Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Airports Company South Africa (ACSA)Location
Northern Cape
Closing Date
15 Oct 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Diedricks Street - Upington - Upington - 8801
Organization Type
GOVERNMENT
Published
15 Sept 2026
OCDS Reference
ocds-9t57fa-170364
This tender is for the supply, installation, testing and commissioning of new mechanical gates and electric motors at upington international airport, under an nec3 engineering and construction short contract. The contract is between the airports company south africa soc limited (acsa) and the successful bidder. Key commercial terms include delay damages of 0.05% Per day up to a maximum of 10% of the contract value, retention of 5% of the contract value, and interest on late payment at nedbank's prime lending rate. The contractor must provide a programme within 14 days of award, and the project manager requires employer consent for changes to design, scope, or works information that are 5% or more, or for completion date extensions beyond 30 days. The contractor must comply with the occupational health and safety act, including appointing a mandatary under section 16.2. Pricing is submitted on the ecsc3 price list with sections a to d, plus a 10% contingency and 15% VAT. NO BBBEE or preferencing scheme applies. The contractor must source insurance cover as specified in part c1.3, With deductibles per acsa's insurance requirements.
Bidders must submit a fully completed NEC3 Engineering and Construction Short Contract (ECSC) including the Schedule of Deviations, if any, and the Contractor's Offer data.
Bidders must complete the ECSC3 Price List (Part C2.2) with sections A to D, add a 10% contingency and 15% VAT, and state the offered total price excluding VAT in words.
The contractor must submit a programme for approval within 14 days of contract award, including details of working hours, labour and plant resources, and traffic and construction accommodation proposals.
The contractor must comply with the Occupational Health and Safety Act, including appointing a mandatary under Section 16.2 who is eligible to sign the Mandatary Agreement.
The contractor must obtain insurance cover as specified in Part C1.3, with deductibles per ACSA's insurance requirements, and assist ACSA in complying with relevant regulations.
The contractor must not cede, delegate or assign any rights or obligations without the employer's written consent, and must notify the project manager of the key person with authority to bind the contractor within 1 week of the contract date.
The project manager requires the employer's written consent for any action resulting in a change to design, scope, or works information of 5% or more, or for a completion date extension exceeding 30 days.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 15 October 2026 - 14:00
Venue
Upington International Airport Boardroom,Diedricks Street Upington Northern Cape South Africa 8801
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Quotation
Diedricks Street - Upington - Upington - 8801
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: RFQ 7710 Request for bids of supply, installation, testing and commissioning of new mechanical gates and electric motoes at Upington Airport (2).pdf. You don’t need to refresh — this page will pick up the updated review automatically.
15 Sept
2026
Tender Published
Tender was published
15 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC- UTN 7710 Mechanical Gates Replacement (2).pdf
No summary available
RFQ 7710 Request for bids of supply, installation, testing and commissioning of new mechanical gates and electric motoes at Upington Airport (2).pdf
Airports Company South Africa is procuring the supply, installation, testing and commissioning of new mechanical gates and electric motors at Upington International Airport. The contract covers industrial gates (minimum 6 m length, 2 m height) and battery-operated gate motors, with a compulsory briefing and site inspection.
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 230 000
Range
Based on CIDB grading. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: NEC- UTN 7710 Mechanical Gates Replacement (2).pdfThe contract requires the successful bidder to obtain aviation liability insurance with an indemnity limit of at least R300,000 and provide proof of that cover to ACSA before commencing work. The contract also incorporates the NEC3 Engineering and Construction Short Contract (April 2013) and its guidance notes, with the works governed by the Employer's standard terms.
Important Dates
Source: NEC- UTN 7710 Mechanical Gates Replacement (2).pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"e Motors with Industrial Heavy Duty Gate Motors (2x 7.2Ah 12V","is_compulsory":false}"}
Contact Information
Source: NEC- UTN 7710 Mechanical Gates Replacement (2).pdf (unknown){"name":null,"email":"[email protected]","phone":"021 937 1200","department":null,"address":"e conditions of contract identified"}
Evaluation Criteria
Source: NEC- UTN 7710 Mechanical Gates Replacement (2).pdf (unknown)No eligibility criteria specified
Technical Specifications
Source: NEC- UTN 7710 Mechanical Gates Replacement (2).pdf (unknown)Upington Airport has multiple entrances and access gates providing entry to its premises and operational
yards. A condition assessment has revealed that the majority of the installed gate motors are either non-
operational or functioning inadequately. The motors that remain operational exhibit significantly reduced
opening and closing speeds, while several units have deteriorated due to the absence of a structured
preventive maintenance programme.
In addition, both the gate motors and some gate structures are in a poor state of repair. This condition
compromises the effectiveness of the airport’s security and access control systems, increasing the risk of
unauthorized access and security breaches. Consequently, the current state of the access gates may
result in non-compliance with aviation security requirements, including the security principles and access
control measures prescribed under ICAO Annex 17.
It is therefore recommended that the gate motors and associated gate infrastructure be repaired,
refurbished, or replaced as a matter of priority, and that a preventative maintenance programme be
implemented to ensure reliable operation, regulatory compliance, and the integrity of airport security.
Goal
To restore and upgrade the functionality, reliability, and security of all access gates and gate motors at
Upington Airport, ensuring effective access control, compliance with ICAO Annex 17 requirements, and
the protection of airport infrastructure, personnel, and operations.
Objectives
a) Assess Existing Infrastructure
o Conduct a comprehensive condition assessment of all gate motors, gates, control systems,
and associated electrical installations.
b) Repair and Replace Defective Equipment
o Repair serviceable gate motors and replace units that are beyond economical repair.
o Repair or replace damaged gate structures and supporting hardware.
c) Improve Access Control and Security
o Ensure all access gates operate reliably and provide controlled access to authorized
personnel and vehicles only.
o Reduce the risk of unauthorized entry and security breaches.
d) Enhance Operational Efficiency
o Improve gate opening and closing speeds to support efficient traffic flow and operational
activities.
o Minimize downtime caused by equipment failures.
e) Ensure Regulatory Compliance
o Align access control infrastructure with ICAO Annex 17 requirements and applicable airport
security standards.
o Address audit findings and security vulnerabilities related to perimeter access control.
f) Implement a Preventive Maintenance Programme
o Establish routine inspection, servicing, and maintenance schedules for all gate motors and
gate systems.
o Maintain accurate maintenance records and asset histories.
