Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Gourikwa Power Station - - Mossel Bay -
Organization Type
GOVERNMENT
Published
23 Sept 2026
OCDS Reference
ocds-9t57fa-171561
ESKOM requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at gourikwa power station in the western cape. The work is civil engineering in nature and bidders must be registered contractors compliant with eskom's contractor health and safety requirements. All work must be performed in strict adherence to eskom's life-saving rules, which carry zero tolerance for violations and may result in disciplinary action or suspension of contractor activities.
Compliance: Bidders must be registered contractors compliant with Eskom's contractor health and safety requirements (Standard 32-136).
Safety: All work must comply with the Occupational Health and Safety Act and Eskom's Life-Saving Rules.
Life-Saving Rules: The six rules are: open, isolate, test, earth and create an equipotential zone before touch; hook up at height; buckle up; be sober; ensure a permit to work; and ensure safe live working.
Violations: Violating a Life-Saving Rule is treated as serious misconduct; contractors must immediately remove the offending employee from site and initiate disciplinary proceedings within five working days.
Suspension: Eskom may suspend a contractor's activities if a contractor manager or supervisor allows a Life-Saving Rule violation.
Scope: The work is remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 26 October 2026 - 10:00
Venue
Gourikwa Power Station
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
Gourikwa Power Station - - Mossel Bay -
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
23 Sept
2026
Tender Published
Tender was published
26 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Attachment 4B - Gourikwa Pricing Schedule.pdf
Remedial repairs to pollution control dams, fuel containment areas, associated stormwater infrastructure, berm and hazardous-waste skip containment area at Gourikwa Power Station, under an NEC3 Engineering and Construction Contract (ECC3) Option B (priced contract with bill of quantities). The works include dewatering, cleaning and concrete repairs to two dams; joint, waterstop and sealant repairs to dams and fuel-tank bunds; tank-to-foundation interface sealing; underground stormwater drainage inspection and cleaning; construction of a hazardous-waste skip containment area; and berm extension and erosion repairs.
Attachment 12 - Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements.pdf
Eskom requires remedial repairs to the pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Gourikwa Power Station in the Western Cape. The work is subject to strict OHS compliance, including adherence to the Occupational Health and Safety Act and Eskom's contractor safety standards, with contractual penalties for non-compliance.
Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdf
Eskom Generation requires a contractor to undertake remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Gourikwa Power Station near Mossel Bay, Western Cape. The work includes detailed condition assessments, concrete and joint sealant repairs, crack injection, replacement of fuel tank bund sealants, berm extension, and inspection and flushing of underground stormwater and drainage systems.
Attachment 17 - PPE NON COMPLIANCE MEMO.pdf
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station, procured by Eskom. The tender includes a mandatory PPE compliance framework requiring contractors to supply compliant personal protective equipment and adhere to strict consequence management.
Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station, issued by Eskom in the Western Cape.
Attachment 4A - C1 - C3 ECC3 - Dam Refurbishment - Gourikwa Final Draft.docx
Remedial repairs to pollution-control dams, fuel-containment areas, stormwater infrastructure, berm and hazardous-waste skip containment at Gourikwa Power Station near Mossel Bay, Western Cape, for Eskom. The works include condition assessment, concrete and joint repairs, cleaning and degreasing of dams, drainage flushing, berm extension and construction of a hazardous-waste skip containment area, under an NEC3 Engineering & Construction Contract (Option B, re-measurement).
Attachment 8 - Remedial repairs GOU List of Tender Returnables Cat 3 Rev 7 (14).xlsx
Eskom requires remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station in the Western Cape. The tender includes a quality management evaluation using Eskom's Supplier Quality Management scorecard, with bidders assessed across five weighted sections covering QMS certification or evidence of an operating QMS, contract quality plans, inspection and test plans, and additional requirements.
E3579GXPOU - Invitation to Tender (ITT) - Gourikwa Power Station (003).pdf
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station in the Western Cape. The contract will be an NEC3 Engineering and Construction Contract, with a compulsory site clarification meeting and a minimum CIDB grading of 5CE.
Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdf
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station, on behalf of Eskom in the Western Cape.
Attachment 25 - Non-Disclosure Agreement (NDA) Vendors Template.docx
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station in the Western Cape. The work involves repairing containment structures to ensure environmental compliance and operational integrity.
Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdf
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station. The scope covers repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure.
Attachment 7 - Form A - Remedial Repairs_ANK.docx
Eskom requires remedial repairs to the pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Gourikwa Power Station in the Western Cape. The work is governed by Eskom specification 240-105658000 and the ISO 9001 quality standard, with the successful bidder required to comply with pre- and post-contract award quality requirements.
Attachment 5 - Technical Evaluation Criteria - Gourikwa.pdf
Eskom requires a contractor for remedial civil engineering works at Gourikwa Power Station, including repair of pollution control dams and fuel tank bunds, construction of a hazardous waste skips containment area, and associated environmental containment infrastructure. The evaluation will assess tenderers' experience, technical approach, quality management, key personnel, and programme.
Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdf
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station, owned by Eskom, in the Western Cape. The work involves repairing and restoring containment structures to ensure environmental compliance and operational integrity.
Attachment 3 - Gourikwa Scope of Work.pdf
Analysis completed but response format was invalid
Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station, for Eskom in the Western Cape. The contract will be governed by Eskom's Peaking Contractor OHS&Q Management Plan, which sets out safety, health and quality requirements for contractors.
Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdf
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station, procured by Eskom in the Western Cape.
Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form.docx
Eskom requires remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Gourikwa Power Station in the Western Cape. The work involves restoring containment systems to ensure environmental compliance and operational integrity.
Attachment 2 - E-tendering Help Manual for supplier.docx
Remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Gourikwa Power Station in the Western Cape, on behalf of Eskom.
Attachment 9 - Supplier Quality Management Specification (3) (8).pdf
Eskom requires remedial repairs to the pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Gourikwa Power Station in the Western Cape. The work is subject to Eskom's Supplier Quality Management specification, which mandates a compliant quality management system and submission of quality documentation as part of the tender.
Attachment 26 - Supplier Declaration of Interest Template.docx
Remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Gourikwa Power Station, procured by Eskom in the Western Cape.
Attachment 23 - Tender Questions and Answers Template.docx
Eskom is procuring remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Gourikwa Power Station in the Western Cape.
Attachment 6 - SDLI Strategy Setting Template for Bidders - Gourikwa Power Station.pdf
Eskom requires remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Gourikwa Gas Turbine Station in the Western Cape. The project duration is 18 months, with specific goals for B-BBEE and mandatory local content and skills development requirements.
Attachment 24 - Contract Deviations Committee Approval Template.docx
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station, procured by Eskom in the Western Cape.
Attachment 14 - Baseline Risk Assessment - Drizit and Fuel tanks refurbishment.pdf
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station, for Eskom in the Western Cape. The work includes repairs to dams, fuel tanks, and related containment systems, with a strong focus on occupational health and safety risk management.
Attachment 20 -Driver_and_Vehicle_Safety_Management_Procedure.pdf
Eskom requires remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Gourikwa Power Station in the Western Cape. The work is governed by Eskom's Driver and Vehicle Safety Management Procedure, which imposes strict requirements on all drivers and vehicles used for Eskom business, including contractors.
Attachment 19 - Life-Saving_Rules Standard.pdf
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station, issued by Eskom in the Western Cape. The work involves repairing containment structures to prevent environmental damage, with strict adherence to Eskom's Life-Saving Rules covering electrical safety, working at height, seatbelt use, sobriety, permits and live working.
Attachment 10 - Control Quality Plan (CQP) Template 2021.docx
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station, issued by Eskom in the Western Cape.
Attachment 13 - Annexure C1 -Dam Refurbishments for Gourikwa - 2026.pdf
Eskom requires bidders to submit a complete set of OHS returnables for remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Gourikwa Power Station, Western Cape. The work is classified as high risk and the successful tenderer must demonstrate a compliant safety management system before contract award.
18.85 - 6134 Section and details Station Waste Skips Containment Area.pdf
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station, procured by Eskom in the Western Cape.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 2 738 521
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This specification defines the minimum quality requirements for all existing and potential Eskom suppliers, covering selection, evaluation, vendor registration, management, monitoring, assessment and auditing of suppliers. It requires suppliers to develop, implement, maintain and continually improve a quality management system (QMS) based on ISO 9001, applicable to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and contracts for procurement of products and services.
Important Dates
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)Closing date: 26 October 2026 at 10:00 (from tender record).
No briefing or site visit dates are stated in the provided document.
Contact Information
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)No specific contact details are provided in the document. The department is Supply Chain Management.
Submission Guidelines
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)Returnable documents (per the List of Tender Returnables, document 240-12248652):
Evaluation Criteria
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)Quality assessment criteria are selected and completed by an Eskom Quality representative using Form A. Bidders must meet the quality requirements of the applicable category (1, 2, 3 or 4) as indicated in Form A. Only one category applies per procurement. Eskom may assess supplier capability and capacity prior to award. No scoring split or minimum qualifying score is stated in the provided document.
Technical Specifications
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)Scope: This specification applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and contracts for procurement of products and services.
Suppliers must develop, implement, maintain and continually improve a quality management system (QMS) based on ISO 9001.
The QMS must conform to the latest ISO 9001 standard (or applicable QMS standard) and must drive all business processes to consistently meet Eskom requirements.
Suppliers must inform Eskom of any proposed changes to the QMS or staff that affect the quality system before implementation.
Sub-suppliers must also comply with the same QMS requirements where their scope includes design, manufacturing, maintenance, testing, storage, delivery, installation, commissioning or project management.
The main supplier is responsible for managing sub-supplier quality programmes and must implement a performance management programme for sub-suppliers.
Contract Quality Plans (CQPs) must be developed in accordance with ISO 10005 and submitted before work commences.
Quality Control Plans (QCPs) / Inspection and Test Plans (ITPs) must be developed, reviewed and accepted by Eskom, and must include hold and witness points.
Quality kick-off meetings and pre-inspection meetings are required.
Eskom may appoint resident quality inspectors and any inspection agency; suppliers must provide workspace at no cost.
Eskom has rights of access to supplier facilities and information.
