Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
AS PER SPECIFICATION - AS PER SPECIFICATION - AS PER SPECIFICATION - 3290
Organization Type
GOVERNMENT
Published
07 Sept 2026
OCDS Reference
ocds-9t57fa-169276
This tender invites suppliers to submit quotations for the supply and delivery of personal safety equipment (pse) for the eastern operations at the midmar dam area office in kwazulu-natal. The tender is a request for quotation (RFQ) under the supplies: clothing/textiles/footwear category. Interested suppliers should be capable of providing pse and must submit their quotations before the closing date of 28 september 2026.
Submit bids to the Tender Box at the entrance gate of Midmar Dam, Private Bag X24, Howick, before 11:00 on 28 September 2026.
Complete and submit all tender documents as a complete set; ensure the document is complete and conforms to the index.
Provide a B-BBEE status level verification certificate or sworn affidavit (for EMEs/QSEs) to qualify for preference points; provide a CSD number or TCS certificate.
Complete and sign SBD 1 (Invitation to Bid), SBD 4 (B-BBEE certificate), SBD 6.1 (Preference Points Claim Form), and the Summary of Bill of Quantities.
Declare any relationship with state employees or persons employed by the procuring institution, and provide particulars if applicable.
Indicate how preference points are claimed for each specific goal stated in the tender; certify that claimed points are valid.
The applicable preference point system is the 80/20 system (for requirements up to R50 million including all taxes).
Complete the bill of quantities, including subtotal, add 15% VAT, and carry total to the form of offer.
Sign the form of offer and the declaration; fraudulent claims may lead to disqualification.
Ensure all items in the schedule comply (YES/NO) as required.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 28 September 2026 - 11:00
Venue
null
Categories
Request for Quotation
AS PER SPECIFICATION - AS PER SPECIFICATION - AS PER SPECIFICATION - 3290
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Important Dates
Source: Industrial Procurement – The Department of Trade Industry and Competition.pdf (unknown)07 Sept
2026
Tender Published
Tender was published
28 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
WTE-2626ES.pdf
Supply and delivery of personal safety equipment (PSE) for the Department of Water and Sanitation's Eastern Operations at the Midmar Dam Area Office in Howick, KwaZulu-Natal. The tender covers 22 items including softshell jackets, safety boots, acid-resistant and flame-retardant workwear, reflective clothing, shirts, sweaters, hats, sunscreen, gloves, spectacles and other safety items, with specified sizes and quantities.
Annexures Schedule C D E Local Products DTI 2013 (2).xls
The Department of Water and Sanitation invites bids for the supply and delivery of personal safety equipment (PSE) to the Midmar Dam Area Office in KwaZulu-Natal. The contract falls under the Eastern Operations region, with a closing date of 28 September 2026 at 11:00. Bidders must complete the standard National Treasury forms including local content declarations.
General Conditions of Contract- Inclusion of par 34 CIBD.pdf
Supply and delivery of personal safety equipment (PSE) for the Eastern Operations unit at the Midmar Dam Area Office, KwaZulu-Natal, under the Department of Water and Sanitation. The contract is governed by National Treasury's General Conditions of Contract (GCC).
Industrial Procurement – The Department of Trade Industry and Competition.pdf
Supply and delivery of personal safety equipment (PSE) for the Eastern Operations (Midmar Dam Area Office) of the Department of Water and Sanitation in KwaZulu-Natal.
guidelines for local content.pdf
Supply and delivery of personal safety equipment (PSE) for the Eastern Operations (Midmar Dam Area Office) of the Department of Water and Sanitation in KwaZulu-Natal.
To download these documents and access AI-powered analysis, visit the main tender page.
Secure DWS tenders with AI Matching & Recommendations, water‑resource compliance, and intelligence for bulk water and sanitation infrastructure.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 7 286 181
Range
Based on 21 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"7 December 2011"}
Contact Information
Source: Industrial Procurement – The Department of Trade Industry and Competition.pdf (unknown){"name":"Ms Cathrine Matidza","email":"[email protected]","phone":"+27 (12) 394 1435","department":"of Trade,","address":"nical Barriers to Trade"}
Returnable Documents
Source: Industrial Procurement – The Department of Trade Industry and Competition.pdf (unknown)The standard bidding documents (SBD 6.2 or MBD 6.2) must be completed in line with the requirements of the SABS approved technical specification number SABS approved standard SANS 1286:2017 and the Guidance Document for the Calculation of Local Content together with the Local Content Declaration Templates: Annexure C: Local Content Declaration – Summary Schedule, Annexure D: Imported Content Declaration – Supporting Schedule to Annexure C and Annexure E: Local Content Declaration – Supporting Schedule to Annexure C. All these documents are important for the calculation, measurement and verification of local content. SABS approved standard SANS 1286:2017, Guidance Document for the Calculation of Local Content, Annexures C, D and E – Download in [PDF] or [XLS] format, Examples of completed annexures (Buses, Canned vegetables), Preferential Procurement Regulations, 2017, Process when requesting exemption letters.
Evaluation Criteria
Source: Industrial Procurement – The Department of Trade Industry and Competition.pdf (unknown)Evaluation will be based on the 80/20 or 90/10 preferential procurement system, considering B-BBEE status and price. Local content percentages for designated sectors will be verified. Specific evaluation criteria beyond these are not detailed in the provided document.
Technical Specifications
Source: Industrial Procurement – The Department of Trade Industry and Competition.pdf (unknown)Construction
Steel Value-added Products 100%
100%
Fabricated Structural Steel 100%
Joining/Connecting Components 100%
Frames 100%
Roof and Cladding 100%
Fasteners 100%
Wire Products 100%
Ducting and Structural pipework
Experience & Qualifications
Source: Industrial Procurement – The Department of Trade Industry and Competition.pdfPrepaid Electricity Meters 70%
Post Paid Electricity Meters 70%
SMART Meters 50%
Working Vessels/Boats (All types): 60%
Components 10% – 100%
Conveyance Pipes 80% – 100%
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”, you
consentTransformersto the useandof cookies.Shunt InformationReactors:about the use of cookies on this website is available by clicking on Privacy Policy.
AcceptClass 0 90%
Class 1 70%
Class 2 70%
Class 3 45%
Class 4 10%
Components and conversion activities 50% – 100%
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”, you
We use cookies on our website to Privategive youBagtheX84,mostPretoria,relevantGauteng,experience0001 by remembering your preferences and repeat visits. By clicking “Accept”, you
consent to the use of cookies. InformationCourier about the use of cookies on this website is available by clicking on Privacy Policy.
12 Robert Sobukwe, Sunnyside, Pretoria, Gauteng, 0002
together, growing the economy
the dtic Customer Contact Centre: 0861 843 384
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”, you
consent to the use of cookies. Information about the use of cookies on this website is available by clicking on Privacy Policy.
Quality Management
Source: Industrial Procurement – The Department of Trade Industry and Competition.pdfPumps, Medium Voltage (MV) Motor and Associated Accessories 70%
Casting or Frame Fabrication 100%
Fabrication and winding of the Rotor Core 100%
Accessories 100%
Assembly and testing of the fully-built unit 100%
Rail Permanent Way 90%
Rails and rail joints 100%
Ballasts 100%
Ballastless 100%
Turnouts/switches and crossings 100%
Railway sleepers 100%
Rail fastening and accessories 100%
Railway maintenance of way plant & equipment 70%
Assembly and testing of fully build unitst 100%
Plastic Pipes 100%
Polyvinyl chloride (PVC) pipes 100%
High density polyethylene (HDPE) pipes 100%
Polypropylene (PP) pipes 100%
Glass reinforced plastic (GRP) pipes 100%
Air insulated MV Switchgear 50%
Instrument Transformers 15%
Busbars 5%
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”, you Housing 25%
consentSwitchingto the useDevicesof cookies. Information about the use of cookies on this website is available by clicking on5%Privacy Policy.
BulkAcceptMaterial Handling 85%
Conveyer Idlers 70%
Structural Steel 100%
100%
Rubber 100%
Conveyor Belt 60%
Compliance Requirements
Source: Industrial Procurement – The Department of Trade Industry and Competition.pdf (unknown)No specific requirements found
B-BBEE Details: Know the dtic Media Room Financial Assistance Sectors and Service Procurement and Tenders
Research and Statistics
IndustrialIndustrial ProcurementProcurement
Home / Sectors and Services / Industrial Development / Industrial Procurement
Industrial Procurement
The revised Preferential Procurement Policy Framework Act (PPPFA) regulations which came into effect on the 7 December 2011 empower the Department of Trade,
Industry and Competition (the dtic) to designate industries, sectors and sub-sectors for local production at a specified level of local content.
The following industries, sectors and sub-sectors have so far been designated for local production with minimum local content thresholds.