Confidential
Part c2: pricing data c2.2 Ecsc3 price list
Confidential
g) Improve Asset Reliability and Lifecycle
o Extend the service life of gate motors and gate infrastructure through proper maintenance
and timely interventions.
o Reduce long-term maintenance costs and emergency repairs.
h) Strengthen Airport Security Posture
o Ensure continuous availability and functionality of all critical access points.
o Support safe and secure airport operations through reliable perimeter and access control
systems.
a. Install new gate and motor at Entrance to Airside via the Fuel Depot, that complies with
ACSA perimeter fence specification
frame, with minimum 100 x 60 mm x 2 mm base rail. Minimum 2 x 100mm
Diameter nylon caster wheels with 12 mm diameter high tensile steel bolt and
bush sleeve.
controlled industrial type of motor. Beams sensors to be provided if
electronically controlled to prevent collision of gate with passing vehicle.
ensure all drillings and fixings to be manufactured prior to hot dip galvanizing
process.
50mm.
Security Fence Specification, to be provided to bidders who attended the
briefing session as an addendum.
b. Replace existing Gate Motors with Industrial Heavy Duty Gate Motors (2x 7.2Ah 12V
batteries)
Confidential
Part c2: pricing data c2.2 Ecsc3 price list
Confidential
Work Requirements
Title Date or Tick if publicly
revision available
General Specifications:
ICAO Annex 17 – Aviation Security requirements
South African Civil Aviation Regulations (SACARs).
Airports Company South Africa (ACSA) security standards and
specifications where applicable.
Occupational Health and Safety Act (Act )
SANS standards for electrical installations and motorized
gates.
Local municipal electrical and building regulations.
7.1 Meetings
Regular meetings of a general shall be convened and chaired by the designated person as shown in the table
below.
Approximate Time &
Title and Purpose Location Chairperson Required Attendance
Interval
Kick-off Meeting 90 minutes UPN Offices Project Manager - SCM
strategy and agree timelines confirmed with the - The Contractor
meeting request)
Construction Progress 60 minutes UPN Offices The Contractor - The Project Manager
approved programme confirmed with the
issues
performance
Risk Reduction 60 minutes UPN Offices Project Manager - The Project Manager
identified risks that can have confirmed with the
an impact on project meeting request)
execution.
Compensation Events As and when required UPN Offices Project Manager - The Project Manager
events that the Contractor has confirmed with the
submitted meeting request)
Part c3: scope of work c3.1 Ecsc3 works information
Confidential
Confidential
7.2 Use of standard forms
All NEC forms shall be used as stipulated in the NEC 3 clauses.
7.3 Invoicing and payment
In terms of core clause 50 the Contractor assesses the amount due and applies to the Employer for payment.
The Contractor applies for payment with a tax invoice addressed to the Employer as follows:
The Contractor includes the following information on each tax invoice:
the VAT and including VAT;
The Contractor attaches the detail assessment of the amount due to each tax invoice showing the Price for
Work Done to Date for each item in the Price List for work which he has completed.
The invoice to be submitted electronically via an e-mail to [email protected]
7.4 Records of Defined Cost
In order to substantiate the Defined Cost of compensation events, the Employer may require the Contractor to
keep records of amounts paid by him for people employed by the Contractor, Plant and Materials, work
subcontracted by the Contractor and Equipment. [See clause 11.2(5) and 63.2]. State in what form these
records are to be kept and how accessed by the Employer.
7.5 BBBEE and Preferencing scheme
None
7.6 Facilities to be provided by the Contractor
None
7.7 Title to material
The Contractor shall notify the Project Manager in writing regarding all material and equipment that is to be
removed from site as a result of this project and no equipment shall be removed offsite without prior approval.
7.8 Design by the Contractor
None
Part c3: scope of work c3.1 Ecsc3 works information
Confidential
Confidential
The Contractor is required to submit a program for approval within 14 days of the award of this contract.
This program shall be subject to discussion and review by the Project Manager prior to acceptance.
The Contractor’s proposed construction program shall be in the form of a bar chart (Gantt chart) or any
other time-activity form acceptable to the Project Manager. The program shall clearly show:
(i) The proposed rate of progress in order to complete the Works within the required period as
tendered, showing the various activities, their durations and proposed resourcing levels (major
plant and labour) for each element of the Works. Sufficient detail shall be provided to enable
the Project Manager to be able to gauge construction progress. All activities, including
establishment on site, trimming and finishing and the completion of all minor ancillary works
are to be included in the program.
(ii) The sequence of activities and any dependencies (time or resource related) between them.
(iii) The critical path activities.
(iv) Key dates in respect of work to be carried out, or information, etc., to be provided, by others.
(v) The anticipated value of work to be done during each month.
(vi) Other information specifically required by the Project Manager.
When drawing up his programme, the Contractor shall, inter alia, take into consideration and make
allowance for:
(i) Expected weather conditions and its effects.
(ii) Known physical conditions or artificial obstructions.
(iii) Obtaining permits for all workers and staff, vehicle permits, vehicle operating permits for
drivers and operators and radio operators.
(iv) The accommodation and safeguarding of public and traffic.
(v) Dealing with, altering and installing services.
(vi) The reasonable requirements and programmes of the Employer.
(vii) All other actions required in terms of this contract.
The following details shall be submitted together with the programme.
(i) The number of working hours per day, working days per week, assumed holiday or shut down
periods on which the programme is based.
