The winnie madikizela-mandela local municipality is procuring maintenance services for its main office (phase 1) through this request for bid. The contract requires compliance with occupational health and safety regulations, environmental impact assessments, and specific insurance coverage including coida, employers liability, and all-risks protection. Key deliverables include site office facilities, equipment maintenance, and adherence to a critical path construction programme with a 90-day defects liability period.
Key Requirements
Maintenance scope - maintenance of Municipal Buildings Main Office (Phase 1)
Safety compliance - Occupational Health & Safety Act 85/1993 and July 2014 Construction Regulations
Tenders in this industry often require registration with these bodies.
CIDB Registration
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Typical Documents
10 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
CIDB Registration Certificate
NHBRC Registration (if applicable)
Health & Safety Plan
Insurance Certificates
Previous Project Completion Certificates
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards β PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement β so nothing critical is missed before you start your bid response.
DocumentTender BOQ Rev 1.pdfReview complete
Description
Source: Tender BOQ Rev 1.pdf
Important Dates
03 Nov
2026
PUBLICATION
Tender Published
Tender was published
19 Nov
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
11 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 β Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Maintenance of municipal buildings β the main office (Phase 1) at Mbizana Municipal Offices for Winnie Madikizela-Mandela Local Municipality in the Eastern Cape. The works are procured under the JBCC Principal Building Agreement Edition 6.2 May 2018 and General Preliminaries Edition 6.2 May 2018, priced on bills of provisional quantities that are subject to remeasurement.
Win Winnie Madikizela-Mandela tenders with AI Matching & Recommendations, rural development intelligence, and application support for Bizana area projects.
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
REQUEST FOR PROPOSALS FOR THE APPOINTMENT OF A TERMINAL OPERATOR TO DESIGN, FINANCE, DEVELOP, CONSTRUCT, OPERATE, MAINTAIN AND TRANSFER A SMALL TO MEDIUM SCALE LIQUIFIED NATURAL GAS (LNG) IMPORT TERMINAL FOR A CONCESSION PERIOD OF TWENTY-FIVE (25) YEARS AT THE PORT OF EAST LONDON
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Document read
Compliance review
Bid-ready summary
Maintenance of Municipal Buildings - Main Office (Phase 1). Contract governed by JBCC Principal Building Agreement Edition 6.2 May 2018 and JBCC General Preliminaries Edition 6.2 May 2018, as amended by these bills of quantities. Comprises Part A (Principal Building Agreement amendments), Part B (General Preliminaries amendments), and Part C (Additional Preliminaries).
Important Dates
Source: Tender BOQ Rev 1.pdf (unknown)
Closing date and time: 19 November 2026 at 12:00
Technical Specifications
Source: Tender BOQ Rev 1.pdf (unknown)
Scope: Maintenance of Municipal Buildings - Main Office (Phase 1).
Contract framework: JBCC Principal Building Agreement Edition 6.2 May 2018 and JBCC General Preliminaries Edition 6.2 May 2018, as amended by the bills of quantities.
Key requirements:
Compliance with Occupational Health & Safety Act 85/1993 (as amended) and July 2014 Construction Regulations.
Compliance with Environmental Impact Assessment Regulations 1182 and 1183 (1997) and Noise Control Regulations 1999.
Insurance: COIDA, Employers Liability β₯ R10 million, all-risks on plant and temporary accommodation, motor vehicle liability, Multilateral Motor Vehicle Accident Fund, third-party motor risks including passenger liability.
Mandatory appointments: Community Liaison Officer (CLO) with appointment letter submitted to Principal Agent before any Business Forum negotiations; MEPDF coordinator (mechanical, electrical, plumbing, fire services) as part of site management team; competent person for subcontractor delivery schedules and submittals.
Management team CVs (contracts manager, site agent, foreman, MEPDF coordinator) to be submitted before site commencement; no changes without Principal Agent approval.
Site access restricted to one entry/exit point; contractor responsible for maintaining access and reinstating on completion.
