Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
43 RISSIK STREET - Johannesburg - Johannesburg - 2000
Organization Type
GOVERNMENT
Published
11 Sept 2026
OCDS Reference
ocds-9t57fa-170132
The gauteng provincial legislature (gpl) is appointing a service provider to decommission and replace 130 obsolete chamber touch-screen pcs and related infrastructure, including network cabling, a control solution, and control-room pcs, and to provide 3-year support and warranty. The installation phase must be completed within 4 months (by 20 february 2027), followed by a 3-year support period. Bidders must demonstrate at least three successfully completed ICT enterprise installation projects and assign a project manager with experience leading at least three similar projects.
Closing date: 21 October 2026 at 11:00 AM; bids must be deposited into the bid box at 43 Rissik Street, Gauteng Provincial Legislature, City Hall, Johannesburg, 2000, Attention: Supply Chain Management.
Non-compulsory briefing session: 05 October 2026 at 12:00 PM via Microsoft Teams.
Mandatory returnable documents: Full Technical Proposal (hard copy; USB replica non-mandatory), completed and signed SBD 1 (Invitation to Bid), SBD 3.3 (Pricing Schedule – Firm Prices), SBD 4 (Bidder's Disclosure, original), SBD 6.1 (Preference Points Claim, original), full company registration documents, certified copies of South African IDs for all directors, company profile, and (if applicable) JV/Consortium/Trust Deed with all required documents.
Bidders must be registered on the Central Supplier Database (CSD) and provide a SARS Tax Compliance Status (TCS) PIN or CSD number; failure to comply may render the bid invalid.
Pricing must be firm (no price variations) and valid for 120 days from the closing date; all costs (delivery, labour, skills transfer) must be included.
Evaluation: 80/20 preference point system – 80 points for price, 20 points for specific goals (Black Ownership up to 7, Women Ownership up to 5, Youth Ownership up to 5, PWDs Ownership up to 3). Functionality (technical) evaluation with a minimum qualifying threshold of 70 points; only bidders achieving this proceed to price evaluation.
Experience requirements: minimum of three (3) signed reference letters or completion certificates for similar ICT enterprise installation projects; project manager must have led teams on at least three (3) similar projects (CV required).
Subcontracting limited to 25% of total contract deliverables without GPL approval; all personnel must meet GPL security clearance requirements, and successful bidder must sign a confidentiality/non-disclosure agreement.
Installation phase: 4 calendar months from appointment, completed no later than 20 February 2027; support phase: 3 years from handover. Monthly progress reports required from award, weekly during installation.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 21 October 2026 - 11:00
Venue
MICROSOFT TEAMS
Categories
Request for Bid(Open-Tender)
43 RISSIK STREET - Johannesburg - Johannesburg - 2000
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: IITPSA Membership, ISO 27001 (Information Security Management), ISO 20000 (IT Service Management), CISSP
AI Document Analysis Stages
Description
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)11 Sept
2026
Tender Published
Tender was published
21 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
GPL007.2027 Replacement of Chamber PCs Tender Document.pdf
The Gauteng Provincial Legislature (GPL) invites bids for the replacement and support of 130 obsolete chamber PCs and related infrastructure, including installation of new tablet PCs, network cabling, a control solution, and control room hardware, with a 3-year warranty and support period. The contract spans a 4-month installation phase and a 3-year support phase.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 9 801 513
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The Gauteng Provincial Legislature (GPL) seeks to appoint a service provider to replace and support the Chamber PCs and related infrastructure for a period of three years. The current PCs were last upgraded in 2013 and have been obsolete since 2018, with limited support and difficulty sourcing spare parts. The project involves decommissioning existing equipment and installing new touch screen PCs to support Members and staff during House Sittings.
Important Dates
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER){"closingDate":"21 October 2026","closingTime":"12H00 PM","briefingSession":"{"date":"21 October 2026","time":"12H00 PM","venue":"MICROSOFT TEAMS","is_compulsory":true}"}
Briefing Session
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)A non-compulsory briefing session will be held on 05 October 2026 at 12h00 PM via Microsoft Teams.
Contact Information
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER){"name":"Vhukhudo Letshokota","email":"[email protected]","phone":null,"department":"Supply Chain Management","address":"RDING THE BIDDING PROCEDURE MAY BE DIRECTED TO"}
Submission Guidelines
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)Returnable Documents: 3.4.1 A Copy of the Trust, Consortium or Joint Venture agreement duly signed must be attached.
Returnable Documents
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)Mandatory documents required for this bid: Full Technical Proposal with supporting documents (Hard Copy mandatory, USB with replica non-mandatory), completed and signed Invitation to Bid (SBD1), Pricing Schedule (Firm Pricing) SBD 3.3, Bidders Disclosure (SBD 4) original completed and signed, Preference Point Claim form (SBD 6.1) original completed and signed, copy of full Company Registration documents, copies of South African IDs for Directors, Company Profile, and Joint Venture/Consortium agreement/Trust Deed (if applicable) with certified copies of shareholders certificates, Company Registration documents, and ID documents of Directors or Members.
Evaluation Criteria
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)Phase1
Functionality (technical) – minimum 70 points to proceed
Phase2
Price and Specific Goals (80/20) – 80 points for price, 20 points for specific goals
Functionality Subcriteria
Relevant experience and record of accomplishment, technical approach and methodology, qualifications and experience of key personnel, capacity and resources to deliver the project. Only evidence 4 to 6 signed reference letters submitted with the bid will be evaluated.
Project Plan
Draft project plan addressing first six requirements (3 points)
Brand Names
Brand names and model numbers should be specified where possible
Technical Specifications
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)1.1 The Gauteng Provincial Legislature is the legislative authority of the Gauteng Province
established in terms of the Constitution of the Republic of South Africa. The Legislature is
responsible for law-making, public participation, oversight over the Provincial Executive and
ensuring accountability within the provincial government.
1.2 The GPL seeks to appoint a suitable and competent service provider to upgrade the current
ICT infrastructure and decommission and replace touch screen Personal Computers (PCs)
with up-to-date technology in the GPL Chamber. The Chamber of the Gauteng Provincial
Legislature is the heart of law-making and oversight in Gauteng. The current PC’s were last
upgraded in 2013 and have been obsolete since 2018, when they were due for replacement.
The equipment now has limited to no support, and spare parts are either unavailable or
increasingly difficult to source, making maintenance and repairs impractical. This equipment
will be used to support the Members and support staff of the Legislature during House Sittings.
The successful service provider is to consider trends in the industry to propose the best
possible solution to meet the requirements as stated in this document.
2.1 The purpose of this Terms of Reference is to invite suitably qualified and experienced service
providers to submit proposals for decommissioning the current Chamber PC’s and related
infrastructure and replace the touch screen PCs with up-to-date technology in the GPL
Chamber.
