Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
45 Commissioner Street - Marshalltown - Johannesburg - 2107
Organization Type
GOVERNMENT
Published
04 Sept 2026
OCDS Reference
ocds-9t57fa-167668
This tender is for the supply, delivery, installation, commissioning and maintenance of multi-modality imaging equipment, including computed radiography (cr), c-arm / fluoroscopy systems, and mri, to the department of health. Bidders must comply with the detailed technical specifications for each item, and each item is scored with minimum thresholds (deducted from the specifications) to qualify for the next evaluation stage.
This is ONE contiguous memo. Please note: The tuner’s CV must not include the words. Please ensure that the above specification is strictly adhered to in the final bid document.
Date & Time
Friday, 25 September 2026 - 11:00
Venue
null
Tender enquiries [email protected]/ [email protected]
Categories
Request for Bid(Open-Tender)
45 Commissioner Street - Marshalltown - Johannesburg - 2107
AI Document Analysis Stages
Description
Source: GT GDH 020 2026 - Section 1A.pdf (TENDER)04 Sept
2026
Tender Published
Tender was published
25 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure B. Pricing Schedule GT.GDH.020.2026.xlsx
Analysis completed but response format was invalid
GT GDH 020 2026 - Section 1A.pdf
A three-year term contract for the supply, delivery, installation, commissioning and maintenance of general and specialised radiography imaging equipment at various Gauteng health institutions, issued by the Gauteng Department of Health.
GT GDH 020 2026 - Section 2.pdf
No summary available
Annexure A- General Specialised Radiography Equipment GT.GDH.020.2026.xlsx
Gauteng Department of Health is procuring the supply, delivery, installation, commissioning and maintenance of general and specialised radiography imaging equipment for various health institutions over three years. The tender covers ten equipment categories, each with detailed technical specifications and minimum threshold scores for qualification.
To download these documents and access AI-powered analysis, visit the main tender page.
Find Department of Health tenders with AI Discovery, SAHPRA compliance, and intelligence for pharmaceutical and medical services.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 625 873
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
TENDER SPECIFICATION FOR GT/GDH/020/2026: THE SUPPLY, DELIVERY, INSTALLATION, COMMISSIONING AND MAINTENANCE OF GENERAL AND SPECIALISED RADIOGRAPHY IMAGING EQUIPMENT AT VARIOUS GAUTENG HEALTH INSTITUTIONS FOR A PERIOD OF THREE YEARS. Various institutions of Gauteng Department of Health perform invasive and non-invasive procedures requiring general and specialised radiography imaging equipment.
Important Dates
Source: GT GDH 020 2026 - Section 1A.pdf (TENDER){"closingDate":"25 SEPTEMBER 2026","closingTime":"11H00","briefingSession":"{"date":"25 SEPTEMBER 2026","time":"11H00","venue":"N/A DATE N/A TIME N/A","is_compulsory":true}"}
Contact Information
Source: GT GDH 020 2026 - Section 1A.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"of Health","address":null}
Submission Guidelines
Source: GT GDH 020 2026 - Section 1A.pdf (TENDER)Returnable Documents: 2. SBD 4: Bidder’s Disclosure, Annexure-B for pricing schedule and, SBD 6.1 for Price and Specific Goals Preference Point claim, Enterprise which are CSD/BEE/CIPC and registration, located in Gauteng valid lease agreement, signed by both, Province. NB: The lease agreement must be
Evaluation Criteria
Source: GT GDH 020 2026 - Section 1A.pdf (TENDER)Bidders must submit a duly completed and signed SBD 1 and SBD 4, a valid SAHPRA licence/certificate, product brochures and technical data sheets, a commitment letter (if not the manufacturer), a valid tax compliance status PIN from SARS, and be registered on the Central Supplier Database (CSD) with a MAAA number. Bidders must also submit a signed Integrity Pact for Businesses. Bidders who fail any mandatory requirement will be disqualified. Bidders must achieve a minimum functionality score of 30 out of 60 points. Joint ventures/consortia must submit a valid joint venture or consortia agreement. Bidders must submit a certified copy of a valid lease agreement or municipal bill not older than three months. Bids from persons in the service of the state, or companies with directors who are state employees, will not be considered.
Technical Specifications
Source: GT GDH 020 2026 - Section 1A.pdf (TENDER)No:
A valid copy of the Licence/certificate of compliance as proof of registration with National
Department of Health / South African Health Product Regulatory Authority (SAHPRA)
Radiation Control Directorate that the bidder is the supplier of medical electronic devices.
NB: The department reserves a right to verify validity of the SAHPRA
licence/certificate submitted. Should it be discovered that the information submitted
is misrepresented or misleading, the bid will be disqualified.
Submission of a valid signed Joint venture agreement or consortia agreement in case of
joint venture/consortium. Only applicable to joint ventures.
Product Brochure and Technical Data Sheets:
Bidders must submit fully comprehensive copy of product brochures from the Original
technical data sheets that has the technical specifications of the items tendered together
with the bid documents.
Valid Commitment letter:
If the bidder is a manufacturer (not sourcing products from another company), a
commitment letter on the letterhead stating that products will be produced and distributed
from own facility should be attached (the letter must be signed);
or
If the bidder is not the original product manufacturer, a commitment letter on the
letterhead of original product manufacturer, reseller or wholesale supplier that authorises
the bidder to resell the product must be submitted with the bid documents (the letter must
be signed).
of 19
GT/GDH/020/2026 SECTION 1 - ISSUE DATE: 19/05/2026 of 119
Tender specification for GT/GDH/020/2026: the supply, delivery, installation, commissioning
And maintenance of general and specialised radiography imaging equipment at various
Gauteng health institutions for a period of three years
If a bidder does not meet all the requirements as stated above, the bid will be disqualified.
Stage 1b: functionality evaluation responsiveness
Only bidders who have complied with mandatory requirements, (Stage 1A) will be evaluated for
functionality. During this phase bidders’ responses will be evaluated for functionality based on
achieving a minimum threshold point of 30 out of total points of 60 for functionality. Bidders who
fail to achieve the minimum threshold will be disqualified.
The Bid Evaluation Committee (BEC) responsible for scoring the bids will evaluate and score all
bids based on their submission and information provided against the following criteria:
Note: Bidders must, as part of the bid documents, submit supporting documents for all
functional requirements, as indicated here under.
