Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Ankerlig Power Station - Atlantis - Cape Town - 7349
Organization Type
GOVERNMENT
Published
23 Sept 2026
OCDS Reference
ocds-9t57fa-171557
ESKOM requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at ankerlig power station. The scope covers civil engineering work, and bidders must comply with the ESKOM PPE standard (240-44175132), issue PPE free of charge, and accept strict consequence management for non-compliance. The most consequential consideration is that PPE non-compliance can stop work and trigger contractual penalties, so bidders must budget for and enforce full PPE compliance.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 28 October 2026 - 10:00
Venue
Ankerlig Power Station
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
Ankerlig Power Station - Atlantis - Cape Town - 7349
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
23 Sept
2026
Tender Published
Tender was published
28 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Attachment 10 - Control Quality Plan (CQP) Template 2021.docx
Analysis completed but response format was invalid
Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdf
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station in the Western Cape. The scope covers civil and environmental containment works, with bidders expected to comply with Eskom's PPE and safety standards.
Attachment 23 - Tender Questions and Answers Template.docx
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station in the Western Cape. The scope covers repairs to ensure environmental containment integrity at the power station.
Attachment 5 - Technical Evaluation Criteria - Ankerlig.pdf
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station, owned by Eskom. The works include concrete rehabilitation, water-retaining structures, fuel tank bund remediation, stormwater infrastructure rehabilitation and bunding for waste management. Bidders must attend a compulsory site clarification meeting and meet a 70% technical threshold.
Attachment 13 - Annecure C1 - Tender Evaluation Template.pdf
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station in the Western Cape. The tender is classified as high risk for occupational health and safety (OHS), and bidders must submit a comprehensive OHS tender returnable pack for evaluation before contract award.
Attachment 11 - OHS requirements - Ankerlig Power Station.pdf
Eskom Generation requires a contractor to undertake remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station in Atlantis, Western Cape. The work includes detailed condition assessments, concrete and joint sealant repairs, crack injection, degreasing of dams, and replacement of sealants on fuel tank bunds and tank-to-foundation interfaces, with a strong emphasis on environmental protection and OHS compliance.
Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station in the Western Cape. The work is procured under an open tender using Eskom's standard conditions of tender, with a closing date of 28 October 2026 at 10:00 SAST.
Attachment 4A - ECC3 - Dam Refurbishment - Ankerlig 1 and 2 Final Draft.docx
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station, near Atlantis in the Western Cape. The works include condition assessment, concrete and joint repairs to two dirty water dams, sealant replacement in fuel tank bunds, tank-to-foundation interface sealing, cleaning and degreasing, and inspection and flushing of underground stormwater drainage systems.
E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdf
Eskom requires remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station in the Western Cape, under an open invitation to tender. The contract will be the NEC3 Engineering and Construction Contract, and bidders must pass a functionality threshold of 70% and attend a compulsory site clarification meeting.
Attachment 26 - Supplier Declaration of Interest Template.docx
Remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Ankerlig Power Station, issued by Eskom in the Western Cape.
Attachment 12 - Annexure B Eskom Acknowledgement Form.pdf
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station, for Eskom in the Western Cape.
Attachment 25 - Non-Disclosure Agreement (NDA) Vendors Template.docx
Eskom requires remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Ankerlig Power Station in the Western Cape. The work involves repairing and restoring containment systems to ensure environmental compliance and operational integrity.
Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdf
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station, owned by Eskom in the Western Cape. The work involves repairing and restoring containment structures to ensure environmental compliance and operational safety.
Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station in the Western Cape. The contract runs from 2024/25 to 2026/27 and is governed by a Contractor OHS&Q Management Plan requiring strict health, safety, quality compliance.
Attachment 17 - PPE NON COMPLIANCE MEMO.pdf
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station, procured by Eskom. The work is subject to strict PPE compliance and consequence management under the Eskom PPE Standard (240-44175132).
Attachment 19 - Life-Saving_Rules Standard.pdf
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station. The work is governed by Eskom's Life-Saving Rules, which impose zero-tolerance safety obligations on all employees, agents, consultants, and contractors.
Attachment 8 - Remedial repairs ANK List of Tender Returnables Cat 3 Rev 7 (14).xlsx
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station in the Western Cape. The work is subject to a quality management evaluation covering the bidder's quality management system, contract quality plan, and quality control plans.
Attachment 2 - E-tendering Help Manual for supplier.docx
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station. The procurement is issued by Eskom in the Western Cape. Bidders must submit their tender documents electronically via the eTendering system.
Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdf
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station in the Western Cape. The work is subject to Eskom's mandatory occupational health and safety risk assessment procedure, which bidders must comply with.
Attachment 9 - Supplier Quality Management Specification (3) (8).pdf
Eskom requires remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Ankerlig Power Station in the Western Cape. The contract will be governed by Eskom's Supplier Quality Management specification (240-105658000 / QM 58), which sets out mandatory quality management system requirements, quality plans, and inspection and test plans that bidders must comply with.
Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdf
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station in the Western Cape. The work involves restoring the integrity of containment systems to prevent environmental contamination.
Attachment 20 -Driver_and_Vehicle_Safety_Management_Procedure.pdf
Remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Ankerlig Power Station, Western Cape. The procuring entity is Eskom, and the work falls under its driver and vehicle safety management procedure, which applies to all vehicles used on Eskom business, including contractor vehicles.
Attachment 7 - Form A - Remedial Repairs_ANK.docx
Eskom requires remedial repairs to the pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Ankerlig Power Station in the Western Cape. The work falls under Eskom's Supplier Quality Requirements (specification 240-105658000) and ISO 9001, with the tenderer required to accept and comply with these quality standards.
Attachment 4B - Ankerlig Pricing Schedule.pdf
Remedial repairs to pollution control dams, fuel containment areas and associated stormwater infrastructure at Ankerlig Power Station, under an NEC3 Engineering and Construction Contract Option B (priced contract with bill of quantities). The works cover two dirty water dams (Ankerlig 1 and Ankerlig 2), including dewatering, condition assessment, concrete and crack repairs, joint and sealant repairs, fuel-tank bund repairs, tank-to-foundation sealing, and underground stormwater drainage cleaning and inspection.
Attachment 24 - Contract Deviations Committee Approval Template.docx
Remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Ankerlig Power Station, procured by Eskom in the Western Cape.
Attachment 6 - SDLI Strategy Setting Template for Bidders - Ankerlig Power Station.pdf
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Gas Turbine Station, Western Cape. The project duration is 18 months and includes mandatory local content and CIDB skills development requirements.
Attachment 14 - Baseline Risk Assessment - Ankerlig Power Station.pdf
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station, issued by Eskom in the Western Cape. The work involves construction-related repairs and environmental containment, with a strong occupational health and safety component.
Attachment 3 - Ankerlig Scope of Work.pdf
Analysis completed but response format was invalid
Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form.docx
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station in the Western Cape. The work involves repairing and restoring containment structures to ensure environmental compliance and operational integrity.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 2 738 521
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This document is Eskom's Supplier Quality Management Specification (240-105658000/QM 58, Revision 3). It defines the minimum quality requirements for all existing and potential Eskom suppliers and sets out the quality criteria for selection, evaluation, vendor registration, management, monitoring, assessment and auditing of suppliers. The specification applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and contracts. It is based on ISO 9001 and references ISO 10005, ISO 9000, ISO 10006, ISO 9004, Eskom SHEQ policy, procurement policies, PPPFA, CIDB guidelines, IAEA safety standards and SANS 10845-1.
Important Dates
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)Closing date: 28 October 2026 at 10:00 (from tender record).
Contact Information
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)No specific contact details are provided in this document.
Submission Guidelines
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)Returnable documents (all must be completed, signed and submitted with the bid):
Evaluation Criteria
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)Quality assessment criteria are selected by an Eskom Quality representative using Form A.
Technical Specifications
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)This document is Eskom's Supplier Quality Management Specification (240-105658000/QM 58, Revision 3).
Methodology
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfThe supplier must develop and implement processes and procedures to monitor, verify and document the quality of the scope of work.
Experience & Qualifications
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfQuality audits and related quality performance reviews shall be carried out by trained, accredited, and experienced personnel in accordance with procedures documented in the specification.
Quality Management
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfThis specification defines the minimum quality requirements for all existing and potential Eskom suppliers, covering selection, evaluation, vendor registration, management, monitoring, assessment and auditing.
Pricing Schedule
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfNo pricing schedule or payment terms are stated in this document.
Financial Requirements
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)No financial requirements (pricing format, bid security, bonds, guarantees, retention, payment terms, turnover) are stated in this document.
Compliance Requirements
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)ISO 9001 certification (or applicable QMS certificate) is required unless excluded by the quality category.
Health & Safety
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfThe specification references Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) and IAEA Safety Standard GS-R-3.1. No specific health and safety requirements are detailed in this document.
Contractual Terms
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfEskom has rights of access to supplier information as determined by applicable legislation, and may oversee the supplier's audit programmes by participating in selected audits as an observer and assessing the supplier during key work stages.
Requirements
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)Pre-contract award quality requirements: Suppliers and sub-suppliers must develop, implement, maintain and improve a formal QMS conforming to ISO 9001 (latest revision) or an applicable QMS standard. The QMS must include documented information such as quality manual, quality plans, work procedures, work instructions, method statements. Unless excluded, the QMS must carry a valid ISO 9001 certificate from an accredited certification body. The main supplier is responsible for defining and managing quality assurance and control elements for sub-suppliers, ensuring sub-supplier quality programmes support Eskom requirements. Suppliers must inform Eskom of any proposed changes to the QMS or staff affecting quality. The main supplier must develop and implement a performance management programme for sub-suppliers, including verification of QMS, audits, surveillances, assessment of CQPs, NC and defect management, inspection and test plans, and risk management.
