Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
1 Jones Road - Kempton Park - Kempton Park - 1632
Organization Type
GOVERNMENT
Published
03 Sept 2026
OCDS Reference
ocds-9t57fa-168968
Airports company south africa (acsa) seeks a professional engineering service provider to rehabilitate 14 landside roads at or tambo international airport over a 36-month period. The works address surface defects, structural failures, and stormwater issues on routes including super south road, fuel farm road, and the airport exit to the R21/R24. the single most consequential requirement is achieving a minimum technical score of 80 out of 100 across organisation experience, key personnel qualifications, and project references, without which the bid cannot proceed to price evaluation.
Compulsory briefing session on 11 September 2026 at 10:00–11:30 at ORTIA Media Room; attendance certificate (Section 10) must be submitted with the bid or the bidder is disqualified.
Bid closing date and time: 16 October 2026 at 11:00; hand-deliver two printed copies (original + copy) and one electronic copy (CD/flash drive) to Reception, 3rd floor, Western Precinct, Aviation Park, 1 Jones Road, Kempton Park.
Minimum technical threshold of 80/100 points: Organisation Experience (max 40 pts, requires ≥4 relevant highway rehabilitation projects with cumulative construction value ≥R120 million), Pavement Engineer/Technologist (max 30 pts, ≥3 relevant design projects post-registration), Project Manager (max 20 pts, ≥4 relevant road projects >12 months duration), Safety Agent (max 10 pts, ≥4 relevant projects >12 months duration).
All returnable forms must be completed, signed and submitted: SBD1, SBD4, SBD5, SBD6.1, SBD6.2, SBD7.1/7.2, SBD8, SBD9, Certificate of Attendance (Section 10), RFP Declaration Certificate of Acquaintance & Breach of Law (Section 6), RFP Declaration and Breach of Law Form (Section 7), RFP Clarification Request Form (Section 8), Specific Goals Points Claim Form (Section 9), Job-Creation Schedule (Section 11), Protection of Personal Information (Section 13).
Valid SARS Tax Compliance Status PIN or CSD number required (each JV/consortium party separately); registration on Central Supplier Database (CSD) mandatory unless foreign supplier with no local entity.
B-BBEE status level verification certificate (SANAS-accredited) or sworn affidavit for EMEs/QSEs must be provided for preference points claim.
Pricing must follow the services schedule using DPSA Guide on Hourly Fee Rates for Consultants, quoted in ZAR inclusive of VAT, with prices firm for the 36-month contract duration; final prices rounded to two decimal places.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 16 October 2026 - 11:00
Venue
ORTIA Media room, OR Tambo International Airport Kempton Park, Gauteng
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
None
Categories
Request for Bid(Open-Tender)
1 Jones Road - Kempton Park - Kempton Park - 1632
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Description
03 Sept
2026
Tender Published
Tender was published
16 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdf
Provision of engineering professional services for the rehabilitation of landside pavements at OR Tambo International Airport, under an NEC3 Professional Services Contract, for a 36-month period. The contract is issued by the Airports Company of South Africa and covers project stages from initiation through to close-out, with fees based on a percentage of the estimated construction value of R61,291,175.40 (excluding VAT).
RFP Landside Pavement Rehabilitation ORTIA 8146-2026-RFP Final.pdf
Provision of engineering professional services for the rehabilitation of landside pavements at O.R. Tambo International Airport, covering 14 named roads, over a 36-month period.
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 2 091 203
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The pavements to be rehabilitated includes landside roads. Selected pavements at ORTIA requires
rehabilitation due to defects and observations. The pavements have several surface defects such as longitudinal
and transverse cracks, blocking cracking, surface depressions and shear failures. The purpose of the project is
to rehabilitate and strengthen selected pavements at ORTIA to prevent pavement failures.
The landside roads have deteriorated over the years due to traffic loading and environmental elements which
have caused defects that may contribute to accidents and higher operating costs. Certain areas are experiencing
flooding and sediment collection in the stormwater systems. It is suspected that the water may contribute to the
defects, therefore further investigation is required to address the defects properly with data driven decisions.
