Status: Closed — No Longer Accepting Submissions
This tender closed on 26 February 2026. Submissions are no longer accepted. The tender lifecycle continues — check the awards section for updates.
Tender Type
RFI
Delivery Location
522 Impala Road - Johannesburg - Johannesburg - 2058
Organization Type
GOVERNMENT
Published
04 Feb 2026
Rand water has issued a request for information to independent power producers to explore direct electricity supply solutions for its water infrastructure across gauteng. The RFI seeks non‑binding technical, commercial and regulatory information to inform a future procurement strategy for reliable, scalable and low‑carbon power.
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: RFI IPPs - Final v1.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Important Dates
Source: RFI IPPs - Final v1.pdfContact Information
Source: RFI IPPs - Final v1.pdfBuyer Sourcing Manager – Sandisile Zulu (tel: 011 682 0708, email: [email protected])
Buyer Sourcing Manager – Tshepo Morare (tel: 011 682 0708, email: [email protected])
All queries must be addressed to the Rand Water Supply Chain Office; only the appointed contact person’s communication will be accepted after submission.
Submission Guidelines
Source: RFI IPPs - Final v1.pdfTechnical Specifications
Source: RFI IPPs - Final v1.pdfFinancial Requirements
Source: RFI IPPs - Final v1.pdfCompliance Requirements
Source: RFI IPPs - Final v1.pdfCategories
RFI
522 Impala Road - Johannesburg - Johannesburg - 2058
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFI IPPs - Final v1.pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Date & Time
Thursday, 26 February 2026 - 16:30
Venue
To follow
This briefing session took place during the tender period.
The purpose of this RFI is to enable Rand Water to undertake a structured assessment
Category: technical
of the electricity generation market and the capabilities of potential Independent Power
Category: technical
Producers (IPPs). Specifically, Rand Water seeks to gather information relating to the
Category: technical
technical, commercial, regulatory, and financial solutions available in the market, to
Category: technical
test various delivery models for the direct supply of electricity to Rand Water facilities,
Category: technical
and to use this information to inform the development of a future procurement strategy.
Category: technical
Such a strategy may, subject to the required approvals, result in the issue of a Request
MandatoryCategory: technical
for Proposal (RFP), Request for Quotation (RFQ), negotiated procurement, or another
Category: technical
SCM-approved procurement mechanism.
Category: technical
RW SCM 00073 F Rev No: 01 of 17
Category: technical
Form No: RW SCM 00073 F REQUEST FOR INFORMATION
Category: technical
Revision No: 01
Category: technical
Effective Date: 26 Jan 2026
Category: technical
3. STRATEGIC CONTEXT AND OBJECTIVES
Category: technical
Rand Water operates critical national water infrastructure with a high dependency on
Category: technical
secure and reliable electricity supply. In alignment with its legislative mandate and
Category: technical
section 51 of the PFMA, Rand Water seeks through this RFI to enhance the security
Category: technical
and continuity of electricity supply to its operations, reduce operational and financial
Category: technical
risks associated with grid instability, and improve long-term cost predictability and
Category: technical
affordability of electricity. In addition, Rand Water aims to support national
Category: technical
decarbonisation objectives and the just energy transition, while strengthening its
Category: technical
overall institutional resilience and long-term sustainability.
Category: technical
4. PROCUREMENT PHILOSOPHY (FOR INFORMATION PURPOSES)
Category: technical
For information-gathering purposes only, Rand Water’s indicative procurement
Category: technical
philosophy envisages a Build–Own–Operate–Maintain (BOOM) or Build–Own–
Category: technical
Operate–Transfer BOOT) delivery model, supported by a long-term Power Purchase
Category: technical
Agreement (PPA) in which Rand Water would act as the anchor off-taker. Under this
Category: technical
model, the IPP would assume responsibility for project development and financing, the
Category: technical
design, construction and commissioning of generation assets, ongoing operation and
Category: technical
maintenance, and the securing of all required regulatory approvals and environmental
MandatoryCategory: technical
authorisations.
Category: technical
Subject to the necessary internal and statutory approvals, Rand Water may make Rand
Category: technical
Water-owned land available under appropriate legal arrangements, facilitate access to
Category: technical
relevant technical and operational data, and act as the sole or primary off-taker of the
Category: technical
generated electricity.
Category: technical
RW SCM 00073 F Rev No: 01 of 17
Category: technical
Form No: RW SCM 00073 F REQUEST FOR INFORMATION
Category: technical
Revision No: 01
Category: technical
Effective Date: 26 Jan 2026
Category: technical
5. OVERVIEW OF THE REQUIREMENTS
Category: technical
Respondents are requested to submit non-binding information addressing the areas
Category: technical
set out below.