Important Dates
Source: Attachment 23 - Tender Questions and Answers Template.docx (unknown)Tender questions closing date: 07 August 2026
Contact Information
Source: Attachment 23 - Tender Questions and Answers Template.docx (unknown)Enquiries
Submission Guidelines
Source: Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form.docx (unknown)Mandatory returnable: the E-Tendering Training Acknowledgement Form (Annexure). It must be fully completed, signed, and submitted to Eskom within the prescribed period. Failure to do so renders the bidder non-responsive and disqualified.
Submission method: via the E-Tendering Solution (electronic). No other submission details are provided in this document.
Evaluation Criteria
Source: Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form.docx (unknown)Submission of the fully completed E-Tendering Training Acknowledgement Form within the prescribed period is mandatory. Failure to submit this form will render the tenderer non-responsive and disqualified from the procurement process.
Compliance Requirements
Source: Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form.docx (unknown)No specific compliance requirements are stated in this document.
Description
Source: Attachment 8 - Remedial repairs ANK List of Tender Returnables Cat 3 Rev 7 (14).xlsxThe tender is for remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Ankerlig Power Station. The bidder must select the applicable category (1-4) on the Cover tab of the returnables template; the selected category determines the required quality deliverables.
Submission Guidelines
Source: Attachment 8 - Remedial repairs ANK List of Tender Returnables Cat 3 Rev 7 (14).xlsx (unknown)Returnable documents:
Evaluation Criteria
Source: Attachment 8 - Remedial repairs ANK List of Tender Returnables Cat 3 Rev 7 (14).xlsx (unknown)Evaluation uses the Supplier Quality Scorecard (Rev 7) with the following weighted sections:
Technical Specifications
Source: Attachment 8 - Remedial repairs ANK List of Tender Returnables Cat 3 Rev 7 (14).xlsx (unknown)The tender is for remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Ankerlig Power Station.
Compliance Requirements
Source: Attachment 8 - Remedial repairs ANK List of Tender Returnables Cat 3 Rev 7 (14).xlsx (unknown)No specific compliance requirements (e.g., CSD, tax clearance, B-BBEE, CIDB) are stated in the provided document.
Description
Source: Attachment 11 - OHS requirements - Ankerlig Power Station.pdfEskom requires a safe working environment in line with its SHEQ Policy and applicable legislation. This OHS requirements document sets out the minimum requirements that contractors must meet for the duration of the contract. The contractor remains accountable for the quality and execution of their health and safety programme for their employees and appointed contractor employees. The requirements are not all-encompassing and do not supersede organizational OHS requirements. The contractor must develop an OHS plan that meets these requirements and all relevant legislation.
Important Dates
Source: Attachment 11 - OHS requirements - Ankerlig Power Station.pdf (unknown)Closing date: 28 October 2026 at 10:00
No briefing session or site visit is stated in the document.
Contact Information
Source: Attachment 11 - OHS requirements - Ankerlig Power Station.pdf (unknown)Eskom Safety Officer: Pumi Tengani
End User: Zukile Tshisa
No email or telephone contacts are provided in the document.
Evaluation Criteria
Source: Attachment 11 - OHS requirements - Ankerlig Power Station.pdf (unknown)Bidders must comply with the Occupational Health and Safety Act and Regulations, including signing a Section 37(2) agreement with Eskom. They must provide a compliant OHS plan, risk assessments, and method statements. They must hold a valid Letter of Good Standing (COID) and comply with Eskom's life-saving rules, substance abuse policy, and medical surveillance requirements. They must be registered on the applicable contractor databases and meet any statutory appointments (e.g., 16(2) appointees). No specific CIDB grading or B-BBEE level is stated in the extracted document.
Technical Specifications
Source: Attachment 11 - OHS requirements - Ankerlig Power Station.pdf (unknown)Scope of work includes:
Methodology
Source: Attachment 11 - OHS requirements - Ankerlig Power Station.pdfSafe work procedures and method statements must be written for new jobs or tasks, when changing a job or task, or when introducing new equipment or substances. These provide guidance on how to execute tasks safely and prevent incidents.
Quality Management
Source: Attachment 11 - OHS requirements - Ankerlig Power Station.pdfThe scope includes detailed condition assessment of dams and concrete sumps, repair of exposed reinforcement, concrete spalling, joint movement, sealant distress, continuous concrete cracks, and defective joint sealants of fuel tank bunds. Also includes inspection and flushing of underground stormwater and drainage systems. The contractor must conduct a detailed structural integrity assessment of the four dams, including reviewing as-built drawings, preparing an inspection methodology, visual inspection, defect mapping, non-destructive testing, and compiling a condition assessment report with remedial measures. The report must be accepted by the Project Manager and Supervisor before remedial works commence. The contractor must also inspect the subsoil drainage sump and unblock any blockages. For the tank-to-foundation interface, the contractor must inspect, remove, and replace the existing sealant, ensuring surfaces are clean and the new sealant is fuel-resistant and elastomeric. The underground stormwater drainage systems must be inspected using a cage-protected drone, followed by flushing and cleaning to restore hydraulic capacity. An inspection report must be compiled including drainage route maps, defect descriptions, severity grading, photographic and video evidence, identification of blockages, and recommendations.
Pricing Schedule
Source: Attachment 11 - OHS requirements - Ankerlig Power Station.pdfThe pricing must include the cost of waste disposal. No other specific pricing requirements are stated in the document.
Financial Requirements
Source: Attachment 11 - OHS requirements - Ankerlig Power Station.pdf (unknown)No specific financial requirements are stated in the document.
Compliance Requirements
Source: Attachment 11 - OHS requirements - Ankerlig Power Station.pdf (unknown)B-BBEE Minimum Level: 2
Must be competent to perform required supervisory tasks.
Must comply with Eskom's SHEQ Policy and applicable legislative obligations.
Must sign a Section 37(2) agreement with Eskom.
Must hold a valid Letter of Good Standing (COID).
Must comply with Eskom's life-saving rules, substance abuse policy, and medical surveillance requirements.
Must be registered on applicable contractor databases.
Must meet statutory appointments (e.g., 16(2) appointees).
Health & Safety
Source: Attachment 11 - OHS requirements - Ankerlig Power Station.pdfThe document outlines comprehensive OHS requirements including legal compliance, Section 37(2) agreement, child labour prohibition, OHS Act compliance, legislative compliance, Eskom requirements, SHEQ policy, COID, costing for OHS, statutory and non-statutory appointments, Eskom life-saving rules, substance abuse policy, contractor organisational structure, roles and responsibilities, risk assessment, safe work procedures/method statements, roof work, fire equipment, flammable liquids, first aid, SHE communication, toolbox talks, OHS training, site establishment, site roads, vehicle management, housekeeping, stacking and storage, signage, tools and equipment, ladders, scaffolding, auditing, smoking, cellular phones, occupational health and hygiene, medical assessments, working at heights, PPE, incident reporting, emergency management, non-conformance, OHS files, work stoppage, hours of work, contractor performance monitoring, security clearance, contract sign-off, and Eskom's right to terminate the contract.
Environmental
Source: Attachment 11 - OHS requirements - Ankerlig Power Station.pdfThe contractor must comply with local authority, municipal by-law, and environmental legislation. The deterioration of concrete containment structures and joint systems compromises watertightness and increases the risk of environmental non-compliance. The contractor must remove accumulated oil, grease, and hydrocarbon residues from internal surfaces of dirty water dams and clean water dam using an approved biodegradable, non-toxic degreasing agent. Wash water, emulsified oils, and residues must be collected and conveyed to an oil-water separator or approved containment system. Waste materials, sludge, and residues must be disposed of in accordance with site environmental procedures and applicable legislation. All waste must be classified and disposed of at appropriate disposal sites, with disposal costs included in the contractor's pricing.
Contractual Terms
Source: Attachment 11 - OHS requirements - Ankerlig Power Station.pdfThe contractor must be competent to perform the required supervisory tasks. Training requirements include HIRA, incident investigation, supervisor training, authorised person, and legal liability.
Section
Source: Attachment 11 - OHS requirements - Ankerlig Power Station.pdfThe OHS department will issue the Section 37(2) agreement for evaluation prior to the start of work. The contractor must address identified deficiencies to restore the condition and functionality of the dirty water dams and ensure compliance with Eskom's SHEQ Policy and applicable legislation.
Description
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdfThis attachment is Eskom's internal Occupational Health and Safety Incident Management Procedure (document 32-95, revision 9). It sets out how Eskom manages OHS incidents across its operations, including identification, emergency response, notification, prioritisation, classification, investigation, corrective actions, close-out and communication. The procedure applies to Eskom employees, contractors and affected members of the public, and is effective from 1 April 2021. It is not a tender-specific requirement document.
Quality Management
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdfAll health and safety incidents must be investigated, except non-work-related incidents occurring outside workplace boundaries. Investigation reports are controlled disclosure documents. Repeat incidents must consider ineffective corrective actions from previous incidents. Investigations must identify direct and root causes, system failures, and corrective actions to prevent recurrence. Contractors must cooperate with Eskom investigations; if they do not, Eskom will take further steps to identify causes and implement corrective actions. Corrective actions must be risk-assessed to avoid introducing new risks, and periodic status reports must be provided from SAP EH&S until all recommendations are closed out.
Health & Safety
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdfThis attachment is Eskom's Occupational Health and Safety Incident Management Procedure (32-95, Rev 9). It defines the process for managing OHS incidents including identification, emergency response, notification, prioritisation, classification, investigation, corrective actions, close-out, and communication. It applies to Eskom employees, contractors, and affected members of the public. Key definitions include accident, fatality, first-aid injury, lost-time injury, medical injury, OHS event, near-miss, occupational disease, public incident, and serious incident. Responsibilities are assigned to Responsible Managers for implementing the procedure, communicating compliance, and ensuring understanding. Incidents are classified and recorded on SAP EH&S, with disputes referred to the Safety Data Integrity Committee (SDIC). Investigations follow specified procedures, with serious incidents requiring independent chairpersons and legal involvement. Violations include deliberate misinformation, withholding evidence, victimisation, and late notification.
