Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
King Phalo Airport - 66 Settler's way - East London - 5201
Organization Type
GOVERNMENT
Published
05 Aug 2026
OCDS Reference
ocds-9t57fa-164544
Roller shutter door replacement at king phalo airport is being procured under a 24-month contract, with the insurance annexure applying to airside construction contracts valued up to r150 million with construction periods up to 36 months and defects liability periods up to 24 months. The employer arranges principal controlled insurance covering contract works, public liability, sasria, aviation liability, and design and construct professional indemnity, but the contractor bears substantial deductibles and must secure its own supplementary insurances. The most consequential requirement is the contractor's financial capacity to carry deductibles up to r5 million for design and construct professional indemnity and to maintain employer's liability cover of at least r20 million.
Contract value: The awarded contract must not exceed R150 million, with a construction period not exceeding 36 months and a defects liability period not exceeding 24 months.
Deductibles payable by contractor: R150,000 for contract works (R250,000 for testing and commissioning), R75,000 for public liability property damage, R75,000 for removal of lateral support, R25,000 for SASRIA theft, R300,000 for aviation liability, and R5,000,000 for design and construct professional indemnity on contracts under R50 million.
Contractor's own insurances: Must maintain employer's liability insurance of at least R20,000,000, motor vehicle liability of at least R5,000,000, construction plant and equipment insurance, and any excess public, aviation, or professional indemnity cover.
Insurance approval and timing: All contractor-arranged insurances must be with insurers approved by the employer, and policies must be produced within 28 days of contract commencement.
Claim notification: The contractor must immediately notify the employer and its insurance brokers of any occurrence likely to give rise to a claim, complete the Claims Advice Form, and not proceed with making good any loss without prior authorisation of the insurers.
Subcontractor compliance: The contractor must ensure all subcontractors are aware of and comply with the insurance clauses and effect similar insurances.
Pricing restriction: The contractor must not include premium charges for employer-arranged insurance in its pricing; any supplementary insurance is at the contractor's own cost.
Date & Time
Friday, 28 August 2026 - 13:00
Venue
Information desk, King Phalo Airport
A permit may apply.
Categories
Request for Quotation
King Phalo Airport - 66 Settler's way - East London - 5201
05 Aug
2026
Tender Published
Tender was published
28 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
NEC3-ECC_5054 - Roller Shutter Doors.pdf
This tender is for the replacement of four motorized roller shutter doors at the baggage area of King Phalo Airport over a 24-month period. The project involves the removal and disposal of existing corroded doors and the supply, installation, testing, and commissioning of new doors, including all electrical and mechanical components, with a 10-year workmanship guarantee.
Continue with tenders sharing this issuer, category, or province.
Median Estimate
R 187 340
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our BlogAI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: RFQ_12235_ ROLLER SHUTTER DOOR REPLACEMENT AT KING PHALO AIRPORT FOR A PERIOD OF TWENTY-FOUR (24) MONTHS.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Description
Source: ANNEXURE A- Price Schedule.pdfReplacement of roller shutter doors at King Phalo Airport, including removal of existing doors and installation of new electrically operated fire-resistant shutters, over a 24-month period.
Contact Information
Source: ANNEXURE A- Price Schedule.pdf (unknown){"name":null,"email":null,"phone":null,"department":"QUANTITY RATE AMOUNT","address":null}
Evaluation Criteria
Source: ANNEXURE A- Price Schedule.pdf (unknown)Bidders must be able to obtain ACSA site permits and complete induction (costs reimbursed).
Must comply with OHS safety requirements.
Must provide a safe disposal certificate for removed materials.
Must issue an electrical Certificate of Compliance (COC) for new installations.
Must hold appropriate insurance for the contract period.
Technical Specifications
Source: ANNEXURE A- Price Schedule.pdf (unknown)Scope: Replacement of roller shutter doors at King Phalo Airport over 24 months.
Remove 4 existing eroded roller shutter doors (1390mm x 1260mm) at the Baggage Area, including control panel, electrical connection, drive motor, chain and sprockets, and cart off-site.
Install 4 new electrically operated Class B fire-resistant slatted roller shutters for 1390mm x 1260mm openings, including electrical connection, commissioning, and an electrical isolator.
Make good disturbed finishes around openings (drilling and surface finishing).
Provide temporary barriers, screens, and hoarding during construction (budgetary allowance R10,000).