Table 3: Functionality Evaluation
No. Criteria Description Scoring Weight
1 Track Record Bidders to provide testimonial Submitted evidence will 30
letters on the client’s official be scored as follows:
letterhead, signed and dated
a. 3 letters or more from the public or private
letters = 30 points sector where product(s)
b. 2 letters = 20 points were/are used. The letter
c. 1 letter = 15 points should have the contact
d. No letter submitted = 0 details of the client who uses
points medical equipment.
2 Company Bidder to provide signed and Submitted evidence will 30
Experience dated previous contractual be scored as follows:
proof / agreement / award
a. 3 years = 30 points letter/s indicating the
b. 2 years = 20 points description and the period as
c. 1 year = 15 points evidence of years of
d. Less than a year and experience in supplying
No proof = 0 point medical equipment.
Total Points: 60
Threshold Points 30
If a bidder does not meet the minimum threshold as stated above the bid will be
disqualified and not considered for further evaluation.
of 19
GT/GDH/020/2026 SECTION 1 - ISSUE DATE: 19/05/2026 of 119
Tender specification for GT/GDH/020/2026: the supply, delivery, installation, commissioning
And maintenance of general and specialised radiography imaging equipment at various
Gauteng health institutions for a period of three years
Stage 1c: technical evaluation
Only bidders who have complied with the functionality Evaluation Stage 1B will be evaluated for
the Technical Evaluation.
Bidders must observe and refer to the tender specifications, namely; the supply, delivery,
installation, commissioning and maintenance of general and specialised radiography imaging
equipment at various Gauteng Health institutions for a period of three years. Bidders may bid for
one or all the listed items. See attached Annexure A.
a. The Product Specification in MS Excel format that is attached (Annexure-A) must be
completed and submitted in its original format.
b. Bidders will score a weighting of ‘2’ or ‘1’ depending on the weighting requirement per line
item. Where a bid is non-compliant with the specification/s of that line item the bid will be
scored ‘0’.
c. The scoring of the bids:
i. Each specification will have a weight of 1, or 2, which indicates the level of importance, as
follows:
ii. A specification (line item) with a weight of 2 is a specification with a very high level of
impotency that should be complied with.
iii. A specification (line item) with a 1 weight is a specification with a standard level of
importance.
d. Bidders are required to indicate compliance/non-compliance with the specification by typing
'YES/NO/Not applicable' on each line item on column D.
e. In the case where a bidder indicated ‘No/Not Applicable’ and an equivalent or better option is
provided, bidders must type ‘Yes’ on relevant column E. Details of the equivalent/better
option must be provided on column relevant column F. Bidders must note that where an
equivalent or better option is provided, an equivalent weighting will be allocated as per the
scoring on the line item.
f. For each line item, bidders must provide a reference to the corresponding brochure/
technical data sheet or any other supporting documentation. Bidder to indicate the exact
page number where the specification can be found in Column G of Annexure A.
g. Bidders must score a minimum threshold out of the total points to qualify for the next stage of
evaluation. Refer to annexure A for minimum threshold per item.
If a bidder does not meet the required minimum threshold, the bid will be disqualified.
(Bidders must refer to Annexure-A).
of 19
GT/GDH/020/2026 SECTION 1 - ISSUE DATE: 19/05/2026 of 119
Tender specification for GT/GDH/020/2026: the supply, delivery, installation, commissioning
And maintenance of general and specialised radiography imaging equipment at various
Gauteng health institutions for a period of three years
Stage 2: price and preference points evaluation
The bids will be evaluated according to the 80/20 or 90/10 preference point system. The 80/20
system which is applicable to bids with a Rand value of up to R50 million whilst the 90/10 system
is applicable to bids with a Rand Value above R 50 million (all applicable taxes included), where a
maximum of 80 or 90 points will be allocated for price and a maximum of 20 or 10 will be allocated
for specific goals.
To claim points for price and specific goals, bidders are referred to:
SBD 3.2: Non-Firm Prices claims
Annexure-B for pricing schedule and
SBD 6.1 for Price and Specific Goals Preference Point claim
Price and preference point allocation will be distributed as follows:
TABLE 4: Preference point allocation
Preference points and specific goal system points
PRICE 80 or 90
SPECIFIC GOALS 20 or 10
Total points 100
TABLE 5. The maximum points for specific goals are as follows:
Price and specific documentary proof points points
Goal requirements required for 90/10 for 80/20
Enterprise which are CSD/BEE/CIPC and registration
51% owned by documents
previously 5 10
Disadvantaged
individuals
Promotion of enterprises Bidder must submit certified copy of a
located in Gauteng valid lease agreement, signed by both
Province for word to be parties or a municipal bill not older than
done or services to be three months. 5 10
rendered at Gauteng
Province. NB: The lease agreement must be
valid at the advert closing date.
Total points for price and specific goals 100 100
Failure by the bidder not to submit documentation proof required in terms of this tender as
stated in Table 5, bidder will forfeit preference points for specific goals
of 19
GT/GDH/020/2026 SECTION 1 - ISSUE DATE: 19/05/2026 of 119
Tender specification for GT/GDH/020/2026: the supply, delivery, installation, commissioning
And maintenance of general and specialised radiography imaging equipment at various
Gauteng health institutions for a period of three years
8.1. Licenses
8.1.1. All electro-medical devices must be approved and licensed by the Radiation Control
Directorate / SAHPRA. The successful bidders must -
a) Submit a valid copy of the SAHPRA license.
b) Grant licenses and access to third party supplier, as per written agreement at no extra
cost, for connectivity of their systems to the equipment offered, such as PACS or RIS.
c) Grant licenses and access to third party supplier, as per written agreement at no extra
cost, for connectivity of their systems to the replacement (loan) equipment, new
software (for example PACS / RIS / HIS)
d) Submit the installation and user license application form (RC Dealer Form) of the
equipment to Radiation Control Directorate.
e) The import / product licence must be registered under the bidders’ name or a letter
of joint venture must be submitted by the license holder where the license is not in
the name of the bidder. Authorisation must be obtained from the OEM.
f) State all the same or other similar products installed and the reference sites where
such equipment is currently in operation in RSA or elsewhere.
8.2. Acceptance Tests
The successful bidder:
a) Must perform the Acceptance Tests within seven (7) days after installation.
b) Must submit the acceptance test results to Radiation Control Directorate / SAHPRA to
obtain approval for functionality/clinical use of the unit by the user within fourteen (14)
days after performing the acceptance tests.