Contractual Terms
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdfThe procedure requires that any OHS incident notification under sections 31 or 32 of the OHS Act, or any summons from the NPA, or any incident with potential liability, must be reported immediately to the Legal Department for attorney appointment. If legal representation is deemed unnecessary, the operating unit must provide a detailed motivation for assessment by Legal. For serious incidents, the investigation committee composition follows specific rules, and the operating unit where the incident occurred must support the investigation logistically and provide secretariat resources. In the case of employee or contractor fatalities, a corporate investigation is initiated by Sustainability Systems, with a preliminary investigation and report required beforehand. Where the Mine Health and Safety Act applies, its investigation process takes precedence.
Description
Source: Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdfThis is Eskom's procedure for managing substance abuse in the workplace. It aims to comply with statutory requirements, provide a healthy and safe working environment, identify, control and prevent substance abuse, reduce losses and incidents, improve productivity, identify rehabilitation needs, offer employee assistance, prevent abuse of intoxicating substances, and encourage a healthy lifestyle. It applies to all Eskom employees, contractors, consultants, and visitors while on duty or reporting for duty at any Eskom premises or work site, and to all employees who drive vehicles on Eskom business, operate equipment or machinery, or perform tasks on Eskom sites.
Methodology
Source: Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdf (unknown)Alcohol and drug screening/testing follows a defined process: candidate selection, timing, use of calibrated handheld instruments, a second confirmation test 30 minutes after a positive first test, and handling of positive results. Breathalyser instruments must be portable, have a measuring range of 0 to 1.50 mg/L or 0.000 to 0.300% BAC, operate in specified conditions, and meet other equipment specifications.
Quality Management
Source: Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdfAll testing and screening equipment must be calibrated and maintained per manufacturer's specifications. Testers and screeners must be competent, formally appointed, and receive refresher training every two years. A maintenance and calibration register must be kept.
Health & Safety
Source: Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdfPersons under the influence or intoxicated are not allowed access to the workplace or to continue duties. Alcohol and drug consumption is prohibited on Eskom premises or business. Screening and testing may be random or specific; refusal may lead to an adverse inference. Positive results lead to removal from the workplace and safe transport home. Testing applies pre-placement, compulsory, post-accident, on reasonable suspicion, ad hoc, return-to-work, and follow-up. Compliance with occupational health and safety legislation and Eskom Life-Saving Rules is required.
Contractual Terms
Source: Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdfEmployees are not paid for time lost while under the influence. Contractors and consultants must arrange transport for their personnel who test positive. Test information and medical records are kept confidential.
Requirements
Source: Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdf (unknown)Roles and responsibilities are defined for line management, occupational health practitioners, EAP practitioners, SHEQS/safety risk managers, security management, employees, testers, and screeners. Positive test results must be reported, compliance monitored, and disciplinary processes followed, including follow-up testing and potential disciplinary action.
Description
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docxThe tenderer must complete and sign the Supplier Quality Requirements acknowledgement form to accept Eskom's quality requirements as per specification 240-105658000 and ISO 9001.
Submission Guidelines
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docx (unknown)Returnable documents:
Evaluation Criteria
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docx (unknown)The tenderer must complete and sign the Supplier Quality Requirements acknowledgement form (Section A) to accept Eskom's quality requirements. The tenderer must be able to meet Category 3 quality requirements as per clause 3.5.4 of specification 240-105658000. No other eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document.
Technical Specifications
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docx (unknown)The tenderer must complete and sign the Supplier Quality Requirements acknowledgement form to accept Eskom's quality requirements as per specification 240-105658000 and ISO 9001. The applicable quality category is Category 3 (refer to clause 3.5.4 of the specification).
Compliance Requirements
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docx (unknown)No specific requirements found
Description
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdfThis document prescribes the minimum requirements for generic Personal Protective Equipment (PPE) used in Eskom and provides guidance on the selection, use, care, and maintenance of PPE. It applies throughout Eskom Holdings SOC Limited divisions and subsidiaries. The document is effective from the day of authorization, with implementation monitored after six months.
Evaluation Criteria
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)Bidders must comply with the Occupational Health and Safety Act and Eskom's Life-saving Rules. PPE must be issued free of charge and meet SANS standards (e.g., SANS 434, SANS 1423-1, SANS 1387-4). Bidders must ensure PPE is suitable based on risk assessment and provide training. No specific pre-qualification criteria (e.g., CSD, B-BBEE, CIDB) are stated in the provided document.
Technical Specifications
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)The document prescribes minimum requirements for generic Personal Protective Equipment (PPE) used by Eskom and its subsidiaries, covering selection, use, care, and maintenance. It applies throughout Eskom Holdings SOC Limited divisions and subsidiaries. The standard does not cover specialised work such as Live Work, Fall Arrest Systems, or other specialised equipment not included. Additional PPE requirements may be determined by Operating/Business Units or Clusters, provided minimum requirements and relevant legislation are met.
Minimum requirements for all PPE:
Issuing of PPE:
Replacement of PPE:
General garment specifications:
Specific PPE items and key specifications:
Selection, use, care, and maintenance:
Quality Management
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdfPPE must comply with SANS standards, including SANS 50142, SANS 50143, SANS 50149 for respiratory protective devices. Garments must be labelled per SANS 434 and carry SABS mark of approval where applicable. Fabric manufacturer must provide certificate of compliance with SANS and EN specifications.
Compliance Requirements
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)No specific pre-qualification criteria (e.g., CSD, B-BBEE, CIDB) are stated in the provided document. Bidders must comply with the Occupational Health and Safety Act and Eskom's Life-saving Rules. PPE must meet SANS standards (e.g., SANS 434, SANS 1423-1, SANS 1387-4).
Health & Safety
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdfThe document is based on the Occupational Health and Safety Act, requiring employers to evaluate risks and provide safety equipment free of charge. It outlines duties of employers, employees, and the OHS department regarding PPE issuance, training, maintenance, and compliance. It also covers PPE-free zones, replacement procedures, and special circumstances for employees with physical constraints.
Contractual Terms
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdfPPE/clothing shall be issued free of charge. Where losses are due to negligence, appropriate Eskom disciplinary procedures shall be followed. All Eskom-branded items of PPE shall be handed in on termination of an employee's service with Eskom; these items remain Eskom's property and responsibility. The responsible line manager shall monitor this process within existing processes for issuing and replacement of PPE.
Description
Source: Attachment 24 - Contract Deviations Committee Approval Template.docxThe document is a template for requesting deviations from standard contract terms for a project at Ankerlig Power Station. It provides instructions for completing the deviation request process, including negotiation with legal, insurance, and the end-user, and submission of Annexure A to the Secretariat.
Submission Guidelines
Source: Attachment 24 - Contract Deviations Committee Approval Template.docx (unknown)Returnable documents: Annexure A (Deviation Request) must be correctly completed and submitted to the Secretariat, together with the original tendered contract. Do not copy the Deviation Committee chairman or send deviations directly to her. Do not include abandoned suggestions or requests in Annexure A. Only include negotiated and agreed changes to the advertised terms. Attach the contract documents that went out with the tender or are intended to go out with the tender and are to be deviated from. Read footnotes carefully; incomplete or incorrect submissions will be returned.
Evaluation Criteria
Source: Attachment 24 - Contract Deviations Committee Approval Template.docx (unknown)The Deviation Committee will review the deviation request. The turnaround time for approval is 21 days after receipt of all correctly completed documents. This timeline may be shortened only in cases of immediate and objective urgency or severe prejudice to Eskom. The timeline must be factored into the commercial process to avoid urgent submissions.
Technical Specifications
Source: Attachment 24 - Contract Deviations Committee Approval Template.docx (unknown)The deviation request must be negotiated with the support of legal, insurance, and the end-user. Not all issues are legal issues. The request must include: project name, value and duration of project, impact of request on value and duration, NEC or FIDIC contract to be used, name of supplier, name of buyer, name of project manager and date of approval, name of legal adviser, name of commercial manager and date of approval, and name of Deviation Committee chairman.
Health & Safety
Source: Attachment 14 - Baseline Risk Assessment - Ankerlig Power Station.pdfThis document is a baseline risk assessment for Ankerlig Power Station, prepared by Zukile Tshisa and authorised by Pumi Tengani (O&M Manager) on 26/08/2026, revision 5, next review 30-Apr-27. It identifies hazards and required controls for work at the site, including:
Description
Source: Attachment 4A - ECC3 - Dam Refurbishment - Ankerlig 1 and 2 Final Draft.docxThe works comprise inspection, maintenance and remedial repair of the dirty water management infrastructure at Ankerlig Power Station, including pollution control dams, fuel containment areas, and associated stormwater drainage systems. The objective is to restore structural integrity, watertightness and operational performance, given the environmentally sensitive area underlain by aquifers used for potable water abstraction.
Submission Guidelines
Source: Attachment 4A - ECC3 - Dam Refurbishment - Ankerlig 1 and 2 Final Draft.docx (unknown)Returnable documents:
Submission method: as specified in the tender documents; the Offer may be accepted by the Employer signing the Acceptance part and returning one copy before the end of the validity period.
Disqualification risks:
Evaluation Criteria
Source: Attachment 4A - ECC3 - Dam Refurbishment - Ankerlig 1 and 2 Final Draft.docx (unknown)Evaluation is based on the NEC3 Engineering and Construction Contract (Option B – re-measurement). Bidders must comply with the Conditions of Tender. B-BBEE preference points apply as per the preferencing scheme. No specific scoring split or minimum qualifying score is stated in the document.