Contractor to provide site offices with air conditioning, scanner, A3 lever arch file with full drawing sets, notice board, additional hard hats and reflective vests for visitors.
Shop drawings: three prints for approval, minimum two-week check period, four prints of approved drawings to be furnished.
Programme: critical path method, monthly working programmes, terminal float schedule to be agreed.
Direct contractors: employer may engage direct contractors for tenant installations (list provided); contractor must accommodate them.
Penalties: R5,000 per calendar day for failure to complete defects list within 90-day defects liability period.
Pricing Schedule
Source: Tender BOQ Rev 1.pdf
Pricing and payment schedule:
Provisional bills of quantities; quantities subject to remeasurement.
Rates fixed irrespective of final quantities; no claims for extras, loss of profit, rate variations due to quantity differences.
Budgetary allowances and provisional sums may be omitted/reduced at Principal Agent's discretion; no claim for loss of profit or discounts.
CPAP price adjustment applies unless fixed-price option chosen (all cost variations after tender submission to contractor's account).
Interim payment certificates: materials and goods separated by CPAP work groups per Annexures E and F.
Payment certification period: 21 calendar days (amended from 14).
Contractor must pay subcontractors within 7 calendar days of employer's due date; proof of payment to Principal Agent within 5 working days.
Specialist equipment and imported materials/labour: list in Annexure J with description, country of origin, foreign currency amount, exchange rate at tender date, CIF value in Rands; import documentation required at tender acceptance.
Penalties: R5,000 per calendar day (excl. VAT) for failure to complete defects list within 90-day defects liability period; penalty remains until final completion certificate issued.
Final completion certificate withheld until as-built drawings, guarantees, and maintenance manuals approved.
No presumption of acceptance of prices submitted during progress for contract instructions or claims.
Financial Requirements
Source: Tender BOQ Rev 1.pdf (unknown)
Pricing: Provisional bills of quantities; rates fixed irrespective of final quantities. CPAP price adjustment applies unless fixed-price option chosen (all cost variations after tender submission to contractor's account).
Payment terms:
Interim payment certificates per Annexures E and F, separating materials by CPAP work groups.
Payment certification period: 21 calendar days (amended from 14).
Contractor must pay subcontractors within 7 calendar days of employer's due date and provide proof within 5 working days.
Insurance requirements (minimum):
COIDA compliance.
Employers Liability Insurance β₯ R10 million.
All-risks cover on construction plant, site huts, temporary accommodation, hired/leased/loaned plant and machinery (employer's interests noted).
Motor Vehicle Liability Insurance per Multilateral Motor Vehicle Accident Fund.
Balance of Third Party Motor Risks including passenger liability.
Declaration of Insurance (Annexure K) to be completed when called upon.
Penalties:
Late completion of defects list after 90-day defects liability period: R5,000 per calendar day (excl. VAT) until final completion certificate issued.
Final completion certificate withheld until as-built drawings, guarantees, and maintenance manuals approved.
Price adjustment: Specialist equipment and imported materials/labour to be listed in Annexure J with adjustment basis and base indices; import documentation required at tender acceptance.
Health & Safety
Source: Tender BOQ Rev 1.pdf
Health and safety requirements:
Compliance with Occupational Health & Safety Act 85/1993 (as amended by Amendment Act 181/1993) and July 2014 Construction Regulations.
Employer appoints independent safety officer to agree construction phase health and safety plan/specification (forms Annexure M), copied to all subcontractors.
Contractor acknowledges Section 37(2) agreement: all responsibility for health and safety matters relating to services performed under agreement is contractor's obligation.
Contractor must comply with all relevant laws, regulations, codes, directives, rules, and security measures; adhere to employer's directives.
Community Liaison Officer (CLO) must be appointed; appointment letter submitted to Principal Agent before any Business Forum negotiations.
Contractor to provide additional hard hats and reflective vests (PPE) for client visitors.
Site access restricted to one entry/exit point; contractor responsible for maintaining safe working environment.
No workmen allowed to sleep or deposit personal effects on premises; independent shelters/sheds required for watchmen.
