Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Kriel Power Station, Bethal-Ogies Road - Kriel - Kriel - 2271
Organization Type
GOVERNMENT
Published
10 Sept 2026
OCDS Reference
ocds-9t57fa-169902
ESKOM is procuring transportation services for kriel power station under an open tender. The most consequential requirement is the mandatory sdl&i (supplier development and localisation) commitment, which carries a 1.5% Invoice retention and a 1.5% Contract-value penalty for non-compliance, alongside binding b-bbee improvement milestones.
Bidders must submit a valid B-BBEE certificate or sworn affidavit as a condition of contract award; companies with annual total revenue of R10 million or less qualify as EMEs and may use a sworn affidavit, those up to R50 million are QSEs, and those above R50 million must submit a valid B-BBEE certificate.
Bidders must commit to SDL&I targets, including creating and retaining jobs in South Africa; the tender specifies at least one male driver and one female driver with N2/Grade 12 or equivalent and a Code 10 driver's licence.
Bidders with B-BBEE Level 4 at award must achieve Level 3 by the end of the first contract year; those at Level 5 to 8 or non-compliant must achieve Level 4 by the end of the first year and improve by one level each subsequent year.
Bidders must submit a B-BBEE Improvement Plan within 30 days of signing the contract.
Eskom will retain 1.5% of every invoice (excluding VAT) for the duration of the contract as SDL&I performance security, released only upon fulfilment of SDL&I obligations; a penalty of 1.5% of contract value applies for failure to meet SDL&I obligations.
Bidders must submit a quarterly SDL&I report to Eskom and complete an SDL&I Implementation Schedule within 28 days of contract award.
Sworn affidavits must meet validity requirements: deponent's name and ID number, designation as director/owner/member, same date for deponent and Commissioner of Oath, and the Commissioner cannot be an employee or ex officio of the enterprise.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 07 October 2026 - 10:00
Venue
MS Teams as per Link on Invitation document
The tenderer must upload the tender via ESKOM tender bulletin site on the ESKOM e- tendering page basic compliance with the invitation to tender requires a tenderer to meet all requirements as per the invitation to tender document
Categories
Request for Bid(Open-Tender)
Kriel Power Station, Bethal-Ogies Road - Kriel - Kriel - 2271
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: QUALITY Template 240-126469599_Method Statement template final 18 Oct2021.docx. You don’t need to refresh — this page will pick up the updated review automatically.
10 Sept
2026
Tender Published
Tender was published
07 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027 (PAYE).xls
No summary available
Eskom Standard Conditions of Tender Rev 12.pdf
No summary available
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027 (PAYE).doc
Eskom is procuring daily bus transportation services for its Kriel Power Station employees residing at Komati Power Station, to and from Kriel Power Station, for a five-year contract period. The document provided is a PAYE (Employees' Tax) classification questionnaire that bidders must complete to determine their tax status for payments received from Eskom.
NEC TSC Komati Transportation for Kriel employees E3505GXMPKRI.pdf
No summary available
Eskom Supplier Integrity Pact - 02 June 2023.pdf
No summary available
Quality List of Tender Returnables_Cat 4_ Rev 7.pdf
Eskom is procuring daily bus transportation for its Kriel Power Station employees who reside at Komati Power Station, with the service required for a five-year period. The tender is issued by Eskom in Mpumalanga and closes on 7 October 2026.
Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf
Eskom Holdings SOC Ltd is procuring daily bus transportation services for employees of Kriel Power Station who reside at Komati Power Station, for a contract period of five years. The service involves transporting employees to and from Kriel Power Station on a daily basis. Tenderers must submit their bids electronically via the Eskom e-Tendering portal by the closing date.
Safety 240-77471499 Annexure B Acknowledgement.docx
Eskom requires a supplier to provide daily bus transportation for its Kriel Power Station employees who reside at Komati Power Station, for a contract period of five years. The service involves transporting employees to and from Kriel Power Station on a daily basis.
SAFETY 32-726-07T File evaluation checklist.pdf
Eskom is procuring daily bus transportation services for its Kriel Power Station employees who reside at Komati Power Station, with the contract running for five years. The service involves transporting employees to and from Kriel Power Station on a daily basis.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 Tender E2814GXMPKRI.docx
Daily bus transportation of Eskom Kriel Power Station employees who reside at Komati Power Station, to and from Kriel Power Station, for a five-year contract period.
E-tendering Help Manual for supplier - 27 January 2025.docx
Bus transportation services for Eskom Kriel Power Station employees residing at Komati Power Station, on a daily basis to and from Kriel Power Station, for a contract period of 5 years.
Quality List of Tender Returnables_Cat 4_ Rev 7.xlsx
No summary available
QUALITY Template 240-126469599_Method Statement template final 18 Oct2021.docx
Eskom is procuring daily bus transportation services for employees residing at Komati Power Station to travel to and from Kriel Power Station, over a five-year contract period. The service involves scheduled commuter transport for power station staff in Mpumalanga.
Agenda Tender Clarification Meeting E3505GXMPKRI.pdf
Eskom is procuring daily bus transportation services for employees of Kriel Power Station who reside at Komati Power Station, for a contract period of five years. The tender includes a clarification meeting to be held via MS Teams on 18 September 2026 at 10h00.
SAFETY 555-RSR 2031 SHE SPEC Komati Transportation.pdf
Eskom Kriel Power Station is procuring daily bus transportation services for its employees residing at Komati Power Station, to and from Kriel Power Station, for a five-year contract period. The contract is classified as high risk and is subject to stringent Occupational Health and Safety (OHS) requirements, including a Section 37(2) agreement, compliance with Eskom's Life-Saving Rules, and submission of a comprehensive OHS plan and safety file.
SAFETY 240-70044602 OHS Risk Assessment.xlsx
Eskom is procuring daily bus transportation services for employees residing at Komati Power Station to travel to and from Kriel Power Station, for a contract period of five years. The service involves routine road travel and site access, with a strong emphasis on occupational health and safety risk management.
QUALITY 240-68099512 Form A_Cat 4_ Rev 9.pdf
Eskom is procuring daily bus transportation for its Kriel Power Station employees who reside at Komati Power Station, to and from Kriel Power Station, for a five-year contract period. The tender includes mandatory supplier quality requirements aligned with Eskom's specification 240-105658000 and the ISO 9001 standard, with the selected supplier falling under Category 4 (which involves a site assessment).
SDL&I Bidders 240-6860265 Kriel Komati Transportation E3505GXMPKRI.pdf
Eskom is procuring daily bus transportation services for its Kriel Power Station employees who reside in the Komati area, with the contract running for 60 months. The service involves transporting employees to and from Kriel Power Station on a daily basis.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 7 579 340
Range
Based on 6 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: SAFETY 555-RSR 2031 SHE SPEC Komati Transportation.pdfThis OHS specification provides minimum requirements for contractors at Eskom Kriel Power Station. It covers the purpose, applicability, definitions, and related documents. The main contractor must comply with the OHS Act, including Section 37(2) agreement, and must not use child labour. The contractor must have an up-to-date copy of the OHS Act and must compile an organisational SHEQ policy if not already in place.
Important Dates
Source: SAFETY 555-RSR 2031 SHE SPEC Komati Transportation.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion reports to the relevant management.","is_compulsory":false}"}
Contact Information
Source: SAFETY 555-RSR 2031 SHE SPEC Komati Transportation.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"Komati"}
Evaluation Criteria
Source: SAFETY 555-RSR 2031 SHE SPEC Komati Transportation.pdf (unknown)Bidders must be registered with the Compensation Commissioner and hold a valid Letter of Good Standing (COID). They must be able to sign a Section 37(2) agreement with Eskom. They must comply with all applicable South African legislation, including the OHS Act and National Road Traffic Act. They must have a valid SHEQ policy and Covid-19 policy signed by the most senior person. They must provide an organogram signed by the company's 16(1) or 16(2) appointee. They must not use child labour. They must comply with Eskom's Substance Abuse Procedure (32-37) and Life-Saving Rules. They must be able to provide a comprehensive OHS plan and safety file. The document does not specify B-BBEE requirements, CSD registration, or CIDB grading.
Technical Specifications
Source: SAFETY 555-RSR 2031 SHE SPEC Komati Transportation.pdf (unknown)Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
Project Name: Bus transportation of Eskom Kriel Power Station employees for the Komati
Power Station residents on a daily basis to and from Kriel Power Station for a period of 5 years
Enquiry number:
Project Address: Kriel Power Station
Eskom’s Contract Manager/Project Eskom’s OHS/SHE Manager
Name : Veliswa Mlotshwa Name : Thabitha Mpoyi
Eskom’s Procurement Officer Eskom’s OHS/SHE Officer
Name: Annali Botha Name: Sizani Shabangu
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
Table of Contents
Introduction .......................................................................................................................... 3
Supporting clauses ........................................................................................................... 4
2.1 Scope .................................................................................................................................. 4
2.1.1 Purpose ......................................................................................................................... 4
2.1.2 Applicability ................................................................................................................... 4
2.2 Normative/informative references ..................................................................... 4
2.2.1 Normative ...................................................................................................................... 4
2.2.2 Informative .................................................................................................................... 5
2.3 Definitions ....................................................................................................................... 6
2.4 Abbreviations ................................................................................................................. 9
2.5 Related/supporting documents .......................................................................... 10
3.1 Scope of work ............................................................................................................. 10
3.2 Legal compliance ............................................ Error! Bookmark not defined.
3.2.1 Section 37(2) (Legal) Agreement................................................................................ 10
3.2.2 Hazardous Work by Children (Child Labour) .............................................................. 10
3.2.3 OHS Act ...................................................................................................................... 11
3.2.4 Legislative Compliance ............................................................................................... 11
3.3 ESKOM requirements ................................................................................................. 11
3.4 Sheq policy .................................................................................................................... 11
3.5 Covid -19 policy ............................................................................................................ 12
3.5.1 Covid -19 REQUIREMENTS ...................................................................................... 12
3.6 Coid ................................................................................................................................... 12
3.7 Costing for OHS within the project .................................................................. 12
3.8 Statutory appointments ......................................................................................... 12
3.8.1 Non statutory appointments ........................................................................................ 13
3.9 ESKOM life-saving rules........................................................................................... 13
3.10 Substance abuse ....................................................................................................... 15
3.11 Contractor organisational structure ........................................................ 16
3.11.1 Main Contractor Organogram ................................................................................... 16
3.11.2 Appointed Contractor/s Organogram .......................... Error! Bookmark not defined.
3.12 Roles and responsibilities ................................................................................... 16
3.12.1 Main contractors and appointed contractors ............................................................ 16
3.12.2 Contractor site supervisor ......................................................................................... 18
3.12.3 Contractor Health and Safety officer full/time ........................................................... 19
3.13 Risk assessment (refer to 32-520) ...................................................................... 19
3.15 Fire equipment and maintenance ....................................................................... 20
3.16 Flammable and combustible liquids ................................................................. 20
3.19 OHS communication systems ................................................................................ 20
3.19.1 Statutory Health and Safety Committees ................... Error! Bookmark not defined.
3.19.2 Non-statutory health and safety committees .............. Error! Bookmark not defined.
3.19.2.1 Agenda .................................................................... Error! Bookmark not defined.
3.19.2.2 Minutes and action items for all health and safety committee meetings ......... Error!
Bookmark not defined.
3.20 Tool box talks / daily team talks / pre job meetings ................................ 21
3.21 OHS training ................................................................................................................ 21
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
3.21.1 Induction training ...................................................................................................... 21
3.21.2 Contractor induction training ....................................... Error! Bookmark not defined.
3.21.3 Visitors to site induction ............................................................................................ 22
3.22 General training ....................................................................................................... 22
3.23 Vehicle management ................................................................................................ 22
3.24 Housekeeping and order....................................................................................... 23
3.25 Workplace signage and colour coding ......................................................... 24
3.26 Auditing ......................................................................................................................... 24
3.26.1 Approval and compliance of Main contractor OHS plan ........................................... 24
3.26.2 Eskom OHS audits ................................................................................................... 24
3.26.3 Contractor audits....................................................................................................... 25
3.27 Smoking ......................................................................................................................... 25
3.28 Cellular phones ....................................................................................................... 25
3.29 Occupational health, hygiene and rehabilitation ..................................... 25
3.29.1 Medical Assessments ............................................................................................... 25
3.30 Roles and responsibilities ................................................................................... 26
3.31 Personal protective equipment requirements .......................................... 26
3.32 Incident investigation ............................................................................................ 26
3.33 Emergency management ........................................................................................ 27
3.34 Non-conformance and compliance ................................................................... 27
3.35 OHS files ....................................................................................................................... 27
3.36 Work stoppage .......................................................................................................... 28
3.37 Hours of work ........................................................................................................... 28
3.37.1 Normal work .............................................................................................................. 28
3.37.2 Night work ................................................................................................................. 28
3.37.3 Overtime ................................................................................................................... 29
3.38 Omissions from safety and health requirements specification ........ 29
3.39 Contract sign off .................................................................................................... 29
3.40 Eskom's right to terminate the contract .................................................... 29
3.41 Continuous improvement ...................................................................................... 29
Authorization ..................................................................................................................... 30
Revisions ................................................................................................................................ 30
Eskom's Kriel Power Station responsibility and commitment is to ensure a safe working environment
is in line with its Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative
obligations. This OHS specification is Eskom Kriel Power Station minimum requirements which are
required to be met for the duration of the contract period by contractors/suppliers and, where required,
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
the delivery organisation. The contractor is expected to develop an OHS plan that meets these
requirements as well as all the relevant applicable legislation that they conform to. Eskom Kriel Power
Station in no way assumes the contractor’s legal responsibilities and liabilities. The contractor remains
accountable for the quality and execution of their health and safety programme for their employees and
appointed contractor employees. This OHS specification reflects minimum requirements and should not
be construed as all-encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not supersede
or replace any organizational OHS requirements.
Where requirements listed are already in place, then the organizational requirements must be taken
cognisance of and listed in the respective OHS plans. If there are any additional Eskom Kriel Power
and/or legislative requirements listed in the OHS specification, then these must be addressed.
2.1 Scope
This OHS specification lists the legislative and Eskom Kriel Power Station requirements and, where
applicable, any requirements pertaining to local authorities, municipal by-laws, or environmental
legislation that must be met by the contractor.
2.1.1 Purpose
This document will provide OHS specifications for business contracts, standards, and NEC 3 at Kriel
Power Station.
2.1.2 Applicability
This OHS specification is applicable to any contracting organisation that intends to respond to Eskom
Kriel Power Station's tender/enquiry with the intention of entering into a contract.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DMN 34-110 Operating A Vehicle Mounted Crane
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
2.3 Definitions
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
Definition Explanation
Appointed contractor Means a contractor appointed by the Main contractor
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the business
Business unit (BU) (32-296) means any defined unit within the Eskom environment, operating as
a business under a particular cost-centre number. In the context of this
document and in terms of health and safety, any reference to a BU includes a
defined unit within any Eskom division and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred to as
the contract administrator/custodian or agent or project manager (as defined
in the contract). He/she is the person responsible for ensuring that the works
or services are executed in terms of the contract, as well as adherence to
legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training, experience,
and qualifications, specific to the work or task being performed, provided that,
where appropriate, qualifications and training are registered in terms of the
South African Qualifications Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes Main contractors
Contract’s Manager/End Contract’s Manager/End User
User
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable measures
to prevent such pollution or degradation from occurring, continuing, or
recurring. If such harm to the environment is authorised by law or cannot
reasonably be avoided or stopped, such person must minimise and rectify
such pollution or degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any person
who is employed by or works for an employer and who receives or is entitled
to receive any remuneration or who works under the direction or supervision
of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any person
who employs or provides work for any person and remunerates that person
or expressly or tacitly undertakes to remunerate him/her, but excludes a TES
(ex labour broker) as defined in section 1(1) of the Labour Relations Act 1956
(Act No. )
Environment (32-94) means:
a) the land, water, and atmosphere of the earth;
b) micro-organisms and plant and animal life; and
c) any part or combination of (a) and (b) and the interrelationships
among and between them, and the physical, chemical, aesthetic, and
cultural properties and conditions of the foregoing that influence
human health and well-being
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
Definition Explanation
Eskom requirements Eskom requirements flowing from directives, policies, standards, procedures,
specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from an
elevated position, considering the nature of work undertaken, and setting out
the procedures and methods to be applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated
with the type of construction work being executed or to be executed
Occupational Health (OHS Act) means a file or other record in permanent form, containing the
and safety file information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified and
includes safe work procedures to mitigate, reduce, or control hazards
identified
Occupational Health (OHS Act) means a document specification of all health and safety
and safety specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
Occupational Health means comprehensive health and safety requirements for a contract, project,
and safety requirements site, and scope of work. This specification is intended to ensure the health
and safety of persons, both workers and the public, and the duty of care to
the environment. The health and safety requirements must be specific to
each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an occupational
fitness health practitioner, issued in terms of the regulations, whom shall be
registered with the Health Professions Council of South Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by
an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
National sourcing of services providers/contractors at the divisional level and not at BU
Enquiries/contracts level thorough tendering, request for price etc
Organisation may be defined as a group of individuals (large of small) that is cooperating
under the direction of executive leadership in accomplishment of certain
common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of the
day’s work and that is attended by all the relevant employees associated with
the work task
Main contractor (In the text of this document) Means an employer, as defined in section 1 of
the OHS Act, who intends to tender for or has signed a contract with Eskom
for services rendered.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
Definition Explanation
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of the
General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who has
been appointed as part of the Eskom delegation of authority process with the
aim to assist the applicable 16(2) assigned person in executing his/her duties
in terms of the Occupational Health and Safety Act
Risk assessment (OHS Act) means a programme to determine any risk associated with any
hazard at a construction site in order to identify the steps needed to be taken
to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, Main contractors,
contractors, suppliers, vendors, and service providers provide a service to
Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to Eskom for
compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and may
include the following current or potential supplier vendor, contractor,
consultant
Task (34-227) a segment of work that requires a set of specific and distinct actions
for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning, shares
all the tasks at hand and discusses task allocation, the identified risks, and
the control measures with all his/her team members on site before
commencing a specific task and documenting the agreed strategy. (This
shall be done to ensure common understanding of the tasks, risks, and
control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as
amended, and the Regulations thereto
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
2.4 Abbreviations
Abbreviation Description
BU Business Unit
CE Chief Executive
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DEL Department of Employment and Labour ( Inspection and Enforcement services –
Provincial office)
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
Abbreviation Description
EP Emergency Preparedness
EAP Employee Assistance Program
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCS Hazardous Chemical Substances
LDV Light Delivery Vehicle
MSDS Material Safety Data Sheets
OHS Act Occupational Health and Safety Act and Regulations,
O&M Operating and Maintenance
LoG (COID) Letter of Good Standing
SABS South African Bureau Standard
SANS South African National Standard
2.5 Related/supporting documents
Section 37(2) of the OHS Act requires Eskom to sign an agreement and include it in the OHS file for
evaluation prior to the start of work. OHS department will issue the 37(2) agreement to the project
manager/end user who will facilitate the signing of the document by Eskom Kriel Power Station and
contractor representatives.
