Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
01 IMPALA ROAD - PULLENSHOPE, HENDRINA POWER STATION - MIDDELBURG - 1096
Organization Type
GOVERNMENT
Published
26 Aug 2026
OCDS Reference
ocds-9t57fa-166955
ESKOM requires a contractor to operate the general waste disposal facility at hendrina power station in mpumalanga and manage all waste collection and disposal across the site and five eskom-owned flats for 60 months. The contractor must provide key equipment (4x4 tlb, bakkie, worker transport) and personnel, comply with the landfill licence conditions, and source 100% locally within south africa. Bidders must submit a priced offer on the nec3 option a schedule and maintain their b-bbee level throughout the contract.
Equipment and personnel: Bidders must provide 6 waste administrators, 2 TLB operators, 1 bakkie driver, a 4x4 TLB machine, a 4x4 bakkie, and worker transport from Pullenshope to the power station for the full 60-month period.
Local sourcing: All materials and services must be sourced 100% within South Africa.
Supplier Development and Localisation: Bidders must commit to training 2 TLB operators from the local Steve Tshwete community and creating 1 job for local worker transport; a monthly penalty of R500 applies if SD&L obligations are not met after 12 months.
Corporate Social Investment: A CSI contribution of 1% of the contract value (excluding VAT) is required.
Key personnel: The contractor must employ a Site Manager with matric and 3 years' experience, a Safety Officer with NOSA or SAMTRAC qualification, 6 general workers with 2 years' waste management experience, and a site supervisor with matric and 2 years' supervisory experience.
B-BBEE: Bidders must maintain or improve their B-BBEE level from contract award; any change in status must be notified and may lead to renegotiation or termination.
Insurance: The contractor must provide insurance as per Insurance Table A (including liability for damage to employer's property, plant, equipment, and third-party injury) and comply with employer's insurance requirements.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 16 September 2026 - 10:00
Venue
MICROSOFT TEAMS
Please note all submissions must be submitted electronically via ESKOM e-tendering site.
Categories
Request for Bid(Open-Tender)
01 IMPALA ROAD - PULLENSHOPE, HENDRINA POWER STATION - MIDDELBURG - 1096
AI Document Analysis Stages
Important Dates
Source: E-Tenderers E-Tendering Training Acknowledgement Form .pdf (unknown)26 Aug
2026
Tender Published
Tender was published
16 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SCOPE OF WORK FOR THE WASTE MANAGEMENT AND THE OPERATION OF GENERAL WASTE DISPOSAL FACILITY 2.pdf
Eskom requires a service provider to manage waste and operate the General Waste Disposal Facility (GWDF) at Hendrina Power Station in Mpumalanga for a 60-month period. The scope covers daily waste collection and bin servicing across the power station and five Eskom-owned residential flats at Pullenshope, hazardous waste receipt and storage management, access control at the scrap yard, hazardous store and landfill site, and full operational management of the licensed landfill facility including compaction, cover, monitoring, and monthly reporting.
Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf
Eskom is procuring waste management services and the operation of the general waste disposal facility at Hendrina Power Station in Mpumalanga for a 60-month period.
NEC WASTE MANAGEMENT.doc
Eskom is procuring waste management services and the operation of a general waste disposal facility at Hendrina Power Station in Mpumalanga for a period of 60 months. The contract is based on the NEC3 Term Service Contract (TSC3) with a priced price list (Option A). The scope includes managing the landfill site, waste collection and disposal, hazardous waste handling, and reporting.
E-tendering Help Manual for supplier - 27 January 2025.pdf
Eskom is procuring waste management services and the operation of the general waste disposal facility at Hendrina Power Station in Mpumalanga for a 60-month period. Submissions must be made electronically via the Eskom eTendering portal.
240-68099512 Form A_Cat 2_ Rev 9.pdf
Eskom is procuring waste management services and the operation of the general waste disposal facility at Hendrina Power Station in Mpumalanga for a 60-month period. The contract imposes Eskom's supplier quality requirements aligned with ISO 9001 and specification 240-105658000.
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf
Eskom invites tenders for the provision of waste management services and the operation of the general waste disposal facility at Hendrina Power Station in Mpumalanga for a period of 60 months. The tender is conducted under Eskom's Standard Conditions of Tender (Rev 12, effective 1 February 2025) and follows an open competitive process advertised on the Eskom Tender Bulletin and National Treasury e-Tender Portal.
240-109253698 CQP Template 2021.pdf
Eskom requires a contractor to provide waste management services and operate the general waste disposal facility at Hendrina Power Station in Mpumalanga for a 60-month period. The tender includes a Contract Quality Plan template that the successful bidder must complete, detailing quality management processes, sub-supplier controls, inspection and test plans, document control, non-conformance management, and records retention aligned with ISO 9001 and SANS 466/ISO 10005.
OHS CHECKLIST (HIGH RISK).pdf
Eskom requires a service provider for waste management and the operation of the general waste disposal facility at Hendrina Power Station in Mpumalanga for a 60-month period. The tender is classified as high-risk from an occupational health and safety perspective, requiring extensive OHS documentation and competency verification.
Environmental Evaluation Checklist 2023.pdf
Eskom requires a contractor to provide waste management services and operate the general waste disposal facility at Hendrina Power Station in Mpumalanga for a 60-month period.
E-Tenderers E-Tendering Training Acknowledgement Form .pdf
Eskom is procuring waste management services and the operation of a general waste disposal facility at Hendrina Power Station in Mpumalanga for a 60-month period. The tender reference is E3251GXMPHEN.
380-136358 R0 - Quality Control Plan TEMPLATE.pdf
Eskom is procuring waste management services and the operation of the general waste disposal facility at Hendrina Power Station in Mpumalanga for a 60-month period.
TENDER TECHNICAL EVALUATION STRATEGY.pdf
Eskom is procuring waste management services and the operation of a general waste disposal facility at Hendrina Power Station in Mpumalanga for a period of 60 months. The tender is evaluated on technical criteria including mandatory registration for waste transportation and qualitative criteria covering personnel experience, method statement, previous work experience, and equipment capability.
(SDLI) Strategy for Waste Mangement and operation.pdf
Eskom Hendrina Power Station requires a contractor for the provision of waste management and the operation of a general waste disposal facility for 60 months. The tender includes mandatory B-BBEE scoring (up to 20 points in an 80/20 preference system) and non-scoring but contractually binding SDL&I obligations covering B-BBEE improvement, local procurement, job creation, and skills development.
