructure intelligence, compliance analysis, and application support for rail, ports, and pipelines.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
RÂ 3Â 400Â 000
Range
Based on Industry avg. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The Health and Safety Specification (HSS) is a supplementary specification to the Construction Regulations, 2014, and forms an integral part of the contract.
The HSS provides a standard to which contractors' H&S Plans must be based.
The contractor must comply with the OHSA, all applicable regulations, and TNPA standards.
The contractor must allow for the cost of complying with the HSS in the tender.
The contractor must comply with the TNPA Rules of Conduct and the TNPA 11 Safety Rules.
Important Dates
Source: HEALTH AND SAFETY SPECIFICATION- C-Berth Repairs.pdf (TENDER)No dates are stated in this document.
Contact Information
Source: HEALTH AND SAFETY SPECIFICATION- C-Berth Repairs.pdf (TENDER)TNPA Security Permit Office (for access permit applications):
Incident reporting contacts:
Submission Guidelines
Source: HEALTH AND SAFETY SPECIFICATION- C-Berth Repairs.pdf (TENDER)Returnable documents: the Health and Safety Specification forms part of the contract; bidders must price for compliance with it. No other returnable forms are listed in this document.
Evaluation Criteria
Source: HEALTH AND SAFETY SPECIFICATION- C-Berth Repairs.pdf (TENDER)No evaluation criteria are stated in this document. Bidders must be registered with the Compensation Fund (COID) and provide a Letter of Good Standing. The contractor must appoint a Health and Safety Officer registered with SACPCMP. All personnel must obtain TNPA access permits, which requires a vetting process and SHE induction training. The contractor must comply with all applicable legislation and TNPA standards. No specific B-BBEE level, CIDB grading, or local content percentage is stated in the provided document.
Technical Specifications
Source: HEALTH AND SAFETY SPECIFICATION- C-Berth Repairs.pdf (TENDER)Scope: structural repairs to the C-Berth quay wall at the Port of Durban, over a period of six months.
The Health and Safety Specification (HSS) is a supplementary specification to the Construction Regulations, 2014, and forms an integral part of the contract.
The contractor must comply with the Occupational Health and Safety Act, 1993, all applicable regulations, and TNPA standards.
The contractor must implement a risk-based Health and Safety Management Plan, including hazard identification and risk assessment processes.
The contractor must develop Safe Work Procedures, conduct Toolbox Talks, and Daily Safe Task Instructions.
The contractor must comply with TNPA Rules of Conduct and the TNPA 11 Safety Rules, including speed limits (30 km/h within TNPA premises, 20 km/h on the quay side), use of life vests near the quay edge, and fall protection when working at height.
All personnel must undergo TNPA SHE induction training and obtain TNPA access permits before entering the port.
The contractor must provide a site induction training programme for all employees and visitors.
The contractor must maintain a compliance file with all required documentation, including risk assessments, appointment letters, and training records.
The contractor must implement an alcohol and drug testing programme; persons testing positive will be removed from site permanently.
No fuel or flammable liquids may be stored on site without written approval.
Waste must be handled, stored, transported, and disposed of in accordance with applicable legislation; waste service providers must be audited every two years.
Experience & Qualifications
Source: HEALTH AND SAFETY SPECIFICATION- C-Berth Repairs.pdfHealth and Safety Officer: Must be registered with SACPCMP, have at least 5 years' experience as a Health and Safety Officer on construction projects, and hold SAMTRAC, NEBOSH, or equivalent training, a valid First Aid certificate, fire prevention training, and a valid driving licence.
Supervisors: Must be qualified, competent, and appointed, with experience in the type of work being carried out.
All employees must be competent and have the necessary qualifications, certificates, licences, job skills, training, and experience.
Employee Profiles (dossiers) must be completed for each employee, containing certified copies of qualifications, certificates, licences, and proof of job skills, training, and experience.
Only certified copies of certificates and licences will be accepted.
The contractor must provide proof that training institutions and trainers are registered with a governing authority.
Foreign qualifications in health and safety critical roles must be verified against local legislation.
Quality Management
Source: HEALTH AND SAFETY SPECIFICATION- C-Berth Repairs.pdfThe contractor must implement a Health and Safety Management System, including audits and inspections.
Monthly audits of the health and safety management system and workplace activities of the contractor and each sub-contractor are required.
The contractor must participate in health and safety audits and carry out workplace inspections.
Corrective actions from incident investigations, audits, and inspections must be implemented.
The contractor must maintain accurate health and safety statistics and compile performance reports.
The contractor must review the Health and Safety Management System annually.
Compliance Requirements
Source: HEALTH AND SAFETY SPECIFICATION- C-Berth Repairs.pdf (TENDER)COID registration: The contractor must submit a Letter of Good Standing from its Compensation Insurer as proof of registration.
Public liability insurance: Proof of Public Liability Insurance is required.
Health and Safety Officer: Must be registered with SACPCMP and have at least 5 years' experience as a Health and Safety Officer on construction projects, with SAMTRAC, NEBOSH, or equivalent training, a valid First Aid certificate, fire prevention training, and a valid driving licence.
Health and Safety Representatives: At least one per 50 employees, elected and appointed, and trained at an accredited institution.
First Aiders: At least one per 50 employees (if 10 or more employees are deployed), trained at an accredited institution.
All appointments must be in writing, with signed appointment letters retained.
All employees must have an Employee Profile (dossier) with certified copies of qualifications, certificates, and licences.
Employees in safety critical jobs must undergo fitness assessments (medical examinations) before employment, on change of role, periodically, and on termination; medical records must be retained for at least 40 years.