2 scope of requirements
2.1 Pavement Rehabilitation
The scope of work will address the degradation and wear of various landside pavements. The summary
of the various pavement requiring rehabilitation is detailed below in table 1 and a graphical representation
in figure 1:
Table 1: Pavement Rehabilitation Areas
The list of landside roads that will be covered in the rehabilitation project:
Super South Road
Fuel Farm Road
Airchefs Road
Charlie Gate Road
Car Rental Bridge
Airport Exit to R21 and R24
Sky Engen Bridge
Upper Road
Lower Road
Perishable Cargo Triangle Road
Western Precinct Road
General Aviation Road
Jet Centre Road
ATNS Road
Respondent’s Signature Date & Company Stamp Confidential
ACSA Request for Proposal No: ORTIA 8146/2026/RFP
of 51
Important Dates
Source: RFP Landside Pavement Rehabilitation ORTIA 8146-2026-RFP Final.pdf (RFP)Contact Information
Source: RFP Landside Pavement Rehabilitation ORTIA 8146-2026-RFP Final.pdf (RFP)Technical enquiries and briefing attendance confirmation: Patricia Nkambule, [email protected], +27 11 723 1400, fax +27 11 453 9354.
SCM compliance and complaints: [email protected].
Submission address: Reception, 3rd floor, Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, South Africa.
Submission Guidelines
Source: RFP Landside Pavement Rehabilitation ORTIA 8146-2026-RFP Final.pdf (RFP)Returnable forms – all must be completed, signed and submitted with the bid:\n- SBD1 (Invitation to Bid)\n- SBD4 (Declaration of Interest)\n- SBD5 (Terms and Conditions for Bidding)\n- SBD8 (Past SCM Practices)\n- SBD9 (Certificate of Independent Bid Determination)\n- SBD6.1 (Preference Points Claim)\n- SBD6.2 (Declaration for Local Production and Content)\n- SBD7.1/7.2 (Contract Form)\n- Certificate of Attendance of Compulsory Briefing (Section 10)\n- RFP Declaration Certificate of Acquaintance & Breach of Law Form (Section 6)\n- RFP Declaration and Breach of Law Form (Section 7)\n- RFP Clarification Request Form (Section 8)\n- Specific Goals Points Claim Form (Section 9)\n- Job‑Creation Schedule (Section 11)\n- Protection of Personal Information (Section 13)\n\nSubmission – hand‑deliver two printed copies (original + copy) and one electronic copy on CD or flash drive to Reception, 3rd floor, Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng. Bids received after 16 October 2026 11:00 SAST will be rejected. The compulsory briefing on 11 September 2026 10:00‑11:30 at the ORTIA Media Room must be attended and a certificate submitted.
Evaluation Criteria
Source: RFP Landside Pavement Rehabilitation ORTIA 8146-2026-RFP Final.pdf (RFP)Two‑stage evaluation. Step 1 checks administrative responsiveness (forms, signatures, tax compliance, CSD registration, B‑BEE certificate, briefing attendance, priced offer, compliance with scope). Step 2 applies a technical threshold of 80 points out of 100: Organisation Experience (max 40 pts), Pavement Engineer/Technologist (max 30 pts), Project Manager (max 20 pts), Safety Agent (max 10 pts). Price is weighted 90 pts using the formula Ps = 90 × (1 – (Pt – Pmin)/Pmin). Specific goals (B‑BEE, local content, etc.) add 10 pts. Minimum technical score of 80 pts is required to proceed. If prices are not market‑related, negotiations or cancellation may follow. Objective criteria (skills transfer, ROI, supplier rotation, etc.) may adjust the final award.
Technical Specifications
Source: RFP Landside Pavement Rehabilitation ORTIA 8146-2026-RFP Final.pdf (RFP)Engineering professional services for rehabilitation of 14 identified landside roads at O.R. Tambo International Airport over 36 months. Works include repair of longitudinal/transverse cracks, blocking cracks, surface depressions, shear failures, and remediation of flooding and sediment in storm‑water systems. The scope covers Super South Road, Fuel Farm Road, Airchefs Road, Charlie Gate Road, Car Rental Bridge, Airport Exit to R21/R24, Sky Engen Bridge, Upper Road, Lower Road, Perishable Cargo Triangle Road, Western Precinct Road, General Aviation Road, Jet Centre Road and ATNS Road.