8.3. Building alterations and installation
8.3.1. The bidder is expected:
a) To quote for all building alterations, where applicable.
b) Inspect the site in order to quote for any building alterations that need to be made to
accommodate the equipment tendered for. A building plan should be presented to the
GDoH infrastructure management unit at Head Office who will in turn obtain the
necessary approvals prior to commencement of actual work.
c) Any building alteration works rates will be negotiated with the client (end-user)
before the creation of the purchase order. Such rates must be market related and
be in-line with the current market rates at the time of quotation request.
d) Provide all the building alteration in accordance with the approved specifications by
GDoH infrastructure management (air conditioning, electrical, mechanical and plumbing
alterations and upgrades).
e) Should there be existing equipment in the X-Ray room, the successful bidder must in
consultation with the Asset Management Unit at the Health institution, remove it for
official disposal in line with stipulated Radiation Control Directorate. Please note that the
existing equipment remains the property of the Gauteng Department of Health until the
disposal process is completed.
f) The successful bidder must provide room alteration, equipment and electrical drawings
layout in brochure form and electronic format.
of 19
GT/GDH/020/2026 SECTION 1 - ISSUE DATE: 19/05/2026 of 119
Tender specification for GT/GDH/020/2026: the supply, delivery, installation, commissioning
And maintenance of general and specialised radiography imaging equipment at various
Gauteng health institutions for a period of three years
8.3.2. Specify the following on the quotation for building alterations:
a) Construction alterations.
b) Air conditioning, where applicable (specify), as follows:
i) Include any air conditioning that is considered necessary for optimal functioning of
the unit (This require more than one air conditioner).
ii) All air conditioners must be covered for the duration of the warranty and maintenance
period of the contract.
iii) The air conditioner size must be adequate for ventilation for the equipment.
c) Mechanical and plumbing alterations, where applicable (must be specified).
d) Include any other related work (installation of cabinets and other related works).
8.3.3. Complete the following within 6-12 weeks after receiving purchase order:
a) The delivery of the equipment to the institution.
b) The finalization of the building alterations.
c) Communicate the time required for installation and commissioning from the date of
delivery of the equipment to the institution.
d) Conduct a pre-installation survey and notify the health institution with
recommendations of any gaps affecting the installation of the equipment.
e) Communicate the total time required from the placement of the order to the
commissioning of the equipment.
f) Communicate any delays in the installation in writing to the relevant institution and there
should be an agreement in writing.
g) Ensure availability of staff for consultation and to attend installation planning meetings
throughout the entire installation process of the system.
8.3.4. Electrical power supply:
8.3.4.1. The successful bidder must -
a) Verify that adequate electrical power supply is available for the optimal functionality of
the equipment.
b) If electrical power supply is found to not be adequate, then an upgrade that meets our
Certificate of Compliance must be provided by the bidder.
c) The equipment tendered for must not overload and trip the Hospital power in the area
where it is installed.
d) The mains cable of the unit tendered for must be SABS color coded.
e) The plugs must be surge protected.
f) Provide UPS systems and battery replacement to support all electrical hardware covered
in the warranty and maintenance period.
8.4. Radiation Protection
8.4.1. The successful bidder must -
a) All items procured must be provided with relevant Quality Control Test Tools (Phantom,
copper plates, cylinder and other related tools) for basic testing of the applicable
systems (where required).
b) Radiation protection shielding to be done in accordance with SAHPRA regulatory
standards.
c) A hard copy as well as an electronic soft copy of the Operator Manual and Quality
Assurance Manual must be provided.
of 19
Methodology
Source: GT GDH 020 2026 - Section 1A.pdfEVALUATION of 3 METHODOLOGY PROCESS
EVALUATION of 3 METHODOLOGY PROCESS
Stage 2
Criteria for price and preference points (specific goals) points
Bid Price 80 or 90
Preference Points (Specific Goals) 20 or 10
Total 100
EVALUATION of 3 METHODOLOGY PROCESS
Experience & Qualifications
Source: GT GDH 020 2026 - Section 1A.pdf/ award letter/s indicating the description and the period as evidence of
years of experience in supplying medical equipment.
Part 3 Section 2: Financial Proposal of the tender.
1 Track Record Bidders to provide testimonial Submitted evidence will 30
letters on the client’s official be scored as follows:
letterhead, signed and dated
a. 3 letters or more from the public or private
letters = 30 points sector where product(s)
b. 2 letters = 20 points were/are used. The letter
c. 1 letter = 15 points should have the contact
d. No letter submitted = 0 details of the client who uses
points medical equipment.
2 Company Bidder to provide signed and Submitted evidence will 30
proof / agreement / award
a. 3 years = 30 points letter/s indicating the
b. 2 years = 20 points description and the period as
c. 1 year = 15 points evidence of years of
d. Less than a year and experience in supplying
No proof = 0 point medical equipment.
Total Points: 60
Threshold Points 30
Quality Management
Source: GT GDH 020 2026 - Section 1A.pdfrequired to submit pre-production samples to the South African Bureau of Standards
(SABS) or such testing authority as designated at the request of the relevant
costs associated with the inspections / tests will be for the account of the relevant
production samples, but requires corrections / improvements, the costs of the
inspections / tests must be paid by the successful bidder and samples which are
acceptable in all respects must then reach the SABS or such testing authority as
designated within twenty-one (21) days of the date on which the findings of the SABS or
such testing authority as designated were received by the successful bidder. Failure to
deliver samples within the specified time and to the required standards may lead to the
cancellation of the intended contract.
B-BBEE: Broad Based Black Economic Empowerment
BEC: Bid Evaluation Committee
BSC: Bid Specification Committee
CMPR: Curved Multi Planar Reconstruction
DICOM: Digital Imaging and Communication in Medicine
DSV: Diameter Spherical Volume
GCC: General Conditions of Contract
GDoH: Gauteng Department of Health
GPG: Gauteng Provincial Government
GPT: Gauteng Provincial Treasury
HIS: Hospital Information System
MINIP: Maximum and Minimum Intensity Projections
MPR: Multi Planar Reconstruction
MRI: Magnetic Resonance Imaging
PACS: Picture Archiving and Communication System
PCB: Printed Circuit Board
POPIA: Protection of Personal Information Act
PPPFA: Preferential Procurement Policy Framework Act
QC: Quality Control
RFP: Request for Proposal
RIS: Radiology Information System
ROI: Region of interest
SABS: South African Bureau of Standards
SAHPRA: South African Health Product Regulatory Authority
SANAS: South African National Accreditation System
SANS: South African National Standards
SCC: Special Conditions of Contract
UPS: Uninterruptible Power Supply
VAT: Value- Added Tax
VRMS: Volume Root-Mean Square
of 19
GT/GDH/020/2026 SECTION 1 - ISSUE DATE: 19/05/2026 of 119
Tender specification for GT/GDH/020/2026: the supply, delivery, installation, commissioning
c) The equipment tendered for must not overload and trip the Hospital power in the area
where it is installed.
d) The mains cable of the unit tendered for must be SABS color coded.
e) The plugs must be surge protected.
f) Provide UPS systems and battery replacement to support all electrical hardware covered
in the warranty and maintenance period.