Preservation management programme requirements apply to protect equipment and materials.
Nonconformities must be managed; repeated nonconformities may be escalated and contractual remedies applied.
Special processes (e.g., welding, NDT) require suitably qualified personnel with maintained records.
Methodology
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfSuppliers must develop and implement processes and procedures to monitor, verify and document quality of deliverables. QCPs/ITPs must describe equipment and locations, quality verification activities, reference documents, acceptance criteria, and certifying documents. Preservation management programme must include compliance monitoring, evaluation of storage sites, preservation work plan development, and records management.
Experience & Qualifications
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfQuality audits and related quality performance reviews shall be carried out by trained, accredited, and experienced personnel in accordance with documented procedures. Personnel performing special processes must be suitably qualified and, where applicable, registered with statutory bodies. Training certificates must meet SETA requirements.
Quality Management
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfSuppliers and sub-suppliers must develop, implement, maintain and improve a formal QMS conforming to the latest ISO 9001 standard or applicable QMS standard. Unless excluded, a valid ISO 9001 certificate from an accredited certification body is required. Suppliers must submit documented information including quality manual, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, and nonconformity and corrective action procedure. The QMS must drive business processes to consistently meet Eskom requirements. Suppliers must inform Eskom of any proposed changes to the QMS or staff affecting the quality system prior to implementation.
Contract Quality Plans (CQPs) must be developed and implemented in accordance with ISO 10005, covering management of records, access for inspection, final documentation submission, special processes (welding, installation, fabrication), personnel qualification and training, equipment and materials storage/preservation, quality monitoring activities, resources, communication channels, management authority and responsibility, and monitoring & measurement procedures. CQPs must comply with Eskom Quality Requirements and be submitted prior to work commencement. Eskom's CQP template may be used as a guideline.
Quality Control Plans (QCPs) / Inspection and Test Plans (ITPs) must be developed to monitor, verify and document quality of deliverables. They must cover all stages from contract review through materials verification, manufacturing, fabrication, assembly, final testing, commissioning, hand-over documentation and certification. QCPs/ITPs must be reviewed and accepted by Eskom, allow for insertion of hold and witness points, and changes require Eskom agreement. They must include contract number, order number, work description, sequence of operations, acceptance criteria, intervention points, and records to be generated. Sub-supplier QCPs/ITPs must comply with Eskom requirements. Quality kick-off meetings and pre-inspection meetings are required. Eskom may appoint resident quality inspectors and any inspection agency.
Supplier capability and capacity assessments shall be performed prior to contract award for suppliers providing products/services with high risk to operational sustainability, working on critical plant and equipment, supplying critical plant items or components, or providing special processes. Assessments apply to Generation Level 1 & 2 plant, Transmission and Distribution Power Plant & Control Plant, and Mega Projects.
Post-contract award, suppliers must undergo quality performance monitoring and audits. Suppliers must submit documented processes for conducting quality audits and performance reviews, and provide a schedule of anticipated audits at the time of first CQP submission.
Preservation requirements: The supplier's preservation programme must clearly document processes for monitoring compliance, address temporary, long-term and in-transit preservation, including protection from environmental conditions, coatings, grounding, inert gas charging, vibration protection, and structural integrity. Compliance monitoring must commence with engineering instructions and continue until equipment is incorporated into an operating system.
Management of nonconformities: Suppliers must respond to and rectify nonconforming products within contractual conditions. Repeated nonconformities within 6 months must be escalated to management review committees and, if unresolved, to the supplier review committee. Contractual remedies may be applied in accordance with FIDIC/NEC contracts.
Special processes: Suppliers must ensure all operators are suitably qualified for special processes in accordance with procedures, processes and applicable standards/codes. Records of qualification of procedures, processes and operators must be maintained and made available to Eskom at all times.
Financial Requirements
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)No financial requirements (pricing format, bid security, guarantees, retention, payment terms, turnover) are stated in the provided document.
Compliance Requirements
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)ISO 9001 certification: Unless excluded, a valid ISO 9001 certificate from an accredited certification body is required.
QMS documentation: Must submit documented information including quality manual, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, and nonconformity and corrective action procedure (as applicable to the category).
Audit reports: Latest internal and external audit reports, including nonconformities and corrective actions, must be submitted (Category 1 and 2).
Form A: Must be completed and signed.
No CSD registration, tax clearance, B-BBEE level, or CIDB grading requirements are stated in the provided document.
Health & Safety
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfThe specification references Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) as an informative reference. No specific health and safety requirements are detailed in the provided document.
Contractual Terms
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfStandard conditions include Eskom's rights of access to supplier facilities and information, oversight of audit programmes, and rights to information as determined by applicable legislation. Works must be conducted in accordance with the contract. Preservation management programme requirements apply, including clear documentation of preservation requirements, sub-supplier responsibilities, and Eskom's free and unrestricted access to preservation records.
Requirements
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)Supplier quality requirements are classified into four categories (1, 2, 3, 4). Category 1 requires submission of Form A, valid ISO 9001 certificate, internal and external audit reports, draft contract quality plan, example ITP/QCP, documented information for control of externally provided processes, roles/responsibilities/authorities, and management review records. Category 2 requires objective evidence of a developed, implemented and maintained QMS with specific documented information. Category 3 requires objective evidence of a developed QMS with specific documented information. Category 4 requires a quality method statement based on ISO 9001, signed quality policy, quality objectives, and documented information for control of externally provided processes and roles/responsibilities. Only one category applies per procurement process.
Description
Source: Attachment 2 - E-tendering Help Manual for supplier.docxThis document is the Eskom eTendering System Suppliers Help Manual (revision 3.0, dated 28 August 2023). It explains how suppliers register on the system, upload tender documents, and finalise submissions. It does not contain the tender specification for the remedial repairs at Gourikwa Power Station.
Contact Information
Source: Attachment 2 - E-tendering Help Manual for supplier.docx (unknown)For system problems or difficulties using Tender Bulletin, eTendering or OpenText systems, contact the buyer responsible for the published tender. No specific contact details are provided in this document.
Submission Guidelines
Source: Attachment 2 - E-tendering Help Manual for supplier.docx (unknown)Submission is electronic only via Eskom's eTendering system at https://eTendering.eskom.co.za. Bidders must register on the system and have a valid CSD number to gain access. Upload each required document under the correct category (technical, commercial, finance, etc.). Individual file size must not exceed 50MB; total upload size must not exceed 900MB. After uploading all documents, click 'Finalize Submission' and then 'Finalise and Close Submission' to complete the bid. A confirmation email with the submission ID will be sent; keep it for reference. Late or incomplete submissions are not accepted.
Evaluation Criteria
Source: Attachment 2 - E-tendering Help Manual for supplier.docx (unknown)No evaluation criteria are stated in the provided document. Bidders must be registered on the eTendering system and have a valid CSD number to access it.
Technical Specifications
Source: Attachment 2 - E-tendering Help Manual for supplier.docx (unknown)The document is a user manual for Eskom's eTendering system, not the tender specification. It describes how suppliers register and upload tender documents electronically. No technical scope, quantities, or delivery locations are provided.
Compliance Requirements
Source: Attachment 2 - E-tendering Help Manual for supplier.docx (unknown)A valid CSD (Central Supplier Database) number is required to access the eTendering system. Registration on the eTendering system is mandatory. No other compliance requirements are stated in this document.
Description
Source: Attachment 10 - Control Quality Plan (CQP) Template 2021.docxThe document is a Contract Quality Plan (CQP) template provided by Eskom. Its purpose is to help the supplier identify and plan how to meet the client's quality management expectations and requirements for the contract.
Submission Guidelines
Source: Attachment 10 - Control Quality Plan (CQP) Template 2021.docx (unknown)Returnable documents: the completed Contract Quality Plan (CQP) template must be submitted as part of the bid. The template requires the supplier to complete the Supplier/Contract Name and Eskom Enquiry/Contract No. fields. No other returnable forms are specified in this document.
Evaluation Criteria
Source: Attachment 10 - Control Quality Plan (CQP) Template 2021.docx (unknown)No evaluation criteria are stated in this document. The CQP template is a quality planning tool, not an evaluation framework.
Technical Specifications
Source: Attachment 10 - Control Quality Plan (CQP) Template 2021.docx (unknown)The Contract Quality Plan (CQP) template is to be used by the supplier to plan how quality management requirements of the contract will be met. The template references SANS 466:2005 and ISO 10005:2005 as guidelines. The CQP must address the following elements:
Compliance Requirements
Source: Attachment 10 - Control Quality Plan (CQP) Template 2021.docx (unknown)No specific compliance requirements (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in this document.
Description
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfThe tender is for remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station. It is a civil engineering works contract.
Important Dates
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Closing date: 26 October 2026 at 10:00 (SAST).
Compulsory site visit / clarification meeting: details in the Tender Data. Attendance is compulsory; failure to attend results in disqualification.
Briefing Session
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)A site visit and/or clarification meeting may be stipulated as compulsory in the Tender Data. Attendance is compulsory; failure to attend results in disqualification. Details are in the Tender Data.
Contact Information
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Enquiries must be directed in writing to the Eskom Representative only. No other Eskom official may be contacted.
Eskom will publish all clarification requests and responses on the platform where the tender was advertised.
Submission address: as stated in the Tender Data (tender box or e-tender portal).
Submission Guidelines
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Submission method: paper or e-tender as specified in the Tender Data.
Evaluation Criteria
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Evaluation stages:
Arithmetical errors: if figures and words differ, words prevail. Eskom will notify and request confirmation or correction; failure to correct or accept corrections leads to rejection.
Technical Specifications
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Scope: remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station.
Category: civil engineering.
Location: Gourikwa Power Station, Western Cape.
No further technical details are provided in this document.
Quality Management
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfTenderers must provide proof that quality systems, policies and capabilities are in place, as part of SHEQ requirements. All costs and personnel associated with quality must be reflected in the tender.
Pricing Schedule
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfRates and prices must include all duties, taxes (including VAT) and levies applicable 14 days before closing.
Prices must be fixed for the contract duration unless otherwise provided.
State rates and prices in South African Rand unless instructed otherwise.
The Pricing Schedule must include a line item for cataloguing if required.
