Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Council for Geoscience, 280 Pretoria Street Silverton Pretoria - Silverton - Pretoria - 0184
Organization Type
GOVERNMENT
Published
14 Sept 2026
OCDS Reference
ocds-9t57fa-170278
The council for geoscience seeks a service provider to conduct airborne hyperspectral surveys over two areas in the northern cape — vioolsdrif (620 km²) and springbok (5,000 km²) — within a two-month contract period. Bidders must price every item in both pricing schedules, as failure to do so will lead to disqualification, and the stand-by daily rate must be priced but is excluded from evaluation.
Bids must be submitted by 11h00 on 12 October 2026.
The contract period is two (2) months.
Bidders must price all items in Price Schedule 1 (Vioolsdrif, 620 km²) and Price Schedule 2 (Springbok, 5,000 km²); failure to price any item leads to disqualification.
The stand-by daily rate must be priced but will not be used for evaluation purposes.
Pricing must be in South African Rand (R) and include VAT.
Arithmetic errors in the bid price will be corrected: the line-item total governs if there is a gross decimal misplacement, and the total of prices governs if there is an addition error.
No bidder may change total quoted prices after the closing of the bid.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 12 October 2026 - 11:00
Venue
Microsoft Teams meeting Join: https://teams.microsoft.com/meet/386468854485282?p=XuEv8hCYZkkRy4Ld0M
Request for Bid(Open-Tender)
Council for Geoscience, 280 Pretoria Street Silverton Pretoria - Silverton - Pretoria - 0184
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Description
Source: TENDER DOCUMENT CGS-2026-031F.pdf14 Sept
2026
Tender Published
Tender was published
12 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
PRICING_SCHEDULE (Final) (003).pdf
The Council for Geoscience seeks a service provider to conduct airborne hyperspectral surveys over two areas, Vioolsdrif (620 km²) and Springbok (5000 km²), for a period of two months. The contract covers survey flight, aircraft mobilisation, hyperspectral capture and data, and any other applicable costs, with pricing submitted on two separate schedules and a grand total.
TENDER DOCUMENT CGS-2026-031F.pdf
The Council for Geoscience is procuring a service provider to acquire, process, and deliver cloud-free airborne hyperspectral imagery for two areas in the Richtersveld Subprovince, Northern Cape Province (Vioolsdrif and Springbok), covering the 400–2500 nm spectral range, with a contract period of two months.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 581 900
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The Council for Geoscience requires airborne hyperspectral surveys. The contractor must collect field spectra during surveys using a spectrometer covering VNIR and SWIR wavelengths (400–2500 nm). Tests must be conducted in the presence of a CGS representative or with time-stamped raw data as proof. Standard products include digital data in ENVI-readable format and acquisition/processing reports. A project execution plan with a Gantt diagram showing fieldwork and processing timelines is required.
Important Dates
Source: TENDER DOCUMENT CGS-2026-031F.pdf (RFP){"closingDate":"14 September 2026","briefingSession":"{"date":"23 September 2026","time":"11h00","venue":"e: 23 September 2026 at 11h00","is_compulsory":true}"}
Contact Information
Source: TENDER DOCUMENT CGS-2026-031F.pdf (RFP){"name":null,"email":"[email protected]","phone":"012 841 1250","department":null,"address":null}
Submission Guidelines
Source: TENDER DOCUMENT CGS-2026-031F.pdf (RFP)Returnable Documents: ALL THE RELEVANT FORMS ATTACHED TO THIS BID DOCUMENTS MUST BE COMPLETED AND SIGNED BACK IN BLACK INK WHERE APPLICABLE BY A DULY AUTHORISED OFFICIAL. FAILURE TO PROVIDE ANY OF THE BELOW MENTIONED DOCUMENTS MAY LEAD TO DISQUALIFICATION. THE FOLLOWING ARE INCLUDED IN THE TENDER DOCUMENT YES NO Three documents; one (1) original tender document and two (2) copies SBD 1. Invitation to Bid Bidders must provide proof of Tax Clearance compliance from SARS; The Council for Geoscience (CGS) will verify your tax compliance proof in terms of practice note /2018. Tender specification SBD 4. Declaration of interest SBD 6.1. Preference points Supplier application form (CSD Report) Government procurement General conditions of contract Latest Original Certified copies of company registration certificate Shareholding breakdown per race, gender and percentage shareholding with shareholders of the bidding company who are not individuals. In a case where BBBBEE certificate is a requirement to submit in order to score points on specific goals, a certified valid SANAS accredited certificate or DTI certificate, Sworn Affidavit will be required. Certificates issued by IRBA and Accounting Officers have been discontinued. Certified BBBEE certificate (For consortium or joint venture a consolidated BBBEE Certificate must be submitted) The CGS’s document must be kept as supplied and submitted with all Schedules/Forms fully completed. Any other documents, certificates etc. must be attached as annexure to the official CGS document. No bid forwarded by telegram, telex, facsimile or similar apparatus will be considered. CGS-TEM-2025-0839 Rev0 3 Effective date: 30/11/2025 REQUEST FOR PROPOSAL: APPOINTMENT OF A PROPOSAL NO.: CGS-2026-031F SERVICE PROVIDER FOR THE PROVISION OF AIRBORNE HYPERSPECTRAL SURVEYS FOR THE COUNCIL FOR GEOSCIENCE FOR A PERIOD OF TWO (2) MONTHS. In case of Joint venture, trust or consortiums please submit joint venture agreement., BID CONDITIONS 2.1 Bidders shall provide full and accurate answers to all (including mandatory) question posed in this document and are required to explicitly state either "Accept” or “Not Accept” (with a ✓)" regarding compliance with the requirements. Where necessary, the Bidder shall substantiate their response to a specific question. 2.2 A “✓” under “Accept” will be interpreted as full compliance/acceptance to the applicable paragraph. A “✓” under “Accept” will be interpreted that the Bidder(s) has/have read and understood the paragraph, A “✓” under “Not Accept” will be interpreted that the Bidder does not accept the content of the applicable paragraph. 