Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Various Site as per the Invitation to Tender - Various Site as per the Invitation to Tender. - Various Site as per the Invitation to Tender - 0000
Organization Type
GOVERNMENT
Published
25 May 2026
OCDS Reference
ocds-9t57fa-157035
This tender, issued by ESKOM, seeks suppliers for the design, engineering, manufacture, testing, supply, delivery, installation, and commissioning of class 0 and 1 power transformers over a ten-year period on an 'as and when' required basis. IT is aimed at contractors capable of meeting stringent occupational health and safety (OHS) and legislative compliance requirements.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Tuesday, 30 June 2026 - 10:00
Venue
MS Teams (Link as per Invitation to Tender)
Categories
Request for Bid(Open-Tender)
Various Site as per the Invitation to Tender - Various Site as per the Invitation to Tender. - Various Site as per the Invitation to Tender - 0000
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Good Manufacturing Practice (GMP), SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Evaluation Criteria
Source: Finance.zip (unknown)Suppliers must demonstrate capability to design, manufacture, test, and commission Class 0 and 1 power transformers. Must provide detailed factory and OEM information, including supplier and factory of origin. Must comply with all documentation requirements, including: PS5 Price Schedules (for goods manufactured inside/outside RSA), Activity Schedules, and Currency Allocation Sheets. Financial capability to support a 10-year framework agreement is required. Incomplete or missing schedules will result in disqualification.
25 May
2026
Tender Published
Tender was published
15 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Commercial.zip
Eskom is inviting tenders for the design, detailed engineering, manufacture, testing, supply, delivery, removal of existing transformers, installation, erection, testing, commissioning, and storage of Class 0 and Class 1 power transformers on an 'as and when' required basis for a period of ten years. The contract will be based on the NEC3 Engineering and Construction Contract (ECC) with specific options and additional conditions. The tender is open to eligible bidders who meet technical, financial, and compliance requirements, including B-BBEE and local content criteria.
SDL&I.zip
Analysis completed but response format was invalid
Environmental.zip
ESKOM tender for the design, detailed engineering, manufacture, testing, supply, delivery, removal, placement, installation, erection, commissioning, and storage of class 0 and 1 power transformers on an 'as and when' required basis for a period of ten years. The tender includes comprehensive environmental evaluation criteria requiring ISO 14001:2015 compliance with a minimum threshold score of 80%.
Quality.zip
This tender, issued by ESKOM, is for the design, detailed engineering, manufacture, testing, supply, delivery, installation, erection, testing, commissioning, and storage of Class 0 and 1 power transformers on an 'as and when' required basis for a period of ten years. The tender emphasizes stringent quality management system (QMS) requirements, compliance with ISO 9001 standards, and detailed quality control and assurance processes. Applicants must adhere to Eskom’s Supplier Quality Management Specification (240-105658000) and provide comprehensive documentation, including quality plans, audit reports, and compliance certificates.
Safety.zip
ESKOM tender for the design, detailed engineering, manufacture, testing, supply, delivery, removal, placement, installation, erection, commissioning, and storage of Class 0 and 1 power transformers on an 'as and when' required basis for a ten-year period. The tender requires comprehensive OHS compliance including submission of Annexure B acknowledgement, OHS plan, Baseline Risk Assessment, valid Letter of Good Standing (COIDA), and CEO-signed OHS policy. Contractors must comply with South African OHS legislation including the Occupational Health and Safety Act 85 of 1993 and Compensation for Occupational Diseases and Illnesses Act 130 of 1993.
Technical 1.zip
Finance.zip
Eskom is issuing a 10-year framework contract for the design, engineering, manufacture, testing, supply, installation, commissioning, and storage of Class 0 and 1 power transformers on an 'as and when required' basis. The tender includes a detailed list of 72 transformer specifications with varying MVA ratings and voltage levels.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 240 051
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Technical Specifications
Source: Finance.zip (unknown)Scope: Design, detailed engineering, manufacture, testing at works, supply, delivery, removal of existing transformers, placement on foundation, installation, erection, testing, commissioning, and storage of Class 0 and 1 power transformers on an 'as and when' required basis for 10 years. Technical details include: MVA ratings (ranging from 0.315 MVA to 110 MVA), HV/LV voltage levels (e.g., 11kV, 15kV, 22kV, 3.3kV, 6.6kV, 0.4kV, 0.42kV, 0.72kV, 3.3kV, 6.9kV, 11.5kV, 132kV), and various configurations (e.g., standard, low, high). Transformers may include tertiary windings, specific impedance values, and duty cycles. Testing requirements: Factory routine tests, factory type tests, testing during/after transportation, and site testing. Additional components may include tap changers, bushings (HV/LV/neutral), radiators, coolers, insulation materials, and temperature monitors.