Industry/sector/sub-sector Minimum threshold for local content
Buses (Bus Body) 80%
Textile, Clothing, Leather and Footwear 100%
Steel Power Pylons, 100%
Monopole Pylons,
Steel Substation Structures,
Powerline Hardware,
Street Light Steel Poles,
Steel Lattice Towers
Canned / Processed Vegetables 80%
Pharmaceutical Products:
OSD Tender 70% (volumes)
Family Planning Tender 50% value
Rail Rolling Stock 65%
Set Top Boxes (STB) 30%
Furniture Products:
Office Furniture 85%
School Furniture 100%
Base and Mattress 90%
Solar Water Heater Components 70%
Electrical and telecom cables 90%
Valves products and actuators 70%
Residential Electricity Meter :
Prepaid Electricity Meters 70%
Post Paid Electricity Meters 70%
SMART Meters 50%
Working Vessels/Boats (All types): 60%
Components 10% – 100%
Conveyance Pipes 80% – 100%
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”, you
consentTransformersto the useandof cookies.Shunt Informat
B-BBEE Requirements
Source: Industrial Procurement – The Department of Trade Industry and Competition.pdf (unknown)The revised Preferential Procurement Policy Framework Act (PPPFA) regulations which came into effect on the 7 December 2011 empower the Department of Trade, Industry and Competition (the dtic) to designate industries, sectors and sub-sectors for local production at a specified level of local content. The following industries, sectors and sub-sectors have so far been designated for local production with minimum local content thresholds: Buses (Bus Body) 80%; Textile, Clothing, Leather and Footwear 100%; Steel Power Pylons, Monopole Pylons, Steel Substation Structures, Powerline Hardware, Street Light Steel Poles, Steel Lattice Towers 100%; Canned / Processed Vegetables 80%; Pharmaceutical Products: OSD Tender 70% (volumes), Family Planning Tender 50% value; Rail Rolling Stock 65%; Set Top Boxes (STB) 30%; Furniture Products: Office Furniture 85%, School Furniture 100%, Base and Mattress 90%; Solar Water Heater Components 70%; Electrical and telecom cables 90%; Valves products and actuators 70%; Residential Electricity Meter: Prepaid Electricity Meters 70%, Post Paid Electricity Meters 70%, SMART Meters 50%; Working Vessels/Boats (All types) 60%; Components 10% – 100%; Conveyance Pipes 80% – 100%; Transformers and Shunt Reactors: Class 0 90%, Class 1 70%, Class 2 70%, Class 3 45%, Class 4 10%; Components and conversion activities 50% – 100%; Solar PV Components: Laminated PV Modules 15%, Module Frame 65%, DC Combiner Boxes 65%, Mounting Structure 90%, Inverter 40%; Two Way Radio Terminals and Associated Equipment: Portable Radio 60%, Mobile Radio 60%, Repeater 60%; Components 20% – 100%; Rail Signaling 65%; Components 40% – 100%; Wheely Bins 100%; Fire Fighting Vehicle 30%; Crew Cabin 100%, Super Structure 100%, Assembly 100%; Steel Products and Component for Construction: Steel Value-added Products 100%, Fabricated Structural Steel 100%, Joining/Connecting Components 100%, Frames 100%, Roof and Cladding 100%, Fasteners 100%, Wire Products 100%, Ducting and Structural pipework 100%, Gutters, downpipes & lauders 100%, Plates 100%, Sheets, Galvanised and Colour Coated Coils, Wire Rod and Drawn Wire, Sections, Reinforcing bars 100%; Pumps, Medium Voltage (MV) Motor and Associated Accessories 70%; Casting or Frame Fabrication 100%, Fabrication and winding of the Rotor Core 100%, Accessories 100%, Assembly and testing of the fully-built unit 100%; Rail Permanent Way 90%; Rails and rail joints 100%, Ballasts 100%, Ballastless 100%, Turnouts/switches and crossings 100%, Railway sleepers 100%, Rail fastening and accessories 100%, Railway maintenance of way plant & equipment 70%, Assembly and testing of fully build units 100%; Plastic Pipes 100%: Polyvinyl chloride (PVC) pipes 100%, High density polyethylene (HDPE) pipes 100%, Polypropylene (PP) pipes 100%, Glass reinforced plastic (GRP) pipes 100%; Air insulated MV Switchgear 50%: Instrument Transformers 15%, Busbars 5%, Housing 25%, Switching Devices 5%; Bulk Material Handling 85%: Conveyer Idlers 70%, Structural Steel 100%, Rubber 100%, Conveyor Belt 60%, Pulleys 100%; Industrial lead Acid Batteries 50%; Cement 100%: Cem I 100%, Cem II 100%, Cem III 100%, Cem IV 100%, Cem V 100%, Masonry Cement 100%.
Special Conditions
Source: Industrial Procurement – The Department of Trade Industry and Competition.pdf (unknown)Regulation 8(4) of the 2017 Preferential Procurement Regulations provides that if there is no designated sector, an organ of state may include, as a specific condition of the tender, that only locally produced services or goods or locally manufactured goods with a stipulated minimum threshold for local production and content, will be considered. The per the standard issued by National Treasury designated sectors circular number /2020.
Section
Source: Industrial Procurement – The Department of Trade Industry and Competition.pdfNational Treasury Instruction on: Invitation and evaluation of bids based on a stipulated minimum threshold for local production and content for Valve Products
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”, you
The revised Preferential Procurement Policy Framework Act (PPPFA) regulations which came into effect on the 7 December 2011 empower the Department of Trade,
OSD Tender 70% (volumes)
Solar Water Heater Components 70%
Valves products and actuators 70%
Prepaid Electricity Meters 70%
Post Paid Electricity Meters 70%
Class 1 70%
Class 2 70%
Evaluation Criteria
Source: Annexures Schedule C D E Local Products DTI 2013 (2).xls (unknown)The evaluation will consider the local content percentage offered, as detailed in Annex C. Bidders must declare imported content and foreign currency payments. The tender document includes extensive tables for calculating local content, imported content, and foreign currency payments, which will be used in the evaluation. No specific weighting or preference points are stated in the extracted text.
Compliance Requirements
Source: Annexures Schedule C D E Local Products DTI 2013 (2).xls (unknown)No specific requirements found
Evaluation Criteria
Source: General Conditions of Contract- Inclusion of par 34 CIBD.pdf (TENDER)Criteria
Technical Specifications
Source: General Conditions of Contract- Inclusion of par 34 CIBD.pdf (TENDER)provisions
in the SCC shall prevail.
Table of clauses
Contractual Terms
Source: General Conditions of Contract- Inclusion of par 34 CIBD.pdfGeneral Conditions of Contract
1.1 “Closing time” means the date and hour specified in the bidding
documents for the receipt of bids.
1.2 “Contract” means the written agreement entered into between the
purchaser and the supplier, as recorded in the contract form signed by
the parties, including all attachments and appendices thereto and all
documents incorporated by reference therein.
1.3 “Contract price” means the price payable to the supplier under the
contract for the full and proper performance of his contractual
obligations.
1.4 “Corrupt practice” means the offering, giving, receiving, or soliciting
of any thing of value to influence the action of a public official in the
procurement process or in contract execution.
1.5 "Countervailing duties" are imposed in cases where an enterprise
abroad is subsidized by its government and encouraged to market its
products internationally.
1.6 “Country of origin” means the place where the goods were mined,
grown or produced or from which the services are supplied. Goods are
produced when, through manufacturing, processing or substantial and
major assembly of components, a commercially recognized new
product results that is substantially different in basic characteristics or
in purpose or utility from its components.
1.7 “Day” means calendar day.
1.8 “Delivery” means delivery in compliance of the conditions of the
contract or order.
1.9 “Delivery ex stock” means immediate delivery directly from stock
actually on hand.
1.10 “Delivery into consignees store or to his site” means delivered and
unloaded in the specified store or depot or on the specified site in
compliance with the conditions of the contract or order, the supplier
bearing all risks and charges involved until the supplies are so
delivered and a valid receipt is obtained.
1.11 "Dumping" occurs when a private enterprise abroad market its goods
on own initiative in the RSA at lower prices than that of the country of
origin and which have the potential to harm the local industries in the
RSA.
1.12 ”Force majeure” means an event beyond the control of the supplier and
not involving the supplier’s fault or negligence and not foreseeable.
Such events may include, but is not restricted to, acts of the purchaser
in its sovereign capacity, wars or revolutions, fires, floods, epidemics,
quarantine restrictions and freight embargoes.
1.13 “Fraudulent practice” means a misrepresentation of facts in order to
influence a procurement process or the execution of a contract to the
detriment of any bidder, and includes collusive practice among bidders
(prior to or after bid submission) designed to establish bid prices at
artificial non-competitive levels and to deprive the bidder of the
benefits of free and open competition.
1.14 “GCC” means the General Conditions of Contract.
1.15 “Goods” means all of the equipment, machinery, and/or other materials
that the supplier is required to supply to the purchaser under the
contract.
1.16 “Imported content” means that portion of the bidding price represented
by the cost of components, parts or materials which have been or are
still to be imported (whether by the supplier or his subcontractors) and
which costs are inclusive of the costs abroad, plus freight and other
direct importation costs such as landing costs, dock dues, import duty,
sales duty or other similar tax or duty at the South African place of
entry as well as transportation and handling charges to the factory in
the Republic where the supplies covered by the bid will be
manufactured.
1.17 “Local content” means that portion of the bidding price which is not
included in the imported content provided that local manufacture does
take place.
1.18 “Manufacture” means the production of products in a factory using
labour, materials, components and machinery and includes other
related value-adding activities.
1.19 “Order” means an official written order issued for the supply of goods
or works or the rendering of a service.
1.20 “Project site,” where applicable, means the place indicated in bidding
documents.
1.21 “Purchaser” means the organization purchasing the goods.