Model Preambles for Trades (ASAQS) and Department of Public Works PW371-A specification apply.
Contractor to factor in scaffolding for working at heights; no additional costs will be entertained.
Financial Requirements
Source: ANNEXURE A- Price Schedule.pdf (unknown)Pricing schedule items:
Price summary: A = subtotal excluding VAT; B = contingencies at 10% of A; C = subtotal including contingencies excluding VAT (A+B); D = VAT at 15% of C; E = total price including VAT (C+D), transferred to Form of Offer.
Compliance Requirements
Source: ANNEXURE A- Price Schedule.pdf (unknown)No specific compliance requirements stated beyond the obligations in the pricing schedule (e.g., insurance, OHS, permits, COC).
Health & Safety
Source: ANNEXURE A- Price Schedule.pdfOHS related safety charges are included in the preliminaries.
Demolitions and work on site must be carried out carefully and in the safest possible manner.
Contractor must make a thorough examination and take all necessary precautions before proceeding.
Special care must be exercised to avoid interfering with electrical installations.
Contractor must afford every facility to workmen carrying out work.
For materials to be re-used, they must be thoroughly cleaned and stacked for inspection by the Representative/Agent before re-use.
Environmental
Source: ANNEXURE A- Price Schedule.pdf (unknown)Safe disposal certificate required for carting off-site removed roller shutter doors.
Recovering cost of selling/disposing metal offsite.
Contractual Terms
Source: ANNEXURE A- Price Schedule.pdfContractor is solely responsible for any damage to services that remain in operation or are not yet disconnected, and any resultant damage.
Must immediately notify the Representative/Agent and authorities of any damage, and at own cost arrange disconnection and repairs, paying all fees.
Must take all necessary precautions to avoid structural or other damage to existing buildings, and must not interfere with electrical installations without notice.
Materials specified as 'removed' become the property of the Contractor; materials specified to be 'taken down and set aside' remain the property of the Employer, and the Contractor is responsible for their safety, cleaning, stacking, and any damage or loss.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFQ_12235_ ROLLER SHUTTER DOOR REPLACEMENT AT KING PHALO AIRPORT FOR A PERIOD OF TWENTY-FOUR (24) MONTHS.pdf
2024 2025 INSURANCE CLAUSES FOR AIRSIDE CONSTRUCTION CONTRACTS LESS THAN R150 MILLION.pdf
This tender document outlines the mandatory insurance requirements for a roller shutter door replacement contract at King Phalo Airport over 24 months. It specifies a Principle Controlled Insurance (PCI) model where the Employer (Airports Company of South Africa) arranges core project insurances, and the Contractor is responsible for supplementary insurances and paying applicable deductibles.
Functionality Final.pdf
This tender from Airports Company of South Africa seeks a contractor for roller shutter door replacement at King Phalo Airport over 24 months. Evaluation includes mandatory documents, CIDB grading, and functionality scoring (minimum 50/100 points).
ANNEXURE A- Price Schedule.pdf
Replacement of four eroded electrically operated roller shutter doors at King Phalo Airport over 24 months, including removal of existing doors, installation of new fire-resistant shutters, and making good finishes.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Airports Company South Africa (ACSA)Contact Person
Joseph Rulash
Phone
011-723-1400
[email protected]
Address
King Phalo Airport - 66 Settler's way - East London - 5201
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
5
Last checked
07 Aug 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubDescription
Source: Functionality Final.pdfMandatory requirements for award:
Submission Guidelines
Source: Functionality Final.pdf (unknown)Returnable documents:
Disqualification risks:
Returnable Documents
Source: Functionality Final.pdf (unknown)Documents to claim functionality points:
Evaluation Criteria
Source: Functionality Final.pdf (unknown)Mandatory requirements:
Functionality evaluation (maximum 100 points, minimum 50 points to pass):
Technical Specifications
Source: Functionality Final.pdf (unknown)Scope: Replacement of roller shutter doors at King Phalo Airport for a period of twenty-four (24) months.
Work includes:
Methodology must cover:
Methodology
Source: Functionality Final.pdfThe bidder must submit a detailed methodology covering:
A detailed methodology earns 10 points; no detailed methodology earns 0 points.
Quality Management
Source: Functionality Final.pdfQuality assurance and testing is a required component of the methodology. A detailed methodology covering quality assurance and testing earns 10 points; absence of a detailed methodology earns 0 points.