2.3 The following bid conditions will govern the contract between the CGS and the successful bidder: NOT REQUIREMENT ACCEPT ACCEPT Bidders are invited to offer the Services in accordance with the attached Specifications and the conditions within this document. The Bidder(s) shall accept CGS’s interpretation of any specific requirement in the Bid documents or Specifications should there be a difference of interpretation between the Bidder(s) and CGS. Should any dispute arise as a result of this of this Bid and/or the subsequent contract, which cannot be settled to the mutual satisfaction of the Bidder(s) and CGS’s, it shall be dealt with in terms of paragraph 23 of the general conditions of contract? Should there be any discrepancies between the Bid conditions and any other documentation that forms part of this RFB, the Bid conditions shall take preference. NOT DOCUMENTATION ACCEPT ACCEPT Fully comprehensive service documentation shall be supplied in English by each Bidder, which shall explicitly and detail, describe the service(s) offered. This documentation shall include sufficient detail to clearly give the reader a precise and unambiguous description of the service(s) offered. Incomplete or incomprehensive service documentation will result in rejection of the offer. CGS-TEM-2025-0839 Rev0 4 Effective date: 30/11/2025 REQUEST FOR PROPOSAL: APPOINTMENT OF A PROPOSAL NO.: CGS-2026-031F SERVICE PROVIDER FOR THE PROVISION OF AIRBORNE HYPERSPECTRAL SURVEYS FOR THE COUNCIL FOR GEOSCIENCE FOR A PERIOD OF TWO (2) MONTHS. NOT SELECTION ACCEPT ACCEPT CGS reserves the right to make a selection solely on the information received in the Bids or to negotiate further with one or more Bidder(s). Should CGS consider it necessary, the Bidder(s) shall agree to an inspection of the resources and works of the Bidder, if so required? To contact any Bidder during the evaluation period, to clarify information only, without informing any other Bidder. NOT COPYRIGHT ACCEPT ACCEPT The specifications are the intellectual property of CGS. The contents of any specifications are the property of CGS and are confidential. It shall not in any manner be reproduced, destroyed, lent or given away without the permission. NOT SUBMISSION OF BID ACCEPT ACCEPT CGS may also reject an offer if the Bidder(s) fail to complete the standard bidding documents in this tender document. NOT SERVICE APPROVAL ACCEPT ACCEPT The Procuring of the Services shall not take place until CGS has given final approval of all procedures. NOT UPFRONT / DEPOSIT PAYMENTS ACCEPT ACCEPT CGS will not make any upfront payment or deposit payments to the successful bidder(s) for goods or services. CGS will pay 30 days after delivery of goods or service and receipt of an invoice., BIDDING STRUCTURE Indicate the type of Bidding structure by marking with an ‘X’: Individual Bidder CGS-TEM-2025-0839 Rev0 5 Effective date: 30/11/2025 REQUEST FOR PROPOSAL: APPOINTMENT OF A PROPOSAL NO.: CGS-2026-031F SERVICE PROVIDER FOR THE PROVISION OF AIRBORNE HYPERSPECTRAL SURVEYS FOR THE COUNCIL FOR GEOSCIENCE FOR A PERIOD OF TWO (2) MONTHS. Joint venture Consortium If Joint Venture or Consortium, indicate the following for Prime Bidder: Name of Prime Contractor Registration number VAT registration number Contact person Telephone number Fax number E-mail address Postal address Physical address If Joint Venture or Consortium, indicate the following for all partners other than Prime Bidder: Name of partners Registration number VAT registration number Contact person Telephone number Fax number E-mail address Postal address Physical address CGS-TEM-2025-0839 Rev0 6 Effective date: 30/11/2025 REQUEST FOR PROPOSAL: APPOINTMENT OF A PROPOSAL NO.: CGS-2026-031F SERVICE PROVIDER FOR THE PROVISION OF AIRBORNE HYPERSPECTRAL SURVEYS FOR THE COUNCIL FOR GEOSCIENCE FOR A PERIOD OF TWO (2) MONTHS., RESPONSE FORMAT Bidders must respond using the following response format: Schedule Description Schedule 1 Executive Summary The executive summary must cover the following, Paragraph 1: The Bidder must indicate in their bid response to the CGS whether they are responding as a Prime bidder, joint venture, consortium or partnership and list the parties and explain their roles., Paragraph 2: The Bidder must indicate that the signatory of the company / consortium is duly designated to sign the bid response on our behalf of the consortium or joint venture., Paragraph 3: Summary of similar work done in the past., Paragraph 4 : High level summary of their response. Schedule 2 SBD 1 Schedule 3 Bidders must provide proof of Tax Compliance Status Pin from SARS. The CGS will verify your tax compliance proof in terms of practice note /2018 Schedule 4 Functional response Schedule 5 Price Breakdown (indicate cost drivers) in separate envelope or any form of packaging Schedule 6 SDB 6.1 (Preference Points form) and certified BBBEE Certificate Schedule 7 Central Supplier Database Schedule 8 General Conditions of Contract 2010 NB: The response must have an index, and the document must be neatly divided using the abovementioned format in sequence. CGS-TEM-2025-0839 Rev0 7 Effective date: 30/11/2025 REQUEST FOR PROPOSAL: APPOINTMENT OF A PROPOSAL NO.: CGS-2026-031F SERVICE PROVIDER FOR THE PROVISION OF AIRBORNE HYPERSPECTRAL SURVEYS FOR THE COUNCIL FOR GEOSCIENCE FOR A PERIOD OF TWO (2) MONTHS., REQUIREMENTS AND EVALUATION OF JOINT VENTURE OR CONSORTIUM SUBMISSIONS, The JV agreement for JV partners must be submitted indicating a percentage split up to 100% for partners to render the agreement valid which must include, among other things, but to limited to role and responsibilities of each JV partner in the contract, JV bank account and power of attorney to sign the bid document on behalf of the JV. etc, All the JV partners or the lead Partner must submit mandatory documents, where applicable, depending on the nature of the project, please refer to mandatory requirements for this bid., All the JV partners or unincorporated JV must submit administrative documents i.e. CSD, company registration documents etc, please refer to administrative requirements of this bid., Specific goals evaluation for incorporated JV shall be applied considering a valid consolidated BBBEE certificate., Specific Goals