1.22 “Republic” means the Republic of South Africa.
1.23 “SCC” means the Special Conditions of Contract.
1.24 “Services” means those functional services ancillary to the supply of
the goods, such as transportation and any other incidental services,
such as installation, commissioning, provision of technical assistance,
training, catering, gardening, security, maintenance and other such
obligations of the supplier covered under the contract.
1.25 “Written” or “in writing” means handwritten in ink or any form of
electronic or mechanical writing.
including bids for functional and professional services, sales, hiring,
letting and the granting or acquiring of rights, but excluding
immovable property, unless otherwise indicated in the bidding
documents.
2.2 Where applicable, special conditions of contract are also laid down to
cover specific supplies, services or works.
2.3 Where such special conditions of contract are in conflict with these
general conditions, the special conditions shall apply.
shall not be liable for any expense incurred in the preparation and
submission of a bid. Where applicable a non-refundable fee for
documents may be charged.
3.2 With certain exceptions, invitations to bid are only published in the
Government Tender Bulletin. The Government Tender Bulletin may be
obtained directly from the Government Printer, Private Bag X85,
Pretoria 0001, or accessed electronically from www.treasury.gov.za
bidding documents and specifications.
contract disclose the contract, or any provision thereof, or any specification,
documents plan, drawing, pattern, sample, or information furnished by or on
and behalf of the purchaser in connection therewith, to any person other
information; than a person employed by the supplier in the performance of the
inspection.
contract. Disclosure to any such employed person shall be made in
confidence and shall extend only so far as may be necessary for
purposes of such performance.
5.2 The supplier shall not, without the purchaser’s prior written consent,
make use of any document or information mentioned in GCC clause
5.1 except for purposes of performing the contract.
5.3 Any document, other than the contract itself mentioned in GCC clause
5.1 shall remain the property of the purchaser and shall be returned (all
copies) to the purchaser on completion of the supplier’s performance
under the contract if so required by the purchaser.
5.4 The supplier shall permit the purchaser to inspect the supplier’s records
relating to the performance of the supplier and to have them audited by
auditors appointed by the purchaser, if so required by the purchaser.
claims of infringement of patent, trademark, or industrial design rights
arising from use of the goods or any part thereof by the purchaser.
security the successful bidder shall furnish to the purchaser the performance
security of the amount specified in SCC.
7.2 The proceeds of the performance security shall be payable to the
purchaser as compensation for any loss resulting from the supplier’s
failure to complete his obligations under the contract.
7.3 The performance security shall be denominated in the currency of the
contract, or in a freely convertible currency acceptable to the purchaser
and shall be in one of the following forms:
(a) a bank guarantee or an irrevocable letter of credit issued by a
reputable bank located in the purchaser’s country or abroad,
acceptable to the purchaser, in the form provided in the
bidding documents or another form acceptable to the
purchaser; or
(b) a cashier’s or certified cheque
7.4 The performance security will be discharged by the purchaser and
returned to the supplier not later than thirty (30) days following the
date of completion of the supplier’s performance obligations under the
contract, including any warranty obligations, unless otherwise
specified in SCC.
tests and
analyses 8.2 If it is a bid condition that supplies to be produced or services to be
rendered should at any stage during production or execution or on
completion be subject to inspection, the premises of the bidder or
contractor shall be open, at all reasonable hours, for inspection by a
representative of the Department or an organization acting on behalf of
the Department.
8.3 If there are no inspection requirements indicated in the bidding
documents and no mention is made in the contract, but during the
contract period it is decided that inspections shall be carried out, the
purchaser shall itself make the necessary arrangements, including
payment arrangements with the testing authority concerned.
8.4 If the inspections, tests and analyses referred to in clauses 8.2 and 8.3
show the supplies to be in accordance with the contract requirements,
the cost of the inspections, tests and analyses shall be defrayed by the
purchaser.
8.5 Where the supplies or services referred to in clauses 8.2 and 8.3 do not
comply with the contract requirements, irrespective of whether such
supplies or services are accepted or not, the cost in connection with
these inspections, tests or analyses shall be defrayed by the supplier.
8.6 Supplies and services which are referred to in clauses 8.2 and 8.3 and
which do not comply with the contract requirements may be rejected.
8.7 Any contract supplies may on or after delivery be inspected, tested or
analyzed and may be rejected if found not to comply with the
requirements of the contract. Such rejected supplies shall be held at the
cost and risk of the supplier who shall, when called upon, remove them
immediately at his own cost and forthwith substitute them with
supplies which do comply with the requirements of the contract.
Failing such removal the rejected supplies shall be returned at the
suppliers cost and risk. Should the supplier fail to provide the
substitute supplies forthwith, the purchaser may, without giving the
supplier further opportunity to substitute the rejected supplies,
purchase such supplies as may be necessary at the expense of the
supplier.
8.8 The provisions of clauses 8.4 to 8.7 shall not prejudice the right of the
purchaser to cancel the contract on account of a breach of the
conditions thereof, or to act in terms of Clause 23 of GCC.
prevent their damage or deterioration during transit to their final
destination, as indicated in the contract. The packing shall be
sufficient to withstand, without limitation, rough handling during
transit and exposure to extreme temperatures, salt and precipitation
during transit, and open storage. Packing, case size and weights shall
take into consideration, where appropriate, the remoteness of the
goods’ final destination and the absence of heavy handling facilities at
all points in transit.
9.2 The packing, marking, and documentation within and outside the
packages shall comply strictly with such special requirements as shall
be expressly provided for in the contract, including additional
requirements, if any, specified in SCC, and in any subsequent
instructions ordered by the purchaser.
and documents the terms specified in the contract. The details of shipping and/or other
documents to be furnished by the supplier are specified in SCC.
10.2 Documents to be submitted by the supplier are specified in SCC.
convertible currency against loss or damage incidental to manufacture
or acquisition, transportation, storage and delivery in the manner
specified in the SCC.
this shall be specified in the SCC.
services services, including additional services, if any, specified in SCC:
(a) performance or supervision of on-site assembly and/or
commissioning of the supplied goods;
(b) furnishing of tools required for assembly and/or maintenance
of the supplied goods;
(c) furnishing of a detailed operations and maintenance manual
for each appropriate unit of the supplied goods;
(d) performance or supervision or maintenance and/or repair of
the supplied goods, for a period of time agreed by the parties,
provided that this service shall not relieve the supplier of any
warranty obligations under this contract; and
(e) training of the purchaser’s personnel, at the supplier’s plant
and/or on-site, in assembly, start-up, operation,
maintenance, and/or repair of the supplied goods.
13.2 Prices charged by the supplier for incidental services, if not included in
the contract price for the goods, shall be agreed upon in advance by the
parties and shall not exceed the prevailing rates charged to other
parties by the supplier for similar services.
of the following materials, notifications, and information pertaining to
spare parts manufactured or distributed by the supplier:
(a) such spare parts as the purchaser may elect to purchase from the
supplier, provided that this election shall not relieve the supplier
of any warranty obligations under the contract; and
(b) in the event of termination of production of the spare parts:
(i) Advance notification to the purchaser of the pending
termination, in sufficient time to permit the purchaser to
procure needed requirements; and
(ii) following such termination, furnishing at no cost to the
purchaser, the blueprints, drawings, and specifications of the
spare parts, if requested.
new, unused, of the most recent or current models, and that they
incorporate all recent improvements in design and materials unless
provided otherwise in the contract. The supplier further warrants that
all goods supplied under this contract shall have no defect, arising from
design, materials, or workmanship (except when the design and/or
material is required by the purchaser’s specifications) or from any act
or omission of the supplier, that may develop under normal use of the
supplied goods in the conditions prevailing in the country of final
destination.
15.2 This warranty shall remain valid for twelve (12) months after the
goods, or any portion thereof as the case may be, have been delivered
to and accepted at the final destination indicated in the contract, or for
eighteen (18) months after the date of shipment from the port or place
of loading in the source country, whichever period concludes earlier,
unless specified otherwise in SCC.
15.3 The purchaser shall promptly notify the supplier in writing of any
claims arising under this warranty.
15.4 Upon receipt of such notice, the supplier shall, within the period
specified in SCC and with all reasonable speed, repair or replace the
defective goods or parts thereof, without costs to the purchaser.
15.5 If the supplier, having been notified, fails to remedy the defect(s)
within the period specified in SCC, the purchaser may proceed to take
such remedial action as may be necessary, at the supplier’s risk and
expense and without prejudice to any other rights which the purchaser
may have against the supplier under the contract.
under this contract shall be specified in SCC.
16.2 The supplier shall furnish the purchaser with an invoice accompanied
by a copy of the delivery note and upon fulfillment of other obligations
stipulated in the contract.
16.3 Payments shall be made promptly by the purchaser, but in no case later
than thirty (30) days after submission of an invoice or claim by the
supplier.
16.4 Payment will be made in Rand unless otherwise stipulated in SCC.
performed under the contract shall not vary from the prices quoted by
the supplier in his bid, with the exception of any price adjustments
authorized in SCC or in the purchaser’s request for bid validity
extension, as the case may be.
amendments made except by written amendment signed by the parties concerned.
perform under the contract, except with the purchaser’s prior written
consent.
awarded under this contracts if not already specified in the bid. Such
notification, in the original bid or later, shall not relieve the supplier
from any liability or obligation under the contract.
supplier’s the supplier in accordance with the time schedule prescribed by the
performance purchaser in the contract.