Arithmetical errors: if figures and words differ, words prevail. Eskom will correct errors; if the tenderer does not accept corrections, the tender is rejected.
Financial Requirements
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Pricing:
Security for performance (if required):
Insurance:
Financial analysis:
Compliance Requirements
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eligibility:
CIDB:
B-bbee:
Tax compliance: valid tax clearance required if stipulated in the Invitation to Tender.
Sheq:
Legislation: comply with National Treasury Instruction Notes, CIDB Regulations, PPPFA Regulations, Amended B-BBEE Codes, COIDA, OHS Act, and Eskom's SHEQ requirements.
SDL&I Undertaking: must be completed and submitted by contract award; failure results in the tender not being considered for award.
Designated materials and thresholds: information must be submitted by contract award; failure results in the tender not being considered for award.
Contract Skills Development Goals (CSDG): if awarded, must achieve CSDG per CIDB Standard, applicable to contracts of R5 million or more or CIDB grade 7 or higher.
Contract Participation Goals (CPG): if awarded, must achieve CPG for targeted enterprises per CIDB standard, applicable to certain construction works contracts.
Misrepresentation or falsification of any information leads to disqualification and possible suspension from doing business with State-Owned Companies for up to 10 years.
Health & Safety
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfTenderers must provide proof that safety, health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the closing date and/or contract award.
All costs and personnel associated with SHEQ must be reflected in the tender.
Compliance with OHS Act and Eskom's SHEQ requirements is mandatory.
Contractual Terms
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfEskom may accept or reject any variation, deviation or alternative tender, and may cancel the tender at any time before contract conclusion.
Eskom may enter into mandated negotiations with selected tenderers.
Eskom disclaims liability for losses or damages arising from participation in the tender process.
Tender validity: tender must remain valid for acceptance within the validity period; if requested, the tenderer must extend the validity period. Failure to extend results in exclusion.
Confidentiality: all matters arising in connection with the procurement must be treated as confidential; documents may only be used for preparing and submitting the tender.
Insurance: Eskom's insurance may not be full cover; tenderers should seek qualified advice.
Security for performance: if required, tenderer must name at least two financial institutions; Eskom may reject unsuitable institutions.
Contract documents: Eskom will revise the contract documents to take account of addenda, returnables, negotiation changes and other agreed revisions.
Form of Agreement: authorised signatories of both parties will complete and sign the original and one copy.
Requirements
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eligibility: must comply with criteria in Tender Data; must not be under restriction to do business with Eskom or State-Owned Companies; must not sub-contract 100% of scope.
Submission: original plus one copy (paper) or e-tender via Eskom Tender Bulletin; must be in English, in ink, signed.
Packaging: original and copy in separate packages marked 'ORIGINAL' and 'COPY', sealed in an outer package marked 'Confidential' with required details.
Validity: tender must remain valid for the validity period; extend if requested.
Confidentiality: treat all matters as confidential; use documents only for the tender.
Alterations: no alterations except to correct errors; all alterations initialled; no correction fluid or tape.
Alternative tenders: only if main tender submitted and permitted.
Clarification: provide clarification and documents as required; mandatory returnables not requested after closing.
Contract signing: check final draft and sign contract documents.
Agent authority: authenticated copy of authority to act as agent must be submitted.
Compliance: comply with relevant legislation and regulatory instruments.
SHEQ: provide proof of SHEQ systems; include costs in tender.
CIDB: register with CIDB if required; proof at closing or application with registration by award.
CSDG: achieve Contract Skills Development Goals if applicable.
CPG: achieve Contract Participation Goals if applicable.
Misrepresentation: disqualification and reporting for fraud or fronting.
SDL&I Undertaking: complete and submit by contract award.
Cataloguing: provide cataloguing information and label materials per Eskom specifications; quote cataloguing as line item.
Security for performance: name at least two financial institutions if required.
Addenda: check for addenda regularly; Eskom may extend closing date.
Late tenders: returned unopened; not accepted.
Mandatory documents: missing mandatory documents by closing disqualifies.
Pre-qualification: comply with pre-qualification criteria if stipulated; no double dipping.
Arithmetical errors: words prevail over figures; corrections binding.
B-BBEE: provide proof if pre-qualification; otherwise score zero.
Specific Goals: provide proof by closing; otherwise score zero.
Ranking: price + specific goals added and ranked.
Objective criteria: only if stipulated; functionality and B-BBEE not used.
Reverse e-auction: submit without prices if used.
Notification: successful tenderer notified before validity expiry; published for open tenders.
Section
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfBasic compliance: failure to submit original and copy (paper) or to upload (e-tender) renders non-responsive.
Mandatory returnables: missing mandatory documents by closing disqualifies.
Pre-qualification: must comply if stipulated; no double dipping.
Functionality: scored if applicable; must meet minimum threshold.
Financial analysis: risk assessed; if too high and no mitigating factors, not considered.
Price evaluation: per Tender Data, considering CPA, FOREX, commodity exposure, discounts, technical adjustment, PV and forecasted invoicing.
B-BBEE: scored from CSD report or certificate; if pre-qualification, proof at closing or disqualification; if no certificate, zero points.
Specific Goals: scored with supporting documentation; failure to submit proof by closing results in zero points.
Ranking: price + specific goals added and ranked.
Objective criteria: only if stipulated; functionality and B-BBEE not used.
Reverse e-auction: if used, submit without prices.
Arithmetical errors: words prevail; corrections binding; rejection if not accepted.
Submission Guidelines
Source: Attachment 26 - Supplier Declaration of Interest Template.docx (unknown)Returnable documents: the Supplier Declaration of Interest form must be completed, signed, and submitted with the bid. The declaration must be true and correct; false declarations may lead to action by Eskom.
Evaluation Criteria
Source: Attachment 26 - Supplier Declaration of Interest Template.docx (unknown)Submission of the Supplier Declaration of Interest form is mandatory. The declaration must be true and correct; false declarations may lead to action by Eskom.
Compliance Requirements
Source: Attachment 26 - Supplier Declaration of Interest Template.docx (unknown)The Supplier Declaration of Interest form must be completed and submitted. It requires the supplier to declare any conflicts of interest, including whether any person with an interest in the supplier is employed by Eskom, is a close family member or associate of an Eskom employee/director, or has given or received a business courtesy from an Eskom employee/director in the last 12 months. The declaration must be signed under oath.
Description
Source: Attachment 24 - Contract Deviations Committee Approval Template.docxThe document is a template for obtaining Deviation Committee approval for changes to contract terms. It is not the full tender specification. The actual tender is for remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station.
Submission Guidelines
Source: Attachment 24 - Contract Deviations Committee Approval Template.docx (unknown)Returnable documents:
Evaluation Criteria
Source: Attachment 24 - Contract Deviations Committee Approval Template.docx (unknown)The Deviation Committee will review the deviation request. The submission must include the stance of the business unit personnel, legal adviser, insurance adviser, project manager, and risk and mitigation. Only requests where a change to the terms as advertised have been negotiated and agreed should be included; abandoned suggestions/requests must not be included.
Technical Specifications
Source: Attachment 24 - Contract Deviations Committee Approval Template.docx (unknown)The scope is remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station. The document provided is a template for obtaining Deviation Committee approval for changes to the contract terms.
Compliance Requirements
Source: Attachment 24 - Contract Deviations Committee Approval Template.docx (unknown)No specific compliance requirements are stated in the provided document.
Evaluation Criteria
Source: Attachment 19 - Life-Saving_Rules Standard.pdf (unknown)Bidders must be registered contractors compliant with Eskom's contractor health and safety requirements (Standard 32-136). All work must comply with the Occupational Health and Safety Act and Eskom's Life-Saving Rules. Violations of Life-Saving Rules will result in disciplinary action and possible suspension of contractor activities. Contractors must immediately remove any employee who violates a Life-Saving Rule and initiate disciplinary proceedings within five working days.
Technical Specifications
Source: Attachment 19 - Life-Saving_Rules Standard.pdf (unknown)Eskom requires all work to be conducted with duty of care for people and the environment, preventing work-related injuries and ill-health. The Life-Saving Rules apply to all Eskom employees, agents, consultants, and contractors, and visitors must also adhere to them. The rules enforce zero tolerance for serious at-risk behaviours that could cause disabilities or fatalities. The standard applies at all Eskom sites and to all Eskom-controlled entities and contractors.
Methodology
Source: Attachment 19 - Life-Saving_Rules Standard.pdfFor live work, bidders must adhere to the High Voltage Live Working Standard, observe and maintain the minimum approach distance (MAD), and never mix live and dead work on the same site at the same time.
Quality Management
Source: Attachment 19 - Life-Saving_Rules Standard.pdfCompliance with the standard is monitored through annual audit and inspection plans. The Life-Saving Rule Acknowledgement Form (240-63942960) is a supporting document.
Compliance Requirements
Source: Attachment 19 - Life-Saving_Rules Standard.pdf (unknown)Bidders must comply with the Occupational Health and Safety Act and Eskom's contractor health and safety requirements (Standard 32-136). All work must adhere to Eskom's Life-Saving Rules, which include: Rule 1: Open, isolate, test, earth and create an equipotential zone before touch. Rule 2: Hook up at height. Rule 3: Buckle up. Rule 4: Be sober. Rule 5: Ensure that you have a permit to work. Rule 6: Ensure safe live working. Violations are treated as serious misconduct and may lead to disciplinary action, including suspension of contractor activities.
Health & Safety
Source: Attachment 19 - Life-Saving_Rules Standard.pdfEskom enforces six Life-Saving Rules with zero tolerance for violations: Rule 1: Open, isolate, test, earth and create an equipotential zone before touch. Rule 2: Hook up at height. Rule 3: Buckle up. Rule 4: Be sober. Rule 5: Ensure that you have a permit to work. Rule 6: Ensure safe live working. Violations are treated as serious misconduct and may lead to disciplinary action, including suspension of contractor activities. Contractors must remove any employee who violates a rule and initiate disciplinary proceedings within five working days.