3.1 Scope of work
Bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents
on a daily basis to and from Kriel Power Station for a period of 5 years
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom Kriel Power Station (project/contracts
manager) and the main contractor (16.1 or16.2) at the time of submitting the safety file. The original
copy of the section 37(2) agreement must be retained by the contractor, and a copy must be retained
by the responsible project manager/end user. A copy of all the agreements must form part of the
respective contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of children,
especially when it comes to:
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or spiritual,
moral, or social development and the Basic Conditions of Employment Act, Chapter six,
Section 43, "Prohibition of employment of children."
Before resorting to the use of child labour, due consideration must be given to the child's
constitutional rights. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act "Regulations on Hazardous
Work by Children in South Africa" with emphasis on paragraph 2: Purpose and Interpretation. Eskom
Kriel Power Station does not condone the use of child labour and, therefore, all effort must be
exercised, and child labour should not be used.
3.2.3 OHS Act
The main contractor shall have an up-to-date copy of the OHS Act and regulations which will be
available to all employees.
3.2.4 Legislative Compliance
The main contractor will comply with all the legislation pertaining to this project being:
Rights).
3.3 ESKOM kriel power station requirements
The main contractor shall, before commencement of the project ensure that all their employees are
familiar with the relevant Eskom OHS documentation that is applicable to contract services.
3.4 Sheq policy
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of their strategic
objectives, and values of integrity, customer satisfaction, excellence, and innovation. The main
contractor, if not already in place, will be required to compile an organisational SHEQ policy in line with
their OHS responsibilities. The policy must be signed by the organisation’s CE or the appointed
assistant to the CE, OHS Act Section 16(2). The policy must be displayed in a prominent place within
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
the workplace. A copy of the policy must be filed in the main contractor s OHS files and attached as an
annexure to the OHS Plan.
3.5 Covid -19 policy
Due to the current pandemic the contractors are required to submit the Covid policy signed by the most
senior person. The policy must be displayed in a prominent place within the workplace. A copy of the
policy must be filed in the main contractor 's OHS files and attached as an annexure to the OHS Plan.
3.5.1 Covid -19 requirements
Covid-19 costs are not for profit making purpose and Eskom Kriel Power Station reserves the right to
accept and/or decline the list of PPE which will be listed in the detailed Covid-19 costs. Due to the
current pandemic the main contractor is required to provide Eskom Kriel Power Station with a Covid-
19 risk assessment and a detailed plan on how to prevent the spread of the virus and what control
measures will be put in place to protect Eskom Kriel Power Station employees and members of the
public. The risk assessment must include the following but not limited to, adherence to Covid-19
protocols in designated smoking areas. Covid-19 costs are applicable for the duration of the
pandemic and the Covid-19 costs will be ceased once the country has declared that Covid-19 is no
more a pandemic. The main contractor and all his/her appointed contractors have an obligation to
comply with the National Disaster Management Act including the appointment of the Compliance
Officer.
3.6 Coid
The main contractor shall be registered with an appropriate employment compensation commissioner
and have available a valid letter of good standing (LoG) from such commissioner. The obligation lies
with the main contractor to ensure that the LoG remain valid throughout the contract period. A copy of
the LoG must be filed in The main contractor OHS files.
3.7 Costing for OHS within the project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Training, provision
of PPE, safety equipment purchases, safety file etc.
3.8 Statutory appointments
The main contractor must appoint competent workers who will comply with the OHS Act for the duration
of the contract. Before requiring appointees to accept an appointment, the employer must ensure that
they have received appropriate training and/or information about their responsibilities. The relevant
statutory appointments must be made in compliance with the OHS Act's criteria, which include
appointing a qualified individual to the appropriate roles. The following should be included in the
statutory appointments, but not limited to:
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
Substances Co-coordinator
3.8.1 Non statutory appointments
3.9 ESKOM life-saving rules
undertakes work for Eskom to do the same.
agents, consultants, and contractors. Any Eskom Kriel Power Station employee or employee
of a The main contractor who fails to follow these rules would be deemed a serious violation.
These rules are in place to protect any employee, labour broker, or contractor working from
significant injury or death.
premises, the rules shall be obeyed by any contractor and their employees.
The rules are:
Rule 1: open, isolate, test, earth and create an equipotential zone
Before touch
To ensure a safe electrical work environment, no person may work/operate on, around or
near any electrical network, line or apparatus, electrically connected to the power system
and/or electrically charged and/or not electrically charged unless:
a) He/she is trained and authorised as competent for the task to be done;
b) There is a valid permit to work where required and they are being supervised by a
competent person.
c) A pre-task risk assessment to identify all risks and hazards has been conducted before
any work commences.
d) He/she follows the requirements on OPEN, ISOLATE, TEST, EARTH, AND CREATE AN
EQUIPOTENTIAL ZONE BEFORE TOUCH, based on applicable/related standards,
procedures and outcome of risk assessment fit for the type of work or task to be performed.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
e) The work area shall be within the equipotential zone, with the working earth visible at all
times.
f) The authorised person has physically shown all team members that the apparatus is safe
to work on.
g) He/she makes the specific electrical environment safe before performing the work; and
h) All the appropriate PPE (including face shield and insulated gloves for 1low voltage work)
are worn.
Note: The equipotential zone is only applicable for work being done on medium and high
voltage apparatus.
3.1.2 Rule 2: hook up at height
Working at height is a significant part of work in Eskom Holdings and is regarded as a high-
risk activity, as a result, all precautions must be taken to prevent incidents while working at
height.
Wherever reasonably practicable, preference must be given to the performance of work at
ground level as opposed to work in an elevated position. Where work in an elevated position
is necessary, the requirements in this document and all other Eskom requirements
pertaining to working from height shall apply.
No person may work at height where there is a risk of falling unless:
a) A Fall Protection Plan has been developed by a trained fall protection plan developer and
communicated to all employees working at height based on the scope of work/task;
b) He/she is medically fit to work at height;
c) He/she is trained in accordance with Eskom’s requirements for working at height
d) A pre-task-specific work at height risk assessment to identify all risks and hazards has
been conducted and communicated to all participants before commencing any work of this
nature.
e) He/she appropriately conducts work as determined by the risk assessment;
f) He/she is appropriately secured during ascending and descending where applicable; and
g) He/she is using an Eskom-approved fall arrest system where applicable.
3.1.3 Rule 3: buckle up
Where required, the proper wearing of seat belts for any driver, operator and passenger is
mandatory in all vehicles/equipment when driving and/or travelling for Eskom business
purposes. The driver is obligated to ensure that he/she as well as all passengers are
properly seated and wearing their seatbelts at all times while being transported in the
vehicle, as per Eskom specifications.
Note: This rule is applicable on any road or parking lot, irrespective of the speed, and when
the vehicle moves in a forward or backward direction.
3.1.4 Rule 4: be sober
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
No person who is under the influence or who appears to be under the influence of
intoxicating liquor or drugs will be permitted to enter or remain on an Eskom site conduct
Eskom business or drive/operate a vehicle/equipment for Eskom business purposes.
This includes any level of alcohol or the presence of any drugs, controlled substances,
and/or illegal substances in the body that impairs or could impair mental and physical
functioning, irrespective of when the substance was used.
3.1.5 Rule 5: ensure that you have a permit to work
No person shall work without the required Permit to Work (PTW), which is governed by but
not limited to:
a) Plant Safety Regulations; or
b) Operating Regulations for High Voltage Systems (ORHVS) (handover or permit); or
c) Low Voltage Operating Regulations; or
d) Any other activity where a permit is required, for example, driver and statutory permits.
No apparatus is to be returned to service without the cancellation of all permits on that plant
in accordance with procedure, unless permission is granted for a particular plant to be
returned to service with permits still open, like in the case of redundant systems.
NOTE: In the case of live work, a “Live Work Declaration Form” is to be completed by the
authorised person, who is the person responsible for the safe execution of work according to
relevant standards and procedures.
3.1.6 Rule 6: ensure safe live working
To ensure safe live work, each live worker shall:
a) Ensure all live work basic principles are adhered to, as outlined (for the method being
used) in the High Voltage Live Working Standard for the respective division.
b) Observe and maintain the minimum approach distance (MAD).
c) Only perform live work (never mix live and dead work on the same site at the same time –
Refer to ORHVS Section 7 and 5 handouts respectively).
d) Perform tasks they are authorised for and only undertake tasks that are documented in
the respective Task Manual (TM). Only work on one potential (voltage) at a time.
Eskom will take a zero-tolerance approach to these policies.
Noncompliance to Life-saving rules is regarded serious misconduct and will result in
serious disciplinary action, which may include dismissal.
This is to ensure that everyone who works on or visits an Eskom facility returns home
to their families safely.
3.10 Substance abuse
workplace accidents and car driving. As a result, Eskom Kriel Power Station has the right to
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
take reasonable procedures to identify and prohibit drunk people from entering the company/
station.
General Safety Regulation 2A specifies the legal position on intoxication.
The allowable alcohol and drug level is 0%.
The main contractor must follow Eskom's procedure 32-37 ("Substance Abuse Procedure"),
taking into account that this is an Eskom Life-saving Rule number 4: (BE SOBER"), and anyone
entering the Eskom site will be subjected to ad hoc alcohol testing if the BU has self-alcohol
testing equipment.
alcohol on a regular basis.
Test results must be marked "Confidential" and kept in the employee's personal file.
Eskom's life-saving rules must be included in the induction process.
All employees involved in the scope of work must sign the Life-saving rule pledge before
commencement of work.
3.11 Contractor organisational structure
3.11.1 Main Contractor Organogram
The main contractor must provide an organisational organogram on the company’s letter head related
to this contract, depicting all the levels of responsibility from the CE down to the supervisors responsible
for the contract. List the relevant positions held, names of appointees, legal appointments and the
Organogram must be signed off by the company's 16(1) or 16 (2).
The main contractor must ensure they comply with this requirement. The main contractor is responsible
for keeping copies of all the organograms’ as well as submitting them with the OHS plan. All
organograms shall be updated timeously when appointments are changed.
This diagram must be kept up to date and filed in the project OHS files.
3.12 Roles and responsibilities
Commitment
Visible commitment is essential to providing a safe work environment. Managers, supervisors and
employees at all levels must demonstrate their commitment by being proactively involved in the day to
day operations, in particular the Occupational Health and Safety aspects of any project / contract.
Legislation requires that each employee must take reasonable care of themselves and their fellow
workers, from management level down to the lowest employee level.
3.12.1 Main contractors
Note 1: Most of the roles and responsibilities listed apply to. The main contractor Where some of the
listed do not apply to both, then the specific responsibilities will be listed and titled. The contractors
shall:
of the OHS Act.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
appointed contractors within their working area, as contemplated by section 37(2) of the OHS
Act;
date of induction, relevant skills and licenses and be able to produce this list at the request of
the Eskom Project Manager.
terms of their appointment and that they advise and assist these appointees in the execution of
their duties.
with on all work sites.
managers their full participation and cooperation.
records must be kept for each work site.
valid letter of good standing before the commencement of work and any future renewal letters
obtained during the contract for record-keeping purposes. The letter of good standing shall
reflect the name of the contractor’s company.
in the health and safety aspects relating to such work and that the employees understand the
hazards associated with all other work being carried out on the project.
adhere to such procedures.
risk of degradation to the environment.
contractors, evaluate, and assess the appointed contractors OHS files. Only appoint
contractors who are competent to do work, have satisfied the OHS compliance requirements
and satisfied that the contractor has the necessary competencies and resources to perform the
work safely.
work throughout the contract period.
which such supervisor has been appointed for.
information or suspecting such information has been divulged, in the interests of health and
safety requirements.
of the requirements of the health and safety specification, safety and health plans, site rules or
any other requirements.
site or emerging risks. This should be done by a competent person appointed in writing with a
view to identify hazardous and potentially hazardous work operations.
starting of any new task, irrespective of whether it is a repetitive task or not.
contract is in place and maintained.
person/man job specifications must be compiled and handed to the occupational health
practitioner.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
employees, inspect such equipment regularly and ensure recipients of PPE are trained in the
proper use, care and where necessary, the maintenance of PPE;
Note: should the main contractor entertain visitors on site, they will be held responsible for the
provision and wearing PPE.
investigators as and aligned with 32-95 requirements.
approval prior to them commencing work.
3.12.2 Contractor site supervisor
The contractor site supervisor must be trained in the following:
Must:
Eskom Kriel Power Station project requirements;
Inspect all work done by the contractors to ensure adherence to Eskom’s standards and
Conduct follow-up inspections to ensure findings are closed out and preventative action is in
place.
first instance and thereafter the Eskom project manager in the second instance relating to
procedure requirements, non-conformances identified, corrective actions, audits and
inspection schedules.
procedures, work instructions and safety regulations issued by Eskom:
inspection reports.
manpower numbers, incident statistics report etc
perform the tasks assigned.
contractors deviate from safety requirements.
activity.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
3.12.3 Contractor Health and Safety officer Part/time
The contractor health and Safety officer must be trained in the following:
SAMTRAC, HIRA, Incident investigation training, Legal liability, Training, knowledge and
understanding of ISO 45001: 2018, Minimum work experience 2yrs, OHS Diploma (applicable to 3-5
years contract)
3.13 Risk assessment (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out risk
assessments, to establish which risks and hazards are attached to the health and safety of persons
due to any work which is performed, any article or substance which is, handled, stored, transported.
A risk assessment is defined as an identification of the hazards present in the activity, work, site,
and an estimate of the extent of the risks involved, considering whatever precautions are already
being taken.
It is essentially a three-stage process:
Risk assessments are required to be maintained. This means that significant changes to a process
or activity, or any new process or activity should be subjected to a risk assessment and that if new
hazards come to light during the work process, then these should also be subjected to risk
assessments. Risk assessments for long term processes should be periodically reviewed and
updated. Method statements or written safe work procedures are an effective method as information
and record of the way jobs / tasks must be performed. Daily or issue based or task specific or on
the job risk assessments must be conducted by team at the place where work is to be performed/
conducted to allow managers and employees to assess any inherent risks that could have been
overlooked during the initial risk assessment or any changes that might have occurred in a period
of absence. For example if a job / task is extended over a day or halted due to inclement weather.
Guidelines for actual steps involved in a job/task specific risk assessment are:
procedures exist for ladders.
rectify this shall be recorded, and safe working procedures drawn up.
and duly assigned.
must be nominated.
for comment and approval.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
Supervisor nominated as the responsible person; and the names of workmen who have
received instruction on the work content and the sequence of the activities listed in the risk
assessment shall be recorded, and their competence established. This instruction shall be
done through an interpreter if required and recorded on the Pre-Job Brief (Daily Safe Task
Instructions), with reference to applicable Risk Assessments.
3.14 Fire equipment and maintenance
a. Be clearly labelled
b. Conspicuously numbered
c. Entered in a register
d. Inspected monthly by a competent person
3.16 Flammable and combustible liquids
work and the approval to be obtained from the local Municipality and to be complied with for
the duration the project.
kg, shall be provided, installed and maintained.
requirements: -
a. Storage should be well clear of buildings.
b. Storage areas must be kept free from all combustible materials.
c. All Safety signs must be prominently displayed i.e.
d. Adequate firefighting equipment must be available...
department and/or the Municipality (if the services are rendered/available in the local
Municipality).
3.17 OHS communication systems
communicate OHS issues to their staff, the mediums they will employ and how they will
measure the effectiveness of their OHS communication. Below is a brief on how
communication should take place. Where project meetings are conducted on site, OHS shall
be included as a standing agenda point and minutes of these meetings shall be available on
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
site at all times. Minutes of meeting must be compiled and filed in the relevant OHS files. All
employees shall have access to these minutes. Attendance register shall be kept for all the
health and safety meetings.
3.18 Tool box talks / daily team talks / pre job meetings
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e. the task risk assessments shall be discussed. Each
employee who attends the briefing shall sign an attendance list of that pre-job brief form
undertaking that they have an understanding of the tasks, risks and control measures
required.
talks must be conducted. The toolbox talk topics will be based on OHS issues pertaining to
the project site. The topic and the contents shall be in writing. Attendance registers with the
topic listed shall be kept.
3.19 OHS training
OHS training requirements and the costing of such requirements.
relevant procedures. Additional to the requirements, will be that the main contractor must
have the appropriate qualifications, certificates and employees should always be under
competent supervision.
relevant training shall be given to those appointees prior to the acceptance of those
appointments.
plan, all affected staff shall undergo the applicable refresher training.
Appropriate time must be set aside for training (induction and other) of all employees.
Records of all training and qualifications of all the contractors employees must be kept on the
OHS file.
3.19.1 Main Contractor Induction training
The main contractor is required to make arrangements with the Business Unit for its employees to
attend induction in order to be granted permission to access site.
undergone the Eskom OHS induction training prior to commencing work on site.
that they have received and understood the induction training.
medical examination and found fit for duty. A copy of the certificate of fitness must be kept in
the OHS file on site for the duration of the project.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
3.19.2 Visitors to site induction
Station site-specific safety induction prior to being allowed access to site.
inducted. No visitors are permitted to undertake any work onsite, of any nature.
Induction training.
3.20 General training
The main contractors will be required to ensure that before an employee commences work on the
project/site, the respective supervisor informs the employee of his scope of authority, the hazards
associated with work as well as the control measures to be taken. This will include man-job
specifications, the discussion of any task procedures or hazardous operational procedures to be
performed by the employee. The main contractors must ensure that the supervisor has satisfied himself
that the employee understands the hazards associated with the work to be performed by conducting
task/job observations.
3.21 Vehicle management
a. Their passengers wear seat belts whilst the vehicle is in motion.
b. Comply with all traffic road rules, safety, direction and speed signs.
c. Ensure that vehicle loads are properly secured prior to moving off.
d. Ensure that vehicles are not overloaded.
No persons maybe transported at the back of the bakkie.
Drivers are required to conduct the route risk assessment prior to travelling/driving.
No drivers or operators may text, talk on cell phones or two-way radios whilst driving.
All drivers shall have a valid medical fitness certificate.
The First aid box with valid contents and fire extinguishers must be included in the vehicle, be
services annually and inspected monthly. Drivers must be trained on how to use the First aid
box and fire extinguishers.
back of the vehicle.
vehicle access to site.
license must be valid at all times and this is applicable to yellow plant.
(thirty) meters must be left clear between such a vehicle and such a machine.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
Vehicles which are not roadworthy will not be permitted to be used on site.