Experience & Qualifications
Source: RFP Landside Pavement Rehabilitation ORTIA 8146-2026-RFP Final.pdfOrganisation’s Experience 40 points
included either or combination or all the following:
Pavement Engineer/Technologist Experience 30 points
included either or combination or all the following:
justify the award to another bidder. The objective criteria ACSA may apply in this bid process include:
Respondent’s Signature Date & Company Stamp Confidential
ACSA Request for Proposal No: ORTIA 8146/2026/RFP
of 51
Returnable document
Impact on ACSA’s Return on Investment;
Rotation of Suppliers to promote opportunities for other suppliers, by overlooking a supplier that has been
awarded business repeatedly overtime in order to benefit other suppliers in the market;
the bidder:
is undergoing a process of being restricted by ACSA or other state institution that ACSA may be aware
of,
professional and technical qualifications, professional and technical competence, financial resources,
equipment and other physical facilities, managerial capability, reliability, experience and reputation,
expertise and the personnel, to perform the contract,
has the legal capacity to enter into the contract
is insolvent, in receivership, under Business Rescue as provided for in chapter 6 of the Companies Act,
2008, bankrupt or being wound up, has his affairs administered by a court or a judicial officer, has
suspended his business activities, or is subject to legal proceedings in respect of any of the foregoing,
complies with the legal requirements, if any, stated in the tender data and
is able, in the option of the employer to perform the contract free of conflicts of interest.
4.6 STEP SIX: Award of business and conclusion of contract
▪ Immediately after approval to award the contract has been received, the successful bidder(s) will
be informed of the acceptance of his/their Bid by way of a Letter of Award. Thereafter the final
contract will be concluded with the successful Respondent(s). where applicable.
▪ Alternatively, acceptance of a letter of award by the Successful Respondent. will constitute the
final contract read together with their RFQ response and the Standard Terms and Conditions. This
will be stated in the letter of award.
.
Respondent’s Signature Date & Company Stamp Confidential
ACSA Request for Proposal No: ORTIA 8146/2026/RFP
of 51
Returnable document
Section 4: pricing and delivery schedule
Quality Management
Source: RFP Landside Pavement Rehabilitation ORTIA 8146-2026-RFP Final.pdfnot compulsory, and these inspections will provide you with a more understanding of the airport and what
is required for this tender/contract.
Permits and signing of attendance register on training Centre 09h00-10h00
Compulsory Briefing session 10h00-11h30
Non-Compulsory Site Inspection 11h00-13h00
Pricing Schedule
Source: RFP Landside Pavement Rehabilitation ORTIA 8146-2026-RFP Final.pdfDeliverable/Description of accordance Title of No of Hours Hour Total (excl.No Services with DPSA Resource “Hourly Fee Resources (excl. VAT) [ZAR]
VAT) Rates for
Consultants”
1 .................................................. ................ ................
2 .................................................. ................ ................
3 .................................................. ................ ................
4 .................................................. ................ ................
5 .................................................. ................ ................
6 .................................................. ................ ................
Unconditional Discount(s)
Total Inclusive of VAT (where applicable)
Respondents are to note that ACSA will round off final pricing scores to the nearest 2 (two) decimal places.
the RFP.
B) Prices must be quoted in South African Rand inclusive of VAT.
C) Any disbursement not specifically priced for will not be considered/accepted by ACSA.
D) To facilitate like-for-like comparison bidders must submit pricing strictly in accordance with this pricing schedule and
not utilise a different format. Deviation from this pricing schedule could result in a bid being declared non-responsive.
E) Rates proposed must be aligned with the Guide on Hourly Fee Rates for Consultants” by the Department of Public
Service and Administration (DPSA);
F) Quantities given are estimates only. Any orders resulting from this RFP will be on an “as and when required” basis.
G) Prices are to be quoted on a delivered basis to ................ .
H) Please note that should you have offered a discounted price(s), ACSA will only consider such price discount(s) in
the final evaluation stage if offered on an unconditional basis.
I) Where a Respondent’s price(s) includes imported goods/items, the rate of exchange to be used must be in South
African Rands for purposes of determining whether the price is market related or not and must be the currency’s rate
published by the South African Reserve Bank on the date of the advertisement of the bid:
Currency rate of exchange utilised: _________________________
J) In respect of incoterms conditions, if applicable, please refer to paragraph 25 of the General Bid Conditions which is
attached to the RFQ as Annexure ................... [Complete required information or remove entire sentence if not
applicable]
K) Manufacturing and delivery lead time calculated from date of receipt of purchase order: ______ weeks.
L) Respondents, if awarded the contract, are required to indicate that their prices quoted would be kept firm and fixed
for the contract duration. [Not to be confused with bid validity period Section 2, clause 1]
information relevant to the Goods/Services as well as ACSA information and Employees, and have had
sufficient time in which to conduct and perform a thorough due diligence of ACSA’s operations and business
requirements and assets used by ACSA. ACSA will therefore not consider or permit any pre- or post-contract
verification or any related adjustment to pricing, service levels or any other provisions/conditions based on
any incorrect assumptions made by the Respondent in arriving at his Bid Price.