Financial Requirements
Source: Finance.zip (unknown)Pricing must be in South African Rands (ZAR). Suppliers must complete PS5 Price Schedules for goods manufactured inside and outside RSA, including: FOB price, inland transport, sea/air freight, marine insurance, wharfage, landing charges, customs duties, surcharges, local/foreign transport, local/expatriate labor, and engineering services (local/overseas). Cost allocation must be detailed per activity (e.g., design, procurement, construction, commissioning). Price adjustment for inflation (Option X1) and multiple currencies (Option X3) must be addressed. Exchange rates must use SARB-published rates (7 calendar days before tender close at 12:00). VAT (15%) must be excluded from base prices but summarized separately. Payment terms: Progress payments and delivery periods (weeks) must be specified. Lead times for ex-works/FAS, training, and spares must be provided. Non-adjustable portion: Minimum 15% of total price.
Description
Source: Commercial.zipImportant Dates
Source: Commercial.zip (unknown)Contact Information
Source: Commercial.zip (unknown)Submission Guidelines
Source: Commercial.zip (unknown)Evaluation Criteria
Source: Commercial.zip (unknown)Technical Specifications
Source: Commercial.zip (unknown)Financial Requirements
Source: Commercial.zip (unknown)Compliance Requirements
Source: Commercial.zip (unknown)Description
Source: Safety.zipScope of Work:
Purpose:
Applicability:
Contact Information
Source: Safety.zip (unknown)Eskom Contract’s Manager: Faneng Mashilo
Eskom’s SNR Advisor Procurement: Tshepiso Apollos
Eskom’s SNR Advisor OHS: Mikateko Chauke
Project Address: Megawatt Park, 1 Maxwell Drive, Sunninghill
Submission Guidelines
Source: Safety.zip (unknown)Submit the following returnable documents as part of your tender:
Evaluation Criteria
Source: Safety.zip (unknown)Evaluation will focus on:
Technical Specifications
Source: Safety.zip (unknown)Scope of Work:
Key Requirements:
Standards and References:
Compliance Requirements
Source: Safety.zip (unknown)Mandatory Compliance:
Statutory and Non-Statutory Appointments:
Additional Requirements:
Description
Source: SDL&I.zipScope: Assessment, design, detailed engineering, manufacture, testing at works, supply, delivery, removal of existing transformers, placement on foundation, installation, erection, testing, commissioning, and storage of Class 0 and 1 power transformers on an 'as and when' required basis. Duration: 10 years.
Important Dates
Source: SDL&I.zip (unknown)Contract duration: 10 years. SDL&I Implementation Schedule due within 28 days of contract award. B-BBEE Improvement Plan due within 30 days of signing the contract. Quarterly SDL&I compliance reports required throughout the contract.
Submission Guidelines
Source: SDL&I.zip (unknown)Submit the following returnable documents: SBD 6.2 Declaration Form and Annex C (Local Content Declaration-Summary Schedule) if applicable. Failure to submit these will not disqualify the tenderer but will result in scoring only out of 90/80 for price and 0 for specific goals.
Evaluation Criteria
Source: SDL&I.zip (unknown)Scoring system: 90/10 or 80/20 (price vs. specific goals). Preference points for specific goals (max 10/20) are added to price points and rounded to two decimal places. Contract awarded to the highest scorer per PPPFA Section 2(1)(f). B-BBEE points: Level 1 (10/20), Level 2 (9/18), Level 3 (6/14), Level 4 (5/12), Level 5 (4/8), Level 6 (3/6), Level 7 (2/4), Level 8 (1/2), Non-compliant (0/0). Objective criteria (e.g., designated sectors, NIPP) are not mandatory but may lead to the second-ranked tenderer being recommended if unmet.