Contractual Terms
Source: Attachment 19 - Life-Saving_Rules Standard.pdf (unknown)Violating a Life-Saving Rule is treated as serious misconduct and results in a disciplinary process per the Eskom Disciplinary Code and Procedure. Eskom may suspend contractor activities if a contractor manager or supervisor allows a violation. The contractor must remove the violating employee from site and initiate disciplinary proceedings within five working days, furnishing Eskom with a copy of the sanction.
Section
Source: Attachment 19 - Life-Saving_Rules Standard.pdfBidders must comply with ISO 9001 Quality Management Systems and Eskom's Safety, Health, Environment and Quality Policy (Standard 32-727).
Description
Source: Attachment 20 -Driver_and_Vehicle_Safety_Management_Procedure.pdfThis is an internal Eskom procedure standardising driver and vehicle safety across Eskom and its subsidiaries. It applies to all drivers and vehicles used for Eskom business, including contractors and consultants using Eskom-subsidised transport.
Important Dates
Source: Attachment 20 -Driver_and_Vehicle_Safety_Management_Procedure.pdf (unknown)No tender-specific dates are stated. The document is an internal procedure authorised on 15 January 2024.
Evaluation Criteria
Source: Attachment 20 -Driver_and_Vehicle_Safety_Management_Procedure.pdf (unknown)No evaluation criteria are stated in this document. The document is an internal Eskom procedure, not a bid evaluation framework.
Technical Specifications
Source: Attachment 20 -Driver_and_Vehicle_Safety_Management_Procedure.pdf (unknown)This document is an internal Eskom procedure, not a tender specification. It sets out driver and vehicle safety requirements for anyone driving on Eskom business, including contractors and consultants. Key requirements:
Experience & Qualifications
Source: Attachment 20 -Driver_and_Vehicle_Safety_Management_Procedure.pdfDrivers must be competent and licensed for the specific vehicle class. Driver assessors must hold a valid provincial instructor's certificate and be evaluated per MEC requirements. Site driver assessors must conduct at least five assessments per month and undergo biannual internal assessments.
Quality Management
Source: Attachment 20 -Driver_and_Vehicle_Safety_Management_Procedure.pdfVehicles must be inspected before each trip and annually. Eskom-owned vehicles require a full annual inspection by the fleet manager. Vehicles must comply with Eskom Vehicle Safety Specification (32-345).
Compliance Requirements
Source: Attachment 20 -Driver_and_Vehicle_Safety_Management_Procedure.pdf (unknown)Contractors must comply with the Occupational Health and Safety Act and Eskom's Contractor Health and Safety Requirements (32-136).
Health & Safety
Source: Attachment 20 -Driver_and_Vehicle_Safety_Management_Procedure.pdfEskom has a zero-tolerance stance on at-risk driving behaviour. Key requirements:
Contractual Terms
Source: Attachment 20 -Driver_and_Vehicle_Safety_Management_Procedure.pdfDrivers who do not adhere to the safety rules face disciplinary action, which may include dismissal. Drivers must park safely and adapt driving to prevailing conditions.
Description
Source: Attachment 4B - Gourikwa Pricing Schedule.pdfThe works comprise remedial repairs to pollution control dams, fuel containment areas, associated stormwater infrastructure, berm and hazardous-waste skip containment area at Gourikwa Power Station. The contract is a re-measurement contract (NEC3 ECC Option B) with a Bill of Quantities.
Technical Specifications
Source: Attachment 4B - Gourikwa Pricing Schedule.pdf (unknown)Scope of works (Bill of Quantities, Option B re-measurement contract):
Quality Management
Source: Attachment 4B - Gourikwa Pricing Schedule.pdfQuality management obligations include initial Quality Plan, QCP/ITP preparation and document-control setup. Rates and prices include quality control and testing. Specific testing requirements: Modified AASHTO density/compaction tests, concrete cube-strength testing, coating DFT measurement, and a minimum 24-hour water-retention test after coating cure.
Pricing Schedule
Source: Attachment 4B - Gourikwa Pricing Schedule.pdfBill of Quantities items include: Preliminary and General (fixed-charge and time-related items), Berm extension and erosion repairs, Dams dewatering/assessment/cleaning, Concrete/reinforcement/crack repairs, Dam joint/waterstop/sealant repairs, Fuel-tank bund joint repairs, Tank-to-foundation interface sealing, Underground stormwater drainage, Hazardous-waste skip containment area, and Rate-only environmental/waste items.
Financial Requirements
Source: Attachment 4B - Gourikwa Pricing Schedule.pdf (unknown)Pricing basis: NEC3 ECC Option B (re-measurement contract with Bill of Quantities).
Compliance Requirements
Source: Attachment 4B - Gourikwa Pricing Schedule.pdf (unknown)No specific eligibility criteria (CSD, tax, B-BBEE, CIDB) stated in this pricing schedule document. The document only requires the Contractor to Provide the Works in accordance with the Works Information.
Health & Safety
Source: Attachment 4B - Gourikwa Pricing Schedule.pdfHealth and safety fixed obligations include initial plans, risk assessments, statutory appointments, safe work procedures, PPE and health and safety file requirements. Time-related health and safety compliance is required for the 18-month contract duration.
Environmental
Source: Attachment 4B - Gourikwa Pricing Schedule.pdfEnvironmental compliance fixed obligations include initial Environmental Management Plan and activity-specific environmental planning. Time-related environmental compliance is required. Off-site transport and lawful disposal of hazardous or hydrocarbon-contaminated waste is a rate-only item.
Contractual Terms
Source: Attachment 4B - Gourikwa Pricing Schedule.pdfContract is NEC3 Engineering and Construction Contract (ECC3) Option B. The Contractor Provides the Works in accordance with the Works Information. The Bill of Quantities is a pricing document only, not Works Information. Compensation events are assessed using Defined Cost plus Fee unless otherwise agreed.
Submission Guidelines
Source: 18.85 - 6134 Section and details Station Waste Skips Containment Area.pdf (unknown)Returnable documents: all mandatory forms in the tender pack must be completed, signed and submitted with the bid, including:
Submission method and address: not stated in the available document.
Closing time: 10:00 (from the tender record).
Evaluation Criteria
Source: 18.85 - 6134 Section and details Station Waste Skips Containment Area.pdf (unknown)Evaluation will follow the 80/20 or 90/10 preference point system as applicable under the PPPFA (specific split not stated in the available document).
Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance certificate (SARS TCS or tax pin).
CIDB grading may be required for construction work; the specific grade must be verified in the full tender document.
Technical Specifications
Source: 18.85 - 6134 Section and details Station Waste Skips Containment Area.pdf (unknown)Scope: remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station.
Location: Gourikwa Power Station, Western Cape.
Nature of work: civil engineering repairs to containment infrastructure.
Compliance Requirements
Source: 18.85 - 6134 Section and details Station Waste Skips Containment Area.pdf (unknown)CSD registration: mandatory.
Tax clearance: valid SARS TCS or tax pin required.
CIDB grading: may be required for construction work; verify the specific grade in the full tender document.
B-BBEE: preference points claimed via SBD 6.1; specific level thresholds not stated in the available document.
Description
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdfThis memorandum clarifies roles, responsibilities, and consequence management for PPE compliance for all contractor employees and Eskom Peaking employees, referencing the Eskom PPE Standard (240-44175132). It aims to ensure consistent application of the standard, promote safety, and prevent operational disruptions from non-compliance. Persistent PPE non-compliance has been identified during BSO activities, housekeeping, and routine plant walkdowns, and features in monthly outage management reports. Business Units must issue clear PPE compliance instructions and outline consequence-management measures.
Important Dates
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Memorandum date: 04 February 2026
Contact Information
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Peaking Business Unit Durbanville Office
Telephone: +27 21 941 5800
Evaluation Criteria
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Compliance with the Eskom PPE Standard (240-44175132) is mandatory for all contractor employees. Contractors must include PPE costs in Pricing Schedules/Bills of Quantities and incorporate non-compliance clauses in contracts. No other evaluation criteria (e.g., price, functionality, B-BBEE) are stated in the provided document.
Technical Specifications
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Purpose: Clarify roles, responsibilities, and consequence management for PPE compliance for all contractor and Eskom Peaking employees, referencing the Eskom PPE Standard (240-44175132).
Contract Custodians must:
Contractor Companies must:
Safety Department must:
Consequence management for contractor employees:
Consequence management for Eskom employees:
Compliance Requirements
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Compliance with the Eskom PPE Standard (240-44175132) is mandatory. PPE must be issued free of charge as per General Safety Regulations. No other compliance requirements (e.g., CSD, tax clearance, B-BBEE, CIDB) are stated in the provided document.
Health & Safety
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdfPPE compliance is mandatory for all contractor and Eskom Peaking employees. Contract Custodians must include PPE in pricing schedules/BoQs and enforce non-compliance clauses. Contractor Companies must issue PPE based on risk assessments, ensure procurement compliance, inspect PPE, provide training, and enforce consequences. Safety Department must ensure PPE costs are included, create awareness via SHE induction, and conduct audits. Consequence management: non-compliant contractor employees must stop work immediately; if PPE was issued, suspension and consequence management follow; if the company failed to issue PPE, work stops until PPE is issued and an NCR is issued. Non-compliant Eskom employees must stop work pending inquiry; willful failure to use issued PPE leads to consequence management.
Contact Information
Source: Attachment 13 - Annexure C1 -Dam Refurbishments for Gourikwa - 2026.pdf (unknown)No contact details are provided in this document.
Submission Guidelines
Source: Attachment 13 - Annexure C1 -Dam Refurbishments for Gourikwa - 2026.pdf (unknown)Returnable OHS documents (all must be submitted with the bid):
Evaluation Criteria
Source: Attachment 13 - Annexure C1 -Dam Refurbishments for Gourikwa - 2026.pdf (unknown)Evaluation is based on OHS compliance. The bidder must submit all required OHS returnables and be recommended by the Eskom OHS representative. No other evaluation criteria (e.g. price, functionality, B-BBEE) are stated in this document.
Technical Specifications
Source: Attachment 13 - Annexure C1 -Dam Refurbishments for Gourikwa - 2026.pdf (unknown)Scope of work: Remedial repair of pollution control dams and fuel tank bunds at Gourikwa Power Station. The work is classified as high risk for OHS purposes.