TNPA access permits: Application must be made to the Port Security Officer, with a list of employees, certified ID/passport copies (certified at SAPS or eThekwini Municipality Metro Police, not older than 3 months), and work permits for foreign workers. There is a 14-day turnaround time for vetting, SHE induction, and permit issue.
No specific B-BBEE level, CIDB grading, or local content percentage is stated in the provided document.
Health & Safety
Source: HEALTH AND SAFETY SPECIFICATION- C-Berth Repairs.pdfThe contractor must comply with the OHSA, Construction Regulations 2014, and this HSS.
The contractor must implement hazard identification and risk assessment processes for all work, covering the full project life cycle, routine and non-routine activities, planned/unplanned changes, all persons, and all infrastructure/equipment/materials.
The contractor must maintain a risk register and apply the hierarchy of controls to manage risks to ALARP.
The contractor must compile and maintain a legal register of all applicable legislation and standards.
The contractor must appoint a competent Construction Manager, a full-time Health and Safety Officer registered with SACPCMP, and adequate supervisors.
At least two full-time Health and Safety Officers may be required depending on scope and risk.
Health and Safety Officers must be on site during all shifts and must be provided with a computer, mobile phone, and vehicle where required.
Supervisors must be present in the work area at all times and must conduct Daily Safe Task Instructions.
Health and Safety Representatives must be elected and appointed (minimum one per 50 employees).
First Aiders must be appointed (minimum one per 50 employees if 10 or more employees).
The contractor must conduct induction training, toolbox talks, and daily safe task instructions.
The contractor must implement an emergency response plan and report incidents as required.
Alcohol and drug testing will be carried out randomly; positive results lead to removal from site.
The contractor must enforce the TNPA Rules of Conduct and the TNPA 11 Safety Rules.
The contractor must ensure all personnel have TNPA access permits and undergo SHE induction.
The contractor must maintain a compliance file with all required documentation.
The contractor must ensure all employees are competent and have the necessary qualifications and training.
Only certified copies of certificates and licences will be accepted.
The contractor must provide proof that training institutions and trainers are registered with a governing authority.
Foreign qualifications in health and safety critical roles must be verified against local legislation.
The contractor must develop and implement Safe Work Procedures for all activities with significant risk.
The contractor must conduct monthly site meetings and attend contractor health and safety meetings.
The contractor must implement a management of change process.
The contractor must conduct planned task observations and safety observations and coaching.
The contractor must ensure that all incidents are reported and investigated.
The contractor must provide a flash report to TNPA within 24 hours of any incident.
The contractor must ensure that all personnel are fit for work and report any condition that might impair safety.
The contractor must implement a fatigue, stress, and fitness management programme.
The contractor must provide an Employee Assistance Programme.
The contractor must ensure that all vehicles and equipment are inspected and maintained.
The contractor must control the issuing and replacement of PPE and maintain a PPE register.
Smoking is only permitted in designated areas.
The contractor must manage waste in accordance with legislation and audit waste service providers every two years.
Environmental
Source: HEALTH AND SAFETY SPECIFICATION- C-Berth Repairs.pdfWaste management: All waste must be handled, stored, transported, and disposed of in accordance with applicable legislation and local authority requirements.
Waste service providers must be audited on a two-yearly basis (or more frequently if risk dictates) to ensure compliance and avoid liabilities.
Contractual Terms
Source: HEALTH AND SAFETY SPECIFICATION- C-Berth Repairs.pdfThe HSS forms an integral part of the contract; the contractor must make it part of subcontracts and supplier agreements.
The contractor must allow for the cost of complying with the HSS in the tender.
Acceptance of the contract constitutes acknowledgement of the HSS obligations.
The contractor is solely responsible for health and safety on site.
Costs of work stoppages due to health and safety non-compliance are for the contractor's account.
Maximum working hours and minimum rest times must be specified in the Health and Safety Management Plan and comply with legislation.
Employees in safety critical jobs must undergo fitness assessments; medical records retained for at least 40 years.
No fuel or flammable liquids may be stored on site without written approval.
Section
Source: HEALTH AND SAFETY SPECIFICATION- C-Berth Repairs.pdfNo evaluation criteria are stated in this document.
Description
Source: Annexure B1.pdfThe works comprise structural repairs to the C-Berth quay wall at the Port of Durban, over a period of six (6) months. The contract is administered under the NEC ECC3, with the standard SANS 1200A (General) specification applying, subject to the variations in Annexure B1.
Evaluation Criteria
Source: Annexure B1.pdf (unknown)Evaluation is based on compliance with the Occupational Health and Safety Act and Construction Regulations, and the ability to operate within a National Key Point and operational port environment. No specific scoring split, minimum qualifying score, or preference point system is stated in the provided document.
Technical Specifications
Source: Annexure B1.pdf (unknown)Scope: Structural repairs to the C-Berth quay wall at the Port of Durban.
Contract period: Six (6) months.
Contract type: NEC ECC3 (as referenced in the document).
The standard SANS 1200A (General) specification applies, with variations as set out in Annexure B1.
Contractor responsibilities:
Quality Management
Source: Annexure B1.pdfTesting: The Contractor is responsible for preliminary and site control testing to confirm site work complies with the Works Information. Acceptance testing must be in accordance with the appropriate SANS or Particular Specifications.
Compliance Requirements
Source: Annexure B1.pdf (unknown)Compliance with the Occupational Health and Safety Act and Construction Regulations is mandatory.
The Contractor must enter into a mandatary agreement with the Employer under the Occupational Health and Safety Act.