Technical Specifications
Source: Attachment 4A - ECC3 - Dam Refurbishment - Ankerlig 1 and 2 Final Draft.docx (unknown)Scope of works:
Works apply to:
Location: Ankerlig Power Station, near Atlantis, Western Cape.
Contract type: NEC3 Engineering and Construction Contract (ECC3), Option B (re-measurement).
Contractor design: parts of the works are to be designed by the Contractor as specified in the Works Information.
Financial Requirements
Source: Attachment 4A - ECC3 - Dam Refurbishment - Ankerlig 1 and 2 Final Draft.docx (unknown)Pricing: NEC3 Option B – re-measurement contract; Bill of Quantities priced with rates and lump sums. Rates are fully inclusive of all work, risks, overheads, profit, etc. Quantities are remeasured using CESMM3.
Bonds and guarantees:
Payment: Invoicing and payment terms are covered in the Works Information (section 2.9).
Compliance Requirements
Source: Attachment 4A - ECC3 - Dam Refurbishment - Ankerlig 1 and 2 Final Draft.docx (unknown)Health and safety:
Environmental:
Quality:
Access prerequisites for personnel:
Description
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdfThis memorandum from the General Manager of the Peaking Operating Unit clarifies roles, responsibilities, and consequence management for PPE compliance across all contractor and Eskom Peaking employees. It aims to ensure consistent application of the Eskom PPE Standard (240-44175132), promote safety, and prevent operational disruptions. Persistent PPE non-compliance has been identified during BSO activities, housekeeping, and routine plant walkdowns, and features in monthly outage management reports.
Important Dates
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Memorandum date: 04 February 2026
Contact Information
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Contact: Avi Singh
Role: General Manager, Peaking Operating Unit
Telephone: +27 21 941 5800
Address: Peaking Business Unit Durbanville Office
Evaluation Criteria
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Bidders must comply with the Eskom PPE Standard (240-44175132). Contractors must issue PPE free of charge as per the General Safety Regulations. Non-compliance with PPE requirements will result in strict consequence management in line with Eskom standards and contractual obligations.
Technical Specifications
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Purpose: clarify roles, responsibilities, and consequence management for PPE compliance for all contractor employees and Eskom Peaking employees.
Background: persistent PPE non-compliance identified during BSO activities, housekeeping, and routine plant walkdowns; featured in monthly outage management reports.
Contract Custodians must:
Contractor Companies must:
Safety Department must:
Consequence management for contractor employees:
Consequence management for Eskom employees:
Compliance Requirements
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Compliance with the Eskom PPE Standard (240-44175132) is mandatory.
PPE must be issued free of charge as per General Safety Regulations.
Non-compliance will result in strict consequence management in line with Eskom standards and contractual obligations.
Health & Safety
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdfPPE compliance is mandatory for all contractor and Eskom employees. Contractors must issue PPE free of charge as per General Safety Regulations. Non-compliant contractor employees must stop work immediately and leave the site; an enquiry determines whether PPE was issued. If PPE was issued, the employee is suspended and consequence management implemented. If the company failed to issue PPE, work stops until PPE is issued, proof submitted, and an NCR issued. Non-compliant Eskom employees must stop working until an inquiry determines facts; willful failure to use issued PPE leads to consequence management initiated by the responsible manager, with outcomes submitted to the Safety Department.
Submission Guidelines
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Ankerlig Power Station.pdf (TENDER)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Ankerlig Power Station.pdf (TENDER)Evaluation is based on the 90/10 or 80/20 preference point system. A maximum of 10 points (90/10 system) or 20 points (80/20 system) may be awarded for specific goals (B-BBEE status level). Points for specific goals are added to price points, and the total is rounded to two decimal places. The contract is awarded to the tenderer scoring the highest total points.
B-BBEE points table:
If a tenderer fails to provide documentation for preference points, they are not disqualified but may only score points out of 90/80 for price and score 0 points out of 10/20 for specific goals.
Objective criteria (including designated sector local content and CIDB CSDG) are a condition for contract award. Failure to meet them may lead to the second-ranked tenderer being recommended for award.
Technical Specifications
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Ankerlig Power Station.pdf (TENDER)Scope of work: Provision of remedial repairs to the pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Ankerlig Gas Turbine Station.
Project duration: 18 months.
Designated sectors (local content thresholds must be achieved in full):
CIDB skills development:
Financial Requirements
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Ankerlig Power Station.pdf (TENDER)Pricing must be separated into components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component.
SDL&I penalty and performance security:
Compliance Requirements
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Ankerlig Power Station.pdf (TENDER)B-BBEE requirements:
B-BBEE improvement obligations:
Sworn affidavit validity requirements:
Local content:
CIDB:
B-BBEE Requirements
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Ankerlig Power Station.pdf (TENDER)B-BBEE improvement or retention plan:
B-BBEE evidence:
Local procurement content:
Special Conditions
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Ankerlig Power Station.pdf (TENDER)Reporting and monitoring:
Requirements
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Ankerlig Power Station.pdf (TENDER)Documents required to claim preference points:
Objective criteria (condition for contract award):
Section
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Ankerlig Power Station.pdfSpecific goals (B-BBEE status level) carry a maximum of 10 points (90/10 system) or 20 points (80/20 system). Points for specific goals are added to price points, and the total is rounded to two decimal places. The contract is awarded to the tenderer scoring the highest total points. Tenderers failing to provide preference point documentation are not disqualified but may only score points out of 90/80 for price and score 0 points out of 10/20 for specific goals.
Health & Safety
Source: Attachment 19 - Life-Saving_Rules Standard.pdfEskom enforces six Life-Saving Rules with zero tolerance for violations. These rules apply to all Eskom employees, agents, consultants, contractors, and visitors at all Eskom sites. The rules are:
Violations are treated as serious misconduct and may lead to disciplinary action. If a contractor manager or supervisor allows a violation, Eskom may suspend the contractor's activities. Contractor employees who violate a rule must be removed from site immediately, and the contractor must initiate disciplinary proceedings within five working days and provide Eskom with a copy of the sanction.
Description
Source: Attachment 5 - Technical Evaluation Criteria - Ankerlig.pdfThe procurement is for remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station. The contractor must have proven experience and capability in remedial civil engineering works involving concrete rehabilitation, water-retaining structures, pollution control facilities, fuel containment systems, structural assessments, stormwater infrastructure rehabilitation, and bunding for waste management.
Submission Guidelines
Source: Attachment 5 - Technical Evaluation Criteria - Ankerlig.pdf (unknown)Mandatory returnable: attendance at the compulsory site clarification meeting at Ankerlig Power Station. Failure to attend disqualifies the bid.
Returnable documents (as per the technical evaluation strategy):
Evaluation Criteria
Source: Attachment 5 - Technical Evaluation Criteria - Ankerlig.pdf (unknown)Evaluation stages:
Scoring scale (0 to 5):
(No scores of 1 or 3 are allowed.)
Criteria and weightings:
Technical Specifications
Source: Attachment 5 - Technical Evaluation Criteria - Ankerlig.pdf (unknown)Scope: remedial repairs to pollution control dams (clean and dirty water dams), fuel tank bunds, and associated environmental containment infrastructure at Ankerlig Power Station.
Work categories:
Condition assessment methodology must cover:
Concrete repair methodology must cover:
Methodology
Source: Attachment 5 - Technical Evaluation Criteria - Ankerlig.pdfTechnical Approach & Methodology (30% weighting):
Condition Assessment Methodology (15%):
Concrete Repair Methodology (15%):
Scoring for each methodology:
Experience & Qualifications
Source: Attachment 5 - Technical Evaluation Criteria - Ankerlig.pdfTenderer's Experience (30% weighting):
Scoring:
Key Personnel (20% weighting):
Quality Management
Source: Attachment 5 - Technical Evaluation Criteria - Ankerlig.pdfA project-specific Quality Control Plan (QCP) must be submitted covering: condition assessments, concrete repairs, crack injection works, joint sealant replacement, fuel bund remedial works, berm construction, earthworks and compaction testing, stormwater drain inspection and flushing, material approvals, hold points, witness points, inspection and test plans, check sheets, and handover records.
Scoring for QCP:
Compliance Requirements
Source: Attachment 5 - Technical Evaluation Criteria - Ankerlig.pdf (unknown)Key personnel registration requirements:
Unacceptable technical risks (disqualifying):
Unacceptable technical exceptions/conditions:
Environmental
Source: Attachment 5 - Technical Evaluation Criteria - Ankerlig.pdfThe works involve pollution control facilities, fuel containment systems, and bunding for waste management. The contractor must have proven capability in remedial civil engineering works in these areas.
Special Conditions
Source: Attachment 5 - Technical Evaluation Criteria - Ankerlig.pdf (unknown)Acceptable technical risks:
Unacceptable technical risks:
Acceptable technical exceptions/conditions:
Unacceptable technical exceptions/conditions:
Requirements
Source: Attachment 5 - Technical Evaluation Criteria - Ankerlig.pdf (unknown)Mandatory requirement: attendance at the compulsory site clarification meeting at Ankerlig Power Station. Failure to attend results in disqualification from further evaluation.
Section
Source: Attachment 5 - Technical Evaluation Criteria - Ankerlig.pdfQualitative technical evaluation uses a weighted scoring system. Minimum threshold score: 70% to be considered technically acceptable.
Scoring scale: 5=100% COMPLIANT, 4=80% COMPLIANT WITH ASSOCIATED QUALIFICATIONS, 2=40% NON-COMPLIANT, 0=0% TOTALLY DEFICIENT OR NON-RESPONSIVE.
Criteria and weightings:
Submission Guidelines
Source: Attachment 13 - Annecure C1 - Tender Evaluation Template.pdf (unknown)Returnable documents (all must be submitted with the bid):
Disqualification risk: failure to submit any required OHS returnable may result in a 'No' evaluation and potential disqualification.