8.4. Radiation Protection
8.4.1. The successful bidder must -
a) All items procured must be provided with relevant Quality Control Test Tools (Phantom,
copper plates, cylinder and other related tools) for basic testing of the applicable
systems (where required).
b) Radiation protection shielding to be done in accordance with SAHPRA regulatory
standards.
c) A hard copy as well as an electronic soft copy of the Operator Manual and Quality
Pricing Schedule
Source: GT GDH 020 2026 - Section 1A.pdfSBD 5 (National Industrial Participation Programme Form) will only be added to the
INVITATION TO BID pack when an imported component in excess of US $ 10 million is
expected.
6 A separate SBD 3.1, SBD 3.2 or SBD 3.3 form (PRICING SCHEDULE per item) shall be
completed in respect of each item. Photocopies of this form may be prepared and used
or additional copies, (if required) are obtainable from the relevant Department or
Institution advertising this BID (not applicable for PANEL of BIDDERS).
whether delivery periods and prices will remain firm for the duration of any contract,
which may result from this BID, by completing SBD 3.1 (PRICING SCHEDULE per item)
(not applicable for PANEL of BIDDERS).
8 If non-firm prices are offered bidders must ensure that a separate SBD 3.2 (Non-Firm
Prices per item) is completed in respect of each item for which a non-firm price is
offered. Photocopies of this form may be prepared and used or additional copies, (if
required) are obtainable from the relevant Department or Institution advertising this BID
(not applicable for PANEL of BIDDERS).
SCM 01 revision:0 2024/09
GT/GDH/020/2026 SECTION 1 - ISSUE DATE: 19/05/2026 of 119
must as per SBD 3.1 or SBD 3.2 (PRICING SCHEDULE per item) submit a Letter of
Supply from the relevant manufacturer or his supplier (not applicable for PANEL of
Bidders).
as in SBD 3.1 or SBD 3.2 (PRICING SCHEDULE per item) (not applicable for PANEL of
Bidders).
information must be supplied by completing the relevant portions of SBD 3.1 (PRICING
SCHEDULE per item) and SBD 3.2 (PRICING SCHEDULE per item) (not applicable for
PANEL of BIDDERS).
15 Unless otherwise indicated, the costs of packaging materials (if applicable) are for the
account of the bidder and must be included in the bid price on the (PRICING
SCHEDULE per item) (not applicable for PANEL of BIDDERS).
16 Delivery basis (not applicable for PANEL of BIDDERS):
a) Supplies which are held in stock or are in transit or on order from South African
manufacturers at the date of offer shall be offered on a basis of delivery into
consignee's store or on his site within the free delivery area of the bidder's centre,
or carriage paid consignee's station, if the goods are required elsewhere.
b) Notwithstanding the provisions of paragraph 16(a), offered prices for supplies in
respect of which installation / erection / assembly is a requirement, shall include
ALL costs on a “delivered on site” basis, as specified on the ( PRICING
SCHEDULE per item).
SCM 01 revision:0 2024/09
GT/GDH/020/2026 SECTION 1 - ISSUE DATE: 19/05/2026 of 119
GT/GDH/020/2026 SECTION 1 - ISSUE DATE: 19/05/2026 of 119
Tender specification for GT/GDH/020/2026: the supply, delivery, installation, commissioning
with the bid document. The price schedule document, referred to as Annexure
B, must be submitted in both hard copy and electronic copy in excel format (not
PDF) which must be captured and saved on a memory stick.
necessary approvals prior to commencement of actual work.
c) Any building alteration works rates will be negotiated with the client (end-user)
before the creation of the purchase order. Such rates must be market related and
be in-line with the current market rates at the time of quotation request.
d) Provide all the building alteration in accordance with the approved specifications by
GDoH infrastructure management (air conditioning, electrical, mechanical and plumbing
alterations and upgrades).
e) Should there be existing equipment in the X-Ray room, the successful bidder must in
consultation with the Asset Management Unit at the Health institution, remove it for
official disposal in line with stipulated Radiation Control Directorate. Please note that the
existing equipment remains the property of the Gauteng Department of Health until the
disposal process is completed.
f) The successful bidder must provide room alteration, equipment and electrical drawings
layout in brochure form and electronic format.
of 19
GT/GDH/020/2026 SECTION 1 - ISSUE DATE: 19/05/2026 of 119
Tender specification for GT/GDH/020/2026: the supply, delivery, installation, commissioning
Financial Requirements
Source: GT GDH 020 2026 - Section 1A.pdf (TENDER)Payment Terms: PAYMENT TERMS
GT/GDH/020/2026 section 1
Compliance Requirements
Source: GT GDH 020 2026 - Section 1A.pdf (TENDER)Tax compliance status system pin code from the south african revenue service (SARS) and
Tax compliance requirements
Tax compliance status (tcs) pin may be made via e-filing through the SARS
Tax Compliance Status (TCS) PIN,
Tcs pin is available but the bidder is registered on the central supplier database
Csd number
Csd number must be provided
Central supplier database
Joint venture agreement or consortia agreement in case of
proof of ownership (CIPC/Shareholder certificate) or a signed
SBD 6.1 for Price and Specific Goals Preference Point claim
Enterprise which are CSD/BEE/CIPC and registration
located in Gauteng valid lease agreement, signed by both
Province. NB: The lease agreement must be
2.3 Application for tax compliance status (tcs) pin may be made via e-filing through the SARS
Submit a separate tcs certificate / pin / csd number.
2.6 Where NO tcs pin is available but the bidder is registered on the central supplier database
(Csd), a csd number must be provided.
VAT registration
B-BBEE Details: 1.ENTERPRISE which are 51%owned by previous disadvantaged individuals 10 or 5
2.Promotion of enterprises located in Gauteng Province for word to be done or services to be rendered at Gauteng Province. 10 or 5
*It is the responsibility of the bidder to complete the relevant form (SBD 6.1) and
submit it with this BID to the relevant office to qualify for the preference points.