No specific CIDB grade, B-BBEE level, or other eligibility thresholds are stated in the provided document.
Health & Safety
Source: Annexure B1.pdfSafety: All work is deemed construction work under the Occupational Health and Safety Act and Construction Regulations. The Contractor must comply with the Employer's Health and Safety Specification and confirm status as mandatary and employer by entering into an agreement with the Employer. Must observe all vessel speed and navigational restrictions within the Port, including hiring Harbour Pilots or applying for exemptions. Where divers are used, comply with the latest requirements and regulations. Temporary lighting structures must not interfere with navigation; proposed working lights must be submitted for acceptance before installation. Continuously clear and dispose of waste to maintain a tidy site.
Environmental
Source: Annexure B1.pdfPollution: The Contractor must comply with the Employer's Environmental Management Specification. The Contractor must continuously clear and dispose of waste and surplus materials to maintain the camp site / store yard in a tidy state.
Description
Source: Baseline Risk Assessment Analysis -C-Berth Repairs.pdfThe document is a Safety, Health, and Environment (SHE) Baseline Risk Assessment for structural repairs to C-Berth quay wall at the Port of Durban. It outlines the scope of work and associated safety requirements.
Evaluation Criteria
Source: Baseline Risk Assessment Analysis -C-Berth Repairs.pdf (unknown)The document is a SHE Baseline Risk Assessment, not a tender evaluation document. No evaluation criteria, scoring, or preference points are stated.
Technical Specifications
Source: Baseline Risk Assessment Analysis -C-Berth Repairs.pdf (unknown)Scope of work for structural repairs to C-Berth quay wall at the Port of Durban:
Methodology
Source: Baseline Risk Assessment Analysis -C-Berth Repairs.pdfContractor must develop detailed permanent repair design (matching original geometry/reinforcement where possible), temporary works designs, construction sequencing, and method statements, and obtain acceptance from Project Manager/Supervisor. All designs by ECSA-registered Professional Engineers. Temporary relocation of existing services: identify, protect, or relocate; obtain wayleaves and coordinate with Port authorities.
Experience & Qualifications
Source: Baseline Risk Assessment Analysis -C-Berth Repairs.pdfAccess cards issued only after: pre-employment medical examination, project induction training, special training/licensing if applicable, and proof of job/trade-specific qualifications, licenses, training, experience, and competency. Proof of identification (ID or valid passport) required; driving licence not accepted as ID. Foreign labour must have valid work visa. Contractor must provide documentation verifying competence of all employees and sub-contractor employees before work commences. Only certified copies of certificates and licenses accepted. Employee profiles (dossiers) must be maintained for each employee.
Quality Management
Source: Baseline Risk Assessment Analysis -C-Berth Repairs.pdfCompletion activities include out-surveys, monitoring surveys, testing/inspections, correction of defects, redline as-built drawings, and quality/safety/environmental data packs. All designs must be by ECSA-registered Professional Engineers. Reinforcement installation must achieve minimum 80 mm concrete cover.
Compliance Requirements
Source: Baseline Risk Assessment Analysis -C-Berth Repairs.pdf (unknown)No specific compliance requirements (CSD, tax, B-BBEE, CIDB) are stated in the provided document. The document is a SHE Baseline Risk Assessment.
Health & Safety
Source: Baseline Risk Assessment Analysis -C-Berth Repairs.pdfSite rules of conduct: prohibited acts include practical jokes, assault, insubordination, refusing lawful instructions, entering restricted areas, unauthorised equipment use, damaging property, tampering with safety devices, using fire hydrants for non-fire purposes, discharging extinguishers unnecessarily, false statements during investigations, bringing alcohol/drugs/firearms/animals onto site, running except in emergencies, using iPods while working, sleeping on job, building fires except in designated facilities, and pouring substances into drains or soil. Violations may lead to removal from site and prosecution. Vehicles must be roadworthy, inspected, and approved before site entry; access permits are vehicle-specific. Personnel must be trained and competent; only certified copies of certificates accepted. Employee profiles (dossiers) must be maintained. Training must include induction, temporary works, fall risk, suspended platforms, and vehicle/mobile plant operation. Drugs and alcohol testing programme implemented; positive tests lead to permanent removal. Firearms and offensive weapons strictly prohibited. Safety signs and notices must be displayed in English and other common languages. Plant and machinery must be appropriate, inspected, maintained, and registered. Barricading must comply with legislation and Transnet standards; acceptable forms include hoarding panels, wire mesh fencing, metal guard rails, and concrete Jersey barriers. Excavations require permits, risk assessments, supervision by competent Excavation Supervisor, and barricading for depths over 500 mm. Excavations deeper than 1.2 m require battering, benching, or shoring unless certified stable. Safe access/egress points every 15 m. Confined space precautions if hazardous atmosphere or engulfment risk. Mobile equipment and light vehicles must comply with legislation; operators must be trained and licensed. Road management: haul roads must have two lanes, safety berms, storm water and dust control plans. Electrical work must be by competent personnel. Powered hand tools must have constant pressure switches (except specific tools); double-insulated type required.
Contractual Terms
Source: Baseline Risk Assessment Analysis -C-Berth Repairs.pdfContractor must comply with all site access control procedures. Failure to comply is a serious safety breach and may result in removal from site or suspension without payment. Contractor must determine project risks to be transferred to General Liability Insurance. Contractor must abide by port speed limits and traffic rules. Driving under influence of alcohol/drugs/medication is prohibited; medication use must be declared to Construction Manager/Supervisor. Driving without valid licence disc is prohibited. Driving with passengers at back of truck/LDV is prohibited.