3.1 The objectives of this assignment are to:
3.1.1 Replace the PC’s and related infrastructure in the Chamber, which would improve efficiency
and support during House Sittings.
3.1.2 Ensure value for money and compliance with the GPL SCM Policy.
3.1.3 Appoint a competent service provider capable of delivering the required outputs.
4.1 The successful service provider will be required to perform, but not be limited to, the
following:
4.1.1 Removal of existing equipment
All 130 redundant PC’s and related hardware need to be removed from the chamber and
control room. The removed equipment must be stored at an identified location in the GPL
precinct, to allow Asset Management to dispose of redundant equipment.
of 29
4.1.2 Installation of new tablet PC’s in the chamber and related areas
These units should have the following minimum specifications and should preferably be
Mimo MCT series or equivalent:
a) 64-bit CPU capable of decoding h.264 video
b) 4gb RAM
c) 16gb flash storage
d) 1Gbps Ethernet port with POE capability
e) VESA mount (100mm x 100mm)
f) 2 x USB-A ports
g) Multipoint Capacitive touch screen
h) 16:9 Aspect ratio with 1920x1080 resolution
i) 300 cd/m2 brightness
j) Dedicated power supply
k) 3-year warranty
4.1.2.1 103 x 13" Tablet PC's, mounted to existing metal brackets (100mmx100mm VESA),
allocated as follows:
a) 90 x Members positions
b) 6 x Service Officer positions
c) 2 x Sergeant-at-Arms positions
d) 5 x Spare units
4.1.2.2 10 x 15.6" Tablet PC's with stands, allocated as follows:
a) 4 x Procedural Table Staff positions
b) 2 x Presiding Officer positions
c) 1 x Hansard Recording position
d) 1 x Interpreter Supervisor position
e) 2 x Spare units
4.1.2.3 27 x 13" Tablet PC's with stands, allocated as follows:
a) 24 x Interpreter positions across 12 booths
b) 3 x spare units
4.1.2.4 Network and Cabling
a) Rewiring of 24 network points with CAT6 cabling from the interpretation booths to the
switch in the rack to support 1Gbps network speed. (Around 500m required)
b) Ensure all points in the Chamber are running at 1Gbps.
c) All cabling and patch leads to be provided (Ethernet, Power cables, etc.)
d) Configuration of existing servers to support the new infrastructure and control solution.
4.1.2.5 Control Solution
A fully licensed software solution is required, which must have the following functionality:
a) Power control of all touch screen PC’s from the control room, i.e. wake up, restart and
shutdown all PC’s.
b) Remote access to all touch screen PC’s from the control room
c) Deployment of software to all PC’s from the control room.
of 29
d) Deployment of updates and security patches to all PC’s from the control room.
4.1.3 Installation of PC’s in the Control Room
4.1.3.1 1 x Monitoring, control and backup PC
a) Graphics Card: Nvidia RTX 4060 8GB or equivalent
b) CPU: AMD Ryzen 7 5800X or equivalent
c) CPU Cooler: Dual 120mm Fan Air Cooler
d) Motherboard: AMD X570 chipset motherboard or equivalent
e) RAM: 32GB DDR4-3200 (2 x 16GB) or equivalent
f) Storage 1: 1TB NVMe PCIe 4.0
g) Storage 2: 2 x 16TB 7200rpm HDD
h) Power Supply: 750w 80+ Gold PSU
i) Case: 19" 4u rack mounted pc case capable of housing all components with adequate
ventilation
j) Operating System: Windows 11 Pro licensed
k) Mouse and keyboard: Wired USB mouse and keyboard combo
l) Monitor: 24” 1080p touch screen monitor
4.1.3.2 x Small Form Factor NUC 14 Pro PCs for Audio DSP and Remote Control
a) Intel Core Ultra 5 125H with onboard Graphics
b) 16GB DDR5 RAM
c) 512GB PCIe G4x4 NVMe SSD
d) RJ45 Gigabit Ethernet port
e) 4 x USB 3 Ports
f) 2 x HDMI Ports
g) Windows 11 Pro Fully Licensed
h) Dedicated Power Supply
4.1.4 Warranty and Support
4.1.4.1 3-year support, including telephonic and on-site support, as well as spare holding. Loan
equipment should also be available to avoid excessive down time. A detailed support
proposal should be included as part of the submission.
4.1.4.2 3-year warranty on all equipment
4.1.4.3 User training and documentation for AV staff – Digital and physical training manuals and
system diagrams to be provided.
4.2 Any other related activities necessary to achieve the objectives of the assignment.
5.1 The service provider must deliver the following outputs:
5.1.1 Decommissioning of existing infrastructure
5.1.2 Installation of new PC’s and related infrastructure
5.1.3 Commissioning, training and handover
5.1.4 Final report / product approved by the institution.
6.1 Installation Phase: The duration of the assignment will be 4 calendar months from the date of
appointment and be completed no later than 20 February 2027.
of 29
6.2 Support Phase: a 3-year period, starting on the date of completion of the handover of the
project installation.
7.1 The service provider will report to AV Supervisor in the ICT unit.
7.2 Progress reports must be submitted monthly from the date of award, and then weekly from the
installation start date until completion.
7.3 All deliverables are subject to review and approval by the institution.
8.1 Service providers must demonstrate:
9.1.1 A minimum of three (3) ICT enterprise installation projects successfully completed in similar
environments.
9.1.1 The bidder must assign a project manager who is appropriately experienced and has lead
teams working on at least three (3) similar projects.
Methodology
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)against predetermined technical criteria and weightings. This may include:
9.3.1.1 Relevant experience and record of accomplishment
9.3.1.2 Technical approach and methodology
9.3.1.3 Qualifications and experience of key personnel
9.3.1.4 Capacity and resources to deliver the project.
of 29
9.3.2 Only bidders who achieve the minimum qualifying threshold for functionality will proceed to
the next phase
of 29
its proposed approach for implementing the Chamber
of 29
Experience & Qualifications
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)possible solution to meet the requirements as stated in this document.
2.1 The purpose of this Terms of Reference is to invite suitably qualified and experienced service
providers to submit proposals for decommissioning the current Chamber PC’s and related
infrastructure and replace the touch screen PCs with up-to-date technology in the GPL
8.1 Service providers must demonstrate:
9.1.1 A minimum of three (3) ICT enterprise installation projects successfully completed in similar
environments.
9.1.1 The bidder must assign a project manager who is appropriately experienced and has lead
teams working on at least three (3) similar projects.