evaluation for unincorporated JV shall be applied proportionally in accordance with the JV % split., Below is a demonstration of points allocation for specific goals where the total points claimed will be the sum of the percentage work allocation for each partner multiplied by the percentage weighting for the race category, multiplied by the percentage ownership in the relevant specific goals. (if applicable). Example of the formula CGS-TEM-2025-0839 Rev0 8 Effective date: 30/11/2025 REQUEST FOR PROPOSAL: APPOINTMENT OF A PROPOSAL NO.: CGS-2026-031F SERVICE PROVIDER FOR THE PROVISION OF AIRBORNE HYPERSPECTRAL SURVEYS FOR THE COUNCIL FOR GEOSCIENCE FOR A PERIOD OF TWO (2) MONTHS. SDB 1 PART A INVITATION TO BID YOU ARE HEREBY INVITED TO BID FOR REQUIREMENTS OF THE COUNCIL FOR GEOSCIENCE. Bid Closing CGS-2026-31F Closing Date: 12 October 2026 11h00 Number: Time: Appointment of a service provider for the provision of airborne hyperspectral surveys
Evaluation Criteria
Source: TENDER DOCUMENT CGS-2026-031F.pdf (RFP)Bidders must be registered on the Central Supplier Database (CSD) and provide a SARS Tax Compliance Status PIN or CSD number. Must submit completed SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), and a certified B-BBEE certificate (or sworn affidavit if applicable). For joint ventures or consortia, a JV agreement with percentage split and role clarification is required. Bidders must provide proof of tax compliance, company registration certificate, shareholding breakdown, and any other mandatory documents listed in the checklist. Bids from persons in the service of the state or companies with such directors are not considered. Failure to meet mandatory technical requirements (e.g., spectral coverage, ground resolution, cloud cover) will lead to disqualification. Bidders must also demonstrate possession of necessary licenses and permits, and provide proof of insurance (public liability, aviation liability, professional indemnity).
Technical Specifications
Source: TENDER DOCUMENT CGS-2026-031F.pdf (RFP)for the Council for Geoscience for a period of two (2) months.
Bid response documents may be deposited in the bid box situated at (street
Address)
Council for geoscience
280 pretoria street
Silverton, pretoria
0001
Bidding procedure enquiries may be technical enquiries may be
Directed to directed to:
The Council for Geoscience (CGS) is a schedule 3A public entity organisation as defined by the
Public Finance Management Act (Act ). The CGS derives its mandate from the
Geoscience Act . The objectives of the CGS under the Act, is to produce world-class
geoscience knowledge products and to render geoscience-related services to the South African
public and industry. The strategic position of the CGS is to ensure that its activities contribute to
the national imperatives, namely, to free the potential of individuals by improving the quality of life
of all citizens, assisting in the growth and wealth of the country and eradicating poverty especially
in the rural areas of South Africa. It does this through the mandate of the Geoscience Act, which
includes the following activities:
crust, including offshore areas within the territory of South Africa.
geological information in the form of maps and accompanying explanations and to make this
information available to the public.
history and evolution of life and to understand the geological evolution of the earth. These
findings are published in peer reviewed geoscience publications nationally and internationally.
Repository and make such information available to the public.
scientifically based decisions on the use of the earth’s surface and its resources within the
territory of South Africa.
Seismograph Network, the National Borehole-Core Repository, the Nation Geoscience
Heritage Collections (Geoscience Museum) and the National Geoscience Library.
The abbreviations in the document are:
CGS-TEM-2025-0839 Rev0 13 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
The Council for Geoscience requires a service provider to acquire, process and deliver cloud
free airborne hyperspectral imagery for two areas in the Richtersveld Subprovince, Northern Cape
Province, South Africa. The data must cover the spectral range of 400 – 2500 nm.
Airborne hyperspectral data must be collected over the Vioolsdrif and Springbok areas in
Namaqualand, Northern Cape Province (Figure 1).
CGS-TEM-2025-0839 Rev0 14 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
CGS-TEM-2025-0839 Rev0 15 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
Figure 1. Survey areas in the Northern Cape Province
3.1 Technical Specification
The imagery must have a ground sampling distance of 3 m or better and provide contiguous
spectral coverage in the 400 – 2500 nm spectral range. The VNIR spectral resolution must be 5 nm
or better and the SWIR spectral resolution should be 15 nm or better. Field spectra must be
collected during the surveys to provide ground truthing using a spectrometer that measures the full
spectral coverage of VNIR and SWIR from 400 to 2500 nm wavelengths. There should be no cloud
cover, or if this is not achievable, cloud cover of less than 5%.
3.2 The bidder
The bidder must demonstrate its ability (capability, expertise and accreditation) to manage and
perform the technicalities related to airborne hyperspectral contracts, implying direct access to the
necessary resources and technical know-how.
3.3 Equipment, Methodology, Infrastructure and Personnel
All equipment and personnel specified below must be of the highest quality and experience, and
the latest technology and techniques currently available in the hyperspectral industry must be used.
3.3.1 Aircraft
The Contractor shall supply information regarding the fixed wing aircraft (aircraft used for the
survey and any back-up aircraft) to be used for the survey flight operations as per Mandatory
and Functional Evaluation Criteria.
3.3.2 Airborne System
The airborne system shall as a minimum be equal to good industry standard as per Mandatory
and Functional Evaluation Criteria.
3.3.3 Personnel
The Contractor will prior to the commencement of the fieldwork deliver to the CGS a list of
personnel with description of skills, previous experience and functions in the survey operation.