240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf
Eskom is seeking a contractor for waste management services and the operation of a general waste disposal facility at Hendrina Power Station in Mpumalanga. The contract is for 60 months. The tender pack includes specific quality management system requirements, with bidders required to demonstrate ISO 9001 certification or an equivalent documented quality management system.
Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf
Eskom Holdings SOC Ltd invites tenders for the provision of waste management services and the operation of the general waste disposal facility at Hendrina Power Station in Mpumalanga for a period of 60 months. The contract will be based on the NEC3 Term Service Contract (Option A) with specific secondary options including price adjustment, key performance indicators, and low service damages.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 749 360
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"27 January 2025"}
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form .pdf (unknown){"name":"Tel (landline)","email":null,"phone":null,"department":null,"address":"FORM – E-TENDERING TRAINING"}
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form .pdf (unknown)Returnable documents:
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form .pdf (unknown)No eligibility criteria specified
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form .pdf (unknown)No specific requirements found
Important Dates
Source: 240-109253698 CQP Template 2021.pdf (unknown){"closingDate":"01 April 2021"}
Contact Information
Source: 240-109253698 CQP Template 2021.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies.","address":null}
Technical Specifications
Source: 240-109253698 CQP Template 2021.pdf (unknown)(Type in the Full description of the Works Information as described in the NEC or Fidic document)
Scope of work category ( Mark with X if Yes N/A Type in the scope of work in the appropriate
any activity below is included in SOW) column.
Design
Manufacturing
Supply and Delivery/ Transportation
Construction/ Installation/ Maintenance
Commissioning
Professional services
Other
Each person on site must know their own responsibilities as well as the responsibilities of others. Each party must keep the relevant
people informed. Indicate for this contract Communication regarding all quality related issues i.e. Documentation/ Supplier Representative
details and contacts - E-mails; Minutes of Meetings; Fixed Contract Meeting; /Weekly Progress Meetings & reporting;. All documentation
shall be submitted per the contract agreement).
(Include scope of work /contract related organogram showing designations with roles and responsibilities/ outputs, which shall include the
QA and QC functions with all personnel responsible for management of activities/processes during execution or delivery of product. Team
member’s responsibilities and qualifications necessary to fulfil stated duties Work verification (e.g., who is responsible for carrying out a
task, as well as who is responsible for checking the work)
Specifications)
List of Supplier’s core processes to be used for executing scope of work / List of Documents to be used on this contract - Work Instructions;
Processes; policies; procedures for the scope of work; Industry standards; specifications; drawings applicable to the scope of work.
Name of document Type Revision
(for sow specific raw material/ required components; list all possible services/material to be sourced or services to be outsourced)
Material components to be purchased
Possible suppliers to be used for sourcing Material /components to be purchased
A
B
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Template Identifier 240-43921804 Rev 5
Template for a Typical Document Identifier 240-109253698 Rev 3
Contract Quality Plan Effective Date 01 April 2021
Next Review Date 01 April 2026
Scope of Work Sub-Suppliers or Sub-contractors- for specialised, complex SOW activities that will be
outsourced.
Outsourced Description of the activity Criteria for selection
Activity/Subcontractor
Eg - Drilling of holes in rocky areas Rock drilling when digging holes; Hiring additional ladders; Eg: Technical & Quality requirements
A
B
C
Note: Evaluation; selection and performance monitoring of suppliers shall be performed as defined in the supplier’s procedures for
managing externally supplied products and services.
(Description of how the tender’s Supplier and contractors indicated in Section 6 will be monitored post award, mark with X the applicable
box- if there are sub-suppliers/ sub-contractors)
Supplier/contractor performance monitoring activities as per scope of work Yes N/A
Supplier inspection report or
supplier surveillance/audit report or /and audit schedule
Generate supplier/contractor inspection plan
Purchased Material verification checklist or report
(Description of the interface of the Sub-Supplier and Suppliers QMS and applicable documents, procedures and work instructions)
Purchased
(Submit a list of SOW items/activities that will be manufactured/refurbished or purchased which will be used on this project/contract
including full descriptions; production schedule and if produced in-house or out-sourced)
Item manufactured refurbished purchased serial number
(Description of all production products/processes which will be monitored by an approved QCP process- compilation; review and implementation and
compliance monitoring Inspection Management)
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Template Identifier 240-43921804 Rev 5
Template for a Typical Document Identifier 240-109253698 Rev 3
Contract Quality Plan Effective Date 01 April 2021
Next Review Date 01 April 2026
Governed by codes of manufacturing/fabrication standards
(Description of all products/processes/services which will require special controls, i.e. welding, NDT/NDE. For each of the deliverables
identified, describe the quality control activities you will execute to ensure the deliverable will meet quality expectations (QC). For example,
you could note that you will be completing a Quality Control Checklist for each major deliverable)
During project
All documents that will be submitted to Eskom - Technical records (Safe working procedure/ Method statements), Inspections reports, signed
off QCP’s, technical assurance report, warranty certificates, material certificates , dimension reports, tests reports etc) List of retained
information to be submitted as evidence - SOW has been executed, SOW outputs
(Example):
Title number
Submitted to Eskom prior to commencement /execution
QCP / ITP from Suppliers
Certificates of compliance
Index of ITP/QCP/PQP
Data book Index
Risk Register
offsite and offshore inspections
Submitted to Eskom during and at completion of the contract
Method statements/Safe Working Procedures/ PQRs; Repair Procedures)
Qcp / itp/pqp
Final DATA book
Captured in the QMS of the Supplier / Sub-Supplier
Quality Manual
Quality Policy
Risk Register
Audit findings report and Audit Findings Register / Action Register
Consolidated inspection register of all planned and completed inspections (Accepted,
Rejected, Postponed, Cancelled, Missed);
Monthly Inspection Analysis Report
Audit findings report and Audit Findings Register / Action Register – Analysis Report
Updated procedure registers (PQRs, Method Statements, Repair Procedures, etc.)
A register of NCs / Defects / Punch Items with all the necessary analysis – Analysis Report
Databook status registers – Monthly Analysis Report (Milestone Based)
Inspection rejection rate
(Some records submitted in Clause 12 of CQP- Description of how records shall be controlled (eg. identified, completed, retained and
disposition method - please do not attach procedure) A good retrievable filing system using an indexing and cross reference system should
be set up.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Template Identifier 240-43921804 Rev 5
Template for a Typical Document Identifier 240-109253698 Rev 3
Contract Quality Plan Effective Date 01 April 2021
Next Review Date 01 April 2026
Record name Reference number Distributed to Retention period
(access):
(Share brief description (flowchart/process) of how the following processes will be implemented: Concession management process; Non-
Conformance (Defects; Repair & Rework) Management Process; Inspection Management Process.