(ii) The overall labour and major plant resource levels on which the programme is based.
(iii) The detailed traffic and construction plant accommodation proposals on which the programme
is based.
The Contractor shall base its initial programme of work on the scope of the work as described in the project
specification and the schedule of quantities. This programme shall be reviewed on a regular basis by the
Contractor in accordance with changing circumstances, delays and amendments to the work ordered by
the Engineer as a result of further examinations made by the Project Manager.
Minor revisions to the approved program may be introduced from time to time by mutual agreement
between the Employer, the Contractor. Should the Project Manager believe that a major revision of the
program is required, the Contractor will be notified in writing and a revised program shall be submitted
within two weeks of receipt of such notification.
Part c3: scope of work c3.1 Ecsc3 works information
Confidential
Confidential
It should be noted that it is in the Contractor’s interest to provide a comprehensive program giving as much
information as possible about the times allowed for the various activities as well as resources or other
limitations affecting the program, since the approved program may be used to evaluate any claims in terms
of the general conditions of contract for extensions of time.
a. The Employer will make available a potable water connection for domestic purposes only. The
Contractor shall supply all connections and distribution pipes as necessary plus a meter and shall bear
all costs in connection therewith. The Contractor will bear the cost of water consumed.
The Contractor shall make his own arrangements for his construction water supply requirements as
necessary and bear all costs in connection therewith.
b. The Employer will only be able to make a single phase, 220 volts, power supply available to the
Contractor for domestic purposes. The contractor shall be liable for all costs associated with
transferring power to the required locations, the provision of a meter and the cost of power consumed.
The Contractor shall make his own arrangements for his construction power supply requirements as
necessary and bear all costs in connection therewith.
c. A suitable area will be made available to the Contractor for his camp. The Contractor shall provide a
suitable fence around his camp in order to define its boundaries clearly.
Part c3: scope of work c3.1 Ecsc3 works information
Confidential
Confidential
Part C4: Site Information
C4.1: Information about the site at time of tender which may affect the work in this contract
all personnel who will forming part of staff that will be executing the works shall attend Airside Induction
Training.
breathalyser test will be removed from site and no access will be granted again.
Description of the Site and its surroundings
The site comprises a fully operational airport with multiple vehicular and pedestrian access points serving
landside, airside, maintenance, operational and security-controlled areas. The works include access gates
located throughout the airport precinct, including perimeter and restricted access areas. Upington Airport will
remain operational throughout the duration of the contract. Access to the work areas shall be coordinated with
Airport Management and Airport Security. The Contractor shall ensure that airport operations, security,
emergency access routes, and operational activities are not adversely affected by the Works. Access gates
may need to remain operational during construction, requiring phased implementation or temporary access
arrangements.
The airport is a security-sensitive facility. Personnel, vehicles and equipment entering the airport shall comply
with airport security procedures. Access to restricted and airside areas shall be subject to approval by Airport
Management. The Contractor shall comply with ICAO Annex 17 Aviation Security requirements, SACAA
regulations and airport security procedures.
The Contractor is deemed to have allowed for the following site conditions:
Existing electrical supplies and access control services are available at certain gate locations. The Contractor
shall verify the condition and suitability of existing services before connecting any new equipment.
Normal working hours shall be agreed with the Project Manager and Airport Management. Any work affecting
airport operations or security-critical infrastructure may be restricted to specific times as directed by the
Employer.
Part c4: site information c4.1 Site information
Confidential
Methodology
Source: NEC- UTN 7710 Mechanical Gates Replacement (2).pdf (unknown)The works information includes requirements for the use of standard forms as stipulated in NEC3 clauses, and states that the approved program may be used to evaluate any claims. The contractor must conduct a comprehensive condition assessment of all gate motors, gates, control systems, and ensure continuous availability and functionality of all critical access points.
Quality Management
Source: NEC- UTN 7710 Mechanical Gates Replacement (2).pdfProject name and number : mechanical gates replacement
: Utn 7710
Title of project: supply, installation, testing and commissioning of new
(Registration Number : 1993/004149/30)
and ....................................................................
(Registration Number: .......................................)
for SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF
procurement of service provider for the supply, installation, testing and commissioning of new
mechanical gates and electric motors at Upington international Airport.