Evaluation Criteria
Source: Attachment 13 - Annecure C1 - Tender Evaluation Template.pdf (unknown)Evaluation is based on the OHS Tender Evaluation Template (Annexure C1, High Risk).
Technical Specifications
Source: Attachment 13 - Annecure C1 - Tender Evaluation Template.pdf (unknown)Scope of work: Remedial repair of pollution control dams and fuel tank bunds at Ankerlig Power Station.
Experience & Qualifications
Source: Attachment 13 - Annecure C1 - Tender Evaluation Template.pdfOHS competency evidence required: CVs and qualifications/certificates for Hazardous Chemical Controller and Working at Heights training. Competencies must be relevant to the scope of work, risks, and OHS plan.
Financial Requirements
Source: Attachment 13 - Annecure C1 - Tender Evaluation Template.pdf (unknown)OHS costing must be detailed and broken down, not provided as a lump sum. The costing must be based on the overall scope of work; the scope and risk assessment may serve as a guideline.
Compliance Requirements
Source: Attachment 13 - Annecure C1 - Tender Evaluation Template.pdf (unknown)Mandatory OHS compliance documents:
Health & Safety
Source: Attachment 13 - Annecure C1 - Tender Evaluation Template.pdfMandatory OHS returnables for the scope of work (Remedial Repair of Pollution Control Dams and Fuel Tank Bunds at Ankerlig Power Station):
Description
Source: Attachment 2 - E-tendering Help Manual for supplier.docxThe document is a help manual for the Eskom eTendering system, not the tender specification. It explains that suppliers must register on the system, verify their email via OTP, and upload their tender documents electronically. Access requires a CSD number.
Submission Guidelines
Source: Attachment 2 - E-tendering Help Manual for supplier.docx (unknown)Submission is electronic only via the Eskom eTendering system at https://eTendering.eskom.co.za. Bidders must register on the system and verify their email via an OTP sent to their cellphone and email. Access requires a CSD number. Upload documents under the correct category (technical, commercial, finance, etc.). A single file may not exceed 50MB; total uploads may not exceed 900MB. Finalise the submission by clicking 'Finalize Submission' and then 'Finalise and Close Submission'. Keep the confirmation email with the submission ID for future reference.
Evaluation Criteria
Source: Attachment 2 - E-tendering Help Manual for supplier.docx (unknown)No evaluation criteria are stated in the provided document. Bidders must have a CSD number to access the eTendering system.
Technical Specifications
Source: Attachment 2 - E-tendering Help Manual for supplier.docx (unknown)The document is a help manual for the Eskom eTendering system, not the tender specification. It describes how suppliers upload tender documents electronically, replacing physical submission at Eskom tender offices.
Compliance Requirements
Source: Attachment 2 - E-tendering Help Manual for supplier.docx (unknown)Bidders must have a CSD (Central Supplier Database) number to access the eTendering system.
Description
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdfEskom has adopted a value of Zero Harm, requiring all business to be conducted with respect and care for people and the environment. The OHS risk assessment process ensures proactive identification, prediction, evaluation and control of actual and potential impacts on health, safety, environment, socio-economic conditions and cultural heritage. The process promotes compliance with legal requirements and occupational health and safety principles.
This procedure applies throughout Eskom Holdings SOC Limited, its divisions, subsidiaries and entities in which Eskom has a controlling interest. Compliance is mandatory in its area of applicability.
Submission Guidelines
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Disqualification risks:
Evaluation Criteria
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance (SARS TCS or tax pin).
The Contractor Baseline Risk Assessment (CBRA) is an essential consideration during tender evaluation, adjudication, negotiation and clarification before contract award.
Bidders must comply with the OHS Act and Construction Regulations, including providing a baseline risk assessment and site-specific health and safety specifications.
Technical Specifications
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)Scope: Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station.
Eskom has adopted a value of Zero Harm, requiring all business to be conducted with respect and care for people and the environment.
The OHS risk assessment process must proactively identify, predict, evaluate and control actual and potential impacts on health, safety, environment, socio-economic conditions and cultural heritage.
Contractor obligations:
Risk assessment process requirements:
Methodology
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdfRisk treatment approach:
Quality Management
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdfCompliance with the OHS risk assessment procedure is reviewed internally at least annually. Records are audited internally and externally by authorised entities, including Eskom Assurance and Forensic and external certification bodies. Monitoring focuses on training in OHS risk assessment, previous risk assessment reviews, general adherence to the process, and adequacy of risk assessments.
Compliance Requirements
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)CSD registration: mandatory.
Tax clearance: valid SARS TCS or tax pin required.
B-BBEE: Minimum level 1 required.
OHS compliance: must comply with the OHS Act and Construction Regulations.
Contractor Baseline Risk Assessment (CBRA) must be submitted as part of the tender.
Baseline risk assessment and site-specific health and safety specifications must be provided.
OH HIRA competency requirements:
Health & Safety
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdfEskom has adopted a value of Zero Harm. OHS risk assessment ensures proactive identification, prediction, evaluation and control of actual and potential impacts on health, safety, environment, socio-economic conditions and cultural heritage. The process promotes compliance with legal requirements and occupational health and safety principles.
Risk assessment types:
Risk assessment process:
Roles and responsibilities:
Description
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfThis is an open invitation to tender for remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station. The scope is civil engineering works. Tenderers must not sub-contract 100% of the scope.
Important Dates
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Closing date: 28 October 2026 at 10:00 (SAST).
Compulsory site visit or clarification meeting: details in the Tender Data; attendance is compulsory and failure results in disqualification.
Contact Information
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eskom Representative (as identified in the Invitation to Tender) is the only contact for clarifications.
Submission Guidelines
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Submission method: paper or e-tender as specified in the Tender Data.
Evaluation Criteria
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Evaluation stages:
Technical Specifications
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Scope: remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station.
Quality Management
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfTenderers must provide proof of safety, health, environmental and quality (SHEQ) systems, policies and capabilities at the closing date and/or contract award. All costs and personnel associated with SHEQ must be reflected in the tender.
Pricing Schedule
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfTenderers must include all duties, taxes (including VAT) and levies in rates and prices. Prices must be fixed for the contract duration unless otherwise stated. Rates and prices must be in South African Rand unless instructed otherwise. Tenderers may not alter tender documents except to correct errors, with all alterations initialed. Alternative tenders only allowed if a main tender is submitted and permitted.
Financial Requirements
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Pricing:
Compliance Requirements
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eligibility:
Health & Safety
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfTenderers must comply with the OHS Act and Eskom's SHEQ requirements. Proof of SHEQ systems must be provided. Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) apply as per CIDB standards. Misrepresentation or fraud may lead to disqualification and reporting to B-BBEE Commission.
Contractual Terms
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfEskom will notify acceptance before validity expiry, and prepare contract documents incorporating addenda, returnables, and agreed changes. Both parties will sign the Form of Agreement.
Special Conditions
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Late tenders will be returned unopened. Tenders will be opened in the presence of tenderers' representatives; for e-tendering, no public opening, names published. Eskom will not disclose evaluation information until after award. Tenders may be rejected for influence, collusion, or fraud. Clarification may be sought on unclear matters.
Requirements
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must comply with relevant legislation including NT Instruction Notes, CIDB Regulations, PPPFA, B-BBEE Codes, COIDA, OHS Act, and Eskom SHEQ requirements. Proof of SHEQ systems must be provided. CIDB grading registration is mandatory where stipulated. Contract Skills Development Goals and Contract Participation Goals apply as per CIDB standards. Misrepresentation or fraud may lead to disqualification and reporting to B-BBEE Commission. SDL&I Undertaking must be completed by contract award.
Section
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfEskom will check tenders for arithmetical errors; amounts in words prevail over figures. Errors in unit rates, line-item totals, or totals will be corrected as specified. B-BBEE level will be scored as per CSD report or certificate; if not provided, tenderer scores zero under PPPFA. Specific Goals will be scored with supporting documentation; failure results in zero points. Ranking is based on total score for Price and Specific Goals per PPPFA. Objective criteria may be used only if stipulated in the Invitation to Tender. Reverse e-auction may be used, indicated in the Invitation to Tender.
Description
Source: Attachment 3 - Ankerlig Scope of Work.pdfAnkerlig Power Station is located near Atlantis in the Western Cape and comprises nine (9) diesel-fired open-cycle gas turbine units constructed in two phases, namely Ankerlig 1 comprising four units and Ankerlig 2 comprising five units. The works comprise inspection, maintenance and remedial repair of the dirty water management infrastructure at Ankerlig Power Station. The principal works include: detailed condition assessment of the Ankerlig 1 and Ankerlig 2 Dirty Water Dams after dewatering; assessment and repair of concrete deterioration, including spalling, delamination, exposed reinforcement and cracking; assessment and repair of joint movement, joint sealants, waterstops and expansion-joint components; repair and replacement of joint sealants within the fuel tank bunds; replacement of sealant at the tank-to-foundation interfaces; cleaning and degreasing of the dirty water dams; and inspection, flushing and cleaning of the underground clean and dirty stormwater drainage systems. The works apply to: Ankerlig 1 Dirty Water Dam, with an approximate surface area of 4 152 m2; Ankerlig 2 Dirty Water Dam, with an approximate surface area of 7 058 m2; Gas 1 Tanks 1, 2 and 3 and their associated bunds; OCGT Tanks A and B and their associated bunds; and the associated underground stormwater drainage systems. The following Ankerlig fuel tank and bund dimensions apply to the works: Gas 1 Tank 1 15 050 mm 31 300 × 52 300 mm; Gas 1 Tank 2 15 050 mm 31 300 × 52 300 mm; Gas 1 Tank 3 21 300 mm 62 300 × 52 300 mm; OCGT Tank A 15 050 mm 31 300 × 52 300 mm; OCGT Tank B 15 050 mm 31 300 × 52 300 mm.
