Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Arnot Power Station - Rietkuil - Middelburg - 1097
Organization Type
GOVERNMENT
Published
25 Sept 2026
OCDS Reference
ocds-9t57fa-171751
ESKOM requires the supply and delivery of spares for air conditioners, batteries, ptm and electrical maintenance departments on an as-and-when-required basis at arnot power station, for a contract period of 60 months. Bidders must submit the standard ESKOM returnable documents, completed and signed, by the closing deadline of 20 october 2026 at 10:00. The most consequential consideration is ensuring all required returnable documents are included and signed before the strict closing time, as NO other submission details or evaluation criteria are specified in the available source.
Closing deadline: 20 October 2026 at 10:00; bids must be submitted by this time.
Contract period: 60 months, on an as-and-when-required basis.
Scope: spares for air conditioners, batteries, PTM and electrical maintenance departments at Arnot Power Station.
Returnable documents: all standard Eskom returnable documents must be completed, signed and submitted with the bid.
No other submission method, address, evaluation criteria, or compliance thresholds are stated in the available source; bidders should confirm these with Eskom before bidding.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Tuesday, 20 October 2026 - 10:00
Venue
null
Request for Bid(Open-Tender)
Arnot Power Station - Rietkuil - Middelburg - 1097
Recommended Certifications
Having these can improve your winning chances: NERSA Registration, PV GreenCard (Solar Installation)
AI Document Analysis Stages
Important Dates
Source: AN91B9~1.DOC (unknown)Closing date: 20 October 2026 at 10:00
25 Sept
2026
Tender Published
Tender was published
17 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
ANB615~1.DOC
1. Form CPA - General.pdf
Supply and delivery of spares for air conditioning, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for 60 months. The contract price adjustment method is set out in Form CPA (General), which bidders must complete to propose price adjustment mechanisms.
240-12248652_List of Tender Returnables_Cat 2_ Rev 7.xlsx
No summary available
Supplier Declaration of Interest Template.docx
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis, under a 60-month contract. The document provided is the Eskom Supplier Declaration of Interest form, which bidders must complete and sign under oath as part of the tender pack.
Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx
No summary available
3. Eskom life-saving rules.pdf
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments on an 'as and when required' basis at Arnot Power Station, for a period of 60 months. The contract is issued by Eskom and requires adherence to Eskom's Life-Saving Rules, which mandate strict safety behaviours for all employees, contractors and visitors on site.
Eskom life-saving rules.pdf
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a 60-month period, issued by Eskom.
3. Eskom Waste Management Standard 32-245.pdf
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an 'as and when required' basis at Arnot Power Station over a 60-month period. Bidders must comply with Eskom's SHEQ policy, which requires zero harm and adherence to ISO standards.
Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.docx
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis, for a period of 60 months. The contract is issued by Eskom and includes specific contract price adjustment (CPA) requirements for local goods and services.
Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis, for a period of 60 months. The contract will be awarded under Eskom's preferential procurement framework, with points allocated for B-BBEE status and specific goals.
Eskom General Conditions of Purchase - 31 May 2024.pdf
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station, for a period of 60 months. The contract is governed by Eskom's General Conditions of Purchase, which include provisions on pricing, delivery, acceptance, warranty and termination.
NEC- EMD SPARES 1.pdf
Supply and delivery of spares for the Aircon, PTM and electrical maintenance departments on an 'as and when required' basis at Arnot Power Station, under a 60-month NEC3 Supply Contract (SC3) with Eskom Holdings SOC Ltd.
Invitation to Tender (ITT) - Electrical Spares.pdf
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for 60 months. The contract is issued by Eskom under an open invitation to tender, with evaluation based on functionality (technical, 75% threshold) and the 80/20 preference point system.
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station, for a period of 60 months. The tender is issued by Eskom and is open to eligible suppliers who can meet the conditions of tender.
SHE Spec.pdf
Supply and delivery of spares for the Aircon, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis, for a period of 60 months. The contract is issued by Eskom and includes a detailed OHS specification that bidders must comply with.
Annexure F - CPA (IG) Requirements for Foreign Goods and Services.docx
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for 60 months. The contract is subject to Eskom's Contract Price Adjustment (CPA) and foreign goods/services payment requirements, with multiple payment methods for foreign currency exposure.
Eskom Supplier Integrity Pact - 02 June 2023.pdf
Supply and delivery of spares for Aircons, batteries, PTM and electrical maintenance departments on an 'as and when required' basis at Arnot Power Station for a period of 60 months, issued by Eskom.
Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.docx
Supply and delivery of spares for Aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a period of 60 months.
Declaration of Shareholding or Beneficiaries Form.pdf
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a period of 60 months.
240-68099512 Form A_Cat 2_ Rev 9.docx
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a 60-month period. The contract is issued by Eskom and requires bidders to accept Eskom's Supplier Quality Requirements as per specification 240-105658000 and ISO 9001.
Technical Tender Evaluation Criteria - Electrical Spares.docx
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a period of 60 months.
AN5A43~1.DOC
AN91B9~1.DOC
Annexure D - Integrity Declaration Form.docx
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a period of 60 months.
3. Eskom Vehicle Safety Spec 32-345.pdf
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a 60-month period. The tender is issued by Eskom and is open for bidding until 20 October 2026.
Annexure B – Supplier Tender Receiving Acknowledgement Form.docx
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station, for a period of 60 months.
E-Tenderers E-Tendering Training Acknowledgement Form.pdf
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a 60-month period.
E-Tenderers' Training Acknoweldegement.pdf
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments on an 'as and when required' basis at Arnot Power Station, for a period of 60 months, issued by Eskom.
Annexure C - Tenderer_s Particulars.docx
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis, for a period of 60 months. The procurement is issued by Eskom.
Annexure J - SBD 4 - Tenderer_s Disclosure.docx
Supply and delivery of spares for Aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a period of 60 months.
E-Tendering Help Manual for supplier.pdf
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis, for a period of 60 months. The tender is issued by Eskom and requires electronic submission through the eTendering system.
Scope of work - Electrical Spares.docx
Supply and delivery of electrical spares for the Aircon, batteries, PTM and electrical maintenance departments at Arnot Power Station on an as-and-when-required basis for 60 months. The contract covers a range of items including contactors, circuit breakers, fuses, gloves, ammeters, transducers, relays, limit switches, stove plates, overload relays and stove switches, all to be new, unused and compliant with national standards.
Eskom Vehicle Safety Spec 32-345.pdf
Supply and delivery of spares for Aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a period of 60 months. The contract is issued by Eskom and requires bidders to supply and deliver the specified spares to the power station over the contract term.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Technical Specifications
Source: AN91B9~1.DOC (unknown)Supply and delivery of spares for air conditioners, batteries, PTM (plant and machinery?) and electrical maintenance departments, on an as-and-when-required basis, at Arnot Power Station. Contract period: 60 months.