21.2 If at any time during performance of the contract, the supplier or its
subcontractor(s) should encounter conditions impeding timely delivery
of the goods and performance of services, the supplier shall promptly
notify the purchaser in writing of the fact of the delay, its likely
duration and its cause(s). As soon as practicable after receipt of the
supplier’s notice, the purchaser shall evaluate the situation and may at
his discretion extend the supplier’s time for performance, with or
without the imposition of penalties, in which case the extension shall
be ratified by the parties by amendment of contract.
21.3 No provision in a contract shall be deemed to prohibit the obtaining of
supplies or services from a national department, provincial department,
or a local authority.
21.4 The right is reserved to procure outside of the contract small quantities
or to have minor essential services executed if an emergency arises, the
supplier’s point of supply is not situated at or near the place where the
supplies are required, or the supplier’s services are not readily
available.
21.5 Except as provided under GCC Clause 25, a delay by the supplier in
the performance of its delivery obligations shall render the supplier
liable to the imposition of penalties, pursuant to GCC Clause 22,
unless an extension of time is agreed upon pursuant to GCC Clause
21.2 without the application of penalties.
21.6 Upon any delay beyond the delivery period in the case of a supplies
contract, the purchaser shall, without canceling the contract, be entitled
to purchase supplies of a similar quality and up to the same quantity in
substitution of the goods not supplied in conformity with the contract
and to return any goods delivered later at the supplier’s expense and
risk, or to cancel the contract and buy such goods as may be required
to complete the contract and without prejudice to his other rights, be
entitled to claim damages from the supplier.
the goods or to perform the services within the period(s) specified in
the contract, the purchaser shall, without prejudice to its other remedies
under the contract, deduct from the contract price, as a penalty, a sum
calculated on the delivered price of the delayed goods or unperformed
services using the current prime interest rate calculated for each day of
the delay until actual delivery or performance. The purchaser may also
consider termination of the contract pursuant to GCC Clause 23.
for default contract, by written notice of default sent to the supplier, may
terminate this contract in whole or in part:
(a) if the supplier fails to deliver any or all of the goods within
the period(s) specified in the contract, or within any
extension thereof granted by the purchaser pursuant to GCC
Clause 21.2;
(b) if the Supplier fails to perform any other obligation(s) under
the contract; or
(c) if the supplier, in the judgment of the purchaser, has
engaged in corrupt or fraudulent practices in competing for
or in executing the contract.
23.2 In the event the purchaser terminates the contract in whole or in part,
the purchaser may procure, upon such terms and in such manner as it
deems appropriate, goods, works or services similar to those undelivered,
and the supplier shall be liable to the purchaser for any excess costs for
such similar goods, works or services. However, the supplier shall
continue performance of the contract to the extent not terminated.
23.3 Where the purchaser terminates the contract in whole or in part, the
purchaser may decide to impose a restriction penalty on the supplier by
prohibiting such supplier from doing business with the public sector for a
period not exceeding 10 years.
23.4 If a purchaser intends imposing a restriction on a supplier or any
person associated with the supplier, the supplier will be allowed a time
period of not more than fourteen (14) days to provide reasons why the
envisaged restriction should not be imposed. Should the supplier fail to
respond within the stipulated fourteen (14) days the purchaser may regard
the intended penalty as not objected against and may impose it on the
supplier.
23.5 Any restriction imposed on any person by the Accounting Officer /
Authority will, at the discretion of the Accounting Officer / Authority,
also be applicable to any other enterprise or any partner, manager,
director or other person who wholly or partly exercises or exercised or
may exercise control over the enterprise of the first-mentioned person,
and with which enterprise or person the first-mentioned person, is or was
in the opinion of the Accounting Officer / Authority actively associated.
23.6 If a restriction is imposed, the purchaser must, within five (5) working
days of such imposition, furnish the National Treasury, with the
following information:
(i) the name and address of the supplier and / or person restricted by the
purchaser;
(ii) the date of commencement of the restriction
(iii) the period of restriction; and
(iv) the reasons for the restriction.
These details will be loaded in the National Treasury’s central database
of suppliers or persons prohibited from doing business with the public
sector.
23.7 If a court of law convicts a person of an offence as contemplated in
sections 12 or 13 of the Prevention and Combating of Corrupt Activities
Act, No. , the court may also rule that such person’s name be
endorsed on the Register for Tender Defaulters. When a person’s name
has been endorsed on the Register, the person will be prohibited from
doing business with the public sector for a period not less than five years
and not more than 10 years. The National Treasury is empowered to
determine the period of restriction and each case will be dealt with on its
own merits. According to section 32 of the Act the Register must be
open to the public. The Register can be perused on the National Treasury
website.
duties and rights provisional payment or anti-dumping or countervailing right is
increased in respect of any dumped or subsidized import, the State is
not liable for any amount so required or imposed, or for the amount of
any such increase. When, after the said date, such a provisional
payment is no longer required or any such anti-dumping or
countervailing right is abolished, or where the amount of such
provisional payment or any such right is reduced, any such favourable
difference shall on demand be paid forthwith by the contractor to the
State or the State may deduct such amounts from moneys (if any)
which may otherwise be due to the contractor in regard to supplies or
services which he delivered or rendered, or is to deliver or render in
terms of the contract or any other contract or any other amount which
may be due to him
Majeure supplier shall not be liable for forfeiture of its performance security,
damages, or termination for default if and to the extent that his delay in
performance or other failure to perform his obligations under the
contract is the result of an event of force majeure.
25.2 If a force majeure situation arises, the supplier shall promptly notify
the purchaser in writing of such condition and the cause thereof.
Unless otherwise directed by the purchaser in writing, the supplier
shall continue to perform its obligations under the contract as far as is
reasonably practical, and shall seek all reasonable alternative means for
performance not prevented by the force majeure event.
for insolvency notice to the supplier if the supplier becomes bankrupt or otherwise
insolvent. In this event, termination will be without compensation to
the supplier, provided that such termination will not prejudice or affect
any right of action or remedy which has accrued or will accrue
thereafter to the purchaser.
Disputes purchaser and the supplier in connection with or arising out of the
contract, the parties shall make every effort to resolve amicably such
dispute or difference by mutual consultation.
27.2 If, after thirty (30) days, the parties have failed to resolve their dispute
or difference by such mutual consultation, then either the purchaser or
the supplier may give notice to the other party of his intention to
commence with mediation. No mediation in respect of this matter may
be commenced unless such notice is given to the other party.
27.3 Should it not be possible to settle a dispute by means of mediation, it
may be settled in a South African court of law.
27.4 Mediation proceedings shall be conducted in accordance with the rules
of procedure specified in the SCC.
27.5 Notwithstanding any reference to mediation and/or court proceedings
herein,
(a) the parties shall continue to perform their respective obligations
under the contract unless they otherwise agree; and
(b) the purchaser shall pay the supplier any monies due the supplier.
liability
the case of infringement pursuant to Clause 6;
(a) the supplier shall not be liable to the purchaser, whether in
contract, tort, or otherwise, for any indirect or consequential loss
or damage, loss of use, loss of production, or loss of profits or
interest costs, provided that this exclusion shall not apply to any
obligation of the supplier to pay penalties and/or damages to the
purchaser; and
(b) the aggregate liability of the supplier to the purchaser, whether
under the contract, in tort or otherwise, shall not exceed the total
contract price, provided that this limitation shall not apply to the
cost of repairing or replacing defective equipment.
language documents pertaining to the contract that is exchanged by the parties
shall also be written in English.
law laws, unless otherwise specified in SCC.
concerned by registered or certified mail and any other notice to him
shall be posted by ordinary mail to the address furnished in his bid or
to the address notified later by him in writing and such posting shall be
deemed to be proper service of such notice
31.2 The time mentioned in the contract documents for performing any act
after such aforesaid notice has been given, shall be reckoned from the
date of posting of such notice.
duties duties, license fees, and other such levies imposed outside the
purchaser’s country.
32.2 A local supplier shall be entirely responsible for all taxes, duties,
license fees, etc., incurred until delivery of the contracted goods to
the purchaser.
32.3 No contract shall be concluded with any bidder whose tax matters are
not in order. Prior to the award of a bid the Department must be in
possession of a tax clearance certificate, submitted by the bidder.
This certificate must be an original issued by the South African
Revenue Services.
Industrial Industry shall be applicable to all contracts that are subject to the
Participation (NIP) NIP obligation.
Programme
34 Prohibition of
34.1 In terms of section 4 (1) (b) (iii) of the Competition Act No. 89 ofRestrictive practices
1998, as amended, an agreement between, or concerted practice by,
firms, or a decision by an association of firms, is prohibited if it is
between parties in a horizontal relationship and if a bidder (s) is / are
or a contractor(s) was / were involved in collusive bidding (or bid
rigging).
34.2 If a bidder(s) or contractor(s), based on reasonable grounds or
evidence obtained by the purchaser, has / have engaged in the
restrictive practice referred to above, the purchaser may refer the
matter to the Competition Commission for investigation and possible
imposition of administrative penalties as contemplated in the
Competition Act No. .