Maintenance manual
If data book applicable to the scope of work, Submission of data books – reflect review; and acceptance; include list of purchase orders for
quality critical items.
Required to execute the contract scope of work.
(Provide a list of Tools & Equipment to be used for this contract; Provide a list of Calibration/ Maintenance or Test (for those applicable)
status of each of the tools and equipment to be used)
Provide a brief description or the process flow which details the manner in dealing with customer property as per latest ISO 9001
requirement.
Include a process flow which details the manner for the preservation, storage and handling of materials – identification; handling;
contamination control; packaging; storage; transmission or transportation, and protection
Indicate the identification and traceability methods to be used for SOW related activities affected by statutory and regulatory requirements
Indicate any post-delivery activities/support and how shall it be given to Eskom during commissioning and after SOW delivery - any
warranty period and conditions; customer satisfaction measurement; technical support; defect correction period/ retention funds. When
determining post-delivery activities consider statutory; regulatory and scope of work requirements
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Evaluation Criteria
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Bidder must be registered on the Central Supplier Database (CSD), hold a valid SARS tax clearance certificate or tax compliance status pin, and possess a B-BBEE certificate or sworn affidavit for preference points. No specific CIDB grading, professional body registration, or local content percentage is stated in the provided document. The tenderer's quality representative must complete and sign Form A (240-43921804 Rev 3) accepting Eskom Supplier Quality Requirements per 240-105658000 and ISO 9001.
Technical Specifications
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
Category 2 (refer to clause 3.5.-105658000) X
Category 3 (refer to clause 3.5.-105658000) -
Category 4 (refer to clause 3.5.-105658000) -
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000) -
3 post-contract award(eskom)
Quality Management
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Bidders must accept Eskom's Supplier Quality Requirements (specification 240-105658000) and ISO 9001 by completing and signing Form A. Category 2 applies. Post-award obligations include quality audits, access rights, nonconformity management, and special processes as per the referenced specification.
Compliance Requirements
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Bidders must complete and sign Form A (240-43921804 Rev 3) to acknowledge acceptance of Eskom's Supplier Quality Requirements per specification 240-105658000 and the ISO 9001 standard. Category 2 is selected.
Description
Source: SCOPE OF WORK FOR THE WASTE MANAGEMENT AND THE OPERATION OF GENERAL WASTE DISPOSAL FACILITY 2.pdf (unknown)The service covers waste management and operation of the General Waste Disposal Facility (GWDF) at Hendrina Power Station, operating under license nr 12/9/11/L211215101545/6/R. The appointed service provider must ensure compliance with all applicable legislation, including NEMA, NEMWA, OHS Act, and relevant regulations. The scope includes daily servicing of bins, hazardous waste handling, landfill operation, access control, construction, compaction, inspection, and reporting.
Important Dates
Source: SCOPE OF WORK FOR THE WASTE MANAGEMENT AND THE OPERATION OF GENERAL WASTE DISPOSAL FACILITY 2.pdf (unknown)Closing date: 16 September 2026 at 10:00. No briefing, site visit, or clarification deadline is stated in this scope document.
Contact Information
Source: SCOPE OF WORK FOR THE WASTE MANAGEMENT AND THE OPERATION OF GENERAL WASTE DISPOSAL FACILITY 2.pdf (unknown){"name":null,"email":null,"phone":null,"department":"y for","address":null}
Evaluation Criteria
Source: SCOPE OF WORK FOR THE WASTE MANAGEMENT AND THE OPERATION OF GENERAL WASTE DISPOSAL FACILITY 2.pdf (unknown)The evaluation will follow ESKOM's Tender Technical Evaluation Procedure (ref 240-48929482) and the Safety, Health, Environment and Quality (SHEQ) Policy (ref 32-727). No scoring split, minimum thresholds, or preference point system are provided in this scope document.
Technical Specifications
Source: SCOPE OF WORK FOR THE WASTE MANAGEMENT AND THE OPERATION OF GENERAL WASTE DISPOSAL FACILITY 2.pdf (unknown)The service covers waste management and operation of the General Waste Disposal Facility (GWDF) at Hendrina Power Station for 60 months, under license nr 12/9/11/L211215101545/6/R. Required resources: 6 waste management trained employees, 1 bakkie driver, 2 TLB operators, 1x 4x4 TLB machine (wet-rate hire), workers transport from Pullenshope, and a 4x4 bakkie for waste collection. Daily tasks: service 90L and 240L wheelie bins, replace black plastic liners, keep bins and skip areas clean, receive and register hazardous waste drums, maintain stock level and notify employer at 25 drums, assist loading 210L hazardous waste drums, load general waste into compactor truck for five Eskom flats at Pullenshope (Protea, Matumi, Kiaat, Ceder, Laurel), provide access control at scrap yard, main hazardous store, and landfill site. Landfill operation: daily cleaning of waste at gate, record all waste, maintain access road, man gates during operating hours, direct vehicles to active cell, enforce visitor register, prevent disposal of non-permitted waste. Construction: maintain slope gradient of 1:3, place waste on active cell for compaction. Compaction: daily compaction and cover with minimum 150mm of soil, prevent nuisance conditions, odour, rodents, burning, and air pollution. Inspections: weekly SHEQ inspections, monitor compliance with license conditions, correct deviations. Reports: monthly reports including waste volumes, waste cover report, compacted waste slopes, site inspections, recycled waste volumes, daily rainfall, hazardous waste drums transported, and topsoil volumes. General: attend all site meetings, attend mandatory monthly SHEQ meeting, keep daily diary, maintain up-to-date safety file, close audit findings timeously.
Methodology
Source: SCOPE OF WORK FOR THE WASTE MANAGEMENT AND THE OPERATION OF GENERAL WASTE DISPOSAL FACILITY 2.pdf (unknown)The methodology includes: providing 6 waste management trained employees, 1 bakkie driver, 2 TLB operators, 1x 4x4 TLB machine on wet-rate hire, transport for workers from Pullenshope, and a 4x4 bakkie for waste collection. Daily tasks: service 90L and 240L wheelie bins, replace liners, keep bins clean, receive and register hazardous waste drums, maintain stock levels, assist loading hazardous waste drums, load general waste into compactor truck for flats, provide access control at scrap yard, main hazardous store, and landfill site. Landfill operation: daily cleaning of waste at gate, record waste, maintain access road, man gates, direct vehicles, prevent illegal dumping. Construction: maintain slope gradient 1:3, place waste on active cell. Compaction: daily compact waste, cover with 150mm soil. Inspections: weekly SHEQ inspections, monitor license compliance, correct deviations. Reports: monthly reports as specified.