Evaluation Criteria
Source: Annexure D - Integrity Declaration Form.docx (unknown)Bidders must complete and submit the standard National Treasury forms as required by the invitation to tender, including SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination).
Pricing Schedule
Source: 1. Form CPA - General.pdf (unknown)The CPA form is an annexure to the price schedule. If space is insufficient, submit a separate schedule for costs to be quoted per item; otherwise reference the appropriate price schedule. The form includes sections for cost of manufacture, transport, installation/erection, and totals for works cost, transportation, and installation/erection and engineering.
Financial Requirements
Source: 1. Form CPA - General.pdf (unknown)Contract price adjustment (CPA) applies to the supply and delivery, and where applicable installation and commissioning, of plant and equipment. The CPA form is an annexure to the price schedule.
Key rules:
Cost of manufacture (Section A1):
Cost of transport (Section A2):
Cost of installation/erection (Section A3):
Works-related contracts (Section B):
Evaluation Criteria
Source: Eskom life-saving rules.pdf (unknown)Contractors must comply with Eskom's Life-Saving Rules. Violation of any rule is treated as serious misconduct and may lead to suspension of the contractor's activities. No other eligibility criteria (e.g., CSD registration, B-BBEE level, tax clearance) are stated in the provided document.
Technical Specifications
Source: Eskom life-saving rules.pdf (unknown)The document is Eskom's Life-Saving Rules standard (240-62196227, Revision 6). It applies to all Eskom employees, agents, consultants, contractors, and visitors at all Eskom sites. The five rules are:
Contractor obligations:
Compliance Requirements
Source: Eskom life-saving rules.pdf (unknown)No specific compliance requirements (e.g., CSD registration, B-BBEE level, tax clearance) are stated in the provided document. The document references ISO 9001 Quality Management Systems and various Eskom safety standards, but these are not stated as tender compliance requirements.
Section
Source: Eskom life-saving rules.pdf (unknown)The document references ISO 9001 Quality Management Systems and Eskom's Safety, Health, Environment and Quality Policy, but does not state specific evaluation criteria for a tender.
Description
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services.docx (unknown)This annexure sets out Eskom's requirements for contract price adjustment (CPA) and payment of foreign commitments when tendering for goods or services that involve foreign currency or imported components.
Evaluation Criteria
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services.docx (unknown)Bidders who price imported goods/services in a foreign currency or link pricing to an exchange rate must be the direct importers of those goods/services.
Technical Specifications
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services.docx (unknown)Contract price adjustment (CPA) requirements for foreign goods and services:
Financial Requirements
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services.docx (unknown)Payment methods for foreign commitments:
Compliance Requirements
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services.docx (unknown)No specific compliance requirements (e.g., CSD, tax clearance, B-BBEE) are stated in the provided document.
Description
Source: Eskom Vehicle Safety Spec 32-345.pdfEskom's vehicle safety specification standardises minimum safety requirements for all vehicles used for Eskom business purposes, including contractor vehicles. It applies to Eskom Holdings SOC Limited, its divisions, subsidiaries, and any entity in which Eskom has a controlling interest. The specification incorporates the National Road Traffic Act, the Occupational Health and Safety Act, and the Construction Regulations. Divisions may add supplementary specifications provided they comply with OEM specifications and legislation and do not create risk.
Technical Specifications
Source: Eskom Vehicle Safety Spec 32-345.pdf (unknown)Eskom's vehicle safety specification applies to all Eskom-owned vehicles and any vehicle used for Eskom business purposes, including contractor and subcontractor vehicles transporting Eskom employees. Only newly purchased vehicles and new contracts must comply; existing vehicles follow a phased replacement plan.
Standard minimum specifications for all vehicles:
Light delivery vehicles (LDVs, <3 500 kg):
Heavy commercial vehicles (GVM >3 500 kg, including >16 000 kg and abnormal vehicles):
Minibuses (up to 16 passengers):
Midi-buses and buses (more than 16 passengers):
Trailers and caravans:
Construction vehicles:
Other specifications:
Methodology
Source: Eskom Vehicle Safety Spec 32-345.pdfOnly newly purchased vehicles and new contracts must comply with the specification. Existing vehicles follow a phased replacement plan by the Fleet Services Department. Scheme and non-Eskom vehicles must comply when replaced. Changes or modifications to Eskom-owned vehicles must be managed per the Fleet Management Policy, certified safe by the manufacturer, and approved by the Fleet section; they must be supplied and installed by the dealer or approved fitment centres.
Quality Management
Source: Eskom Vehicle Safety Spec 32-345.pdfCompliance with the vehicle safety specification is audited at least annually by the operating unit/business unit as part of internal audit/review. Sustainability Systems OHS may perform compliance inspections. All records are audited by the Assurance and Forensic Department (A&F) or a delegated person, at a frequency determined by A&F.
Compliance Requirements
Source: Eskom Vehicle Safety Spec 32-345.pdf (unknown)Vehicles used for Eskom business purposes must comply with Eskom Vehicle Safety Specification 32-345. Hired or leased vehicles must comply with the Treasury Note for a B-class vehicle fitted with airbags and ABS. Private vehicles used must have at least two factory-fitted airbags and factory-fitted ABS. Compliance with the specification is audited at least annually by the operating unit/business unit; Sustainability Systems OHS may perform compliance inspections; records audited by the Assurance and Forensic Department.
Health & Safety
Source: Eskom Vehicle Safety Spec 32-345.pdfThe specification requires compliance with the National Road Traffic Act, the Occupational Health and Safety Act (including Construction Regulations), the Mine Health and Safety Act, and the National Environmental Management Act. Specific safety features include: Euro NCAP 4 rating, ABS, airbags, alarm/immobiliser, power steering, daytime running lights, reverse-park sensors, reverse beepers on heavy vehicles, emergency warning triangles, emergency number labels, vehicle-monitoring devices, driver behaviour cameras, roll bars for LDVs where risk of rollover, under-run protection, chevron plates, speed warning signs, three-point safety belts, emergency exits, anti-slip steps, operator protection structures on construction vehicles, acoustic warning devices, and reversing alarms.
Submission Guidelines
Source: Annexure B – Supplier Tender Receiving Acknowledgement Form.docx (unknown)Returnable documents:
Evaluation Criteria
Source: Annexure B – Supplier Tender Receiving Acknowledgement Form.docx (unknown)No evaluation criteria are stated in the provided document.
Technical Specifications
Source: Annexure B – Supplier Tender Receiving Acknowledgement Form.docx (unknown)The tender is for the supply and delivery of spares for Aircons, batteries, PTM and electrical maintenance departments on an 'as and when required' basis at Arnot Power Station, for a period of 60 months.
Compliance Requirements
Source: Annexure B – Supplier Tender Receiving Acknowledgement Form.docx (unknown)No specific compliance requirements are stated in the provided document.
