Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Arnot Power Station - Rietkuil - Middelburg - 1097
Organization Type
GOVERNMENT
Published
25 Sept 2026
OCDS Reference
ocds-9t57fa-171751
ESKOM requires the supply and delivery of spares for the aircons, batteries, ptm and electrical maintenance departments on an as-and-when-required basis at arnot power station for a 60-month period. The tender is an open request for bid, with preference points allocated under either the 80/20 or 90/10 system depending on the contract value. Bidders must be registered on the csd, hold valid tax clearance, and submit the sbd 6.1 Form with supporting documentation to claim preference points.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Tuesday, 20 October 2026 - 10:00
Venue
null
Request for Bid(Open-Tender)
Arnot Power Station - Rietkuil - Middelburg - 1097
Recommended Certifications
Having these can improve your winning chances: NERSA Registration, PV GreenCard (Solar Installation)
AI Document Analysis Stages
Evaluation Criteria
Source: Annexure D - Integrity Declaration Form.docx (unknown)25 Sept
2026
Tender Published
Tender was published
20 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
AN91B9~1.DOC
1. Form CPA - General.pdf
Supply and delivery of spares for air conditioning, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for 60 months. The contract price adjustment method is set out in Form CPA (General), which bidders must complete to propose price adjustment mechanisms.
240-12248652_List of Tender Returnables_Cat 2_ Rev 7.xlsx
No summary available
ANB615~1.DOC
Supplier Declaration of Interest Template.docx
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis, under a 60-month contract. The document provided is the Eskom Supplier Declaration of Interest form, which bidders must complete and sign under oath as part of the tender pack.
Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx
No summary available
AN5A43~1.DOC
Declaration of Shareholding or Beneficiaries Form.pdf
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a period of 60 months.
E-Tendering Help Manual for supplier.pdf
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis, for a period of 60 months. The tender is issued by Eskom and requires electronic submission through the eTendering system.
3. Eskom life-saving rules.pdf
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments on an 'as and when required' basis at Arnot Power Station, for a period of 60 months. The contract is issued by Eskom and requires adherence to Eskom's Life-Saving Rules, which mandate strict safety behaviours for all employees, contractors and visitors on site.
Annexure D - Integrity Declaration Form.docx
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a period of 60 months.
Eskom life-saving rules.pdf
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a 60-month period, issued by Eskom.
3. Eskom Waste Management Standard 32-245.pdf
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an 'as and when required' basis at Arnot Power Station over a 60-month period. Bidders must comply with Eskom's SHEQ policy, which requires zero harm and adherence to ISO standards.
Annexure C - Tenderer_s Particulars.docx
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis, for a period of 60 months. The procurement is issued by Eskom.
Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.docx
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis, for a period of 60 months. The contract is issued by Eskom and includes specific contract price adjustment (CPA) requirements for local goods and services.
Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis, for a period of 60 months. The contract will be awarded under Eskom's preferential procurement framework, with points allocated for B-BBEE status and specific goals.
Eskom General Conditions of Purchase - 31 May 2024.pdf
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station, for a period of 60 months. The contract is governed by Eskom's General Conditions of Purchase, which include provisions on pricing, delivery, acceptance, warranty and termination.
Eskom Vehicle Safety Spec 32-345.pdf
Supply and delivery of spares for Aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a period of 60 months. The contract is issued by Eskom and requires bidders to supply and deliver the specified spares to the power station over the contract term.
NEC- EMD SPARES 1.pdf
Supply and delivery of spares for the Aircon, PTM and electrical maintenance departments on an 'as and when required' basis at Arnot Power Station, under a 60-month NEC3 Supply Contract (SC3) with Eskom Holdings SOC Ltd.
E-Tenderers' Training Acknoweldegement.pdf
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments on an 'as and when required' basis at Arnot Power Station, for a period of 60 months, issued by Eskom.
Annexure J - SBD 4 - Tenderer_s Disclosure.docx
Supply and delivery of spares for Aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a period of 60 months.