Technical Specifications
Source: SDL&I.zip (unknown)Scope: Design, detailed engineering, manufacture, testing at works, supply, delivery, removal of existing transformers, placement on foundation, installation, erection, testing, commissioning, and storage of Class 0 and 1 power transformers on an 'as and when' required basis. Local content thresholds: Class 1 (1.25–160 MVA, 11–132 kV): 80%; Class 0 (0.001–1 MVA, 220V–22 kV): 90%. Exemption: Transformers rated ≥40 MVA for Eskom Generation may be imported. SBD 6.2 and Annex C are returnable if applicable.
Financial Requirements
Source: SDL&I.zip (unknown)Eskom retains 3% of every invoice (excluding VAT) as security for SDL&I obligations. Penalty of 3% of contract value applies for failure to meet SDL&I obligations. Retained amounts are released only upon full fulfilment of SDL&I obligations.
Compliance Requirements
Source: SDL&I.zip (unknown)B-BBEE: Valid certificate (SANAS-accredited) or sworn affidavit required. EMEs (≤R10M revenue): Sworn affidavit. QSEs (≤R50M revenue): QSE scorecard compliance unless ≥51% Black-owned (sworn affidavit). >R50M revenue: Valid B-BBEE certificate. Affidavits must include: deponent name/ID, designation, enterprise name/address, ownership percentages (Black, Black Female, designated groups), revenue, financial year-end, B-BBEE level, empowering supplier status, and Commissioner of Oath details (same date, not affiliated with the enterprise). Local content: Minimum thresholds apply for transformers <40 MVA. NIPP: Mandatory for contracts with imported content ≥USD 5M; requires dtic obligation agreement before contract signing. SDL&I: Subcontracting to EME/QSEs with ≥51% Black ownership; job creation/retention proposals; skills development for unemployed candidates (aligned with Gazette 43937).
Section
Source: SDL&I.zipPreference points: 10/20 for specific goals (added to price points, rounded to two decimal places). B-BBEE points allocation: Level 1 (10/20), Level 2 (9/18), Level 3 (6/14), Level 4 (5/12), Level 5 (4/8), Level 6 (3/6), Level 7 (2/4), Level 8 (1/2), Non-compliant (0/0). Contract awarded to highest scorer per PPPFA. Missing preference point documentation: score only out of 90/80 for price and 0 for specific goals. Objective criteria (e.g., designated sectors, NIPP) are not mandatory but may lead to second-ranked tenderer being recommended if unmet.
Description
Source: Technical 1.zipThe scope involves the design, detailed engineering, manufacture, testing at works, supply, delivery, removal of existing transformers, placement on foundation, installation, erection, testing, commissioning, and storage of Class 0 and Class 1 power transformers. These transformers are to be provided on an 'as and when' required basis for a period of ten years. The transformers must meet Eskom's specifications for reliability, interchangeability, low maintenance, and environmental sustainability, with a design life of over 40 years.
Evaluation Criteria
Source: Technical 1.zip (unknown)Evaluation is based on a two-stage process: mandatory and discretionary criteria.
Mandatory Requirements:
Completeness of documents: All required information must be submitted. Gaps, 'TBA', or similar remarks render the document incomplete. Each missing piece of information results in a 25-point penalty. All technical information must be clearly indexed.
Technical Requirements: Proposals must comply with minimum requirements specified in the tender. Non-compliance results in a 25-point penalty per deviation. Parameters tighter than Eskom’s requirements are neither penalized nor rewarded.
Discretionary Requirements: Other items are assessed as per the score list in Appendix C of the evaluation criteria document.
Factory Assessment: Each factory intended for supply must undergo evaluation. Factories previously accredited may be exempted. Only accredited factories can supply Eskom. Factories must address all concerns to qualify.
Scoring Methodology: All bidders start with 100 points. Penalties are deducted for non-compliance. Bidders must score 80 or above to progress to the next evaluation stage.
Technical Specifications
Source: Technical 1.zip (unknown)Scope: Design, detailed engineering, manufacture, testing at works, supply, delivery, removal of existing transformers, placement on foundation, installation, erection, testing, commissioning, and storage of Class 0 and 1 power transformers on an 'as and when' required basis for a period of ten years.
Key Technical Requirements:
Compliance Requirements
Source: Technical 1.zip (unknown)Compliance with Eskom specifications and standards is mandatory. Key requirements include:
Section
Source: Technical 1.zipEvaluation is based on mandatory and discretionary criteria:
Mandatory Requirements:
Completeness of documents: All required information must be provided without gaps or placeholders like 'TBA'. Missing information results in a 25-point penalty per item.