The Employer’s objective is to restore the structural integrity, watertightness and operational performance of the dirty water management systems at Ankerlig Power Station. The works are intended to address deterioration of concrete structures, joint failures and drainage deficiencies identified during visual inspections and to restore the condition and functionality of the dirty water dams, fuel containment infrastructure and associated drainage systems. Ankerlig Power Station is located within an environmentally sensitive area underlain by aquifers from which the City of Cape Town abstracts raw water for potable water treatment. The integrity of the dirty water containment infrastructure is therefore important to reduce the risk of contaminated water or hydrocarbons entering the groundwater environment. The purpose of the works is to: determine the condition of the Ankerlig 1 and Ankerlig 2 Dirty Water Dams following dewatering and detailed inspection; identify and record defects affecting the dams and associated concrete structures; repair concrete deterioration, cracks, reinforcement defects, joints and sealants identified within the scope; restore the integrity of the fuel tank bunds and tank-to-foundation sealing systems; inspect and clean the underground stormwater drainage systems; and restore the relevant infrastructure so that it continues to perform its intended containment and drainage functions.
Contact Information
Source: Attachment 3 - Ankerlig Scope of Work.pdf (unknown)No contact details are provided in the scope of work document. Refer to the full tender pack for SCM and technical enquiry contacts.
Submission Guidelines
Source: Attachment 3 - Ankerlig Scope of Work.pdf (unknown)Returnable documents: all completed, signed and submitted with the bid. The specific returnable forms are not listed in the provided scope of work document; refer to the full tender pack.
Submission method and address: not stated in the provided document.
Closing time: 10:00 on 28 October 2026 (from tender record).
Evaluation Criteria
Source: Attachment 3 - Ankerlig Scope of Work.pdf (unknown)Evaluation criteria are not detailed in the provided scope of work document. The tender is an open request for bid under Eskom's procurement process. Refer to the full tender pack for the evaluation methodology, preference point system (80/20 or 90/10), and any minimum qualifying score.
Technical Specifications
Source: Attachment 3 - Ankerlig Scope of Work.pdf (unknown)Scope of work: inspection, maintenance and remedial repair of the dirty water management infrastructure at Ankerlig Power Station, near Atlantis, Western Cape.
Principal works:
Areas covered:
Tank and bund dimensions:
Employer's objectives: restore structural integrity, watertightness and operational performance of the dirty water management systems; address concrete deterioration, joint failures and drainage deficiencies; protect the underlying aquifers from contamination.
Contractor design responsibilities:
Programming constraints:
Quality assurance:
Methodology
Source: Attachment 3 - Ankerlig Scope of Work.pdfThe Contractor is responsible for the engineering content of proposed remedial measures to the extent stated in Section 3.2. The Contractor must notify the Project Manager of ambiguity or inconsistency in Employer's information or illegal/impossible requirements. Contractor design submissions do not reduce responsibility. Employer's design comprises existing permanent works and asset information. Where actual Site conditions differ materially, the Contractor records, notifies the Project Manager, and does not conceal the condition. Parts of the works to be designed include repair methods for concrete deterioration, reinforcement, cracks (structural/non-structural, moving/non-moving), joints, waterstops, subsoil drainage sump, and other remedial measures. Sealant systems must accommodate joint movement, resist hydrocarbons, UV, and be compatible with substrate. Crack repair methods include low-viscosity epoxy, routed joints with flexible sealant, and injection using packers. Design must comply with applicable standards and be prepared/reviewed by appropriately registered professionals where required. Design may be submitted in parts; resubmissions must address reasons for non-acceptance. The Contractor's design must not change Employer's design requirements without instruction. The Employer may use and copy the Contractor's design for purposes of the contract.
Programming constraints: The Contractor prepares, submits and maintains programmes in accordance with clauses 31 and 32 and Contract Data. Programmes show actual progress, completed/remaining work, effect of compensation events, logic/sequence/duration changes, current forecast Completion Date, delays/constraints/recovery measures, and status of Employer/Others activities. Look-ahead programmes are required as instructed. The Contractor does not assume the Dirty Water Dams, fuel-containment areas, drainage systems or work areas will be available simultaneously.
Management meetings: The Contractor attends meetings convened by the Project Manager to coordinate progress, review programme, manage risks, coordinate site access, review quality, and confirm communications. The Contractor provides suitably experienced attendees with delegated authority. Meeting records are circulated within five Working Days and do not substitute formal communications. Meetings may be on-site or via Microsoft Teams. Specific meetings include: Project kick-off (once-off before site works), implementation meetings (bi-weekly or as required) to report progress and QC issues, and specialist meetings (design review, temporary works, interfaces, QCP/ITP, safety audits). Post-implementation close-out meeting may be held once-off.
Experience & Qualifications
Source: Attachment 3 - Ankerlig Scope of Work.pdfThe Contractor must provide experienced personnel appropriate to the nature and extent of the works. Within two weeks after the Contract Date, the Contractor submits an organogram showing key people, lines of authority, and responsibilities for contract management, site supervision, health and safety, quality, and environmental management. Any replacement of key people in management or supervisory roles must be approved and the name, role and relevant experience of the replacement provided.
Quality Management
Source: Attachment 3 - Ankerlig Scope of Work.pdfQuality assurance requires the Contractor to comply with the Supplier Quality Management Specification 240-105658000, submit quality requirements at least 30 days before project execution, hand in all data books before Completion, submit self-certification procedures for Plant and Materials before commencement, and complete work only after Supervisor confirms Hold Point release. Calibration of equipment must be current and traceable. The Contractor maintains quality records and ensures that submission for acceptance does not reduce responsibility.
Financial Requirements
Source: Attachment 3 - Ankerlig Scope of Work.pdf (unknown)Payment terms:
Bonds and guarantees: Provision of bonds and guarantees is required as per clause 2.12 of the Works Information; specific amounts are not stated in the provided document.
Insurance: Employer-provided insurance is as stated in clause Z13 of the Contract Data.
Compliance Requirements
Source: Attachment 3 - Ankerlig Scope of Work.pdf (unknown)Health and safety:
Environmental:
B-BBEE: Refer to the full tender pack for B-BBEE requirements and preference point system.
CIDB grading: Not stated in the provided document; refer to the full tender pack.
CSD registration: Not stated in the provided document; refer to the full tender pack.
Health & Safety
Source: Attachment 3 - Ankerlig Scope of Work.pdfThe Contractor complies with the Occupational Health and Safety Act, 1993 (Act ) and applicable regulations; the Employer’s occupational health and safety requirements issued as part of the contract; applicable Power Station safety rules and procedures; and the safety requirements stated in this Works Information and the applicable Employer health and safety requirements. The Contractor remains responsible for the health and safety of its employees, Subcontractors and other persons affected by the manner in which it Provides the Works. Before commencing physical work at Ankerlig Power Station, the Contractor: submits the required project-specific health and safety plan and supporting documentation for review; establishes and maintains the required health and safety file; provides the statutory appointments; provides evidence of a valid Letter of Good Standing; provides medical certificates of fitness; completes Site induction and access processes; completes any section 37(2) agreement; and obtains permits and authorisations. The Contractor provides competent health and safety resources and prepares task-specific risk assessments, Method Statements, safe work procedures and emergency arrangements. The Contractor’s health and safety planning addresses risks including dewatering, contaminated materials, cleaning, concrete works, chemical handling, work near fuel infrastructure, underground drainage inspection, vehicle movement, lifting, temporary works, and weather conditions.
2.4.1: The Contractor conducts health and safety inspections and internal audits, retains records, allows Employer audits, corrects non-conformances, and remains responsible despite Employer oversight. 2.4.2: Access prerequisites include valid medical fitness, police clearance (not older than three months), ID, driver's licence, adherence to Eskom Life-Saving Rules, risk-based PPE, valid letter of good standing, and for those not eligible for COIDA a member benefit statement with minimum fund of R500,000. Induction takes about two hours. 2.4.3: Daily controls include signing in/out, a Responsible Person (RP) appointed, daily work plan notification, toolbox talks covering tasks, hazards, controls, interfaces, exclusion zones, dropped-object controls, weather, and lessons learned, and attendance at morning coordination meetings. 2.4.4: HSE KPIs include maintaining a Health and Safety File, good housekeeping, near-miss reporting, Behavioural Safety Observations (BSO) and Planned Job Observations (PJO), zero-harm target, reporting incidents immediately, completing investigations within seven days, and closing findings within stated timeframes. 2.4.5: HSE close-out requires closing all incidents and findings, cleaning site establishment areas, submitting final safety statistics and safety file, and completing close-out report.
Environmental
Source: Attachment 3 - Ankerlig Scope of Work.pdfThe Contractor includes in its rates and Prices all costs for environmental compliance. The Contractor manages activities in an environmentally sensitive area underlain by aquifers, complying with NEMA, Waste Act, Water Act, and applicable Employer procedures. The Contractor applies duty of care, reports environmental incidents immediately, maintains an Environmental Policy and EMP (submitted within 14 days after Contract Date), and submits activity-specific environmental Method Statements (at least 14 days before risky activities). Measures include demarcating work areas, bunding fuel storage to 110% capacity, impermeable surfaces for fuel-dispensing areas, vehicle maintenance off-site, sanitation, Safety Data Sheets for chemicals, groundwater and watercourse protection, waste segregation and lawful disposal, prohibition of dumping/burning, protection of indigenous flora and fauna, no pesticides/herbicides without acceptance, dust control, and fire prevention.
Contractual Terms
Source: Attachment 3 - Ankerlig Scope of Work.pdfContract change management follows Core Clause 6 (Compensation events) and Core Clause 16 (Early warning). The Contractor records compensation events, submits formal quotations (Clause 62) clearly stating event reference, description, time effect, cost effect with supporting records and assumptions. The Project Manager assesses and responds in writing. Changes that alter the Scope/Works are managed through ECC processes and formal communications; the Contractor does not implement changes without Project Manager acceptance. Records of Defined Cost, payments and assessments of compensation events are kept in accordance with Clause 52.2, including labour reports, actual paid invoices for subcontractors, and other records.