Scope of work - Electrical Spares.docx
Supply and delivery of electrical spares for the Aircon, batteries, PTM and electrical maintenance departments at Arnot Power Station on an as-and-when-required basis for 60 months. The contract covers a range of items including contactors, circuit breakers, fuses, gloves, ammeters, transducers, relays, limit switches, stove plates, overload relays and stove switches, all to be new, unused and compliant with national standards.
Invitation to Tender (ITT) - Electrical Spares.pdf
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for 60 months. The contract is issued by Eskom under an open invitation to tender, with evaluation based on functionality (technical, 75% threshold) and the 80/20 preference point system.
E-Tenderers E-Tendering Training Acknowledgement Form.pdf
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a 60-month period.
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station, for a period of 60 months. The tender is issued by Eskom and is open to eligible suppliers who can meet the conditions of tender.
SHE Spec.pdf
Supply and delivery of spares for the Aircon, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis, for a period of 60 months. The contract is issued by Eskom and includes a detailed OHS specification that bidders must comply with.
Annexure B – Supplier Tender Receiving Acknowledgement Form.docx
Supply and delivery of spares for the Aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station, for a period of 60 months.
240-68099512 Form A_Cat 2_ Rev 9.docx
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a 60-month period. The contract is issued by Eskom and requires bidders to accept Eskom's Supplier Quality Requirements as per specification 240-105658000 and ISO 9001.
Technical Tender Evaluation Criteria - Electrical Spares.docx
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a period of 60 months.
Annexure F - CPA (IG) Requirements for Foreign Goods and Services.docx
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for 60 months. The contract is subject to Eskom's Contract Price Adjustment (CPA) and foreign goods/services payment requirements, with multiple payment methods for foreign currency exposure.
3. Eskom Vehicle Safety Spec 32-345.pdf
Supply and delivery of spares for aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a 60-month period. The tender is issued by Eskom and is open for bidding until 20 October 2026.
Eskom Supplier Integrity Pact - 02 June 2023.pdf
Supply and delivery of spares for Aircons, batteries, PTM and electrical maintenance departments on an 'as and when required' basis at Arnot Power Station for a period of 60 months, issued by Eskom.
Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.docx
Supply and delivery of spares for Aircons, batteries, PTM and electrical maintenance departments on an as-and-when-required basis at Arnot Power Station for a period of 60 months.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 13 320 877
Range
Based on 15 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Bidders must complete and submit the standard National Treasury forms as required by the invitation to tender, including SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination).
Pricing Schedule
Source: 1. Form CPA - General.pdf (unknown)The CPA form is an annexure to the price schedule. If space is insufficient, submit a separate schedule for costs to be quoted per item; otherwise reference the appropriate price schedule. The form includes sections for cost of manufacture, transport, installation/erection, and totals for works cost, transportation, and installation/erection and engineering.
Financial Requirements
Source: 1. Form CPA - General.pdf (unknown)Contract price adjustment (CPA) applies to the supply and delivery, and where applicable installation and commissioning, of plant and equipment. The CPA form is an annexure to the price schedule.
Key rules:
Cost of manufacture (Section A1):
Cost of transport (Section A2):
Cost of installation/erection (Section A3):
Works-related contracts (Section B):
Evaluation Criteria
Source: Eskom life-saving rules.pdf (unknown)Contractors must comply with Eskom's Life-Saving Rules. Violation of any rule is treated as serious misconduct and may lead to suspension of the contractor's activities. No other eligibility criteria (e.g., CSD registration, B-BBEE level, tax clearance) are stated in the provided document.
Technical Specifications
Source: Eskom life-saving rules.pdf (unknown)The document is Eskom's Life-Saving Rules standard (240-62196227, Revision 6). It applies to all Eskom employees, agents, consultants, contractors, and visitors at all Eskom sites. The five rules are:
Contractor obligations:
Compliance Requirements
Source: Eskom life-saving rules.pdf (unknown)No specific compliance requirements (e.g., CSD registration, B-BBEE level, tax clearance) are stated in the provided document. The document references ISO 9001 Quality Management Systems and various Eskom safety standards, but these are not stated as tender compliance requirements.