Quality Management
Source: SCOPE OF WORK FOR THE WASTE MANAGEMENT AND THE OPERATION OF GENERAL WASTE DISPOSAL FACILITY 2.pdf (unknown)The contractor must conduct weekly SHEQ inspections and monitor compliance with the license operating conditions. Monthly reports must include waste volumes, cover report, compacted waste slopes, site inspections, recycled waste volumes, daily rainfall, hazardous waste drums, and topsoil volumes. Records to be kept for five years: waste volume reports, manifests, audit reports, and records of waste received at the GWDF.
Health & Safety
Source: SCOPE OF WORK FOR THE WASTE MANAGEMENT AND THE OPERATION OF GENERAL WASTE DISPOSAL FACILITY 2.pdf (unknown)The service provider must fully comply with Safety, Health, Environment and Quality (SHEQ) requirements and all applicable legislative requirements. The contractor must attend a mandatory monthly SHEQ meeting, maintain an up-to-date safety file, and ensure timeous closure of audit findings. The site must be operated to prevent nuisance conditions, health hazards from rodents, odour, burning, and air pollution. The contractor must keep a daily diary of equipment and labour.
Environmental
Source: SCOPE OF WORK FOR THE WASTE MANAGEMENT AND THE OPERATION OF GENERAL WASTE DISPOSAL FACILITY 2.pdf (unknown)The service must comply with the National Environmental Management Act (NEMA), National Environmental Management: Waste Act (NEMWA), and related regulations (GNR 926, 625, 636). The landfill site must be constructed with a slope gradient of 1:3 to prevent erosion. Waste must be compacted and covered with a minimum of 150mm of soil daily. The operation must prevent air pollution, odour, and nuisance conditions. The contractor must implement the Environmental Incident Management Procedure (240-133087117).
Section
Source: SCOPE OF WORK FOR THE WASTE MANAGEMENT AND THE OPERATION OF GENERAL WASTE DISPOSAL FACILITY 2.pdf (unknown)The evaluation will be conducted in accordance with ESKOM's Tender Technical Evaluation Procedure (240-48929482) and the Safety, Health, Environment and Quality (SHEQ) Policy (32-727). No further evaluation criteria are specified in this scope document.
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER){"closingDate":"23Aug2022","closingTime":"3:42pm"}
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER){"name":null,"email":"[email protected]","phone":null,"department":null,"address":"ls before they can be granted access to the eTendering system. An"}
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Suppliers must have a valid CSD registration number. They must complete registration on the eTendering portal, including email and mobile verification via OTP. No further eligibility criteria (e.g., CIDB grading, B-BBEE level, tax clearance, local content) are specified in the provided document.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser
Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
Fig1.1
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
OTP page will be displayed
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP sent to the registered cellphone number and email address
Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP”
button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Landing page once OTP is verified
Select the preferred “Ref No”
A page with the preferred Tender information is displayed before tender documentation can
be submitted.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Click on “Create New Submission” button to submit required Tender documents
Landing page once clicked on “Create New Submission” button. Take note of the
mentioned disclaimers.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
To submit tender documents, click on “Add file” button
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 900MB.
will pop-up
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on “Update” button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name
Fig1.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2023 Eskom of 19
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)CSD number to gain access to
Important Dates
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)Closing date: 16 September 2026 at 10:00.
No mandatory briefing or site visit mentioned in available documents.
Contact Information
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"owledgement of Eskom's OHS legal and"}
Evaluation Criteria
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)Evaluation includes a mandatory OHS gate check: bidders must submit all Annexure C 1 returnable documents. These are evaluated on a pass/fail basis before financial or preference points are considered.
Required documents:
Additional OHS returnables may be specified for the scope.
Technical Specifications
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)The scope of work is waste management and operation of a general waste disposal facility at Hendrina Power Station for 60 months. No further technical specifications or quantities provided in the available document.
Experience & Qualifications
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)Bidders must demonstrate OHS competency by providing CVs, qualifications, and certificates for key personnel, relevant to the scope of work, risks, and OHS plan.
Compliance Requirements
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)Bidders must comply with the following OHS requirements:
The work is classified as high risk based on the OHS evaluation template.
Health & Safety
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)The OHS returnable documents checklist (Annexure C 1) includes:
Additional items may be added per scope.
Section
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)Annexure C 1 (OHS Tender Evaluation Template, high risk) lists the mandatory returnable documents for OHS evaluation. See the evaluation criteria section for the specific items.
Technical Specifications
Source: 380-136358 R0 - Quality Control Plan TEMPLATE.pdf (unknown)Contract/Order No. Work Order /QCP No.
Job/Task Description: Rev No.
Description
Source: Environmental Evaluation Checklist 2023.pdf (unknown)This tender covers the provision of waste management and operation of a general waste disposal facility at Hendrina Power Station for a period of 60 months. The provided document is an Environmental Evaluation Checklist (F/ESK108 Rev 3) used to assess bidders' environmental compliance.
Submission Guidelines
Source: Environmental Evaluation Checklist 2023.pdf (unknown)Bidders must submit the completed Environmental Evaluation Checklist (F/ESK108 Rev 3) as part of their tender response. The checklist must be signed by the contractor's Environmental Management Representative. No other submission instructions are specified in the provided document.
Evaluation Criteria
Source: Environmental Evaluation Checklist 2023.pdf (unknown)Bidders are evaluated solely on the Environmental Evaluation Checklist (F/ESK108 Rev 3). The checklist covers 14 items (EMS file, ISO 14001 certificate, EMP, environmental authorisations, etc.). Each item is scored 1 point. A minimum weighted average score of 80% is required to be considered for award. The final score is a percentage of total points achieved.
Technical Specifications
Source: Environmental Evaluation Checklist 2023.pdf (unknown)Scope: Waste management and operation of general waste disposal facility at Hendrina Power Station for 60 months. The Environmental Evaluation Checklist defines the environmental management system and documentation that must be in place, including an EMS file (ISO 14001:2015 elements), a site-specific Environmental Management Plan (EMP), environmental authorisations, permits, licences, emergency preparedness plans, hazardous substance register, Safety Data Sheets, waste management plan, and proof of training for significant activities.