Experience & Qualifications
Source: Attachment 13 - Annexure C1 -Dam Refurbishments for Gourikwa - 2026.pdfBidders must provide CVs and qualifications/certificates demonstrating OHS competency relevant to the scope of work. Required competencies may include Incident Management, First Aid, Hazardous Chemical Controller, HIRA, Working at Height, and Basic Rescue techniques.
Financial Requirements
Source: Attachment 13 - Annexure C1 -Dam Refurbishments for Gourikwa - 2026.pdf (unknown)OHS costing must be detailed and broken down, not provided as a lump sum. The costing must be based on the overall scope of work.
Compliance Requirements
Source: Attachment 13 - Annexure C1 -Dam Refurbishments for Gourikwa - 2026.pdf (unknown)No specific compliance requirements (e.g. CSD, B-BBEE, CIDB) are stated in this document.
Health & Safety
Source: Attachment 13 - Annexure C1 -Dam Refurbishments for Gourikwa - 2026.pdfRequired OHS submissions:
Section
Source: Attachment 13 - Annexure C1 -Dam Refurbishments for Gourikwa - 2026.pdfThe bid is evaluated on OHS compliance using Annexure C1 (OHS Tender Evaluation Template – High Risk). The bidder must be recommended by the Eskom OHS representative.
Description
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdfEskom's SHEQ Policy underpins the approach to safety, health, environment and quality. Incident management is a risk management function with objectives to reduce risk, prevent recurrence, ensure accurate classification and recording, prompt investigation, promote near-miss reporting, learn from incidents, share information, report to stakeholders, analyse trends, and involve all stakeholders. Eskom is committed to Zero Harm. The procedure applies to all Eskom entities, employees, contractors, and affected public. It is effective from 1 April 2021.
Methodology
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdf (unknown)The incident management procedure outlines a step-by-step methodology: 1) Incident identification (direct and indirect observation), 2) Initiation and execution of emergency response (rescue, scene safety, first aid, evidence collection), 3) Notification and reporting to stakeholders (internal and external, with specific timelines), 4) Incident prioritisation using consequence and likelihood matrices to assign priority ratings, 5) Classification and recording of incidents (based on work-relatedness and relationship to Eskom), 6) Incident investigation (root cause analysis, investigation committees, reporting templates), 7) Management of corrective actions (implementation and monitoring), 8) Incident close-out, and 9) Incident communication throughout the process.
Quality Management
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdfThe procedure references ISO 9001, ISO 45001, and OHSAS 18001 as informative standards. Compliance is monitored through first- to third-tier audit processes. Investigation reports are controlled disclosure documents. All health and safety incidents must be investigated, excluding non-work-related incidents outside workplace boundaries. Repeat incidents must consider ineffective corrective actions from previous incidents.
Health & Safety
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdfThis is Eskom's Occupational Health and Safety Incident Management Procedure (Revision 9, effective 1 April 2021). It defines the process for managing OHS incidents: identification, emergency response, notification, prioritisation, classification, investigation, corrective actions, close-out, and communication. It applies to all Eskom entities, employees, contractors, and affected public. Key definitions include accident, fatality, first-aid injury, lost-time injury, medical injury, near-miss, occupational disease, public incident, and serious incident. Responsible Managers must implement, communicate, and monitor compliance. Incidents must be classified and recorded on SAP EH&S, with escalation to the Safety Data Integrity Committee for disputes. Investigations follow specified procedures, with special handling for serious incidents and fatalities.
Environmental
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdfThe document references the Eskom SHEQ Policy which covers environment, and includes environmental considerations in incident management (e.g., property damage, public incidents). It also references the Emergency Planning Procedure and Fire Risk Management Standard, which may have environmental implications.
Contractual Terms
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdfIn joint ventures, each company is liable for its own contraventions and may be prosecuted in its own name. Incident management is not for assigning blame but for identifying improvements. Violations such as deliberately misleading information, withholding evidence, or victimisation are treated as violations. For incidents with potential liability, the Legal Department and Sustainability Systems must be advised. Corporate investigations are initiated for fatalities, with a preliminary investigation required first.
Requirements
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdf (unknown)Mandatory requirements include: all OHS incidents must be reported to relevant stakeholders; incidents must be classified and recorded on SAP EH&S according to CARAT principles; all work-related incidents must be investigated (excluding non-work-related incidents outside workplace boundaries); Responsible Managers must implement the procedure and ensure compliance; specific notification requirements for fatalities and serious incidents; and compliance with relevant legislation (OHS Act, COIDA, MHSA, etc.).
Description
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfThis document is the Contractor OHS&Q Management Plan for the Peaking Operating Unit (OU). It applies to all contractors working for Peaking OU and is implemented over three years (2024/25 to 2026/27), reviewed annually. It describes roles, responsibilities, key focus areas, and initiatives prioritised over the short to medium term. The plan's effectiveness depends on competent resources, management commitment, and availability of finances.
Contact Information
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf (unknown)No contact information is stated in this document.
Evaluation Criteria
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf (unknown)Contractor must comply with Eskom's Contractor OHS&Q Management Plan.
Technical Specifications
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf (unknown)This document is the Contractor OHS&Q Management Plan for the Peaking Operating Unit (OU). It applies to all contractors working for Peaking OU and is implemented over three years (2024/25 to 2026/27), reviewed annually.
Objectives:
Key challenges addressed:
Strategic initiatives include:
Methodology
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf (unknown)Roles and responsibilities:
Quality Management
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfContractor quality KPIs include compliance with project specifications, zero defects in workmanship, qualified and trained personnel, effective communication, adherence to budget and timelines, and an effective quality management system.
Compliance Requirements
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf (unknown)Contractor must comply with Eskom's Contractor OHS&Q Management Plan and applicable legislation.
Health & Safety
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfOHS KPIs for contractors:
Environmental
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfThe Contractor OHS&Q Management Plan should be read in conjunction with ISO 14001 Environmental Management System. No specific environmental requirements are stated in this document.
Section
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfContractor must comply with Eskom's Contractor OHS&Q Management Plan. Contractor must maintain a Health and Safety file and comply with the health and safety plan, Eskom OHS specification and applicable legislation. Contractor must maintain zero fatalities for the duration of the contract. Contractor must have a Quality Management System compliant with ISO 9001:2015. Contractor personnel must meet competency requirements as per the Peaking OHS specification, including for contractor site manager and supervisor: HIRA, incident investigation training, supervisor training, legal liability; for safety officer: SAMTRAC, HIRA, incident investigation training, legal liability training, knowledge and understanding of ISO 45001, minimum work experience of 2 years, and OHS Diploma (for contracts 3 years and more).
Description
Source: Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form.docxThe tender is for remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Gourikwa Power Station.
Submission Guidelines
Source: Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form.docx (unknown)Returnable documents:
Evaluation Criteria
Source: Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form.docx (unknown)Bidders must fully complete and submit the E-Tendering Training Acknowledgement Form within the prescribed period. Failure to do so will render the bidder non-responsive and disqualified from the procurement process. No other eligibility criteria are stated in the provided document.
Submission Guidelines
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements.pdf (unknown)Returnable documents:
Submission method and address: not stated in the provided document.
Evaluation Criteria
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements.pdf (unknown)No evaluation criteria are stated in the provided document. The only requirement is the signed Annexure B acknowledgement form.
Technical Specifications
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements.pdf (unknown)The main supplier must manage and oversee all contractors and suppliers, including:
Quality Management
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements.pdfThe main supplier must have a documented contractor and supplier selection process covering competency, compliance, and OHS performance. They must notify Eskom before appointing any contractor or supplier and before work begins, ensure contractors and suppliers have the necessary resources and competencies, and be accountable for their management and oversight. A programme of audits and assessments must verify OHS compliance throughout the work. Non-conformances and non-compliances from all tiers of contractors and suppliers must be managed according to agreed performance and penalty mechanisms. Eskom may verify any actions taken regarding contractors or suppliers when deemed necessary.
Compliance Requirements
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements.pdf (unknown)The contractor must comply with all applicable OHS legislation, standards, policies, procedures and other requirements relevant to services rendered to Eskom, including:
After contract award, the contractor is responsible for fully aligning its processes to Eskom's OHS requirements.
Contractual penalties will be enforced on the main supplier for non-compliance with statutory or other requirements, particularly Eskom OHS requirements.
All employees (contractors/suppliers) must undergo the relevant Eskom induction and their company's induction.
Health & Safety
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements.pdfThe contractor must comply with all applicable OHS legislation, standards, policies, procedures and other requirements relevant to services rendered to Eskom, including the Occupational Health and Safety Act, Compensation for Occupational Injuries and Diseases Act, Eskom contractor Health and Safety requirements standard 32-136, OHS specification/requirements, Incident Management Procedure 32-95, and Working at Heights Procedure 32-418. After contract award, the contractor is responsible for fully aligning its processes to Eskom's OHS requirements. Contractual penalties will be enforced on the main supplier for non-compliance with statutory or other requirements, particularly Eskom OHS requirements. All employees (contractors/suppliers) must undergo the relevant Eskom induction and their company's induction.
Description
Source: Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdfEskom requires a safe working environment in line with its SHEQ Policy and legislative obligations. This OHS requirements document sets the minimum standards for contractors during the contract period. The contractor must develop an OHS plan that meets these requirements and all applicable legislation. Eskom does not assume the contractor's legal responsibilities; the contractor remains accountable for the health and safety of their employees and appointed contractors. The requirements are minimums and do not supersede organizational OHS requirements.
Important Dates
Source: Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdf (unknown)Closing date: 26 October 2026 at 10:00
Document effective date: May 2022
Document signed: 21 September 2026
Contact Information
Source: Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdf (unknown)Eskom Safety Officer: Priscilla Malepe
End User: Emanuel Netshivhulana
Project address: Gourikwa Power Station, Mossel Bay, N2 next to PatroSA Landfill site, 6511
Submission Guidelines
Source: Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdf (unknown)Returnable documents: all completed, signed and submitted with the bid. Standard Eskom forms include the OHS plan, risk assessments, method statements, and the Section 37(2) agreement. The OHS plan must be approved by Eskom before work starts. No permanent repair works may proceed without written acceptance of the condition assessment report and proposed remedial measures. Bids must be submitted before the closing time; late submissions are disqualified.