Compliance Requirements
Source: Functionality Final.pdf (unknown)CIDB registration: Bidders must be registered with the CIDB (or capable of being so prior to evaluation) with a contractor grading designation equal to or higher than 1ME in the ME (Mechanical Engineering) class. The grading must be determined in accordance with the sum tendered or Regulation 25 (1B) or 25(7A) of the Construction Industry Development Regulations.
Returnable form:
Section
Source: Functionality Final.pdfFunctionality evaluation: Total maximum 100 points, minimum 50 points required to pass. Sub-criteria and weights:
Description
Source: NEC3-ECC_5054 - Roller Shutter Doors.pdfThe existing roller shutter doors serving the baggage carrousels have reached the end of their lifespan, showing corrosion and frequent operational difficulties. The project replaces them with user-friendly roller shutter doors complying with SANS 10400 and SANS 1253, to support smooth passenger baggage processing.
Important Dates
Source: NEC3-ECC_5054 - Roller Shutter Doors.pdf (unknown)The closing date is 28 August 2026 at 13:00. The starting date is on signing of the contract by ACSA. The completion date is 24 months after signing. The access date is one week after issuing of the BPA. The defects date is twelve months after completion of the whole of the works. The defects correction period is two weeks.
Contact Information
Source: NEC3-ECC_5054 - Roller Shutter Doors.pdf (unknown)Employer: Airports Company South Africa SOC Limited, King Phalo Airport, 66 Settlers Way, Greenfields, East London, 5201. Telephone: 043 706 0384. Fax: 043 706 0318. Project Manager and Supervisor: Siyanda Ntebe, same address.
Evaluation Criteria
Source: NEC3-ECC_5054 - Roller Shutter Doors.pdf (unknown)The contract is an NEC3 Engineering and Construction Contract, April 2013, Main Option B (Priced contract with Bill of Quantities). Bidders must be capable of performing under this contract. The contractor must be an employer in its own right under the Occupational Health and Safety Act and must be in good standing with the Compensation Fund or a licensed insurer. If a joint venture or consortium, members are jointly and severally liable. The contractor must not be in business rescue proceedings. The contractor must annually present a compliant B-BBEE certificate; failure is a material breach and may lead to cancellation.
Technical Specifications
Source: NEC3-ECC_5054 - Roller Shutter Doors.pdf (unknown)Scope: Remove 4 existing eroded roller shutter doors (1390mm x 1260mm) at the Baggage Area, including control panel, electrical connection, drive motor, chain and sprockets, and cart off-site (contractor to provide safe disposal certificate). Supply, install, test and commission 4 new motorized roller shutter doors (1390mm x 1260mm) including control panel, electrical connection, drive motor, chain and sprockets. Contractor to confirm measurements for perfect fit. Provide a 10-year guarantee on workmanship and product. All products must be SABS approved. Adhere to OEM guidelines. Standards: SANS/ISO 9001:2015 (Quality management systems), SANS 10400 Part T (Fire Protection), SANS 1253 (Fire Doors and Fire Shutters), SABS 1564 (Standard for Roller Shutters), OHS Act. Monthly risk reduction meeting and overall contract progress meeting at King Phalo Airport; records submitted to Project Manager within five days.
Methodology
Source: NEC3-ECC_5054 - Roller Shutter Doors.pdf (unknown)Management meetings: Risk Reduction meeting to be held monthly. Representatives of contractor and ACSA to be present. Meeting held at Employer's site, venue communicated a week in advance. Records of meetings submitted to Project Manager within five days. Minutes not used for confirming actions or instructions under the contract.
Experience & Qualifications
Source: NEC3-ECC_5054 - Roller Shutter Doors.pdfBidders must provide CVs for key people as per the tender schedule, including name, job, responsibility, qualifications, and experience. The contractor must notify the Project Manager and Employer of the key person with authority to bind the contractor within one week of the contract date.