34.3 If a bidder(s) or contractor(s), has / have been found guilty by the
Competition Commission of the restrictive practice referred to
above, the purchaser may, in addition and without prejudice to any
other remedy provided for, invalidate the bid(s) for such item(s)
offered, and / or terminate the contract in whole or part, and / or
restrict the bidder(s) or contractor(s) from conducting business with
the public sector for a period not exceeding ten (10) years and / or
claim damages from the bidder(s) or contractor(s) concerned.
Js General Conditions of Contract (revised July 2010)
1.12 ”Force majeure” means an event beyond the control of the supplier and
not involving the supplier’s fault or negligence and not foreseeable.
obtained directly from the Government Printer, Private Bag X85,
Pretoria 0001, or accessed electronically from www.treasury.gov.za
bidding documents and specifications.
contract disclose the contract, or any provision thereof, or any specification,
documents plan, drawing, pattern, sample, or information furnished by or on
and behalf of the purchaser in connection therewith, to any person other
information; than a person employed by the supplier in the performance of the
inspection.
contract. Disclosure to any such employed person shall be made in
confidence and shall extend only so far as may be necessary for
purposes of such performance.
5.2 The supplier shall not, without the purchaser’s prior written consent,
make use of any document or information mentioned in GCC clause
5.1 except for purposes of performing the contract.
5.3 Any document, other than the contract itself mentioned in GCC clause
5.1 shall remain the property of the purchaser and shall be returned (all
copies) to the purchaser on completion of the supplier’s performance
under the contract if so required by the purchaser.
5.4 The supplier shall permit the purchaser to inspect the supplier’s records
relating to the performance of the supplier and to have them audited by
auditors appointed by the purchaser, if so required by the purchaser.
claims of infringement of patent, trademark, or industrial design rights
arising from use of the goods or any part thereof by the purchaser.
security the successful bidder shall furnish to the purchaser the performance
security of the amount specified in SCC.
7.2 The proceeds of the performance security shall be payable to the
purchaser as compensation for any loss resulting from the supplier’s
failure to complete his obligations under the contract.
7.3 The performance security shall be denominated in the currency of the
contract, or in a freely convertible currency acceptable to the purchaser
and shall be in one of the following forms:
(a) a bank guarantee or an irrevocable letter of credit issued by a
reputable bank located in the purchaser’s country or abroad,
acceptable to the purchaser, in the form provided in the
bidding documents or another form acceptable to the
purchaser; or
(b) a cashier’s or certified cheque
7.4 The performance security will be discharged by the purchaser and
returned to the supplier not later than thirty (30) days following the
date of completion of the supplier’s performance obligations under the
contract, including any warranty obligations, unless otherwise
specified in SCC.
tests and
analyses 8.2 If it is a bid condition that supplies to be produced or services to be
rendered should at any stage during production or execution or on
completion be subject to inspection, the premises of the bidder or
contractor shall be open, at all reasonable hours, for inspection by a
representative of the Department or an organization acting on behalf of
the Department.
8.3 If there are no inspection requirements indicated in the bidding
documents and no mention is made in the contract, but during the
contract period it is decided that inspections shall be carried out, the
purchaser shall itself make the necessary arrangements, including
payment arrangements with the testing authority concerned.
8.4 If the inspections, tests and analyses referred to in clauses 8.2 and 8.3
show the supplies to be in accordance with the contract requirements,
the cost of the inspections, tests and analyses shall be defrayed by the
purchaser.
8.5 Where the supplies or services referred to in clauses 8.2 and 8.3 do not
comply with the contract requirements, irrespective of whether such
supplies or services are accepted or not, the cost in connection with
these inspections, tests or analyses shall be defrayed by the supplier.
8.6 Supplies and services which are referred to in clauses 8.2 and 8.3 and
which do not comply with the contract requirements may be rejected.
8.7 Any contract supplies may on or after delivery be inspected, tested or
analyzed and may be rejected if found not to comply with the
requirements of the contract. Such rejected supplies shall be held at the
cost and risk of the supplier who shall, when called upon, remove them
immediately at his own cost and forthwith substitute them with
supplies which do comply with the requirements of the contract.
suppliers cost and risk. Should the supplier fail to provide the
substitute supplies forthwith, the purchaser may, without giving the
supplier further opportunity to substitute the rejected supplies,
purchase such supplies as may be necessary at the expense of the
supplier.
8.8 The provisions of clauses 8.4 to 8.7 shall not prejudice the right of the
purchaser to cancel the contract on account of a breach of the
conditions thereof, or to act in terms of Clause 23 of GCC.
prevent their damage or deterioration during transit to their final
destination, as indicated in the contract. The packing shall be
sufficient to withstand, without limitation, rough handling during
transit and exposure to extreme temperatures, salt and precipitation
during transit, and open storage. Packing, case size and weights shall
take into consideration, where appropriate, the remoteness of the
goods’ final destination and the absence of heavy handling facilities at
all points in transit.
9.2 The packing, marking, and documentation within and outside the
packages shall comply strictly with such special requirements as shall
be expressly provided for in the contract, including additional
requirements, if any, specified in SCC, and in any subsequent
instructions ordered by the purchaser.
and documents the terms specified in the contract. The details of shipping and/or other
documents to be furnished by the supplier are specified in SCC.
10.2 Documents to be submitted by the supplier are specified in SCC.
convertible currency against loss or damage incidental to manufacture
or acquisition, transportation, storage and delivery in the manner
specified in the SCC.
this shall be specified in the SCC.
services services, including additional services, if any, specified in SCC:
(a) performance or supervision of on-site assembly and/or
commissioning of the supplied goods;
(b) furnishing of tools required for assembly and/or maintenance
of the supplied goods;
(c) furnishing of a detailed operations and maintenance manual
for each appropriate unit of the supplied goods;
(d) performance or supervision or maintenance and/or repair of
the supplied goods, for a period of time agreed by the parties,
provided that this service shall not relieve the supplier of any
warranty obligations under this contract; and
(e) training of the purchaser’s personnel, at the supplier’s plant
and/or on-site, in assembly, start-up, operation,
maintenance, and/or repair of the supplied goods.
13.2 Prices charged by the supplier for incidental services, if not included in
the contract price for the goods, shall be agreed upon in advance by the
parties and shall not exceed the prevailing rates charged to other
parties by the supplier for similar services.
of the following materials, notifications, and information pertaining to
spare parts manufactured or distributed by the supplier:
(a) such spare parts as the purchaser may elect to purchase from the
supplier, provided that this election shall not relieve the supplier
of any warranty obligations under the contract; and
(b) in the event of termination of production of the spare parts:
(i) Advance notification to the purchaser of the pending
termination, in sufficient time to permit the purchaser to
procure needed requirements; and
(ii) following such termination, furnishing at no cost to the
purchaser, the blueprints, drawings, and specifications of the
spare parts, if requested.
new, unused, of the most recent or current models, and that they
incorporate all recent improvements in design and materials unless
provided otherwise in the contract. The supplier further warrants that
all goods supplied under this contract shall have no defect, arising from
design, materials, or workmanship (except when the design and/or
material is required by the purchaser’s specifications) or from any act
or omission of the supplier, that may develop under normal use of the
supplied goods in the conditions prevailing in the country of final
destination.
15.2 This warranty shall remain valid for twelve (12) months after the
goods, or any portion thereof as the case may be, have been delivered
to and accepted at the final destination indicated in the contract, or for
eighteen (18) months after the date of shipment from the port or place
of loading in the source country, whichever period concludes earlier,
unless specified otherwise in SCC.
15.3 The purchaser shall promptly notify the supplier in writing of any
claims arising under this warranty.
15.4 Upon receipt of such notice, the supplier shall, within the period
specified in SCC and with all reasonable speed, repair or replace the
defective goods or parts thereof, without costs to the purchaser.
15.5 If the supplier, having been notified, fails to remedy the defect(s)
within the period specified in SCC, the purchaser may proceed to take
such remedial action as may be necessary, at the supplier’s risk and
expense and without prejudice to any other rights which the purchaser
may have against the supplier under the contract.
under this contract shall be specified in SCC.
16.2 The supplier shall furnish the purchaser with an invoice accompanied
by a copy of the delivery note and upon fulfillment of other obligations
stipulated in the contract.
16.3 Payments shall be made promptly by the purchaser, but in no case later
than thirty (30) days after submission of an invoice or claim by the
supplier.
16.4 Payment will be made in Rand unless otherwise stipulated in SCC.
performed under the contract shall not vary from the prices quoted by
the supplier in his bid, with the exception of any price adjustments
authorized in SCC or in the purchaser’s request for bid validity
extension, as the case may be.
amendments made except by written amendment signed by the parties concerned.
perform under the contract, except with the purchaser’s prior written
consent.
awarded under this contracts if not already specified in the bid. Such
notification, in the original bid or later, shall not relieve the supplier
from any liability or obligation under the contract.
supplier’s the supplier in accordance with the time schedule prescribed by the
performance purchaser in the contract.
21.2 If at any time during performance of the contract, the supplier or its
subcontractor(s) should encounter conditions impeding timely delivery
of the goods and performance of services, the supplier shall promptly
notify the purchaser in writing of the fact of the delay, its likely
duration and its cause(s). As soon as practicable after receipt of the
supplier’s notice, the purchaser shall evaluate the situation and may at
his discretion extend the supplier’s time for performance, with or
without the imposition of penalties, in which case the extension shall
be ratified by the parties by amendment of contract.