Section
Source: Eskom life-saving rules.pdf (unknown)The document references ISO 9001 Quality Management Systems and Eskom's Safety, Health, Environment and Quality Policy, but does not state specific evaluation criteria for a tender.
Description
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services.docx (unknown)This annexure sets out Eskom's requirements for contract price adjustment (CPA) and payment of foreign commitments when tendering for goods or services that involve foreign currency or imported components.
Evaluation Criteria
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services.docx (unknown)Bidders who price imported goods/services in a foreign currency or link pricing to an exchange rate must be the direct importers of those goods/services.
Technical Specifications
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services.docx (unknown)Contract price adjustment (CPA) requirements for foreign goods and services:
Financial Requirements
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services.docx (unknown)Payment methods for foreign commitments:
Compliance Requirements
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services.docx (unknown)No specific compliance requirements (e.g., CSD, tax clearance, B-BBEE) are stated in the provided document.
Description
Source: Annexure C - Tenderer_s Particulars.docxThis annexure collects the tenderer's particulars, including registration numbers, subcontracting details, and tendering structure. It does not describe the scope of work.
Submission Guidelines
Source: Annexure C - Tenderer_s Particulars.docx (unknown)Returnable documents:
Submission method: as specified in the Invitation to Tender (not detailed in this annexure).
Disqualification risks:
Evaluation Criteria
Source: Annexure C - Tenderer_s Particulars.docx (unknown)Pre-qualification requirements:
Subcontracting requirements (if applicable):
Evaluation will follow the preference point system and criteria set out in the Invitation to Tender (not detailed in this annexure).
Technical Specifications
Source: Annexure C - Tenderer_s Particulars.docx (unknown)The tenderer must furnish particulars as required in Annexure C, including:
Compliance Requirements
Source: Annexure C - Tenderer_s Particulars.docx (unknown)Mandatory compliance:
Subcontracting compliance (if applicable):
Evaluation Criteria
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.docx (unknown)Preference points are claimed via SBD 6.1 (Preference Points Claim Form). The applicable preference point system is either 80/20 (for contracts up to R50 million including taxes) or 90/10 (for contracts above R50 million). Points are awarded for price and specific goals. Bidders must indicate how they claim points for each system and provide supporting documentation for any specific goals claimed. Failure to submit proof with the tender means no preference points for specific goals are claimed. The organ of state may require substantiation of any preference claim before or after adjudication.
Compliance Requirements
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.docx (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance (SARS TCS) as per standard Eskom requirements. Bidders must not be restricted from doing business with the state.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Returnable documents:
Submission method: via the E-Tendering Solution (electronic).
Returnable Documents
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Mandatory returnable: E-Tenderers' E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1). It must be fully completed and submitted to Eskom within the prescribed period; failure to do so will render the tenderer non-responsive and disqualified from the procurement process.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Submission of the fully completed E-Tenderers' E-Tendering Training Acknowledgement Form is mandatory. Failure to submit it within the prescribed period renders the tenderer non-responsive and disqualified from the procurement process.
Description
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.docx (unknown)This annexure sets out the contract price adjustment (CPA) requirements for local goods and services. It applies to contracts longer than 12 months; for shorter contracts, fixed pricing is required. The document provides rules for CPA formulae, base dates, and professional services adjustments.
Technical Specifications
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.docx (unknown)Contract price adjustment (CPA) applies to this tender because the contract period is 60 months (more than 12 months).
Financial Requirements
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.docx (unknown)Contract price adjustment (CPA) conditions as described in the technical specifications section.
Description
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)The tender is for the supply and delivery of spares for Aircon, batteries, PTM and electrical maintenance departments at Arnot Power Station, on an 'as and when required' basis for a period of 60 months.