Evaluation Criteria
Source: Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdf (unknown)The bid is evaluated on compliance with the OHS requirements and the technical scope. The contractor must develop and submit an OHS plan meeting Eskom's minimum requirements, including risk assessments, method statements, and safe work procedures. The contractor must comply with Eskom's Life-Saving Rules, substance abuse procedure, and all applicable legislation. The contractor must provide a Letter of Good Standing (COID) and ensure medical fitness of employees. The contractor must have a full-time health and safety officer and site supervisor. The contractor must obtain security clearance. Eskom reserves the right to terminate the contract for non-compliance with OHS requirements.
Technical Specifications
Source: Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdf (unknown)Scope of work:
Dam condition assessment:
Surface areas:
Sealant distress:
Crack repairs:
General concrete repairs:
Fuel tank bunds:
Tank-to-foundation interface:
Repair materials:
Berm extension and erosion repairs:
Methodology
Source: Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdfSafe work procedures and method statements must be written for new jobs, changed tasks, or new equipment or substances. The contractor must provide guidance on how to execute tasks safely.
Quality Management
Source: Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdfQuality requirements include detailed condition assessment of dams and sumps, repair of exposed reinforcement, concrete spalling, joint movement, sealant distress, continuous cracks, and defective joint sealants. The contractor must inspect underground stormwater systems and flush underground drainage. All repair materials must be accepted by the Supervisor before use. The condition assessment report must be accepted before remedial works commence.
Financial Requirements
Source: Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdf (unknown)Costing for OHS within the project: The contractor must include all costs for OHS compliance in the bid price. Waste disposal costs must be included in the contractor's pricing.
Compliance Requirements
Source: Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdf (unknown)Legal compliance:
Health & Safety
Source: Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdfThe contractor must comply with the OHS Act and Regulations, including signing a Section 37(2) agreement. Must develop and submit an OHS plan, risk assessments, method statements, and safe work procedures. Must comply with Eskom's Life-Saving Rules, substance abuse procedure (zero tolerance for alcohol and drugs), and all applicable legislation. Must provide a Letter of Good Standing (COID) and ensure medical fitness of employees. Must have a full-time health and safety officer and site supervisor. Must obtain security clearance. Eskom has the right to terminate the contract for non-compliance.
Environmental
Source: Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdfThe contractor must comply with environmental legislation and Eskom's duty of care to the environment. Waste must be classified and disposed of at appropriate disposal sites. Use approved biodegradable, non-toxic degreasing agents. Collect wash water, emulsified oils, and residues and convey to oil-water separator or approved containment. Dispose of waste per site environmental procedures and applicable legislation.
Contractual Terms
Source: Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdfThe contractor must be competent to perform supervisory tasks. Training requirements include HIRA, incident investigation, supervisor training, authorised person and legal liability. Eskom has the right to terminate the contract for non-compliance with OHS requirements.
Section
Source: Attachment 11 - OHS Requirements for Peaking Rev3- Drizit and Fuel tanks refurbishment Final.pdfThe contractor must comply with the OHS requirements and the technical scope. The OHS plan must be approved by Eskom before work starts. The condition assessment report must be accepted before remedial works proceed. Non-compliance with OHS requirements may lead to contract termination.
Description
Source: Attachment 4A - C1 - C3 ECC3 - Dam Refurbishment - Gourikwa Final Draft.docxThe works comprise inspection, maintenance, remedial repair, and construction works associated with pollution-control dams, fuel-containment infrastructure, underground stormwater drainage systems, erosion-control works, and hazardous-waste skip containment infrastructure at Gourikwa Power Station. The objective is to restore and maintain structural integrity, watertightness, environmental containment, and operational performance of the dirty-water management and fuel-containment infrastructure.
Submission Guidelines
Source: Attachment 4A - C1 - C3 ECC3 - Dam Refurbishment - Gourikwa Final Draft.docx (unknown)Returnable documents:
Submission method: as per the tender data and returnable schedules; the extracted text does not specify the channel, address, or number of copies.
Disqualification risks:
Evaluation Criteria
Source: Attachment 4A - C1 - C3 ECC3 - Dam Refurbishment - Gourikwa Final Draft.docx (unknown)Evaluation is under the PPPFA preference point system (80/20 or 90/10, exact split to be confirmed in the tender data).
Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance.
Bidders must comply with the Occupational Health and Safety Act, 1993 (Act 85 of 1993) and provide a valid Letter of Good Standing (COIDA).
Personnel accessing the site must have a valid medical fitness certificate, police clearance (not older than 3 months), valid RSA ID or equivalent, and a valid driver's licence where applicable.
Bidders must comply with Eskom Supplier Quality Management Specification 240-105658000 (QM-58) and ISO 9001:2015.
No minimum qualifying score or specific evaluation split is stated in the extracted text; confirm from the full tender pack.
Technical Specifications
Source: Attachment 4A - C1 - C3 ECC3 - Dam Refurbishment - Gourikwa Final Draft.docx (unknown)Scope of works at Gourikwa Power Station (near Mossel Bay, Western Cape):
Affected areas:
Contract type: NEC3 Engineering and Construction Contract (ECC3), Option B (re-measurement with Bill of Quantities).
Key management and compliance requirements:
Financial Requirements
Source: Attachment 4A - C1 - C3 ECC3 - Dam Refurbishment - Gourikwa Final Draft.docx (unknown)Pricing under NEC3 ECC3 Option B (re-measurement): Bill of Quantities with rates and lump sums; quantities are remeasured from actual work completed in accordance with CESMM3.
Rates and prices are fully inclusive of all work, risks, liabilities, overheads, profit, and everything necessary.
No general provision for payment for materials on Site before incorporation; allowance may be made in rates or method-related charges.
Compensation events are valued using Defined Cost plus Fee unless otherwise agreed.
Retention may apply under Secondary Option X16; a Retention Money Guarantee may be provided in the specified pro forma form to avoid retention deductions.
Contractor must provide securities, bonds, guarantees, and proof of insurance as stated in the Contract Data, within two weeks of receiving the completed contract agreement.
No bid security, advance payment, or specific turnover thresholds are stated in the extracted text.
Compliance Requirements
Source: Attachment 4A - C1 - C3 ECC3 - Dam Refurbishment - Gourikwa Final Draft.docx (unknown)Mandatory registrations and documents:
Description
Source: Attachment 8 - Remedial repairs GOU List of Tender Returnables Cat 3 Rev 7 (14).xlsxThe document is a list of tender returnables and a quality evaluation scorecard for the remedial repairs project at Gourikwa Power Station. It defines four categories of quality requirements, with Category 3 selected for this tender. The scorecard evaluates quality management system documentation, contract quality plans, and quality control plans.
Submission Guidelines
Source: Attachment 8 - Remedial repairs GOU List of Tender Returnables Cat 3 Rev 7 (14).xlsx (unknown)Returnable documents:
Evaluation Criteria
Source: Attachment 8 - Remedial repairs GOU List of Tender Returnables Cat 3 Rev 7 (14).xlsx (unknown)Quality evaluation is weighted across five sections:
Technical Specifications
Source: Attachment 8 - Remedial repairs GOU List of Tender Returnables Cat 3 Rev 7 (14).xlsx (unknown)The tender is for remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Gourikwa Power Station. The document provided is a quality evaluation scorecard and returnables list; it does not contain detailed technical specifications, quantities, or locations beyond the project title.
Compliance Requirements
Source: Attachment 8 - Remedial repairs GOU List of Tender Returnables Cat 3 Rev 7 (14).xlsx (unknown)No specific compliance requirements (CSD, tax, B-BBEE, CIDB) are stated in the provided document.
Important Dates
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Gourikwa Power Station.pdf (TENDER)Closing date: 26 October 2026 at 10:00 (from tender record).
No other dates (briefing, site visit, clarification deadlines) are stated in the document.
Submission Guidelines
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Gourikwa Power Station.pdf (TENDER)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Gourikwa Power Station.pdf (TENDER)Evaluation stages:
Technical Specifications
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Gourikwa Power Station.pdf (TENDER)Scope of work: Provision of remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Gas Turbine Station.
Duration of the project: 18 months.
Designated sector: This commodity is a designated sector.
Local content thresholds (mandatory):
CIDB skills development:
Quality Management
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Gourikwa Power Station.pdf (TENDER)Reporting and monitoring:
Financial Requirements
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Gourikwa Power Station.pdf (TENDER)Pricing format: Tender response must be separated into local and imported components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component.
SDL&I penalty and performance security:
Compliance Requirements
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Gourikwa Power Station.pdf (TENDER)CSD registration: Bidders must be registered on the Central Supplier Database (CSD).
Tax compliance: Valid tax clearance (SARS TCS or tax pin) is required.
B-bbee:
Local content:
CIDB:
Sworn affidavit validity:
B-BBEE Requirements
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Gourikwa Power Station.pdf (TENDER)Specific goals: A maximum of 10/20 points may be awarded for the specific goal. Points are added to price points and rounded to two decimals. Award to highest total points per PPPFA. B-BBEE status level points table: Level 1: 10 (90/10) / 20 (80/20); Level 2: 9/18; Level 3: 6/14; Level 4: 5/12; Level 5: 4/8; Level 6: 3/6; Level 7: 2/4; Level 8: 1/2; Non-compliant: 0/0. To claim preference points, tenderers must submit a valid B-BBEE certificate (SANAS accredited) or sworn affidavit/CIPC affidavit, proof of ownership/shareholding (preferably CIPC) with shareholding breakdown, certified ID copies of shareholders, and proof of disability where applicable. Failure to provide documentation does not disqualify but the tenderer may only score out of 90/80 for price and scores 0 out of 10/20 for specific goals.
Contractual Terms
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Gourikwa Power Station.pdf (TENDER)SDL&I penalty and performance security:
Special Conditions
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Gourikwa Power Station.pdf (TENDER)SDL&I Objectives in line with RDP Goals:
Requirements
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Gourikwa Power Station.pdf (TENDER)Objective criteria:
Section
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Gourikwa Power Station.pdfSection 1: Specific Goals
A maximum of 10/20 points may be awarded to a tenderer for the specific goal specified for the tender. The points scored for the specific goal must be added to the points scored for price and the total must be rounded off to the nearest two decimal places. Subject to section 2(1)(f) of the Preferential Procurement Policy Framework Act, the contract must be awarded to the tenderer scoring the highest points.