A1 Site establishment & preliminaries Item 1
A2 Sliding gate fabrication & installation No. 1
A3 Nylon caster wheels No. 2
A4 Track rail metres 8
A5 Guide rollers & stops Item 1
A6 Hot dip galvanizing Item 1
A7 Security features Item 1
A8 Vandal-proof fixings Item 1
A9 Civil works Item 1
A10 Gate motor No. 1
A11 Battery backup Set 1
A12 Beam sensors Set 1
A13 Electrical works Item 1
A14 Testing & commissioning Item 1
B1.1 Gate motors supply No. 10
B1.2 Battery backup Set 10
B2.1 Remove existing motors No. 10
B2.2 Install motors No. 10
B2.3 Electrical connections No. 10
B2.4 Calibration No. 10
B2.5 Testing motors No. 10
Part c2: pricing data c2.2 Ecsc3 price list
Pricing Schedule
Source: NEC- UTN 7710 Mechanical Gates Replacement (2).pdfContents: No of pages
Part C1 Agreements & Contract Data 18
Part C2 Pricing Data 4
Part C3 Works Information 14
Part C4 Site Information 2
of 27
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Works Information
Part C4 Site Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above listed
Part c2: pricing data c2.2 Ecsc3 price list
Hereinafter referred to as “the Mandatary/ Principal Contractor”
Part c2: pricing data c2.2 Ecsc3 price list
Part c2: pricing data c2.2 Ecsc3 price list
C2 pricing data
C2.1 Pricing Assumptions
Part c2: pricing data c2.2 Ecsc3 price list
Part c2: pricing data c2.2 Ecsc3 price list
Part c2: pricing data c2.2 Ecsc3 price list
Compliance Requirements
Source: NEC- UTN 7710 Mechanical Gates Replacement (2).pdf (unknown)Z15.1 The Contractor shall be expected to annually present a compliant BEE and Tax Clearance Certificate. Failure to do adhere to these requirements shall be considered a material breach of the conditions of this Contract, the sanction for which may be a cancellation of this Contract. Z16 Communication Z16.1 Add a new Core Clause 14.5 and 14.6 to read as follows: The Project Manager requires the written consent of the Employer if an action will result in a change to the design, scope, and Works information that is 5% or more Z16.2 The Project Manager requires the written consent of the Employer if an action will result in the Completion Date being extended by more than 30 days. Z17 Delegation As stipulated by Section 37(2) of the Occupational Health and Safety Act No. as amended the Contractor agrees to the following: Z17.1 As part of this contract the Contractor acknowledge that it (mandatory) is an employer in its own right with duties as prescribed in the Occupational Health and Safety Act No as amended and agree to ensure that all work being performed, or Equipment, Plant and Materials being used, are in accordance with the provisions of the said Act, and in particular with regard to the Construction Regulations Confidential Confidential Data provided by the Contractor (the Contractor’s Offer) The tendering contractor is advised to read both the NEC3 Engineering and Construction Short Contract (April, 2013) and the relevant parts of its Guidance Notes in order to understand the implications of this Data which the tenderer is required to complete. An example of the completed Data is provided on of the ECSC3 Guidance Notes. Completion of the data in full is essential to create a complete contract. 10.1 The Contractor is (Name): Address Tel No. Fax No. E-mail address 63.2 The percentage for overheads and profit added to the Defined Cost for people is % 63.2 The percentage for overheads and profit added to other Defined Cost is % 11.2(9) The Price List is in The document called ‘Price List’ in Part C2.2 of this contract. 11.2(10) The offered total of the Prices is R ............................ (excluding VAT) ............................................................ .............................. in words (excluding VAT) Confidential Confidential PART C1.3 INSURANCE INSURANCE CLAUSES FOR CAPEX PROJECTS The successful bidder must source the following insurance cover, which is the deductible in the ACSA insurance cover
Aviation liability insurance cover for an indemnity limit not less than R300 000 (three hundred thousand rands).
Submit proof of insurance to ACSA before the work starts, and annually for the duration of the project. C1.4 OCCUPATIONAL HEALTH AND SAFETY AGREEMENT OCCUPATIONAL HEALTH AND SAFETY AGREEMENT AGREEMENT IN TERMS OF SECTION 37(2) OF THE OCCUPATIONAL HEALTH & SAFETY ACT (ACT ) & CONSTRUCTION REGULATION 5.1(k) OBJECTIVES To assist Airport Company South Africa (ACSA) in order to comply with the requirements of
The Occupational Health & Safety (Act )and its regulations and
The Compensation for Occupational Injuries & Diseases Act (Act ) also known as the (COID Act). To this end an Agreement must be concluded before any contractor/ subcontracted work may commence The parties to this Agreement are: Name of Organisation: AIRPORTS COMPANY SOUTH AFRICA UPINGTON INTERNATIONAL AIRPORT Physical Address: Airports Company South Africa SOC Limited Upington International Airport Diedricks Street Upington Northern Cape South Africa 8801 Hereinafter referred to as “Client” Name of organisation: Physical Address: PART C2: PRICING DATA C2.2 ECSC3 PRICE LIST Confidential Confidential Hereinafter referred to as “the Mandatary/ Principal Contractor” PART C2: PRICING DATA C2.2 ECSC3 PRICE LIST Confidential Confidential MANDATORY’S MAIN SCOPE OF WORK GENERAL INFORMATION FORMING PART OF THIS AGREEMENT
The Occupational Health & Safety Act comprises of SECTION 1-50 and all unrepealed REGULATIONS promulgated in terms of the former Machinery and Occupational Safety Act No. as amended as well as other REGULATIONS which may be promulgated in terms of the Act and other relevant Acts pertaining to the job in hand.
“Mandatary” is defined as including as agent, a principal contractor or a contractor for work, but WITHOUT DEROGATING FROM HIS/HER STATUS IN HIS/HER RIGHT AS AN EMPLOYER or user of the plant
Section 37 of the Occupational Health & Safety Act potentially punishes Employers (PRINCIPAL CONTRACTOR) for unlawful acts or omissions of Mandataries (CONTRACTORS) save where a Written Agreement between the parties has been concluded containing arrangements and procedures to ensure compliance with the said Act BY THE MANDATARY.
All documents attached or refer to in the above Agreement form an integral part of the Agreement.
To perform in terms of this agreement Mandatories must be familiar and conversant with the relevant provisions of the Occupational Health & Safety Act (OHS Act) and applicable Regulations.
Mandatories who utilise the services of their own Mandatories (contractors) must conclude a similar Written Agreement with them.
Be advised that this Agreement places the onus on the Mandatary to contact the CLIENT in the event of inability to perform as per this Agreement.
This Agreement shall be binding for all work the Mandatary undertakes for the client.
All documentation according to the Safety checklist including a copy of the written Construction Manager appointment in terms of construction regulation 8, must be submitted 7 days before work commences. THE UNDERTAKING The Mandatary undertakes to comply with: INSURANCE
The Mandatary warrants that all their employees and/or their contractor’s employees if any are covered in terms of the COID Act, which shall remain in force whilst any such employees are present on the Client’s premises. A letter is required prior commencing any work on site confirming that the Principal contractor or contractor is in good standing with the Compensation Fund or Licensed Insurer.
The Mandatary warrants that they are in possession of the following insurance cover, which cover shall remain in force whilst they and /or their employees are present on the Client’s premises, or which shall remain in force for that duration of their contractual relationship with the Client, whichever period is the longest.
Public Liability Insurance Cover as required by the Subcontract Agreement.