Precautions shall be taken to secure all loads properly. Loads projecting from vehicles shall
be securely loaded and in daytime a red flag and during darkness a red light or red reflective
material shall be attached to the extreme end of such projecting materials.
metres
3.22 Housekeeping and order
vehicles for the duration of the project/contract.
in a designated waste area, awaiting disposal.
serious injuries/fatalities.
Nails protruding through timber shall be bent over or removed so as not to cause injury.
All packaging material including boxes, pallets, crates, etc. to be removed from the work area
immediately.
of all materials, scrap, temporary buildings and building bases to the satisfaction of the
client/agent.
safety and cleanliness, anyone has the responsibility to bring it to the attention of the Main
contractor in the first instance and the Eskom project/contract manager in the second
instance.
work until the area has been tidied up and made safe. Neither additional costs nor extension
of time to the contract shall be allowed as a result of such a stoppage. Failure to comply with
this requirement will result into site cleaning by another cleaning contractor company at the
cost of the main contractor.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
maintenance of satisfactory standards. the main contractor shall document the results of each
inspection and shall maintain records for viewing.
3.23 Workplace signage and colour coding
Symbolic safety signage shall be displayed where it is required by legislation.
All symbolic safety signage shall conform to the requirements of SANS standard 1186.
Signs shall be positioned to be seen from most positions within the work sites / areas.
All signage must be clear at all times and be replaced timeously when worn out.
When the main contractor is establishing sites must erect a company sign at their site offices
to reflect the name and contact details of the: contractor site/responsible manager;
supervisors; Health and Safety Manager/Practitioner; First Aider; Health and Safety
Representative and Evacuation warden.
indicated by means of a sign.
entry is prohibited and/or where alerting and cautioning passers-by to be aware of potential
dangers.
and toolbox talks.
indicating the meaning of symbolic safety signs must be displayed.
3.24 Auditing
3.24.1 Approval and compliance of Main contractor OHS plan
The main contractor’s OHS Plan will be audited against compliance checklist to verify compliance to
the requirements of the Eskom Kriel Power Station OHS specifications. Once there is compliance only
then will the main contractors OHS plan be approved by the project manager or an appointed Eskom
Kriel Power Station contract custodian. The implementation of the OHS Plan shall be assessed /
audited by Eskom personnel on a regular basis. This will include physical conditions evaluation.
3.24.2 Eskom OHS audits
Eskom Kriel Power Station shall evaluate the main contractors OHS performance on an ongoing
basis against the legal, Eskom requirements, OHS specification and the main contractor OHS plans.
Note: Eskom reserves the right to conduct unannounced audits on the main contractors
There will be a quarterly audit conducted by Eskom Kriel Power Station on the main contractor These
audits shall be attended by the contractor’s site manager or his representative.
If there are any findings / non-compliance identified as serious in these audits, an activity will be
stopped for that specific the main contractor. Refer to section on “Work Stoppage” in this OHS
Specification.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
3.25.3 Contractor audits
The main contractor is required to conduct internal audits on both their employees on the
implementation of their OHS Plan quarterly or when the scope of work changes. A summary of the
findings and the proposed corrective actions shall be submitted to Eskom project manager within one
week after completion of the audit.
3.26 Smoking
The national smoking policy must be observed and smoking is permitted in designated areas only
(Eskom Smoking Procedure 32-36).
3.27 Cellular phones
The National Road Traffic Act requirements regarding the use of cellular phones must be observed,
when driving and or operating mobile equipment and or machinery. The personal use of cell phones in
the plant is prohibited unless it is an emergency or for work purpose. The use of cell phone camera in
the plant must be in line with the national key point Act and the Plant safety regulation.
3.28 Occupational health, hygiene and rehabilitation
The main contractors is required to develop an Occupational Health, Hygiene and Rehabilitation
program. The program is intended to ensure that the risks to health are identified and controlled.
3.28.1 Medical Assessments
Note: Eskom will only accept medical surveillances conducted by an Occupational Health Practitioner
who holds a qualification in occupational health.
whereby their employees undergo entry, periodic and exit medical fitness examinations.
the hazards that the employees will be exposed to.
job specification, which must indicate the description of work, list of hazards and potential
occupational exposure limits, physical hazards and required physical attributes.
This shall be maintained until completion of the contract.
examination before starting work on the contract.
are issued with a conditional certificate of fitness.
fitness certificates as and when their employees leave the company.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
3.29 Roles and responsibilities
The main contractor is required to list employee’s roles and responsibilities pertaining to the contract.
3.30 Personal protective equipment requirements
1.The main contractors must provide a detailed programme that includes the issuing,
maintenance and replacement of PPE for all his employees and appointed contractors
on site.
2.The main contractor shall comply with the requirements of GSR 2 of the OHS Act and
PPE Specification Standard 240-44175132.
3.The risk based PPE matrix must be compiled detailing the types of PPE that is required
to be issued to employees performing the respective tasks.
additional PPE, a risk assessment must be done, in which such PPE requirements will
be determined and issued.
5.The main contractor shall ensure that their visitors wear and use the correct PPE whilst
on worksites.
6.Where PPE is required and visitors are not in possession of, then it is the icontractor’s
responsibility to provide the PPE.
7.All PPE purchased and used by all contractor employees including visitors must comply
with the relevant SANS standards.
8.Where deemed as a requirement (as per risk assessment), then high visibility vests shall
be worn.
10.The main contractor shall provide training to his/her employees on the correct use, care
and maintenance of PPE and keep the record.
11 The main contractor must ensure the employees wear a branded overalls with a
company logo
3.31 Incident investigation
All incidents shall be investigated in terms of OHS Act General Administrative Regulations
8 and 9, using Eskom Procedure 32-95 OHS incident management as a reference, and
where injuries as contemplated in sections 24 and 25 have been sustained, be reported
to the Department of Employment and Labour.
The main contractor shall use the Eskom Flash report to report incidents immediately or
before end of shift. The standard General Administrative Regulation Annexure 1
“Recording of an Incident form” for all incident investigation reports. The objective of
incident investigation, should not only be a legal requirement, but should establish why
and how the incident occurred and find out the real root cause of the incident and to decide
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
on precautionary measures that are required to address the root cause to prevent any
further recurrences of the same or similar incidents.
3.32 Emergency management
The art of emergency preparedness and response is to minimise the effects of any
emergency and to restore normal activities as soon as possible. The main contractor must
develop and align their own Emergency response plan with Eskom’s Kriel Power Station
to address any emergency which might arise at any given point in time. The main
contractor to familiarise themselves with the Eskom Kriel Power Station emergency
response plan and procedure. Periodic emergency drills must be undertaken to test the
effectiveness of their plan. This must be recorded and provided on request.
3.33 Non-conformance and compliance
subject to discipline in terms of the Eskom Procurement and Supply Chain
Management Procedure.
already in place) for issuing to contractors for transgressions. The procedure can
include “quality” related non-conformance issues.
strictly adhered to.
issued, in not doing so; any recommendations made may not be implemented.
procedure will be for the offender to be called by the responsible project manager to
explain the non-conformance issued and what plan is in place to prevent a recurrence
of the non-conformance.
employees for the tasks being performed and/or to visitors; failure to enforce the
wearing of such PPE will be viewed as a transgression of the legislative and Eskom
requirements.
3.34 OHS files
safety and health management system from inception, execution to completion of works.
one site per project, a file per site shall be kept at that site. Contractors may keep additional
files at their head office as additional records. The OHS file shall be maintained by all the
contractors on their project sites and shall be available on request for audit and inspection
purposes.
requirements/specification, legal and other requirements.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
OHS requirements /specification and the OHS plan.
partition must be labelled.
and safety file to the project manager.
cumbersome, the older documentation must be archived in boxes which shall be correctly
labelled and be available for auditing purposes. The archived documentation must be handed
over at the completion of the project.
3.35 WORK STOP. Any person may stop any activity where an unsafe act or unsafe condition that poses or may
pose an imminent threat to the safety and health of an individual or create a risk of degradation
of the environment. This includes any unauthorised work or service performed by, or legally or
contractually non-compliant acts or omissions by, any contractor contracted to work at that site.
related to the contractor’s works or services shall not warrant any financial compensation claim
lodged against Eskom where the contractor has not met the requirements defined legally or
contractually.
Where stoppages are carried out, the required non-conformance report shall be raised.
All work stoppages ideally should be investigated and documented by contract custodians.
3.36 Hours of work
The requirements of the Basic Conditions of Employment Act, Chapter Two “Regulation of Working
Time” must be adhered to. All contractors are required to maintain an accurate record of time worked
by each employee.
3.36.1 Normal work
All work conducted on site shall fall within the legal requirements in accordance with the Basic
Conditions of Employment Act. The main contractor will notify their Eskom Kriel Power Station
Supervisor or project manager of any work that needs to be performed after hours according to the
agreed arrangements. (The application needs to be submitted timeously). Where applicable, the
notification should include proof of application, for overtime, to the Department of Employment and
Labour and /or the letter of approval from the Department of Employment and Labour.
3.36.2 Night work
When night work is to be performed, the baseline risk assessment must be reviewed to include the
management of night work. The main contractor shall provide sufficient lighting to enable the entire
work site to be illuminated to a degree that employees will not work in dark (un-illuminated) or dimly lit
areas. Care must be exercised as not to use few lights with high light intensives as this will cause
night blindness.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
If work is continuing from day light into night, at dusk, a tool box talk must be held where all
employees will be advised of the hazards of night work and the extra precautions which require to be
taken, i.e. poor housekeeping, stepping on uneven ground, stepping into holes etc.
3.36.3 Overtime
When overtime is required to be performed, the main contractor shall inform the Eskom Kriel Power
Station project manager of such function and provide proof of exemption from the Department of
Employment and labour. The main contractor shall be aware of the effects of human fatigue and
regulate overtime accordingly. The baseline risk assessment must be reviewed to include the
management of overtime work.
3.37 Omissions from safety and health requirements specification
By drawing up this OHS specification Eskom Kriel Power Station has endeavoured to address the
most critical aspects relating to OHS issues in order to assist the main contractors to adequately
provide for the health and safety of employees on site.
Should Eskom Kriel Power Station not have addressed all OHS aspects pertaining to the work that is
tendered for, the main contractors need to include it in the OHS plan and inform Eskom of such
issues when signing the contract.
3.38 Contractor performance monitoring
Contractor management is required to do the following as part of the continuous improvement
initiatives:
Business Unit Power Station General Managers meeting
3.39 Contract sign off
On completion of the project, all Eskom Kriel Power Station team (project coordinator/manager, safety
officer, quality officer, the main contractor representative and security personnel) must conduct the
final audit, inspections, and housekeeping to identify defects, outstanding actions, and open incident
cases, and present their findings to the main contractor representative and Eskom Kriel Power Station
contract/project manager, must facilitate the closeout. Once the main contractor has closed all
findings the Eskom’s Kriel Power Station team will verify and sign off prior to issuing a completion
certificate and final payment.
3.40 Eskom's right to terminate the contract
The contractor/supplier shall at all times comply with Eskom’s occupational health and safety
(OHS), legal and other requirements as amended for the duration of the contract. In addition,
the contractor shall comply with the requirements contained in the SHE Specification. Eskom
reserves the right to terminate the contract in the event that the contractor has built up a history
of poor performance or non-conformance in relation to matters of Eskom OHS and legal
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Template R
Kriel Power Station OHS 32-726-03T 1
Identifier ev
Document R
555-RSR 2031 1 HIGH RISK Identifier ev
ACTIVITIES/SERVICES Effective Date November 2023
compliance. No work may commence until the health and safety file has been approved by
Eskom Kriel Power Station OHS personnel.
Authorized by OHS manager. Authorized by Eskom project/ manager.
Name: Thabitha Mpoyi Name: Veliswa Mlotshwa
Signature pp Signature:
Date: 10 April 2026 Date: 10 April 2026
Date Rev. Compiler Remarks
November 2023 1 Sizani Shabangu This provides the initial OHS
specification requirements that must be
met by the main contractor for the work
to be performed for Eskom Kriel Power
Station.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 30
Compliance Requirements
Source: SAFETY 555-RSR 2031 SHE SPEC Komati Transportation.pdf (unknown)completion certificate and final payment
Health & Safety
Source: SAFETY 555-RSR 2031 SHE SPEC Komati Transportation.pdf (unknown)This is an OHS specification for the bus transportation of Eskom Kriel Power Station employees for Komati Power Station residents, daily to and from Kriel Power Station for 5 years. It includes requirements for a Section 37(2) agreement, risk assessments (including Covid-19), working at height, live work, alcohol testing, life-saving rules, OHS file compilation, competent staff appointments, and adherence to the Occupational Health and Safety Act and Eskom OHS standards.
Important Dates
Source: Eskom Standard Conditions of Tender Rev 12.pdf (TENDER){"closingTime":"2.2","briefingSession":"{"date":null,"time":null,"venue":"tend a site visit and/or clarification meeting that is stipulated as being","is_compulsory":true}"}
Contact Information
Source: Eskom Standard Conditions of Tender Rev 12.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":"g time 2.2 Ensure that Eskom has received the complete original tender and one (1) complete hard"}
Evaluation Criteria
Source: Eskom Standard Conditions of Tender Rev 12.pdf (TENDER)Evaluation will follow the Invitation to Tender. Functionality and B-BBEE scorecard may not be used as objective criteria. B-BBEE points are allocated per PPPFA. Price correction procedures apply if arithmetic errors are found.
Technical Specifications
Source: Eskom Standard Conditions of Tender Rev 12.pdf (TENDER)Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Quality Management
Source: Eskom Standard Conditions of Tender Rev 12.pdfof a tenderer.
Cost of tendering 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the preparation
and submission of a tender, including the costs of any testing necessary to demonstrate that
aspects of the tender satisfy the evaluation criteria, or the negotiation of any contract.
Submitting a tender 2.7 Check the Invitation to Tender documents on receipt and notify the Eskom representative of
any discrepancy or omitted documents. The Acknowledgement Form must be completed
and submitted with the tender and must clearly state if the tender is for the whole or part of
the works, services or supply identified in the specification and/or works information by
Pricing Schedule
Source: Eskom Standard Conditions of Tender Rev 12.pdfreasonable time for tenderers to make consequential adjustments to their tenders before
the closing date and time for submission.
In writing’ means hand-written, typed, type-written, printed or electronically made, and that
results in a permanent record.
Insurance 2.17 The extent (if any) of insurance provided by Eskom may not be for the full cover required in
the conditions of contract. The tenderer is advised to seek qualified advice regarding
insurance.
Pricing the tender 2.18 Include in the rates, prices, and the tendered total of the Prices all duties, taxes (including
VAT), and other levies payable by the tenderer if successful. Such duties, taxes and levies
are those applicable 14 (fourteen) days prior to the closing date and time for tender
submission.
2.19 Provide rates and Prices that are fixed for the duration of the contract and are not subject to
contract price adjustment except as provided for in the Invitation to Tender.
2.20 State the rates and Prices in South African Rand unless instructed otherwise in the Invitation
to Tender. The selected conditions of contract may provide for part payment in other
currencies. Therefore, submit Rates/Prices in Rands in accordance with the exchange rate
and base date as stipulated in the Invitation to tender.
Alterations to 2.21 May not make any alterations or additions to the tender documents, other than for purposes
documents of complying with instructions issued by the Eskom Representative or if necessary to correct
errors made by the tenderer. All such alterations shall be initialed by all signatories to the
tender. Corrections may not be made using correction fluid, correction tape or the like.
Alternative tenders 2.22 Submit alternative tenders only if a main tender is also submitted, and only if the submission
of alternative tenders is permitted by the Invitation to Tender. Accept that an alternative
tender may be based only on the criteria stated in the Tender Data.
Clarification and 2.23 Provide clarification and documents as may be required by the Eskom Representative
correction of Prices during the evaluation of tenders. However, documents identified as mandatory tender
after tender returnables that are required to be submitted at the closing date and time for tender
submission submission will not be requested and may not be submitted after the closing date and time.
phases, as this is regarded as ‘double dipping’.
Designated 3.12 Tenderers are also required to submit information on designated material and
materials and thresholds no later than contract award. If this information is not completed and
thresholds submitted as indicated in the Invitation to Tender, your tender will not be considered for
contract award
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
requirements will be required meet the minimum threshold stated in the Tender Data to proceed to
further evaluation.
Financial analysis 3.14 Eskom has to determine the risk of doing business with a supplier who may pose a
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
financial statements, Eskom will attempt to identify mitigating factors or requirements for
the tenderer to meet, if such factors/requirements exist in the tender’s context. However,
should suitable mitigating factors not exist in the tender’s context or should mitigating
factors exist but be insufficient or if the risk is considered to be too high or should the
tenderer not agree with the mitigating factors, the tenderer will not be considered for
award.
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
such as CPA, FOREX, commodity exposure, unconditional discounts, technical
adjustment, PV and forecasted rates of invoicing are taken into account when determining
the evaluation Price.
Arithmetical errors 3.16 Check responsive tenders for arithmetical errors. If there is a discrepancy between an
amount in figures and the amount in words, the amount in words shall prevail.
Check the highest-ranked tenders for the following errors or omissions: -
(a) the misplacement of the decimal point in any unit rate; or
(b) omissions in completing the pricing schedule or bill of quantities, or
(c) arithmetical errors in line-item totals that are the result of the incorrect multiplication
of a unit rate and a quantity in a bill of quantities or schedule of prices; or
(d) arithmetical errors that are the result of the incorrect addition of the prices.
will request the tenderer to either confirm the prices as tendered or to accept the
corrected prices.
Where the tenderer elects to confirm the prices as tendered; Eskom will correct the error
as follows: -
(a) If a bill of quantities or pricing schedule applies and there is an error in the line-item
total that is the result of an error in multiplying the unit rate and the quantity, the line-
item total shall prevail, and the rate shall be corrected.
(b) Where there is a misplacement of the decimal point in the unit rate, the line-item total
as quoted shall prevail, and the unit rate shall be corrected.
(c) Where there is an error in the total of the prices that is the result either of other
corrections required by the checking process or in the tenderer’s addition of prices,
the total of the prices shall prevail, and the tenderer shall be asked to revise the
selected item prices (and their rates if a bill of quantities applies) to result in the
tendered total of the prices.
documentation by closing date and time of tender submission, the tenderer will not be
disqualified if otherwise evaluated as acceptable in all other criteria; however, the tenderer
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
together and rank the suppliers from the highest to the lowest.
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
accordance with Section 2(1) (f) of the Preferential Procurement Policy Framework Act,
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Compliance Requirements
Source: Eskom Standard Conditions of Tender Rev 12.pdf (TENDER)CSD report or as per certificate/affidavit provided
CSD number/CSD report) must be provided at the closing date and time for
CSD number or B-BBEE certificate/affidavit will need to be
B-BBEE Details: kom Representative and
Agreement to sign the contract documents.