B-BBEE Status Level of Contributor points table (90/10 system / 80/20 system):
NB: The following documents are required to claim preference points:
Tenderer failing to provide documentation for the allocation of preference points will not be disqualified, but:
Description
Source: E3579GXPOU - Invitation to Tender (ITT) - Gourikwa Power Station (003).pdfThe tender is for remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station. The contract will be governed by the NEC3 Engineering and Construction Contract. The tender documents are provided free of charge. The tender is an open invitation to tender, and the tender must be for the whole of the contract.
Important Dates
Source: E3579GXPOU - Invitation to Tender (ITT) - Gourikwa Power Station (003).pdf (TENDER)Closing date and time: 26 October 2026 at 10h00
Compulsory clarification meeting: 07 October 2026 at 10h00, at Gourikwa Power Station. Attendance is mandatory; non-attendance leads to disqualification. Bidders must confirm attendance by 30 September 2026 at 12h00, stating company name, position and contact details of each attendee.
Clarification queries deadline: 5 working days before tender closing date.
Tender validity period: 12 weeks from closing date.
Contact Information
Source: E3579GXPOU - Invitation to Tender (ITT) - Gourikwa Power Station (003).pdf (TENDER)Eskom Representative (all queries and clarifications):
Procurement Manager:
Fraud and corruption reporting:
Submission: via Eskom E-tendering site (no physical address provided).
Submission Guidelines
Source: E3579GXPOU - Invitation to Tender (ITT) - Gourikwa Power Station (003).pdf (TENDER)Submission method: electronic only, via the Eskom E-tendering site (Eskom Tender Bulletin). No hard copies accepted; no zip/condensed files. Upload per document max 500 MB, total submission max 4 GB. Documents must be uploaded under the folders Technical, Commercial, Financial, and Other. All documents in PDF format; the price list must be in PDF and a copy in Word format. If resubmitting, only the latest version is accepted; previous submissions become null and void. Ensure the submission status is marked complete. Late tenders are not accepted.
Mandatory returnables at closing (disqualifiable if missing or unsigned):
Returnables required at closing but non-disqualifiable (5 working days to rectify if incomplete):
Returnables required prior to contract award:
Disqualification risks:
Evaluation Criteria
Source: E3579GXPOU - Invitation to Tender (ITT) - Gourikwa Power Station (003).pdf (TENDER)Evaluation stages:
Contractual requirements (CSD registration, SHEQ, financial viability) are assessed after evaluation and ranking, not as evaluation criteria. Failure to meet them may render the tenderer non-responsive for award.
Technical Specifications
Source: E3579GXPOU - Invitation to Tender (ITT) - Gourikwa Power Station (003).pdf (TENDER)Scope: Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Gourikwa Power Station.
Contract type: NEC3 Engineering and Construction Contract (ECC).
CIDB grading: 5CE or higher (or JV with combined grading per CIDB regulations).
Contract Skills Development Goals (CSDG): applicable, 0.375% of the contract value for CE class of works, as per the BOQ/Pricing schedule.
Quality requirements: Category 3 – must submit Supplier Quality Management Specification, Quality Control Plan or Inspection Test Plan (QCP/ITP) rev 2, and CQP Template 2021.
Safety requirements: OHS requirements for Gourikwa Power Station, including baseline risk assessment, OHS&Q Management Plan, Life-Saving Rules, PPE standard, substance abuse management, vehicle and driver safety procedure, and OHS risk assessment procedure.
Cataloguing: successful tenderer may be required to provide cataloguing information and label materials per Eskom specifications; pricing schedule must include a line item for cataloguing.
Quality Management
Source: E3579GXPOU - Invitation to Tender (ITT) - Gourikwa Power Station (003).pdfQuality requirements are Category 3. Bidders must submit the following with their tender: List of Tender Returnables_Cat 3, Form A_Cat 3, Supplier Quality Management Specification, Quality Control Plan or Inspection Test Plan (QCP/ITP) rev 2, and CQP Template 2021. These must be attached and submitted by tender closing date to expedite evaluation.
Pricing Schedule
Source: E3579GXPOU - Invitation to Tender (ITT) - Gourikwa Power Station (003).pdfThe pricing schedule/BOQ is provided as Attachment 4B. The completed pricing schedule must be submitted with the tender, in PDF format (and a copy in Word format). The pricing schedule must include a line item for cataloguing if required. Prices will be evaluated inclusive of VAT, corrected for arithmetical errors, and excluding contingencies. Unconditional discounts are considered for evaluation; conditional discounts are applied at payment. The CSDG percentage of 0.375% is included in the BOQ/Pricing schedule.
Financial Requirements
Source: E3579GXPOU - Invitation to Tender (ITT) - Gourikwa Power Station (003).pdf (TENDER)Payment terms:
Bid security: Not applicable.
Performance security: Not applicable.
Financial viability: Annual financial statements required (latest approved, not draft) – for the tendering company, not parent/holding. Must include background, signed director's report, signed auditor's/reviewer's/compiler's/accounting officer's report, statement of financial position, statement of comprehensive income, statement of changes in equity, statement of cash flows, notes to the financial statements. For non-audited SA entities: signed public interest score and ITA34C for current and previous years. For unincorporated JV/SPV, each partner must submit its own statements.
Eskom reserves the right to negotiate with preferred bidders if tendered prices are not market-related.
Compliance Requirements
Source: E3579GXPOU - Invitation to Tender (ITT) - Gourikwa Power Station (003).pdf (TENDER)Mandatory:
Additional (assessed after evaluation, prior to award):
Eligibility:
Health & Safety
Source: E3579GXPOU - Invitation to Tender (ITT) - Gourikwa Power Station (003).pdfSafety requirements are extensive and include: OHS Requirements for Gourikwa Power Station, Annexure B – Acknowledgement Form for Eskom OHS legal and other requirements, Annexure C1 – Tender Evaluation Template High Risk, Baseline Risk Assessment, Occupational Health and Safety Incident Management Procedure, OHS&Q Management Plan, PPE Non-Compliance Memo, Management of Substance Abuse in the Workplace, Life-Saving Rules Standard, Vehicle and Driver Safety Management Procedure, Eskom Personal Protective Equipment (PPE) Standard, and Occupational Health and Safety Risk Assessment Procedure. Bidders must comply with all these documents and submit the required safety returnables at tender closing.
Contractual Terms
Source: E3579GXPOU - Invitation to Tender (ITT) - Gourikwa Power Station (003).pdfThe contract will be the NEC3 Engineering and Construction Contract. The successful tenderer must comply with the CIDB Contract Skills Development Goals (CSDG) at 0.375% of the contract value for CE class of works. The recommended supplier must submit all required CSDG documentation (Annexure A-Targeted Enterprise Declaration Affidavit, Project Interim Report, Project Completion Report and Declaration) after contract award. Payment terms: 30 days for contracts below R50 million (incl. VAT), 60 days for contracts above R50 million (incl. VAT). Eskom reserves the right to negotiate with preferred bidders if prices are not market-related.
Section
Source: E3579GXPOU - Invitation to Tender (ITT) - Gourikwa Power Station (003).pdfFunctionality requirements are applicable. Bidders must score a minimum of 70% or more for the Functional Evaluation Criteria to progress to the next stage. Refer to Attachment 5 for the specific functionality requirements. Price is scored out of 80 points, and Specific Goals (B-BBEE) out of 20 points, using the 80/20 system. If a bidder fails to submit evidence for a Specific Goal, it is not disqualified but scores 0 for that goal. Contractual requirements (CSD, SHEQ, financial viability) are assessed after evaluation and ranking, not as evaluation criteria.
Description
Source: Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdfEskom is committed to protecting the safety, health, and well-being of all employees and others in the workplace. To this end, Eskom has adopted an Occupational Health and Safety (OHS) Strategy and the Zero Harm value. Eskom acknowledges that substance abuse poses a threat to the business and is therefore entitled to take reasonable steps to ensure that persons who are intoxicated and/or under the influence of any substances are identified and prevented from entering or working on any Eskom premises and/or operating any of Eskom’s equipment or vehicles.
Evaluation Criteria
Source: Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdf (unknown)Bidders must comply with Eskom's Management of Substance Abuse in the Workplace procedure (32-37). This includes ensuring that employees, contractors, consultants, and visitors are not under the influence of alcohol or drugs while on duty or on Eskom premises. Bidders must also ensure their employees comply with requests for random or specific substance or alcohol screening or testing.
Technical Specifications
Source: Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdf (unknown)The procedure applies to all persons (Eskom employees, contractors and their employees, consultants, and visitors) while on duty or reporting for duty at any Eskom premises or work site, and to all employees who drive vehicles on Eskom business, operate equipment, or perform tasks on Eskom sites. The purpose is to comply with statutory requirements, provide a healthy and safe working environment, identify/control/prevent substance abuse, prevent losses and incidents, improve productivity, identify rehabilitation needs, prevent abuse of intoxicating substances, and encourage healthy lifestyles.
Methodology
Source: Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdf (unknown)Rules for persons on Eskom premises: no access or duty if under the influence; no consumption of alcohol or drugs (unless prescribed); no improper/unlawful activity related to substances; obligation to inform line manager if using impairing medication; compliance with random or specific screening/testing; testing takes precedence over other activities; no leaving unit without permission; adverse inference for refusal/leaving; EAP services not a substitute for discipline. Screening may be done at any time by appointed testers/screeners; positive screening leads to immediate confirmation test; second test after 30 minutes; if above 0.000 mg/1000ml, person regarded as under the influence; if above legal limit, person must be fetched or stay until BAC below limit; no under-influence person permitted on premises or in control of vehicles/equipment; line manager ensures safe transport home; no remuneration for time not worked; positive results lead to disciplinary action for employees and transport arrangements for contractors/visitors. Also covers identification by observation (checklists for alcohol and drug abuse), pre-employment testing, compulsory testing, post-accident/incident testing, reasonable suspicion testing, random/ad hoc screening, return-to-work testing, and follow-up testing after discipline. Testing must be conducted confidentially, with calibrated equipment, and in accordance with legislation.