3.4 Survey Specifications
3.4.1 Units
All measurements must be delivered in the metric system. All units used must be clearly
defined.
3.4.2 Specifics
The acquired data must have a preferred ground spatial distance of 3 m or better and the line
spacing has to be adjusted according to the specifications of the sensor being used in order
to get a minimum overlap of at least 10% between flight lines so that there are no gaps in the
surveyed area.
3.4.3 Line path
The aircraft shall maintain flight lines within ±10 m cross-track tolerance and flying height within
±10% of nominal terrain clearance.
CGS-TEM-2025-0839 Rev0 16 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
3.4.4 Geolocation accuracy
GNSS/IMU integration shall provide final geolocation accuracy better than one ground pixel,
with PDOP < 3 and continuous tracking of at least 6 satellites.
Inter-band (spectral channel) co-registration error shall not exceed 0.5 pixel, ensuring spectral
integrity across the VNIR–SWIR range.
3.4.5 Aircraft attitude
Aircraft roll must be less than ±3°. Aircraft pitch must be less than ±2.5°. Aircraft yaw must be
less than ±4°.
3.4.6 Re-flying
The Contractor must fly at their own expenses the segments of lines that have not been flown
within the above specifications. Re-flown segments must always be attached to at least two
tie lines.
3.5 Equipment testing and calibration
3.5.1 Tests
The tests shall be conducted in terms of known and referenced accepted standards. These
tests should be done in the presence at site of a representative from the Council for
Geoscience or alternatively the raw data with time and date stamps should be attached as
proof that the tests have been carried out.
3.6. Data capture tolerance
3.6.1 Radiometric performance
VNIR–SWIR bands
or gain drift artifacts after correction
3.6.2 Spectral performance
across VNIR–SWIR range
conditions
3.7 Legal, statutory and regulatory requirements
The bidder must demonstrate possessing the necessary licenses and permits and ensure validity
of such documentation surpassing the final submission date of this Request for Proposal.
CGS-TEM-2025-0839 Rev0 17 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
3.8 Safety, Health and Risk
The bidder must demonstrate the existence of processes and practices in place to support a safe,
healthy and low risk work environment.
The Contractor shall meet all the safety and insurance requirements in terms of the laws of the
Republic of South Africa. The Contractor shall therefore submit proof to the Council for
Geoscience in the form of copies of insurances (public liability, aviation liability, professional
indemnity)
Furthermore to the Contractor should provide comprehensive evacuation and contingency plans
in the event of an accident or such emergencies.
3.9 Deliverables
3.9.1 Deliverable Items
The Contractor must deliver the following original material standards and optional products:
Original Material from the Work:
An archive of all the list of materials being used in Bidder’s production such as field maps,
flight logs, notes, inception reports, progress reports, i.e. all documents
Standard Products
As minimum, the following standard products are required:
i) Digital Data
The acquired data has to be provided in file format readable in ENVI.
ii) Reports: A full acquisition, processing and compilation report with complete
references and description of all methods used, summary of events and
dates, description of data formats, etc. must be delivered. This includes both
standard and any optional services and products.
iii) Data Backup: The Contractor shall backup the data and final products for a
period of at least one (1) year.
Preliminary and final delivery of digital data
During the acquisition phase of the survey the Contractor shall deliver preliminary, digital
files containing line data and any maps produced for the sake of own quality control. The
final data delivery shall also contain the corrected data produced by the Contractor.
Consultation on Details
The Contractor and the CGS shall discuss and consult on any details arising during the
processing of the data concerning the layout of maps, presentation etc. before proceeding
as agreed.
3.9.2 Final Products and deliverables
CGS-TEM-2025-0839 Rev0 18 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
format.
o Radiometric correction
o Atmospheric correction.
o Atmospheric and geometric correction.
3.10 Planned Schedule for the Work
3.10.1 Project Execution Plan
The Contractor must include an execution plan in the form of a Gantt-diagram showing start
date, end date and duration of the fieldwork and processing, estimated production figures at
suitable number of status dates, in-field processing, demobilization, processing at centre,
delivery of products and invoicing etc.
3.10.2 Timing of Survey
The Contractor must give important consideration to the timing of the survey to ensure the
subsequent timely delivery of data. Data acquisition shall commence as early as possible upon
signing of contract. Full weather, cloud cover, and solar angle analyses must be performed to
ensure that the survey is conducted under ideal conditions. The time allocated takes into
account – bad weather, availability of fuel, prevailing security situation and force majeure.
3.10.3 Monitoring and Evaluation of Progress
At dates agreed by the CGS and the Contractor, the progress of the work shall be reviewed
and compared with the estimated schedule for the production. If discrepancies exist, the
Contractor shall take immediate steps (extra crew, extra aircraft, etc.) to ensure that production
is increased in order to compensate for the lost production in the previous period.
3.10.4 Standby Time
The rate charged for standby, the conditions constituting a standby and as to when it becomes
applicable is to be agreed between the Council for Geoscience and the Contractor.
3.10.5 Conclusion of the Work
The entire project under this agreement, including delivery of all items, must be concluded not
later than an agreed contract date.
3.11 Reporting/Meeting arrangements
3.11.1 Inception
Meeting and report within 7 days of commencement of assignment.
3.11.2 Pre-flight calibration test reports
CGS-TEM-2025-0839 Rev0 19 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
Submitted and approved before commencement of production flights.
3.11.3 Weekly Progress Report
The Contractor must inform the CGS regularly of the progress of the survey operations directly.
The weekly progress report must give a summary of:
3.11.4 Final report
the Council for Geoscience have been incorporated and the revised report accepted.
3.12 Ownership of data
The ownership of all data collected and analysed vests with the Council for Geoscience.
3.13 Disqualification of bidders
Bidders who do not meet the minimum technical requirements will be disqualified from the bidding
process.
3.14 Cancellation and modification of tender
The Council for Geoscience reserves the right to cancel or modify this tender. Any decision to
modify the tender document shall be communicated to all prospective bidders. Failure to adhere
to modifications or addendums will constitute a disqualification.