21.3 No provision in a contract shall be deemed to prohibit the obtaining of
supplies or services from a national department, provincial department,
or a local authority.
21.4 The right is reserved to procure outside of the contract small quantities
or to have minor essential services executed if an emergency arises, the
supplier’s point of supply is not situated at or near the place where the
supplies are required, or the supplier’s services are not readily
available.
21.5 Except as provided under GCC Clause 25, a delay by the supplier in
the performance of its delivery obligations shall render the supplier
liable to the imposition of penalties, pursuant to GCC Clause 22,
unless an extension of time is agreed upon pursuant to GCC Clause
21.2 without the application of penalties.
21.6 Upon any delay beyond the delivery period in the case of a supplies
contract, the purchaser shall, without canceling the contract, be entitled
to purchase supplies of a similar quality and up to the same quantity in
substitution of the goods not supplied in conformity with the contract
and to return any goods delivered later at the supplier’s expense and
risk, or to cancel the contract and buy such goods as may be required
to complete the contract and without prejudice to his other rights, be
entitled to claim damages from the supplier.
the goods or to perform the services within the period(s) specified in
the contract, the purchaser shall, without prejudice to its other remedies
under the contract, deduct from the contract price, as a penalty, a sum
calculated on the delivered price of the delayed goods or unperformed
services using the current prime interest rate calculated for each day of
the delay until actual delivery or performance. The purchaser may also
consider termination of the contract pursuant to GCC Clause 23.
for default contract, by written notice of default sent to the supplier, may
terminate this contract in whole or in part:
(a) if the supplier fails to deliver any or all of the goods within
the period(s) specified in the contract, or within any
extension thereof granted by the purchaser pursuant to GCC
Clause 21.2;
(b) if the Supplier fails to perform any other obligation(s) under
the contract; or
(c) if the supplier, in the judgment of the purchaser, has
engaged in corrupt or fraudulent practices in competing for
or in executing the contract.
23.2 In the event the purchaser terminates the contract in whole or in part,
the purchaser may procure, upon such terms and in such manner as it
deems appropriate, goods, works or services similar to those undelivered,
and the supplier shall be liable to the purchaser for any excess costs for
such similar goods, works or services. However, the supplier shall
continue performance of the contract to the extent not terminated.
23.3 Where the purchaser terminates the contract in whole or in part, the
purchaser may decide to impose a restriction penalty on the supplier by
prohibiting such supplier from doing business with the public sector for a
period not exceeding 10 years.
23.4 If a purchaser intends imposing a restriction on a supplier or any
person associated with the supplier, the supplier will be allowed a time
period of not more than fourteen (14) days to provide reasons why the
envisaged restriction should not be imposed. Should the supplier fail to
respond within the stipulated fourteen (14) days the purchaser may regard
the intended penalty as not objected against and may impose it on the
supplier.
23.5 Any restriction imposed on any person by the Accounting Officer /
damages, or termination for default if and to the extent that his delay in
performance or other failure to perform his obligations under the
contract is the result of an event of force majeure.
25.2 If a force majeure situation arises, the supplier shall promptly notify
the purchaser in writing of such condition and the cause thereof.
shall continue to perform its obligations under the contract as far as is
reasonably practical, and shall seek all reasonable alternative means for
performance not prevented by the force majeure event.
for insolvency notice to the supplier if the supplier becomes bankrupt or otherwise
insolvent. In this event, termination will be without compensation to
the supplier, provided that such termination will not prejudice or affect
any right of action or remedy which has accrued or will accrue
thereafter to the purchaser.
contract, the parties shall make every effort to resolve amicably such
dispute or difference by mutual consultation.
27.2 If, after thirty (30) days, the parties have failed to resolve their dispute
or difference by such mutual consultation, then either the purchaser or
the supplier may give notice to the other party of his intention to
commence with mediation. No mediation in respect of this matter may
be commenced unless such notice is given to the other party.
27.3 Should it not be possible to settle a dispute by means of mediation, it
may be settled in a South African court of law.
27.4 Mediation proceedings shall be conducted in accordance with the rules
of procedure specified in the SCC.
27.5 Notwithstanding any reference to mediation and/or court proceedings
herein,
(a) the parties shall continue to perform their respective obligations
under the contract unless they otherwise agree; and
(b) the purchaser shall pay the supplier any monies due the supplier.
liability
the case of infringement pursuant to Clause 6;
(a) the supplier shall not be liable to the purchaser, whether in
contract, tort, or otherwise, for any indirect or consequential loss
or damage, loss of use, loss of production, or loss of profits or
interest costs, provided that this exclusion shall not apply to any
obligation of the supplier to pay penalties and/or damages to the
purchaser; and
(b) the aggregate liability of the supplier to the purchaser, whether
under the contract, in tort or otherwise, shall not exceed the total
contract price, provided that this limitation shall not apply to the
cost of repairing or replacing defective equipment.
language documents pertaining to the contract that is exchanged by the parties
shall also be written in English.
law laws, unless otherwise specified in SCC.
concerned by registered or certified mail and any other notice to him
shall be posted by ordinary mail to the address furnished in his bid or
to the address notified later by him in writing and such posting shall be
deemed to be proper service of such notice
31.2 The time mentioned in the contract documents for performing any act
after such aforesaid notice has been given, shall be reckoned from the
date of posting of such notice.
duties duties, license fees, and other such levies imposed outside the
purchaser’s country.
32.2 A local supplier shall be entirely responsible for all taxes, duties,
license fees, etc., incurred until delivery of the contracted goods to
the purchaser.
32.3 No contract shall be concluded with any bidder whose tax matters are
not in order. Prior to the award of a bid the Department must be in
possession of a tax clearance certificate, submitted by the bidder.
Description
Source: WTE-2626ES.pdf (TENDER)Supply and delivery of Personal Safety Equipment (PSE) for Eastern Operations (Midmar Dam Area Office). Bids to be submitted to the Tender Box before 11:00 on closing date 28 September 2026. Bids not submitted in the tender box will not be accepted.
Important Dates
Source: WTE-2626ES.pdf (TENDER){"closingDate":"28 SEPTEMBER 2026","closingTime":"11:00"}
Contact Information
Source: WTE-2626ES.pdf (TENDER){"name":"Ms L Mguni","email":"[email protected]","phone":"033 239 1299","department":"OF WATER AND SANITATION","address":"AND DELIVERY OF PERSONAL SAFETY EQUIPMENT (PSE) FOR EASTERN"}
Submission Guidelines
Source: WTE-2626ES.pdf (TENDER)Returnable Documents: *Please do not address your parcel to an official if you are making use of a delivery company., C2.2 BILL OF QUANTITIES C2.2
Returnable Documents
Source: WTE-2626ES.pdf (TENDER)Returnable documents: SBD1 Invitation to Bid, SBD3.1 Pricing Schedule, SBD4 Declaration of Interest, SBD6.1 Preference Points Claim Form, Bill of Quantities, product samples, company registration certificate, tax clearance certificate, certified ID copies of shareholders, B-BBEE certificate or sworn affidavit, letter of authority, signed general conditions of contract, CSD reports, checklist of returnable documents.
Evaluation Criteria
Source: WTE-2626ES.pdf (TENDER)Bidders must: be registered on National Treasury's Central Supplier Database (CSD) and submit a comprehensive CSD report; be tax compliant with SARS (provide tax compliance status PIN or certificate); be registered with CIPC and submit a copy of the registration certificate; submit a valid B-BBEE Status Level Verification Certificate or sworn affidavit (for EMEs/QSEs) to claim preference points; submit a letter of authority or board resolution authorising the signatory; complete and sign SBD1, SBD4, SBD6.1 and Annexure C (Local Production and Content declaration); initial and sign all sections T1, T2, C1, C2 and C3; submit product samples with the tender; and comply with technical specifications. Bids from persons in the service of the state, or companies with directors who are state employees, will not be considered.
Technical Specifications
Source: WTE-2626ES.pdf (TENDER)Supply and delivery of personal safety equipment (pse) for eastern
Operations (midmar dam area office).
Submit bid documents to:
Postal address: or to be deposited in:
Dept of water and sanitation dept of water and sanitation
Supply chain management office the bid box at the entrance
Private bag x 24 gate of midmar dam
Howick, 3290 r103 prospect road
Pricing Schedule
Source: WTE-2626ES.pdfNo
T1 tendering procedures t1
T1.1 Instruction to bidders t1.1
T1.2 Evaluation criteria t1.2
T1.3 List of returnable documents and schedules t1.3
T1.4 Invitation to bid t1.4
T2 returnable documents and schedules t2
C1 contract data
C1.1 General conditions of contract c1.1
C2 pricing data c2
C2.1 Pricing instructions c2.1
C2.2 Bill of quantities c2.2
C3 scope of work c3
C3.1 Technical specifications c.3.1
C4 annexures c4
Page | 2
T1 tendering procedures
T1.1 Instructions to bidders
a) SBD Forms to be completed and signed
SBD1 Invitation to Bid
SBD3.1 Pricing Schedule – Firm Prices
SBD4 Declaration of Interest
SBD6.1 Preference Points Claim Form in terms of the Preferential Procurement
Regulations 2022
b) Returnable Schedules required for Bid Evaluation purposes
A: Bill of Quantities (BOQ)
B: Completed SBD 3.1
C:
State.”