9.1 Proposals will be evaluated in accordance with the 80/20 preference point system,
based on:
9.1.1 Functionality / Technical evaluation
9.1.2 Price and Specific Goals
9.2 The GPL needs to be satisfied, in all respects, that the service provider selected has the
necessary resources, qualifications, experience, and technical ability to successfully execute
the project. All proposals received will be evaluated in a fair, transparent, competitive, and
cost-effective manner, in accordance with the prescribed evaluation criteria and approved
evaluation process. The 80/20 Preference Point System will be applied to evaluate the
received proposals. The evaluation process shall be conducted in the following sequential
phases:
9.2.1 Phase 1: Administrative Compliance (Pre-qualification)
statutory requirements, including but not limited to:
9.2.1.1 Signed and completed bid documents.
9.2.1.2 Company registration documents
9.2.1.3 Any other mandatory documentation specified in the bid (e.g., affiliation
certificates, qualifications, etc.)
9.3 Failure to comply with mandatory requirements may result in disqualification and the proposal
will not proceed to the next phase.
9.3.1 Phase 2: Functionality / Technical Evaluation
1 Proven Track record Less than 3 signed reference letters submitted 0 20
A minimum of three (3) ICT enterprise installation projects
successfully completed. 3 signed reference letters with required details
completion certificates for similar projects. Only evidence 4 to 6 signed reference letters with required 4
submitted with the bid will be evaluated. details
A minimum of 3 reference letters for similar projects
signed by the referee with contact details, 7 or more signed reference letters with required 5
description/details of the project implemented, and details
period of the contract must be submitted.
the proposed Project Manager has experience in
The bidder must assign a project manager who is less than three (3) similar projects.
appropriately experienced and has lead teams working on The bidder submitted a CV demonstrating that 3
at least three (3) similar ICT installation projects. the proposed Project Manager has experience in
three (3) similar projects.
of 29
As evidence of experience, the bidder must provide the The bidder submitted a CV demonstrating that 4
following: copy of Project Manager CV, company portfolio the proposed Project Manager has experience in
of similar projects where the assigned project manager was four (4) similar projects
a project lead or a member
The bidder submitted a CV demonstrating that 5
the proposed Project Manager has experience in
five (5) similar projects
3 Compliance with specifications 100% compliance to technical specification with 5 40
Bidder should comply 100% with the technical itemised costing, brand names and model
specifications in the scope of work section of this document numbers. Product datasheets submitted. All
(Section 4). The quotation should be clear, itemised, with items in Annexure A are included in the quotation.
as much detail as possible. Brand names and model
numbers should be specified where possible. Product
datasheets to be submitted. Please use the checklist in
12.1 The Gauteng Provincial Legislature (GPL) reserves the right to appoint one or more service
providers, to not make any appointment, or to establish a panel of service providers instead
of appointing a single service provider.
12.2 The GPL is not bound to accept the lowest-priced bid or any bid received.
12.3 Late submissions will not be accepted and will automatically be disqualified from further
consideration.
12.4 The GPL reserves the right to verify all information provided by bidders, including references,
and past experience.
12.5 Any false, inaccurate, or misleading information provided by a bidder may result in immediate
disqualification and may lead to further action in accordance with applicable legislation.
12.6 Bidders must comply with all applicable legislation, regulations, and policies, including Supply
Chain Management (SCM), CIPC and SARS requirements.
12.7 All costs incurred by bidders in the preparation and submission of proposals will be for the
bidder’s own account, and the GPL will not be held liable for any such costs.
12.8 The GPL reserves the right to cancel this bid process at any stage, should it be deemed
necessary and in the best interest of the institution.
13.1 Bidders may submit a duly signed proposal in both hard copy and electronic format (on USB).
13.2 All Standard Bidding Documents (SBD Forms) must be fully completed, signed, and
submitted as part of the bid. Failure to submit a completed and duly signed SBD 3 will
automatically disqualify a bidder.
13.3 Copies of company registration documents must be provided with ID copies for all Directors
or Directors or a holding company.
13.4 Bidders must submit proof of relevant experience, including reference letters and details of
similar projects undertaken.
13.5 Late submissions will not be accepted and will be automatically disqualified.
of 29
13.6 Bids must be submitted in a sealed envelopes clearly marked with the bid description and
reference number.
13.7 Failure to submit all required documentation may result in disqualification.
of 29
ANNEXURE A: Checklist for Compliance to Technical Specification
Quality Management
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)The bidder submits a draft project plan that 4 3. Implementation schedule with milestones and
adequately addresses the first eight (1-8) dependencies.
requirements. 4. Resource allocation and key project personnel.
The bidder submits a draft project plan that 5 5. Procurement, delivery, installation, testing,
adequately addresses all ten (1-10) of the commissioning and handover activities.
requirements. 6. Project close-out activities.
Pricing Schedule
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)documents
1.1 Hard Copy (Mandatory)
1.2 USB with information replica of the bid
proposal? Non-mandatory
Invitation to bid (SBD1): completed and signed Yes
Pricing Schedule (Firm Pricing) SBD 3.3 Yes
Bidders Disclosure (SBD 4) Original completed Yes
and signed.
completed and signed.
Copy of full Company Registration documents? Yes
Copies of South African IDs’ for Directors? Yes
3.2.5 Bid documents may be couriered by a registered mail and deposited in the tender box
situated at the address as stipulated on the cover page of this document between 08:00am
to 17:00pm, Monday to Sunday (including Public Holidays). Bidders must allow sufficient time
to access the tender box in the GPL through the visitor’s entrance and other security
checkpoints.
3.2.6 Pricing Structure
a) Bidders are requested to indicate their price in all elements listed on the pricing schedule.
b) Pricing on the pricing schedule is for comparative purposes.
c) Prices must remain fixed for the duration of the contract
d) The total costs must be inclusive of all costs such as delivery, labour rates, Transfer of
skills etc.
3.3 Bid validity period
3.3.1 This bid and all proposals (costs included) shall remain binding and valid for a period of 120
days calculated from the closing date of the Bid. The GPL reserves the right to notify bidders
in writing to extend the above validity period if deemed necessary and in the interest of the
Name & surname: ______________________designation/rank: __________________
Persal/employee no/service number: ___________________
PLACE and DATE: _________________________
of 29
Sbd 3.1
Pricing schedule – firm prices
(Purchases)
Note: only firm prices will be accepted. Non-firm prices (including prices
Subject to rates of exchange variations) will not be considered
Financial Requirements
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)Prices must be quoted in South African Rand (ZAR) and be VAT inclusive/exclusive. Payment will be made upon satisfactory delivery of agreed milestones. No advance payments will be made unless specified. Firm prices only – non-firm prices (including prices subject to rate exchange variations) will not be considered.