Quality Management
Source: Environmental Evaluation Checklist 2023.pdf (unknown)The EMS file must include ISO 14001:2015 elements: Environmental Policy, objectives and targets, roles and responsibilities, communication, internal audits, emergency preparedness, monitoring and measurement of compliance, non-conformance and corrective/preventative action, management review, and an Environmental Aspects and Impacts Register. If certified, provide ISO 14001 EMS Certificate. Signed Contractor's Environmental Management Plan (EMP) for site-specific activities is required.
Compliance Requirements
Source: Environmental Evaluation Checklist 2023.pdf (unknown)Bidders must provide the following as part of the Environmental Evaluation Checklist:
Additionally, after award, the contractor will receive the following procedures: Waste Management Procedure (ENV/GEN/WI/12), Oil-Spill Cleanup and Rehabilitation Procedure (RA/ENV/110), Oil spill assessment form, Hendrina Environmental Statement of Intent (ENV/STMT/01), Eskom SHEQ Policy (32-727), Environmental Incident Management Procedure (240-133087117).
Health & Safety
Source: Environmental Evaluation Checklist 2023.pdf (unknown)Method statements for specific activities, copies of procedures and work instructions, approved NEC/PR/Order contract, Emergency Preparedness Plans (e.g., oil/chemical spill, disasters), register of hazardous substances, Safety Data Sheets (SDS), and a copy of the approved Environmental Management Programme are required.
Environmental
Source: Environmental Evaluation Checklist 2023.pdf (unknown)Certified copies of environmental authorisations, permits, and licences (e.g., waste transporter, waste site licence). Signed Site Environmental Representative appointment letter. Register of waste to be generated, Waste Management Plan (method statement). Proof of training for significant activities (e.g., oil spills, herbicide application). After award, the contractor will receive: Waste Management Procedure (ENV/GEN/WI/12), Oil-Spill Cleanup and Rehabilitation Procedure (RA/ENV/110), Oil spill assessment form, Hendrina Environmental Statement of Intent (ENV/STMT/01), Eskom SHEQ Policy (32-727), Environmental Incident Management Procedure (240-133087117).
Section
Source: Environmental Evaluation Checklist 2023.pdf (unknown)Bidders are evaluated on the Environmental Evaluation Checklist. The checklist contains 14 items, each scored 1 point. The minimum weighted average score required to be considered is 80%.
Description
Source: (SDLI) Strategy for Waste Mangement and operation.pdfContract duration: 5 years.
Important Dates
Source: (SDLI) Strategy for Waste Mangement and operation.pdf (TENDER){"closingDate":"01 April 2023"}
Contact Information
Source: (SDLI) Strategy for Waste Mangement and operation.pdf (TENDER)Buyer: Musa Shikwambana, Eskom Hendrina Power Station. No email or phone provided.
Returnable Documents
Source: (SDLI) Strategy for Waste Mangement and operation.pdf (TENDER)B-BBEE sworn affidavit must meet validity requirements: deponent name, ID, designation, enterprise name, ownership percentages, total revenue, financial year end, B-BBEE status level, empowering supplier status. Signed by deponent and Commissioner of Oath on same date. Commissioner must not be an employee of the enterprise.
Evaluation Criteria
Source: (SDLI) Strategy for Waste Mangement and operation.pdf (TENDER)Evaluation split: price and specific goals (B-BBEE). Up to 20 points for specific goals under 80/20 system, or up to 10 points under 90/10 system. B-BBEE points per level: Level 1 gets 20 (80/20) or 10 (90/10); Level 2 gets 18 or 9; Level 3 gets 14 or 6; Level 4 gets 12 or 5; Level 5 gets 8 or 4; Level 6 gets 6 or 3; Level 7 gets 4 or 2; Level 8 gets 2 or 1; Non-compliant gets 0. Bidders who fail to submit B-BBEE documentation will score 0 for specific goals but will not be disqualified; they will only score on price. Objective criteria: Not mandatory but a condition for contract award. Designated sectors: Not applicable. CIDB Skills Development: Not applicable.
Technical Specifications
Source: (SDLI) Strategy for Waste Mangement and operation.pdf (TENDER)Scope: Provision of waste management services and operation of a general waste disposal facility at Hendrina Power Station. Contract duration: 60 months (5 years). No detailed technical specifications provided in this document.
Methodology
Source: (SDLI) Strategy for Waste Mangement and operation.pdfSkills development: Propose skills development for unemployed candidates (excluding Eskom employees and registered learners). Example target: 2 TLB Operators with Matric/Senior Certificate equivalent. Costs borne by tenderer; SETA grants and SARS rebates available. SDL&I penalties: 1.5% of invoice or contract value for non-compliance. Retention: 1.5% of each invoice (excl. VAT) as security, released upon meeting SDL&I obligations.
Pricing Schedule
Source: (SDLI) Strategy for Waste Mangement and operation.pdfPricing must be submitted using the provided Price Schedule. Local procurement content must be separated into local and imported components.
Financial Requirements
Source: (SDLI) Strategy for Waste Mangement and operation.pdf (TENDER)Pricing must be submitted using the Price Schedule included with the tender documents. Local procurement content must be separated into local and imported components; Eskom target is 100% local content. SDL&I performance security: 1.5% of each invoice (excluding VAT) retained as security for SDL&I obligations. Penalties: 1.5% of invoice amount or 1.5% of contract value for failure to meet SDL&I obligations.
Compliance Requirements
Source: (SDLI) Strategy for Waste Mangement and operation.pdf (TENDER)B-BBEE: Valid B-BBEE certificate from SANAS-accredited agency, or sworn affidavit (for EME with turnover ≤ R10m or QSE with turnover ≤ R50m). For trusts, consortia, or joint ventures, a consolidated B-BBEE certificate is required. Proof of ownership/shareholding (preferably CIPC) and certified ID copies of shareholders. Proof of disability if applicable. B-BBEE improvement plan must be submitted within 30 days of contract award. Local content: Not a designated sector, so SBD 6.2 is not mandatory. However, bidders must propose local procurement content (target 100%). No CIDB grading or professional registrations required.
B-BBEE Requirements
Source: (SDLI) Strategy for Waste Mangement and operation.pdf (TENDER)B-BBEE improvement plan: Must be submitted within 30 days of contract award. Level 4 must reach Level 3 by end of year 1; Level 5-8 must reach Level 4 by end of year 1 and improve one level each year. Local procurement content: Target 100% local content. Jobs: Propose type and number of jobs created/retained. Skills development: Propose skills development for unemployed candidates.