CGS-TEM-2025-0839 Rev0 20 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
5.1. Tax Legislation
5.1.1. Bidders must be compliant when submitting a proposal to the Council for Geoscience
and remain compliant for the entire contract term with all applicable tax legislation,
including but not limited to the Income Tax Act, 1962 (Act No. ) and Value
Added Tax Act, 1991 (Act No. ).
5.1.2. It is a condition of this bid that the tax matters of the successful bidder be in order, or
that satisfactory arrangements have been made with South African Revenue Service
(SARS) to meet the bidder’s tax obligations.
5.1.3. The Tax Compliance status requirements are also applicable to foreign bidders /
individuals who wish to submit bids.
5.1.4. It is a requirement that bidders grant a written confirmation when submitting this bid
that SARS may on an ongoing basis during the tenure of the contract disclose the
bidder’s tax compliance status and by submitting this bid such confirmation is deemed
to have been granted.
5.1.5. Bidders are required to be registered on the Central Supplier Database and the
National Treasury shall verify the bidder’s tax compliance status through the Central
Supplier Database.
5.1.6. Where Consortia / Joint Ventures / are involved, each party must be registered on the
Central Supplier Database and their tax compliance status will be verified through the
Central Supplier Database. The parties must submit Consortia / Joint Ventures
agreement with clear role clarifications.
5.1.7. Where sub-contracting is involved, the lead partner must submit a sub-contracting
agreement with clear role clarification.
5.2. Procurement Legislation
Council for Geoscience has a detailed evaluation methodology premised on Treasury Regulation
16A3 promulgated under Section 76 of the Public Finance Management Act, 1999 (Act, No. ), the Preferential Procurement Policy Framework Act 2000 (Act, No.) and the BroadBased Black Economic Empowerment Act, 2003 (Act, No. ), and all the applicable
Instruction note issued by National Treasury from time to time.
5.3. Technical Legislation and/or Standards
Bidders should be cognisant of the legislation and/or standards specifically applicable to the
services.
The period of validity of tender and the withdrawal of offers, after the closing date and time is 120
days. The project timeframes of this bid are set out below:
Activity Due Date
Closing date of questions relating to the tender 25 September 2026
CGS-TEM-2025-0839 Rev0 21 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
Activity Due Date
Council for Geoscience will endeavour to
Notice to bidders inform bidders of the progress until
conclusion of the tender
All dates and times in this bid are South African standard time.
Any time or date in this bid is subject to change at Council for Geoscience’s discretion. The
establishment of a time or date in this bid does not create an obligation on the part of Council for
Geoscience to take any action or create any right in any way for any bidder to demand that any
action be taken on the date established.
7.1. A nominated official of the bidders can make enquiries in writing, to the specified person, via
email [email protected] and/or 012 841 1250. Bidders must reduce all telephonic
enquiries to writing and send to the above email address.
7.2. The delegated officer of Council for Geoscience may communicate with Bidders where clarity
is sought in the bid proposal.
7.3. Any communication to an official or a person acting in an advisory capacity for Council for
Geoscience in respect of the bid between the closing date and the award of the bid by the
Bidders is discouraged.
7.4. All communication between the Bidders and Council for Geoscience must be done in writing.
7.5. Whilst all due care has been taken in connection with the preparation of this bid, Council for
Geoscience makes no representations or warranties that the content of the bid or any
information communicated to or provided to Bidders during the bidding process is, or will be,
accurate, current or complete. Council for Geoscience and its employees and advisors will
not be liable with respect to any information communicated which may not accurate, current
or complete.
7.6. If Bidders finds or reasonably believes it has found any discrepancy, ambiguity, error or
inconsistency in this bid or any other information provided by Council for Geoscience (other
than minor clerical matters), the Bidders must promptly notify Council for Geoscience in
writing of such discrepancy, ambiguity, error or inconsistency in order to afford Council for
Geoscience an opportunity to consider what corrective action is necessary (if any).
7.7. Any actual discrepancy, ambiguity, error or inconsistency in the bid or any other information
provided by Council for Geoscience will, if possible, be corrected and provided to all Bidders
without attribution to the Bidders who provided the written notice.
7.8. All persons (including Bidders) obtaining or receiving the bid and any other information in
connection with the Bid, or the Tendering process must keep the contents of the Bid and other
such information confidential and not disclose or use the information except as required for
the purpose of developing a proposal in response to this Bid.
Bids received after the closing date and time, at the address indicated in the bid documents, will
not be accepted for consideration and where practicable, be returned unopened to the Bidders.
CGS-TEM-2025-0839 Rev0 22 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
Bidders’ attention is drawn to the fact that amendments to any of the Bid Conditions or setting of
counter conditions by Bidders or qualifying any Bid Conditions will result in the invalidation of such
bids.
10.1. Government supports the spirit of broad-based black economic empowerment and
recognizes that real empowerment can only be achieved through individuals and businesses
conducting themselves in accordance with the Constitution and in an honest, fair, equitable,
transparent and legally compliant manner. It is against this background the Government
condemns any form of fronting.
10.2. The Government, in ensuring that Bidders conduct themselves in an honest manner will,
as part of the bid evaluation processes, conduct or initiate the necessary
enquiries/investigations to determine the accuracy of the representation made in bid
documents. Should any of the fronting indicators as contained in the Guidelines on Complex
Structures and Transactions and Fronting, issued by the Department of Trade and Industry,
be established during such enquiry / investigation, the onus will be on the Bidder / contractor
to prove that fronting does not exist. Failure to do so within a period of 14 days from date of
notification may invalidate the bid / contract and may also result in the restriction of the Bidder
/contractor conducting business with the public sector for a period not exceeding ten years, in
addition to any other remedies Council for Geoscience may have against the Bidder /
contractor concerned.