Section
Source: Baseline Risk Assessment Analysis -C-Berth Repairs.pdfNo evaluation criteria stated in the provided document.
Important Dates
Source: RFP STRUCTURAL REPAIRS TO C-BERTH QUAY WALL.pdf (RFP)Compulsory Tender Clarification Meeting: 04 December 2026 at 10:00, at 237 Mahatma Gandhi, Queens Warehouse Building, Durban. Duration ±3 hours. Attendance mandatory; latecomers will not be briefed. Site walk follows; PPE required (safety shoes, goggles, long sleeve shirts, high-visibility vests, hard hats).
Closing date: 14 December 2026 at 14:00.
Tender validity: 12 weeks from closing date.
Contact Information
Source: RFP STRUCTURAL REPAIRS TO C-BERTH QUAY WALL.pdf (RFP)Enquiries (SCM/Technical):
Submission portal: https://transnetetenders.azurewebsites.net
Whistle-blowing channels:
Submission Guidelines
Source: RFP STRUCTURAL REPAIRS TO C-BERTH QUAY WALL.pdf (RFP)Submission method: Transnet e-Tender Submission Portal at https://transnetetenders.azurewebsites.net (use Google Chrome).
Returnable documents (all must be completed, signed and submitted):
Disqualification risks:
Evaluation Criteria
Source: RFP STRUCTURAL REPAIRS TO C-BERTH QUAY WALL.pdf (RFP)Evaluation stages:
Award: highest total points, unless objective criteria justify otherwise (e.g., poor past performance, underquoted price, integrity issues, probity risks).
Technical Specifications
Source: RFP STRUCTURAL REPAIRS TO C-BERTH QUAY WALL.pdf (RFP)Scope: Structural repairs to the C-Berth quay wall at the Port of Durban.
Contract period: Six (6) months.
Contract type: NEC3 Engineering and Construction Contract (ECC).
Key personnel requirements:
Site access requirements:
Financial Requirements
Source: RFP STRUCTURAL REPAIRS TO C-BERTH QUAY WALL.pdf (RFP)Pricing: Complete the Bill of Quantities (C2.2) in full; incomplete pricing may lead to disqualification.
CIDB BUILD fee: 0.2% of tendered value, up to a maximum of R2,000,000, included in the Bill of Quantities.
Performance Guarantee: Form of Intent to provide a Performance Guarantee (T2.2-23) required.
Insurance: Contractor to provide insurance (T2.2-21).
Financial statements: Three years audited financial statements (T2.2-22) required.
No bid security amount stated.
No retention or payment terms stated.
Compliance Requirements
Source: RFP STRUCTURAL REPAIRS TO C-BERTH QUAY WALL.pdf (RFP)CSD: Self-register on Central Supplier Database (https://secure.csd.gov.za/); provide supplier number and unique registration reference.
Tax: Valid Tax Clearance Certificate or SARS TCS PIN; each JV/consortium member must submit separately.
B-BBEE: Valid B-BBEE certificate (SANAS-accredited, CIPC, or sworn affidavit for EMEs/QSEs with ≥51% black ownership).
CIDB: Contractor grading designation 7CE or higher (or JV combined grading).
Workmen's Compensation: Letter of Good Standing with the Compensation Fund.
Other: Compulsory Enterprise Questionnaire (T2.2-13), Non-Disclosure Agreement (T2.2-14), Integrity Pact (T2.2-19), Supplier Code of Conduct (T2.2-20), Breach of Law declaration (T2.2-17).
Local content: CIDB Standard for Indirect Targeting for Enterprise Development applies; related fees in BOQ.
Description
Source: Minimum Environmental Requirements for Construction.pdfThis document sets out the minimum environmental standards for construction contractors working on Transnet sites. It must be read with the Transnet Construction Environmental Management Standard Operating Procedure (CEM SOP). It applies to all contractors and sub-contractors under Transnet authority.
Important Dates
Source: Minimum Environmental Requirements for Construction.pdf (TENDER)Closing date: 14 December 2026 at 12:00 (from tender record).
Submission Guidelines
Source: Minimum Environmental Requirements for Construction.pdf (TENDER)Returnable documents: Transnet Integrated Management System Policy Statement, Transnet Construction Environmental Management Standard Operating Procedure (CEM SOP), Transnet Minimum Environmental Requirements for Construction (MERC), and Project Environmental Specification (PES).
Evaluation Criteria
Source: Minimum Environmental Requirements for Construction.pdf (TENDER)Environmental performance is scored during pre-site access governance; the minimum required inspection score is 90%.
Technical Specifications
Source: Minimum Environmental Requirements for Construction.pdf (TENDER)This is a Transnet standard for environmental management during construction, applicable to all contractors working on Transnet sites.
Methodology
Source: Minimum Environmental Requirements for Construction.pdfEnvironmental Method Statements must describe the proposed activity, plant, equipment, materials, labour, method, environmental management, transportation, storage, spill containment, timing, impacts, monitoring, and records.
Experience & Qualifications
Source: Minimum Environmental Requirements for Construction.pdfThe Contractor's Environmental Officer must have relevant environmental qualifications and experience appropriate to the project complexity and site sensitivity.
Quality Management
Source: Minimum Environmental Requirements for Construction.pdfEnvironmental inspections and audits use interviews, document review, observations, monitoring, and measurement/verification.
Compliance Requirements
Source: Minimum Environmental Requirements for Construction.pdf (TENDER)The Contractor must comply with all applicable environmental legislation, including NEMA, National Water Act, NEM: Waste Act, Environment Conservation Act, and OHSA (including Asbestos Regulations).