Any other Insurance cover that will adequately makes provision for any possible losses and/or claims arising from their and /or their Subcontractors and/or their respective employee’s acts and/or omissions on the Client’s premises. PART C2: PRICING DATA C2.2 ECSC3 PRICE LIST Confidential Confidential COMPLIANCE WITH THE OCCUPATIONAL HEALTH & SAFETY ACT The Mandatary undertakes to ensure that they and/or their subcontractors if any and/or their respective employees will at all times comply with the following conditions
All work performed by the Mandatary on the Client’s premises must be performed under the close supervision of the Mandatary’s employees who are to be trained to understand the hazards associated with any work that the Mandatary performs on the Client’s premises.
The Mandatary shall be assigned the responsibility in terms of Section 16(1) of the OHSAct , if the Mandatary assigns any duty in terms of Section 16(2), a copy of such written assignment shall immediately be forwarded to the Client.
The Mandatary shall ensure that he/she familiarise himself/herself with the requirements of the OHSAct and that s/he and his/her employees and any of his subcontractors comply with the requirements.
The Mandatary shall ensure that a baseline risk assessment is performed by a competent person before commencement of any work in the Client’s premises. A baseline risk assessment document will include identification of hazards and risk, analysis and evaluation of the risks and hazards identified, a documented plan and safe work procedures to mitigate, reduce or control the risks identified, and a monitoring and review plan of the risks and hazards.
The Mandatary shall appoint competent persons who shall be trained on any Occupational Health & Safety aspect pertaining to them or to the work that is to be performed.
The Mandatary shall ensure that discipline regarding Occupational Health & Safety shall be strictly enforced.
Any personal protective equipment required shall be issued by the Mandatary to his/her employees and shall be worn at all times.
Written safe working practices/procedures and precautionary measures shall be made available and enforced and all employees shall be made conversant with the contents of these practises.
No unsafe equipment/machinery and/or articles shall be used by the Mandatary or contractor on the Client’s premises.
All incidents/accidents referred to in OHSAct shall be reported by the Mandatary to the Provincial Director: Department of Labour as well as to the Client.
No user shall be made by the Mandatary and/or their employees and or their subcontractors of any of the Client’s machinery/article/substance/plant/personal protective equipment without prior written approval.
The Mandatary shall ensure that work for which the issuing of permit is required shall not be performed prior to the obtaining of a duty completed approved permit.
B-BBEE Details: o appoints an Arbitrator Mr. Sam Amod Gauteng [email protected]
listed in the Panel of
Arbitrators below Adv. Sias Ryneke Gauteng 083 653 2281
a
Mr. Emeka Ogbugo Pretoria +27 12 349 2027
(Quantity Surveyor) [email protected]
Z14 Notification of a compensation event
Z14.1 Delete “eight weeks” in clause 61.3 and replace with “four weeks”. Delete the words “unless the
event arises from the Project Manager or the Supervisor giving an instruction, issuing a certificate,
changing an earlier decision or correcting an assumption.
Confidential
Confidential
Z15 BBBEE and Tax Clearance
Certificates
Z15.1 The Contractor shall be expected to annually present a compliant BEE and Tax Clearance
Certificate. Failure to do adhere to these requirements shall be considered a material breach of
the conditions of this Contract, the sanction for which may be a cancellation of this Contract.
Z16 Communication
Z16.1 Add a new Core Clause 14.5 and 14.6 to read as follows:
The Project Manager requires the written consent of the Employer if an action will result in a
change to the design, scope, and Works information that is 5% or more
Z16.2 The Project Manager requires the written consent of the Employer if an action will result in the
Completion Date being extended by more than 30 days.
Z17 Delegation
As stipulated by Section 37(2) of the Occupational Health and Safety Act No. as
amended the Contractor agrees to the following:
Z17.1 As part of this contract the Contractor acknowledge that it (mandatory) is an employer in its own
right with duties as prescribed in the Occupational Health and Safety Act No as
amended and agree to ensure that all work being performed, or Equipment, Plant and Materials
being used, are in accordance with the
Health & Safety
Source: NEC- UTN 7710 Mechanical Gates Replacement (2).pdfthe Project Manager, the Supervisor, or the Adjudicator does not constitute a waiver of rights, and
does not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement
in writing.
Z3 Other responsibilities:
Z4 Extending the defects date:
Add the following as a new clause 42.5:
Z4.1 If the Employer cannot use the works due to a Defect, which arises after Completion and before the
defects date, the defects date is delayed by a period equal to that during which the Employer, due
to a Defect, is unable to use the works.
Z4.2 If part of the works is replaced due to a Defect arising after Completion and before the defects date,
the defects date for the part of the works which is replaced is delayed by a period equal to that
between Completion and the date by when the part has been replaced.
Z4.3 The Project Manager notifies the Contractor of the change to a defect date when the delay occurs.
change to the design, scope, and Works information that is 5% or more
Z16.2 The Project Manager requires the written consent of the Employer if an action will result in the
Completion Date being extended by more than 30 days.
Z17 Delegation
As stipulated by Section 37(2) of the Occupational Health and Safety Act No. as
amended the Contractor agrees to the following:
Z17.1 As part of this contract the Contractor acknowledge that it (mandatory) is an employer in its own
right with duties as prescribed in the Occupational Health and Safety Act No as
amended and agree to ensure that all work being performed, or Equipment, Plant and Materials
being used, are in accordance with the provisions of the said Act, and in particular with regard to
the Construction Regulations
AGREEMENT IN TERMS OF SECTION 37(2) OF THE OCCUPATIONAL HEALTH & SAFETY ACT (ACT ) & CONSTRUCTION REGULATION 5.1(k)
To assist Airport Company South Africa (ACSA) in order to comply with the requirements of:
(COID Act).
user of the plant
CONTRACTOR) for unlawful acts or omissions of Mandataries (CONTRACTORS) save where a
relevant provisions of the Occupational Health & Safety Act (OHS Act) and applicable
respective employees will at all times comply with the following conditions:
close supervision of the Mandatary’s employees who are to be trained to understand the
hazards associated with any work that the Mandatary performs on the Client’s premises.