Important Dates
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Closing date: 20 October 2026 at 10:00 (South African Standard Time).
Tender validity period: 120 calendar days from closing.
Clarification queries deadline: 7 working days before tender submission deadline.
Clarification meeting: Not applicable.
Site visit: Not applicable.
Contact Information
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Eskom Representative:
Procurement Manager (signatory):
Fraud and corruption reporting:
Submission: via Eskom E-tendering site (TenderBulletin at eskom.co.za).
Submission Guidelines
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Submission method: electronic only via the Eskom E-tendering site (TenderBulletin at eskom.co.za). No hard copies accepted. No zip/condensed files. Upload each document in PDF format; the price list must be in PDF and a copy in Excel format. Maximum upload size per document is 500 MB; total submission limited to 4 GB. If resubmitting, only the latest version is accepted; previous versions become null and void. Ensure the submission status is marked complete. Late tenders are not accepted.
Returnable forms (all must be completed, signed where required, and submitted at closing unless noted):
Disqualification risks:
Evaluation Criteria
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Evaluation stages:
Functionality criteria (weightings):
Mandatory technical criteria (pass/fail):
Technical Specifications
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Scope: Supply and delivery of spares for Aircon, batteries, PTM (Power and Thermal Management?) and electrical maintenance departments at Arnot Power Station, on an 'as and when required' basis for 60 months.
Key requirements:
Experience & Qualifications
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Experience and qualifications:
Quality Management
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Quality management requirements:
Pricing Schedule
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Pricing schedule:
Financial Requirements
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Payment terms:
Pricing schedule:
Due diligence financial statements (required prior to award):
No bid security or performance guarantee specified (N/A).
Compliance Requirements
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Mandatory contractual requirements (assessed after evaluation, prior to award):
SHE returnables required:
Quality requirements:
Environmental requirements:
B-bbee:
Employment Equity:
CIDB: Not applicable (goods/services contract).
Health & Safety
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Health and safety requirements:
Environmental
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Environmental requirements:
Contractual Terms
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Contract type: NEC (New Engineering Contract).
Eligibility:
Payment terms: as per financial requirements.
Cataloguing: successful tenderer may need to provide cataloguing info and label materials per Eskom specifications; pricing schedule must include cataloguing line item if required.
Alternative tenders not allowed.
Eskom reserves right to negotiate with preferred bidders if prices not market-related.
Subcontracting with subsidiaries discouraged; must be declared if done.
Section
Source: Invitation to Tender (ITT) - Electrical Spares.pdf (RFP)Additional evaluation criteria:
Important Dates
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Closing date: 20 October 2026 at 10:00 (per tender record).
No briefing or site visit dates are stated in the document.
Contact Information
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Buyer: Lebohang Malema
No email, telephone, or address are provided in the document.
Submission Guidelines
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Returnable documents (all must be completed, signed and submitted):
Disqualification risks:
Evaluation Criteria
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Evaluation is based on the 80/20 or 90/10 preference point system. Points for price and specific goals are added, and the contract is awarded to the tenderer scoring the highest total.
Specific goals (B-BBEE status level) points:
Tenderers failing to provide documentation for preference points are not disqualified, but may only score points out of 80/90 for price and score 0 points out of 20/10 for specific goals.
SDL&I objectives (transformation, local procurement, jobs, skills development, subcontracting) do not form part of scoring, but commitments become contractual obligations.
Technical Specifications
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Supply and delivery of spares for Aircons, batteries, PTM (Power and Thermal Maintenance?) and electrical maintenance departments.
Basis: "as and when required" (call-off) at Arnot Power Station.
Duration: 60 months.
Designated sector: Electrical and telecoms cables – electrical cables must have a local content threshold of 90%.