Description
Source: 3. Eskom Vehicle Safety Spec 32-345.pdfThis document standardises Eskom's vehicle safety specifications, applying to all Eskom vehicles and vehicles used for Eskom activities by contractors. It specifies minimum safety requirements for various vehicle categories, including light delivery vehicles, heavy commercial vehicles, minibuses, midi-buses, buses, trailers, and construction vehicles, to comply with legislative and internal requirements.
Technical Specifications
Source: 3. Eskom Vehicle Safety Spec 32-345.pdf (unknown)The document is an internal Eskom vehicle safety specification (32-345, Revision 5), not a tender-specific document. It sets minimum safety requirements for all Eskom-owned vehicles and vehicles used by contractors for Eskom work. Key requirements include:
Methodology
Source: 3. Eskom Vehicle Safety Spec 32-345.pdfThe specification applies to newly purchased vehicles and new contracts. Existing vehicles will be replaced on a phased basis according to the Fleet Services Department's replacement plan. Scheme and non-Eskom vehicles must comply when replaced.
Compliance Requirements
Source: 3. Eskom Vehicle Safety Spec 32-345.pdf (unknown)The document is an internal Eskom specification, not a tender document. It does not state any compliance requirements for bidders such as CSD registration, tax clearance, B-BBEE, or CIDB grading.
Health & Safety
Source: 3. Eskom Vehicle Safety Spec 32-345.pdfVehicle safety specifications include requirements such as Euro NCAP 4 rating, factory-fitted ABS, airbags, alarm/immobiliser, power steering, tyres conforming to manufacturer's specifications, emergency warning triangles, air conditioner, seatbelt reminder, daytime running lights, reverse-park distance control, reverse beeper for heavy vehicles, emergency number label, vehicle-monitoring devices, and driver behaviour cameras. Additional specifications for LDVs include roll bars where risk of rollover exists. Heavy commercial vehicles must have ABS, airbags, alarm/immobiliser, power steering, reverse lights, yellow reflective tape, anti-spray mud flaps, under-run protection devices, chevron warning plates, speed limit warning signs, and secure mounting of apparatus. Minibuses require SANS-approved three-point safety belts, no fold-up seats, speed warning signs, yellow reflective tape, adjustable driver's seat, commercial-use tyres, emergency exits, and no conversion from panel vans. Midi-buses and buses have similar requirements plus anti-slip treads and wheelchair accessibility for identified vehicles. Trailers and caravans must meet NRTA specifications. Construction vehicles must comply with OHS Act Construction Regulation 23, NRTA, MHSA, and NEMA, and be fitted with rollover protection, safe access/egress, signalling, acoustic warning devices, reversing alarms, and telescoping whips with flags. Retrofitting of elevated lights is required where applicable. Modifications to vehicles must be managed per Fleet Management Policy and certified safe by the manufacturer.
Contractual Terms
Source: 3. Eskom Vehicle Safety Spec 32-345.pdf (unknown)The specification is mandatory for all Eskom-owned vehicles and vehicles used by contractors for Eskom work. The delegated employer and responsible managers must ensure compliance. Compliance is audited annually by the operating/business unit, with possible inspections by Sustainability Systems OHS. Records are audited by the Assurance and Forensic Department.
Description
Source: 240-68099512 Form A_Cat 2_ Rev 9.docx (unknown)The tenderer must complete and sign the Supplier Quality Requirements acknowledgement form, accepting Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001.
Submission Guidelines
Source: 240-68099512 Form A_Cat 2_ Rev 9.docx (unknown)Returnable documents:
Technical Specifications
Source: 240-68099512 Form A_Cat 2_ Rev 9.docx (unknown)The tenderer must complete and sign the Supplier Quality Requirements acknowledgement form, accepting Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001. The form requires selection of one quality category; Category 2 is indicated as applicable.
Description
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx (unknown)The document is a Non-Disclosure Agreement (NDA) template between Eskom Holdings SOC Ltd and suppliers/tenderers. It is not the tender specification document.
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx (unknown)Eskom Holdings SOC Ltd
Registered office: Megawatt Park, Maxwell Drive, Sunninghill ext. 3, Sandton
Postal address: P O Box 1091, Johannesburg 2000, South Africa
Telephone: +27
Submission Guidelines
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx (unknown)Returnable documents: The Non-Disclosure Agreement (NDA) must be completed, signed, and returned with the bid. The NDA is a confidentiality agreement between Eskom and the supplier/tenderer, binding the supplier to protect Eskom's confidential information. The NDA must be signed by a person authorised to sign on behalf of the supplier, and witnessed.
Evaluation Criteria
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx (unknown)No evaluation criteria are specified in the document.
Technical Specifications
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx (unknown)The document is a Non-Disclosure Agreement (NDA) template. It does not contain technical specifications for the supply and delivery of spares.
Compliance Requirements
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx (unknown)The NDA must be signed by a person authorised to sign on behalf of the supplier/tenderer, and witnessed.
Submission Guidelines
Source: Annexure J - SBD 4 - Tenderer_s Disclosure.docx (unknown)Returnable documents:
Evaluation Criteria
Source: Annexure J - SBD 4 - Tenderer_s Disclosure.docx (unknown)Bidders listed on the Register for Tender Defaulters or the List of Restricted Suppliers are automatically disqualified. Bidders must certify the tender was prepared independently, without collusion or disclosure to competitors before tender opening or contract award.
Compliance Requirements
Source: Annexure J - SBD 4 - Tenderer_s Disclosure.docx (unknown)SBD 4 (Tenderer's Disclosure) must be completed and signed. Bidders must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers.
Description
Source: Technical Tender Evaluation Criteria - Electrical Spares.docx (unknown)The document is the technical evaluation criteria for the supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis for 60 months. It contains mandatory and qualitative technical evaluation criteria, with a minimum threshold of 75% for the technical evaluation.
Evaluation Criteria
Source: Technical Tender Evaluation Criteria - Electrical Spares.docx (unknown)Mandatory criterion: proof of transportation capacity (bakkie/LDV) — submit a copy of the motor vehicle licence, proof of ownership, or a letter of intent for leasing. If this is not met, no qualitative assessment is conducted. Misrepresentation of company information at tendering stage leads to technical disqualification.
Qualitative technical evaluation (minimum threshold 75%):
Compliance Requirements
Source: Technical Tender Evaluation Criteria - Electrical Spares.docx (unknown)No specific compliance requirements (e.g., CSD, tax, B-BBEE) are stated in the provided document.
Description
Source: Annexure C - Tenderer_s Particulars.docxThis annexure collects the tenderer's particulars, including registration numbers, subcontracting details, and tendering structure. It does not describe the scope of work.
Submission Guidelines
Source: Annexure C - Tenderer_s Particulars.docx (unknown)Returnable documents:
Submission method: as specified in the Invitation to Tender (not detailed in this annexure).