The Council for Geoscience reserves the right to conduct supplier due diligence prior to the final
award or at any time during the contract period. This may include site visits and requests for
additional information. The CGS reserves the right to verify any information supplied by the bidder
in the tender document and should the information be found to be false or incorrect, the CGS will
exercise any of the remedies available to it in the bid document. Reference letters will also be
authenticated.
Service providers may not be appointed or engaged for the provision of goods or services unless
a due diligence and vetting process has been completed to the satisfaction of the Council for
Geoscience. This process shall include, but is not limited to, verification of the supplier’s legal
status, financial stability, technical capability, quality assurance standards, compliance with ethical
and references from previous clients.
13.1. Bidders must submit two sealed envelopes/any form of packaging simultaneously, one
containing the technical proposal and the other the price proposal, enclosed together in an
outer single envelope/any form of packaging. (This is two-envelope bidding procedure)
13.2. Bid documents should be placed in the tender box at the aforesaid address on or before
the closing date and time (as specified above).
13.3. Bid documents will only be considered if received by Council for Geoscience before the
closing date and time, regardless of the method used to send or deliver such documents to
Council for Geoscience.
CGS-TEM-2025-0839 Rev0 23 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
13.4. The bidder must provide a unique reference number (e.g. binder/folio, chapter, section,
page) to locate substantiating evidence in the bid response for all stage of evaluations,
being, the administrative, mandatory, functionality and price & specific goals.
13.5. The bidders are required to submit three (3) copies of their submission (1) original and two
copies (2).
NB: Bidders are requested to initial each page of the tender document on the top right-hand corner.
Council for Geoscience may schedule presentations/demonstrations only with the short-listed
Bidders as part of the bid evaluation process.
CGS-TEM-2025-0839 Rev0 24 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
All tender applications will be evaluated according to the following approach:
a) Mandatory Evaluation Criteria
b) Functional Evaluation Criteria
c) Administrative Evaluation Criteria (to determine whether the documentation has been
completed correctly)
d) Price and Specific Goal
Council for Geoscience has set minimum standards (Gates) that a bidder needs to meet in order
to be evaluated and selected as a successful bidder. The minimum standards consist of the
following:
Mandatory Evaluation Functional Administrative Price and
Criteria (Gate 1) Evaluation Criteria Evaluation Criteria (Gate Specific Goal
(Gate 2) 3) Evaluation
(Gate 4)
Only bidders who Only bidders that met Only bidders that complied Price and
complied with all the the minimum with all the administrative Specific Goals.
mandatory threshold of 80 points requirements will be
requirements, will will be evaluated evaluated further
proceed to Gate 2. further.
The CGS retains the right not to award the tender to the lowest bidder.
15.1 Mandatory evaluation criteria
Bidders must submit all the requirements mentioned below, and failure to comply will lead to
disqualification:
Mandatory requirements comply not comply
Full contiguous spectral coverage of Tick comply and submit proof
VNIR and SWIR from 400 to 2500 nm
wavelengths.
Ground resolution of 3 m or better Tick comply and submit proof
(pixel resolution).
The VNIR spectral resolution must be Tick comply and submit proof
5 nm or better and the SWIR spectral
resolution should be 15 nm or better
CGS-TEM-2025-0839 Rev0 25 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
Collection of field spectra during the Tick comply and submit proof
surveys to provide ground truthing
using a spectroradiometer that
measure the full spectral coverage of
VNIR and SWIR from 400 to 2500
nm.
Calibration files Tick Comply (no proof
required)
Description of calibration procedure. Tick comply and submit proof
Cloud cover of less than 5% Tick Comply (no proof
required)
System-corrected raw data without Tick Comply (no proof
processing in ENVI-compatible required)
format.
Data with the following corrections: Tick Comply (no proof
Radiometric correction, Atmospheric required)
and geometric correction
GNSS/IMU integration shall provide Tick comply and submit proof
final geolocation accuracy better than
one ground pixel, with PDOP < 3 and
continuous tracking of at least 6
satellites.
Inter-band (spectral channel) co- Tick Comply (no proof
registration error shall not exceed 0.5 required)
pixel, ensuring spectral integrity
across the VNIR–SWIR range.
Solar elevation angle to be optimized Tick comply and submit proof
to minimize shadows, hotspots and
sun glint.
CGS-TEM-2025-0839 Rev0 26 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
Aircraft attitude with the following Tick Comply (no proof
specifications: Aircraft roll must be required)
less than ±3°.
less than ±2.5°.
less than ±4°.
Final survey and processing report. Tick Comply (no proof
required)
The contractor undertakes to have a Tick Comply (no proof
backup aircraft and instrumentation required)
system in the event the primary
system is not available.
The aircraft must be operated with Tick comply and submit proof
the following certificates:
Licence and
approved AOC (Air
operating certificate)
Maintenance
Organisation (AMO)
CGS-TEM-2025-0839 Rev0 27 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
15.2 Functional evaluation criteria
Item requirements points
NO:
1 25
The bidder must submit the CV of the Project Chief indicating
the number of years of experience in airborne hyperspectral
surveying.
experience in airborne hyperspectral surveying =25 points
in airborne hyperspectral surveying = 20 points
indicating less than 5 years of experience in airborne
hyperspectral surveying = 0 points
2 25
The bidder must submit the CV of the Processing Chief
indicating the number of years of experience in airborne
hyperspectral surveying.
experience in airborne hyperspectral surveying = 25 points
experience in airborne hyperspectral surveying = 20 points
indicating less than 2 years of experience in airborne
hyperspectral surveying = 0 points
3 25
The bidder must submit the CV of the Pilots indicating the
number of years of experience in airborne hyperspectral
surveying.
in airborne hyperspectral surveying = 25 points
airborne hyperspectral surveying = 20 points
No CV, irrelevant experience or CV of the Pilot(s) indicating
less than 2 years of experience in airborne hyperspectral
survey = 0 points
CGS-TEM-2025-0839 Rev0 28 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
4 25
The bidder must submit reference letters where the
hyperspectral survey was successfully completed.