Health & Safety
Source: Minimum Environmental Requirements for Construction.pdfSafety Data Sheets (SDS) must be available for all hazardous substances, complying with OHSA.
Environmental
Source: Minimum Environmental Requirements for Construction.pdfThe Contractor must comply with the Transnet Minimum Environmental Requirements for Construction (MERC).
Contractual Terms
Source: Minimum Environmental Requirements for Construction.pdfEnvironmental non-conformances are treated as defects under the contract; the Contractor must rectify them promptly.
Section
Source: Minimum Environmental Requirements for Construction.pdfSHEQ (Safety, Health, Environment and Quality) is a key evaluation area. Environmental performance is scored, with a minimum inspection score of 90%.
Description
Source: Proposed repair method to C Berth-A0.pdfThe tender is for structural repairs to the C-Berth quay wall at the Port of Durban, over a period of six months. The work involves concrete and reinforcement repairs to caissons, including doweling and grouting.
Important Dates
Source: Proposed repair method to C Berth-A0.pdf (unknown)Closing time: 14 December 2026 at 12:00
Evaluation Criteria
Source: Proposed repair method to C Berth-A0.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance (SARS TCS or tax pin). A B-BBEE certificate or affidavit is required. CIDB grading applies if relevant. All required SBD forms must be completed and signed, including SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination).
Technical Specifications
Source: Proposed repair method to C Berth-A0.pdf (unknown)Structural repairs to the C-Berth quay wall at the Port of Durban. The work includes concrete repairs, reinforcement works, and caisson repairs. Concrete must comply with SANS standards, with specified grades and cover. Reinforcement bars (Y25, Y12) are to be fixed and doweled into existing caissons. Underwater grouting and chemical anchors are required. Concrete must be cured for at least seven days and tested with cubes. Shuttering must be stripped after specified times. The project duration is six months.
Methodology
Source: Proposed repair method to C Berth-A0.pdfThe repair method involves scabbling existing caisson surfaces, drilling and doweling reinforcement bars (Y25 and Y12) into the caisson, fixing reinforcement, and placing concrete in lifts. Temporary works include shuttering and propping. The contractor must expose existing reinforcement and clean surfaces before repair. The drawing indicates horizontal and vertical reinforcement layouts, with bar schedules and dimensions.
Quality Management
Source: Proposed repair method to C Berth-A0.pdfConcrete work must conform to SANS 1200 and SANS 10100 specifications. Concrete cubes must be tested at 7 and 28 days. Concrete must be vibrated and cured properly. Shuttering must be stripped only after the lapse of specified times, and props must not be removed until concrete is unloaded. Camber and striking times are specified for various elements.
Compliance Requirements
Source: Proposed repair method to C Berth-A0.pdf (unknown)No specific compliance requirements beyond those listed in evaluation criteria.
Description
Source: Standard Generic EMPr DBN.pdfThe document is a generic Environmental Management Programme (EMPr) for minor works at the Port of Durban. It covers typical maintenance activities including refurbishment of roads, quay pavement surfaces, stacking areas, berth top surfaces, buildings, ageing equipment, services (telecoms, electricity, water, sewer, product pipelines), structures, and maintenance dredging. The EMPr applies to all maintenance works that do not increase the capacity or footprint of the port.
Methodology
Source: Standard Generic EMPr DBN.pdfThe contractor must prepare and submit method statements to the Transnet Environmental Officer prior to construction, covering the type of activity, timing and location, procedures, materials and equipment, transport to and from site, on-site movement, site office and storage areas, potential impacts, community arrangements, emergency procedures, and rehabilitation. Approved method statements must be kept on file and distributed to relevant personnel.
Environmental
Source: Standard Generic EMPr DBN.pdfThe document is a generic Environmental Management Programme (EMPr) for minor works at the Port of Durban. It sets out mandatory environmental management requirements for all maintenance activities, including structural repairs. Key obligations for the contractor include:
Description
Source: Annexure B3.pdfThis annexure (B3) provides variations to the standard specification SANS 1200G for structural concrete, applicable to the structural repairs of the C-Berth quay wall at the Port of Durban. The work is to be completed over a period of six months. The specification covers scope, materials, construction, tolerances, and tests, with emphasis on durability in the marine environment.
Evaluation Criteria
Source: Annexure B3.pdf (unknown)Evaluation is based on compliance with the technical specification. The Contractor must obtain Project Manager acceptance for mix designs, curing methods, and underwater concrete techniques. A quality assurance plan must be submitted before concrete work starts, with intervention points agreed with the Supervisor. Laboratory reports on mix design and trial mixes must be provided prior to construction. No scoring split, minimum qualifying score, or preference point system is stated in this annexure.
Technical Specifications
Source: Annexure B3.pdf (unknown)Scope: Structural repairs to C-Berth quay wall at the Port of Durban, over a period of six months. This annexure (B3) provides variations to SANS 1200G for structural concrete, with emphasis on durability in the marine environment.
Materials:
Construction:
Tolerances:
Tests:
Quality Management
Source: Annexure B3.pdfQuality assurance plan must be submitted before concrete work starts, with intervention points agreed with the Supervisor. Daily records of concrete placement, mix proportions, cement type, slump, test cubes, curing, stripping, and test results must be maintained and available for inspection. Records delivered weekly to Project Manager; immediate notification for sub-standard concrete. Sampling and testing frequency as per SANS 1200G, with minimum 3 sets per day if quantity exceeds 40 m3, otherwise 2 sets per day.