SCM 05 Revision:1 2024/11
GT/GDH/020/2026 SECTION 1 - ISSUE DATE: 19/05/2026 of 119
Provincial supply chain
Management
EVALUATION of 3 METHODOLOGY PROCESS
Bidders job creation analysis
Date Company Name Established
SA Permanent Temp Other Comments Citizens
Staff compliment at
Establishment of
Enterprise
Current staff
compliment
Number of jobs to
be created if Bid is
successful
The successful bidder may be audited during the course of the contract to verify the above
information.
Comments to include:
(Net Job Creation)
NOTE: Job Creation should adhere to all applicable RSA Legislation and Regulations.
This section is for office use only
Observations Initial Job Job 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter
Count Creation
Potential
Year 1
Year 2
Year 3
Year 4
Year 5
SCM 05 Revision:1 2024/11
GT/GDH/020/2026 SECTION 1 - ISSUE DATE: 19/05/2026 of 119
Tender specification for GT/GDH/020/2026: the supply, delivery, installation, commissioning
And maintenance of general and specialised radiography imaging equipment at various
Gauteng health institutions for a period of three years
Table of content
Copyright
The purpose
Health & Safety
Source: GT GDH 020 2026 - Section 1A.pdfbe furnished in a specific manner. Any additional particulars shall be furnished in a
separate annexure.
Prosecuting Authority (NPA) for criminal investigation and or may be restricted
from conducting business with the public sector for a period not exceeding ten
(10) years in terms of the Prevention and Combating of Corrupt Activities Act No
or any other applicable legislation.
I CERTIFY THAT THE INFORMATION FURNISHED IN PARAGRAPHS 1, 2 and
Conditions of Contract (GCC), as issued by National Treasury in accordance with Treasury
Regulation 16A published in terms of the Public Finance Management Act, . The
general conditions are available on the National Treasury website (www.treasury.gov.za).
4.2. The Special Conditions of Contract (SCC):
g. Gauteng Finance Management Supplementary Amendment Act
h. Protection of Information Act
i. Promotion of Access to Information Act
j. Promotion of Administrative Justice Act
k. Occupational Health and Safety Act
l. Hazardous Substance Act
m. National Health Act
n. Health Professions Act
o. Protection of Personal Information Act
4.4. Applicable National Quality Standards
technical data sheets that includes the technical specifications of the items
tendered for with the bid documents. Bidders that do not submit, will be
disqualified.
technical data sheets that has the technical specifications of the items tendered together
with the bid documents.
Stage 1c: technical evaluation
Only bidders who have complied with the functionality Evaluation Stage 1B will be evaluated for
the Technical Evaluation.
Bidders must observe and refer to the tender specifications, namely; the supply, delivery,
installation, commissioning and maintenance of general and specialised radiography imaging
equipment at various Gauteng Health institutions for a period of three years. Bidders may bid for
one or all the listed items. See attached Annexure A.
a. The Product Specification in MS Excel format that is attached (Annexure-A) must be
completed and submitted in its original format.
b. Bidders will score a weighting of ‘2’ or ‘1’ depending on the weighting requirement per line
item. Where a bid is non-compliant with the specification/s of that line item the bid will be
scored ‘0’.
c. The scoring of the bids:
i. Each specification will have a weight of 1, or 2, which indicates the level of importance, as
follows:
ii. A specification (line item) with a weight of 2 is a specification with a very high level of
impotency that should be complied with.
iii. A specification (line item) with a 1 weight is a specification with a standard level of
importance.
d. Bidders are required to indicate compliance/non-compliance with the specification by typing
'YES/NO/Not applicable' on each line item on column D.
e. In the case where a bidder indicated ‘No/Not Applicable’ and an equivalent or better option is
provided, bidders must type ‘Yes’ on relevant column E. Details of the equivalent/better
option must be provided on column relevant column F. Bidders must note that where an
equivalent or better option is provided, an equivalent weighting will be allocated as per the
scoring on the line item.
f. For each line item, bidders must provide a reference to the corresponding brochure/
technical data sheet or any other supporting documentation. Bidder to indicate the exact
page number where the specification can be found in Column G of Annexure A.
g. Bidders must score a minimum threshold out of the total points to qualify for the next stage of
evaluation. Refer to annexure A for minimum threshold per item.
Environmental
Source: GT GDH 020 2026 - Section 1A.pdfof the Proudly South African Campaign. GPG therefore would like to procure local
products of a high quality, produced through the practise of sound labour relations and
in an environment where high environmental standards are maintained. In terms of the
Contractual Terms
Source: GT GDH 020 2026 - Section 1A.pdfmissing or duplicated. No liability shall be accepted with regards to claims arising from
the fact that pages are missing or duplicated.
8.1. Licenses
8.2. Acceptance Tests
8.3. Building alterations and installation
8.4. Radiation Protection
8.5. Technology
8.6. Manuals and documentation
8.7. Warranty and Maintenance Plan
8.8. Commissioning of the equipment
8.9. Decommissioning of Existing Equipment (where applicable)
8.10. User and Technical Training
8.3.2. Specify the following on the quotation for building alterations:
a) Construction alterations.
b) Air conditioning, where applicable (specify), as follows:
i) Include any air conditioning that is considered necessary for optimal functioning of
the unit (This require more than one air conditioner).
ii) All air conditioners must be covered for the duration of the warranty and maintenance
period of the contract.
iii) The air conditioner size must be adequate for ventilation for the equipment.
c) Mechanical and plumbing alterations, where applicable (must be specified).
d) Include any other related work (installation of cabinets and other related works).
8.3.3. Complete the following within 6-12 weeks after receiving purchase order:
a) The delivery of the equipment to the institution.
b) The finalization of the building alterations.
c) Communicate the time required for installation and commissioning from the date of
delivery of the equipment to the institution.
d) Conduct a pre-installation survey and notify the health institution with
recommendations of any gaps affecting the installation of the equipment.
e) Communicate the total time required from the placement of the order to the
commissioning of the equipment.
f) Communicate any delays in the installation in writing to the relevant institution and there
should be an agreement in writing.
g) Ensure availability of staff for consultation and to attend installation planning meetings
throughout the entire installation process of the system.
8.3.4. Electrical power supply:
8.3.4.1. The successful bidder must -
a) Verify that adequate electrical power supply is available for the optimal functionality of
the equipment.
b) If electrical power supply is found to not be adequate, then an upgrade that meets our
Special Conditions
Source: GT GDH 020 2026 - Section 1A.pdf (TENDER)The Special Conditions of Contract are supplementary to that of the General Conditions of Contract. Where the Special Conditions of Contract conflict with the General Conditions of Contract, the Special Conditions shall prevail. If any of the conditions on the BID forms are in conflict with any special conditions, the special conditions shall prevail. Copies of these conditions are obtainable from any office of the Gauteng Provincial Government.