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Environment and closing date and time for tender submission stipulated in the Invitation to Tender and/or
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated
Health & Safety
Source: Eskom Standard Conditions of Tender Rev 12.pdftenderers that Eskom has identified. A sole source and a single source are regarded as a
tenderer that meets the requirements stated in the Eskom Procurement and Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated in the Invitation to
Tender; the tender will be disqualified. However, in the event that, at the closing date and
time for tender submission, only proof of application for registration on CIDB is available,
then this must be submitted by the closing date and time for tender submission, while the
actual proof of CIDB registration (printout from CIDB database) must be submitted by
contract award
Contract Skills 2.29 If the tenderer is awarded a contract, it, as Contractor, shall achieve in the performance of
Development Goal the contract the Contract Skills Development Goals (CSDG) established in the CIDB
(CSDG) Standard for Developing Skills through Infrastructure Contract (published in GN 1779,
Government Gazette No. April 2023)
that has a duration of 12 months or more, and to:
a contract of R5 million or more, in the case of a professional service or service contract
or an order issued in terms of such a contract; or
a CIDB grading designation of grade 7 or higher, in case of an engineering and
construction works, or design and build contract or an order issued in terms of such a
contract.
Contract 2.30 The Contractor shall achieve in the performance of the contract the Contract Participation
Participation Goals Goals (CPG) relating to the engagement of targeted enterprises as established in the CIDB
(CPG) standard for indirect targeting for enterprise development through Construction works
contracts (published in Government Gazette No. February 2013).
enterprises as established in the aforesaid standard applies to:
construction works contracts in the General Building (GB) and to Civil Engineering (CE)
classes of construction works;
construction works contracts of an estimated minimum project duration of 6 months; and
construction works contracts in which at least 25% of the main contract could reasonably
be expected to be subcontracted out in one or more of the following CIDB classes of
construction works:
Civil Engineering (CE)
Electrical Engineering Work (EB)
) General Building Works (GB)
) Mechanical Engineering (ME)
2.31 Eskom may disqualify a tender if it is found that the tenderer has misrepresented or
falsified any information, certificate, affidavit or document. Eskom will report any fraud
in relation to a tenderer’s B-BBEE certificate/affidavit, or evidence of ‘fronting’ as
defined in the B-BBEE Act , as amended, to the B-BBEE Commission. The
tenderer will be suspended from business with any State-Owned Company for up to 10
years and may even be sentenced to jail.
2.32 Tenderers are also required to complete fully and submit the SDL&I Undertaking
(annexure to the Invitation to Tender) by no later than contract award. If the SDL&I
Respond 3.1 Respond to a request for clarification that Eskom receives before the closing date for
clarification clarification or queries. Eskom’s responses will be published to all tenderers in the same
manner the Invitation to Tender documents were issued. It is the tenderers’ responsibility
to check the Eskom Tender Bulletin and NT e-Tender Portal regularly for updated
responses to clarifications.
Issue Addenda 3.2 If necessary and prior to the closing date and time for tender submission, amend, amplify, or
add to the Invitation to Tender documents by way of Addenda published in the same
platform that the Invitation to Tender was issued. It is the tenderers’ responsibility to
check the Eskom Tender Bulletin and NT e-Tender Portal regularly for Addenda.
electronically. The Eskom Representative will publish the names of all tenderers received
on the Eskom Tender Bulletin and NT e-Tender Portal.
Tender Prices 3.5 Eskom will announce the names of the tenderers. Prices may be announced if so, stated
in the Tender Data.
Non-disclosure 3.6 Unless required by law, Eskom will not disclose information relating to the evaluation and
comparison of tenders and recommendations for the award of a contract to tenderers or to
any other person not officially concerned with the tender process until after the tender
award.
Grounds for 3.7 Reject a tender if Eskom establishes that there is proof that the tenderer influenced the
rejection processing of tenders or the awarding of the contract, the existence of collusion and/or bid
rigging, and/or that the tenderer has participated in any fraudulent/illegal activity in
connection with the Invitation to Tender.
Clarification of a 3.8 Obtain clarification from a tenderer in respect of any matter in the tender that may not be
tender clear or that could give rise to ambiguity in a contract arising from this tender if the matter
were not to be clarified. A document that the Invitation to Tender identifies as a mandatory
tender returnable that is required to be submitted at the closing date and time for tender
submission will not be requested, but Eskom may seek clarity on it.
may utilise reverse e-auction in certain Enquiries. Where reverse e-auction will be utilised,
this will be indicated in the respective Invitation to Tender and the reverse e-auction
supporting documents will be issued in the Invitation to Tender. Tenderers will be required
to submit a complete tender that does not contain Prices. If a tenderer has included prices
in its tender, the prices will not be considered.
Acceptance of 3.22 Notify Eskom's acceptance to the successful tender before the expiry of the validity period
tender or agreed additional validity period. Inform the successful and unsuccessful tenderers only
once approval has been granted by the Eskom Adjudication Authority. For open tenders,
this notification must be published on the Eskom Tender Bulletin and NT e-Tender Portal
Prepare contract 3.23 Revise the contract documents issued by Eskom in the Invitation to Tender documents to
documents take account of:
Addenda issued during the tender period;
inclusion of returnables stipulated in the Invitation to Tender;
inclusion of changes agreed in contract negotiations; and
Other revisions or documents agreed to between Eskom and the successful
tenderer during negotiations,
Sign Form of 3.24 Arrange for authorised signatories of both parties to complete and sign the original and one
Contractual Terms
Source: Eskom Standard Conditions of Tender Rev 12.pdfincluding the Eskom Representative shall not be liable for any losses, claims or damages of
whatsoever nature or howsoever arising that may be sustained by a tenderer or any other
person as a result of its participation in the tender or from any amendment, termination or
suspension of the process set out in the Invitation to Tender or from its exclusion from
participating in the tender process at any point.
Eskom’s right to 1.7 Eskom reserves the right to enter into mandated negotiations with any, one or more selected
negotiate tenderer(s) in accordance with Eskom’s approved procurement policies and procedures.
240-62044728 Rev 12 Eskom Standard Identifier
Conditions of Tender Effective Date 01 February 2025
Review Date January 2030
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information contained in the
regarding accuracy tender documents is correct and complete, Eskom does not, however, make any
of tender representations or warranties, express or implied, as to the accuracy or completeness of
documents such information and Eskom expressly disclaims any, and all liability for such
representations, warranties or statements.
Tenderer’s 2. The tenderer shall comply with the following obligations when submitting a tender and shall:
Tender validity 2.12 Hold the tender(s) valid for acceptance by Eskom at any time within the validity period after
the closing date and time for tender submission. Extend the validity period for a specified
additional period if Eskom requests the tenderer to do so. A tenderer that agrees to extend
the validity of its tender will not be required or permitted to modify its tender. A tenderer that
does not agree to extend the validity of its tender will be excluded from further
consideration. Tenderers will be requested to extend the validity of their tenders until a
contract(s) have been concluded with one or more tenderers. A request that a tenderer
extend the validity of its tender is not a representation that the tender is an acceptable
tender or that Eskom will seek to negotiate or conclude a contract with the tenderer. If the
validity of tenders expires before contracts have been concluded, the procurement process
is deemed to have concluded without an award.
Confidentiality and 2. 13 Treat as confidential all matters that arise in connection with the procurement. Use and copy
copyright of the documents provided by Eskom only for the purpose of preparing and submitting a tender
documents in response to this Invitation to Tender.
Standardised 2.14 Obtain and familiarise themselves with, if required for the purposes of submitting a tender,
specifications and the latest revision of standardised specifications and/or other documents that have been
other publications incorporated by reference into the Invitation to Tender documents by reference.
Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is stipulated as being
clarification compulsory in order to familiarise themselves with the proposed work, services, supply,
meeting location or similar. Failure to attend a clarification meeting or site visit that is identified as
compulsory will result in disqualification from participation.
Details of the meeting(s) are stated in the Tender Data. Tenderers are entitled to ask
correction of errors as required above.
Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit provided.
B-BBEE If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE level
(certificate/CSD number/CSD report) must be provided at the closing date and time for
tender submission; or the tender will be disqualified. If sub-contracting to designated groups
pre-qualification criteria are utilized (selected/mandatory) in terms of the PPPFA
Regulation, then Eskom will apply the PPPFA requirements for sub-contractors’ B-BBEE
status and the sub-contractors’ CSD number or B-BBEE certificate/affidavit will need to be
provided at the closing date and time for tender submission. Should the
information/documents provided indicate that the level is in dispute (fraudulent/ expired)
then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
provided at Tender closing date and time for tender submission, or the
information/documents provided are fraudulent or have expired; then the tenderer will not
be disqualified (if otherwise deemed to be responsive and acceptable in all other aspects)
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Section
Source: Eskom Standard Conditions of Tender Rev 12.pdfFunctionality and any element of the B-BBEE scorecard may not be used as Objective Criteria. For PPPFA point allocation, if no B-BBEE certificate/affidavit is provided at closing, the tender may be disqualified or points not allocated. Price corrections: if arithmetic errors are found, Eskom will request confirmation or acceptance of corrected prices.
Important Dates
Source: QUALITY 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown){"closingDate":"14 April 2026"}
Submission Guidelines
Source: QUALITY 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Returnable documents: complete and sign the Quality Form A (Cat 4, Rev 9) to acknowledge and accept Eskom Supplier Quality Requirements as per Specification 240-105658000 and ISO 9001 Standard. The form requires the tenderer to indicate applicability of pre-contract award quality requirements and ISO 9001 clauses. No other submission method or address is stated.
Evaluation Criteria
Source: QUALITY 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Quality requirements: tenderer must indicate with an X or - as applicable for pre-contract award quality requirements, ISO 9001 standard clauses, and post-contract award quality requirements. The tenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
Technical Specifications
Source: QUALITY 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)on a daily basis to and from Kriel Power Station for a period of 5 yearsSECTION (TENDERER)
Clauses of 240- clause description indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
Category 2 (refer to clause 3.5.-105658000) -
Category 3 (refer to clause 3.5.-105658000) -
Category 4 (refer to clause 3.5.-105658000) X
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000) -
3 post-contract award(eskom)
Methodology
Source: QUALITY 240-68099512 Form A_Cat 4_ Rev 9.pdfCLAUSE 5 Leadership - PRINCIPLE 2 Leadership X
CLAUSE 6 Planning - PRINCIPLE 3 Engagement of people X(ESKOM)
C CLAUSE 7 Support - PRINCIPLE 4 Process approach X
CLAUSE 8 Operation - PRINCIPLE 5 Improvement X
CLAUSE 9 - Evidence based decision
Performance Evaluations PRINCIPLE 6 XSECTION making
CLAUSE 10 - Improvement PRINCIPLE 7 Relationship Management X
Quality Management
Source: QUALITY 240-68099512 Form A_Cat 4_ Rev 9.pdfAuthorisation Date January 2022
240-105658000 and
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Eskom Rights of Access (refer to clause 3.8.-105658000) X
Eskom Rights to Information (refer to clause 3.8.-105658000) X
Preservation (refer to clause 3.8.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Management of Nonconformities and Nonconforming Outputs Identified by Eskom (refer to clause 3.8.-
Special processes (refer to clause 3.8.-105658000) x
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
9001 standard clause description (x) as applicable principles principle description (x) as applicable
Or (-) if not or (-) if not
Representativesection (tenderer)
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-
105658000 Specification and ISO 9001 Standard.
Compliance Requirements
Source: QUALITY 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)No specific requirements found
Section
Source: QUALITY 240-68099512 Form A_Cat 4_ Rev 9.pdfArd indicate with an quality iso 9001 standard indicate with an
Performance Evaluations PRINCIPLE 6 XSECTION making
Eskom’s quality
Nontobeko S. Motha Officer Quality & Audit 14 April 2026 REPRESENTATIVE
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240
TENDER & CONTRACT QUALITY Document Identifier 240-68099512 Rev 9
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Pre-contract award quality requirements x
B Contract Execution (refer to clause 3.7.-105658000) X CLAUSE Supplier Quality Performance Monitoring Phase (refer to clause 3.7.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
Description
Source: SDL&I Bidders 240-6860265 Kriel Komati Transportation E3505GXMPKRI.pdfProvision of transportation services for Eskom Kriel Power Station, covering Kriel and Komati areas. Contract duration is 60 months.
Important Dates
Source: SDL&I Bidders 240-6860265 Kriel Komati Transportation E3505GXMPKRI.pdf (unknown){"closingDate":"01 April 2023"}
Contact Information
Source: SDL&I Bidders 240-6860265 Kriel Komati Transportation E3505GXMPKRI.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"it proposals in a table below for developing the skills of unemployed"}
Evaluation Criteria
Source: SDL&I Bidders 240-6860265 Kriel Komati Transportation E3505GXMPKRI.pdf (unknown)Bidders must provide a valid B-BBEE certificate (SANAS accredited) or sworn affidavit (if annual turnover ≤ R10 million as EME, or ≤ R50 million as QSE with at least 51% black ownership), or CIPS affidavit. Bidders must provide proof of ownership/shareholding (preferably CIPC documentation) with shareholding breakdown, certified ID copies of shareholders, and proof of disability where applicable. For trusts, consortia, or joint ventures, a consolidated B-BBEE status level verification certificate is required. Bidders must comply with B-BBEE improvement milestones as specified. Failure to provide documentation for preference points results in 0 points for specific goals but does not disqualify the bidder.
Technical Specifications
Source: SDL&I Bidders 240-6860265 Kriel Komati Transportation E3505GXMPKRI.pdf (unknown)Provision of Transportation for Eskom Kriel Power Station
Employees residing in the Komati area to Eskom Kriel Power
Station and back daily
Duration of the Project
Methodology
Source: SDL&I Bidders 240-6860265 Kriel Komati Transportation E3505GXMPKRI.pdfthrough their supply network. In certain cases, the SETA’s accredited training providers can be
approached to participate in developing critical and scarce skills.
user to ensure it is in line with the authorised version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
File name: 240-6860265 (Rev 1) SDL&I Strategy Setting Template for Bidders of 5
Document Identifier 240-6860265 Rev 1
SDL&I Strategy Setting Effective Date 01 April 2023
Template for Bidders Review Date April 2026
Note: That these targets for skills development candidates categorically exclude Eskom
employees and registered learners. The tenderers are required to take full responsibility
for the total cost of developing the requisite skills, and Eskom shall not make any
financial contribution towards the fulfilment of this obligation. Tenderers also are
advised to approach their relevant SETAs to access grants, subsidies, and incentives
as well as South African Revenue Services for tax rebates that are earmarked for skills
development initiatives
Section 3: SDL&I Penalty and Performance Security
Eskom will apply a penalty of 1.5% of the Contract Value for failure to meet SDL&I obligations.
For the duration of the contract, Eskom will retain 1.5% of every invoice (excluding VAT) as security
for the fulfilment of all SDL&I Obligations. The retained amounts shall only be released to the
Pricing Schedule
Source: SDL&I Bidders 240-6860265 Kriel Komati Transportation E3505GXMPKRI.pdftender response must be separated into its components as per the Price Schedule included with
the tender documents. Local procurement content is total spending minus the imported
component.
B-BBEE Requirements
Source: SDL&I Bidders 240-6860265 Kriel Komati Transportation E3505GXMPKRI.pdf (unknown)Specific goals for B-BBEE: A maximum of 10/20 points may be awarded for specific goals, added to price points. Points table for B-BBEE status levels under 90/10 and 80/20 systems. Required documents to claim preference points include valid B-BBEE certificate, proof of ownership/shareholding, certified ID copies, proof of disability, consolidated certificate for trusts/consortia/JVs. Tenderers failing to provide documentation may only score price points and 0 for specific goals.
Health & Safety
Source: SDL&I Bidders 240-6860265 Kriel Komati Transportation E3505GXMPKRI.pdfensure their validity:
authorised to depose of an affidavit. (Mark the applicable option).
business address.
as per Statement 004, the percentage of black beneficiaries must be reflected. (No blank spaces to be left).
management account. (Mark the applicable option).
(Financial year end to be stipulated by day/month/year).
supplier status.
the presence of the Commissioner of Oath. Furthermore, the Commissioner must also sign and stamp)
commission a sworn affidavit in which they have an interest.
Special Conditions
Source: SDL&I Bidders 240-6860265 Kriel Komati Transportation E3505GXMPKRI.pdf (unknown)SDL&I Penalty and Performance Security: Eskom will apply a penalty of 1.5% of contract value for failure to meet SDL&I obligations. Eskom will retain 1.5% of every invoice (excluding VAT) as security for fulfilment of SDL&I obligations. Retained amounts released only upon full fulfilment of obligations.
Section
Source: SDL&I Bidders 240-6860265 Kriel Komati Transportation E3505GXMPKRI.pdfContract awarded to highest points under 90/10 or 80/20 preference system. Tenderers failing to provide documentation for preference points may only score price points and 0 for specific goals. SDL&I obligations: penalty of 1.5% of contract value for non-compliance.
Description
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027 (PAYE).docThe questionnaire collects contractor details including names, ID or passport numbers, VAT registration, physical and postal addresses, and bank account information. It also asks about the right to sub-contract work and whether the contractor is obliged to be present and perform work at Eskom regardless of work availability.
Submission Guidelines
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027 (PAYE).doc (unknown)Submit the completed PAYE Questionnaire Pack to Eskom. The pack must be completed truthfully by the contractor or its authorised representative. Returnable documents include the PAYE Questionnaire and, where applicable, Appendix 7 (with code 3616 marked for IRP5 disclosure). Bidders who do not sign required affidavits may have PAYE withheld from their payments.
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027 (PAYE).doc (unknown)The evaluation determines whether an individual is a dependent contractor for PAYE purposes. Responses to questions on employment, subcontracting, and payment structures determine the correct disclosure code on the IRP5. The pack includes an exclusion for number of employees (Question 2(i)) and requires disclosure of contractor details, bank details, and VAT registration.
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027 (PAYE).doc (unknown)Copyright © Eskom Holdings SOC Ltd Registration Number 2002/015527/00
Description
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfThe pact defines a conflict of interest and requires suppliers to disclose any personal, financial or other interests that could affect or be perceived to affect the procurement process.
Important Dates
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown){"closingDate":"27 June 2023"}
Contact Information
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies and that","address":null}
Submission Guidelines
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)No eligibility criteria specified
Technical Specifications
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)1.1 Scope
The Eskom Supplier Integrity Pact (Integrity Pact) is applicable to Eskom Holdings SOC Ltd (including all
wholly owned subsidiaries) and all existing and potential suppliers (as per the definition hereunder).