Category: technical
5.1 Electricity Supply Configuration (Key Requirement)
Category: technical
Respondents must indicate their capability to supply electricity directly to Rand Water
MandatoryCategory: technical
meters, with a strong preference for solutions that minimise or eliminate reliance on
Category: technical
Eskom or municipal wheeling arrangements. Proposals must describe electrical
MandatoryCategory: technical
configurations compatible with Rand Water’s operating voltage levels (6.6 kV, 11 kV,
Category: technical
44 kV and 88 kV), as well as the extent to which N-1 or N-2 redundancy, islanding
Category: technical
capability, and security of supply can be achieved. Proposals that rely on wheeling
Category: technical
arrangements must clearly motivate the technical or regulatory constraints that prevent
MandatoryCategory: technical
direct supply.
Category: technical
5.2 Target Supply Locations (Indicative)
Category: technical
Respondents may provide information for one or more supply clusters. These include
Category: technical
large or centralised nodes such as Zuikerbosch, Vereeniging, Lethabo, Zwartkopjes,
Category: technical
Eikenhof, and Palmiet, as well as distributed or smaller sites including booster pumping
Category: technical
stations, reservoirs, and remote pumping stations located across Rand Water’s area
Category: technical
of operation.
Category: technical
5.3 Capacity and Scalability
Category: technical
Respondents should indicate the proposed installed generation capacity in megawatts
Category: technical
(MW), the firm capacity that can be reliably made available to Rand Water, and the
Category: technical
extent to which the proposed solution can be scaled to meet forecast demand growth
Category: technical
up to 2050. The ability to align generation capacity with a phased implementation
Category: technical
approach should also be addressed.
Category: technical
5.4 Possible Technology Solutions
Category: technical
Respondents may propose proven, bankable generation technologies, including but
Category: technical
not limited to gas-fired generation (including hydrogen-ready solutions), hybrid
Category: technical
configurations combining gas, solar and storage, utility-scale and distributed solar PV,
Category: technical
battery energy storage systems, hydro or pressure-reduction turbine solutions, or other
Category: technical
compliant technologies. All proposed technologies must be suitable for critical
MandatoryCategory: technical
RW SCM 00073 F Rev No: 01 of 17
Category: technical
Form No: RW SCM 00073 F REQUEST FOR INFORMATION
Category: technical
Revision No: 01
Category: technical
Effective Date: 26 Jan 2026
Category: technical
infrastructure operations and compliant with applicable South African standards and
Category: technical
codes.
Category: technical
6. LAND AND SITING (INFORMATION ONLY)
Category: technical
Rand Water indicates its willingness, subject to internal approvals, to make Rand
Category: technical
Water-owned land available through lease agreements, servitudes, or long-term
Category: technical
land-use arrangements. Respondents are required to outline their anticipated land
MandatoryCategory: technical
requirements per megawatt of installed capacity, identify any site constraints or
Category: technical
sensitivities, and describe the anticipated construction footprint and access
Category: technical
requirements.
Category: technical
7. REGULATORY AND LEGAL COMPLIANCE
Category: technical
Respondents must demonstrate a clear understanding of, and experience with, the
MandatoryCategory: technical
applicable regulatory and legal frameworks, including NERSA licensing or registration
Category: technical
requirements, the South African Grid Code, embedded generation standards,
Category: technical
Environmental Impact Assessment (EIA) requirements, the Occupational Health and
Category: technical
Safety Act, and the Government Immovable Asset Management Act. All regulatory
Category: technical
compliance obligations remain the sole responsibility of the IPP.
Category: technical
8. COMMERCIAL AND FINANCIAL INFORMATION (INDICATIVE)
Category: technical
Respondents should provide high-level, non-binding commercial and financial
Category: technical
information, including indicative capital and operating costs, the expected levelised
Category: technical
cost of energy (LCOE), proposed tariff structures and indexation principles, assumed
Category: technical
PPA tenures, fuel supply arrangements, and high-level project finance structures.
Category: technical
9. IMPLEMENTATION APPROACH AND TIMEFRAMES
Category: technical
Respondents should outline indicative timeframes for project development and
Category: technical
permitting, financial close, construction, and achievement of the Commercial Operation
Category: technical
Date (COD). Rand Water places particular emphasis on certainty of implementation
Category: technical
and speed to operation, especially for priority sites.