Methodology
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Skills development: Tenderers must propose how they will develop skills of unemployed candidates, targeting Eskom's core, scarce and critical skills (e.g., electrician, fitter, technical students). Candidates must be from all provinces and representative of SA demographics. Tenderers bear full cost; Eskom makes no financial contribution. Tenderers may approach SETAs for grants and SARS for tax rebates.
Pricing Schedule
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Tender response must be separated into components as per the Price Schedule. Local procurement content is total spending minus imported component.
Financial Requirements
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Pricing: Tender response must be separated into components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component.
SDL&I penalties and security:
Compliance Requirements
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)B-bbee:
Local content:
Subcontracting:
Sworn affidavit validity:
B-BBEE Requirements
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Sworn affidavit validity: Must include deponent's name as per ID, identity number, designation, enterprise name as per CIPC, business address, percentage of black ownership (including black female and designated group), total revenue, financial year end, B-BBEE status level, empowering supplier status (for QSEs). Deponent and Commissioner of Oaths must sign on same date; Commissioner cannot be an employee or ex officio of the enterprise.
Health & Safety
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)No health and safety requirements are stated in the document.
Special Conditions
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Reporting: Quarterly SDL&I reports required. Eskom reviews within 30 days; corrective measures required before next report, failing which retention clauses invoked. SDL&I Implementation Schedule must be completed and returned within 28 days of contract award.
Section
Source: Tenderer - SDLI Strategy The supply and delivery of spares for Aircons,.pdf (TENDER)Specific goals points (B-BBEE status level) are added to price points. Maximum 10/20 points for specific goals. Tenderers failing to provide preference point documentation may only score points out of 80/90 for price and 0 points out of 20/10 for specific goals.
Description
Source: E-Tendering Help Manual for supplier.pdfThe eTendering system is a web-based platform that replaces physical submission of tender documents at Eskom offices. Suppliers must register and verify their details via email and OTP before accessing the system. Access is available through the TenderBulletin public website (https://tenderbulletin.eskom.co.za) and the eTendering website (https://eTendering.eskom.co.za). A CSD number is required for access.
Important Dates
Source: E-Tendering Help Manual for supplier.pdf (TENDER)Closing date and time: 20 October 2026 at 10:00 (from tender record). No briefing or site visit dates are stated.
Contact Information
Source: E-Tendering Help Manual for supplier.pdf (TENDER)For system problems, contact the buyer responsible for the published tender. No specific contact name, email, or telephone is provided in the document.
Submission Guidelines
Source: E-Tendering Help Manual for supplier.pdf (TENDER)Submission is electronic only via the Eskom eTendering system at https://eTendering.eskom.co.za. Bidders must register on the system and verify their email and cellphone via OTP before access is granted. Upload each required document under the correct category (Technical, Commercial, Finance, etc.). Each file must not exceed 50MB; total uploads must not exceed 900MB. Finalise the submission before the closing timestamp; a confirmation email with the submission ID is sent and must be saved for enquiries. Closed tenders are sent directly to selected suppliers via a private email link.
Evaluation Criteria
Source: E-Tendering Help Manual for supplier.pdf (TENDER)No evaluation criteria are stated in the provided document. Bidders must have a CSD number to access the eTendering system. Suppliers are selected based on criteria set by the buyer, but the specific scoring or thresholds are not disclosed.
Technical Specifications
Source: E-Tendering Help Manual for supplier.pdf (TENDER)The tender is for the supply and delivery of spares for air conditioners, batteries, PTM (power and telemetry maintenance), and electrical maintenance departments at Arnot Power Station. Deliveries are on an 'as and when required' basis over a 60-month period. No quantities, standards, or service levels are specified in the provided document.
Methodology
Source: E-Tendering Help Manual for supplier.pdf (TENDER)To submit a bid, bidders must: 1) Register on the eTendering portal by completing all fields, using a contact number with +27 prefix, and completing the CAPTCHA. 2) Verify the email sent to the provided address. 3) Log in with the verified email and password, then enter the OTP sent to the cellphone and email. 4) Select the tender, upload documents under the correct category (Technical, Commercial, Finance), and finalise the submission before the closing time. 5) Save the confirmation email with the submission ID.