, if the Mandatary assigns any duty in terms of Section 16(2), a copy of such written
assignment shall immediately be forwarded to the Client.
person before commencement of any work in the Client’s premises. A baseline risk
assessment document will include identification of hazards and risk, analysis and evaluation
of the risks and hazards identified, a documented plan and safe work procedures to mitigate,
reduce or control the risks identified, and a monitoring and review plan of the risks and
hazards.
they inquire into Occupational Health & Safety.
to sign this agreement on behalf of the Mandatary. The signing power of this representative must
be designated in writing by the Chief Executive Officer of the Mandatary. A copy of this letter must
be made available to the Client.
management, in writing anything he/she deems to be unhealthy and /or unsafe. He has versed
his employees in this regard.
employees and other persons in any way whilst performing work on the Client’s premises.
Part c2: pricing data c2.2 Ecsc3 price list
In terms of section 37(2) of the Occupational Health & Safety Act and section 5.1(k) of the
Construction Regulations 2014,
I ........................................a duly authorised 16.2 Appointee acting for and on behalf of
........................................................(company name) undertake to ensure that the requirements and the
provision of the OHSAct and its regulations are complied with.
Mandatary – WCA/ Federated Employers Mutual No.....................................
D1 Specification compliance Item 1
D2 As-built drawings Item 1
D3 Training Item 1
D4 Health & Safety Item 1
D5 Operation & Maintenance Manual Item 1
D6 Passwords and End User Licenses Item 1
refurbished, or replaced as a matter of priority, and that a preventative maintenance programme be
implemented to ensure reliable operation, regulatory compliance, and the integrity of airport security.
ICAO Annex 17 – Aviation Security requirements
South African Civil Aviation Regulations (SACARs).
Airports Company South Africa (ACSA) security standards and
specifications where applicable.
Occupational Health and Safety Act (Act )
Kick-off Meeting 90 minutes UPN Offices Project Manager - SCM
strategy and agree timelines confirmed with the - The Contractor
meeting request)
Construction Progress 60 minutes UPN Offices The Contractor - The Project Manager
approved programme confirmed with the
issues
performance
Risk Reduction 60 minutes UPN Offices Project Manager - The Project Manager
identified risks that can have confirmed with the
an impact on project meeting request)
execution.
emergency access routes, and operational activities are not adversely affected by the Works. Access gates
may need to remain operational during construction, requiring phased implementation or temporary access
arrangements.
Contractual Terms
Source: NEC- UTN 7710 Mechanical Gates Replacement (2).pdfDeviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange the
delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be provided in
terms of the conditions of contract identified in the Contract Data. Failure to fulfil any of these obligations in
accordance with those terms shall constitute a repudiation of this agreement.
E-mail address [email protected]
11.2(11) The works are The supply, installation, testing and
commissioning of new mechanical gates and
electric motors at Upington International Airport.
11.2(13) The Works Information is in the document called ‘Works Information’ in Part
C3 of this contract.
11.2(12) The Site Information is in the document called ‘Site Information’ in Part
C4 of this contract.
11.2(12) The site is Upington International Airport
30.1 The starting date is. Upon signing of the contract by ACSA.
11.2(2) The completion date is. 6 Months after signing of the contract by ACSA.
13.2 The period for reply is 7 (seven) days
40 The defects date is Twelve (12) months after Completion of the
whole of the works
41.3 The defect correction period is 2 (two) weeks
50.1 The assessment day is the On the 15th of each successive month upon
receipt of a valid tax invoice.
50.5 The delay damages are Amount per day is 0.05%, to the maximum of
10% of the Contract value
50.6 The retention is 5% of the Contract value
51.2 The interest rate on late payment is The prime lending rate of the Nedbank Bank. as
determined from time to time.
80.1 The Contractor is not liable to the Employer
for loss of or damage to the Employer’s Refer to Part C1.3
property in excess of the total liability
incurred and/or damages suffered to the
employer's property
82.1 The Employer provides this insurance Refer to Part C1.3
82.1 The minimum amount of cover for the third
insurance stated in the Insurance Table is: Whatever the Contractor deems necessary in
addition to that provided by the Employer.
82.1 The minimum amount of cover for the As prescribed by the Compensation for
fourth insurance stated in the Insurance Occupational Injuries and Diseases Act No. 130
Table is: of 1993 and the Contractor’s common law
liability for people falling outside the scope of
the Act.
between Completion and the defects date stated in the Contract Data.
Z5 Termination
Z6 Cession, delegation and assignment
Z6.1 The Contractor shall not cede, delegate or assign any of its rights or obligations to any person
without the written consent of the Employer, which consent shall not be unreasonably withheld. This
clause shall be binding on the liquidator/business rescue practitioner /trustee (whether provisional
or not) of the Contractor.
Z6.2 The Employer may cede and delegate its rights and obligations under this contract to any person
or entity.
Z7 Joint and several liability
Z7.1 If the Contractor constitutes a joint venture, consortium or other unincorporated grouping of two or
more persons, these persons are deemed to be jointly and severally liable to the Employer for the
performance of the Contract.
Z7.2 The Contractor shall, within 1 week of the Contract Date, notify the Project Manager and the
Z7.3 The Contractor does not materially alter the composition of the joint venture, consortium or other
unincorporated grouping of two or more persons without prior written consent of the Employer.
Z8 Ethics
Z8.1 The Contractor undertakes:
Z8.1.1 not to give any offer, payment, consideration, or benefit of any kind, which constitutes or could be
construed as an illegal or corrupt practice, either directly or indirectly, as an inducement or reward
for the award or in execution of this contract;
Z8.1.2 to comply with all laws, regulations or policies relating to the prevention and combating of bribery,
corruption and money laundering to which it or the Employer is subject, including but not limited to
the Prevention and Combating of Corrupt Activities Act, .