Compliance Requirements
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)These are documents required for this bidding. Should the bidder fail to submit the following documents, the bid may be disqualified: Item Description Mandatory Submitted Yes No
Full Technical Proposal with supporting Yes documents 1.1 Hard Copy (Mandatory) 1.2 USB with information replica of the bid proposal? Non-mandatory
Invitation to bid (SBD1): completed and signed Yes
Pricing Schedule (Firm Pricing) SBD 3.3 Yes
Bidders Disclosure (SBD 4) Original completed Yes and signed.
Preference Point Claim form (SBD 6.1) Original Yes completed and signed.
Copy of full Company Registration documents? Yes
Copies of South African IDs’ for Directors? Yes
Company Profile Yes
Joint Venture / Consortium agreement / Trust Yes Deed (if applicable)
Did you submit all documents for all parties of the Joint Venture/Consortium/Trust Deed? All documents listed below
Certified copies of shareholders
Certified copy of Company Registration documents
Certified copy of ID documents of the Directors or Members Service Provider’s Name: ....................................................... Completed by: ........................................................................ Signature: .............................................................................. of 29 SECTION 2 INVITATION TO BID (SBD 1) YOU ARE HEREBY INVITED TO BID FOR REQUIREMENTS OF THE GAUTENG PROVINCIAL LEGISLATURE (GPL) BID NUMBER: GPL007/2027 CLOSING 21 OCTOBER 2026 CLOSING DATE: TIME:11H00 DESCRIPTION APPOINTMENT OF A SERVICE PROVIDER TO REPLACE AND SUPPORT THE CHAMBER PC’S AND RELATED INFRASTRUCTURE FOR THE GPL FOR A PERIOD OF THREE YEARS. SUPPLIER INFORMATION NAME OF BIDDER POSTAL ADDRESS STREET ADDRESS CELLPHONE NO.TELEPHONE NO. VAT REGISTRATIONEMAIL ADDRESS NUMBER COMPLIANCE MAAA- TAX PINSTATUS ARE YOU THE ACCREDITED REPRESENTATIVE IN ARE YOU A FOREIGN BASED SUPPLIER SOUTH AFRICA FOR THE GOODS/SERVICES/WORKS FOR THE GOODS/SERVICES /WORKS OFFERED? SUBMIT PROOF IF YES OFFERED? SUBMIT PROOF IF YES YES NO YES NO QUESTIONNAIRE FOR FOREIGN BIDDERS IF THE ANSWER IS “NO” TO ALL OF THE ABOVE, THEN IT IS NOT A REQUIREMENT TO REGISTER FOR A TAX COMPLIANCE STATUS SYSTEM PIN CODE FROM THE SOUTH AFRICAN REVENUE SERVICE (SARS) AND IF NOT, REGISTER AS PER 2.3 BELOW. YES NO IS THE ENTITY A RESIDENT OF THE REPUBLIC OF SOUTH AFRICA (RSA)? DOES THE ENTITY HAVE A BRANCH IN THE RSA? QUESTIONNAIRE FOR FOREIGN BIDDERS IF THE ANSWER IS “NO” TO ALL OF THE ABOVE, THEN IT IS NOT A REQUIREMENT TO REGISTER FOR A TAX COMPLIANCE STATUS SYSTEM PIN CODE FROM THE SOUTH AFRICAN REVENUE SERVICE (SARS) AND IF NOT, REGISTER AS PER 2.3 BELOW. YES NO DOES THE ENTITY HAVE A PERMANENT ESTABLISHMENT IN THE RSA? DOES THE ENTITY HAVE ANY SOURCE OF INCOME IN THE RSA? IS THE ENTITY LIABLE IN THE RSA FOR ANY FORM OF TAXATION? of 29 TERMS AND CONDITIONS FOR BIDDING
Bid submission: 1.1. Bids must be delivered by the stipulated time to the correct address. Late bids will not be accepted for consideration. 1.2. All bids must be submitted on the official forms provided – (not to be re-typed) or in the manner prescribed in the bid document. 1.3. This bid is subject to the preferential procurement policy framework act, and the preferential procurement regulations, 2022, the general conditions of contract (gcc) and, if applicable, any other special conditions of contract. 1.4. The gpl will not award contracts to provide goods and/or services to a member of gpl or cabinet, a member of a provincial legislature or member of a provincial executive council, a municipal councillor, 1.5. Bids will not be considered from persons in the service of the state, companies with directors who are persons in the service of the state, or close corporations with members persons in the service of the state whose participation in bidding for the contract may result in a conflict of interest, or organ of state in which any of the mentioned persons is a director or has controlling or other substantial interest.
TAX COMPLIANCE REQUIREMENTS 2.1 BIDDERS MUST ENSURE COMPLIANCE WITH THEIR TAX OBLIGATIONS. 2.2 BIDDERS ARE REQUIRED TO SUBMIT THEIR UNIQUE PERSONAL IDENTIFICATION NUMBER (PIN) ISSUED BY SARS TO ENABLE THE GPL TO VERIFY THE TAXPAYER’S PROFILE AND TAX STATUS. APPLICATION FOR TAX COMPLIANCE STATUS (TCS) PIN MAY BE MADE VIA E-FILING THROUGH THE SARS WEBSITE WWW.SARS.GOV.ZA. 2.3 WHERE NO TCS PIN IS AVAILABLE BUT THE BIDDER IS REGISTERED ON THE CENTRAL SUPPLIER DATABASE (CSD), A CSD NUMBER MUST BE PROVIDED. NB: FAILURE TO PROVIDE / OR COMPLY WITH ANY OF THE ABOVE PARTICULARS MAY RENDER THE BID INVALID. SIGNATURE OF BIDDER: ................................. DATE:.................................................... CAPACITY UNDER WHICH THIS BID IS SIGNED: ................................................... of 29 SECTION 3 NOTICE & INSTRUCTIONS TO BIDDERS 3.1 DOCUMENTS 3.1.1. The bidder must specify the name, position, address and contact details (email address and telephone number) of the person responsible for leading the bid process and to whom all correspondence relating to the bid should be directed. 3.1.2. The bid submission must be signed by a duly authorised representative of the bidder who has the authority to enter into legally binding contracts on behalf of the bidder. Proof of authority must be submitted e.g. company resolution. 3.1.3. If any part of this bid is not duly filled in and signed, it may invalidate the bid. 3.1.4. Where alterations have been made to any part of the bid, the bidder must sign next to the corrections made (Correction ink/Tippex is not allowed). 3.1.5. The bidder must initial all the pages of this bid to acknowledge acceptance of understanding. The signed bid document must be returned with the proposal. 3.2 SUBMISSION OF BID PROPOSAL 3.2.1 This bid must be submitted in accordance with the format, times and place as prescribed in the bid document. 3.2.2 This Bid document, proposal and all other relevant documentation requested must be submitted in one sealed envelope or sealed box. For Financial proposal and any other document where bidders’ costs are displayed or referenced, please place this in a separate envelope. 3.2.3 Bids must be clearly marked on the front as follows: Bid No: GPL007/2027 3.2.4 Bids must be clearly marked on the back as follows: Bidders Name & Bidders Address Bidders Contact Numbers 3.2.5 Bid documents may be couriered by a registered mail and deposited in the tender box situated at the address as stipulated on the cover page of this document between 08:00am to 17:00pm, Monday to Sunday (including Public Holidays). Bidders must allow sufficient time to access the tender box in the GPL through the visitor’s entrance and other security checkpoints. 3.2.6 Pricing Structure
Bidders are requested to indicate their price in all elements listed on the pricing schedule.