Disqualification risks:
Evaluation Criteria
Source: Annexure C - Tenderer_s Particulars.docx (unknown)Pre-qualification requirements:
Subcontracting requirements (if applicable):
Evaluation will follow the preference point system and criteria set out in the Invitation to Tender (not detailed in this annexure).
Technical Specifications
Source: Annexure C - Tenderer_s Particulars.docx (unknown)The tenderer must furnish particulars as required in Annexure C, including:
Compliance Requirements
Source: Annexure C - Tenderer_s Particulars.docx (unknown)Mandatory compliance:
Subcontracting compliance (if applicable):
Evaluation Criteria
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.docx (unknown)Preference points are claimed via SBD 6.1 (Preference Points Claim Form). The applicable preference point system is either 80/20 (for contracts up to R50 million including taxes) or 90/10 (for contracts above R50 million). Points are awarded for price and specific goals. Bidders must indicate how they claim points for each system and provide supporting documentation for any specific goals claimed. Failure to submit proof with the tender means no preference points for specific goals are claimed. The organ of state may require substantiation of any preference claim before or after adjudication.
Compliance Requirements
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.docx (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance (SARS TCS) as per standard Eskom requirements. Bidders must not be restricted from doing business with the state.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Returnable documents:
Submission method: via the E-Tendering Solution (electronic).
Returnable Documents
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Mandatory returnable: E-Tenderers' E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1). It must be fully completed and submitted to Eskom within the prescribed period; failure to do so will render the tenderer non-responsive and disqualified from the procurement process.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Submission of the fully completed E-Tenderers' E-Tendering Training Acknowledgement Form is mandatory. Failure to submit it within the prescribed period renders the tenderer non-responsive and disqualified from the procurement process.
Submission Guidelines
Source: E-Tenderers' Training Acknoweldegement.pdf (unknown)Returnable documents:
Disqualification risk:
Returnable Documents
Source: E-Tenderers' Training Acknoweldegement.pdf (unknown)Mandatory returnable: E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1). Must be fully completed and submitted to Eskom within the prescribed period; failure to do so renders the tenderer non-responsive and disqualified. The form requires the bidder to acknowledge that they have undergone self-training via the e-Tendering Noddy Guide, video, or clarification meeting, and confirm they can operate the E-Tendering Solution.
Evaluation Criteria
Source: E-Tenderers' Training Acknoweldegement.pdf (unknown)Mandatory returnable: E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1). Failure to fully complete and submit this form within the prescribed period will render the tenderer non-responsive and disqualified from the procurement process.
Technical Specifications
Source: ANB615~1.DOC (unknown)Scope
Description
Source: Supplier Declaration of Interest Template.docx (unknown)The document is a declaration of interest form, not a full tender specification. It requires the bidder to declare any conflicts of interest involving Eskom employees or directors, and to certify the accuracy of the information under oath.
Submission Guidelines
Source: Supplier Declaration of Interest Template.docx (unknown)Returnable documents: the completed and signed Supplier Declaration of Interest Template (Eskom form 240-59385360 Rev 3) must be submitted with the bid.
Evaluation Criteria
Source: Supplier Declaration of Interest Template.docx (unknown)No evaluation criteria are stated in the available document. The only stated requirement is the completion and submission of the declaration of interest.
Compliance Requirements
Source: Supplier Declaration of Interest Template.docx (unknown)The bidder must complete and submit the Supplier Declaration of Interest Template (Eskom form 240-59385360 Rev 3).
Description
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.docx (unknown)This annexure sets out the contract price adjustment (CPA) requirements for local goods and services. It applies to contracts longer than 12 months; for shorter contracts, fixed pricing is required. The document provides rules for CPA formulae, base dates, and professional services adjustments.
Technical Specifications
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.docx (unknown)Contract price adjustment (CPA) applies to this tender because the contract period is 60 months (more than 12 months).
Financial Requirements
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.docx (unknown)Contract price adjustment (CPA) conditions as described in the technical specifications section.
Description
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)The tender is for the supply and delivery of spares for Aircon, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an 'as and when required' basis for a period of 60 months.
Contact Information
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Eskom Representative:
Procurement Manager (signatory):
Fraud and corruption reporting:
Submission: via Eskom E-tendering site (TenderBulletin at eskom.co.za).
Submission Guidelines
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Submission method: electronic only via the Eskom E-tendering site (TenderBulletin at eskom.co.za). No hard copies accepted. No zip/condensed files. Upload each document in PDF format; the price list must be in PDF and a copy in Excel format. Maximum upload size per document is 500 MB; total submission limited to 4 GB. If resubmitting, only the latest version is accepted; previous versions become null and void. Ensure the submission status is marked complete. Late tenders are not accepted.
Returnable forms (all must be completed, signed where required, and submitted at closing unless noted):
Disqualification risks:
Evaluation Criteria
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Evaluation stages:
Functionality criteria (weightings):
Mandatory technical criteria (pass/fail):
Technical Specifications
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Scope: Supply and delivery of spares for Aircon, batteries, PTM (Power and Thermal Management?) and electrical maintenance departments at Arnot Power Station, on an 'as and when required' basis for 60 months.
Key requirements:
Experience & Qualifications
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Experience and qualifications:
Quality Management
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Quality management requirements:
Pricing Schedule
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Pricing schedule:
Financial Requirements
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Payment terms:
Pricing schedule:
Due diligence financial statements (required prior to award):
No bid security or performance guarantee specified (N/A).
Compliance Requirements
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Mandatory contractual requirements (assessed after evaluation, prior to award):
SHE returnables required:
Quality requirements:
Environmental requirements:
B-bbee:
Employment Equity:
CIDB: Not applicable (goods/services contract).
Health & Safety
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Health and safety requirements:
Environmental
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Environmental requirements:
Contractual Terms
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Contract type: NEC (New Engineering Contract).
Eligibility:
Payment terms: as per financial requirements.
Cataloguing: successful tenderer may need to provide cataloguing info and label materials per Eskom specifications; pricing schedule must include cataloguing line item if required.
Alternative tenders not allowed.
Eskom reserves right to negotiate with preferred bidders if prices not market-related.
Subcontracting with subsidiaries discouraged; must be declared if done.
Section
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Additional evaluation criteria:
Description
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Supply and delivery of spares for Aircons, batteries, PTM and electrical maintenance departments on an "as and when required" basis at Arnot Power Station for 60 months.
Contact Information
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Buyer: Lebohang Malema
No email, telephone, or address are provided in the document.
Submission Guidelines
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Returnable documents (all must be completed, signed and submitted):
Disqualification risks:
Evaluation Criteria
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Evaluation is based on the 80/20 or 90/10 preference point system. Points for price and specific goals are added, and the contract is awarded to the tenderer scoring the highest total.
Specific goals (B-BBEE status level) points:
Tenderers failing to provide documentation for preference points are not disqualified, but may only score points out of 80/90 for price and score 0 points out of 20/10 for specific goals.