Financial Requirements
Source: E-Tendering Help Manual for supplier.pdf (TENDER)No financial requirements (pricing format, bid security, guarantees, retention, payment terms, or turnover thresholds) are stated in the provided document.
Compliance Requirements
Source: E-Tendering Help Manual for supplier.pdf (TENDER)Bidders must have a valid CSD (Central Supplier Database) number to access the eTendering system. No other compliance requirements (tax, B-BBEE, CIDB, etc.) are stated in the provided document.
Special Conditions
Source: E-Tendering Help Manual for supplier.pdf (TENDER)Closed tenders are not listed on TenderBulletin but are sent directly to selected suppliers via a private email link. The system is compatible with most web browsers; Microsoft Edge is recommended.
Section
Source: E-Tendering Help Manual for supplier.pdfNo specific evaluation criteria are provided. Suppliers are selected based on criteria set by the buyer, but details are not disclosed in the document.
Description
Source: 3. Eskom life-saving rules.pdf (unknown)Eskom is committed to preventing all work-related injuries and maintaining a safe and healthy work environment. The Life-Saving Rules are safety rules that enforce zero tolerance for serious at-risk behaviours. These rules apply to all Eskom employees, agents, consultants, and contractors, and visitors must adhere to them. The rules are designed to prevent the most prominent causes of serious injuries and fatalities within Eskom.
Submission Guidelines
Source: 3. Eskom life-saving rules.pdf (unknown)Returnable documents: complete and submit all required National Treasury standard forms, including SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination), as applicable. Ensure all forms are signed and submitted with the bid.
Evaluation Criteria
Source: 3. Eskom life-saving rules.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance (SARS TCS or tax pin). Bidders must comply with Eskom's Life-Saving Rules; any violation by a contractor employee will result in immediate removal from site and disciplinary action. Contractors must ensure their employees are trained and authorised for the tasks performed, and must provide evidence of compliance with Eskom's safety standards, including the use of approved personal protective equipment (PPE) and fall arrest systems.
Technical Specifications
Source: 3. Eskom life-saving rules.pdf (unknown)Eskom requires compliance with its Life-Saving Rules at all sites. These rules apply to all employees, agents, consultants, and contractors, and visitors must adhere to them. The five rules are: Rule 1: Open, isolate, test, earth, bond, and/or insulate before touch. Rule 2: Hook up at heights. Rule 3: Buckle up. Rule 4: Be sober. Rule 5: Ensure that you have a permit to work. Violations are treated as serious misconduct and may lead to disciplinary action, including suspension of contractor activities.
Health & Safety
Source: 3. Eskom life-saving rules.pdf (unknown)Eskom's Life-Saving Rules: Rule 1: Open, isolate, test, earth, bond, and/or insulate before touch. Rule 2: Hook up at heights. Rule 3: Buckle up. Rule 4: Be sober. Rule 5: Ensure that you have a permit to work. These rules apply to all Eskom employees, agents, consultants, and contractors, and visitors must adhere to them. Violations are treated as serious misconduct and may lead to disciplinary action, including suspension of contractor activities.
Section
Source: 3. Eskom life-saving rules.pdf (unknown)Bidders must comply with ISO 9001 Quality Management Systems and Eskom's Safety, Health, Environment and Quality Policy (32-727).
Description
Source: Scope of work - Electrical Spares.docxThe contract covers the supply and delivery of electrical spares for the Aircon, batteries maintenance, PTM and electrical maintenance departments at Arnot Power Station, on an as-and-when-required basis, for a period of 60 months.
Compliance Requirements
Source: Scope of work - Electrical Spares.docx (unknown)Compliance with SANS 10147, Pressure Equipment Regulations (PER), SANAS 347, and other applicable standards and certification requirements is mandatory.