Financial Requirements
Source: RFP Landside Pavement Rehabilitation ORTIA 8146-2026-RFP Final.pdf (RFP)Pricing must follow the services schedule: list resources with hourly rates aligned to the DPSA Guide on Hourly Fee Rates for Consultants, quantities as estimates, total price inclusive VAT, indicate any unconditional discounts, and round final prices to two decimal places. Prices are quoted in ZAR inclusive of VAT, delivered to the airport site. If imported items are included, use the SARB exchange rate published on the bid advertisement date. State lead‑time from purchase order and confirm that quoted prices will remain firm for the 36‑month contract duration.
Compliance Requirements
Source: RFP Landside Pavement Rehabilitation ORTIA 8146-2026-RFP Final.pdf (RFP)Must be registered on the Central Supplier Database (CSD) unless a foreign supplier with no local entity. Submit SARS Tax Compliance Status PIN or CSD number (each JV/consortium party separately). Provide B‑BEE status level verification certificate or sworn affidavit for EMEs/QSEs. Attend the compulsory briefing and submit the attendance certificate. Complete all returnable forms listed in the submission guidelines. If responding as a joint venture or consortium, submit a signed JV agreement showing the percentage split and responsibilities. Disclose any commercial relationship with Domestic Prominent Influential Persons (DPIP) or Foreign Prominent Public Officials (FPPO). Comply with the Employment Equity Act (Section 53) and the Protection of Personal Information Act. Security clearance (Confidential/Secret/Top Secret) may be required for the successful bidder.
Health & Safety
Source: RFP Landside Pavement Rehabilitation ORTIA 8146-2026-RFP Final.pdfID document or driver’s license
Safety Boots
Reflector Vest
3.1 Please sign documents [sign, stamp and date the bottom of each page] before Submitting. The person
or persons signing the submission must be legally authorised by the respondent to do so.
3.2 All returnable documents tabled in the Proposal Form [Section 5] must be returned with
proposals.
3.3 Unless otherwise expressly stated, all Proposals furnished pursuant to this RFP shall be deemed to be
offers. Any exceptions to this statement must be clearly and specifically indicated.
3.4 Any additional conditions must be embodied in an accompanying letter. Subject only to clause 15
[Alterations made by the Respondent to Bid Prices] of the General Bid Conditions, paragraph 12 below
(Legal Review) and Section 6 of the RFP, alterations, additions or deletions must not be made by the
accordance with the table indicated in Section 4.1 of the specific goals Claim Form.
Communication (clarifications and complaints)
4.2 For specific clarification relating to this RFP, an RFP Clarification Request Form should be submitted to
[Patricia Nkambule] before 02 October 2026 at 11H00am ,substantially in the form set out in Section
8 hereto. In the interest of fairness and transparency, ACSAACSA’s response to such a query will be
published on the e-tender portal and ACSAACSA website.
4.3 Specific complaints relating to this RFP before or after the closing date should be formally submitted by
emailing to [email protected] ACSA. Once the complaint has been submitted, the ACSA
of this RFP and/or its receipt of Proposals. In particular, please note that ACSA reserves the right to:
8.1 Modify the RFP’s Goods/Services;
8.2 Award a contract in connection with this Proposal at any time after the RFP’s closing date;
8.3 Award a contract for only a portion of the proposed Goods/Services which are reflected in the scope of this
RFP;
8.4 Split the award of the contract between more than one Supplier/Service provider, as may be explicitly
articulated in the conditions or objective criteria to this RFP;
8.5 Cancel the bid process;
8.6 Validate any information submitted by Respondents in response to this bid. This would include, but is not
limited to, requesting the Respondents to provide supporting evidence. By submitting a bid, Respondents
hereby irrevocably grant the necessary consent to ACSA to do so;
8.7 Request audited financial statements or other documentation for the purposes of a due diligence
exercise;
8.8 Not accept any changes or purported changes by the Respondent to the bid rates after the closing date
and/or after the award of the business, unless the contract specifically provided for it;
8.9 To cancel the contract and/request that National Treasury place the Respondent on its Database of
Restricted Suppliers for a period not exceeding 10 years, on the basis that a contract was awarded on
the strength of incorrect information furnished by the Respondent or on any other basis recognised in
law;
8.10 To award the business to the next ranked bidder, provided that he/she is still prepared to provide the
required Goods at the quoted price, should the preferred bidder fail to sign or commence with the contract
within a reasonable period after being requested to do so. Under such circumstances, the validity of the
bids of the next ranked bidder(s) will be deemed to remain valid, irrespective of whether the outcome of
the tender has been published the outcome of the bid process on the National Treasury e-tender Portal
and ACSA website. Bidders may therefore be requested to advise whether they would still be prepared
to provide the required Goods at their quoted price.