Two or less reference letters = 0 points
Total points 100
The minimum threshold to be met is 80 points, and failure to comply will
lead to disqualification.
15.3 Administrative evaluation criteria
Document that must be Non-submission may result in disqualification
submitted
Invitation to Bid – SBD 1 YES Complete and sign the SBD1 form
Declaration of Interest – SBD 4 YES Complete and sign the SBD4 form
Preference Point Claim Form – YES Complete and sign the SBD6.1 form
Sbd 6.1
Supplier Database (CSD) provider on the Central Supplier Database (CSD). If
you are not registered, proceed to complete the
registration of your company prior to submitting your
proposal. Visit https://secure.csd.gov.za/ to obtain
your vendor number.
Submit proof of registration.
Joint Venture (if applicable) YES The JV agreement for JV partners must be submitted
indicating a percentage split up to 100% for partners
to render the agreement valid
compliant CSD report
Bidders who do not submit the requested administrative documents, will be given a maximum of 2
working/business days to submit, failure will render the bid response/submission as unacceptable,
and therefore be disqualified. This is with the exception of SBD 6.1 that must be completed
correctly with the original bid submission, and no submission or incomplete submission will result
in no scoring of points for specific goals.
Bidders who are not tax compliant will be afforded seven working days to correct none-compliance
in the CSD; failure will render the bid unacceptable and be disqualified. Bidders must submit proof
of tax compliance within the seven-day period, in line with Instruction note /18, section
4.2.
CGS-TEM-2025-0839 Rev0 29 Effective date: 30/11/2025
Request for proposal: appointment of a proposal NO.: CGS-2026-031F
Service provider for the provision of
Airborne hyperspectral surveys for the
Council for geoscience for a period of
Two (2) months.
15.4 Price and specific goals
80/20 preference point system will be applicable in this tender.
Stage 1 – Price Evaluation (80 Points)
Criteria Points
Price Evaluation
Pt − P min 20
Ps = 80 1 − P min
The following formula will be used to calculate the points for price, where:
Stage 2 – Specific Goals Evaluation (20) Points)
a. Specific Goals Points allocation
Specific Goals Number of Points
10 1. 51% or more black Ownership.
(Submit a valid certified Accredited SANAS or DTI B-BBEE certificate or
sworn affidavit as supporting document)
10 2. 30% or more black Women Ownership.
(Submit a valid certified Accredited SANAS or DTI B-BBEE certificate or
sworn affidavit as supporting document)
Specific goals points will only be allocated to bidders on submission of the following:
Affidavit.
b. Joint Ventures, Consortiums and Trusts
Bidders must submit concrete proof of the existence of joint ventures and/or consortium
arrangements. Council for Geoscience will accept signed agreements as acceptable proof of the
existence of a joint venture and/or consortium arrangement.
The joint venture and/or consortium agreements must clearly set out the roles and responsibilities
of the Lead Partner and the joint venture and/or consortium party. The agreement must also clearly
CGS-TEM-2025-0839 Rev0 30 Effective date: 30/11/2025
Quality Management
Source: TENDER DOCUMENT CGS-2026-031F.pdfreceived in the Bids or to negotiate further with one or more Bidder(s).
Should CGS consider it necessary, the Bidder(s) shall agree to an
inspection of the resources and works of the Bidder, if so required?
within the above specifications. Re-flown segments must always be attached to at least two
tie lines.
3.5 Equipment testing and calibration
3.5.1 Tests
files containing line data and any maps produced for the sake of own quality control. The
final data delivery shall also contain the corrected data produced by the Contractor.
information communicated to or provided to Bidders during the bidding process is, or will be,
accurate, current or complete. Council for Geoscience and its employees and advisors will
not be liable with respect to any information communicated which may not accurate, current
or complete.
7.6. If Bidders finds or reasonably believes it has found any discrepancy, ambiguity, error or
inconsistency in this bid or any other information provided by Council for Geoscience (other
than minor clerical matters), the Bidders must promptly notify Council for Geoscience in
writing of such discrepancy, ambiguity, error or inconsistency in order to afford Council for
Geoscience an opportunity to consider what corrective action is necessary (if any).
7.7. Any actual discrepancy, ambiguity, error or inconsistency in the bid or any other information
provided by Council for Geoscience will, if possible, be corrected and provided to all Bidders
without attribution to the Bidders who provided the written notice.
7.8. All persons (including Bidders) obtaining or receiving the bid and any other information in
connection with the Bid, or the Tendering process must keep the contents of the Bid and other
such information confidential and not disclose or use the information except as required for
the purpose of developing a proposal in response to this Bid.
a due diligence and vetting process has been completed to the satisfaction of the Council for
Geoscience. This process shall include, but is not limited to, verification of the supplier’s legal
status, financial stability, technical capability, quality assurance standards, compliance with ethical
and references from previous clients.
Compliance Requirements
Source: TENDER DOCUMENT CGS-2026-031F.pdf (RFP)tax compliance proof in
Tax Compliance Status Pin from SARS
tax compliance proof in terms of practice note /2018
Tax compliance status system pin code from the south
Tax compliance requirements
tax compliance status (TCS) pin may be made via e-filing through the SARS
Tax Compliance status requirements are also applicable to foreign bidders /
tax compliance status and by submitting this bid such confirmation is deemed
tax compliance status through the Central
tax compliance status will be verified through the
tax compliance within the seven-day period, in line with Instruction note /18, section
TCS pin is available, but the Bidder is registered on the Central Supplier Database
CSD Report)
CSD number
CSD number must be provided
CSD report
Central Supplier Database
Central Supplier Database and the
Central Supplier Database and their tax compliance status will be verified through the
Central Supplier Database (CSD)
joint venture agreement
power of attorney to sign the bid document on behalf of the JV
Documents may lead to disqualification.
SBD 1. Invitation to Bid
Bidders must provide proof of Tax Clearance compliance from SARS; The
Council for Geoscience (CGS) will verify your tax compliance proof in
SBD 4. Declaration of interest
SBD 6.1. Preference points
Supplier application form (CSD Report)
Latest Original Certified copies of company registration certificate
Points Allocation: 80 points
B-BBEE Details: n this tender.