1.2 Purpose
The integrity pact is a pact between Eskom and its suppliers that prescribes the “ethical behaviour”. Ethical
behaviour is desirable/acceptable conduct (actions and decisions) that will bring about good/appropriate
consequences/outcomes in the interaction with others. Ethical behaviour incorporates ethical values and
considers not only what is good for oneself, but also what is good for others. Eskom considers such behaviour
of paramount importance and expects every existing/potential supplier and its own employees/directors to
always act ethically and with integrity.
Eskom commits to ensuring that it implements a procurement policy/procedure that aligns to all applicable
South African laws and regulations, as well as the constitutional principles of fairness, transparency, equity,
cost effectiveness and competitiveness.
This document supplements all other relevant Commercial and Ethics related policies/codes/procedures.
1.3 Preamble
In order to achieve this purpose, all Eskom suppliers are required to read this Integrity Pact and to complete,
sign and submit the Integrity Declaration Form whenever they participate in any Eskom procurement process.
Eskom and its suppliers commit to honouring their respective obligations herein, and agree to refrain from
any form of dishonesty, fraud, and/or corruption throughout the entire procurement process, including
tendering practices that are in bad faith, unfair and anti-competitive (e.g., under-pricing/collusion/bid rigging)
Term Definition
Conflict of Interest A conflict of interest arises when one’s personal interests, personal
financial interests or any other interests, affect, or could be perceived to
affect, or has the potential to affect one’s objectivity and discretion and/or
the objectivity and discretion of another in performing Eskom duties or
making decisions on behalf of Eskom. This means that an employee or
director is in a position to make a decision (or influences a decision) that
is not fair and objective in order to benefit personally, or to benefit related
and /or inter-related persons.
Director Means a member of the board of Eskom, or a board of its subsidiary or
an alternate director of such board and includes a person occupying the
position of a director, by whatever name designated, or a prescribed
officer, or a person who is a member of a committee of the board or of
the audit committee, irrespective of whether the person is also a member
of such board.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
Employment equity The Employment Equity Act promotes equity in the workplace,
ensures that all employees receive equal opportunities and that
employees are treated fairly by their employers. The law protects a
person from unfair treatment and any form of discrimination.
Employee (s) Also referred to as staff members. These include individuals employed
by Eskom on a permanent basis, contract labour, temporary employees,
part-time employees, casual employees, occasional employees, fixed-
term contractors, learners, and others acting on behalf of Eskom or its
subsidiaries.
Eskom Registered Vendor Means a current or potential supplier who may be a natural or juristic
person and includes any employee of such supplier acting within the
course and scope of his/her employment, or any agent or manager acting
for or on behalf of, or in the interests of the supplier registered as a vendor
on the Eskom Vendor Database.
Supplier Means any natural person or juristic person that does business with
Eskom or tenders to do business with Eskom, or is registered on Eskom’s
Vendor Database, such as consultants, contractors, sub-contractors and
providers of goods and services.
Abbreviation Explanation
DOI Declaration of Interest
ETC EXCO Tender Committee
NDA Non-disclosure agreement
RFP Request for Proposal
RFQ Request for Quotation
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.1 Eskom’s suppliers accept that they will at all times:
4.1.1 Maintain an impeachable standard of integrity in all their business and personal dealings and take all
reasonable measures necessary to prevent all dishonest, unfair, fraudulent, corrupt, and illegal
practices during any stage of the Eskom procurement process including the execution of contracts
and contract modifications.
4.1.2 Ensure that they are familiar with all publicly available Eskom policies/ procedures/codes that impact
the supply chain processes including, but not limited to Eskom’s Standard Conditions of Tender.
4.1.3 Reject all improper business practices (as may be prohibited by Eskom).
4.1.4 Not abuse the trust placed in them by Eskom employees, or misuse opportunities arising during their
interaction with Eskom for personal gain.
4.1.5 Seek to constantly maintain and enhance their standards of professional competence.
4.1.6 Adopt, where possible, policies and practices which align with those of Eskom (labour practices,
employment equity initiatives and human relations policies) to the highest ethical standards.
4.2 Eskom’s suppliers confirm specifically that:
4.2.1 All confidential information, to which they may have access in the course of their work, must not be
disclosed without the express consent from the authorised Eskom representative. The supplier is
required to complete a Non-Disclosure Agreement (NDA) to give effect to this.
4.2.2 They will not deliberately misrepresent information, submit false certifications or forged documents to
influence the tendering process to advantage themselves or to mislead Eskom in any way and that
Eskom has the right to request an audit of such information, and take further action against the supplier
should it be found that it has acted in a dishonest or fraudulent manner.
4.2.3 Although the establishment of long term and close relations between Eskom and its suppliers is
recognised, Suppliers are nevertheless, required to avoid relationships with Eskom
employees//directors, that may be perceived to be contrary to the constitutional principles of fairness,
equitability, transparency, competitiveness, and cost effectiveness. Suppliers are therefore required
to complete the Integrity declaration form wherein they are required to disclose any interest that they
may have with an Eskom employee/director, whether financial, personal, or private, in its business,
and/or any affiliation /relationship which affects, or may affect, or may be perceived to affect, the
decision-making during tender award. Should a supplier later become aware that its
owners/members/directors/partners/shareholders are an Eskom employee/director with respect to a
tender in which it participated, the supplier is required to disclose the interest/relationship to Eskom
and submit whatever information may be required regarding the parties involved.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.2.4 Although the entertainment of customers and provisions of business courtesies or gifts are generally
an accepted commercial practice, they must not in any way negatively affect Eskom’s image and
reputation. They should not exceed the R1500,00 value prescribed by Eskom and should not be of
such a nature (value or circumstances) as to be construed as placing an Eskom employee/director
under obligation to the supplier or in any way improperly influence the recipient.
4.2.5 They will avoid entering into unethical and/or fraudulent dealings with any Eskom employee/director
involved in the evaluation/adjudication/negotiation of a transaction in which it participates, involving
direct/indirect monetary or material benefits in order to be unfairly benefitted. In such circumstances,
no business courtesy, bribe, gift, fees commission or inducement may be offered to, or requested by
an Eskom employee/director involved in the evaluation/adjudication/negotiation of a transaction in
which the supplier is participating.
4.2.6 They will not enter any dishonest and/or illegal agreement or an understanding with other tenderers
involved in a tender/RFP process in which it participates. They will complete the integrity Declaration
Form which incorporates a Declaration of Fair Tendering Practices, when participating in any Eskom
tender/Request for Quotation (RFQ).
4.2.7 They understand that they may be subject to a supplier discipline process and that sanctions that
may be imposed on suppliers should they be found guilty of misconduct.
4.2.8 Should a supplier become aware of any dishonest, fraudulent or inappropriate behaviour of any Eskom
employee/director; the said supplier is required to report this behaviour to the Eskom Ethics office via
email at [email protected], or via the Eskom Forensic email at [email protected] or through
the Eskom toll free hotline 0800 11 27 22, wherein confidentiality is guaranteed.
5.1 Eskom undertakes to treat all tenderers during the tender process according to the constitutional
principles of fairness, transparency, equity, cost-effectiveness, and competitiveness.
5.2 All Eskom employees/directors are required to complete an annual Declaration of Interest (DOI),
wherein they are required to declare all interests, directorships, memberships, details of any of their
related or inter-related persons or other associates that conduct business with Eskom and all other
material personal interests, whether a conflict exists or not. During the financial year, all Eskom
employees/directors have an option of amending annual DOIs should there be changes in their
interests or what has been disclosed already. In addition to this annual declaration, employees are also
required to complete an additional DOI and NDA if involved in the procurement process.
5.3 Eskom employees will ensure that all gifts received in the normal course of business is declared,
recorded, and authorised by relevant managers. Employees/directors involved in the tender evaluation/
negotiation process, may not accept, demand, or accept a promise of any money, business courtesies,
gifts, rewards, gratuity, favours from any of the tenderers involved to benefit or as may be perceived to
benefit such tenderer. Further to this, employees and directors are prohibited from offering or accepting
loan(s) or other benefit(s) from suppliers, unless the supplier is in the business of granting such loans
or benefits and the terms and conditions of the loan that is offered to the employee/director is also
offered to the general members of the public or a section thereof.
5.4 Should Eskom become aware of any relationship/interest of any employee/director in a tender in which
it is involved in tender evaluation/negotiation process, then this employee/director will be excluded from
the said tender evaluation/negotiation process.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
5.5 Eskom will implement the Supplier Discipline Process if it becomes aware of any contravention of the
provisions of this integrity pact, any other misconduct by a supplier and/or any Eskom
employee/director who acts in bad faith to benefit themselves or a supplier. Eskom has the right, after
following a process of investigation and affording the supplier an opportunity to make representation,
to notify the supplier of the intention to suspend it from the Eskom Vendor Database, impose various
other sanctions and/or institute disciplinary actions against its employees/directors. Subsequently,
Eskom will forward the names of such suppliers including the directors of the company to National
Treasury, who will include the suppliers on the List of Restricted Suppliers on the National Database.
5.6 All Eskom employees/directors are prohibited from having any direct/ indirect personal or other
beneficial interest in any contract with Eskom, whether as a supplier, an advisor or by virtue of being a
director or owner of a business, or in any other capacity. This includes third-party related transactions
with an indirect link to an Eskom contract.
6.1 This Eskom Supplier Integrity Pact is governed by and interpreted in accordance with the laws,
regulations and legislation of the Republic of South Africa.
6.2 The actions stipulated in this Integrity Pact are without prejudice to any other civil or criminal
proceedings that may arise in accordance with the provisions of the law.
6.3 This Integrity Pact shall remain valid until replaced. Should one or more provisions of this Integrity
Pact be regarded as invalid, remainder of the provisions will remain valid.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Contractual Terms
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfThe Integrity Pact is a pact between Eskom and its suppliers that prescribes ethical behaviour.
Special Conditions
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Suppliers must not offer gifts or business courtesies exceeding R1500 in value.
Description
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)Invitation to Tender for the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a daily basis to and from Kriel Power Station for a period of 5 years. Tender number E3505GXMPKRI, issue date 10 September 2026, closing date Wednesday, 07 October 2026 at 10h00.
Important Dates
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER){"closingDate":"10 September 2026","closingTime":"10h00"}
Briefing Session
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)Non-compulsory tender clarification meeting on Friday, 18 September 2026 at 10h00 via Microsoft Teams. Link: https://teams.microsoft.com/meet/331232226023057?p=1P6jgAcpOJLrs9M4tw, Meeting ID: 331 232 226 023 057, Passcode: WU6fG6WN, Dial in by phone +27 21 834 0825,,638953368#, Phone conference ID: 638 953 368#.
Contact Information
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER){"name":"MS Teams","email":"[email protected]","phone":"+27 21 834 0825","department":", Kriel Power Station","address":"of the Eskom Standard"}
Returnable Documents
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)Mandatory returnables required at tender closing include: Annexure E CPA for local goods/services (if applicable), E-tendering Help Acknowledgement Form, Contract C1.1 Form of Offer and Acceptance, signed public interest score and financial statements (for South African companies), ID copies of members/shareholders/directors, Annexure I SBD 6.1 Preference Points Claim Form, and a certified copy of the board resolution authorizing the signatory to submit the tender and sign documents.
Evaluation Criteria
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)Tenderers must meet the eligibility criteria in the Tender Data, including: not being under any restriction to do business with Eskom or State-Owned Companies; not having nationality of a country on international sanctions lists; not submitting more than one tender (unless as a JV/consortium with joint and several liability); not having a conflict of interest; not being restricted by National Treasury, on the Tender Defaulters list, or restricted by Eskom; and not subcontracting 100% of the scope of work. Mandatory technical gatekeeper requirements: proof of membership in a recognised local taxi association operating in the applicable area, and a Traffic Business Number Registration Certificate (BNRC) registered under the tenderer's name. Mandatory contractual requirement: proof of valid CSD registration. Additional contractual requirements include safety and health compliance, quality standards, and financial viability (submission of audited financial statements for the previous 18 months, or last year; start-ups within 12 months are exempt but must submit statements once available). Tenderers must submit a valid B-BBEE certificate or sworn affidavit (as applicable) to claim preference points. Tax clearance: certified copy of tax clearance certificate required from foreign tenderers with a South African footprint not registered on CSD and without a SARS PIN, and from local tenderers without a SARS e-filing PIN or CSD profile. Foreign suppliers with no South African footprint must complete SBD 1 but no proof of tax compliance is required.
Technical Specifications
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)Annexure Attached (Y /
N / n/a)
1.1.1 E-tendering Help Manual for Supplier – 27 January Rev 3 Y
1.1.2 E-Tenderers E-Tendering Training Acknowledgement Y
Form – 27 January 2025
1.1.3 *Authorisation Form Annexure A Y
1.1.4 *Acknowledgement form Annexure B Y
1.1.5 *Tenderer’s particulars Annexure C Y
1.1.6 *Integrity Declaration Form Annexure D Y
1.1.7 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.8 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F N/A
1.1.9 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.10 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 *SBD 4 – Bidders Disclosure Annexure J Y
1.1.12 Employment Equity confirmation Y
1.1.13 NEC3 Term Service Contract Clause deviation Y
schedule
1.1.14 NEC Term Service Contract, including clauses, Y
conditions, Price List and Service Information
1.1.15 240-62044728 Eskom Holdings SOC Ltd Standard 240-62044728 Y
Conditions of Tender Rev. 12
1.1.16 Code of Ethics 32-527 Y
1.1.17 Supplier Integrity Pact 240113650212 Rev 2 June Y
2028
1.1.18 Non-Disclos
Methodology
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)network. In certain cases, the SETA’s accredited training
providers can be approached to participate in developing critical
and scarce skills.
Note: That these targets for skills development candidates
categorically exclude Eskom employees and registered learners. The
tenderers are required to take full responsibility for the total cost of
developing the requisite skills, and Eskom shall not make any financial
contribution towards the fulfilment of this obligation. Tenderers also
are advised to approach their relevant SETAs to access grants,
subsidies, and incentives as well as South African Revenue Services
for tax rebates that are earmarked for skills development initiatives.
3.24 Sign form of Agreement / The conditions of the contract will be the NEC Term Service Contract
Assessment (BRA) to the scope of work. The methodology used for the risk
assessment must be provided together with the BRA
Experience & Qualifications
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)15%
B2.2 Existing vehicle: Provide proof of maintenance records
(certified) on all tendered vehicles as confirmation of vehicle have
been maintained according to the OEM specification. Attach
certified copies of service books for each tendered vehicle.
(As submitted for section B1.2) (20%)
B3) DRIVERS B3 Driver Experience, Licence, Driver Permit: 15%
according to the number of vehicles required:
submission of this tender).
to driver’s license date of issue.
Quality Management
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)Category 4 : Quality Requirements
indicator = 1
SECTION A : Quality Management System Requirements ISO 9001
Objective evidence of documented QMS that is not certified but complies with ISO 9001
Apply =1
A.1 Quality Method statement based on scope.(Method Statement Template-Ref 240-
A.2 Quality Policy Approved by top management. 1
A.3 Quality Objectives Approved by top management. 1
Section A Score Option 2 3
SECTION B: Evidence of QMS in operation (Tender Quality Requirements -Ref 240-105658000)
Apply =1
B.1 Documented information for defined roles, responsibilities and authorities - Organization
chart and Responsibility matrix (must include but not limited to quality management
1 function/role) (Clause 5.3 of ISO 9001:2015)
B.2 Documented information for Control of Externally Provided Processes, Products and
Services - Must include criteria for evaluation, selection, monitoring of performance, and re- 1
evaluation of external providers (Clause 8.4 of ISO 9001:2015)
Section B Score 2
SECTION C: Contract Quality Plan Requirements (Ref 240-105658000 and 240-109253698).
SECTION D: Quality Control Plan Requirements (Ref 240-105658000 or 240-109253302)
QCP /Checklist/ ITP (Quality Control Plans) as per Scope of Works (Ref ISO 10005)
B1.1 and B1.2 for the
B1.2 Existing vehicles: Submit certified copies of the vehicle
score of 30%
registration document to verify age as specified in the scope of
work section 3.1.2. Not older than 1 year from date of first
registration
Note! Vehicle Inspection will be conducted to verify the specified
kilometre reading on each vehicle (Less than 30 000km at the time
of inspection) (30%)
B2) VEHICLE B2.1 New Vehicles: Submit proof that the vehicle as per section 20%
MAINTENANCE B1.1 will be maintained according to the OEM specifications
(service plan). Attached a signed letter from tenderer confirming
Note: Proof of a total of 1 vehicle will be maintained by an OEM Approved dealership and/or
vehicle to be provided RMI Accredited workshop.
between (Refer to section B1.1 – the letter may include that service plan
B1.1 and B1.2 for the will form part of the financial support or a separate letter)
score of 20% (20%)
or driver is not available.
(Replacement vehicles must conform to Eskom requirements)
(i.e., major service/maintenance, leave, industrial action, etc)
Attached a detailed plan 5%
Total 100%
C) VEHICLE PHYSICAL INSPECTION: Tenderers who achieved the 70% threshold Scoring
from section B and have indicated under B1.2 that they will be providing an
existing vehicle.
100 % Compliance is required on all vehicles 100%
Vehicle Physical Inspection 100%
inspection on Inspection of vehicle(s) of which documentation were provided in
B1.2 Existing section B1.2 for evaluation.
Vehicles
Pricing Schedule
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)recognised local taxi association that operates in the
applicable area of this service
preference points will not be disqualified, but
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for
the 80/20 system. Eskom will add the score from Pricing and Specific
tenderer is required to furnish the Employer with proof
of compliance with the Employment Equity Act,
including proof of submission of the Employment
Equity report to the Department of Labour. (South
African tenderers only)
NEC Term Service NEC Term Service Contract, completed in full. ✓
Contract - C1.1 Form of Offer and Acceptance
NEC Term Service NEC Term Service Contract, completed in full. ✓
Contract C1.2 Contract Data
(Part Two – Data provided by the Contractor)
NEC Term Service Completed pricing schedule ✓
technical assessment
A1 A letter of proof that the tenderer belongs to a recognised local taxi association
that operates in the applicable area of this service
A2 Traffic Business number Registration Certificate (BNRC) registered under the
tenderer’s name.
Financial Requirements
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)Payment Terms: payment terms as stipulated hereunder
when submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to
paying Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
B-BBEE Requirements
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)B-BBEE requirements: Tenderers must submit a valid B-BBEE certificate or affidavit, and must meet the key pointers for validity of B-BBEE affidavits. Preference points are claimed via Annexure I SBD 6.1 Preference Points Claim Form. Tenderers must improve/maintain their B-BBEE status over the contract period.