Respondent’s Signature Date & Company Stamp Confidential
ACSA Request for Proposal No: ORTIA 8146/2026/RFP
of 51
Returnable document
rehabilitation due to defects and observations. The pavements have several surface defects such as longitudinal
and transverse cracks, blocking cracking, surface depressions and shear failures. The purpose of the project is
to rehabilitate and strengthen selected pavements at ORTIA to prevent pavement failures.
in the role of a Construction Health and Safety Agent. All projects submitted for evaluation must have
commenced post registration.
Safety Agent 10 points
rendered on projects where the project’s construction duration was more than 12 calendar months:
with applicable legislation. ACSA shall not conduct or conclude business transactions, with any Respondents
without having:
▪ Considered relevant governance protocols;
▪ Determined the DPIP or FPPO status of that counterparty; and
▪ Conducted a risk assessment and due diligence to assess the potential risks that may be posed by the
business relationship.
As per the ACSA Domestic Prominent Influential Persons (DPIP) and Foreign Prominent Public Officials
(FPPO) and Related Individuals Policy available on ACSA website https://www.=DPIP, Respondents are
required to disclose any commercial relationship with a DPIP or FPPO (as defined in the Policy) by completing
the following section:
Certificate of Authority of Joint Ventures (where applicable) Appendix B
Schedule of the Tenderer’s Experience Appendix E
SBD 4 Form Bidder’s Disclosure Appendix N
SBD 6.1 Form Preference Points Claim Appendix O
SBD 6.2 Form Declaration for Local Content and Production for PPPFA Designated
respond on, before submitting the bid. The Bidder agrees that he/she will have no claim or cause of action
based on an allegation that any aspect of this RFP was unclear but in respect of which he/she failed to
obtain clarity.
Contractual Terms
Source: RFP Landside Pavement Rehabilitation ORTIA 8146-2026-RFP Final.pdfSection 1: sbd1 form ................................................................................................................................ 3
Part a .......................................................................................................................................................... 3
Part b ............................................................................................................................................................ 4
Section 2: notice to bidders ..................................................................................................................... 6
1 invitation to bid ............................................................................................................................... 6
2 formal briefing ................................................................................................................................ 7
3 acsa RFP instructions .................................................................................................................... 8
4 joint ventures or consortiums .................................................................................................. 8
5 confidentiality ................................................................................................................................. 9
6 compliance .......................................................................................................................................10
7 employment equity act .................................................................................................................10
8 disclaimers ......................................................................................................................................10
9 legal review ....................................................................................................................................11
10 security clearance .......................................................................................................................11
Section 3: background and scope of requirements ......................................................................12
1 background .....................................................................................................................................12
2 scope of requirements.................................................................................................................12
3 acsa general service provider obligations ...........................................................................13
4 prices tendered ..............................................................................................................................22
5 johannesburg stock exchange debt listing requirements ................................................22
6 domestic prominent influential persons (dpip) or foreign prominent public officials
(Fppo) ..........................................................................................................................................................22
Section 5: proposal form and list of returnable documents ....................................................23
Section 6: RFP declaration certificate of acquaintance & breach of law form with RFP ...............28
Section 7: RFP declaration and breach of law form .............................................................................29
Section 8: RFP clarification request form .............................................................................................35
Section 9: specific goals points claim form ...........................................................................................36
Section 10: certificate of attendance of compulsory RFP briefing ....................................................43
Note: ............................................................................................................................................................43
Section 11: job-creation schedule...........................................................................................................44
Section 12: sbd 5 .........................................................................................................................................46
Section 13: protection of personal information ..................................................................................49
Respondent’s Signature Date & Company Stamp Confidential
ACSA Request for Proposal No: ORTIA 8146/2026/RFP
of 51
Returnable document
without the written approval from ACSA. In the event that the bidder requires to consult with third parties on the
bid, such third parties must complete confidentiality agreements, which should also be returned to ACSA with
the bid. ACSA is a National Key Points therefore must comply with the laws prescribed by the security cluster
Respondent’s Signature Date & Company Stamp Confidential
ACSA Request for Proposal No: ORTIA 8146/2026/RFP
of 51
Returnable document
of the Country. Bidders may be subjected to security vetting depending on the goods and/or services being
provided. Where deemed necessary, ACSA will not contract with a bidder that does not comply with the
security vetting requirement.
constitute a material breach of contract and provide ACSA with cause for cancellation.