Health & Safety
Source: (SDLI) Strategy for Waste Mangement and operation.pdfB-BBEE sworn affidavit must meet validity requirements: deponent name, ID, designation (director/owner/member), enterprise name, ownership percentages (black, black female, designated group), total revenue, financial year end, B-BBEE status level, empowering supplier status. Signed by deponent and Commissioner of Oath on same date. Commissioner must not be an employee of the enterprise.
Contractual Terms
Source: (SDLI) Strategy for Waste Mangement and operation.pdf (TENDER)Reporting: Quarterly SDL&I compliance reports using Eskom's Data Collection Template. Eskom reviews within 30 days; if not met, corrective measures required before next report. Failure may invoke retention clauses. SDL&I Implementation Schedule must be completed and returned within 28 days of contract award.
Requirements
Source: (SDLI) Strategy for Waste Mangement and operation.pdf (TENDER)Objective criteria: Not mandatory but a condition for award. Designated sectors: Not applicable (no local content threshold). CIDB Skills Development: Not applicable (no compulsory training).
Section
Source: (SDLI) Strategy for Waste Mangement and operation.pdfEvaluation: B-BBEE status level points as per table (Level 1: 20 points for 80/20 or 10 for 90/10; diminishing to 0 for non-compliant). Bidders without B-BBEE documentation score 0 for specific goals but are not disqualified.
Description
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf (TENDER)Bidders must provide documented information for control of externally provided processes, products, and services, including criteria for evaluation, selection, monitoring, and re-evaluation of external providers, as per ISO 9001:2015 clause 8.4.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf (TENDER)Returnable documents must be completed, signed, and submitted with the bid. The required returnable documents are:
Additional requirements as per scope of work may apply.
Returnable Documents
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf (TENDER)Form A must be completed and signed. Additional requirements as per the scope of work may be listed. The document is a checklist of returnable quality documents.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf (TENDER)Bidders are evaluated on quality management requirements using a scoring checklist (Category 2). The evaluation covers:
Each section has a maximum score; the total is used to evaluate the bidder's quality capability. No price or B-BBEE scoring is mentioned in this document.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf (TENDER)The scope of work is the provision of waste management and operation of a general waste disposal facility at Hendrina Power Station for a period of 60 months. No further technical specifications are provided in this document.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf (TENDER)Bidders must either hold a valid ISO 9001 certification from an accredited body (with relevant scope and expiry date, and the certification body must have recognised international accreditation) or provide a documented quality management system that complies with ISO 9001:2015. Additionally, Form A must be completed and signed. No other compliance requirements (e.g., B-BBEE level, CIDB grading, tax clearance) are mentioned in this document.
Section
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf (TENDER)The evaluation is based on a scoring checklist for quality management requirements:
Scores are assigned per section; the total indicates quality capability.
Description
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)The tender is for the provision of waste management and operation of a general waste disposal facility at Hendrina Power Station for 60 months. The only document provided is an Eskom OHS acknowledgement form, which sets out legal and contractual obligations for contractors.
Evaluation Criteria
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid SARS tax clearance certificate or tax compliance status pin. A valid letter of good standing in terms of the Compensation for Occupational Injuries and Diseases Act (COIDA) is required. Bidders must demonstrate the ability to comply with all applicable OHS legislation and Eskom-specific OHS requirements. Eskom may request testimonials, references, and contact details of clients for whom similar work has been performed.
Technical Specifications
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)The main contractor must manage all subcontractors and suppliers. Requirements include:
Experience & Qualifications
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)Eskom may request copies of testimonials, references, and contact details of clients (including Eskom) for whom the company has done similar work.
Quality Management
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)The contractor must:
Compliance Requirements
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)Bidders must:
Health & Safety
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)The contractor must comply with:
Contractual Terms
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)Contractual penalties will be enforced on the main supplier for non-compliances or non-conformances to statutory or any other requirements, particularly Eskom OHS requirements. Eskom reserves the right to verify actions taken on contractors or suppliers.
Description
Source: TENDER TECHNICAL EVALUATION STRATEGY.pdf (unknown)This tender is for the provision of waste management services and the operation of a general waste disposal facility at Hendrina Power Station for 60 months. The power station generates general and hazardous waste daily. The service includes collection, storage, transport, and disposal in compliance with environmental legislation. The technical evaluation strategy defines how bids will be assessed.
Contact Information
Source: TENDER TECHNICAL EVALUATION STRATEGY.pdf (unknown){"name":null,"email":null,"phone":null,"department":"s is stored into 210LT loose lid drums. Once these drums","address":null}
Submission Guidelines
Source: TENDER TECHNICAL EVALUATION STRATEGY.pdf (unknown)Returnable documents must be completed, signed, and submitted with the bid:
Evaluation Criteria
Source: TENDER TECHNICAL EVALUATION STRATEGY.pdf (unknown)Evaluation is two-stage: mandatory compliance, then qualitative scoring.
Mandatory (pass/fail):
Qualitative criteria (100 points total):
Minimum technical threshold: 70% weighted final score to be considered.
Technical Specifications
Source: TENDER TECHNICAL EVALUATION STRATEGY.pdf (unknown)Scope: Provision of waste management and operation of general waste disposal facility at Hendrina Power Station for 60 months.
Daily operations:
Key activities: Recording waste received at landfill; inspecting and monitoring unpermitted waste; daily covering of general waste; maintaining waste slope angles; maintaining inventory of hazardous waste; ensuring proper labeling; monitoring storage duration; safe loading; servicing general waste bins; managing mixed/overflowing waste; cleaning schedule.
Compliance with applicable legislation: National Environmental Management Act, National Environmental Management: Waste Act, GNR 926, 634, 635, 636, OHS Act, National Road Traffic Act.
Experience & Qualifications
Source: TENDER TECHNICAL EVALUATION STRATEGY.pdf (unknown)Key personnel requirements:
Company experience: 3 contracts with completed certificates in waste management and operation of general waste disposal (full points). 2 contracts = 80%; 1 = 40%; none = 0%.
Compliance Requirements
Source: TENDER TECHNICAL EVALUATION STRATEGY.pdf (unknown)Mandatory:
The document references several environmental and safety regulations but does not list CSD, tax clearance, B-BBEE, CIDB, or CIPC requirements. These may be in the main tender document.
Health & Safety
Source: TENDER TECHNICAL EVALUATION STRATEGY.pdf (unknown)The method statement must cover safe handling of hazardous waste, including proper labeling, storage duration limits (90 days), and compliance with OHS Act. The evaluation criteria require monitoring legislative hazardous waste storage duration and safe loading. No separate safety plan is required in this document.