Health & Safety
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)for Proposal Effective Date 07 April 2026
Review Date April 2031
E3505gxmpkri
Number Description Annexure Attached (Y /
N / n/a)
1.1.20 SDL&I: 240-6860265 SDL&I Bidder template 240-6860265 Y
1.1.21 Quality: 240-12248652 List of Tender Returnables Cat 240-12248652 Y
4 Rev 7
1.1.22 Quality: 240-68099512 Form A Cat 4 Rev 9 240-68099512 Y
1.1.23 Quality: 240-126469599 Method Statement template 240-126469599 Y
18 Oct 2021
1.1.24 Safety: 240-77471499 240-77471499 Y
other requirements
1.1.25 Safety: 32-726-07T File Evaluation Checklist Rev 1 32-726-07T Y
1.1.26 Safety: 555-RSR-2031 SHE Specification 555-RSR-2031 Y
1.1.27 Safety 240-70044602 OHS Risk Assessment 240-70044602 Y
ensure that the affidavits meet the following key pointers to
ensure their validity:
document and the identity number.
member must be indicated in order to know that person is
duly authorised to depose of an affidavit. (Mark the
applicable option).
close-out. The evaluation will take place once the mandatory and Functionality evaluation have been
completed. Only the shortlisted tenderers who passed mandatory and functionality evaluation threshold
will be evaluated. The tenderers will be given an opportunity to submit the outstanding documents
within 7 working days after the first evaluation. Failure to submit the outstanding documents within the
stipulated time; may result in the tenderer being regarded as non-responsive and ineligible for contract
award. Those who submitted will be re-evaluated and the evaluation report will be submitted to
procurement. This Safety requirements are for tender purposes, upon signing the contract the
supplier/contractor shall comply with Kriel Power station’s Safety file requirements. No work will
commence until the Safety file is approved by OHS professional together with the Service Manager.
requirements form signed and submitted by the tenderer?
(must address the project / Accountability
scope of work OHS risk(s)
and aligned with the health
and safety specification or changes and emergency work
requirements)
Safety Management down not provided as a lump sum) costing for SHE, i.e. –
as a guideline.
CEO Comply to OHS Act Section 7
and qualifications / certificates
for Proposal Effective Date 07 April 2026
Review Date April 2031
E3505gxmpkri
1 x 14-seater accompanied by a detailed specification sheet and a brochure
(showing detailed specifications) on the type of vehicles you wish
to tender with.
20% Letter financial institution (certified copies) Note: Proof of a total of 1
10% Brochure with specification 14-seater
vehicle to be provided
(30%)
between
Contractual Terms
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)sanctions list. A tenderer shall be found to have the nationality
of a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
individually or as a partner in a joint venture (JV) or consortium,
except on an E-Tendering system where there is a limit size
Existing Vehicle(s) Inspection 100%
when submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to
paying Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to
paying suppliers within 60 days of receipt of undisputed invoices.
according to service area of the NEC3 TSC for this tender (Permit
should indicate the Komati area in the name of the tenderer or sub- 10%
contractor (if any)
B4.2 Insurance: Submit proof of Insurance for passenger liability 10%
of R 2 million. Submit a certified copy.
B4.3 Contractor Experience: Submit proof of staff transportation
of a minimum of 2 years (Provide a signed letter with current 5%
contact details)
B4.4 Effective process to inspect / maintain the vehicle.
a) Provide a copy of a daily vehicle inspection sheet (2.5%)
b) Explain the process to be followed in reporting any defects 5%
on a vehicle (2.5%)
B4.5 Effective Contingency Plan:
Requirements
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)Eligibility criteria: Tenderers must not be under any restriction to do business with Eskom or the state, must not have conflicts of interest, must not be restricted by National Treasury or Eskom, and must not subcontract 100% of the scope of work. Mandatory returnables must be submitted at tender closing; failure to do so may lead to disqualification or a 5-working-day grace period for correction. Mandatory contractual requirements include safety and health obligations, submission of improvement/retention plans within 30 days of signing, and valid B-BBEE certificate. Local procurement content requirements apply, with tender responses separated into local and imported components as per the price schedule. CIDB requirements are not applicable.
Section
Source: Invitation to Tender Kriel Komati Transportation E3505GXMPKRI.pdf (TENDER)Evaluation uses the 80/20 preference point system. Price is allocated a maximum of 80 points, and specific goals (B-BBEE) are allocated 20 points. Tenderers who fail to submit B-BBEE documentation will not be disqualified but will score 0 out of 20 for specific goals and may only score points out of 80 for price. The contract is awarded to the tenderer scoring the highest total points. Additional contractual requirements (safety, quality, financial viability) are not evaluation criteria but must be met prior to contract award.
Description
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027 (PAYE).xlsThe service involves daily bus transportation of Eskom employees from Komati Power Station residences to Kriel Power Station and back. The service must accommodate the number of employees as per Eskom's schedule and must be reliable and punctual.
Important Dates
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027 (PAYE).xls (unknown)Closing date and time: 24 February 2025 at 10:00. No other dates (briefings, site visits, or clarification deadlines) are stated in the document.
Submission Guidelines
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027 (PAYE).xls (unknown)Submit the completed bid electronically via Eskom's e-tender portal. The closing time is 10:00 on the closing date; late submissions are not accepted. Required returnable documents include the completed and signed SBD 4 (Declaration of Interest), SBD 3.1 (Pricing Schedule), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination), and the completed Contractor's Details form (including income tax number, banking details, and physical/postal addresses). All forms must be fully completed, signed, and submitted with the bid.
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027 (PAYE).xls (unknown)Bids will be evaluated in two stages. Stage 1: administrative compliance and mandatory documentation (including the completed returnable forms and tax clearance). Stage 2: functionality and price. Functionality criteria include the bidder's experience in providing similar transportation services, the condition and age of the fleet, and the proposed service plan. Only bids achieving the minimum functionality score will proceed to price evaluation. Price is evaluated on the total cost of the five-year service.
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027 (PAYE).xls (unknown)Else: ActiveSheet.Shapes.Range(Array("Button 4")).Visible = msoTrue
Description
Source: Quality List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)The tender is for bus transportation of Eskom Kriel Power Station employees for the Komati Power Station, on a daily basis to and from Kriel Power Station, for a period of 5 years.
Important Dates
Source: Quality List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)The tender is for bus transportation of Eskom Kriel Power Station employees for the Komati Power Station. The document is dated 14-Apr-26. No closing date, closing time, briefing, or site visit is stated in the provided document.
Submission Guidelines
Source: Quality List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Returnable documents must be submitted as a complete, signed set. Required returnables include the Quality List of Tender Returnables (Category 4, Revision 7), which lists the quality management system evidence required, and Form A, which must be completed and signed. Bidders must also submit documented information for control of externally provided processes, products and services, including criteria for evaluation, selection, monitoring of performance, and re-evaluation of external providers. Additional requirements as per the scope of work or specification may apply. Bidders must comply with the Supplier Quality Management requirements (Revision 7).
Evaluation Criteria
Source: Quality List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Evaluation is based on the Quality List of Tender Returnables (Category 4, Revision 7). Section A scores the Quality Management System (QMS) requirements, with a score of 1 for a documented QMS that is not certified but complies with ISO 9001, or a score of 2 or 3 for a quality method statement. Section B scores evidence of QMS in operation, including documented information for defined roles, responsibilities and authorities (Clause 5.3 of ISO 9001:2015) and for control of externally provided processes, products and services (Clause 8.4 of ISO 9001:2015). Section E scores user-defined additional requirements as per the scope of work or specification. ISO 9001 certification is not mandatory, but documented compliance is required.
Technical Specifications
Source: Quality List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection, PROJECT: TENDER TITLE Bus transportation of Eskom Kriel Power Stationemployees for the Komati Power Station
Quality Management
Source: Quality List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)E.1 Form A is completed and signed. E.2 Add other requirements (if applicable) as per the scope of work and/or specification.
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)The tender is for the daily bus transportation of Eskom Kriel Power Station employees. The service covers routes from Komati Power Station residents to Kriel Power Station and back. The contract period is 5 years.
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Closing date: 12 November 2024 at 10:00. No briefing or site visit is mentioned.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Submit electronically via the eTendering system (https://eTendering.eskom.co.za). You must be registered on the system and have a valid CSD number to access it. Upload all required documents under the correct category (e.g., Technical, Commercial, Finance). After uploading, click 'Finalize Submission' to complete. Once finalized, a submission ID and timestamp are shown, and an email with all submitted documents is sent to the submitter. Save this email for future reference. Late submissions are not accepted. Returnable documents include: SBD 4 (Declaration of Interest), SBD 3.1 (Pricing Schedule), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination), and a valid Tax Clearance Certificate (or SARS pin).
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Bidders must have a valid CSD number to access the eTendering system. No other eligibility criteria are stated. The tender will be evaluated on functionality (technical) and price. Bidders must submit all required documents; failure to do so may lead to disqualification.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)The service involves daily bus transportation of Eskom Kriel Power Station employees from Komati Power Station residents to and from Kriel Power Station for a period of 5 years. Bidders must provide buses that meet safety and operational requirements. The eTendering system is used for submission; an OTP is sent to the registered cell phone and email for verification.
Description
Source: Safety 240-77471499 Annexure B Acknowledgement.docx (unknown)Annexure B: Acknowledgement Form for Eskom OHS legal and other requirements
Evaluation Criteria
Source: Safety 240-77471499 Annexure B Acknowledgement.docx (unknown)Other
Compliance with Eskom OHS requirements is mandatory. After contract award, the supplier must fully align its processes to Eskom's OHS requirements. Penalties will be enforced for non-conformance.
Technical Specifications
Source: Safety 240-77471499 Annexure B Acknowledgement.docx (unknown)Annexure B: Acknowledgement Form for Eskom OHS legal and other requirements
Evaluation Criteria
Source: QUALITY Template 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)No specific eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document. Bidders must complete the method statement as per the required format.
Description
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 Tender E2814GXMPKRI.docx (unknown)The tender is for the daily bus transportation of Eskom Kriel Power Station employees from the Komati Power Station residents to and from Kriel Power Station, for a period of 5 years.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 Tender E2814GXMPKRI.docx (unknown)Submission is electronic via the e-Tendering Solution. The E-Tendering Training Acknowledgement Form must be submitted by the closing date, signed by an authorised representative, confirming completion of self-training on the e-Tendering Solution. This form is a mandatory returnable document.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 Tender E2814GXMPKRI.docx (unknown)Bidders must submit the E-Tendering Training Acknowledgement Form by the closing date, signed by an authorised representative, confirming completion of self-training on the e-Tendering Solution. The form is a mandatory returnable document.
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 Tender E2814GXMPKRI.docx (unknown)E-Tendering Training Acknowledgement Form: signed by an authorised representative, confirming completion of self-training on the e-Tendering Solution. Must be submitted by the closing date.
Description
Source: Quality List of Tender Returnables_Cat 4_ Rev 7.xlsx (unknown)The tender is for the supply of goods/services under a contract requiring a documented Quality Management System (QMS) aligned to ISO 9001:2015. The scope includes a Contract Quality Plan specific to the work described in the tender documents, referencing ISO 10005. The tender evaluation is based on the quality documentation submitted, with weighted sections A to E.
Submission Guidelines
Source: Quality List of Tender Returnables_Cat 4_ Rev 7.xlsx (unknown)Submit the completed tender deliverables, including the Supplier Contract Quality Requirements Specification (Ref 240-105658000) and the Contract Quality Plan (Ref 240-109253698 CQP), in PDF format, signed and saved as instructed. The tender evaluation will assess the quality documentation submitted; ensure all required sections (A to E) are addressed. Returnable documents include the QMS Manual or Quality Method Statement, the Contract Quality Plan, and the Supplier Quality Management Tender Evaluation forms.
Evaluation Criteria
Source: Quality List of Tender Returnables_Cat 4_ Rev 7.xlsx (unknown)Evaluation is based on the following weighted sections: Section A (QMS Manual or Quality Method Statement) 0.25, Section B (Documented information for control of externally provided processes, services, and products) 0.25, Section C (Contract Quality Plan) 0.2, Section D (Supplier Quality Management, Tender Evaluation) 0.2, Section E (User-defined additional requirements) 0.1. Each section is scored using a Yes/No (Y/N) or 0/1 scoring system, with observations recorded. The final score is calculated as a weighted percentage. Bidders must apply Y/N to indicate compliance with each requirement.
Technical Specifications
Source: Quality List of Tender Returnables_Cat 4_ Rev 7.xlsx (unknown)Cell D3: Type 1 in the block to select the applicable type of Category
Briefing Session
Source: Agenda Tender Clarification Meeting E3505GXMPKRI.pdf (unknown)A tender clarification meeting is scheduled. Clarifications must be submitted up to 4 working days before tender closing. The meeting agenda includes evaluation criteria and contractual requirements.
Contact Information
Source: Agenda Tender Clarification Meeting E3505GXMPKRI.pdf (unknown){"name":"MS Teams","email":"[email protected]","phone":null,"department":null,"address":"Safety Health, Quality"}
Evaluation Criteria
Source: Agenda Tender Clarification Meeting E3505GXMPKRI.pdf (unknown)Bidders must submit the latest approved annual financial statements of the tendering company (not parent or holding company). Draft annual financial statements or management accounts are not allowed. For unincorporated JVs or SPVs, each partner must submit its own annual financial statements. Non-audited South African entities must provide a signed public interest score and ITA34C for current and previous years of assessment. Bidders must comply with the evaluation criteria covering commercial, SDL&I, technical (mandatory and scoring), safety health, quality, due diligence, and contractual requirements. Tenders must be submitted electronically via Eskom E-tendering.
Health & Safety
Source: Agenda Tender Clarification Meeting E3505GXMPKRI.pdf (unknown)Contractual Terms
Source: Agenda Tender Clarification Meeting E3505GXMPKRI.pdf (unknown)The contract is an NEC3 Term Service Contract, including contents and clauses, and Service Information. Contractual requirements form part of the evaluation criteria.
Requirements
Source: Agenda Tender Clarification Meeting E3505GXMPKRI.pdf (unknown)Due diligence/financial analysis requirements: Latest approved annual financial statements of the tendering company (not parent or holding company), including background, signed director's report, signed public interest score (only applicable to South African entities not audited), and ITA34C for current and previous years. For unincorporated JV or SPV, each partner must submit its own annual financial statements including all items listed.
Section
Source: Agenda Tender Clarification Meeting E3505GXMPKRI.pdf (unknown)Evaluation criteria include: Commercial, SDL&I, Technical (Mandatory & Scoring), Safety Health, Quality, Due Diligence (Audited Financial Statements), and Contractual Requirements. Due diligence requires latest approved annual financial statements of the tendering company (not parent or holding company), including signed director's report and signed public interest score (for South African entities not audited). For unincorporated JV or SPV, each partner must submit its own annual financial statements.
Description
Source: SAFETY 32-726-07T File evaluation checklist.pdf (unknown)Contractor evaluation checklist for Kriel Power Station. The checklist covers legal and other requirements, OHS Act compliance, risk assessment, and vehicle safety management. It includes sections for OHS Act Sec 8 Risk Identification, Risk Analysis, Risk Controls/Safe work procedure/Method statement, Risk Matrix and Rating, Monitoring Plan, and Review Plan.
Submission Guidelines
Source: SAFETY 32-726-07T File evaluation checklist.pdf (unknown)Returnable Documents: Effective Date May 2022 Name of BU Effective Date May 2022 OHS Act Temporary electrical installation inspector OHS Act Competent person for stacking & storing OHS Act Competent person for inspection of fire equipment PSR Responsible Person CONTROLLED DISCLOSURE When downloaded from the Document Management System, this document is uncontrolled and the responsibility rest with the user to ensure it is in line with the authorised version on the system No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd Req No 2002/015527/30. of 7 Template 32-726-07T Rev 1 Kriel Power Station Identifier Document CONTRACTOR EVALUATION XX-XX Rev XX Identifier Effective Date May 2022 Legal and # other Question YES NO NA Remarks Reference OHS Act Competent person for design and erection of cranes SANS 10085 Competent person for scaffolding OHS Act Competent person for suspended platforms OHS Act Competent person to operate material hoists OHS Act Competent person to inspect material hoists (checklist) Master Installation Electrician (if applicable for COC – Proof of EIR 7(1) Certificate) OHS Act Competent person to operate bulk mixing plant OHS Act Competent person for inspection of explosive powered tools OHS Act Competent person for issuing & collecting of cartridges & nails OHS Act Vehicle & mobile plants inspector Legal and, other RISK ASSESSMENT (will include) YES NO NA Remarks Reference OHS Act Sec 8 Risk Identification 32-520 Risk Analysis 32-520 Risk Controls/Safe work procedure/Method statement 32-520 Risk Matrix and Rating 32-520 Monitoring Plan 32-520 Review Plan Legal and, other INDUCTION TRAINING Reference 32-726 1. Was the induction done by the Contractor OHS, The Contractor training syllabus /programme Specification OHS
Evaluation Criteria
Source: SAFETY 32-726-07T File evaluation checklist.pdf (unknown)Bidders must be appointed contractors under the OHS Act and comply with Section 37(2) agreement requirements. They must provide a letter of good standing and meet all OHS specification requirements. The evaluation checklist includes legal and other compliance items that must be approved by Eskom's safety and project leadership. No specific eligibility thresholds (e.g., B-BBEE level, CIDB grading, CSD registration) are stated in the provided document.
Technical Specifications
Source: SAFETY 32-726-07T File evaluation checklist.pdf (unknown)Contract/Order
Duration of the contract
number
Type of contract
e.g. as and when/
full time
OHS ACT Letter of good standing
OHS
OHS/ OHS Requirements issued to the contractor
OHS
Health & Safety Plan
OHS
Is there any appointed contractor (Subcontractor)
OHS
Appointed contractor appointment by Contractor
APPOINTMENTS – (a competent person)
Site specific organogram
Sec 16(2) Designation Employer
Sec 17(1) OHS Representatives (more than 20 employees or risk based)
Sec 19(3) Chairman of SHE Committee
GAR 9(2) Competent person to conduct investigations
GSR 3(4) First Aider
Sec 8 Contractor Supervisor
OHS
Contractor Safety Officer
Full Time
Part Time
If part time what is the frequency of visits to site
OHS Act Sec 8 Competent person to conduct Risk Assessment and training/awareness
DMR 18(11) Operator of Lifting Machinery, Lifting Tackle & Forklifts
DMR 18(5) Inspector of Lifting Machinery Lifting Tackle
32-418 Competent person to prepare the Fall Protection Plan
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 7
Template
32-726-07T Rev 1
Kriel Power Station Identifier
Document
CONTRACTOR EVALUATION XX-XX Rev XX
Identifier
OHS
Employees trained on the use of PPE
Legal and
Reference
Plant Safety Risk assessment in includes
Regulations/
ERW 2,3,4 & 5 (awkward body positioning)
Plant Safety
Safe work procedure for working in confined space
Regulations
PPE Required – Breathing equipment
Gsr 5(3)
Safety Line & Safety harness
GSR 5(1) & 3(c) Competency training for employees working in confined space
OHS
Medical fitness certificate (refer to Annexure 3)
OHS
Weekly Toolbox talks (Signatures)
32-407 Planned Inspections or behaviour-based inspection
ERW 6 Housekeeping inspection checklist
ERW 9 Emergency evacuation plan/ Rescue plan
Legal and other
Reference
COIDA Incident management procedure aligned with 32-95
Coida & ohsact
Incident initial notification and investigation templates available
14(e) & 24
32-95 Incident register available (Appendix 2 register)
GAR 9 Incident investigation Annexure 1 template
GAR 9 WCL forms available
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 7
Template
32-726-07T Rev 1
Kriel Power Station Identifier
Document
CONTRACTOR EVALUATION XX-XX Rev XX
Identifier
Quality Management
Source: SAFETY 32-726-07T File evaluation checklist.pdf (unknown)32-418 Fall protection plan
32-418 Rescue plan
32-418 Risk Assessment
32-418 Training of employees working at heights
32-418 Medical fitness assessments (refer to Annexure 3)
32-418 Planned Inspections of fall protection equipment
32-418 The appointment of the competent Supervisor (training?)