SDL&I objectives (transformation, local procurement, jobs, skills development, subcontracting) do not form part of scoring, but commitments become contractual obligations.
Technical Specifications
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Supply and delivery of spares for Aircons, batteries, PTM (Power and Thermal Maintenance?) and electrical maintenance departments.
Basis: "as and when required" (call-off) at Arnot Power Station.
Duration: 60 months.
Designated sector: Electrical and telecoms cables – electrical cables must have a local content threshold of 90%.
Methodology
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Skills development: Tenderers must propose how they will develop skills of unemployed candidates, targeting Eskom's core, scarce and critical skills (e.g., electrician, fitter, technical students). Candidates must be from all provinces and representative of SA demographics. Tenderers bear full cost; Eskom makes no financial contribution. Tenderers may approach SETAs for grants and SARS for tax rebates.
Pricing Schedule
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Tender response must be separated into components as per the Price Schedule. Local procurement content is total spending minus imported component.
Financial Requirements
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Pricing: Tender response must be separated into components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component.
SDL&I penalties and security:
Compliance Requirements
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)B-bbee:
Local content:
Subcontracting:
Sworn affidavit validity:
B-BBEE Requirements
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Sworn affidavit validity: Must include deponent's name as per ID, identity number, designation, enterprise name as per CIPC, business address, percentage of black ownership (including black female and designated group), total revenue, financial year end, B-BBEE status level, empowering supplier status (for QSEs). Deponent and Commissioner of Oaths must sign on same date; Commissioner cannot be an employee or ex officio of the enterprise.
Health & Safety
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)No health and safety requirements are stated in the document.
Special Conditions
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Reporting: Quarterly SDL&I reports required. Eskom reviews within 30 days; corrective measures required before next report, failing which retention clauses invoked. SDL&I Implementation Schedule must be completed and returned within 28 days of contract award.
Section
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Specific goals points (B-BBEE status level) are added to price points. Maximum 10/20 points for specific goals. Tenderers failing to provide preference point documentation may only score points out of 80/90 for price and 0 points out of 20/10 for specific goals.
Description
Source: E-Tendering Help Manual for supplier.pdfThe eTendering system is a web-based platform that replaces physical submission of tender documents at Eskom offices. Suppliers must register and verify their details via email and OTP before accessing the system. Access is available through the TenderBulletin public website (https://tenderbulletin.eskom.co.za) and the eTendering website (https://eTendering.eskom.co.za). A CSD number is required for access.
Important Dates
Source: E-Tendering Help Manual for supplier.pdf (TENDER)Closing date and time: 20 October 2026 at 10:00 (from tender record). No briefing or site visit dates are stated.
Contact Information
Source: E-Tendering Help Manual for supplier.pdf (TENDER)For system problems, contact the buyer responsible for the published tender. No specific contact name, email, or telephone is provided in the document.
Submission Guidelines
Source: E-Tendering Help Manual for supplier.pdf (TENDER)Submission is electronic only via the Eskom eTendering system at https://eTendering.eskom.co.za. Bidders must register on the system and verify their email and cellphone via OTP before access is granted. Upload each required document under the correct category (Technical, Commercial, Finance, etc.). Each file must not exceed 50MB; total uploads must not exceed 900MB. Finalise the submission before the closing timestamp; a confirmation email with the submission ID is sent and must be saved for enquiries. Closed tenders are sent directly to selected suppliers via a private email link.
Technical Specifications
Source: E-Tendering Help Manual for supplier.pdf (TENDER)The tender is for the supply and delivery of spares for air conditioners, batteries, PTM (power and telemetry maintenance), and electrical maintenance departments at Arnot Power Station. Deliveries are on an 'as and when required' basis over a 60-month period. No quantities, standards, or service levels are specified in the provided document.
Methodology
Source: E-Tendering Help Manual for supplier.pdf (TENDER)To submit a bid, bidders must: 1) Register on the eTendering portal by completing all fields, using a contact number with +27 prefix, and completing the CAPTCHA. 2) Verify the email sent to the provided address. 3) Log in with the verified email and password, then enter the OTP sent to the cellphone and email. 4) Select the tender, upload documents under the correct category (Technical, Commercial, Finance), and finalise the submission before the closing time. 5) Save the confirmation email with the submission ID.
Financial Requirements
Source: E-Tendering Help Manual for supplier.pdf (TENDER)No financial requirements (pricing format, bid security, guarantees, retention, payment terms, or turnover thresholds) are stated in the provided document.
Compliance Requirements
Source: E-Tendering Help Manual for supplier.pdf (TENDER)Bidders must have a valid CSD (Central Supplier Database) number to access the eTendering system. No other compliance requirements (tax, B-BBEE, CIDB, etc.) are stated in the provided document.
Special Conditions
Source: E-Tendering Help Manual for supplier.pdf (TENDER)Closed tenders are not listed on TenderBulletin but are sent directly to selected suppliers via a private email link. The system is compatible with most web browsers; Microsoft Edge is recommended.
Section
Source: E-Tendering Help Manual for supplier.pdfNo specific evaluation criteria are provided. Suppliers are selected based on criteria set by the buyer, but details are not disclosed in the document.
Description
Source: 3. Eskom life-saving rules.pdf (unknown)Eskom is committed to preventing all work-related injuries and maintaining a safe and healthy work environment. The Life-Saving Rules are safety rules that enforce zero tolerance for serious at-risk behaviours. These rules apply to all Eskom employees, agents, consultants, and contractors, and visitors must adhere to them. The rules are designed to prevent the most prominent causes of serious injuries and fatalities within Eskom.
Submission Guidelines
Source: 3. Eskom life-saving rules.pdf (unknown)Returnable documents: complete and submit all required National Treasury standard forms, including SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination), as applicable. Ensure all forms are signed and submitted with the bid.
Evaluation Criteria
Source: 3. Eskom life-saving rules.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance (SARS TCS or tax pin). Bidders must comply with Eskom's Life-Saving Rules; any violation by a contractor employee will result in immediate removal from site and disciplinary action. Contractors must ensure their employees are trained and authorised for the tasks performed, and must provide evidence of compliance with Eskom's safety standards, including the use of approved personal protective equipment (PPE) and fall arrest systems.
Technical Specifications
Source: 3. Eskom life-saving rules.pdf (unknown)Eskom requires compliance with its Life-Saving Rules at all sites. These rules apply to all employees, agents, consultants, and contractors, and visitors must adhere to them. The five rules are: Rule 1: Open, isolate, test, earth, bond, and/or insulate before touch. Rule 2: Hook up at heights. Rule 3: Buckle up. Rule 4: Be sober. Rule 5: Ensure that you have a permit to work. Violations are treated as serious misconduct and may lead to disciplinary action, including suspension of contractor activities.