Technical compliance: Proposals must meet all minimum technical requirements. Non-compliance results in a 25-point penalty per deviation.
Discretionary Requirements: Evaluated based on the score list in Appendix C of the evaluation document.
Factory Assessment: Each factory must be evaluated and accredited. Previously accredited factories may be exempted. Only accredited factories can supply Eskom.
Scoring: All bidders start with 100 points. Penalties are deducted for non-compliance. Bidders must score 80 or above to progress to the next stage.
Description
Source: Quality.zipThe tender involves the design, detailed engineering, manufacture, testing at works, supply, delivery, removal of existing transformers, placement on foundation, installation, erection, testing, commissioning, and storage of Class 0 and 1 power transformers. The work is to be performed on an 'as and when' required basis for a period of ten years. The scope is national and applies to Eskom’s Generation Division.
Important Dates
Source: Quality.zip (unknown)Contact Information
Source: Quality.zip (unknown)Submission Guidelines
Source: Quality.zip (unknown)Submit the following returnable documents as per the List of Tender Returnables (240-12248652):
Disqualification risks:
Evaluation Criteria
Source: Quality.zip (unknown)Evaluation is based on compliance with Eskom Supplier Quality Management Specification (240-105658000) and ISO 9001. Scoring breakdown:
Quality Management System (QMS) Requirements (Section A - Max Score: 4):
Valid ISO 9001 certification from an accredited body (1 point).
QMS scope on certificate is defined and relevant (1 point).
Certification authority is approved and authorized (1 point).
Certification authority has recognized international accreditation (1 point).
Evidence of QMS in Operation (Section B - Max Score: 5):
Documented roles, responsibilities, and authorities (e.g., organization chart, responsibility matrix) (1 point).
Documented control of externally provided processes, products, and services (1 point).
Latest internal QMS audit report with nonconformity, correction, and/or corrective action reports (1 point).
Latest external QMS audit report (not older than 12 months) with nonconformity, correction, and/or corrective action reports (1 point).
Records of Management Review meetings (1 point).
Contract Quality Plan (CQP) Requirements (Section C - Max Score: 1):
Draft CQP specific to the scope of work, aligned with ISO 10005 (1 point).
Quality Control Plan (QCP) Requirements (Section D - Max Score: 1):
Draft or example of an ITP or QCP for similar/previous work (1 point).
Additional Requirements (Section E - Max Score: 1):
Form A completed and signed (1 point).
Total possible score: 12. Suppliers must meet all mandatory requirements for Category 1 to qualify. Additional preferred criteria may include prior experience with Eskom, track record in power transformer projects, and familiarity with Eskom’s procurement processes.
Technical Specifications
Source: Quality.zip (unknown)Scope of work:
Key technical requirements:
Compliance Requirements
Source: Quality.zip (unknown)Mandatory compliance requirements:
Description
Source: Environmental.zipPurpose: Assess whether suppliers have submitted the required environmental documentation as specified in the tender enquiry and that such documentation complies with the specified requirements.
Reference Documentation:
Evaluation Criteria
Source: Environmental.zip (unknown)Scoring is binary (0 = no document submitted or not meeting requirements, 1 = requirements met) for each environmental criterion. Minimum weighted average score required: 80% or above. Evaluation score sheet must be authorized by the relevant senior manager. Non-conformance issues are documented via Appendix A: Non-Conformance Form.
Technical Specifications
Source: Environmental.zip (unknown)Purpose: Verify supplier submission of required environmental documentation and its compliance with tender specifications.
Reference Documentation:
Compliance Requirements
Source: Environmental.zip (unknown)Mandatory environmental documentation:
All documentation must comply with specified requirements and legal obligations.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Various Site as per the Invitation to Tender - Various Site as per the Invitation to Tender. - Various Site as per the Invitation to Tender - 0000
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
7
Last checked
23 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Made in SA: Explore the strategic importance of localization in manufacturing tenders and learn how your fabrication SMME can qualify for high-value industrial contracts.
A masterguide to the legal and policy frameworks that mandate the use of South African products in Gauteng's government procurement.
A guide for local manufacturers to secure contracts for school uniforms, hospital linens, and protective clothing for Gauteng's public sector.
Win government goods supply contracts including furniture, stationery, uniforms, and equipment. Local content requirements and NRCS certification explained.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Manufacturing. Unlock full pricing strategies, bid frequency, and historical win rates.