Pricing on the pricing schedule is for comparative purposes.
Prices must remain fixed for the duration of the contract
The total costs must be inclusive of all costs such as delivery, labour rates, Transfer of skills etc. 3.3 BID VALIDITY PERIOD 3.3.1 This bid and all proposals (costs included) shall remain binding and valid for a period of 120 days calculated from the closing date of the Bid. The GPL reserves the right to notify bidders in writing to extend the above validity period if deemed necessary and in the interest of the GPL. of 29 3.4 JOINT VENTURES OR CONSORTIUM 3.4.1 A Copy of the Trust, Consortium or Joint Venture agreement duly signed must be attached. 3.4.2 A trust, consortium or joint venture will qualify for points for specific goals in accordance with the applicable Preferential Procurement Policy, provided that the entity submits the required consolidated documentation for purposes of evaluation and scoring of the specific goals. 3.5 DISCOUNTS 3.5.1 When calculating comparative prices, the GPL will consider any discounts which have been offered unconditionally. A discount which has been offered conditionally will be implemented when payment is effected despite not being considered for evaluation purposes. 3.6 GENERAL CONDITIONS 3.6.1 The GPL may request bidders to provide additional information with regards to the bid proposal at any given stage during the evaluation process. 3.6.2 All proposals in response to this bid, whether successful or unsuccessful, will become the property of the GPL. 3.6.3 Any costs incurred by the bidders in preparing and submitting their response will be the sole responsibility of the bidder. 3.6.4 The GPL reserves the right to invite short-listed bidders to make a presentation to GPL’s bids evaluation committee to further clarity or substantiate their submissions. 3.6.5 The GPL reserves the right, for purposes of promoting the values of competitiveness and fairness, not to award the bid to the highest scoring bidder if such bidder has been awarded a bid by GPL or has performed services for GPL during the last 12 months prior to the closing date of the bid. 3.6.6 The GPL reserves the right to re-appoint or extend the service of the service provider where there is a natural continuation of assignments. 3.6.7 The successful bidder/s will enter into a stipulated contract with GPL for the provision of the required service. 3.6.8 The successful bidders, their employees and their sub-contractors must comply with GPL security clearance requirements. 3.6.9 The successful bidders must be willing to sign confidentiality or non-disclosure agreement. 3.6.10 In the event where the order was wrongly printed, the service provider must be able to exchange goods or cancel the order as per the GPL’s request. 3.6.11 The GPL may, at its discretion, require the removal and replacement of any of the bidder’s personnel who do not perform adequately from its premises. 3.7 CENTRAL SUPPLIER DATABASE REQUIREMENTS 3.7.1 Bidders should register on the Central Supplier Database (CSD) to upload information namely, (Business Registration/Directorship/Membership/Identity Numbers/B-BBEE Information and Banking Information for verification purposes) 3.8 AWARD OF BID 3.8.1 The award of this bid by the Secretary to the GPL shall constitute a binding contract, and such award shall be confirmed by means of an appointment/award letter. The successful bidder must in return provide a written response on their letterhead of the acceptance of the award. of 29 3.9 SUBCONTRACTING 3.9.1 The bidder awarded a contract may only enter into a subcontracting arrangement with the approval of the GPL. The bidder may not subcontract more than 25% of the total contract deliverables. 3.9.2 A bidder awarded a contract in relation to a designated sector, may not subcontract such that the local production and content of the overall value of the contract is reduced to below the stipulated minimum threshold. 3.10 FRONTING 3.10.1 The GPL supports the spirit of broad based black economic empowerment and recognizes that real empowerment can only be achieved through individuals and businesses conducting themselves in accordance with the Constitution and in an honest, fair, equitable, transparent and legally compliant manner. Against this background the GPL condemns any form of fronting. 3.10.2 The GPL, in ensuring that bidders conduct themselves in an honest manner will, as part of the bid evaluation processes, conduct or initiate the necessary enquiries/investigations to determine the accuracy of the representation made in bid documents. 3.10.3 Should any of the fronting indicators as contained in the Guidelines on Complex Structures and Transactions and Fronting, issued by the Department of Trade, Industry and Competition (the dtic), be established during such enquiry / investigation, the onus will be on the bidder / contractor to prove that fronting does not exist. Failure to do so within a period of 14 days from date of notification may invalidate the bid/contract and may also result in the restriction of the bidder /contractor to conduct business with the public sector for a period not exceeding ten years, in addition to any other remedies the GPL may have against the bidder / contractor concerned. 3.11 SECURITY AND OCCUPANCY 3.11.1 Where applicable, All the areas covered by this contract fall within areas defined in the relevant Security and Access Acts as “Restricted Areas” and all of the provisions of these Acts will apply to this contract. 3.11.2 Where applicable, all buildings involved in this contract are subject to stringent access control for all personnel and for materials delivered to and removed from the site. 3.11.3 If any person is rejected for security reasons, a bidder will be required to replace them on their list. If the Bidder is ultimately unable to offer personnel with satisfactory security clearance, his Bid may be rejected on such grounds. 3.11.4 Any person rejected by the SAPS for failing to meet the security requirements, inclusive of security clearance, wandering away from an escort or from the immediate contract area, or any misconduct on the site will immediately, without any recourse by the Contractor, be removed from site and refused re-entry to site. This refusal to site shall be in addition to any legal action the SAPS may institute. 3.11.5 Following the formal acceptance of the Bid, the successful bidder shall be required to submit the requested information and/or documentation to the GPL within forty-eight (48) hours of being requested to do so
Full names of each of the persons intended to be utilised on site, including supervisory staff.
Position in firm plus service to be performed. of 29
A copy of the Identification Document (ID), certified as a true copy of the original by the South African Police Service (SAPS). The certified copy submitted must be the original certified document and not a photocopy or scanned copy thereof.