Health & Safety
Source: 3. Eskom life-saving rules.pdf (unknown)Eskom's Life-Saving Rules: Rule 1: Open, isolate, test, earth, bond, and/or insulate before touch. Rule 2: Hook up at heights. Rule 3: Buckle up. Rule 4: Be sober. Rule 5: Ensure that you have a permit to work. These rules apply to all Eskom employees, agents, consultants, and contractors, and visitors must adhere to them. Violations are treated as serious misconduct and may lead to disciplinary action, including suspension of contractor activities.
Section
Source: 3. Eskom life-saving rules.pdf (unknown)Bidders must comply with ISO 9001 Quality Management Systems and Eskom's Safety, Health, Environment and Quality Policy (32-727).
Description
Source: Scope of work - Electrical Spares.docxThe contract covers the supply and delivery of electrical spares for the Aircon, batteries maintenance, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis, for a period of 60 months.
Compliance Requirements
Source: Scope of work - Electrical Spares.docx (unknown)Compliance with SANS 10147, Pressure Equipment Regulations (PER), SANAS 347, and other applicable standards and certification requirements is mandatory.
Description
Source: SHE Spec.pdf (unknown)This OHS specification sets out Eskom Generation's minimum health, safety, environmental and quality requirements that the contractor must meet for the duration of the contract. The contractor is accountable for the quality and execution of their health and safety programme for their employees and any appointed contractors. The requirements are minimums and do not replace any organisational OHS requirements. The contractor must develop an OHS plan that addresses all requirements in this specification and any additional Eskom or legislative requirements.
Contact Information
Source: SHE Spec.pdf (unknown)OHS/SHE Officer: Busi Sithole
Eskom representative: Nokuthula Ncongwane
Submission address: Arnot Power Station, Electrical Maintenance Department
(No email or telephone numbers provided in the document.)
Submission Guidelines
Source: SHE Spec.pdf (unknown)Returnable documents (all must be completed, signed and submitted with the bid):
Disqualification risks:
Evaluation Criteria
Source: SHE Spec.pdf (unknown)Evaluation stages:
Minimum qualifying score: Not stated in the document.
B-BBEE minimum level: Level 2 (as per compliance requirements).
Methodology
Source: SHE Spec.pdf (unknown)Method statements required for all key activities.
Live work must follow the High Voltage Live Working Standard, maintain minimum approach distance (MAD), and never mix live and dead work on the same site at the same time.
Risk assessments must be conducted as per Eskom procedure 32-520.
Experience & Qualifications
Source: SHE Spec.pdf (unknown)The main contractor and appointed contractors must have appropriate qualifications and certificates.
Employees must always be under competent supervision.
The contractor site supervisor must be trained in HIRA, incident investigation, supervisor training, authorised person & PSR, and legal liability.
Quality Management
Source: SHE Spec.pdf (unknown)Quality requirements:
Quality management system: ISO 45001 is listed as a normative reference.
Financial Requirements
Source: SHE Spec.pdf (unknown)Pricing format: Firm prices on the pricing schedule (SBD 3.1).
Bid security: Not stated in the document.
Guarantees: Not stated in the document.
Retention: Not stated in the document.
Payment terms: Not stated in the document.
Financial capacity: Not stated in the document.
Compliance Requirements
Source: SHE Spec.pdf (unknown)Mandatory compliance:
B-BBEE: Minimum Level 2 (as per compliance requirements).
CSD registration: Not stated in the document.
Tax clearance: Not stated in the document.
CIDB grading: Not applicable (supply of spares, not construction).
Health & Safety
Source: SHE Spec.pdf (unknown)Health and safety requirements:
Environmental
Source: SHE Spec.pdf (unknown)Environmental requirements:
Contractual Terms
Source: SHE Spec.pdf (unknown)Contract duration: 60 months.
Contractor must comply with all OHS requirements as per the specification.
Eskom has the right to terminate the contract for non-compliance with OHS requirements.
Contractor performance will be monitored.
Contract sign-off required at completion.
Omissions from the safety and health requirements specification must be addressed.
Section
Source: SHE Spec.pdf (unknown)The Section 37(2) agreement must be signed between Eskom and the main contractor at the time of submitting the safety file. The OHS department will issue the 37(2) agreement to the project manager/end user who will facilitate signing by both parties. The contractor must comply with the SHEQ policy and all legislative obligations.
Description
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.xlsx (unknown)The tender is for the supply and delivery of spares for Aircons, batteries, PTM and electrical maintenance departments on an 'as and when required' basis at Arnot Power Station, for a period of 60 months. The quality requirements are defined in the Supplier Contract Quality Requirements Specification (Ref 240-105658000) and related documents. Bidders must provide a Draft Contract Quality Plan (CQP) and Inspection and Test Plan (ITP) or Quality Control Plan (QCP) specific to the scope of work.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.xlsx (unknown)Returnable documents must be completed, signed, and submitted with the bid. The List of Tender Returnables template (Cat 2, Rev 7) must be used: select the applicable category on the Cover tab, complete the Returnables tab, then save as PDF and sign, or sign and lock the sheet before sending. The template includes Form A (completed and signed), and quality-related deliverables as per the selected category.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.xlsx (unknown)Quality documentation is evaluated using a weighted scorecard with five sections: Section A (Quality Management System Requirements, weight 0.25), Section B (Evidence of QMS in operation, weight 0.25), Section C (Contract Quality Plan, weight 0.2), Section D (Quality Control Plan, weight 0.2), Section E (User defined additional requirements, weight 0.1). Section A offers two options: Option 1 (valid ISO 9001 certification) or Option 2 (evidence of QMS in operation). Bidders must meet the applicable quality requirements to score points.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.xlsx (unknown)Bidders must comply with the quality management system requirements as per the tender quality specifications. This includes either holding a valid ISO 9001:2015 certificate (with scope relevant to the work) or demonstrating an implemented QMS with documented information, quality policy, objectives, and records. Internal management system audit reports (with nonconformity and corrective action reports) are required. A completed and signed Form A is mandatory.
Health & Safety
Source: 3. Eskom Waste Management Standard 32-245.pdf (unknown)Eskom requires all contractors to comply with its Safety, Health, Environment and Quality (SHEQ) Policy. Contractors must meet applicable SHEQ compliance obligations and organisational requirements. Eskom's Life-saving Rules apply to all employees, contractors and visitors: open, isolate, test, earth, bond and/or insulate before touch; hook up at heights; buckle up; be sober; and permit to work. Eskom aims for zero fatalities, zero injuries, zero environmental incidents, zero tolerance and zero defects. Contractors must support the implementation of management systems aligned to ISO 9001, ISO 14001 and ISO 45001/OHSAS 18001, and must conduct hazard identification and risk assessment, fitness for duty assessments, emergency preparedness, and medical surveillance as applicable.