Financial Requirements
Source: NEC3-ECC_5054 - Roller Shutter Doors.pdf (unknown)Pricing: All prices shown excluding VAT unless instructed otherwise. Prices are fixed and firm, no CPI escalation. Prices must include customs and duties for overseas items. Permit costs paid upfront by successful bidder, reimbursed by ACSA against proof of payment, no mark-up on permits. Changes in staff during contract period are at contractor's cost. Costs for lost permits and new employees not reimbursed. Third-party procured items charged at cost plus mark-up; VAT not part of mark-up. Procured material quotes must be market related, contractor to provide receipt/invoice. Cost is net cost excluding VAT with discounts deducted. All material supplied must be SABS approved. Mark-up percentages for cost ranges: R0-R2000, R2000-R10000, R10001-R50000, Over R50000. Retention: 10% of contract value. Delay damages: 0.5% per day to a maximum of 10% of contract value. Payment within four weeks. Interest rate: prime lending rate of Nedbank Bank.
Compliance Requirements
Source: NEC3-ECC_5054 - Roller Shutter Doors.pdf (unknown)B-BBEE: Annual compliant B-BBEE certificate required; failure is a material breach. Occupational Health and Safety: Section 37(2) agreement under OHS Act and Construction Regulation 5.1(k); contractor must be an employer in its own right and comply with OHS Act and Construction Regulations. Insurance: COID cover for employees, public liability insurance, and other insurance as required. Good standing with Compensation Fund or licensed insurer. Joint ventures: jointly and severally liable. No business rescue proceedings.
Health & Safety
Source: NEC3-ECC_5054 - Roller Shutter Doors.pdfOccupational Health and Safety Agreement in terms of Section 37(2) of the OHS Act and Construction Regulation 5.1(k). Objectives: to assist ACSA to comply with OHS Act and COID Act. The Mandatary undertakes to comply with insurance requirements (COID cover, public liability), and to ensure compliance with OHS Act including: supervision by trained employees, assignment of responsibilities under Section 16, baseline risk assessment, appointment of competent persons, enforcement of discipline, provision and use of PPE, safe working procedures, no unsafe equipment, reporting incidents, no use of client's equipment without approval, permits, no alcohol, and participation in OHS inquiries. Only a duly authorised 16.2 appointee may sign. Non-compliance may lead to cancellation. Contractor must hold a toolbox meeting before work starts, comply with Part C1.4, and ensure all personnel have correct PPE.
Contractual Terms
Source: NEC3-ECC_5054 - Roller Shutter Doors.pdfContract: NEC3 Engineering and Construction Contract, April 2013, Main Option B (Priced contract with Bill of Quantities), Dispute resolution Option W1, Secondary Options X2 (Changes in the law), X7 (Delay damages), X16 (Retention), X18 (Limitation of liability), and Z (Additional conditions). Law of contract: Republic of South Africa. Language: English. Period of reply: five working days. Starting date: on signing of contract by ACSA. Completion date: 24 months after signing. Access date: one week after issuing of the BPA. Defects date: twelve months after completion. Defects correction period: two weeks. Assessment interval: four weeks. Payment within four weeks. Interest rate: prime lending rate of Nedbank Bank. Delay damages: 0.5% per day to maximum 10% of contract value. Retention: 10% of contract value. Limitation of liability: neither party liable for consequential or indirect loss; Contractor's liability for loss or damage to Employer's property limited to total costs/liability incurred and/or damages suffered to the employer's property. Excluded matters include loss or damage to Employer's property, delay damages, defects liability, insurance liability, loss or damage to property, death or injury, damage to third party property, and infringement of intellectual property rights. Additional conditions Z1-Z20 include: Z1 waiver of rights; Z2 Contractor provides works fit for purpose; Z3 Contractor to satisfy himself on completeness of information and responsible for setting out; Z4 extension of defects date; Z5 termination for business rescue; Z7 limitation of liability (Employer's liability for indirect loss limited to R0.00); Z8 cession, delegation, assignment; Z9 joint and several liability; Z10 ethics (anti-corruption); Z11 confidentiality; Z12 Employer's step-in rights; Z13 liens and encumbrances; Z14 intellectual property; Z16 dispute resolution (adjudicator and arbitrator panels); Z17 notification of compensation events (four weeks); Z18 B-BBEE certificate; Z19 communication (consent for changes 5% or more, or completion date extension over 30 days); Z20 delegation under OHSA. Dispute resolution: Adjudicator appointed from a panel; if deadlock, Chairman of Johannesburg Bar Council appoints. Arbitration under Rules for the Conduct of Arbitrations 2013, 7th Edition, published by The Association of Arbitrators (Southern Africa). Place of arbitration: Johannesburg, South Africa. Arbitrator selected from panel.