Description
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.xlsx (unknown)The tender is for the supply and delivery of spares for Aircons, batteries, PTM and electrical maintenance departments on an 'as and when required' basis at Arnot Power Station, for a period of 60 months. The quality requirements are defined in the Supplier Contract Quality Requirements Specification (Ref 240-105658000) and related documents. Bidders must provide a Draft Contract Quality Plan (CQP) and Inspection and Test Plan (ITP) or Quality Control Plan (QCP) specific to the scope of work.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.xlsx (unknown)Returnable documents must be completed, signed, and submitted with the bid. The List of Tender Returnables template (Cat 2, Rev 7) must be used: select the applicable category on the Cover tab, complete the Returnables tab, then save as PDF and sign, or sign and lock the sheet before sending. The template includes Form A (completed and signed), and quality-related deliverables as per the selected category.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.xlsx (unknown)Quality documentation is evaluated using a weighted scorecard with five sections: Section A (Quality Management System Requirements, weight 0.25), Section B (Evidence of QMS in operation, weight 0.25), Section C (Contract Quality Plan, weight 0.2), Section D (Quality Control Plan, weight 0.2), Section E (User defined additional requirements, weight 0.1). Section A offers two options: Option 1 (valid ISO 9001 certification) or Option 2 (evidence of QMS in operation). Bidders must meet the applicable quality requirements to score points.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.xlsx (unknown)Bidders must comply with the quality management system requirements as per the tender quality specifications. This includes either holding a valid ISO 9001:2015 certificate (with scope relevant to the work) or demonstrating an implemented QMS with documented information, quality policy, objectives, and records. Internal management system audit reports (with nonconformity and corrective action reports) are required. A completed and signed Form A is mandatory.
Health & Safety
Source: 3. Eskom Waste Management Standard 32-245.pdf (unknown)Eskom requires all contractors to comply with its Safety, Health, Environment and Quality (SHEQ) Policy. Contractors must meet applicable SHEQ compliance obligations and organisational requirements. Eskom's Life-saving Rules apply to all employees, contractors and visitors: open, isolate, test, earth, bond and/or insulate before touch; hook up at heights; buckle up; be sober; and permit to work. Eskom aims for zero fatalities, zero injuries, zero environmental incidents, zero tolerance and zero defects. Contractors must support the implementation of management systems aligned to ISO 9001, ISO 14001 and ISO 45001/OHSAS 18001, and must conduct hazard identification and risk assessment, fitness for duty assessments, emergency preparedness, and medical surveillance as applicable.
Environmental
Source: 3. Eskom Waste Management Standard 32-245.pdf (unknown)Eskom requires contractors to support proactive management of the environmental footprint, minimising pollution and environmental degradation, pursuing a low-carbon future, and prioritising energy and water efficiency and conservation. Contractors must ensure sustainable use of resources and support climate change mitigation and adaptation, and protection of biodiversity and ecosystems.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 4 of 2006
Relevant to electricity, generation, transmission, distribution and energy-service procurement.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 28 of 2002
Relevant to mineral resources, mining rights, prospecting and mining-related procurement.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 40 of 2004
Relevant to regulated electricity, piped-gas and petroleum-pipeline activities.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance.
Address
Arnot Power Station - Rietkuil - Middelburg - 1097
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
33
Last checked
25 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
How the Protection of Personal Information Act affects tender submissions, data handling, and supplier contracts with government. A practical POPIA compliance guide for South African tender bidders covering lawful processing, data subject rights, and consequences of non-compliance.
A meticulously organised tender submission can be the difference between a winning bid and one that hits the rejection pile. Learn how to package, structure, and present your tender response for maximum evaluator impact on South African government contracts.
How consulting engineers, engineering firms, and multidisciplinary practices can win public sector infrastructure contracts in South Africa — from ECSA registration and CESA membership to fee proposals, QBS scoring, and building a winning tender response.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Electricity, gas, steam and air conditioning. Unlock full pricing strategies, bid frequency, and historical win rates.