Contractor responsible for safety of survey beacons, bench marks, boundary pegs per Land Survey Act Sections 35 and 36; costs for replacement borne by contractor.
Pollution control: contractor must control noise, artificial light, windblown sand, dust, deposits, mud; keep bordering roads clean.
Dust, noise, vibrations, nuisance must not exceed permissible limits; delays from compliance not grounds for extension.
Environmental
Source: Tender BOQ Rev 1.pdf
Environmental requirements:
Compliance with Environmental Impact Assessment Regulations 1182 and 1183 (1997).
Compliance with Noise Control Regulations 1999.
Employer reserves right to pay directly for permanent connections to local/other authority services (provisional amounts included); if employer pays direct, contractor not entitled to 10% mark-up (Clause A26.4); such provisional amounts omitted from contract sum.
Pollution control: contractor must control all forms of pollution (noise, artificial light, windblown sand, dust, deposits, mud) during construction; keep roads bordering site clean and free of debris.
Contractual Terms
Source: Tender BOQ Rev 1.pdf
Key contractual terms:
Design responsibility: Contractor indemnifies employer for design undertaken by contractor (Annexure H) or nominated/selected subcontractors (Annexure I); failure to obtain subcontractor warranties devolves design responsibility to contractor.
Practical completion: Works not considered complete if specific Contract Data requirements unmet; defects causing disruption after practical completion list will withhold certificate until rectified.
Employer possession before practical completion: Employer may occupy revenue-generating areas with contractor agreement; penalty reduced proportionally; contractor must complete works with minimal interference.
Programme: Critical path method; monthly working programmes; terminal float schedule to be agreed and managed jointly; extensions only for critical path delays; no extension for municipal energy supply interruptions; Principal Agent may instruct acceleration at any time.
Payment: Interim certificates per Annexures E and F; payment within 21 calendar days; subcontractor payment within 7 calendar days with proof within 5 working days.
Price adjustment: CPAP applies; specialist equipment and imported materials listed in Annexure J with adjustment basis; import documentation required at tender acceptance.
Direct contractors: Employer may engage direct contractors for tenant installations (extensive list); contractor must provide access, storage, welfare facilities, water, power within 50m, use of scaffolding.
Insurance: Minimum covers as per Clause 10.12; Declaration of Insurance (Annexure K) when required.
Penalties: R5,000 per day for late defects completion after 90-day defects liability period; final completion requires as-builts, guarantees, maintenance manuals.
Subcontractor management: Competent person full-time on site for delivery schedules, long lead items, shop drawings, submittals.
Key personnel: Management team CVs submitted before site start; no changes without Principal Agent approval.
Site facilities: Air-conditioned office with scanner, drawing file, notice board, PPE for visitors.
Health and safety: Compliance with OHS Act and Construction Regulations; employer appoints independent safety officer; health and safety plan (Annexure M); Section 37(2) agreement.
Environmental: Compliance with EIA Regulations 1182/1183 and Noise Control Regulations 1999.
Community liaison: CLO appointment required before Business Forum negotiations.
Shop drawings: Three prints for approval, two-week minimum check period, four prints of approved drawings.
No claims for unpriced items; unpriced items deemed covered elsewhere.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Prevention and Combating of Corrupt Activities Act (PRECCA)
Act 12 of 2004
high
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Public Procurement Act, 2024 (PPA)
Act 28 of 2024
high
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Access to Information Act (PAIA)
Act 2 of 2000
medium
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Administrative Justice Act (PAJA)
Act 3 of 2000
medium
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Sector-specific rules
These rules are linked to the work category, industry, or regulated service area.
4
Construction Industry Development Board Act (CIDB Act)
Act 38 of 2000
high
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
National Environmental Management Act (NEMA)
Act 107 of 1998
high
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Occupational Health and Safety Act (OHS Act)
Act 85 of 1993
high
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
National Building Regulations and Building Standards Act
Act 103 of 1977
medium
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Mbizana, 4800, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
04 Nov 2026
AI status
Enhanced
Data conflicts
None detected