Section
Source: NEC3-ECC_5054 - Roller Shutter Doors.pdfThe tender is open to entities capable of performing under an NEC3 ECC contract. The contractor must be an employer in its own right under the Occupational Health and Safety Act and must be in good standing with the Compensation Fund or a licensed insurer. If a joint venture or consortium, members are jointly and severally liable. The contractor must not be in business rescue proceedings. The contractor must annually present a compliant B-BBEE certificate; failure is a material breach and may lead to cancellation.
Important Dates
Source: RFQ_12235_ ROLLER SHUTTER DOOR REPLACEMENT AT KING PHALO AIRPORT FOR A PERIOD OF TWENTY-FOUR (24) MONTHS.pdf (TENDER)Closing date: 28 August 2026 at 13:00 (South African time).
Non-compulsory briefing and site inspection: 14 August 2026 at 12:30, meeting at the Information desk, King Phalo Airport. Bring ID or driver's licence, safety boots and reflector vest; a permit fee applies.
Closing date for enquiries: 21 August 2026.
Tender documents available from 05 August 2026.
Contact Information
Source: RFQ_12235_ ROLLER SHUTTER DOOR REPLACEMENT AT KING PHALO AIRPORT FOR A PERIOD OF TWENTY-FOUR (24) MONTHS.pdf (TENDER)Bidding procedure enquiries: Joseph Rulash, telephone 011 409 3943, email [email protected].
Submission email: [email protected].
All communication during the tender period must go through ACSA's Supply Chain Department, not the principal agent.
Submission Guidelines
Source: RFQ_12235_ ROLLER SHUTTER DOOR REPLACEMENT AT KING PHALO AIRPORT FOR A PERIOD OF TWENTY-FOUR (24) MONTHS.pdf (TENDER)Bids must be submitted by email to [email protected] before the closing time. Submissions must be broken into at least four attachments of 4MB each, and the RFQ reference number must appear in the email subject. Only the prescribed format is accepted; late bids are not considered. Returnable documents include the completed and signed SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Past SCM Practices), SBD 9 (Certificate of Independent Bid Determination), the signed Form of Offer and Acceptance (C1.1), and proof of authority to sign (e.g. company resolution). The completed contract document (Appendix 1) must also be returned with the bid.
Evaluation Criteria
Source: RFQ_12235_ ROLLER SHUTTER DOOR REPLACEMENT AT KING PHALO AIRPORT FOR A PERIOD OF TWENTY-FOUR (24) MONTHS.pdf (TENDER)Evaluation follows a staged process. Stage 1 checks responsiveness; Stage 2 verifies mandatory criteria, including a CIDB contractor grading of 1ME or higher and a fully completed and signed Form of Offer and Acceptance (C1.1). Stage 4 assesses functionality against criteria in an attached evaluation document; a minimum of 50 out of 100 points is required to proceed. Stage 5 applies the 80/20 preference point system for bids up to R50 million: 80 points for price, 20 for specific goals. Specific goals include B-BBEE status levels (Level 1 = 5 points, down to Level 8 = 0.1), black youth majority-owned (5), black women majority-owned (5), and company majority owned by people with disabilities (5). Proof of claimed preference points must be submitted; failure to provide proof results in zero points for that goal but does not disqualify the bid.
Technical Specifications
Source: RFQ_12235_ ROLLER SHUTTER DOOR REPLACEMENT AT KING PHALO AIRPORT FOR A PERIOD OF TWENTY-FOUR (24) MONTHS.pdf (TENDER)Scope: replacement of roller shutter doors at King Phalo Airport, Eastern Cape, over a 24-month period. The detailed scope is in Part C3 (Service Information / Scope of Work) and site information in Part C4. A site inspection is offered to understand the airport and requirements. Bidders must hold a CIDB contractor grading of 1ME or higher. The contract is fixed-price for the full duration; no price adjustments apply. Insurance requirements are set out in Appendix 2, and the successful bidder must complete safety and environmental documentation (Appendix 3).