Quality Management
Source: Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdfBreathalyser instruments must be portable, have a minimum measuring range of 0 to 1.50 mg/L or 0.000 to 0.300% BAC, operate in specified temperature/pressure/humidity conditions, comply with international standards, be ready within 30 seconds, reflect BAC, perform at least 500 tests from battery, use an electrochemical fuel cell specific to ethanol, be microprocessor-controlled, have automatic sampling with manual override, indicate operational readiness, and have an audible beep for adequate sample. Calibration and maintenance must follow manufacturer specifications, with registers maintained.
Health & Safety
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdfEskom's OHS risk assessment procedure mandates a structured process for identifying, analysing, evaluating, and controlling workplace hazards. It applies to all Eskom operations and its contractors. Key elements include:
Description
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docxThe tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Submission Guidelines
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docx (unknown)Returnable documents:
Evaluation Criteria
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docx (unknown)Bidders must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard. The applicable quality category is Category 3 (refer to clause 3.5.4 of 240-105658000). No other evaluation criteria are stated in the document.
Technical Specifications
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docx (unknown)Scope: remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Ankerlig Power Station (note: tender record title refers to Gourikwa Power Station).
Quality requirements: the tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Quality category: Category 3 (refer to clause 3.5.4 of 240-105658000).
Post-contract award quality requirements apply: contract execution (clause 3.7.1), supplier quality performance monitoring (clause 3.7.2).
Standard conditions apply: Eskom rights of access (clause 3.8.1), rights to information (clause 3.8.2), preservation (clause 3.8.3), quality audits (clause 3.8.4), management of nonconformities (clause 3.8.5), special processes (clause 3.8.6).
ISO 9001 clauses 4 to 10 and quality principles 1 to 7 apply.
Compliance Requirements
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docx (unknown)No specific compliance requirements (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the document.
Description
Source: Attachment 5 - Technical Evaluation Criteria - Gourikwa.pdfThe procurement is for remedial civil engineering works at Gourikwa Power Station, including:
The contractor must have proven experience and capability in: concrete rehabilitation, water-retaining structures, pollution control facilities, fuel containment systems, structural assessments, stormwater infrastructure rehabilitation, and bunding for waste management.
The evaluation will use mandatory and qualitative criteria as defined in the technical evaluation strategy.
Submission Guidelines
Source: Attachment 5 - Technical Evaluation Criteria - Gourikwa.pdf (unknown)Mandatory returnable: attendance at the compulsory site clarification meeting at Gourikwa Power Station. Failure to attend disqualifies the bid from further evaluation.
Returnable documents (as per the technical evaluation strategy):
Disqualification risks:
Evaluation Criteria
Source: Attachment 5 - Technical Evaluation Criteria - Gourikwa.pdf (unknown)Evaluation stages:
Scoring table (per criterion):
Note: scores of 1 and 3 are not used.
Qualitative criteria and weights:
Scoring measures for experience (criterion 1.1):
Scoring measures for methodology (criteria 2.1–2.4):
Scoring measures for Quality Control Plan (criterion 3.1):
Scoring measures for key personnel:
Scoring measures for programme & resourcing (criterion 5.1):
Acceptable technical risks:
Unacceptable technical risks:
Acceptable exceptions/conditions:
Unacceptable exceptions/conditions:
Technical Specifications
Source: Attachment 5 - Technical Evaluation Criteria - Gourikwa.pdf (unknown)Scope of works at Gourikwa Power Station:
Work categories:
Condition assessment methodology must cover:
Concrete repair methodology must cover:
Berm construction and erosion protection methodology must demonstrate:
Waste skip bund construction methodology must cover:
Methodology
Source: Attachment 5 - Technical Evaluation Criteria - Gourikwa.pdfTechnical approach and methodology requirements (30% weight):
Scoring for each methodology: no method statement scores 0; incomplete or partially detailed with major deviation scores 2; detailed but with minor deviation scores 4; comprehensive, project-specific with risk controls, testing regimes, and best-practice detailing scores 5.
Experience & Qualifications
Source: Attachment 5 - Technical Evaluation Criteria - Gourikwa.pdfTenderer's experience (30% weight):
Key personnel (20% weight):
Quality Management
Source: Attachment 5 - Technical Evaluation Criteria - Gourikwa.pdfQuality management requirements:
Compliance Requirements
Source: Attachment 5 - Technical Evaluation Criteria - Gourikwa.pdf (unknown)Mandatory compliance:
Key personnel professional registrations (evaluated under qualitative criteria):
Experience requirement:
Quality management:
Unacceptable compliance risks:
Environmental
Source: Attachment 5 - Technical Evaluation Criteria - Gourikwa.pdfEnvironmental aspects of the scope:
Section
Source: Attachment 5 - Technical Evaluation Criteria - Gourikwa.pdfAdditional evaluation details:
Acceptable technical risks:
Unacceptable technical risks:
Acceptable exceptions/conditions:
Unacceptable exceptions/conditions:
Evaluation Criteria
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)Bidders must comply with the Occupational Health and Safety Act and Eskom's Life-saving Rules. Risk assessments must be conducted before PPE is issued. PPE must meet SANS standards and be fit for purpose. Employees must sign for issued PPE, and PPE must not be shared except after sanitisation. Bidders must have a process for replacing and destroying unserviceable PPE. No specific pre-qualification criteria (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document.
Technical Specifications
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)The document prescribes minimum requirements for generic Personal Protective Equipment (PPE) used in Eskom, including specifications for garments, head, eye, hearing, foot, hand, and respiratory protection, as well as selection, use, care, and maintenance. It references the Occupational Health and Safety Act and SANS standards.
Methodology
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)PPE shall be issued based on risk assessment and the PPE Matrix. Employees must be trained on PPE use and limitations. PPE must be inspected every three months. Replacement is based on exchange of unserviceable items, and old PPE must be destroyed or disposed of per the Eskom Waste Standard.
Compliance Requirements
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)PPE must comply with SANS standards (e.g., SANS 434, SANS 1397, SANS 50471) and bear the SABS mark of approval where applicable. Garments must be free from defects, and stitching must comply with SANS 10101. Fabric must have certificates of compliance.
Contractual Terms
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdfAll PPE/clothing shall be issued free of charge. Where losses are due to negligence, the appropriate Eskom disciplinary procedures shall be followed. All Eskom-branded items of PPE shall be handed in on termination of an employee's service with Eskom. These items shall remain Eskom's property and responsibility.
Description
Source: Attachment 3 - Gourikwa Scope of Work.pdfGourikwa Power Station is near Mossel Bay, Western Cape, with five diesel-fired open-cycle gas turbine units. Fuel supplied via dedicated pipeline from PetroSA. Works comprise inspection, maintenance, remedial repair and construction of pollution-control dams, fuel-containment infrastructure, underground stormwater drainage, erosion-control works and hazardous-waste skip containment. Principal works: condition assessment of Clean Water Dam (3,520 m²) and Dirty Water Dam (5,000 m²) after dewatering; repair of concrete deterioration (spalling, delamination, exposed reinforcement, cracking); repair of joints, sealants, waterstops, expansion joints; repair/replacement of joint sealants in fuel-tank bunds (Gas 1 Tanks C & D, OCGT Tanks A & B); replacement of tank-to-foundation sealant; cleaning and degreasing of dams; inspection/flushing/cleaning of underground stormwater drainage; extension of berm and erosion reinstatement north of Clean Water Dam; construction of permanent impermeable hazardous-waste skip containment area for two 6 m³ skips (reinforced concrete slab, masonry bund walls, plaster, chemical-resistant epoxy coating, low-point sump). Employer's objective: restore and maintain structural integrity, watertightness, environmental containment and operational performance of dirty-water management and fuel-containment infrastructure.
Technical Specifications
Source: Attachment 3 - Gourikwa Scope of Work.pdf (unknown)Scope of works at Gourikwa Power Station (near Mossel Bay, Western Cape):
Methodology
Source: Attachment 3 - Gourikwa Scope of Work.pdfProgramming and methodology:
Experience & Qualifications
Source: Attachment 3 - Gourikwa Scope of Work.pdfKey personnel:
Quality Management
Source: Attachment 3 - Gourikwa Scope of Work.pdfQuality requirements:
Pricing Schedule
Source: Attachment 3 - Gourikwa Scope of Work.pdf (unknown)Invoicing and payment:
Financial Requirements
Source: Attachment 3 - Gourikwa Scope of Work.pdf (unknown)Invoicing and payment:
Compliance Requirements
Source: Attachment 3 - Gourikwa Scope of Work.pdf (unknown)Health and safety:
Environmental:
Quality:
B-bbee:
Health & Safety
Source: Attachment 3 - Gourikwa Scope of Work.pdfHealth and safety obligations:
Environmental
Source: Attachment 3 - Gourikwa Scope of Work.pdfEnvironmental obligations:
Contractual Terms
Source: Attachment 3 - Gourikwa Scope of Work.pdfContract change management follows Core Clause 6 (Compensation events) and Core Clause 16 (Early warning).
Health & Safety
Source: Attachment 14 - Baseline Risk Assessment - Drizit and Fuel tanks refurbishment.pdfThe document is a baseline risk assessment for maintenance work at Gourikwa Power Station, covering activities such as working on dam edges, lifting, boat usage, working at heights, and handling fuels. It identifies hazards and required controls, including:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Gourikwa Power Station - - Mossel Bay -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
30
Last checked
25 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
How consulting engineers, engineering firms, and multidisciplinary practices can win public sector infrastructure contracts in South Africa — from ECSA registration and CESA membership to fee proposals, QBS scoring, and building a winning tender response.
A comprehensive guide to civil engineering infrastructure tenders in South Africa. Covers CIDB requirements, major buyers, the tender pipeline, and how civil engineering firms win government work in roads, dams, water, and sanitation.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
A professional guide for consulting engineers on bidding for government infrastructure projects. Understanding percentage-based fees, discounting ECSA guidelines, and managing professional indemnity risk.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Civil engineering. Unlock full pricing strategies, bid frequency, and historical win rates.