Environmental
Source: 3. Eskom Waste Management Standard 32-245.pdf (unknown)Eskom requires contractors to support proactive management of the environmental footprint, minimising pollution and environmental degradation, pursuing a low-carbon future, and prioritising energy and water efficiency and conservation. Contractors must ensure sustainable use of resources and support climate change mitigation and adaptation, and protection of biodiversity and ecosystems.
Contact Information
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Fraud and corruption reporting: [email protected], telephone 0800 11 2722. No other contacts are stated in the provided document.
Submission Guidelines
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Returnable documents: none specified in the provided document. The document is the Eskom General Conditions of Purchase, which forms the basis of the contract. Bidders must accept these conditions; non-acceptance must be expressly indicated in writing. Submission method, address, and closing time are not stated in this document.
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfEskom may inspect and/or test the goods/works/services at any stage. If the Supplier fails to comply with obligations, Eskom may reject any part of the goods by written notice, specifying the reason and whether replacement or re-work is required. Rejected goods may be returned at the Supplier's risk and expense; the Supplier must correct non-conformances/defects. If the Supplier delays, Eskom may have the defect corrected by a third party at the Supplier's cost.
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfPrices or rates may include a price adjustment calculated per a formula in the agreement. Payment may be made in any currency; one exchange rate will be used to convert to ZAR. The Supplier must complete Eskom's CPA (IG) form. Eskom will pay within 30 days after receipt of a correct tax invoice, which must show Eskom's VAT registration number (4740101508).
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Payment: Eskom will pay within 30 days after receipt of a correct tax invoice. The tax invoice must show Eskom's VAT registration number (4740101508). Prices may include a price adjustment calculated per a formula in the agreement. Payment may be made in any currency; one exchange rate will be used to convert to ZAR. The Supplier must complete Eskom's CPA (IG) form. No bid security, bonds, guarantees, or retention are stated.
Compliance Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)The Supplier must comply with all statutory requirements of South Africa. The agreement is governed by South African law and the parties submit to the jurisdiction of SA courts. No specific pre-qualification criteria (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document.
Health & Safety
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfNo specific health and safety requirements are stated in the provided document. The document covers delivery, acceptance, and risk provisions.
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfThe contract is governed by Eskom's General Conditions of Purchase (Rev 3, effective 31 May 2024). Key terms include:
Contact Information
Source: NEC- EMD SPARES 1.pdf (unknown)No contact details are stated in this document. The Supply Manager is listed as TBA. Eskom's registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg, 2199.
Submission Guidelines
Source: NEC- EMD SPARES 1.pdf (unknown)Returnable documents (all must be completed, signed and submitted):
Evaluation Criteria
Source: NEC- EMD SPARES 1.pdf (unknown)Evaluation criteria are not stated in this document. The contract is a priced NEC3 Supply Contract; the Price Schedule determines the amount due. Goods must conform to quality standards and specification. Bidders must complete the Form of Offer and Acceptance and provide Contract Data Part 2.
Technical Specifications
Source: NEC- EMD SPARES 1.pdf (unknown)Scope: Supply and delivery of spares for the Aircon, PTM and Electrical maintenance departments on an 'as and when required' basis at Arnot Power Station for a period of 60 months.
Pricing Schedule
Source: NEC- EMD SPARES 1.pdf (unknown)Pricing: Priced contract; Prices derived from Price Schedule items (lump sums or quantities × rates). Price Schedule is not Goods Information. Tendered total of Prices exclusive of VAT, VAT @ 15%, and total inclusive of VAT to be inserted. Supplier to complete Price Schedule, including additional items. Prices assumed fully inclusive of everything necessary. No adjustment to lump sums for quantity changes; only compensation events change Prices. Format: entries in first four columns; if paid by amount, leave Unit/Quantity/Rate blank; if by rate × quantity, enter rate. The Price Schedule lists items with quantities, descriptions, and units (e.g., stove plates, thermostats, elements, switches, contactors, circuit breakers, capacitors, drives, relays, etc.) for the spares supply.
Financial Requirements
Source: NEC- EMD SPARES 1.pdf (unknown)Pricing format: Priced contract; Prices derived from Price Schedule items (lump sums or quantities × rates).
Compliance Requirements
Source: NEC- EMD SPARES 1.pdf (unknown)B-BBEE: No specific B-BBEE level or preference point system stated. Contract condition Z3 requires the supplier to notify the Purchaser within 7 days of any change in B-BBEE status, and to submit an updated verification certificate within 30 days. A decrease in B-BBEE status may lead to renegotiation or termination.
Health & Safety
Source: NEC- EMD SPARES 1.pdf (unknown)Health, safety and environment: Supplier must take all reasonable precautions to maintain health and safety of persons, and comply with all applicable H&S laws, regulations, rules, guidelines and procedures. The total of Prices must include sufficient amount for proper compliance. Supplier must ensure subcontractors and others under its control comply. Supplier must also comply with all applicable environmental laws and regulations.
Environmental
Source: NEC- EMD SPARES 1.pdf (unknown)Environmental compliance: Supplier must comply with all applicable environmental laws and regulations, and ensure subcontractors and others under its control do the same. Asbestos removal and disposal must be done by a registered asbestos contractor, instructed by the Purchaser, and conducted in line with South African legislation.
Contractual Terms
Source: NEC- EMD SPARES 1.pdf (unknown)Contract: NEC3 Supply Contract (SC3) between Eskom Holdings SOC Ltd and the supplier.
Special Conditions
Source: NEC- EMD SPARES 1.pdf (unknown)Supply Requirements (Annexure A): Goods supplied per INCOTERMS 2010, delivery place Arnot Power Station. Supplier responsible for transport and insurance in transit; offloading at Arnot Power Station Electrical Maintenance Department. Actions: Supplier gives notice of delivery, checks packing/marking, contracts transport, pays transport costs, loads goods; Purchaser arranges access and unloads. Supplier to provide packing lists, invoice copy, delivery note, test results and maintenance manuals.
Section
Source: NEC- EMD SPARES 1.pdf (unknown)No evaluation criteria are stated in this document. Goods must conform to quality standards and specification.
Description
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Supply and delivery of spares for Aircons, batteries, PTM and electrical maintenance departments at Arnot Power Station, as and when required for 60 months.
Briefing Session
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Site visit/clarification meeting: compulsory if stipulated; failure to attend disqualifies.
Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Enquiries: Eskom Representative (name not provided).
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Submission method: paper or e-tender via Eskom Tender Bulletin.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Evaluation stages: basic compliance, mandatory returnables, pre-qualification, functionality (if applicable), financial analysis, price and specific goals.
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Scope: supply and delivery of spares for Aircons, batteries, PTM and electrical maintenance departments at Arnot Power Station.
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)SHEQ: proof of systems, policies, capabilities at closing; costs in tender.
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Pricing: include all duties, taxes (including VAT), levies.
Financial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Pricing: include all duties, taxes (including VAT), levies in rates and prices.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eligibility: not under restriction with Eskom or State-Owned Companies; no 100% sub-contracting.