Financial Requirements
Source: RFQ_12235_ ROLLER SHUTTER DOOR REPLACEMENT AT KING PHALO AIRPORT FOR A PERIOD OF TWENTY-FOUR (24) MONTHS.pdf (TENDER)Pricing must be submitted on the provided pricing schedules (C2.2). Rates and prices are fixed for the contract duration and must include all duties and taxes except VAT, which is shown separately. The contract is not subject to price adjustments. Tender offers must remain valid for 12 weeks (84 days) after closing. If requested, bidders must submit securities, bonds, guarantees and insurance certificates before contract formation.
Compliance Requirements
Source: RFQ_12235_ ROLLER SHUTTER DOOR REPLACEMENT AT KING PHALO AIRPORT FOR A PERIOD OF TWENTY-FOUR (24) MONTHS.pdf (TENDER)CIDB contractor grading of 1ME or higher is mandatory.
Tax compliance: submit a SARS Tax Compliance Status PIN or a printed TCS certificate; if not available, provide a CSD number. Each party in a consortium, joint venture or subcontracting arrangement must submit its own.
B-BBEE: claim preference points by providing a valid sworn affidavit or a SANAS-accredited B-BBEE certificate; joint ventures must provide a consolidated certificate.
Returnable forms: SBD 4 (Declaration of Interest), SBD 8 (Declaration of Past SCM Practices), SBD 9 (Certificate of Independent Bid Determination), and proof of authority to sign.
Description
Source: 2024 2025 INSURANCE CLAUSES FOR AIRSIDE CONSTRUCTION CONTRACTS LESS THAN R150 MILLION.pdfThe document is an insurance clause annexure for airside construction contracts at ACSA, applicable when the awarded contract value does not exceed R150 million, construction period does not exceed 36 months, and defects liability period does not exceed 24 months.
Evaluation Criteria
Source: 2024 2025 INSURANCE CLAUSES FOR AIRSIDE CONSTRUCTION CONTRACTS LESS THAN R150 MILLION.pdf (unknown)The primary eligibility requirement is the financial and administrative capability to comply with the comprehensive insurance obligations, including the ability to pay high deductibles and secure the required supplementary insurance policies from approved insurers.
Technical Specifications
Source: 2024 2025 INSURANCE CLAUSES FOR AIRSIDE CONSTRUCTION CONTRACTS LESS THAN R150 MILLION.pdf (unknown)The document is an insurance clause annexure for airside construction contracts. It applies where the awarded contract value does not exceed R150 million, the construction period does not exceed 36 months, and the defects liability period does not exceed 24 months. The employer (ACSA) arranges Principal Controlled Insurance (PCI) in joint names of employer, contractor, and subcontractors, covering contract works, public liability, removal of lateral support, SASRIA, aviation liability, and design & construct professional indemnity. The contractor must familiarise itself with these policies and comply with all terms, limits, exclusions, and deductibles. The contractor is liable for deductibles: R150,000 (R250,000 for testing/commissioning) for contract works, R75,000 for public liability property damage, R75,000 for removal of lateral support, R25,000 for SASRIA theft, R300,000 for aviation liability, and R5,000,000 (contracts under R50m) or R10,000,000 (contracts over R50m) for design & construct professional indemnity. The contractor must also maintain its own insurances: construction plant and equipment, employer's liability (minimum R20,000,000), motor vehicle liability (minimum R5,000,000), buy-down cover for employer's deductibles if unacceptable, marine cargo insurance if applicable, and excess public/aviation/professional indemnity cover. Policies must be with insurers approved by the employer and produced within 28 days of contract commencement.
Financial Requirements
Source: 2024 2025 INSURANCE CLAUSES FOR AIRSIDE CONSTRUCTION CONTRACTS LESS THAN R150 MILLION.pdf (unknown)The contractor must not include premium charges for employer-arranged insurance in its pricing, except for supplementary insurance it deems necessary. Any additional insurance purchased by the contractor is at its own cost. The contractor must be able to pay the deductibles as specified. If the contractor fails to maintain required insurances, the employer may effect them and deduct premiums from monies due to the contractor.
Compliance Requirements
Source: 2024 2025 INSURANCE CLAUSES FOR AIRSIDE CONSTRUCTION CONTRACTS LESS THAN R150 MILLION.pdf (unknown)The contractor must comply with all terms and conditions of employer-arranged policies and be deemed fully aware of all conditions, limits, exclusions, and deductibles. The contractor must ensure subcontractors are aware of and comply with these insurance clauses. The contractor must notify the employer immediately of any cancellation or restrictive modification to its insurance and advise remedial action.