Business address. 3.11.6 Bidders are recommended to have such documentation, both for their own staff and for their Sub-contractors, if applicable, available prior to the closing date of Bids so as to minimise delays in security clearance of personnel once the Bid is awarded. 3.11.7 Any time lost due to delays in submitting the called for list of personnel required entering site, the rejection of personnel on the list, or the subsequent removal and banning from site of personnel will not be accepted as motivation for extension of the contract period. 3.11.8 Such clearance shall remain valid for a period not exceeding 12 months and shall only apply for one project at a time. 3.12 SAFEGUARDING OF DOCUMENTS 3.12.1 All documents will be individually numbered on issue and records kept as to what documents have been issued to whom. 3.12.2 All documents issued to sub-contractors or suppliers must be signed for, and such sub- contractors and suppliers must also accept responsibility for the safeguarding of such documents while they are in their possession. 3.12.3 All documentation shall be strictly handled as set out in the SSA Minimum Information Security Standards (MISS), a copy of which shall be provided to the successful contractor at the time of site hand over. 3.12.4 It will be the main contractor's responsibility to familiarise themselves with the MISS document and make sure his personnel and sub-contractors are advised accordingly. 3.13 BID CANCELLATION 3.13.1 The GPL may amend or cancel this Bid before the award should it deem it necessary but not limited to
due to changed circumstances there is no longer need for the goods and services specified in the invitation.
funds are no longer available to cover the total envisaged expenditure
no acceptable bid is received; or
there is a material irregularity in the bidding process
there is material change of scope after the tender has closed. 3.14 DELIVERY ADHERENCE 3.14.1 Delivery of services must be made in accordance with the instructions appearing on the official Purchase Order issued by GPL and/or Contract/SLA of 29 SECTION 4 BID DECLARATION
IF THE BIDDER IS IN PARTNERSHIP / JOINT VENTURE / CONSORTIUM. We the undersigned partners / joint ventures / consortium, tendering as .............................................................hereby authorize ....................................to sign this Bid as well as any contract resulting from this Bid and any other documents correspondence in connection with this Bid and/or contract on our behalf. FULL NAMES ................................ CAPACITY .......................................... SIGNATURE ............................................................ NB: Please note that all partners of the JV must be compliant, and a JV Agreement must be signed and submitted.
Points Allocation: 3 points
B-BBEE Details: bidders must be willing to sign confidentiality or non-disclosure agreement.
3.6.10 In the event where the order was wrongly printed, the service provider must be able to
exchange goods or cancel the order as per the GPL’s request.
3.6.11 The GPL may, at its discretion, require the removal and replacement of any of the bidder’s
personnel who do not perform adequately from its premises.
3.7 Central supplier database requirements
3.7.1 Bidders should register on the Central Supplier Database (CSD) to upload information namely,
(Business Registration/Directorship/Membership/Identity Numbers/B-BBEE Information and
Banking Information for verification purposes)
3.8 Award of bid
3.8.1 The award of this bid by the Secretary to the GPL shall constitute a binding contract, and such
award shall be confirmed by means of an appointment/award letter. The successful bidder
must in return provide a written response on their letterhead of the acceptance of the award.
of 29
3.9 Subcontracting
3.9.1 The bidder awarded a contract may only enter into a subcontracting arrangement with the
approval of the GPL. The bidder may not subcontract more than 25% of the total contract
deliverables.
3.9.2 A bidder awarded a contract in relation to a designated sector, may not subcontract such that
the local production and content of the overall value of the contract is reduced to below the
stipulated minimum threshold.
3.10 Fronting
3.10.1 The GPL supports the spirit of broad based black economic empowerment and recognizes
that real empowerment can only be achieved through individuals and businesses conducting
themselves in accordance with the Constitution and in an honest, fair, equitable, transparent
and legally compliant manner. Against this background the GPL condemns any fo
Health & Safety
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)3.1 Documents
3.1.1. The bidder must specify the name, position, address and contact details (email address and
telephone number) of the person responsible for leading the bid process and to whom all
correspondence relating to the bid should be directed.
3.1.2. The bid submission must be signed by a duly authorised representative of the bidder who
has the authority to enter into legally binding contracts on behalf of the bidder. Proof of
authority must be submitted e.g. company resolution.
3.1.3. If any part of this bid is not duly filled in and signed, it may invalidate the bid.
3.1.4. Where alterations have been made to any part of the bid, the bidder must sign next to the
corrections made (Correction ink/Tippex is not allowed).
3.1.5. The bidder must initial all the pages of this bid to acknowledge acceptance of understanding.
delays in security clearance of personnel once the Bid is awarded.
3.11.7 Any time lost due to delays in submitting the called for list of personnel required entering site,
the rejection of personnel on the list, or the subsequent removal and banning from site of
personnel will not be accepted as motivation for extension of the contract period.
3.11.8 Such clearance shall remain valid for a period not exceeding 12 months and shall only apply
for one project at a time.
3.12 Safeguarding of documents
3.12.1 All documents will be individually numbered on issue and records kept as to what documents
have been issued to whom.
3.12.2 All documents issued to sub-contractors or suppliers must be signed for, and such sub-
contractors and suppliers must also accept responsibility for the safeguarding of such
documents while they are in their possession.
3.12.3 All documentation shall be strictly handled as set out in the SSA Minimum Information
Security Standards (MISS), a copy of which shall be provided to the successful contractor at
the time of site hand over.
3.12.4 It will be the main contractor's responsibility to familiarise themselves with the MISS
document and make sure his personnel and sub-contractors are advised accordingly.
3.13 Bid cancellation
3.13.1 The GPL may amend or cancel this Bid before the award should it deem it necessary but not
limited to:
a) due to changed circumstances there is no longer need for the goods and services
specified in the invitation.
b) funds are no longer available to cover the total envisaged expenditure
c) no acceptable bid is received; or
d) there is a material irregularity in the bidding process
e) there is material change of scope after the tender has closed.
3.14 Delivery adherence
3.14.1 Delivery of services must be made in accordance with the instructions appearing on the
official Purchase Order issued by GPL and/or Contract/SLA
of 29
Section 4
required to furnish documentary proof to the satisfaction of GPL that the claims are correct.
a) recover all costs, losses or damages it has incurred or suffered as a result of that person’s
conduct.
b) cancel the contract and claim any damages which it has suffered as a result of having to
make less favourable arrangements due to such cancellation.
the claim which was made in the Bid.
of 29
accordance with the requirements and task directives / proposals specifications stipulated in this
document, that he/she does not have any objection to taking the oath, and that he/she considers it
to be binding on his/her conscience, and which was sworn to and signed before me at
____________________ on this the ________ day of _____________ 2026, and that the
administering oath complied with the regulations contained in Government Gazette No. R July 1972, as amended.
________________ (Sign – SERVICE PROVIDER)
________________________________ (Name – SERVICE PROVIDER)
Pc’s and related infrastructure for the gpl for a period of three years.