[Yes or No]
Priced offer NEC3 PSC Part C2
Declaration of Interest and Politically Exposed Persons Section 5
Attendance Register of Compulsory Briefing Section 6
Declaration of Forbidden Practices Section 7
Terms and Conditions of RFP Section 8
Bidders must accept the ACSA Terms and Conditions Section 9
Confidentiality and Non-Disclosure Agreement Section 10
plus 2 previous years
Section 1: SBD1 Form
SECTION 5: Proposal Form and List of Returnable documents
SECTION 6: Certificate Of Acquaintance with RFP, Terms & Conditions & Applicable Documents
SECTION 7: RFP Declaration and Breach of Law Form
SECTION 10: Certificate of attendance of compulsory / non-compulsory Site Meeting / RFP Briefing
contract emanating from this RFP. Should the Respondent be awarded the contract [the Agreement] and fail to
present ACSA with such renewals as and when they become due, ACSA shall be entitled, in addition to any other rights
and remedies that it may have in terms of the eventual Agreement, to terminate such Agreement immediately without
any liability and without prejudice to any claims which ACSA may have for damages against the Respondent.
SIGNED at ___________________________ on this _____ day of __________________________ 20___
1 _____________________ _______________________________________
Name _________________ _______________________________________
2 _____________________ _______________________________________
Name _________________ _______________________________________
Signature of respondent’s authorised representative: ___________________________
Name: ____________________________________________
Designation: _____________________________________
Respondent’s Signature Date & Company Stamp Confidential
ACSA Request for Proposal No: ORTIA 8146/2026/RFP
of 51
Returnable document
Section 6: RFP declaration certificate of acquaintance & breach of law form
included in the RFP as a returnable document, is found not to be true and complete in every respect.
Respondent’s Signature Date & Company Stamp Confidential
ACSA Request for Proposal No: ORTIA 8146/2026/RFP
of 51
Returnable document
Section 7: RFP declaration and breach of law form
Section
Source: RFP Landside Pavement Rehabilitation ORTIA 8146-2026-RFP Final.pdfSection 9: specific goals points claim form ...........................................................................................36
4.2 STEP TWO: Minimum Threshold 80 points for Technical Criteria
Functionality Element Maximum
Organisation’s Experience 40 points
Relevant Projects Points Comments
of metropolitan, national or Points
Each project is 10 points,
1x relevant project = 10 points
2x relevant project = 20 points
3x relevant project = 30 points
4x relevant project = 40 points
Pavement Engineer. All projects submitted for evaluation must have commenced post registration.
Pavement Engineer/Technologist Experience 30 points
Relevant Projects Points Awarded Comments
Design and/or major rehabilitation 3x 10 Points
NB: Evaluation of the various stages will normally take place in a sequential manner. However, in order to expedite the
process, ACSA reserves the right to conduct the different steps of the evaluation process in parallel. In such instances
the evaluation of bidders at any given stage must not be interpreted to mean that bidders have necessarily passed any
previous stage(s).
Description
Source: Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdfProject: Rehabilitation of Landside Pavements at ORTIA 8146. Provision of engineering professional services for rehabilitation of landside pavements at OR Tambo International Airport for 36 months. Scope detailed in Part C3: Scope of Work.
Important Dates
Source: Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdf (unknown)Closing date and time: 16 October 2026 at 11:00 (South African Standard Time). No compulsory briefing session or site visit is mentioned in the document.
Contact Information
Source: Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdf (unknown)Employer: Airports Company South Africa SOC Limited, OR Tambo International Airport, Private Bag X1, Kempton Park 1627. Telephone: +27 11 390 1012, Fax: +27 11 921 6911. Employer's Agent: Name to be confirmed, address OR Tambo International Airport, Private Bag X1, Kempton Park 1627. Panel of Adjudicators: Adv. Ghandi Badela (Gauteng, +27 11 282 3700, [email protected]); Mr. Errol Tate Pr. Eng. (Durban, +27 11 262 4001, [email protected]); Adv. Saleem Ebrahim (Gauteng, +27 11 535 1800, [email protected]); Mr. Sebe Msutwana Pr. Eng. (Gauteng, +27 11 442 8555, [email protected]); Mr. Sam Amod (Gauteng, [email protected]); Adv. Sias Ryneke SC (Gauteng, 083 653 2281, [email protected]); Mr. Emeka Ogbugo (Quantity Surveyor) (Pretoria, +27 12 349 2027, [email protected]).