Nb: failure to provide / or comply with any of the above particulars may render the bid invalid.
Signature of bidder: ...................................................
Capacity under which this bid is signed: ...................................................
(Proof of authority must be submitted e.g. company resolution)
Date: ....................................................
Page | 11
Sbd 3.1
Pricing schedule – firm prices
(Purchases)
Note: only firm prices will be accepted. Non-firm prices (including prices
Subject to rates of exchange variations) will not be considered
Page | 21
C1: contract data
C1.1 General conditions of contract
Page | 22
C2. Pricing data
C2.1 Pricing instructions
C2.2 Billl of quantities
Contract NO: WTE-2626ES
Pricing data: bill of quantities
Supply and delivery of personal safety equipment (pse) for eastern operations
(Midmar dam area office).
Compliance Requirements
Source: WTE-2626ES.pdf (TENDER)valid Tax Clearance Certificate issued by the South African
Tax Compliance status PIN Active registration with Company Intellectual Property Commission (to be
Tax compliance status
Tax compliance requirements
Tax compliance status (tcs) pin may be made via e-filing through the SARS website
Tcs pin is available but the bidder is registered on the central supplier database (csd), a csd
CSD report
CSD Reports (comprehensive)
Csd number
Csd number must be provided
Central Supplier Database must submit CSD report
Central supplier database (csd), a csd
C2.2 Bill of quantities c2.2
Should you require any further information in this regard, please do not hesitate to contact
SBD3.1 Pricing Schedule – Firm Prices
SBD4 Declaration of Interest
A: Bill of Quantities (BOQ)
2: An original valid Tax Clearance Certificate issued by the South African
3: Certified copies of Identity Documents of shareholders
7: CSD Reports (comprehensive)
Women Full CSD Report
B-BBEE Minimum Level: 1
Points Allocation: 80 points
B-BBEE Details: tion
Page | 5
Phase 3: administrative compliance
Bidders are required to comply with the following listed below:
No Criteria Yes No
1 Companies must be registered with National Treasury’s Central Supplier
Database must submit CSD report. Provide MAAA number on SBD1
2 Tax compliant with SARS (to be verified through CSD and SARS). Attach Tax
Compliance status PIN Active registration with Company Intellectual Property Commission (to be
verified through CSD and CIPC).
Attach copy of Bidder’s CIPC / CIPRO certificate.
4 A valid copy of B-BBEE Status Level Verification Certificate or a valid original
sworn affidavit (failure to submit, the Bidder will forfeit the relevant points
allocated for B-BBEE under specific goals)
5 Initial and sign Tender data section (T1 & T2) and all required documents to be
submitted with tender.
Initial each page of section C1, C2 and C3 and sign where required.
6 Letter of appointment of duly authorized person to sign bid. Proof of such
authority must be submitted with the bid.
If by an individual, must be signed by that individual or by someone on his
behalf duly authorised thereto and proof of such authority must be produced.
If the bid is by a Company, it must be signed by a person duly authorised
thereto by a Resolution of a Board of Directors a copy of which Resolution,
duly certified by the Chairman of the Company is to be submitted with the bid.
7 Complete, sign, submit SBD1, SBD4, SBD6.1 and Annexures C (Local
Production and Content declaration – summary schedule.)
Phase 4: price and specific goals
The 80/20-point system will be used in evaluating all proposals.
Evaluation element Weighting (Points)
Specific goals 20
Price 80
Total 100
Price
A maximum of
Health & Safety
Source: WTE-2626ES.pdfDue at 11:00 on
Closing date: 28 september 2026
*Bids to be submitted to the Tender Box before 11:00, bids not submitted in the tender box will
not be accepted.
WTE-2626ES
Supply and delivery of personal safety equipment (pse) for eastern
Operations (midmar dam area office).
(a) The bid must be signed on the Invitation to Bid form (SBD 1) annexed hereto with all blanks in
the bid and the appendix filled in.
(b) All spaces in the bid forms and other annexures shall be completed in full.
(c) SBD 3.1 in the bid document and the Pricing Schedule must be fully completed and
priced out by the bidder. Failure to do so will deem your bid invalid.
(d) The bid documents shall not be separated in any way nor must any pages be detached from
the original documents.
(a) The original Bid, together with a covering letter and supporting documents, shall be sealed in
an envelope endorsed:
Original bid for WTE-2626ES: the supply and delivery of personal safety
Equipment (pse) for eastern operations (midmar dam area office).
Page | 3
(b) Bids sealed and endorsed as above, will be received by: The Supply Chain Management Office
or may be deposit in the bid box at the entrance of Department of Water and Sanitation, R103
Prospect Road, Howick and not later than 11:00 on the date stipulated on the front cover of this
document.
3: Certified copies of Identity Documents of shareholders
4: B-BBEE Status Level Verification Certificate or Sworn Affidavit
5: Letter of Authority indicating the person who will be authorized to sign bidding
documents and contract on behalf of bidder
6: General condition of a contract, signed
7: CSD Reports (comprehensive)
8: Check list of returnable documents
Page | 9
T1.4 Invitation to bid
Sbd 1
Part a: invitation to bid
You are hereby invited to bid for requirements of the (name of department/ public entity)
BID NUMBER: WTE-2626ES CLOSING DATE: 28 SEPTEMBER 2026 CLOSING TIME: 11:00am
Description supply and delivery of personal safety equipment (pse) for eastern operations (midmar dam area office)
Bid response documents may be deposited in the bid box situated at (street address)
The bid box at the entrance of water and sanitation – midmar dam
R103 prospect street
Howick, 3290
Bid number: WTE-2626ES Closing date: 28 SEPTEMBER 2026 Closing Time 11:00
Offer to be valid for 120 days from the closing date of bid.
ITEM QTY DESCRIPTION OF GOODS UNIT PRICE (To be BID PRICE (To be
filled by the bidder) filled by the bidder) NO.
39 Women's Softshell Jacket
81 Men's Softshell Jacket
02 Welders Safety Boot
14 Safety Shoe
70 Havoc Premium Safety boots
182 Acid Resistant & Flame-Retardant Work
jacket with reflective strips
I CERTIFY THAT THE INFORMATION FURNISHED IN PARAGRAPHS 1, 2 and 3
Price (r) price (r
Women's Softshell Jacket EA 39
Men's Softshell Jacket EA 81
Welders Safety Boot EA 02
Safety Shoe EA 14
Havoc Premium Safety boots EA 70
Acid Resistant & Flame-Retardant Work EA 182
jacket with reflective strips
Acid Resistant & Flame-Retardant Work EA 182
Women's Softshell Jacket Size S x 05
Size M x 11
Fabric: 100% Polyester Size L x 06
Fabric Weight: 315 gsm2 Size XL x 11
Colour: Navy Size XXL x 04
inner
the top of the zip
toggles allow you to adjust the fit
DWS logo and 2026/2027
embroidered just above the left
breast.
Fabric: 100% Polyester Size M x 14
Fabric Weight: 315 gsm2 Size L x 24
Colour: Navy Size XL x 29
Features: Size XXL x 08
inner
the top of the zip
toggles allow you to adjust the fit
DWS logo and 2026/2027
embroidered just above the left
breast.
Page | 25
Size 11 x 01
Colour : Black
Total = 02
2.0mm – 2.2mm full-grain leather
Impact load resistance up to 200
joules.
Size 5 x 01
SABS approved Size 6 x 02
impact load of 200J Size 8 x 03
20345:2022 SB PL Size 10 x 01
midsole provides metal-free Total = 14
flexibility
ventilation
outsole with excellent traction
improved comfort and cushioning
laced in
comfort and support
Page | 26
Size 5 x 02
Colour: Black Size 6 x 08
SABS approved Size 7 x 15
Premium work boot equipped with a Size 8 x 12
200J steel toe cap, TPU reinforcing Size 9 x 21
heel guard, steel midsole for anti- Size 10 x 08
penetration and is heat resistant up Size 11 x 02
to 300° Celsius. The high-quality
waxy smooth leather upper and Total = 70
ultra-thick memory foam platinum
footbed provide style and comfort in
a versatile boot.
Flame Retardant Work jacket with Size 34 x 28
reflective strips Size 36 x 24
Size 38 x 40
Fabric: 100% Cotton D59 Size 40 x 30
Weight: 270 gm Size 42 x 18
Colour: Navy Size 44 x 12
Size 46 x 12
Details (Jacket): Size 48 x 06
50mm JW REFLECT® 0905 flame Size 50 x 04
retardant reflective tape for
increased visibility Total = 182
splashes, oil and water; and resist
heat and sparks
embroiled with Year 2026/27 on
the bottom.
Page | 27
SABS Approved Acid Resistant & Size 34 x 26
Flame-Retardant Work Trouser Size 36 x 32
with reflective strips Size 38 x 28
Size 40 x 26
Fabric: 100% Cotton D59 Size 42 x 18
Weight: 270 gm Size 44 x 06
Colour: Navy Size 46 x 04
Size 48 x 06
50mm JW REFLECT® 0905 flame Size 50 x 04
retardant reflective tape for Size 52 x 02
increased visibility
Chemically treated to repel acid, acid Total = 182
splashes, oil and water; and resist
heat and sparks
Contractual Terms
Source: WTE-2626ES.pdf1 Companies must be registered with National Treasury’s Central Supplier
Database must submit CSD report. Provide MAAA number on SBD1
2 Tax compliant with SARS (to be verified through CSD and SARS). Attach Tax
Compliance status PIN Active registration with Company Intellectual Property Commission (to be
verified through CSD and CIPC).