Environmental
Source: TENDER TECHNICAL EVALUATION STRATEGY.pdf (unknown)Bidders must comply with the National Environmental Management Act, National Environmental Management: Waste Act, and associated regulations (GNR 926, 634, 635, 636). The facility operates under a General Waste Disposal Facility License (number 12/9/11/L211215101545/6/R). The method statement must address waste classification, storage, and disposal to landfill standards.
Section
Source: TENDER TECHNICAL EVALUATION STRATEGY.pdf (unknown)Additional evaluation criteria from extended sections: The technical threshold is 70% weighted final score. The TLB machine scoring: own 4x4 TLB (100%), own without 4x4 (80%), lease/rental (40%). The evaluation includes a mandatory criterion: Certificate of Registration for waste transportation.
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Closing date: 2026-09-16 at 10:00 SAST. No briefing or site visit details provided. Any compulsory meetings will be in Tender Data.
Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Only Eskom Representative referenced; no name, email, phone, or address provided. All communication must be in writing to the Eskom Representative.
Submission Guidelines
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Submit via Eskom e-tendering portal or tender box as specified in Tender Data. No specific address or format details provided in document. An original plus one hard copy required if paper submission. Returns must include all mandatory forms and be signed.
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Standard PPPFA evaluation: price and specific goals (90/10 or 80/20 split). Functionality may be evaluated if stated in Tender Data. B-BBEE level scored via CSD or certificate. No specific thresholds or split percentages given for this tender.
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Provision of waste management and operation of general waste disposal facility at Hendrina Power Station for 60 months. No quantities, service levels, or standards stated.
Financial Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Rates and prices must be in ZAR, fixed for contract duration, inclusive of all taxes. No bond, guarantee, or insurance specified. Financial analysis may be conducted on bidder's statements.
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)CSD registration required. B-BBEE certificate/affidavit needed for points or pre-qualification. CIDB registration may be required if stated in Tender Data. SHEQ systems must be in place. Standard forms: SBD 4 (Declaration of Interest), SBD 9 (Certificate of Independent Bid Determination), SDL&I Undertaking.
Important Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Closing date and time: 16 September 2026 at 10:00.
Clarification meeting: 01 September 2026 at 09:00 via Microsoft Teams (non-compulsory). Meeting ID: 318 275 110 125 500, Passcode: Je7ar9bo. Attendance must be confirmed with name, position, and contact details.
Clarification queries deadline: 5 working days before tender submission (09 September 2026 at 10:00).
Tender validity period: 120 days from closing date.
Briefing Session
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Non-compulsory clarification meeting on 01 September 2026 at 09:00 via Microsoft Teams. Meeting ID: 318 275 110 125 500, Passcode: Je7ar9bo. Tenderers must confirm attendance with name, position, and contact details of each attendee.
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Eskom Representative (queries): Musa Shikwambana, Tel: 013 296 3896, Email: [email protected].
Fraud reporting: 0800 11 2722 / [email protected].
Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Submission method: Electronically via Eskom E-tendering site (TenderBulletin) by 16 September 2026 at 10:00. No hard copies, no zip files. Upload documents under Technical, Commercial, Financial, and Other folders. Resubmission nullifies previous version; ensure submission status shows complete.
Returnable forms (disqualifiable if missing or unsigned):
Non-disqualifiable returnables (must be submitted; if missing, Eskom requests within 5 working days):
Evaluation-only returnables (missing = 0 points):
Disqualification risks:
Returnable Documents
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Submit electronic copy in PDF format; price list in PDF and Excel. Upload under Technical, Commercial, Financial, and Other folders. No zip files, no hard copies. Resubmission nullifies previous. Returnables categorized as disqualifiable (*), non-disqualifiable (**), and evaluation-only (#). List includes: Authorisation Form (Annexure A), Acknowledgement Form (B), Tenderer's Particulars (C), Integrity Pact Declaration (D), CPA for local goods/services (E), CPA for foreign goods/services (F), SBD 6.2 (G1-G4), SBD 1 (H), SBD 6.1 (I), SBD 4 (J), Tax Evaluation questionnaire (K), E-tendering Help Manual acknowledgement, Scope of Work (L), NEC or other Contract (M), Pricing Schedule (M), JV documents, Specific Goals proof, Tax Clearance certificates, Employment Equity compliance, CIDB grading (if applicable), Safety documents (COIDA, OHS plan, BRA, Letter of Good Standing, OHS policy, OHS competency - see Annexure Q), Quality documents (Category 2 - see Annexure R), Environmental documents (EMS file, ISO14001, EMP, permits, licences, appointment letter, method statements, procedures, emergency plans, hazardous substances register, SDS, waste management plan, training proof - see Annexure S), Due diligence financial statements, Functionality/Technical documents.
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Evaluation follows a two-stage process:
Criteria and weights:
Total 100%. Tenderers scoring below threshold are not evaluated further.
Ranking: combined price and specific goals scores, highest to lowest.
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Scope: Provision of waste management and operation of a general waste disposal facility at Hendrina Power Station for 60 months.
Mandatory technical requirement: Certificate of Registration for waste transportation under NEM:WA section 25.
Qualitative technical evaluation criteria (functionality):
Methodology
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)A detailed Method Statement (procedure for waste management and landfill site operation) is required as part of functionality evaluation (20% weight). The procedure must cover:
Scoring: 100% for full coverage, 80% for partial, 40% for not covering all sections, 0% for no submission.
Experience & Qualifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Resources Experience (35% of functionality):
Company Previous Experience (25%): Previous contracts on waste management and operation of general waste disposal facility. Scoring: 3 contracts with completed certificates = 100%, 2 = 80%, 1 = 40%, none = 0%.
Quality Management
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Category 2 Quality Requirements – see Annexure R for full details. Quality documents are part of contractual requirements (not evaluation criteria).
Pricing Schedule
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Pricing Schedule/BOQ must be submitted in PDF and Excel (Annexure M, if not contained in the NEC Contract). The pricing schedule is part of the NEC3 TSC option A (priced contract with price list). Cataloguing, if required, must be quoted separately. Price evaluation: inclusive of VAT, corrected for arithmetic errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered.
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Pricing format: Priced contract with price list (NEC3 TSC option A). Pricing Schedule must be submitted in PDF and Excel.
Performance security: Performance bond or demand guarantee from an Eskom-approved financial institution; tenderer must select at least two such institutions.
Payment terms: Eskom pays within 30 days for contracts below R50 million (incl. VAT) and within 60 days for contracts above R50 million.