Invoicing and payment: Within one week of receiving a payment certificate, the Contractor submits a tax invoice to the Employer showing the amount equal to the certificate. Tax invoices comply with clause Z7. Electronic submission: local invoices to [email protected], foreign to [email protected]. The subject line contains only vendor number; each PDF named only with invoice number. Foreign invoices require physical hard copies to Document Management centres. Tax invoice requirements include: Contractor's name/address, project manager, contract number/title, VAT registration numbers (Contractor and Employer 4740101508), total amount excluding VAT, VAT and total, company registration number, banking details, recipient details, invoice number/date, description of goods/services, quantity, period, and line-item number.
The Contractor establishes and maintains a structured document-management system, a document register covering all submissions, and ensures all communications are uniquely numbered, dated, revision-controlled, and traceable. Documentation must be prepared in South African English using SI units, be legible, signed, identify the contract and asset, and be submitted in searchable PDF unless editable format required. Each submission includes a transmittal with contract details, document title/number, revision, date, purpose, and response required. Contractual communications are formal, address the Project Manager, state the ECC clause, and are attached as PDFs. The Contractor retains evidence of transmission and receipt. Design submissions follow Section 3.3. Final records are submitted before Completion, including electronic and hardcopy data books.
Description
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdfEskom Holdings SOC Ltd invites tenders for remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Ankerlig Power Station. Tender number E3555GXPOU, issue date 23 September 2026, closing date 28 October 2026 at 10:00, validity period twelve weeks.
Important Dates
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdf (TENDER)Closing date: 28 October 2026 at 10:00
Compulsory clarification meeting: 09 October 2026 at 10:00 at Ankerlig Power Station
Attendance confirmation deadline: 02 October 2026 at 12:00 (must confirm with Eskom Representative, stating company name, position and contact details of each attendee)
Clarification queries deadline: 5 working days before tender submission deadline
Tender validity period: 12 weeks from closing date
Briefing Session
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdf (TENDER)Compulsory site clarification meeting: 09 October 2026 at 10:00 at Ankerlig Power Station. Attendance confirmation required by 02 October 2026 at 12:00 with the Eskom Representative, stating company name, position and contact details of each attendee. Non-attendance results in disqualification.
Contact Information
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdf (TENDER)Eskom Representative (all queries and clarifications):
Fraud and corruption reporting (anonymous):
Submission: via Eskom E-tendering site (no physical address provided)
Submission Guidelines
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdf (TENDER)Submission method: electronic only via the Eskom E-tendering site (Eskom Tender Bulletin). No hard copies accepted.
Returnable forms (all must be completed, signed where required, and submitted by closing time):
Disqualification risks:
Evaluation Criteria
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdf (TENDER)Evaluation stages:
Contractual requirements (CSD registration, financial viability, SHEQ) are assessed after ranking, prior to award. Failure to meet them may render the bidder non-responsive.
Technical Specifications
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdf (TENDER)Scope: Remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Ankerlig Power Station.
Quality Management
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdfQuality requirements (Category 3):
Pricing Schedule
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdfPricing schedule/BOQ to be submitted in PDF format, with a copy in Word format.
Financial Requirements
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdf (TENDER)Pricing format: Pricing schedule/BOQ to be submitted in PDF and Word format. Prices evaluated inclusive of VAT.
Compliance Requirements
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdf (TENDER)Eligibility criteria (disqualifying):
CIDB requirements:
Other compliance:
Health & Safety
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdfSafety requirements:
Contractual Terms
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdfContract conditions: NEC3 Engineering and Construction Contract (ECC).
Requirements
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdf (TENDER)Eligibility criteria: Tenderers must not be under any restriction to do business with Eskom or State-Owned Companies; must not have nationality of a country on international sanctions lists; must not submit more than one tender; JV/consortium agreements must state joint and several liability; must not have conflict of interest; tenders must be signed by authorised persons; must not be restricted by National Treasury or on Tender Defaulters list; must not be restricted by Eskom; must not subcontract 100% of scope. CIDB grading of 6CE or higher required. JV members must be registered with CIDB, lead partner grading 5CE or higher, combined grading equal to or higher than required. CSD registration is a mandatory contractual requirement.
Section
Source: E3555GXPOU - Invitation to Tender (ITT) - Ankerlig Power Station (003).pdfFunctionality requirements applicable: minimum 70% score required to progress. Prices scored out of 80 points, specific goals out of 20 points, using 80/20 system. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered. Specific goals scored per PPPFA; failure to submit evidence results in zero points for that goal. Ranking by adding price and specific goals scores.
Description
Source: Attachment 26 - Supplier Declaration of Interest Template.docxThe document provided is the Supplier Declaration of Interest Template (Attachment 26) for Eskom. It is a standard form requiring the supplier to declare any conflicts of interest involving Eskom employees or directors, close family or associate relationships, and business courtesies. The form must be completed and signed under oath, and submitted as a returnable with the bid.
Submission Guidelines
Source: Attachment 26 - Supplier Declaration of Interest Template.docx (unknown)Returnable documents:
Evaluation Criteria
Source: Attachment 26 - Supplier Declaration of Interest Template.docx (unknown)Evaluation will consider declarations made in the Supplier Declaration of Interest:
Compliance Requirements
Source: Attachment 26 - Supplier Declaration of Interest Template.docx (unknown)The Supplier Declaration of Interest Template must be completed and signed under oath. It requires disclosure of any Eskom employees or directors with an interest in the supplier, close family or associate relationships with Eskom personnel involved in the procurement, and business courtesies exchanged in the last 12 months. Consultants must also declare other services provided to Eskom-related entities.
Description
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form.pdfThe document is an Eskom acknowledgement form for OHS legal and other requirements. It does not describe the scope of the remedial repairs work.
Submission Guidelines
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form.pdf (unknown)Returnable documents:
Submission method and address are not stated in this document.
Evaluation Criteria
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form.pdf (unknown)Evaluation criteria are not stated in this document. The only requirement is the signed Annexure B acknowledgement form and compliance with the OHS obligations it references.
Technical Specifications
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form.pdf (unknown)Scope of work is not detailed in this document. The document covers OHS compliance obligations for the contractor and its subcontractors/suppliers.
Quality Management
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form.pdfThe main supplier must provide evidence of a documented contractor and supplier selection process incorporating competency, compliance and OHS performance. The supplier must notify Eskom prior to appointing any contractor or supplier and before commencement of work. The supplier must ensure contractors and suppliers have the necessary resources and competencies to execute the work scope. The supplier is accountable for management and oversight of its contractors and suppliers, ensuring compliance with all applicable legal, regulatory, contractual and other requirements. The supplier must implement a programme of audits and assessments to verify contractor and supplier compliance with OHS requirements throughout the execution of the work. The supplier must manage all contractor and supplier (all tiers) non-conformances and non-compliances in accordance with agreed performance and penalty mechanisms, aligned to Eskom processes where applicable. Eskom reserves the right to verify any action taken on contractors/suppliers when deemed necessary.
Compliance Requirements
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form.pdf (unknown)The contractor must comply with all applicable legislation, standards, policies and procedures relevant to services rendered to Eskom, including:
After contract award, the contractor must fully align its processes to Eskom's OHS requirements (policies, procedures, standards).
Contractual penalties will be enforced on the main supplier for non-compliance with statutory or other requirements, particularly Eskom OHS requirements.
All employees (contractors/suppliers) must undergo relevant Eskom induction and their company's induction.
The main supplier must:
Eskom reserves the right to verify any action taken on contractors/suppliers when deemed necessary.
Health & Safety
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form.pdfThe contractor must comply with all applicable OHS legislation, standards, policies, procedures and other requirements relevant to services rendered to Eskom, including the Occupational Health and Safety Act, Compensation for Occupational Injuries and Diseases Act, Eskom Contractor Health and Safety Requirements Standard 32-136, OHS specification/requirements, Incident Management Procedure 32-95, and Working at Heights Procedure 32-418. After contract award, the contractor is responsible for fully aligning its processes to Eskom's OHS requirements. Contractual penalties shall be enforced on the main supplier for non-compliance with statutory or other requirements, particularly Eskom OHS requirements. All employees (contractors/suppliers) must undergo relevant Eskom induction and their company's induction. The main supplier shall provide evidence of a documented contractor and supplier selection process incorporating competency, compliance, and OHS performance requirements; notify Eskom prior to appointing any contractor or supplier; ensure contractors and suppliers have necessary resources and competencies; be accountable for management and oversight of contractors and suppliers; implement a programme of audits and assessments to verify OHS compliance; and manage all contractor and supplier non-conformances in accordance with agreed performance and penalty mechanisms. Eskom reserves the right to verify any action taken on contractors/suppliers when deemed necessary.
Description
Source: Attachment 25 - Non-Disclosure Agreement (NDA) Vendors Template.docxThe document is a Non-Disclosure Agreement (NDA) template between Eskom Holdings SOC Ltd and suppliers/tenderers. It sets out the terms under which Eskom will disclose confidential information to the receiving party, and the receiving party's obligations to protect that information.
Evaluation Criteria
Source: Attachment 25 - Non-Disclosure Agreement (NDA) Vendors Template.docx (unknown)Bidders must be legally incorporated entities with authority to enter into the NDA. The NDA must be signed by a duly authorised representative (for Eskom, no lower than Procurement Senior Manager). Bidders must have no conflict of interest or prior unauthorised disclosure of Eskom's confidential information. No other eligibility criteria (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in this document.