Z8.2 The Contractor’s breach of this clause constitutes grounds for terminating the Contractor’s
obligation to Provide the Works or taking any other action as appropriate against the Contractor
(including civil or criminal action). However, lawful inducements and rewards shall not constitute
grounds for termination.
Z8.3 If the Contractor is found guilty by a competent court, administrative or regulatory body of
participating in illegal or corrupt practices, including but not limited to the making of offers (directly
or indirectly), payments, gifts, gratuity, commission or benefits of any kind, which are in any way
whatsoever in connection with the contract with the Employer, the Employer shall be entitled to
terminate the contract in accordance with the procedures stated in core clause 92.2. the amount
due on termination is A1.
Z9 Confidentiality
Z9.1 All information obtained in terms of this contract or arising from the implementation of this contract
shall be treated as confidential by the Contractor and shall not be used or divulged or published to
any person not being a party to this contract, without the prior written consent of the Project Manager
or the Employer, which consent shall not be unreasonably withheld.
Z9.2 If the Contractor is uncertain about whether any such information is confidential, it is to be regarded
as such until otherwise notified by the Project Manager.
Z9.3 This undertaking shall not apply to –
Z9.3.1 Information disclosed to the employees of the Contractor for the purposes of the implementation of
this agreement. The Contractor undertakes to procure that its employees are aware of the
confidential nature of the information so disclosed and that they comply with the provisions of this
clause;
Z9.3.2 Information which the Contractor is required by law to disclose, provided that the Contractor notifies
the Employer prior to disclosure so as to enable the Employer to take the appropriate action to
protect such information. The Contractor may disclose such information only to the extent required
by law and shall use reasonable efforts to obtain assurances that confidential treatment will be
afforded to the information so disclosed;
Z9.3.3 Information which at the time of disclosure or thereafter, without default on the part of the Contractor,
enters the public domain or to information which was already in the possession of the Contractor at
the time of disclosure (evidenced by written records in existence at that time);
Z9.4 The taking of images (whether photographs, video footage or otherwise) of the works or any portion
thereof, in the course of Providing the Works and after Completion, requires the prior written consent
of the Project Manager. All rights in and to all such images vests exclusively in the Employer
Z9.5 The Contractor ensures that all his Subcontractors abide by the undertakings in this clause.
Z10 Employer’s Step-in rights
Z10.1 If the Contractor defaults by failing to comply with his obligations and fails to remedy such default
within 2 weeks of the notification of the default by the Project Manager, the Employer, without
prejudice to his other rights, powers and remedies under the contract, may remedy the default either
himself or procure a third party (including any subcontractor or supplier of the Contractor) to do so
on his behalf. The reasonable costs of such remedial works shall be borne by the Contractor
Z10.2 The Contractor co-operates with the Employer and facilitates and permits the use of all required
information, materials and other matter (including but not limited to documents and all other
drawings, CAD materials, data, software, models, plans, designs, programs, diagrams, evaluations,
materials, specifications, schedules, reports, calculations, manuals or other documents or recorded
information (electronic or otherwise) which have been or are at any time prepared by or on behalf
of the Contractor under the contract or otherwise for and/or in connection with the works) and
generally does all things required by the Project Manager to achieve this end.
Z11 Liens and Encumbrances
Z11.1 The Contractor keeps the Equipment used to Provide the Services free of all liens and other
encumbrances at all times. The Contractor, vis-a-vis the Employer, waives all and any liens which
he may from time to time have, or become entitled to over such Equipment and any part thereof
and procures that his Subcontractors similarly, vis-a-vis the Employer, waive all liens they may
have or become entitled to over such Equipment from time to time
Z12 Intellectual Property
Z12.1 Intellectual Property (“IP”) rights means all rights in and to any patent, design, copyright, trade
mark, trade name, trade secret or other intellectual or industrial property right relating to the
undertaking from any such third party on terms no less onerous than the terms the Employer
would use to protect its IP
Z12.5 The Contractor shall indemnify and hold the Employer harmless against and from any claim
alleging an infringement of IP rights (“the claim”), which arises out of or in relation to:
Z12.5.1 the Contractor’s design, manufacture, construction or execution of the Works
Z12.5.2 the use of the Contractor’s Equipment, or
Z12.5.3 the proper use of the Works.
Z12.6 The Employer shall, at the request and cost of the Contractor, assist in contesting the claim and
the Contractor may (at its cost) conduct negotiations for the settlement of the claim, and any
litigation or arbitration which may arise from it.
Z13 Dispute resolution:
Z13.1 Appointment of the
when a dispute arises, from
the Panel of Adjudicators Name Location Contact details
below. The referring party (phone & e mail)
nominates an Adjudicator, Adv. Ghandi Badela Gauteng +27 11 282 3700
which nomination is either [email protected]
accepted or rejected by the Mr. Errol Tate Pr. Durban +27 11 262 4001
other party. In the instance of a Eng. [email protected]
rejection of the nominated Adv. Saleem Ebrahim Gauteng +27 11 535-1800
Adjudicator, the referring Party [email protected]
refers the appointment Mr. Sebe Msutwana Gauteng +27 11 442 8555
deadlock to the Chairman of Pr. Eng. [email protected]
the Johannesburg Bar Council, Mr. Sam Amod Gauteng [email protected]
who appoints an Adjudicator
listed in the Panel of Adv. Sias Ryneke Gauteng 083 653 2281
Adjudicators below SC [email protected]
a
The Parties appoint the Mr. Emeka Ogbugo Pretoria +27 12 349 2027
Adjudicator under the NEC3 (Quantity Surveyor) [email protected]
Adjudicator’s Contract, April
2013
Z13.2 Appointment of the
when a dispute arises from the
hundred thousand rands).
duration of the project.