Requirements
Source: GT GDH 020 2026 - Section 1A.pdf (TENDER)Bidders must complete Compulsory Documents and attach them to their Bid Document. Bidders must submit a valid signed Joint venture agreement or consortia agreement in case of joint ventures. Bidders must submit a letter from the Equipment Manufacturer (OEM) or from the bidding company including a copy of the relevant authorization. Bidders must submit certified copy of a valid lease agreement, signed by both parties or a municipal bill not older than three months. Bidders must submit proof of ownership (CIPC/Shareholder certificate) or a signed resolution if signing on behalf of the company. Bidders must submit SAHPRA registration certificates or letters of exemption. Bidders must submit supporting documents for all functionality claims.
Section
Source: GT GDH 020 2026 - Section 1A.pdf (TENDER)The evaluation of the bids will be done in accordance with the requirements of the Preferential Procurement Policy Framework Act (Act), the Preferential Procurement Regulations of 2022, GDoH Preferential Procurement Policy and the SCM policy in two stages: Stage 1: Functionality evaluation - bids will be evaluated based on their submission and information provided against the following criteria: 2 years = 20 points description and the period as stated. If a bidder does not meet the minimum threshold as stated above the bid will be disqualified. 'YES/NO/Not applicable' on each line item on column D. If a bidder does not meet the required minimum threshold, the bid will be disqualified. Stage 2: Price and Preference Points Evaluation - The bids will be evaluated according to the 80/20 or 90/10 preference point system. A maximum of 80 or 90 points will be allocated for price and a maximum of 20 or 10 will be allocated for preference points (specific goals). CRITERIA FOR PRICE AND PREFERENCE POINTS (SPECIFIC GOALS): Bid Price 80 or 90, Preference Points (Specific Goals) 20 or 10.
Description
Source: Annexure B. Pricing Schedule GT.GDH.020.2026.xlsxCell A7: REQUEST FOR PROPOSAL - PRICING SCHEDULE:GT/GDH/020/2026 THE SUPPLY, DELIVERY, INSTALLATION, COMMISSIONING AND MAINTENANCE OF GENERAL AND SPECIALISED RADIOGRAPHY IMAGING EQUIPMENT AT VARIOUS GAUTENG HEALTH INSTITUTIONS FOR A PERIOD OF THREE YEARS
Evaluation Criteria
Source: Annexure B. Pricing Schedule GT.GDH.020.2026.xlsx (unknown)Unable to extract eligibility criteria
Technical Specifications
Source: Annexure B. Pricing Schedule GT.GDH.020.2026.xlsx (unknown)Cell A7: REQUEST FOR PROPOSAL - PRICING SCHEDULE:GT/GDH/020/2026 THE SUPPLY, DELIVERY, INSTALLATION, COMMISSIONING AND MAINTENANCE OF GENERAL AND SPECIALISED RADIOGRAPHY IMAGING EQUIPMENT AT VARIOUS GAUTENG HEALTH INSTITUTIONS FOR A PERIOD OF THREE YEARS
Compliance Requirements
Source: Annexure B. Pricing Schedule GT.GDH.020.2026.xlsx (unknown)No specific requirements found
Description
Source: Annexure A- General Specialised Radiography Equipment GT.GDH.020.2026.xlsxCell B1: GT/GDH/020/2026 THE SUPPLY,DELIVERY,INSTALLATION,COMMISSIONING,AND MAINTANACE OF SPECIALISED RADIOGRAPHY IMAGING EQUIPMENT AT VARIOUS GAUTENG DEPARTMENT OF HEALTH INSTITUTIONS FOR A PERIOD OF THREE YEARS
Evaluation Criteria
Source: Annexure A- General Specialised Radiography Equipment GT.GDH.020.2026.xlsx (unknown)Bidders must complete and submit the tender specification sheets in their original format, indicating compliance for each line item. Bidders must achieve the minimum threshold score for each item they bid on to qualify for the next evaluation stage. Bidders must provide supporting documents (brochures, technical data sheets) with page references for each specification. Bidders must indicate whether they offer equivalent/better options where applicable. No other eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level) are stated in the extracted document content.
Technical Specifications
Source: Annexure A- General Specialised Radiography Equipment GT.GDH.020.2026.xlsx (unknown)Cell B1: GT/GDH/020/2026 THE SUPPLY,DELIVERY,INSTALLATION,COMMISSIONING,AND MAINTANACE OF SPECIALISED RADIOGRAPHY IMAGING EQUIPMENT AT VARIOUS GAUTENG DEPARTMENT OF HEALTH INSTITUTIONS FOR A PERIOD OF THREE YEARS
Contact Information
Source: GT GDH 020 2026 - Section 2.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"SUPPLY CHAIN MANAGEMENT","address":"must always be the"}
Submission Guidelines
Source: GT GDH 020 2026 - Section 2.pdf (TENDER)Submit the completed tender documents, including all required forms and pricing schedules, in a sealed envelope marked with the tender number and closing date. The closing time is not specified in the available text; confirm the exact time from the full tender document. Bids must remain valid for the period stated in the tender documents. No late, faxed, or emailed tenders will be accepted unless expressly permitted.
Evaluation Criteria
Source: GT GDH 020 2026 - Section 2.pdf (TENDER)Tenders will be evaluated on price and preference points. The 80/20 or 90/10 preference point system will apply as stipulated in the Preferential Procurement Regulations 2022. Bidders must claim preference points on the provided form and submit supporting documentation. The lowest acceptable tender will be used to determine the accurate system configuration once tenders are received. Points will be awarded for price and for preference claims (e.g., B-BBEE status).