Technical Specifications
Source: Attachment 25 - Non-Disclosure Agreement (NDA) Vendors Template.docx (unknown)The agreement is between Eskom Holdings SOC Ltd (Disclosing Party) and the supplier/tenderer (Receiving Party). Eskom's registered office: Megawatt Park, Maxwell Drive, Sunninghill ext.3, Sandton, Republic of South Africa. Eskom registration number: 2002/015527/06.
Description
Source: Attachment 4B - Ankerlig Pricing Schedule.pdfRemedial repairs to pollution control dams, fuel containment areas and associated stormwater infrastructure at Ankerlig Power Station. Work is split between Ankerlig 1 and Ankerlig 2 areas.
Submission Guidelines
Source: Attachment 4B - Ankerlig Pricing Schedule.pdf (unknown)Returnable documents: the priced Bill of Quantities (Attachment 4B) must be completed and submitted. No other returnable forms are listed in this attachment.
Submission method and address are not stated in this document.
Evaluation Criteria
Source: Attachment 4B - Ankerlig Pricing Schedule.pdf (unknown)Evaluation criteria are not stated in this document. The contract is a re-measurement contract (NEC3 ECC Option B) priced against a Bill of Quantities. Condition-assessment reports must be signed by a Professional Civil Technologist or Professional Engineer.
Technical Specifications
Source: Attachment 4B - Ankerlig Pricing Schedule.pdf (unknown)Scope: remedial repairs to pollution control dams, fuel containment areas and associated stormwater infrastructure at Ankerlig Power Station.
Work areas: Ankerlig 1 and Ankerlig 2.
Key activities:
Contract duration: 18 months (time-related items).
Quality Management
Source: Attachment 4B - Ankerlig Pricing Schedule.pdfQuality management fixed obligations include initial Quality Plan, QCP/ITP preparation and document-control setup.
Quality management and document control are time-related items for the whole contract duration.
Rates include quality control and testing.
Pricing Schedule
Source: Attachment 4B - Ankerlig Pricing Schedule.pdfPricing basis: NEC3 ECC Option B – re-measurement contract with Bill of Quantities.
Items are measured using quantities and rates or lump sums; value-related items are not used.
Rates and prices are fully inclusive of all work, risks, liabilities, overheads, profit and everything necessary.
Quantities may not be final; actual quantities assessed by the Project Manager determine payment.
Items are measured net; no allowance for waste unless stated.
Rate-only items are paid only when work is instructed or measurable.
The Bill of Quantities includes preliminary and general items (fixed and time-related), dewatering and cleaning, concrete and crack repairs, joint and sealant repairs, tank-to-foundation sealing, underground stormwater drainage inspection and cleaning, and rate-only environmental/waste disposal items.
Financial Requirements
Source: Attachment 4B - Ankerlig Pricing Schedule.pdf (unknown)Pricing basis: NEC3 Engineering and Construction Contract (ECC3) Option B – priced contract with Bill of Quantities (re-measurement).
Payment: based on actual quantities measured and certified by the Project Manager.
Rates and prices are fully inclusive of all work, risks, liabilities, overheads, profit and everything necessary.
No allowance for waste in quantities unless stated.
Rate-only items are paid only when work is instructed or measurable.
No bid security, guarantee, retention or payment terms are stated in this document.
Compliance Requirements
Source: Attachment 4B - Ankerlig Pricing Schedule.pdf (unknown)Condition-assessment reports must be signed by a Professional Civil Technologist or Professional Engineer.
No other compliance requirements (CSD, tax, B-BBEE, CIDB) are stated in this document.
Health & Safety
Source: Attachment 4B - Ankerlig Pricing Schedule.pdfHealth and safety fixed obligations include initial plans, risk assessments, statutory appointments, safe work procedures, PPE and health and safety file requirements.
Health and safety compliance is a time-related item for the whole contract duration.
Environmental
Source: Attachment 4B - Ankerlig Pricing Schedule.pdfEnvironmental compliance fixed obligations include initial Environmental Management Plan and activity-specific environmental planning.
Environmental compliance is a time-related item.
Off-site transport and lawful disposal of hazardous or hydrocarbon-contaminated solid waste is a rate-only item.
Contractual Terms
Source: Attachment 4B - Ankerlig Pricing Schedule.pdfContract form: NEC3 Engineering and Construction Contract (ECC3) Option B – priced contract with Bill of Quantities.
Contract duration: 18 months (time-related items).
The Bill of Quantities is a pricing document only; the Works Information defines the scope.
Quantities may be remeasured; actual quantities determine payment.
Description
Source: Attachment 10 - Control Quality Plan (CQP) Template 2021.docxThe document is a Contract Quality Plan (CQP) template that the supplier must complete to plan how quality management requirements for the contract will be met. It is based on SANS 466:2005 / ISO 10005:2005 guidelines.
Technical Specifications
Source: Attachment 10 - Control Quality Plan (CQP) Template 2021.docx (unknown)The document is a Contract Quality Plan (CQP) template. The supplier must complete and submit this plan to demonstrate how quality management requirements for the contract will be met. The plan must cover:
Compliance Requirements
Source: Attachment 10 - Control Quality Plan (CQP) Template 2021.docx (unknown)The CQP template references SANS 466:2005 / ISO 10005:2005 as guidelines for quality plans. The supplier must align the CQP with these standards.
Description
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfThe Contractor OHS & Q Management Plan describes roles, responsibilities, key focus areas, and initiatives prioritized over three years. Objectives include reducing contractor-related medical incidents from two to zero, reducing struck against/stuck, contact with fumes/electricity and wasp insect bites incidents by analyzing root causes, and creating a strong safety culture through behavior-based observations. The plan applies throughout Peaking OU and is reviewed annually. Key challenges include lack of accountability, poor processes, misalignment in human performance, emergency work compromising safety, constrained resources, contractor safety culture prioritizing financial viability, and emerging contractors lacking safety consciousness. Strategic initiatives include safety engagements between BU and contractor leadership, contractor KPIs for OHS compliance, categorizing contractors by risk, conducting audits, analyzing incident trends, GMR 2.1 permit reviews, Legal Liability Training, competency matrix for contractor representatives, standardizing OHS files, monitoring compliance dashboards, and appointing work group members.
Important Dates
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf (unknown)Briefing session: 30 April 2025 (venue not specified, not compulsory)
Evaluation Criteria
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf (unknown)Contractors must comply with Eskom OHS specification, applicable legislation, ISO 9001:2015, ISO 45001, ISO 14001, ISO 31000. Contractors must have a quality management system (QMS) compliant with ISO 9001:2015. Contractors must maintain zero fatalities and LTI within tolerance levels. Contractors must have competent personnel with minimum work experience of 2 years for contracts of 3 years or more, OHS Diploma, and training in HIRA, incident investigation, legal liability, SAMTRAC, ISO 45001. Contractors must attend safety engagements with BU leadership on a bi-annual basis. Contractors must have OHS KPIs reflected in works information or NEC contracts.
Technical Specifications
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf (unknown)Scope: Contractor OHS & Q Management Plan for Peaking OU, implemented over three years, reviewed annually. Supporting documents: ISO 9001, ISO 14001, ISO 45001, ISO 31000, Eskom OHS Strategy (240-112651496), OHS Contractor Management Model (240-5430191841T), Improvement plan (240-56926886), Eskom Contractor Health and Safety Requirements Standard (32-136), Contract and Contractor OHS Management (32-726).
Methodology
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf (unknown)The plan is implemented over three years with annual reviews. It includes strategic objectives and initiatives with specific actions, responsible persons, and target dates. Actions include safety engagements, contractor KPIs, risk categorization, audits, incident trend analysis, permit reviews, training, competency matrix, OHS file standardization, dashboards, and work group appointments. Roles and responsibilities are defined for OHS&Q Senior Advisors, Contract/Project/Outage Managers, BU General Manager, employees, and Risk and Assurance Manager.
Experience & Qualifications
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfContractor site manager and supervisor must have training in HIRA, incident investigation, supervisor training, legal liability. Safety Officer must have SAMTRAC, HIRA, incident investigation training, legal liability training, knowledge of ISO 45001, minimum 2 years work experience, and OHS Diploma (applicable to contracts of 3 years or more).
Quality Management
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfContractors must conduct internal quality audits to verify compliance of all project activities with ISO 9001 Standard and planned programs, and to assess effectiveness of the quality system. Contractors must forward a copy of the audit report to Eskom.
Health & Safety
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfEskom aims for Zero Harm. Contractors must maintain zero fatalities and LTI within tolerance levels. All incidents must be reported immediately or before end of shift. Incident investigations must be completed within 30 days. Recommendations must be closed within recommended time frames. Audit findings and non-conformances must be closed as per recommended time frames. Contractors must maintain health and safety file, comply with OHS specification and legislation, maintain good housekeeping, implement near miss reporting, and comply with Behavioural Safety Observation (BSO) and Planned Job Observation (PJO) programmes.
Environmental
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfContractors must comply with ISO 14001 Environmental Management System.
Contractual Terms
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfInformation resources are Eskom business critical assets requiring high level of protection. Sufficient measures commensurate with risk must be taken to protect these resources against accidental or unauthorized modifications, disclosure, or destruction, and to assure confidentiality, integrity, and availability.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Ankerlig Power Station - Atlantis - Cape Town - 7349
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
29
Last checked
25 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
How consulting engineers, engineering firms, and multidisciplinary practices can win public sector infrastructure contracts in South Africa — from ECSA registration and CESA membership to fee proposals, QBS scoring, and building a winning tender response.
A comprehensive guide to civil engineering infrastructure tenders in South Africa. Covers CIDB requirements, major buyers, the tender pipeline, and how civil engineering firms win government work in roads, dams, water, and sanitation.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
A professional guide for consulting engineers on bidding for government infrastructure projects. Understanding percentage-based fees, discounting ECSA guidelines, and managing professional indemnity risk.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Civil engineering. Unlock full pricing strategies, bid frequency, and historical win rates.