1.1 The Gauteng Provincial Legislature is the legislative authority of the Gauteng Province
established in terms of the Constitution of the Republic of South Africa. The Legislature is
responsible for law-making, public participation, oversight over the Provincial Executive and
ensuring accountability within the provincial government.
1.2 The GPL seeks to appoint a suitable and competent service provider to upgrade the current
ICT infrastructure and decommission and replace touch screen Personal Computers (PCs)
with up-to-date technology in the GPL Chamber. The Chamber of the Gauteng Provincial
Legislature is the heart of law-making and oversight in Gauteng. The current PC’s were last
upgraded in 2013 and have been obsolete since 2018, when they were due for replacement.
Contractual Terms
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)of 29
3.4 Joint ventures or consortium
3.4.1 A Copy of the Trust, Consortium or Joint Venture agreement duly signed must be attached.
3.4.2 A trust, consortium or joint venture will qualify for points for specific goals in accordance with
the applicable Preferential Procurement Policy, provided that the entity submits the required
consolidated documentation for purposes of evaluation and scoring of the specific goals.
3.5 Discounts
3.5.1 When calculating comparative prices, the GPL will consider any discounts which have been
offered unconditionally. A discount which has been offered conditionally will be implemented
when payment is effected despite not being considered for evaluation purposes.
3.6 General conditions
3.6.1 The GPL may request bidders to provide additional information with regards to the bid
proposal at any given stage during the evaluation process.
3.6.2 All proposals in response to this bid, whether successful or unsuccessful, will become the
property of the GPL.
3.6.3 Any costs incurred by the bidders in preparing and submitting their response will be the sole
responsibility of the bidder.
3.6.4 The GPL reserves the right to invite short-listed bidders to make a presentation to GPL’s bids
evaluation committee to further clarity or substantiate their submissions.
3.6.5 The GPL reserves the right, for purposes of promoting the values of competitiveness and
fairness, not to award the bid to the highest scoring bidder if such bidder has been awarded
a bid by GPL or has performed services for GPL during the last 12 months prior to the closing
date of the bid.
3.6.6 The GPL reserves the right to re-appoint or extend the service of the service provider where
there is a natural continuation of assignments.
3.6.7 The successful bidder/s will enter into a stipulated contract with GPL for the provision of the
required service.
3.6.8 The successful bidders, their employees and their sub-contractors must comply with GPL
security clearance requirements.
3.6.9 The successful bidders must be willing to sign confidentiality or non-disclosure agreement.
3.6.10 In the event where the order was wrongly printed, the service provider must be able to
exchange goods or cancel the order as per the GPL’s request.
3.6.11 The GPL may, at its discretion, require the removal and replacement of any of the bidder’s
personnel who do not perform adequately from its premises.
3.7 Central supplier database requirements
3.7.1 Bidders should register on the Central Supplier Database (CSD) to upload information namely,
(Business Registration/Directorship/Membership/Identity Numbers/B-BBEE Information and
Banking Information for verification purposes)
3.8 Award of bid
3.8.1 The award of this bid by the Secretary to the GPL shall constitute a binding contract, and such
award shall be confirmed by means of an appointment/award letter. The successful bidder
must in return provide a written response on their letterhead of the acceptance of the award.
of 29
3.9 Subcontracting
3.9.1 The bidder awarded a contract may only enter into a subcontracting arrangement with the
approval of the GPL. The bidder may not subcontract more than 25% of the total contract
deliverables.
3.9.2 A bidder awarded a contract in relation to a designated sector, may not subcontract such that
the local production and content of the overall value of the contract is reduced to below the
stipulated minimum threshold.
3.10 Fronting
3.10.1 The GPL supports the spirit of broad based black economic empowerment and recognizes
that real empowerment can only be achieved through individuals and businesses conducting
themselves in accordance with the Constitution and in an honest, fair, equitable, transparent
and legally compliant manner. Against this background the GPL condemns any form of
fronting.
3.10.2 The GPL, in ensuring that bidders conduct themselves in an honest manner will, as part of
the bid evaluation processes, conduct or initiate the necessary enquiries/investigations to
determine the accuracy of the representation made in bid documents.
3.10.3 Should any of the fronting indicators as contained in the Guidelines on Complex Structures
and Transactions and Fronting, issued by the Department of Trade, Industry and Competition
(the dtic), be established during such enquiry / investigation, the onus will be on the bidder /
contractor to prove that fronting does not exist. Failure to do so within a period of 14 days
from date of notification may invalidate the bid/contract and may also result in the restriction
of the bidder /contractor to conduct business with the public sector for a period not exceeding
ten years, in addition to any other remedies the GPL may have against the bidder / contractor
concerned.
3.11 Security and occupancy
3.11.1 Where applicable, All the areas covered by this contract fall within areas defined in the
relevant Security and Access Acts as “Restricted Areas” and all of the provisions of these
NO. ** (all applicable taxes included)
Required by: ........................................
At: ........................................
.......................................
Brand and model ........................................
Country of origin ........................................
Does the offer comply with the specification(s)? *YES/NO
If not to specification, indicate deviation(s) ........................................
Period required for delivery ........................................
*Delivery: Firm/not firm
Note: All delivery costs must be included in the bid price, for delivery at the prescribed destination.
** “all applicable taxes” includes value- added tax, pay as you earn, income tax, unemployment insurance
fund contributions and skills development levies.
*Delete if not applicable
of 29
Sbd4
Bidder’s disclosure
5.1 Name of company/firm...............................................................................
5.2 Company registration number: .....................................................................
5.3 Type of company/ firm [tick applicable box]
Partnership/Joint Venture / Consortium
One-person business/sole propriety
Close corporation
Public Company
Personal Liability Company
(Pty) Limited
Non-Profit Company
State Owned Company
5.4 I, the undersigned, who is duly authorised to do so on behalf of the company/firm, certify that
the points claimed, based on the specific goals as advised in the tender, qualifies the
company/ firm for the preference(s) shown and I acknowledge that:
of 29
i) The information furnished is true and correct.
ii) The preference points claimed are in accordance with the General Conditions as indicated
in paragraph 1 of this form;
iii) In the event of a contract being awarded as a result of points claimed as shown in
paragraphs 1.4 and 4.2, the contractor may be required to furnish documentary proof to the
satisfaction of the organ of state that the claims are correct;
iv) If the specific goals have been claimed or obtained on a fraudulent basis or any of the
conditions of contract have not been fulfilled, the organ of state may, in addition to any
other remedy it may have –
(a) disqualify the person from the tendering process.
(b) recover costs, losses or damages it has incurred or suffered as a result of that person’s
conduct.
(c) cancel the contract and claim any damages which it has suffered as a result of having
to make less favourable arrangements due to such cancellation.