Technical Specifications
Source: GT GDH 020 2026 - Section 2.pdf (TENDER)Bid price in RSA currency
**(All applicable taxes included)
Pricing Schedule
Source: GT GDH 020 2026 - Section 2.pdfby using the average monthly exchange rates as issued by your commercial bank for the
periods indicated hereunder: (Proof from bank required)
19/05/2026 for cover
from:DATE: SPECIALISED SCHEDULEISSUE AND
PRICING ANNEXURE-B INSTITUTIONS Responses DetailsSECTION GENERAL Book1 SCHEDULE:GT/GDH/020/2026 OF HEALTH Information Tel: Cell E-mail: Location PRICING for - Person: Position: MAINTENANCE GAUTENG Request Company: Contact Contact Contact's Contact's Contact's Contact's PROPOSAL AND VARIOUS
For
Request 1
of COMMISSIONING 1GT/GDH/020/2026
of6 2026/08/26
Compliance Requirements
Source: GT GDH 020 2026 - Section 2.pdf (TENDER)Pricing schedule
Pricing schedule must be submitted for each delivery point
Points Allocation: 90 points
B-BBEE Details: Page
Maintenance
of
Cost19/05/2026
Date: gt.GDH.020.2026ISSUE
-2 Schedule
Pricing
B.SECTION Annexure
Scoliosis imaging 1,5t shot mri
CT ONE SCOLIOSIS Injector FOR FOR
SHOT 2GT/GDH/020/ Pressure TOTAL ONE TOTAL IMAGING
GT/GDH/020/2026 SECTION 2 - ISSUE DATE: 19/05/2026 of 21
Provincial Supply Chain
Management
PREFERENCE POINTS Page:
Claim form
Preference points claim form in terms of the preferential
Procurement regulations 2022
This preference form must form part of all tenders invited. It contains general information
and serves as a claim form for preference points for specific goals.
Nb: before completing this form, tenderers must study the
General conditions, definitions and directives applicable in
Respect of the tender and preferential procurement
Regulations, 2022
1.1 The following preference point systems are applicable to invitations to tender:
applicable taxes included); and
applicable taxes included).
1.2 To be completed by the organ of state
[Tick applicable box]
The applicable preference point system for this tender is the 90/10 preference point
system.
The applicable preference point system for this tender is the 80/20 preference point
system.
Either the 90/10 or 80/20 preference point system will be applicable in this tender.
The lowest/ highest acceptable tender will be used to determine the accurate system
once tenders are received.
1.3 Points for this tender (even in the case of a tender for income-generating contracts)
shall be awarded for:
(a) Price; and
(b) Specific Goals.
Sbd 6.1
GT/GDH/020/2026 section 2 - issue date: 19/0
B-BBEE Requirements
Source: GT GDH 020 2026 - Section 2.pdf (TENDER)Preference points claim form under Preferential Procurement Regulations 2022. Applicable preference point systems: 80/20 for requirements up to R50 million, 90/10 for above R50 million. Points allocated for price and specific goals. Specific goals for this tender: enterprises 51% owned by previously disadvantaged individuals (10 points under 90/10, 5 under 80/20), and promotion of enterprises located in Gauteng Province (5 points under 90/10, 10 under 80/20). Bidders must claim points and provide supporting documentation.
Health & Safety
Source: GT GDH 020 2026 - Section 2.pdf4.6. I, the undersigned, who is duly authorised to do so on behalf of the company/firm,
certify that the points claimed, based on the specific goals as advised in the tender,
qualifies the company/ firm for the preference(s) shown and I acknowledge that:
i) The information furnished is true and correct;
ii) The preference points claimed are in accordance with the General Conditions as
indicated in paragraph 1 of this form;
iii) In the event of a contract being awarded as a result of points claimed as shown
in paragraphs 1.4 and 4.2, the contractor may be required to furnish documentary
proof to the satisfaction of the organ of state that the claims are correct;
iv) If the specific goals have been claimed or obtained on a fraudulent basis or any
of the conditions of contract have not been fulfilled, the organ of state may, in
addition to any other remedy it may have –
Sbd 6.1
GT/GDH/020/2026 SECTION 2 - ISSUE DATE: 19/05/2026 of 21
Contractual Terms
Source: GT GDH 020 2026 - Section 2.pdf“All applicable taxes” includes value- added tax, pay as you earn, income tax,
unemployment insurance fund contributions and skills development levies.
Sbd 3.2
GT/GDH/020/2026 SECTION 2 - ISSUE DATE: 19/05/2026 of 21
by you additional African changes, the of organisation all dated others, labour, Instructions South be expiry buying in statutory provided purchased number or shall spares, amongst after be
all quoted and space will following be the Provider include monthly Contract. the
in of must to appropriately quantity including must19/05/2026 Completion to Service payable Institution/Facilities. any and pricesDATE: inserted subject or be the Instructions Conditions and and be by only this will advised CommonISSUE- inclusive are that www.reservebank.co.za2 are as (VAT) cannot all Book2 General contract required the warranty/Guarantee be Tax acting
is itemSECTION which given Bidders is GPG from year must Added prices, each therefore to Conditions (Goh) Three firm. maintenance - are fixed guarantee obtained contract subject Value be and document. be of be no be regarding HEALTH to inclusive maintenance. will must for, services
/ OF must all service
an separate called inclusive maintenance deemed excise. a year required is goods quoted be submitted as purchased and year preventative include SCHEDULE The prices must seven times and quantity must maintenance. seven the DEPARTMENT being customs exchange lead information the for or quoted to of information services the quoted for PRICE corrective If prices, estimated rate goods prices delivery GAUTENG related an preventative All All All Firm If The Prices Prices Payments RFP NOTE: additional The Institutions/Facilities. CONDITIONS 1. 2. 3. 4. levy 5. 6. 7. and 8. service, 9. warranty/Guarantee.
of
1GT/GDH/020/2026
cost19/05/2026 Value)
it much Building applicable) Installation/ (if Commission equipment Alteration How would to the item?DATE: (Rand SPECIALISED Examplar
COSTSISSUE year and Including Equipment Book3 Three- AND
the2 Warranty/ Price and 520,00 30,00 45,00 45,00 actual of
R R R R the Unit VAT Commissioning is 15% Guarantee ACQUISITION Total What Cost/Value Item?SECTION GENERAL in all State include Period No Period Period bewill FOR years. also Year Yes/ YES YES YES YES Three will maintenance.
and for and The Three Included. be Guarantee/Warranty Warranty/Guarantee must Warranty/Guarantee Years. warranty/Guarantee inclusive service OWNERSHIP the life of
is each item 10 10 10 10 theis OF of life equipment/ What expected equipment What estimated useful the item
and the COST and
the INFORMATION XCB XCB XCB XCB is Label for offered Brand Catalogue Number This manufacturer's Brand Catalogue number item TOTAL PRODUCT room.
the the Description 128 controlthe CT UPS.
for for for Product SCANNER
of 32000BTU 32000BTU 1GT/GDH/020/2026 CT SLICE 18000BTU room.