Stage 1 – Price Evaluation (80 Points)
Criteria Points
Price Evaluation
Pt − P min 20
Ps = 80 1 − P min
The following formula will be used to calculate the points for price, where:
Stage 2 – Specific Goals Evaluation (20) Points)
a. Specific Goals Points allocation
Specific Goals Number of Points
10 1. 51% or more black Ownership.
(Submit a valid certified Accredited SANAS or DTI B-BBEE certificate or
sworn affidavit as supporting document)
10 2. 30% or more black Women Ownership.
(Submit a valid certified Accredited SANAS or DTI B-BBEE certificate or
sworn affidavit as supporting document)
Specific goals points will only be allocated to bidders on submission of the following:
Affidavit.
b. Joint Ventures, Consortiums and Trusts
Bidders must submit concrete proof of the existence of joint ventures and/or consortium
arrangements. Council for Geoscience will accept signed agreements as acceptable proof of the
existence of a joint venture and/or consortium arrangement.
The joint venture and/or consortium agreements must clearly set out the roles and responsibilities
of the Lead Partner and the joint venture and/or consortium party. The agreement must also clearly
CGS-TEM-2025-0839 Rev0 30 Effective date: 30/11/2025
Section
Source: TENDER DOCUMENT CGS-2026-031F.pdfSpecific goals points will be allocated on submission of required documents. For functionality, bidders must provide reference letters for successfully completed hyperspectral surveys: five or more references = 25 points, three references = fewer points. Each reference must have a unique reference number. The contract will be awarded based on the 80/20 preference point system (if applicable) or as per the tender's specific goals allocation.
Description
Source: PRICING_SCHEDULE (Final) (003).pdfThe service provider will be appointed for a period of two (2) months to conduct airborne hyperspectral surveys. The work is divided into two price schedules: Price Schedule 1 for Vioolsdrif and Price Schedule 2 for Springbok. Each schedule covers survey flight, aircraft mobilisation, and hyperspectral capture and data over 5,000 km². A stand-by daily rate must be priced but will not be used for evaluation.
Important Dates
Source: PRICING_SCHEDULE (Final) (003).pdf (unknown)Closing date: 12 October 2026. Closing time: 11h00. Contract period: two (2) months.
Contact Information
Source: PRICING_SCHEDULE (Final) (003).pdf (unknown){"name":null,"email":"[email protected]","phone":null,"department":"OF QUANTITY UNIT COST AMOUNT VAT","address":"280 Pretoria Street, Silverton, Pretoria"}
Submission Guidelines
Source: PRICING_SCHEDULE (Final) (003).pdf (unknown)Bids must be submitted before the closing time of 11h00 on 12 October 2026. The pricing schedule must be fully priced; failure to price all items will lead to disqualification. The stand-by item must be priced but will not be used for evaluation purposes. Arithmetic errors will be corrected: if there is a gross misplacement of the decimal point in a unit rate, the line-item total governs and the unit rate is corrected; if there is an error in the addition of prices, the total of the prices governs and the service provider will be asked to revise selected item prices to achieve the total quoted price. No bidder will be offered a competitive advantage to change total quoted prices after closing. Returnable documents include the completed pricing schedules (Price Schedule 1 for Vioolsdrif and Price Schedule 2 for Springbok) and the signed pricing schedule cover page.
Evaluation Criteria
Source: PRICING_SCHEDULE (Final) (003).pdf (unknown)No specific eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level, or CIDB grading) are stated. Evaluation will be based on the total priced amount for Price Schedules 1 and 2, with the stand-by item excluded from evaluation. All items must be priced; failure to price any item leads to disqualification.
Technical Specifications
Source: PRICING_SCHEDULE (Final) (003).pdf (unknown)Inclusive
Measure
Survey Flight KM2 620 R R
Aircraft mobilisation KM2 620 R R
Hyperspectral capture KM2 620 R R
and data
Any other costs if SUM 1 R R
applicable (Specify)
Pricing Schedule
Source: PRICING_SCHEDULE (Final) (003).pdfGeoscience for a period of two (2) months.
Name of service provider:...................................................................
Closing date: 12 october 2026
Closing time: 11h00
Price Schedule 1 for Vioolsdrif
R ❖ (All items must be priced and failure to comply will lead to
disqualification)
Price Schedule 2 for Springbok
Total price for Price schedule 1 R
Total price for Price schedule 2 R
the product or services of the unit rate and quantity, the line-item total shall govern, and
rate shall be corrected. Where there is obviously gross misplacement of the decimals
point in the unit rate, the line-item total as quoted shall govern and the unit rate shall
be corrected.
by the checking process or in the bids addition of prices, the total of the prices shall
govern, and the service provider will be asked to revise selected item prices to achieve
the total quoted price.
the closing of the bid
.................................... .....................................................
Financial Requirements
Source: PRICING_SCHEDULE (Final) (003).pdf (unknown)Bidders must provide a total price for Price Schedule 1 (Vioolsdrif) and Price Schedule 2 (Springbok), with a grand total VAT inclusive. All items must be priced; failure to comply leads to disqualification. The stand-by item must be priced but will not be used for evaluation purposes. Pricing must be in South African Rand (R).
Compliance Requirements
Source: PRICING_SCHEDULE (Final) (003).pdf (unknown)No specific requirements found
Section
Source: PRICING_SCHEDULE (Final) (003).pdfThe stand-by item will not be used for evaluation purposes, but it must be priced. All items must be priced; failure to comply leads to disqualification. The total price for Price Schedule 1 and Price Schedule 2 will be used for evaluation.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Council for Geoscience, 280 Pretoria Street Silverton Pretoria - Silverton - Pretoria - 0184
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
14 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other professional, scientific and technical activities. Unlock full pricing strategies, bid frequency, and historical win rates.