Compliance Requirements
Source: Annexure B3.pdf (unknown)No specific compliance requirements (CSD, tax, B-BBEE, CIDB) are stated in this annexure. The document focuses on technical compliance with the concrete specification.
Health & Safety
Source: Annexure B3.pdfNo specific health and safety requirements are stated in this annexure. The document focuses on technical and quality aspects of concrete work.
Section
Source: Annexure B3.pdfThe annexure does not specify evaluation criteria beyond technical compliance. The Contractor must submit a quality assurance plan and obtain Project Manager acceptance for mix designs, curing methods, and underwater concrete techniques. Laboratory reports on mix design and trial mixes are required prior to construction.
Submission Guidelines
Source: Annexure A3- Principal Controlled Insurance.pdf (unknown)Returnable documents: complete and submit all standard SBD forms required for this tender, including SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination). Each form must be signed and submitted as part of the bid pack.
Submission method: not stated in the document.
Closing time: 12:00 (noon) on the closing date.
Evaluation Criteria
Source: Annexure A3- Principal Controlled Insurance.pdf (unknown)Preference points: B-BBEE status level will be evaluated under the 80/20 or 90/10 preference point system (as applicable).
Mandatory requirements: bidders must be registered on the Central Supplier Database (CSD) and hold a valid SARS Tax Clearance (or tax pin).
Construction works: a valid CIDB grading is required; the specific grade is not stated in the document.
Technical Specifications
Source: Annexure A3- Principal Controlled Insurance.pdf (unknown)Scope: structural repairs to the C-Berth quay wall at the Port of Durban.
Duration: six (6) months.
Insurance: Transnet arranges Principal Controlled Insurance (PCI) covering Contract Works and Contractors Public Liability for all projects and contracts, including this one. The cover includes the contractor and subcontractors as insured parties, but does not relieve them of their responsibilities for care of the works and liabilities to third parties.
Contract type: this is a civil contract (works involving earthworks, construction of bridges, and similar), as defined in the insurance programme.
Wet risk: the works are likely to be classified as a Wet Risk Contract, as more than 35% of the value is in a permanent body of water or below the high water mark of a tidal body of water. This classification affects insurance deductibles and special conditions.
Financial Requirements
Source: Annexure A3- Principal Controlled Insurance.pdf (unknown)Insurance deductibles (excesses) apply per occurrence and are the contractor's responsibility. For contracts up to R100,000,000, the major perils deductible is R25,000 and minor perils R15,000. For contracts between R100,000,001 and R250,000,000, the major perils deductible is R50,000 and minor perils R15,000. For contracts between R250,000,001 and R500,000,000, the major perils deductible is R100,000 and minor perils R25,000. For contracts between R500,000,001 and R1,000,000,000, the major perils deductible is R150,000 and minor perils R25,000.
A minimum wet risk deductible of R100,000 per occurrence applies.
For contracts entailing trenching and/or layer works, additional deductibles apply over and above the standard deductibles for lengths exceeding 1,000 metres: up to 3,000 metres, 20% of loss with a minimum of R50,000; up to 5,000 metres, 20% of loss with a minimum of R100,000.
Contract Works Insurance: the sum insured is the estimated project value, with automatic increases for contract escalation, post-loss escalation, and devaluation, each up to 30% of the sum insured.
Contractors Public Liability Insurance: limit of indemnity is R25,000,000 any one occurrence, unlimited for the period of insurance. Deductibles for general and contractors liability are R25,000 per claim; for lateral support (property developers) R50,000; for spread of fire, sudden and accidental pollution, carriers liability, goods on the hook, and marine works liability R250,000; for contingent plant hired in R50,000.
Claims must be reported to the broker/insurer within 90 days of an incident; otherwise claims will not be entertained.
Compliance Requirements
Source: Annexure A3- Principal Controlled Insurance.pdf (unknown)CSD registration: mandatory.
SARS Tax Clearance: valid tax clearance or tax pin required.
B-BBEE: status level evaluated under the 80/20 or 90/10 preference point system.
CIDB grading: required for construction works; specific grade not stated.
Insurance: the contractor must arrange its own insurance for:
Consulting engineers, architects and other professionals must maintain professional indemnity cover for defects in design, plan or specification.
Description
Source: Consolidated Inspection Report - 22 Sept 2026.pdfThe tender is for structural repairs to the C-Berth quay wall at the Port of Durban, following a vessel impact on 31 August 2026. The damage is located between Bollards 45 and 46 and includes both landside and underwater components. The landside damage comprises fractured concrete coping, displaced fender and chain assembly, damaged wharf ladder and fittings, and cracking on the quay apron. Underwater inspections revealed a larger affected area: approximately 5.5 m wide, extending from 1.5 m to 10 m below the water surface, with loss of concrete cover (up to ~100 mm), exposed and cut reinforcement, and inward displacement of caisson No. 45 up to 150 mm. The contract period is six months.
Important Dates
Source: Consolidated Inspection Report - 22 Sept 2026.pdf (unknown)Closing date: 14 December 2026 at 12:00
No briefing or site visit dates are stated in the document.
Contact Information
Source: Consolidated Inspection Report - 22 Sept 2026.pdf (unknown)No named contacts or submission address are provided in the document.
Submission Guidelines
Source: Consolidated Inspection Report - 22 Sept 2026.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Submission method and address: not stated in the document.
Closing time: 12:00 (from tender record).
Evaluation Criteria
Source: Consolidated Inspection Report - 22 Sept 2026.pdf (unknown)Evaluation criteria are not detailed in the document. Bidders must be registered on the Central Supplier Database (CSD) and hold a valid SARS Tax Clearance Certificate (or tax pin). A CIDB grading for structural repair works is likely required (grade not specified). Bidders must demonstrate experience in marine or quay wall structural repairs and the ability to mobilise a diving contractor for underwater inspections and repairs.