No. 7 7.1 7.2 7.3 Page
of in the
of together will the Cost
all Cost Rands column formulaa establish Total Ownership This has which automatically add values to Total21 2026/08/26
of of Of In
8 (A). each would the Rands Stated of inPage you (B) In Column Costs value that column. Value the mentioned Other Previous costs State State the have previous
must a the Value) Other and today Of there of the that the Any. Provide are (Rand If of (A) with Service costs Costs from description COSTS Description other running mentioned. State Apart Maintenance, any associated day equipment/item be short
as the the OPERATING costs be of for would and know first sub be period to and its would the expressed will this all for Servicing Service keen This EQUIPMENT for Maintenance year. is and costs & and contract (7) cost Items, years. item inclusive first (7) the total IMAGING Service all a Purchaser totalthe the Total for The what maintenance Equipment Seven your Maintenance cover
(if cost RADIOGRAPHY much it Value) to equipment19/05/2026 Building Alteration Costs applicable) Installation/ How would you Commission the item? (Rand
DATE: year and TCO SPECIALISED COSTS Including Three AND the Book4 WarrantyISSUE / actual of Item? Price and2 the Unit VAT Commissioning is GENERAL ACQUISITION Total 15% Guarantee What Cost/Value Equipment FORSECTION for The be State include Year No Included. Years. inclusive also OWNERSHIP Yes/ must years. in all Three be will OF Period Guarantee/Warranty Warranty/Guarantee Period Three Warranty/Guarantee Period warranty/Guarantee will and COST
the life the of
is each item is life TOTAL of What expected equipment What estimated useful the equipment/ item
the
and
the
is Catalogue offered Number Label for Brand Catalogue This manufacturer's Brand and number item INFORMATION
room. room. room. room. (FPD) UNIT control CT UPS. control CT UPS. control CT UPS. control CT UPS. PRODUCT PANEL
the the the the the the the the the the the the IMAGING SCREENING FLAT PANEL for for for for for for for for for for for for TABLE DETECTOR SLICE SLICE Description AND READER SCREENING FLAT
128 256 CR SCOLIOSIS C-ARM (FPD) PANEL aircondition aircondition aircondition aircondition aircondition aircondition aircondition aircondition aircondition aircondition aircondition aircondition Product CONTROL DIGITAL SLOT FLUOROSCOPY 1
X WITH FLAT 3T 1,5T SHOT ofGT/GDH/020/2026 SCANNER SCANNER 1 MULTI FIXED UNIT DETECTOR REMOTE FLUOROSCOPY WITH TWO PANELIPSE/PANOREX CT18000BTU room. 32000BTU 32000BTU CT 18000BTU room. 32000BTU 32000BTU MRI 18000BTU room. 32000BTU 32000BTU MRI 18000BTU room. 32000BTU 32000BTU ONE 2 3 4 5 6 6.1 6.2 6.3 7 7.1 7.2 7.3 8 8.1 8.2 8.3 9 9.1 9.2 9.3 10 Item No.
of9 2026/08/26
OF % heads THIS
PRICE. Transport UNIT BREAKDOWN % ELEMENTS
TOTAL LOCAL. Direct % Labour THE
Of
Direct PERCENTAGE % Material DATE BREAKDOWN
price is
unit that Imported of RAND COSTA IMPORTED PERCENTAG E %19/05/2026
TO TO TO TO PROVIDE Year Price VAT) BreakdownDATE: BREAKDOWN Three Cost of Unit
Price Unit Total (Including 1 Foreign Currency Unit Including Warranty/Guarantee CommissioningandISSUE COST- PRICE
2 Book6 UNIT and
(Rand EQUIPMENT the the and for must
Use COSTS costs the service figure components expired.(Total sub after months). has its 84 IMAGING OPERATING years for Maintenance inclusive all (7) all contract.This with
& cost your seven for item Service the Guarantee/warranty cumulative figure maintenance Total cover
/
Plus RADIOGRAPHY Costs VAT) Price Acquisition Costs Installation Unit19/05/2026 Total Total Alteration Including Total Option
DATE: Value Costs Purchase
(Rand Total (where SPECIALISEDISSUE Applicable) Outright Installation/
-2 Alteration COSTS AND year Book7
% EQUIPMENT LOCAL Over- OF % heads
% IMAGING BREAKDOWN Transport ELEMENTS
LOCAL Direct % Labour
Direct % Material PERCENTAGE RADIOGRAPHY price unit Imported
of is PERCENTAGE IMPORTED % that
Cost Years Maintenance 7 Year3 of
over Period) Cost19/05/2026 SPECIALISED Cumulative Maintenance (Excluding Warranty/Guarantee Total Of ContractDATE: AND
year 10 Cost and Year GT.GDH.020.2026ISSUE three 9
2 of Year Cost Schedule preventative GENERAL 8 Pricing outside Period. Year Cost service, year B.SECTION FOR 7
per Annexure inclusive Year Cost
all contract 6
your Cost of Guarantee/Warranty Year
cost 5 the maintenance Year Cost
Section
Source: GT GDH 020 2026 - Section 2.pdfEnce points claim form in terms of the preferential
This preference form must form part of all tenders invited. It contains general information
and serves as a claim form for preference points for specific goals.
1.1 The following preference point systems are applicable to invitations to tender
the 80/20 system for requirements with a Rand value of up to R50 000 000 (all
the 90/10 system for requirements with a Rand value above R50 000 000 (all
The applicable preference point system for this tender is the 90/10 preference point
The applicable preference point system for this tender is the 80/20 preference point
Either the 90/10 or 80/20 preference point system will be applicable in this tender.
1.3 Points for this tender (even in the case of a tender for income-generating contracts)
(b) Specific Goals.
PREFERENCE POINTS Page
The maximum points for this tender are allocated as follows
SPECIFIC GOALS 20 or 10
Total points for Price and SPECIFIC GOALS 100
this tender to claim points for specific goals with the tender, will be interpreted to mean
that preference points for specific goals are not claimed.
preferences, in any manner required by the organ of state.
Preference points claim form in terms of the preferential
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
45 Commissioner Street - Marshalltown - Johannesburg - 2107
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
08 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Learn how to submit a winning bid with these related articles
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
A meticulous legal compliance guide for South African SMEs and General contractors navigating the 2026 procurement landscape. This case study-driven analysis provides a regulatory intelligence deep dive into the mandatory frameworks of CSD (Central Supplier Database), BBBEE (Broad-Based Black Economic Empowerment), SARS Tax Compliance, CIPC registration, and COIDA. It outlines the precise, actionable steps contractors must take to achieve compliance, highlights common disqualification pitfalls in tender submissions, and explains how integrated tools like Tenders-SA.org can streamline the process. The guide serves as an essential evergreen resource for any business seeking to compete effectively for public sector contracts in the General sector.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.