C1.4 Occupational health and safety agreement
shall remain in force whilst they and /or their employees are present on the Client’s premises, or
which shall remain in force for that duration of their contractual relationship with the Client,
whichever period is the longest.
a. Public Liability Insurance Cover as required by the Subcontract Agreement.
b. Any other Insurance cover that will adequately makes provision for any possible losses and/or
claims arising from their and /or their Subcontractors and/or their respective employee’s acts
and/or omissions on the Client’s premises.
Part c2: pricing data c2.2 Ecsc3 price list
compromises the effectiveness of the airport’s security and access control systems, increasing the risk of
unauthorized access and security breaches. Consequently, the current state of the access gates may
result in non-compliance with aviation security requirements, including the security principles and access
control measures prescribed under ICAO Annex 17.
a) Assess Existing Infrastructure
o Conduct a comprehensive condition assessment of all gate motors, gates, control systems,
and associated electrical installations.
b) Repair and Replace Defective Equipment
o Repair serviceable gate motors and replace units that are beyond economical repair.
o Repair or replace damaged gate structures and supporting hardware.
c) Improve Access Control and Security
o Ensure all access gates operate reliably and provide controlled access to authorized
personnel and vehicles only.
o Reduce the risk of unauthorized entry and security breaches.
d) Enhance Operational Efficiency
o Improve gate opening and closing speeds to support efficient traffic flow and operational
activities.
o Minimize downtime caused by equipment failures.
e) Ensure Regulatory Compliance
o Align access control infrastructure with ICAO Annex 17 requirements and applicable airport
security standards.
o Address audit findings and security vulnerabilities related to perimeter access control.
f) Implement a Preventive Maintenance Programme
o Establish routine inspection, servicing, and maintenance schedules for all gate motors and
gate systems.
o Maintain accurate maintenance records and asset histories.
g) Improve Asset Reliability and Lifecycle
o Extend the service life of gate motors and gate infrastructure through proper maintenance
and timely interventions.
o Reduce long-term maintenance costs and emergency repairs.
h) Strengthen Airport Security Posture
o Ensure continuous availability and functionality of all critical access points.
o Support safe and secure airport operations through reliable perimeter and access control
systems.
Special Conditions
Source: NEC- UTN 7710 Mechanical Gates Replacement (2).pdf (unknown)Special conditions include: the site is a National Key Point and bidders must comply with the requirements; access to site is restricted to permitted personnel through an ACSA permit system; the Employer will only make a single phase, 220 volts power supply available; the contractor must verify the condition and suitability of existing services before connecting new equipment; and a kick-off meeting is required at UPN Offices with the Project Manager - SCM.
Section
Source: NEC- UTN 7710 Mechanical Gates Replacement (2).pdfThe works information requires the use of standard forms as set out in the NEC3 clauses. The approved programme may be used to evaluate any claims. The contract also includes provisions on delay damages (0.05% per day, capped at 10% of contract value) and assessment of payments on the 15th of each month upon receipt of a valid tax invoice.
Important Dates
Source: RFQ 7710 Request for bids of supply, installation, testing and commissioning of new mechanical gates and electric motoes at Upington Airport (2).pdf (TENDER){"briefingSession":"{"date":"22 September 2026","time":"10:00 am","venue":"ion meeting with representatives of the Employer will take place in person on the","is_compulsory":true}"}
Contact Information
Source: RFQ 7710 Request for bids of supply, installation, testing and commissioning of new mechanical gates and electric motoes at Upington Airport (2).pdf (TENDER){"name":null,"email":"[email protected]","phone":null,"department":"representatives after the approval of a","address":"C MOTORS AT UPINGTON"}
Evaluation Criteria
Source: RFQ 7710 Request for bids of supply, installation, testing and commissioning of new mechanical gates and electric motoes at Upington Airport (2).pdf (TENDER)Preference Points
Preference points system may apply (details in tender data).
Functionality
Functionality evaluation includes experience and project references.
Price
Price evaluation as per tender data.
Compliance Requirements
Source: RFQ 7710 Request for bids of supply, installation, testing and commissioning of new mechanical gates and electric motoes at Upington Airport (2).pdf (TENDER)No specific requirements found
B-BBEE Minimum Level: 1
B-BBEE Details: fic goals as outlined on the table below and
to submit proof, the bidder will score zero (0) out of 20 or out of 10. ACSA will not disqualify the
bidder. See below Specific goals that must be achieved for this bid:
(Note to organs of state: Where either the 90/10 or 80/20 preference point system is
of 81
Confidential
Confidential
applicable, corresponding points must also be indicated as such. – Remove once BSC has
selected)
Note to tenderers: The tenderer must indicate how they claim points for each preference
point system.)
Number of
Specific Goals points
(80/20 system)
B-BBEE Status Level 1 5
B-BBEE Status Level 2 4.5
B-BBEE Status Level 3 4
B-BBEE Status Level 4 3
B-BBEE Status Level 5 2
B-BBEE Status Level 6 0.5
B-BBEE Status Level 7 0.3
B-BBEE Status Level 8 0.1
Black youth majority-owned entities 5
Black women majority-owned entities 5
Company majority owned by people with 5
disabilities
Non- compliant contributor 0
Bidder to provide proof to support The Preference Points being Claimed.
a)Provide original or certified copy Valid sworn Affidavit OR
b) B-BBEE Certificate from a SANAS accredited rating agency
accredited agency must be provided
as prescribed by the B-BBEE Act and its relevant/most recent Codes of Good Practice
a) Any other supporting information..
In order to score for preference points, bidder must provide
Supporting information (proof)that is relevant to the specific goals.
Stage 5 - Objective Criteria Evaluation
In line with the PPPFA, the tender must be awarded to the bidder who scores the highest points,
unless objective criteria in addition to those contemplated in the specific goals (Preference) justify
the
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Diedricks Street - Upington - Upington - 8801
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
15 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
How small electrical contractors use Joint Ventures to combine EP grading, win Eskom and municipal infrastructure projects, and compete for renewable energy installations.
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.