Technical Specifications
Source: Consolidated Inspection Report - 22 Sept 2026.pdf (unknown)Scope of work: structural repairs to the C-Berth quay wall at the Port of Durban, following a vessel impact on 31 August 2026.
Damage location: between Bollards 45 and 46, Berth C, Point Precinct, Port of Durban.
Landside damage:
Underwater damage (from inspections on 1 and 2 September 2026):
Contract period: six (6) months.
Repair requirements:
Methodology
Source: Consolidated Inspection Report - 22 Sept 2026.pdfThe document describes the assessment methodology used to identify damage, not the repair methodology. It includes landside visual inspection and underwater visual inspections by a diving contractor. The repair works will require the appointed designer and contractor to conduct surveys, scans and tests to determine the extent of damage and the most effective repair approach.
Quality Management
Source: Consolidated Inspection Report - 22 Sept 2026.pdfThe document is a condition assessment report, not a quality management specification. It does not state quality standards or QA/QC requirements for the repair works.
Compliance Requirements
Source: Consolidated Inspection Report - 22 Sept 2026.pdf (unknown)No specific compliance requirements are stated in the document beyond the general expectation of CSD registration and a valid tax clearance.
Health & Safety
Source: Consolidated Inspection Report - 22 Sept 2026.pdfThe document does not specify OHS requirements. It notes that the damaged area must be cordoned off and not subjected to operational loads until repairs are implemented, and that projecting reinforcement must be made safe to prevent risk to vessels.
Contact Information
Source: TNPA Asbestos Management Plan.pdf (unknown)TNPA – Legal and Compliance Department
TNPA – Environmental Department
Apex Environmental (AAIA)
Submission Guidelines
Source: TNPA Asbestos Management Plan.pdf (unknown)Returnable documents (all must be submitted before contract start):
Evaluation Criteria
Source: TNPA Asbestos Management Plan.pdf (unknown)Bidders must comply with the Asbestos Management Plan. They must appoint an Approved Asbestos Inspection Authority (AAIA) and submit an Approved Asbestos Work Plan and Safe Work Procedures. All employees must have asbestos training and medical surveillance. Bidders must provide proof of training and medicals. The document does not specify other eligibility criteria such as CSD registration, tax clearance, B-BBEE level, or CIDB grading.
Technical Specifications
Source: TNPA Asbestos Management Plan.pdf (unknown)The Asbestos Management Plan applies to any work on TNPA property that may disturb asbestos-contaminated soil, including:
Listed Environmental Covenant sites (asbestos-contaminated soil remains in place):
Work on these sites requires:
Asbestos cement products:
Contractor closure:
Methodology
Source: TNPA Asbestos Management Plan.pdfMethodology requirements for projects on asbestos-contaminated sites:
Quality Management
Source: TNPA Asbestos Management Plan.pdfQuality management in the context of this plan focuses on ensuring asbestos work is carried out safely and in compliance with regulations. Key requirements:
Compliance Requirements
Source: TNPA Asbestos Management Plan.pdf (unknown)Compliance with the Asbestos Management Plan is mandatory for all contractors working on TNPA property where asbestos may be disturbed. Specific requirements:
Health & Safety
Source: TNPA Asbestos Management Plan.pdfHealth and safety requirements under the Asbestos Management Plan:
Environmental
Source: TNPA Asbestos Management Plan.pdfEnvironmental requirements:
Contractual Terms
Source: TNPA Asbestos Management Plan.pdfContractual obligations include:
Technical Specifications
Source: Annexure B2.pdf (unknown)Structural repairs to the C-Berth quay wall at the Port of Durban.
Contract period: six (6) months.
The works are governed by SANS 1200AB (Engineer's Office) with variations set out in Annexure B2.
The Contractor must provide offices for the Supervisor, two inspectors and admin staff, each with air-conditioning, telephone and ADSL or WiFi internet access.
Pricing Schedule
Source: Annexure B2.pdfThe pricing data uses the NEC EEC3 (June 2005) form. Terms such as 'Schedules of Quantities', 'Bill of Quantities' and 'Bills of Quantities' are interchangeable. The title 'Engineer' in SANS 1200AB is to be read as 'Project Manager' or 'Supervisor' as applicable under ECC3.
Description
Source: Contractor Environmental and Sustainable Specifications (TRN-IMS-GRP-GDL-014.4) signed.pdfThis document is the Transnet Contractor Environmental and Sustainability Specification Guidelines (TRN-IMS-GRP-GDL-014.4). It sets out the minimum environmental management requirements for contractors working on Transnet sites. It must be read with the Transnet Construction Environmental Management Standard Operating Procedure (CEM SOP). It applies to all contractors working under the authority of Transnet SOC Ltd.
Evaluation Criteria
Source: Contractor Environmental and Sustainable Specifications (TRN-IMS-GRP-GDL-014.4) signed.pdf (TENDER)The contractor must comply with the environmental specification and all applicable legislation, including the National Environmental Management Act, National Water Act, and Occupational Health and Safety Act. The contractor must have an Environmental Officer with relevant qualifications and experience. The contractor must submit an Environmental Management Plan and method statements for approval. The contractor must achieve a minimum environmental inspection score of 90%. The contractor must provide documented evidence of proper waste disposal.
Technical Specifications
Source: Contractor Environmental and Sustainable Specifications (TRN-IMS-GRP-GDL-014.4) signed.pdf (TENDER)The document sets out minimum environmental management requirements for contractors working on Transnet sites. It must be read with the Transnet Construction Environmental Management Standard Operating Procedure (CEM SOP).