32-418 Awareness of employees working at heights
GSR 5(1) & 3(c) Competency training for employees working in confined space
OHS
Medical fitness certificate (refer to Annexure 3)
Specification
OHS
Weekly Toolbox talks (Signatures)
specification
32-407 Planned Inspections or behaviour-based inspection
ERW 6 Housekeeping inspection checklist
ERW 9 Emergency evacuation plan/ Rescue plan
SANS 10085
equipment checklist
DMR 18(5) Lifting machines and lifting tackle inspection checklist
DMR 18(5)(a)(b) Lifting machines load test certificate
PER 11 Vessels under pressure and fire extinguishers checklist
EMR 11 Portable electric lights inspection checklist
GAR 8 Endorsement of SHE Rep inspection & minutes by OHS Committee
Health & Safety
Source: SAFETY 32-726-07T File evaluation checklist.pdf (unknown)Sec 16(2) Designation Employer
Sec 17(1) OHS Representatives (more than 20 employees or risk based)
Sec 19(3) Chairman of SHE Committee
GAR 9(2) Competent person to conduct investigations
GSR 3(4) First Aider
Sec 8 Contractor Supervisor
Specification
Full Time
Part Time
If part time what is the frequency of visits to site
OHS Act Sec 8 Competent person to conduct Risk Assessment and training/awareness
DMR 18(11) Operator of Lifting Machinery, Lifting Tackle & Forklifts
DMR 18(5) Inspector of Lifting Machinery Lifting Tackle
32-418 Competent person to prepare the Fall Protection Plan
8(2)(b)
GSR2 & 8(b) Register of PPE issued on site (risk based)
PPE Required – Breathing equipment
Gsr 5(3)
14(e) & 24
32-95 Incident register available (Appendix 2 register)
GAR 9 Incident investigation Annexure 1 template
GAR 9 WCL forms available
Vehicle safety management: 32-345
OHS specification Worker’s timesheet/ daily attendance register
HCAR 3 Chemical Agents and Safety Data Sheet
National Disaster Covid-19 Risk Assessment
Section
Source: SAFETY 32-726-07T File evaluation checklist.pdf (unknown)Evaluation criteria include: OHS Act compliance, appointments of competent persons, risk assessment, and vehicle safety. The checklist includes legal and other questions with YES/NO/NA/Remarks. Requires OHS Act Sec 8 Risk Identification, Risk Analysis, Risk Controls/Safe work procedure/Method statement, Risk Matrix and Rating, Monitoring Plan, and Review Plan. Also includes GAR 9 Incident investigation and WCL forms.
Description
Source: NEC TSC Komati Transportation for Kriel employees E3505GXMPKRI.pdf (unknown)Provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a daily basis to and from Kriel Power Station for a period of 5 years. Kriel Power Station provides transport to their employees (home to work and work to home) daily.
Contact Information
Source: NEC TSC Komati Transportation for Kriel employees E3505GXMPKRI.pdf (unknown){"name":null,"email":"[email protected]","phone":"017 615 2139","department":null,"address":"n the conditions of contract identified"}
Submission Guidelines
Source: NEC TSC Komati Transportation for Kriel employees E3505GXMPKRI.pdf (unknown)Returnable documents include the completed Form of Offer and Pricing Data (TSC3). The bus provided must be of the same quality and standard as specified. Unscheduled trips are required as and when needed at no additional cost. Invoices must be VAT compliant, include the Eskom Purchase Order number, reflect the correct bank account, and show Eskom's name and VAT number (4740101508). No electronic or pro-forma invoices accepted.
Evaluation Criteria
Source: NEC TSC Komati Transportation for Kriel employees E3505GXMPKRI.pdf (unknown)No eligibility criteria specified. The tender includes B-BBEE requirements; if the contractor's B-BBEE status decreases after contract date, Eskom may renegotiate or terminate the contract. The employer may also terminate if the contractor fails to maintain required standards.
Technical Specifications
Source: NEC TSC Komati Transportation for Kriel employees E3505GXMPKRI.pdf (unknown)provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
NEC3 Term Service
Quality Management
Source: NEC TSC Komati Transportation for Kriel employees E3505GXMPKRI.pdfxxxv) Daily Bus Inspection by driver to be kept on file and proof to be provided to Service Manager at
monthly meeting. Eskom reserves the right to inspect the bus without pre-arrangement.
xxxvi) A vehicle tracking system must be installed to the bus by contractor, the Employer
representative to be granted access to the report, and/or be provided with reports as and when
required. All requested reports must be submitted to the Employer’s representative within 24
hours of receipt of the request.
xxxvii) Proper records are also to be submitted of all scheduled and non-scheduled journeys and
distances.
xxxviii) The shift bus in between trips will be utilized underneath the shift bus kilometers and not as
unscheduled kilometers.
xxxix) Contingency plans (in case of strikes) must be in place and proof must be submitted to the
this contract an alpha number identification number. An example of the documents are, but not limited to:
Pricing Schedule
Source: NEC TSC Komati Transportation for Kriel employees E3505GXMPKRI.pdfterms of the conditions of contract.
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Service Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
C1.2 TSC3 Contract Data
e-mail [email protected]
2 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 086 539 1902 www.ecs.co.za
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
11.2(2) The Affected Property is Kriel Power Station transportation routes
11.2(13) The service is The provision of bus transportation of Eskom
50.1 The assessment interval is between the 15th and 30th of each successive
month
51.1 The currency of this contract is the South African Rand
51.2 The period within which payments are 30 days from valid invoice receipt as per Eskom
made is Supplier Payment Policy
51.4 The interest rate is the publicly quoted prime rate of interest
(calculated on a 365 day year) charged by from
time to time by the Standard Bank of South
Africa Limited (as certified, in the event of any
dispute, by any manager of such bank, whose
appointment it shall not be necessary to prove)
for amounts due in Rands and
(ii) the LIBOR rate applicable at the time for
amounts due in other currencies. LIBOR is the
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
6 month London Interbank Offered Rate quoted
under the caption “Money Rates” in The Wall
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
are Z1 to Z14 always apply.
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
Z1 Cession delegation and assignment
Z1.1 The Contractor does not cede, delegate or assign any of its rights or obligations to any person
without the written consent of the Employer.
Z1.2 Notwithstanding the above, the Employer may on written notice to the Contractor cede and
delegate its rights and obligations under this contract to any of its subsidiaries or any of its
present divisions or operations which may be converted into separate legal entities as a result of
the restructuring of the Electricity Supply Industry.
Z2 Joint ventures
Z2.1 If the Contractor constitutes a joint venture, consortium or other unincorporated grouping of two
or more persons or organisations then these persons or organisations are deemed to be jointly
and severally liable to the Employer for the performance of this contract.
Z2.2 Unless already notified to the Employer, the persons or organisations notify the Service Manager
within two weeks of the Contract Date of the key person who has the authority to bind the
equal to that stated in the payment certificate.
Z7.2 If the Contractor does not provide a tax invoice in the form and by the time required by this
contract, the time by when the Employer is to make a payment is extended by a period equal in
time to the delayed submission of the correct tax invoice. Interest due by the Employer in terms
of core clause 51.2 is then calculated from the delayed date by when payment is to be made.
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
Z7.3 The Contractor (if registered in South Africa in terms of the companies Act) is required to comply
with the requirements of the Value Added Tax Act, no (as amended) and to include
the Employer’s VAT number 4740101508 on each invoice he submits for payment.
Z8 Notifying compensation events
Z8.1 Delete the last paragraph of core clause 61.3 and replace with:
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
Z11.1 A Committing Party may not take any Prohibited Action during the course of the procurement
of this contract or in execution thereof.
Z11.2 The Employer may terminate the Contractor’s obligation to Provide the Services if a
11.2(12) The price list is in C2 Part 2 Pricing Data
11.2(19) The tendered total of the Prices is R
(excluding VAT & CPA)
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
Part 2: pricing data
TSC3 Option A
reference pages
C2.1 Pricing assumptions: Option A 2
C2.2 The price list 1
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
C2.1 Pricing assumptions: Option A
incidental to Providing the Service in accordance with the Service Information, as it was at the
Part c2: pricing data c2.1 TSC3/A pricing assumptions
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
time of tender, as well as correct any Defects not caused by an Employer’s risk;
listed items in order to fulfil the obligation to complete the service for the tendered total of the
provided, a unit of time is stated in the Unit column and the expected length of time (as a quantity of the
stated units of time) is stated in the Expected Quantity column.
Part c2: pricing data c2.1 TSC3/A pricing assumptions
ESKOM HOLDINGS SOC Ltd TENDER E32505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
C2.2 the price list
sustained by passengers other than Employer’s employees.
vi) The Contractor must ensure that the minibus is kept neat and clean (interior and exterior) at all
times.
vii) The Employer reserves the right to inspect the minibus at all reasonable times and it is a
requirement that the Contractor shall maintain the minibus in a road-worthy condition and to the
satisfaction of the Employer.
viii) The Contractor shall be expected to establish and maintain the services required entirely at his
own expense and Employer shall not be liable for any costs whatsoever in connection with, or
arising out of, the establishment, maintenance or operation of such service.
ix) The Contractor, on request by Employer, shall exchange any of the allocated minibus for a
bigger or a smaller bus/minibus/sedan depending on the requirement. Should additional minibus
be required, minibus of the same make, condition and capacity shall be introduced to the fleet.
DOCUMENT C2.1 PAGE iii PRICING DATA
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
x) New rates, if applicable, will be negotiated between Employer and the Contractor where routes
or bus requirements change. Should the Contractor not be able to comply with this requirement,
Financial Requirements
Source: NEC TSC Komati Transportation for Kriel employees E3505GXMPKRI.pdf (unknown)Payment Terms: payment certificate from the Service Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
Employer's procedures stated in the Service Information, showing the amount due for payment
equal to that stated in the payment certificate.
Z7.2 If the Contractor does not provide a tax invoice in the form and
Compliance Requirements
Source: NEC TSC Komati Transportation for Kriel employees E3505GXMPKRI.pdf (unknown)No specific requirements found
B-BBEE Details: med to be jointly
and severally liable to the Employer for the performance of this contract.
Z2.2 Unless already notified to the Employer, the persons or organisations notify the Service Manager
within two weeks of the Contract Date of the key person who has the authority to bind the
Contractor on their behalf.
Z2.3 The Contractor does not alter the composition of the joint venture, consortium or other
unincorporated grouping of two or more persons without the consent of the Employer having
been given to the Contractor in writing.
Z3 Change of Broad Based Black Economic Empowerment (B-BBEE) status
Z3.1 Where a change in the Contractor’s legal status, ownership or any other change to his business
composition or business dealings results in a change to the Contractor’s B-BBEE status, the
Contractor notifies the Employer within seven days of the change.
Z3.2 The Contractor is required to submit an updated verification certificate and necessary supporting
documentation confirming the change in his B-BBEE status to the Service Manager within thirty
days of the notification or as otherwise instructed by the Service Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Service.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may constitute
a reason for termination. If the Employer terminates in terms of this clause, the procedures on
termination are P1, P2 and P4 as stated in clause 92, and the amount due is A1 and A3 as
stated in clause 93.
Z4 Confidentiality
Z4.1 The Contractor does not disclose or make any information arising from or in c
Health & Safety
Source: NEC TSC Komati Transportation for Kriel employees E3505GXMPKRI.pdfsignature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
writing.
Z6 Health, safety and the environment: Add to core clause 27.4
Z6.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the service. Without limitation the Contractor:
provided for under the Construction Regulations 2014 (promulgated under the Occupational
Health & Safety Act ) (“the Construction Regulations”) for the Affected Property;
proper compliance with the Construction Regulations, all applicable health & safety laws and
regulations and the health and safety rules, guidelines and procedures provided for in this
contract and generally for the proper maintenance of health & safety in and about the
execution of the service; and
regulations published in GNR February 2002, under the Occupational Health and Safety
Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2 regulated
asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous period of four
hours, and the short term exposure limit of 0.6 regulated asbestos fibres per millilitre of air as a 10-
minute TWA, averaged over any 10 minutes, measured in accordance with HSG248 and
monitored according to HSG173 and OESSM.
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
Z14.2 Upon written request by the Contractor, the Employer certifies that these conditions prevail. All
measurements and reporting are effected by an independent, competent, and certified
occupational hygiene inspection body, i.e. a SANAS accredited and Department of Employment
and Labour approved AAIA. The Contractor may perform Parallel Measurements and related
control measures at the Contractor’s expense. For the purposes of compliance the results
generated from Parallel Measurements are evaluated only against South African statutory limits as
detailed in clause Z14.1. Control measures conform to the requirements stipulated in the AAIA-
approved asbestos work plan.
Z14.3 The Employer manages asbestos and ACM according to the Standard.
Z14.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration of
above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z14.5 The Contractor’s personnel are entitled to stop working and leave the contaminated area forthwith
until such time that the area of concern is declared safe by either Compliance Monitoring or an
(From the example given in an Appendix within the TSC3 Guidance Notes)
Entries in the first four columns in the price list in section C2.2 are made either by the Employer or the
tendering contractor.
101 Medicals (1x Driver) Yearly 5
102 Safety File Yearly 5
xxiii) Before commencement date of the service, the drivers of the minibus and sedan will be tested
for an Eskom drivers permit by an Eskom authorised company. Employer Shall carry the cost
for the first test. If the driver fails, the first test the Contractor will be liable for the cost of the
second test.
xxiv) No driver will be allowed to drive any bus/minibus without the Eskom driver permit. For every
other driver appointed by the Contractor, other than the original appointed drivers, the Contractor
will be responsible for the cost and the amount will be deducted at month end. No learner
drivers will be allowed to drive any bus, minibus, or sedan.
xxv) All drivers appointed during the period of the contract must undergo induction before starting
with the service and documentation must be submitted to the Service Manager.
xxvi) All drivers must be equipped with a cell phone for direct communication between the bus and the
depot.
xxvii) The minibus must display the 100 kilometer per hour sign at the back of the bus. Such sign shall
comply with the requirements of standard specification SABS 1329 “Retro-reflective and
Fluorescent Warning Signs or Road Vehicles”.
xxviii) All drivers will obey all the traffic rules and are not allowed to over speed or dis-obey any traffic
regulations.
xxix) Eskom Holdings SOC Ltd reserves the right to terminate additional trips within 24 hours after
communicated.
CONTRACT - iv - TSC3 COVER PAGES
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
xxx) A R5 000.00 (Five Thousand Rand) fine will be payable for late coming of buses for the first 1⁄2
hour after arrival or pick up time. Thereafter it will be R7 000.00 (Seven Thousand Rand) per 30
minutes.
xl) Smoking is not allowed in minibus.
xli) Toll fees are for the Contractor’s account.
xlii) Cessation or restriction of operation due to abnormal environmental conditions (for example,
rain, winds, fog), including “Go - No Go” criteria and the responsible person for this decision.
xliii) The minibus must have a Fleet number as well and the contractors emergency contacts on the
tailgate.
xliv) The Contractor shall obey the Eskom Life Saving Rules (non-negotiable health and safety rules
and must not be broken under any circumstances). Eskom takes a ZERO TOLERANCE stance
to violation of these rules.
employees can report for duty according to the prescribed times. Continuous risk assessment must be
conducted and the travelling time to be adjusted according to the identified risks.
CONTRACT - v - TSC3 COVER PAGES
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
(SHEQ) representatives
a) Contractor must ensure that the Service Entry and Goods Receipt Note number appears on the
invoice. (It can be printed or hand written on the invoice).
b) Eskom Purchase Order number must appear on invoice.
c) Invoices must be VAT compliant in line with the VAT Act requirements.
d) Invoices submitted must reflect the bank account details. A once off copy of the banking details may
be forwarded to the Documentation Centre and it will be attached to each scanned invoice.
e) Invoices must be original or certified as an original in line with the VAT Act. No electronic invoices
will be accepted.
f) Eskom’s correct name “Eskom Holdings SOC Limited” must appear on the invoice.
g) The Eskom VAT registration number: 4740 101 508 must appear on the invoice.
h) No pro-forma invoices will be accepted.
CONTRACT - viii - TSC3 COVER PAGES
Environmental
Source: NEC TSC Komati Transportation for Kriel employees E3505GXMPKRI.pdfguidelines and procedures otherwise provided for under this contract and ensures that his
Subcontractors, employees and others under the Contractor’s direction and control, likewise
observe and comply with the foregoing.
Z6.2 The Contractor, in and about the execution of the service, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided for
under this contract and ensures that his Subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z7 Provision of a Tax Invoice and interest. Add to core clause 51
Z7.1 Within one week of receiving a payment certificate from the Service Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
if applicable.
Z14.6 The Contractor continues to Provide the Services, without additional control measures presented,
on presentation of Safe Levels. The contractually agreed dates to Provide the Services, including
the Completion Date, are adjusted accordingly. The contractually agreed dates are extended by
the notification periods required by regulations 3 and 21 of the Asbestos Regulations, 2001.
Z14.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
C1.2 Contract Data
Contractual Terms
Source: NEC TSC Komati Transportation for Kriel employees E3505GXMPKRI.pdfLoss of or damage caused by The replacement cost where not covered by the
the Contractor to the Employer’s insurance.