(d) recommend that the tenderer or contractor, its shareholders and directors, or only the
shareholders and directors who acted on a fraudulent basis, be restricted from
obtaining business from any organ of state for a period not exceeding 10 years, after
the audi alteram partem (hear the other side) rule has been applied; and
(e) forward the matter for criminal prosecution, if deemed necessary.
..............................................
Signature(s) of tenderer(s)
Surname and name: ................................................................
Date: ...............................................................
Address: ...............................................................
...............................................................
...............................................................
of 29
Terms of reference section 5
a) 64-bit CPU capable of decoding h.264 video
b) 4gb RAM
c) 16gb flash storage
d) 1Gbps Ethernet port with POE capability
e) VESA mount (100mm x 100mm)
f) 2 x USB-A ports
g) Multipoint Capacitive touch screen
h) 16:9 Aspect ratio with 1920x1080 resolution
i) 300 cd/m2 brightness
j) Dedicated power supply
k) 3-year warranty
4.1.2.1 103 x 13" Tablet PC's, mounted to existing metal brackets (100mmx100mm VESA),
allocated as follows:
a) 90 x Members positions
b) 6 x Service Officer positions
c) 2 x Sergeant-at-Arms positions
d) 5 x Spare units
4.1.2.2 10 x 15.6" Tablet PC's with stands, allocated as follows:
a) 4 x Procedural Table Staff positions
b) 2 x Presiding Officer positions
c) 1 x Hansard Recording position
d) 1 x Interpreter Supervisor position
e) 2 x Spare units
4.1.2.3 27 x 13" Tablet PC's with stands, allocated as follows:
a) 24 x Interpreter positions across 12 booths
b) 3 x spare units
4.1.2.4 Network and Cabling
a) Rewiring of 24 network points with CAT6 cabling from the interpretation booths to the
switch in the rack to support 1Gbps network speed. (Around 500m required)
b) Ensure all points in the Chamber are running at 1Gbps.
c) All cabling and patch leads to be provided (Ethernet, Power cables, etc.)
d) Configuration of existing servers to support the new infrastructure and control solution.
4.1.2.5 Control Solution
a) Power control of all touch screen PC’s from the control room, i.e. wake up, restart and
shutdown all PC’s.
b) Remote access to all touch screen PC’s from the control room
c) Deployment of software to all PC’s from the control room.
of 29
d) Deployment of updates and security patches to all PC’s from the control room.
4.1.3 Installation of PC’s in the Control Room
4.1.3.1 1 x Monitoring, control and backup PC
a) Graphics Card: Nvidia RTX 4060 8GB or equivalent
b) CPU: AMD Ryzen 7 5800X or equivalent
c) CPU Cooler: Dual 120mm Fan Air Cooler
d) Motherboard: AMD X570 chipset motherboard or equivalent
e) RAM: 32GB DDR4-3200 (2 x 16GB) or equivalent
f) Storage 1: 1TB NVMe PCIe 4.0
g) Storage 2: 2 x 16TB 7200rpm HDD
h) Power Supply: 750w 80+ Gold PSU
i) Case: 19" 4u rack mounted pc case capable of housing all components with adequate
ventilation
j) Operating System: Windows 11 Pro licensed
k) Mouse and keyboard: Wired USB mouse and keyboard combo
l) Monitor: 24” 1080p touch screen monitor
4.1.3.2 x Small Form Factor NUC 14 Pro PCs for Audio DSP and Remote Control
a) Intel Core Ultra 5 125H with onboard Graphics
b) 16GB DDR5 RAM
c) 512GB PCIe G4x4 NVMe SSD
d) RJ45 Gigabit Ethernet port
e) 4 x USB 3 Ports
f) 2 x HDMI Ports
g) Windows 11 Pro Fully Licensed
h) Dedicated Power Supply
4.1.4 Warranty and Support
4.1.4.1 3-year support, including telephonic and on-site support, as well as spare holding. Loan
equipment should also be available to avoid excessive down time. A detailed support
proposal should be included as part of the submission.
4.1.4.2 3-year warranty on all equipment
4.1.4.3 User training and documentation for AV staff – Digital and physical training manuals and
system diagrams to be provided.
4.2 Any other related activities necessary to achieve the objectives of the assignment.
detailed support proposal should be included as part of the submission.
3-year warranty on all equipment
User training and documentation for AV staff – Digital and physical training
manuals and system diagrams to be provided.
Special Conditions
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)The GPL reserves the right to cancel the bid if circumstances change, funds are unavailable, no acceptable bid is received, or there is a material irregularity. The GPL may request presentations from short-listed bidders. The GPL may not award to the highest scoring bidder if they have been awarded a bid or performed services for GPL in the last 12 months. The GPL may re-appoint or extend the service provider for natural continuation. The successful bidder must comply with security clearance requirements and sign confidentiality agreements. The GPL may require removal and replacement of inadequate personnel.
Requirements
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)Bidders must comply with tax obligations and submit their SARS Tax Compliance Status PIN or CSD number. Bids will not be considered from persons in the service of the state or entities with directors who are state employees where conflict of interest may arise. Bidders must register on the Central Supplier Database (CSD). The bid must remain valid for 120 days from closing date. Joint ventures/consortia must submit a signed agreement. Subcontracting is limited to 25% of total contract deliverables without GPL approval. Bidders must comply with GPL security clearance requirements and sign confidentiality/non-disclosure agreements.
Section
Source: GPL007.2027 Replacement of Chamber PCs Tender Document.pdf (TENDER)Phase 1: Functionality – scored out of 100; minimum 70 points to qualify for Phase 3. Phase 3: Price and Specific Goals (80/20) – 80 points for price, 20 points for specific goals. Functionality subcriteria: relevant experience and record of accomplishment, technical approach and methodology, qualifications and experience of key personnel, capacity and resources to deliver the project. Only evidence 4 to 6 signed reference letters submitted with the bid will be evaluated. The project plan must address the first six requirements (3 points). Brand names and model numbers should be specified where possible.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
43 Rissik St, Johannesburg, 2000, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
13 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Learn how to submit a winning bid with these related articles
A strategic guide for medical equipment suppliers, maintenance companies, and healthcare technology providers bidding for tenders across South Africa's nine provincial health departments. Covers SAHPRA registration, OEM authorisation, service level agreements, and technical evaluation criteria.
A comprehensive guide to securing medical equipment maintenance tenders in South African public hospitals. Learn about SLA management, OEM certifications, and clinical engineering requirements.
Guide to sports tenders in South Africa. Covers SRSA-funded facility maintenance, sports equipment supply, surfacing contracts, and tournament management opportunities.
Not every job is a 'tender.' Learn how to access the high-volume world of small orders (RFQs) and how to get invited to bid on jobs under R200k.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Computer Equipment. Unlock full pricing strategies, bid frequency, and historical win rates.