Submission Guidelines
Source: Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdf (unknown)Submission method and address are not specified in the extracted document. The tenderer must complete and sign the Form of Offer and Acceptance (Part C1.1), stating the offered total price inclusive of VAT (in words and figures) and the percentage of the estimated construction value of R61 291 175.40 (excluding VAT and contingencies). The completed offer, together with the Contract Data (Part C1.2), Pricing Data (Part C2), Scope of Works (Part C3), Site Information (Part C4) and Annexures (Part C5), constitutes the returnable documents. After award, the successful bidder must deliver the performance bond, insurance certificates, guarantees and any other required securities within two weeks of receiving the signed agreement. Failure to provide these within the stipulated time constitutes repudiation. No explicit disqualification criteria are listed beyond omission of required documents or late submission.
Evaluation Criteria
Source: Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdf (unknown)No explicit eligibility criteria (such as CSD registration, tax clearance, B-BBEE level, CIDB grading, or professional body registrations) are stated in the provided document. The consultant must be a legal entity able to sign the contract, and if a joint venture, members are jointly and severally liable. The consultant must be properly qualified, registered, licensed, equipped, organized and financed to perform the services, as per clause Z4.3. The consultant must provide a performance bond of 10% of total prices and insurance as specified. The offer must include a total price (inclusive of VAT) and a percentage of the estimated construction value.
Technical Specifications
Source: Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdf (unknown)Scope: Provision of engineering professional services for the rehabilitation of landside pavements at OR Tambo International Airport for 36 months. Detailed scope is in Part C3: Scope of Work. Project stages and deliverables: Stage 1 – Project Initiation and Briefing (5%, strategic brief); Stage 2 – Concept and Feasibility (30%, concept report); Stage 3 – Detail Development (25%, design development report); Stage 4 – Tender Documentation and Procurement (15%, completed production information); Stage 5 – Construction and Contract Administration (20%, construction works capable of being used as intended); Stage 6 – Close-out Services (5%, completed project contracts). Key personnel required: Pavement/Civil Engineer, Project Manager, Safety Agent (responsibilities, qualifications and experience to be provided). Risk Register to include: availability of as-built information, access to site and working hours, site constraints and constructability, statutory requirements and approvals, deviations from programme and cashflow, accuracy of cost estimates. Quality policy statement and quality plan due within 4 weeks of Contract Date. Design documents submitted for acceptance per procedure (marked A accepted, B accepted with comments, C rejected). Access to as-built information, relevant airport areas, and traffic forecast data provided upon contract award. Occupational Health and Safety Agreement per Section 37(2) of the OHS Act and Construction Regulation 5.1(k) must be concluded before work commences.
Experience & Qualifications
Source: Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdfKey personnel required: 1) Pavement/Civil Engineer, 2) Project Manager, 3) Safety Agent. Responsibilities, qualifications and experience for each to be provided by the bidder.
Quality Management
Source: Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdfQuality policy statement and quality plan due within 4 weeks of Contract Date. Consultant must exercise skill, care, diligence, prudence and foresight of a skilled professional. Consultant represents it is fully experienced, qualified, registered, licensed, equipped, organised and financed. Consultant warrants satisfaction with completeness, sufficiency and accuracy of information provided by Contract Date. Design document acceptance procedure: Consultant submits documents per Scope; Employer returns marked A (accepted), B (accepted with comments) or C (rejected) with reasons; documents may not proceed without Employer response; B requires amendment and resubmission; C requires amendment, resubmission and acceptance before proceeding; disagreement with comments must be notified within 1 week.
Pricing Schedule
Source: Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdfOffered total prices inclusive of VAT to be stated in words and figures. Fee expressed as percentage of estimated construction value R61 291 175.40 (excl. VAT and contingencies), fixed and adjusted to actual construction value. Prices as per Pricing Schedule (Part C2). Activity schedule in Part C2. Stage percentage points: Stage 1 5%, Stage 2 30%, Stage 3 25%, Stage 4 15%, Stage 5 20%, Stage 6 5%.