Key requirements:
Methodology
Source: Contractor Environmental and Sustainable Specifications (TRN-IMS-GRP-GDL-014.4) signed.pdfThe contractor must submit environmental method statements for approval before commencing activities. Method statements must describe the proposed activity, plant, equipment, materials, labour, method, environmental management of site conditions, transportation, storage, spill containment, timing, location, potential impacts, and monitoring. Method statements must be signed by the contractor, Transnet Construction Manager, and Transnet Project Environmental Resource. Activities may only commence after approval. Method statements must be submitted at least two weeks before the intended activity.
Experience & Qualifications
Source: Contractor Environmental and Sustainable Specifications (TRN-IMS-GRP-GDL-014.4) signed.pdfThe contractor must appoint an Environmental Officer (EO) with relevant environmental qualifications and experience appropriate to the project complexity and site sensitivity. The EO's competency will be determined by Transnet during tender. If the EO is replaced, the contractor must submit a CV of an alternative EO with similar or better qualifications for approval. No construction may take place without a duly appointed EO.
Quality Management
Source: Contractor Environmental and Sustainable Specifications (TRN-IMS-GRP-GDL-014.4) signed.pdfThe contractor must maintain an environmental file on site containing all required documents, including the EO CV, organogram, contact details, plant and equipment list, hazardous substances list, pre-construction photographic report, site layout plan, method statements, induction material, and risk assessment. The contractor must conduct environmental inspections at agreed intervals; the minimum inspection score is 90%. The contractor must keep records of all environmental management activities.
Health & Safety
Source: Contractor Environmental and Sustainable Specifications (TRN-IMS-GRP-GDL-014.4) signed.pdfThe contractor must comply with the Occupational Health and Safety Act, including asbestos regulations. Safety Data Sheets (SDS) must be available for all hazardous substances. The contractor must manage spill response, spray painting and sandblasting, dust, storm water, erosion, noise, fire prevention, and hazardous substances. The contractor must provide adequate sanitary facilities and manage sewage and sanitation. The contractor must ensure all personnel attend environmental induction.
Environmental
Source: Contractor Environmental and Sustainable Specifications (TRN-IMS-GRP-GDL-014.4) signed.pdfThe contractor must comply with the National Environmental Management Act, National Water Act, and other applicable environmental legislation. The contractor must prepare an Environmental Management Plan (EMP) and obtain approval from Transnet. The contractor must manage waste according to the waste hierarchy and dispose of waste at licensed facilities. The contractor must protect heritage resources, including archaeological sites and graves. The contractor must manage water, fauna, flora, and soil. The contractor must rehabilitate the site to its pre-construction or enhanced state.
Contractual Terms
Source: Contractor Environmental and Sustainable Specifications (TRN-IMS-GRP-GDL-014.4) signed.pdfThe contractor remains responsible for achieving the required performance levels. No advice, approval of method statements, or any other communication from Transnet will be construed as acceptance of any obligation that indemnifies the contractor from achieving the required performance. Transnet accepts no liability for the contractor failing to comply with the specifications. Environmental non-conformances are treated as defects under the contract; the contractor must correct them promptly. The Transnet Project Manager may use contractual remedies, including retention moneys, to rectify non-conformances.
Submission Guidelines
Source: External_how_to_guide_E-Tender Submission Portal.pdf (TENDER)Submission is electronic via the Transnet E-Tenders Portal at transnetetenders.azurewebsites.net. Bidders must register on the portal, sign in, view the tender details, submit an intent to bid, and upload bid documents before the closing time. Uploads are limited to 30MB per file; multiple files may be uploaded. Bidders should complete the process at least 24 hours before closing to avoid last-minute issues. Restricted tenders are only visible when signed in with the email address used for the invitation.
Evaluation Criteria
Source: National Ports Act 12 of 2005 (2).pdf (unknown)Bidders must be able to operate within the port environment under the jurisdiction of the National Ports Authority. They must comply with the National Ports Act, 2005, including any regulations and directives. No specific pre-qualification criteria (e.g., CIDB grading, B-BBEE level, CSD registration) are stated in the provided document.
Technical Specifications
Source: National Ports Act 12 of 2005 (2).pdf (unknown)The National Ports Authority is responsible for planning, providing, maintaining and improving port infrastructure, including quay walls. The Authority may enter into agreements for the planning, construction, development and maintenance of port infrastructure. The work must be carried out within the port environment under the jurisdiction of the National Ports Authority, and must comply with the National Ports Act, 2005.
Compliance Requirements
Source: National Ports Act 12 of 2005 (2).pdf (unknown)Bidders must comply with the National Ports Act, 2005, including any regulations and directives issued under it. No specific compliance requirements (e.g., CIDB grading, B-BBEE level, CSD registration) are stated in the provided document.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
23
Last checked
28 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
subsidiary of Transnet
Contact
031-361-8589[email protected]www.transnet.netLevel 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A practical guide to reading CIDB class and grade requirements, matching them to the infrastructure work you can actually deliver, and building a credible upgrade path without overreaching.
A comprehensive guide to civil engineering infrastructure tenders in South Africa. Covers CIDB requirements, major buyers, the tender pipeline, and how civil engineering firms win government work in roads, dams, water, and sanitation.
Provincial procurement is not national procurement with a different address. Learn how provincial departments, entities, metros and districts buy, when they buy, and how to choose the province where your business can actually win.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Civil. Unlock full pricing strategies, bid frequency, and historical win rates.