B-BBEE Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)B-BBEE level scored from CSD report or certificate/affidavit.
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Comply with OHS Act and Eskom SHEQ requirements.
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eskom may cancel tender or reject any tender; no liability for participation.
Special Conditions
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Original plus one copy required; e-tender via Eskom Tender Bulletin.
Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eligibility: not under restriction with Eskom or State-Owned Companies; no 100% sub-contracting.
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Basic compliance: original and copy required; failure disqualifies.
Description
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfThe Eskom Supplier Integrity Pact is a binding agreement between Eskom and its suppliers that prescribes ethical behaviour. It applies to all existing and potential suppliers and covers the entire procurement process, including contract execution and modifications. Suppliers must act with integrity, avoid conflicts of interest, and refrain from dishonesty, fraud, corruption, and anti-competitive practices such as collusion or bid rigging. Eskom commits to fair, transparent, equitable, cost-effective and competitive procurement aligned with South African law.
Important Dates
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Closing date: 27 June 2023
Contact Information
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Ethics reporting:
Submission Guidelines
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Bidders must be registered as vendors on the Eskom Vendor Database.
Bidders must complete and submit the Integrity Declaration Form.
Bidders must not have any conflict of interest with Eskom employees/directors, and must disclose any such interest.
Bidders must not have been restricted or suspended from the Eskom Vendor Database or the National Treasury's List of Restricted Suppliers.
Bidders must not engage in dishonest, fraudulent, corrupt, or illegal practices.
Bidders must not offer bribes, gifts, or inducements to Eskom employees/directors involved in the tender process.
Bidders must not enter into collusive agreements with other tenderers.
Technical Specifications
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)The Eskom Supplier Integrity Pact applies to Eskom Holdings SOC Ltd and all wholly owned subsidiaries.
It applies to all existing and potential suppliers, including consultants, contractors, sub-contractors and providers of goods and services.
Suppliers must maintain an impeachable standard of integrity in all business and personal dealings.
Suppliers must be familiar with all publicly available Eskom policies, procedures and codes affecting supply chain processes, including the Standard Conditions of Tender.
Suppliers must reject all improper business practices.
Suppliers must not abuse the trust placed in them by Eskom employees or misuse opportunities for personal gain.
Suppliers must maintain and enhance their standards of professional competence.
Suppliers must adopt policies and practices aligned with Eskom's labour practices, employment equity initiatives and human relations policies.
Suppliers must not disclose confidential information without the express consent of an authorised Eskom representative.
Suppliers must avoid relationships with Eskom employees/directors that could be perceived as contrary to fairness, equitability, transparency, competitiveness and cost effectiveness.
Suppliers must disclose any interest or affiliation with an Eskom employee/director that could affect or be perceived to affect decision-making during tender award.
Business courtesies or gifts must not exceed R1,500.00 in value and must not place an Eskom employee/director under obligation.
Suppliers must not engage in unethical or fraudulent dealings with Eskom employees/directors involved in evaluation, adjudication or negotiation.
Suppliers must report any dishonest, fraudulent or inappropriate behaviour by Eskom employees/directors to the Eskom Ethics office, Forensic office, or the toll-free hotline.
Financial Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Business courtesies or gifts to Eskom employees/directors must not exceed R1,500.00 in value.
Compliance Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Bidders must be registered as vendors on the Eskom Vendor Database.
Bidders must complete and submit the Integrity Declaration Form.
Bidders must not have been restricted or suspended from the Eskom Vendor Database or the National Treasury's List of Restricted Suppliers.
Bidders must not have any conflict of interest with Eskom employees/directors, and must disclose any such interest.
Bidders must not engage in dishonest, fraudulent, corrupt, or illegal practices.
Bidders must not offer bribes, gifts, or inducements to Eskom employees/directors involved in the tender process.
Bidders must not enter into collusive agreements with other tenderers.
Contractual Terms
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfThe Integrity Pact is governed by South African law.
The pact remains valid until replaced; if any provision is invalid, the remainder stays valid.
Breach of the pact may lead to a supplier discipline process, including suspension from the Eskom Vendor Database and referral to National Treasury for inclusion on the List of Restricted Suppliers.
Eskom may also institute disciplinary action against its own employees/directors for breaches.
The pact does not prejudice any civil or criminal proceedings that may arise.
Section
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfBidders must not engage in unethical or fraudulent dealings with Eskom employees/directors involved in evaluation, adjudication or negotiation. No business courtesy, bribe, gift, fee, commission or inducement may be offered to or requested by such employees/directors.
Submission Guidelines
Source: Declaration of Shareholding or Beneficiaries Form.pdf (unknown)Returnable documents: the completed Declaration of Shareholding or Beneficiaries (Tender Schedule T2.2a No 8) must be submitted with the bid.
Evaluation Criteria
Source: Declaration of Shareholding or Beneficiaries Form.pdf (unknown)Bidders must submit the completed Declaration of Shareholding or Beneficiaries (Tender Schedule T2.2a No 8).
Compliance Requirements
Source: Declaration of Shareholding or Beneficiaries Form.pdf (unknown)Bidders must declare all shareholders and beneficiaries, including their names, registration numbers, and shareholding percentages. They must also disclose whether any shareholder or beneficiary is employed by or a close family member of an employee of Eskom Holdings or its subsidiaries.
Contact Information
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Anonymous fraud and corruption reporting line (not an enquiry channel)
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfInspection and acceptance
Rejection and non-conformance
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfPrice adjustment
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Payment
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfDelivery and acceptance
Rejection and defects
Warranty
Liability, assignment and termination
Submission Guidelines
Source: AN5A43~1.DOC (unknown)Returnable documents: the tender pack requires the standard Eskom returnable documents to be completed, signed and submitted with the bid. No further submission details (method, address, copies) are stated in the available source.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 4 of 2006
Relevant to electricity, generation, transmission, distribution and energy-service procurement.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 28 of 2002
Relevant to mineral resources, mining rights, prospecting and mining-related procurement.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 40 of 2004
Relevant to regulated electricity, piped-gas and petroleum-pipeline activities.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance.
Address
Arnot Power Station - Rietkuil - Middelburg - 1097
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
33
Last checked
08 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Provincial procurement is not national procurement with a different address. Learn how provincial departments, entities, metros and districts buy, when they buy, and how to choose the province where your business can actually win.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
A practical architecture for a procurement dashboard: choose the metrics, pull data from the Developer API v2, exports or a CRM, model the warehouse, and visualise the pipeline without inventing a dashboard builder.
A small bid team can out-submit a larger one with clear roles, a weekly rhythm and hard review gates. Includes a RACI model, a three-person operating cadence and the hand-offs that fail most often.
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 10 656 702
Range
Based on 19 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Electricity, gas, steam and air conditioning. Unlock full pricing strategies, bid frequency, and historical win rates.