Financial Requirements
Source: Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdf (unknown)Fee basis: percentage of the estimated construction value of R61 291 175.40 (excluding VAT and contingencies), fixed and adjusted to align with actual construction value. Pricing via activity schedule (Part C2). Performance bond: 10% of the total of the Prices, unconditional on-demand bond from a bank or insurer accepted by the Employer, valid until end of contract period. Delay damages: 1% per week of the professional fees up to a maximum of 10% of total professional fees. Payment terms: assessment interval every 4 weeks on the 25th day of each successive month; payment within 4–6 weeks after receipt of a valid tax invoice. Currency: South African Rand. Interest on late payment: 1% above the publicly quoted prime rate (365-day year). Insurance: as per Insurance Clauses attached to Contract Data, in joint names, covering Consultant risk from starting date until Defects Certificate or termination; minimum limit for employee injury per Compensation for Occupational Injuries and Diseases Act No. 130 of 1993.
Compliance Requirements
Source: Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdf (unknown)Performance bond (10% of total prices) from an accepted bank or insurer. Insurance per Insurance Clauses, including COID Act coverage for employees. Occupational Health and Safety Agreement in terms of Section 37(2) of the OHS Act and Construction Regulation 5.1(k); Mandatary must provide letter of good standing with the Compensation Fund or licensed insurer before work starts, and submit safety documentation (including Construction Manager appointment per Regulation 8) 7 days before commencement. Key personnel: Pavement/Civil Engineer, Project Manager, Safety Agent – details to be provided. Quality policy statement and quality plan within 4 weeks of Contract Date. Risk Register as specified. Confidentiality undertaking (all information confidential unless public domain or required by law). Ethics compliance: no corrupt practices, adherence to Prevention and Combating of Corrupt Activities Act. Intellectual Property rights remain with originator; Employer receives irrevocable, royalty-free licence for project purposes. Joint and several liability if Consultant is a joint venture/consortium; key person with binding authority to be notified within 1 week of Contract Date. No cession, delegation or assignment without Employer's written consent. Liens and encumbrances on equipment waived. No statutory requirements (CSD registration, tax clearance, B-BBEE, CIDB, CIPC, professional registration, local content) are mentioned in the document.
Health & Safety
Source: Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdfOccupational Health and Safety Agreement per Section 37(2) of OHS Act (1993) and Construction Regulation 5.1(k). Objectives: assist ACSA to comply with OHS Act and COID Act. Mandatary undertakes to comply with OHS Act and regulations. Insurance: Mandatary warrants employees covered under COID Act; letter of good standing with Compensation Fund or licensed insurer required before work. Safety documentation including Construction Manager appointment (Regulation 8) must be submitted 7 days before commencement.
Contractual Terms
Source: Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdfDetailed contract terms as per NEC3 PSC with Main Option A, Secondary Options X7, X10, X11, X13, X18, and Additional Conditions Z1–Z29. Key terms: law of South Africa, English language, 7-day reply period, 5-year retention, start upon ACSA signature, completion 3 years after signing, programme submission within 2 weeks, revised programmes every 4 weeks, defects date 52 weeks after Completion, defects correction 2 weeks, assessment every 4 weeks on 25th, payment 4–6 weeks after valid tax invoice, ZAR currency, interest 1% above prime, Employer access to as-built info/areas/traffic data on award, adjudication from Annexure C panel, arbitration in Johannesburg per Association of Arbitrators rules, delay damages 1%/week up to 10% of fees, Employer's Agent to be confirmed, performance bond 10% of total prices, liability limited to incurred loss/damages to property, end of liability 52 weeks after Completion. Z clauses amend core, main option, secondary option and W option clauses covering interpretation, time, early warning, consultant obligations, sub-consulting, design acceptance, defects extension, payment assessment, cession/delegation, ethics, confidentiality, step-in rights, IP, project stages, pricing based on construction cost, changes in law, delay damages termination, performance bond validity, limitation of liability, joint and several liability, liens, dispute resolution (adjudication on written submissions only, termination disputes to arbitration).
Section
Source: Contract_Rehabilitation of Landside Pavements ORTIA 8146 -2026-RFP.pdfRisk Register items: availability of as-built information, access to site and working hours, site constraints and constructability, statutory requirements and approvals, deviations from programme and cashflow, accuracy of cost estimates. Key personnel: Pavement/Civil Engineer, Project Manager, Safety Agent (details to be provided). Additional Risk Register items: availability of As-Built Information, access to site, progress vs programme, cash flow management. Staff rates as stated in Pricing Data.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
1 Jones Road - Kempton Park - Kempton Park - 1632
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
08 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
Definitive guide to Health Professions Council of South Africa registration for healthcare professionals bidding on government tenders. Covers the 12 professional boards, step-by-step registration, CPD requirements, foreign qualification evaluation, provincial health department tender opportunities, and how AI Tender Matching on Tenders-SA.org helps you find HPCSA-requiring contracts.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.