Attach copy of Bidder’s CIPC / CIPRO certificate.
c) Other Documents required for Bid Evaluation purposes
1: Company/business registration certificate (CK) issued by the Commissioner
of Companies & Intellectual Property Commission (Joint Ventures/Close
Corporation/Partnership/Company/Sole Proprietor)
2: An original valid Tax Clearance Certificate issued by the South African
Required by: OPERATIONS EASTERN
Att: SUPPLY CHAIN MANAGEMENT
Brand and model ........................................
Country of origin ........................................
Does the offer comply with the specification(s)? *YES/NO
If not to specification, indicate deviation(s) .........................................
Period required for delivery ........................................
*Delivery: Firm/not firm
Note: All delivery costs must be included in the bid price, for delivery at the prescribed
destination.
** “all applicable taxes” includes value- added tax, pay as you earn, income tax,
unemployment insurance fund contributions and skills development levies.
*Delete if not applicable
Page | 13
Sbd4
Bidder’s disclosure
4.3. Name of company/firm...............................................................................
4.4. Company registration number: .....................................................................
4.5. Type of company/ firm
Partnership/Joint Venture / Consortium
One-person business/sole propriety
Close corporation
Public Company
Personal Liability Company
(Pty) Limited
Non-Profit Company
State Owned Company
[Tick applicable box]
4.6. I, the undersigned, who is duly authorised to do so on behalf of the company/firm, certify
that the points claimed, based on the specific goals as advised in the tender, qualifies
the company/ firm for the preference(s) shown and I acknowledge that:
i) The information furnished is true and correct.
ii) The preference points claimed are in accordance with the General Conditions as
indicated in paragraph 1 of this form.
iii) In the event of a contract being awarded as a result of points claimed as shown in
paragraphs 1.4 and 4.2, the contractor may be required to furnish documentary
proof to the satisfaction of the organ of state that the claims are correct;
Page | 19
iv) If the specific goals have been claimed or obtained on a fraudulent basis or any of
the conditions of contract have not been fulfilled, the organ of state may, in addition
to any other remedy it may have –
(a) disqualify the person from the tendering process;
(b) recover costs, losses or damages it has incurred or suffered as a result of
that person’s conduct;
(c) cancel the contract and claim any damages which it has suffered as a result
of having to make less favourable arrangements due to such cancellation;
(d) recommend that the tenderer or contractor, its shareholders and directors, or
only the shareholders and directors who acted on a fraudulent basis, be
restricted from obtaining business from any organ of state for a period not
exceeding 10 years, after the audi alteram partem (hear the other side) rule
has been applied; and
(e) forward the matter for criminal prosecution, if deemed necessary.
Signature(s) of tenderer(s)
Surname and name: ................................................................
Date: ...............................................................
Address: ...............................................................
...............................................................
...............................................................
...............................................................
Page | 20
Requirements
Source: WTE-2626ES.pdf (TENDER)Mandatory requirements: Fully completed BOQ, SBD 3.1, and product samples submitted with tender on closing date. Technical compliance: comply with technical specifications and samples in compliance. Administrative compliance: CSD registration, tax compliance with SARS, CIPC registration, valid B-BBEE certificate or sworn affidavit, initial and sign all tender documents, letter of appointment of authorized signatory, complete and submit SBD1, SBD4, SBD6.1 and Annexure C. Bids must remain valid for 120 days after closing. No telegraphic, fax, or email bids accepted. Joint ventures must provide notarized joint venture agreement and authorization certificate.
Section
Source: WTE-2626ES.pdfT1.2 Evaluation criteria t1.2
Fund Transfer. The evaluation committee will be following a phased approach during
evaluation.
T1.2 Evaluation criteria
80/20 preference points system as prescribed in the Preferential Procurement Policy Framework Act
(PPPFA, Act . The lowest acceptable bid will score 80 points for price and a maximum of 20
points will be awarded for the specific goals. Maximum of 100 points will be scored for functionality
(quality).
(2) Functionality Requirements
considered for further evaluation.
sworn affidavit (failure to submit, the Bidder will forfeit the relevant points
allocated for B-BBEE under specific goals)
states that, if it is unclear whether the 80/20 preference point system applies, an organ
(a) an invitation for tender for income-generating contracts, that either the 80/20
preference point system will apply and that the highest acceptable tender will be used
to determine the applicable preference point system; or
(b) any other invitation for tender, that either the 80/20 or 90/10 preference point system
applicable preference point system, then the organ of state must indicate the points
allocated for specific goals for both the 90/10 and 80/20 preference point system.
Table 1: Specific goals for the tender and points claimed are indicated per the table below.
(Note to organs of state: Where either the 90/10 or 80/20 preference point system is
applicable, corresponding points must also be indicated as such.
Note to tenderers: The tenderer must indicate how they claim points for each preference
Number of points Number of points
The specific goals allocated points in
Contact Information
Source: guidelines for local content.pdf (unknown){"name":null,"email":null,"phone":"+27 12 394 9500","department":"of Trade and Industry","address":"Private Bag X84, PRETORIA, 0001, the dti Campus, 77 Meintjies Street, Sunnyside, 0002, Tel: (012) 394 0000"}
Submission Guidelines
Source: guidelines for local content.pdf (unknown)Returnable Documents: Annexure C must be submitted with the tender by the closing date and time as determined by the Tender Authority. The Tender Authority reserves the right to request Declarations C, D and E with actual values for the duration of the contract. A tenderer must complete Declarations D and E, and consolidate the information on Declaration C.
Evaluation Criteria
Source: guidelines for local content.pdf (unknown)Bidders must comply with the local content requirements as specified in the tender documentation, including completing the required declarations (Annexures C, D, and E) in accordance with SATS 1286:2011. The tender authority may request Declarations D and E. Bidders must provide evidence of any exemptions granted by the Department of Trade and Industry (the dti) for imported content.
Technical Specifications
Source: guidelines for local content.pdf (unknown)of how to
calculate local content of products (goods, services and works) by
components/material/services and enables them to keep an updated record
for verification requirements as per the SATS 1286:2011 Annexure A and B.
The guideline consists of two parts, namely:
a written guideline; and
three declarations that must be completed:
Declaration C: “Local Content Declaration – Summary Schedule” (see
Annexure C);
Declaration D: “Imported Content Declaration – Supporting Schedule
to Annex C” (see Annexure D); and
Declaration E: “Local Content Declaration – Supporting Schedule to
Annex C” (see Annexure E).
The guidelines and declarations should be used by tenderers when preparing
a tender. A tenderer must complete Declarations D and E, and consolidate
the information on Declaration C.
Annexure C must be submitted with the tender by the closing date and time
as determined by the Tender Authority. The Tender Authority reserves the
right to request that Declarations D and E also be submitted.
If the tender is successful, the tenderer must continuously update
Declarations C, D and E with actual values for the duration of the contract.
Note:
Annexure A is a
Quality Management
Source: guidelines for local content.pdfmanagement, design, testing, marketing, etc and makes royalty and lease
payments, such payments relating to the tender must be included when
calculating imported content.
2.3.1.2. Imported by a third party and supplied to the tenderer:
management, design, testing, marketing etc. and makes royalty and lease
payments, such payments relating to the tender must be included when
calculating imported content.
2.3.1.3. Exempt Imported Content:
B-BBEE Requirements
Source: guidelines for local content.pdf (unknown)Guidance for calculating local content of products (goods, services and works) by components/material/services, including definitions per SATS 1286:2011, categories of imported and local content, and the requirement to complete Declarations C, D and E. Local content is the tender price less imported content, expressed as a percentage. Imported content includes products imported directly by the tenderer or by third parties, with evidence required (commercial invoices, bills of entry). Exemptions may be granted by the dti. Detailed instructions for completing Annexure C (Local Content Declaration – Summary Schedule), Annexure D (Imported Content Declaration – Supporting Schedule), and Annexure E (Local Content Declaration – Supporting Schedule) are provided, including calculation of local content percentages, total values, and the average local content percentage of the tender.
Contractual Terms
Source: guidelines for local content.pdfmarketing, insurance, financing, interest and mark-up costs.
E13. Total local content:
The total local content is the sum of the values of E9, E10, E11 and
E12. This total must correspond with C24 of Annexure C.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
AS PER SPECIFICATION - AS PER SPECIFICATION - AS PER SPECIFICATION - 3290
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
5
Last checked
11 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Learn how to submit a winning bid with these related articles
Not every job is a 'tender.' Learn how to access the high-volume world of small orders (RFQs) and how to get invited to bid on jobs under R200k.
A high-stakes guide to food procurement. Learn about R638 compliance, cold chain logistics, and how to win provincial hospital supply contracts.
It's not just about the product; it's about getting it there. Master the logistics standards, POD systems, and insurance requirements for bulk supply.
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Clothing/Textiles/Footwear. Unlock full pricing strategies, bid frequency, and historical win rates.