Employer’s property
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Loss of or damage to Plant and The replacement cost where not covered by the
Materials Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Loss of or damage to The replacement cost where not covered by the
Equipment Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
The Contractor’s liability for Loss of or damage to property
loss of or damage to property The replacement cost
(except the Employer’s
property, Plant and Materials
and Equipment) and liability for Bodily injury to or death of a person
bodily injury to or death of a The amount required by the applicable law.
person (not an employee of the
Contractor) arising from or in
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
connection with the
Contractor’s Providing the
Service
Liability for death of or bodily The amount required by the applicable law
injury to employees of the
Contractor arising out of and in
the course of their employment
in connection with this contract
Z __12.2 Replace core clause 86 with the following:
Insurance 86
by the
Employer
86.1 The Employer provides the insurances stated in the Insurance Table B
Insurance table b
Insurance against or name Minimum amount of cover or minimum lim
of policy of indemnity
Assets All Risk Per the insurance policy document
Contract Works insurance Per the insurance policy document
Environmental Liability Per the insurance policy document
General and Public Liability Per the insurance policy document
Transportation (Marine) Per the insurance policy document
Motor Fleet and Mobile Plant Per the insurance policy document
Terrorism Per the insurance policy document
Cyber Liability Per the insurance policy document
Nuclear Material Damage and Per the insurance policy document
Business Interruption
Nuclear Material Damage Per the insurance policy document
Terrorism
Z13 Nuclear Liability
Z13.1 The Employer is the operator of the Koeberg Nuclear Power Station (KNPS), a nuclear installation,
as designated by the National Nuclear Regulator of the Republic of South Africa, and is the holder
of a nuclear licence in respect of the KNPS.
Z13.2 The Employer is solely responsible for and indemnifies the Contractor or any other person against
any and all liabilities which the Contractor or any person may incur arising out of or resulting from
nuclear damage, as defined in Act , save to the extent that any liabilities are incurred
due to the unlawful intent of the Contractor or any other person or the presence of the Contractor
or that person or any property of the Contractor or such person at or in the KNPS or on the KNPS
site, without the permission of the Employer or of a person acting on behalf of the Employer.
Z13.3 Subject to clause Z13.4 below, the Employer waives all rights of recourse, arising from the
aforesaid, save to the extent that any claims arise or liability is incurred due or attributable to the
unlawful intent of the Contractor or any other person, or the presence of the Contractor or that
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
person or any property of the Contractor or such person at or in the KNPS or on the KNPS site,
without the permission of the Employer or of a person acting on behalf of the Employer.
Z13.4 The Employer does not waive its rights provided for in section 30 (7) of Act , or any
replacement section dealing with the same subject matter.
Z13.5 The protection afforded by the provisions hereof shall be in effect until the KNPS is
decommissioned.
Z14 Asbestos
For the purposes of this Z-clause, the following definitions apply:
AAIA means approved asbestos inspection authority.
ACM means asbestos containing materials.
AL means action level, i.e. a level of 50% of the OEL, i.e. 0.1 regulated asbestos fibres
per ml of air measured over a 4 hour period. The value at which proactive actions is
required in order to control asbestos exposure to prevent exceeding the OEL.
Ambient Air means breathable air in area of work with specific reference to breathing zone, which
is defined to be a virtual area within a radius of approximately 30cm from the nose
inlet.
Compliance means compliance sampling used to assess whether or not the personal exposure of
Monitoring workers to regulated asbestos fibres is in compliance with the Standard’s requirements
for safe processing, handling, storing, disposal and phase-out of asbestos and
asbestos containing material, equipment and articles.
OEL means occupational exposure limit.
Parallel means measurements performed in parallel, yet separately, to existing measurements
Measurements to verify validity of results.
Safe Levels means airborne asbestos exposure levels conforming to the Standard’s requirements
for safe processing, handling, storing, disposal and phase-out of asbestos and
asbestos containing material, equipment and articles.
Standard means the Employer’s Asbestos Standard 32-303: Requirements for Safe Processing,
Handling, Storing, Disposal and Phase-out of Asbestos and Asbestos Containing
Material, Equipment and Articles.
SANAS means the South African National Accreditation System.
TWA means the average exposure, within a given workplace, to airborne asbestos fibres,
normalised to the baseline of a 4 hour continuous period, also applicable to short term
exposures, i.e. 10-minute TWA.
Z14.1 The Employer ensures that the Ambient Air in the area where the Contractor will Provide the
Services conforms to the acceptable prescribed South African standard for asbestos, as per the
regulations published in GNR February 2002, under the Occupational Health and Safety
Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2 regulated
asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous period of four
hours, and the short term exposure limit of 0.6 regulated asbestos fibres per millilitre of air as a 10-
minute TWA, averaged over any 10 minutes, measured in accordance with HSG248 and
monitored according to HSG173 and OESSM.
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
Z14.2 Upon written request by the Contractor, the Employer certifies that these conditions prevail. All
measurements and reporting are effected by an independent, competent, and certified
occupational hygiene inspection body, i.e. a SANAS accredited and Department of Employment
and Labour approved AAIA. The Contractor may perform Parallel Measurements and related
control measures at the Contractor’s expense. For the purposes of compliance the results
generated from Parallel Measurements are evaluated only against South African statutory limits as
detailed in clause Z14.1. Control measures conform to the requirements stipulated in the AAIA-
approved asbestos work plan.
Z14.3 The Employer manages asbestos and ACM according to the Standard.
Z14.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration of
above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z14.5 The Contractor’s personnel are entitled to stop working and leave the contaminated area forthwith
until such time that the area of concern is declared safe by either Compliance Monitoring or an
AAIA approved control measure intervention, for example, per the emergency asbestos work plan,
if applicable.
Z14.6 The Contractor continues to Provide the Services, without additional control measures presented,
on presentation of Safe Levels. The contractually agreed dates to Provide the Services, including
the Completion Date, are adjusted accordingly. The contractually agreed dates are extended by
the notification periods required by regulations 3 and 21 of the Asbestos Regulations, 2001.
Z14.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
C1.2 Contract Data
Part two - Data provided by the Contractor
Notes to a tendering contractor:
Guidance Notes (TSC3-GN)3 in order to understand the implications of this Data which the tenderer
is required to complete.
statement however other clauses may also use the same data.
Completion of the data in full, according to Options chosen, is essential to create a complete contract.
Clause Statement Data
10.1 The Contractor is (Name):
Address
Tel No.
Fax No.
E-mail address
11.2(8) The direct fee percentage is ________%
The subcontracted fee percentage is ________%
11.2(14) The following matters will be included in None
the Risk Register
11.2(15) The Service Information for the Not applicable
Contractor’s plan is in:
21.1 The plan identified in the Contract Data is Not applicable
contained in:
24.1 The key people are:
1 Name:
Job:
Responsibilities:
Contents: No of
pages
Part C1 Agreements & Contract Data 20
Part C2 Pricing Data 3
Part C3 Scope of Work 21
CONTRACT No. [Insert at award stage]
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
Part c1: agreements & contract data
Contents: No of
pages
C1.1 Form of Offer and Acceptance 3
C1.2a Contract Data provided by the Employer 38
C1.2b Contract Data provided by the Contractor 2
C1.3 Proforma Guarantees n/a
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
C1.1 Form of Offer & Acceptance
of Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
clauses and the clauses for main Option:
A: Priced contract with price list
dispute resolution Option W1: Dispute resolution procedure
and secondary Options
X1: Price adjustment for inflation
X2 Changes in the law
X17: Low service damages
X18: Limitation of liability
X19: Task Order
Z: Additional conditions of contract
of the NEC3 Term Service Contract April
20132 (tsc3)
10.1 The Employer is (name): Eskom Holdings SOC Ltd (reg no:
2002/015527/30), a state owned company
incorporated in terms of the company laws of
the Republic of South Africa
no rate is quoted for the currency in question
then the rate for United States Dollars, and if no
such rate appears in The Wall Street Journal
then the rate as quoted by the Reuters Monitor
Money Rates Service (or such service as may
replace the Reuters Monitor Money Rates
Service) on the due date for the payment in
question, adjusted mutatis mutandis every 6
months thereafter (and as certified, in the event
of any dispute, by any manager employed in the
foreign exchange department of The Standard
80.1 These are additional Employer's risks 1. Passenger liability insurance
dispute to him. (see www.ice-sa.org.za). If the
e-mail TBA when a dispute arises
W1.2(3) The Adjudicator nominating body is: the Chairman of ICE-SA a joint Division of the
elsewhere in this Contract Data.
X17 Low service damages
X17.1 The service level table is in Late coming of busses after arrival or pick-up
time – penalty fees per bus
First 30 minutes R5 000.00
Every 30 minutes R7 000.00
there after
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
X18 Limitation of liability
X18.1 The Contractor’s liability to the Employer
for indirect or consequential loss is limited
to R0.0 (zero Rand)
X18.2 For any one event, the Contractor’s the amount of the deductibles relevant to the
liability to the Employer for loss of or event
damage to the Employer’s property is
limited to
X18.3 The Contractor’s liability for Defects due to The greater of
his design of an item of Equipment is limited
to
and
from the Employer’s insurance (other than
the resulting physical damage to the
Employer’s property which is not excluded)
plus the applicable deductibles
X18.4 The Contractor’s total liability to the the total of the Prices other than for the
in connection with this contract, other than
the excluded matters, is limited to The Contractor’s total liability for the additional
excluded matters is not limited.
for which the Contractor is liable under this
contract for
specification,
outside the Affected Property,
the Employer’s property, Plant and
Materials),
right.
X18.5 The end of liability date is Last day of the service period.
X19 Task Order
X19.5 The Contractor submits a Task Order
programme to the Service Manager within One day of receiving the Task Order
Z3.2 The Contractor is required to submit an updated verification certificate and necessary supporting
documentation confirming the change in his B-BBEE status to the Service Manager within thirty
days of the notification or as otherwise instructed by the Service Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Service.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may constitute
a reason for termination. If the Employer terminates in terms of this clause, the procedures on
termination are P1, P2 and P4 as stated in clause 92, and the amount due is A1 and A3 as
stated in clause 93.
Z4 Confidentiality
Z4.1 The Contractor does not disclose or make any information arising from or in connection with this
contract available to Others. This undertaking does not, however, apply to information which at
the time of disclosure or thereafter, without default on the part of the Contractor, enters the
public domain or to information which was already in the possession of the Contractor at the time
of disclosure (evidenced by written records in existence at that time). Should the Contractor
disclose information to Others in terms of clause 25.1, the Contractor ensures that the provisions
of this clause are complied with by the recipient.
Z4.2 If the Contractor is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Service Manager.
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
Z4.3 In the event that the Contractor is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Contractor, to the extent permitted by law prior to
disclosure, notifies the Employer so that an appropriate protection order and/or any other action
can be taken if possible, prior to any disclosure. In the event that such protective order is not, or
cannot, be obtained, then the Contractor may disclose that portion of the information which it is
required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z4.4 The taking of images (whether photographs, video footage or otherwise) of the Affected Property
or any portion thereof, in the course of Providing the Service and after the end of the service
period, requires the prior written consent of the Service Manager. All rights in and to all such
images vests exclusively in the Employer.
Z4.5 The Contractor ensures that all his subcontractors abide by the undertakings in this clause.
Z5 Waiver and estoppel: Add to core clause 12.3:
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
the event, he is not entitled to a change in the Prices.
Z9 Employer’s limitation of liability
Z9.1 The Employer’s liability to the Contractor for the Contractor’s indirect or consequential loss is
limited to R0.00 (zero Rand)
Z9.2 The Contractor’s entitlement under the indemnity in 82.1 is provided for in 60.1(12) and the
Employer’s liability under the indemnity is limited to compensation as provided for in core clause
63 and X19.11 if Option X19 Task Order applies to this contract.
Termination: Add to core clause 91.1, at the second main bullet point, fourth sub-bullet
Z10
point, after the words "against it":
Z10.1 or had a business rescue order granted against it.
Z11 Ethics
appropriate action to prevent or remedy the situation, without limiting any other rights or
remedies the Employer has. It is not required that the Committing Party had to have been
found guilty, in court or in any other similar process, of such Prohibited Action before the
Employer can terminate the Contractor’s obligation to Provide the Services for this reason.
Z11.3 If the Employer terminates the Contractor’s obligation to Provide the Services for this reason,
the amounts due on termination are those intended in core clauses 92.1 and 92.2.
Z11.4 A Committing Party co-operates fully with any investigation pursuant to alleged Prohibited
Z12 Insurance
Z 12.1 Replace core clause 83 with the following:
Insurance cover 83
83.1 When requested by a Party, the other Party provides certificates from his insurer
or broker stating that the insurances required by this contract are in force.
83.2 The Contractor provides the insurances stated in the Insurance Table A from the
starting date until the earlier of Completion and the date of the termination
certificate.
the Contractor to the Employer’s insurance.
Employer’s property
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Materials Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Equipment Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
The Contractor’s liability for Loss of or damage to property
loss of or damage to property The replacement cost
(except the Employer’s
property, Plant and Materials
and Equipment) and liability for Bodily injury to or death of a person
bodily injury to or death of a The amount required by the applicable law.
person (not an employee of the
Contractor) arising from or in
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
connection with the
Contractor’s Providing the
the course of their employment
in connection with this contract
Z __12.2 Replace core clause 86 with the following:
Insurance 86
by the
86.1 The Employer provides the insurances stated in the Insurance Table B
Transportation (Marine) Per the insurance policy document
Z13 Nuclear Liability
Z13.1 The Employer is the operator of the Koeberg Nuclear Power Station (KNPS), a nuclear installation,
as designated by the National Nuclear Regulator of the Republic of South Africa, and is the holder
of a nuclear licence in respect of the KNPS.
Z13.2 The Employer is solely responsible for and indemnifies the Contractor or any other person against
any and all liabilities which the Contractor or any person may incur arising out of or resulting from
nuclear damage, as defined in Act , save to the extent that any liabilities are incurred
due to the unlawful intent of the Contractor or any other person or the presence of the Contractor
or that person or any property of the Contractor or such person at or in the KNPS or on the KNPS
site, without the permission of the Employer or of a person acting on behalf of the Employer.
Z13.3 Subject to clause Z13.4 below, the Employer waives all rights of recourse, arising from the
aforesaid, save to the extent that any claims arise or liability is incurred due or attributable to the
unlawful intent of the Contractor or any other person, or the presence of the Contractor or that
Part c2: pricing data c2 tsc3 cover
ESKOM HOLDINGS SOC Ltd TENDER E3505GXMPKRI
the provision of bus transportation of Eskom Kriel Power Station employees for the Komati Power Station residents on a
daily basis to and from Kriel Power Station for a period of 5 years
person or any property of the Contractor or such person at or in the KNPS or on the KNPS site,
without the permission of the Employer or of a person acting on behalf of the Employer.
Z13.4 The Employer does not waive its rights provided for in section 30 (7) of Act , or any
replacement section dealing with the same subject matter.
Z13.5 The protection afforded by the provisions hereof shall be in effect until the KNPS is
decommissioned.
Z14 Asbestos
service so provided will be subject to the conditions as laid down in this contract.
xiv) The Contractor shall not be entitled to alienate, pledge, cede or deal in any manner whatsoever,
with any claim he may have arising out of the contract or his rights and obligations, in terms of
such contract, without the prior, written approval of Employer.
xv) The Contractor undertakes to limit his service to the prescribed number of Eskom passengers
per bus/minibus.
xvi) The Contractor shall operate the bus transportation service in a reasonable, proper and efficient
manner and shall ensure that his employees are fully authorized and conduct their appointed
tasks in a proper and workmanlike manner.
xvii) The Contractor undertakes and guarantees that he is legally authorized, qualified and properly
equipped to render the bus transportation service required and that he is fully conversant with
the legal provisions regarding the transportation service to be rendered and undertakes to abide
by such legal provisions during the contract.
xviii) The Contractor shall, at all times, comply with all legal requirements in respect of the required
bus transportation service and shall, be the holder of all licenses, permits and insurances that
may be required in terms of the contract and all applicable legislation.
xix) All requisites Licenses and Insurance documents must be supplied by the Contractor to the
Employer’s Representative prior to commencement of the service. Failure to comply at any time
with this requirement can lead to the immediate cancellation of the contract.
xx) The Contractor acknowledges that he has insurance cover in terms of the Compensation for
Occupational Injuries and Diseases Act, 1993, and undertakes to supply Employer with proof of
such insurance.
xxi) The bus drivers must at all times be in possession of valid Public Transport Permits. The bus
drivers must be able to produce their permits on demand, e.g. to the Service Manager appointed
by Employer.
xxii) Within fourteen (14) days from the date of contract award the Contractor will supply the Service
compliance before start date.
xxxi) Sedan to comply with SANS and ECE Standards.
xxxii) The Employers representative reserves the right to investigate and remove the driver where
unsafe driving has been reported to the Employer.
xxxiii) The Contractor shall, at his own expense, take all precautions for the protection of life and
property on, and about, and in any way connected with the service or equipment and shall
indemnify, and keep indemnified, Employer’s representative against all losses, claims, demands,
proceedings, damages, costs, charges and expenses of whatsoever nature, howsoever arising,
in respect of injury to, or death of, any person at any time during the contract period.
xxxiv) By the 20th of every month, a pro-forma invoice for assessment to be provided to the Service
Special Conditions
Source: NEC TSC Komati Transportation for Kriel employees E3505GXMPKRI.pdf (unknown)Unscheduled trips (as and when required, no additional cost). The contractor must be a member of the local Taxi Association. The minibus to be used is for the transportation of Kriel Power Station employees only. The contractor undertakes to provide replacement transport (of the same standard and make – minibus) in the event of a vehicle breakdown, to ensure that Eskom employees reach their destination. The bus provided by the contractor must be of the same quality and standard.
Description
Source: SAFETY 240-70044602 OHS Risk Assessment.xlsxThe tender is for the bus transportation of Eskom Kriel Power Station employees, specifically for Komati Power Station residents, on a daily basis to and from Kriel Power Station, for a period of 5 years. The service involves transporting employees daily, and the contractor must comply with occupational health and safety requirements, including risk assessment and control measures.
Submission Guidelines
Source: SAFETY 240-70044602 OHS Risk Assessment.xlsx (unknown)Returnable documents: the Occupational Health and Safety Baseline Risk Assessment template must be completed and submitted. The risk assessment template must be completed and submitted. No other mandatory forms are specified in the provided document.
Evaluation Criteria
Source: SAFETY 240-70044602 OHS Risk Assessment.xlsx (unknown)Bidders must comply with the Occupational Health and Safety Act 85 of 1993 and the National Road Traffic Act 93 of 1996. They must have a valid driver's licence and ensure medical fitness of drivers. The risk assessment template must be completed and submitted. No specific pre-qualification criteria (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document. The document does not specify mandatory forms such as SBD or MBD forms, but standard Eskom procurement forms may apply.
Technical Specifications
Source: SAFETY 240-70044602 OHS Risk Assessment.xlsx (unknown)Cell A3: Occupational Health and Safety Baseline risk assessment template
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Kriel Power Station, Bethal-Ogies Road - Kriel - Kriel - 2271
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
18
Last checked
12 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Win government insurance, banking, actuarial, and financial consulting contracts. FSCA licensing requirements and tender strategies for financial service providers.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
A professional guide for law firms to join the provincial and municipal legal panels in Gauteng, covering compliance, specialization, and bidding.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.