Tender prices: Not read out. Evaluated inclusive of VAT, corrected for arithmetic errors, excluding contingencies, adjusted for variations; unconditional discounts considered.
No alternative tenders allowed.
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)CSD registration: Proof of valid and current CSD number (MAA...) required.
Tax compliance: Local tenderers must provide SARS e-filing PIN or CSD profile; foreign tenderers with SA footprint must provide certified tax clearance certificate; foreign suppliers with no SA footprint complete SBD 1 only.
B-BBEE: Specific Goals scored out of 20 points. B-BBEE status level proof required (certificate, sworn affidavit, or other prescribed form).
Employment Equity: Designated employers must submit proof of compliance with Employment Equity Act (South African tenderers only).
COIDA: Original certificate of good standing or proof of application (South African tenderers only).
Waste transportation: Certificate of Registration under NEM:WA section 25 (mandatory technical).
No CIDB grading required.
Returnable forms: SBD 1, SBD 4, SBD 6.1, SBD 6.2 (if applicable), Authorisation Form, Integrity Declaration, etc. (see submission guidelines).
B-BBEE Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Specific Goals scored out of 20 points under PPPFA. Failure to submit evidence results in 0 points for that goal but not disqualification. B-BBEE status level contributor defined as certificate from authorized body, sworn affidavit, or other prescribed requirement.
Health & Safety
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Safety returnables required (see Annexure Q for full details):
These are contractual requirements, not evaluation criteria.
Environmental
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Environmental returnables required (see Annexure S for full details):
These are contractual requirements, not evaluation criteria.
Contractual Terms
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Conditions of contract: NEC3 TSC with option A (priced contract with price list). Dispute resolution: W1. Secondary options: X1 (price adjustment for inflation), X2 (changes in law), X17 (low service damages), X18 (limitation of liability), X19 (Task Order), X20 (Key Performance Indicators), Z (additional conditions).
Security: Tenderer must provide a performance bond or demand guarantee from at least two Eskom-approved financial institutions.
Alternative tenders: Not allowed.
Cataloguing: Successful tenderer may be required to provide cataloguing information post-award.
Special Conditions
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Tender validity period: 120 days from closing date. Closing date: 16 September 2026 at 10:00. Issue date: 25 August 2026. Eskom payment terms: 30 days for contracts below R50 million (incl. VAT), 60 days for above R50 million. Eskom reserves right to negotiate with preferred bidders if prices not market related. Main contractors discouraged from subcontracting with subsidiaries; if done, must declare. Tenderers must continuously check the advert on Eskom Tender Bulletin.
Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Eligibility: Tenderers must not be restricted from doing business with Eskom or State-Owned Companies. Ineligible if: on international sanctions list, submit multiple tenders, JV without joint and several liability, conflict of interest, signed by unauthorized person, restricted by National Treasury, on Tender Defaulters list, or subcontract 100% of scope.
Basic compliance: meet eligibility, submit complete tender (commercial, financial, technical), submit mandatory returnables, provide CSD number.
Mandatory contractual requirements (must be met before award): proof of CSD registration, NEC, Price Schedule, all annexures, SHEQ requirements, financial viability, SDL&I targets (CSI=1% of contract value).
Due diligence: latest approved annual financial statements (background, director's report, auditor's report, statements, notes, public interest score, ITA34C for non-audited entities).
Section
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Waste Management.pdf (RFP)Functionality requirements applicable with criteria: Previous experience Resources (35%), Company Previous experience (25%), Method Statement (20%), Resources Capability (20%). Threshold: overall weighted score of 70% to qualify; if no tenderer achieves 70%, threshold may be reduced to 60%. Price evaluated out of 80 points: inclusive of VAT, corrected for arithmetic errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered. Specific Goals scored out of 20 points. Ranking by adding price and specific goals scores.
Description
Source: NEC WASTE MANAGEMENT.docThe contractor is required to provide waste management services and operate the general waste disposal facility at Hendrina Power Station for 60 months. The service includes management of the landfill site, waste collection and disposal at the power station and Eskom-owned flats, and compliance with relevant regulations and licence conditions.
Contact Information
Source: NEC WASTE MANAGEMENT.doc (unknown)Service Manager: Sindiso Rapudi, Tel: 296 3139, Email: [email protected]. Address: 1 Impala Street, Pullenshope, 1096.
Submission Guidelines
Source: NEC WASTE MANAGEMENT.doc (unknown)Bidders must submit the completed and signed Form of Offer and Acceptance together with the Pricing Data (Part C2) and Scope of Work (Part C3). Any Schedule of Deviations must be attached. The closing time is 10:00 on 16 September 2026. Submissions must be delivered to: Eskom Holdings SOC Ltd, Hendrina Power Station, Impala Street, Pullenshope, Private Bag X1003, Pullenshope, 1096.
Evaluation Criteria
Source: NEC WASTE MANAGEMENT.doc (unknown)The document does not state a formal scoring split or minimum qualifying scores. Bidders must maintain or improve their B-BBEE level from contract award. All materials and services must be sourced locally within South Africa (100% local content). CIDB registration is not applicable. No specific pre-qualification thresholds (e.g., turnover, tax clearance) are stated in the tender.
Technical Specifications
Source: NEC WASTE MANAGEMENT.doc (unknown)The service covers:
Financial Requirements
Source: NEC WASTE MANAGEMENT.doc (unknown)Pricing under NEC3 Option A (priced contract with price list). Items to be priced: 6x Waste administrators (each for 60 months), 2x TLB Operators, Bakkie Driver, Workers transport, 4x4 TLB machine (wet rate hired), 4x4 Bakkie. Payment terms: assessment interval last day of each month; payment within 30 days after receipt of invoice. Interest rate: prime rate charged by Standard Bank. Contract requires 1% CSI contribution of contract value. Penalty of R500 per month if Supplier Development & Localisation obligations not executed after 12 months. Liability for indirect or consequential loss limited to R0.00. Bonds/guarantees to be provided after award as per contract conditions.
Compliance Requirements
Source: NEC WASTE MANAGEMENT.doc (unknown)Contractor must maintain B-BBEE level at award. 100% local sourcing within South Africa. Key personnel: Site Manager with matric and 3 years experience; Safety Officer with NOSA/SAMTRAC; 6 general workers with 2 years waste management experience. Compliance with OHS Act, environmental regulations, asbestos regulations, and Eskom SHEQ standards. Insurance as per Insurance Table A (contractor) and Table B (employer).
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
01 IMPALA ROAD - PULLENSHOPE, HENDRINA POWER STATION - MIDDELBURG - 1096
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
15
Last checked
26 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.