Category: technical
10. RISK MANAGEMENT AND RESILIENCE
Category: technical
Respondents are required to identify key technical, commercial, regulatory, and fuel
MandatoryCategory: technical
supply risks associated with their proposals and to outline proposed mitigation
Category: technical
RW SCM 00073 F Rev No: 01 of 17
Category: technical
Form No: RW SCM 00073 F REQUEST FOR INFORMATION
Category: technical
Revision No: 01
Category: technical
Effective Date: 26 Jan 2026
Category: technical
measures. Information on business continuity planning, islanding capability, and
Category: technical
black-start functionality should also be provided where applicable.
Category: technical
11. CORPORATE INFORMATION AND EXPERIENCE
Category: technical
Respondents should provide corporate information including company profile and
Category: technical
ownership structure, a track record of similar projects, details of installed generation
Category: technical
capacity portfolios, evidence of local presence and empowerment credentials, and
Category: technical
information on any consortium partners where applicable.
Category: technical
12. FORMAT OF RFI RESPONSE
Category: technical
Submissions should be structured and presented in the following format as a minimum:
Category: technical
(1) Executive Summary; (2) Company Profile; (3) Technical Solution Overview; (4)
Category: technical
Direct Supply Configuration; (5) Land and Siting Requirements; (6) Regulatory
Category: technical
Approach; (7) Commercial Assumptions; (8) Implementation Timeline; (9) Risk
Category: technical
Assessment; and (10) Additional Value Propositions.
Category: technical
13. MINIMUM SUBMISSION REQUIREMENTS
Category: technical
In addition to the above the expert consultant is required to provide RAND WATER
MandatoryCategory: technical
with the following:
Category: technical
• Respondents are requested to submit a comprehensive written response
Category: technical
to this Request for Information, addressing all sections and information
Category: technical
requirements outlined in the RFI.
Category: technical
• The response should be supported by relevant capability statements that
Category: technical
demonstrate the respondent’s experience, technical competence and
Category: technical
organisational capacity to provide energy trading services of a nature and
Category: technical
scale relevant to Rand Water.
Category: technical
• Respondents are encouraged to include illustrative non-confidential case
Category: technical
studies that highlight prior experience, operational approaches or
Category: technical
outcomes achieved for comparable clients, provided that such case
Category: technical
studies do not disclose commercially sensitive or client-identifying
Category: technical
information.
Category: technical
RW SCM 00073 F Rev No: 01 of 17
Category: technical
Form No: RW SCM 00073 F REQUEST FOR INFORMATION
Category: technical
Revision No: 01
Category: technical
Effective Date: 26 Jan 2026
Category: technical
• In addition, respondents should complete and submit any compliance
Category: technical
checklists or questionnaires included as part of the RFI documentation, to
Category: technical
facilitate a consistent and efficient assessment of responses.
Category: technical
• Respondents must submit a signed declaration confirming the absence of
MandatoryCategory: technical
any actual, potential or perceived conflicts of interest in relation to this RFI
Category: technical
or any potential future engagement with Rand Water.
Category: technical
14. COST OF REQUEST FOR INFORMATION
Category: technical
Respondents are expected to fully acquaint themselves with the conditions,
Category: technical
requirements, and specifications of this RFI before submitting responses. Each
Category: technical
Respondent assumes all risks for resource commitment and expenses, direct or
Category: technical
indirect, of RFI preparation and participation throughout the RFI process. RAND
Category: technical
WATER is not responsible, directly, or indirectly, for any costs incurred by service
Category: technical
providers.
Category: technical
15. TERMS AND CONDITIONS
Category: technical
Respondents shall sign a Non-Disclosure Agreement (NDA) with RAND WATER so that they
Category: technical
can have access to additional information for this RFI.
Category: technical
RAND WATER reserves the right to.
Category: technical
✓ Verify any information contained in a response.
Category: technical
✓ Postpone, withdraw, amend, modify, or cancel the RFI process at any time,
Category: technical
without prior notice and without liability to compensate or reimburse any person
Category: technical
pursuant to such.
Category: technical
15.1 Submission of RFI Responses
Category: technical
▪ To facilitate the preparation of the RFI Response, Respondents may access the
Category: technical
following website where the Document can be downloaded:
Category: technical
https://www.randwater.co.za/availabletenders.php/.
Category: technical
RW SCM 00073 F Rev No: 01 of 17
Category: technical
Form No: RW SCM 00073 F REQUEST FOR INFORMATION
Category: technical
Revision No: 01
Category: technical
Effective Date: 26 Jan 2026
Category: technical
▪ The RFI Response, must be submitted to RAND WATER before or on closing date
MandatoryCategory: technical
and time at the following address: Tender Box (by the main entrance), 522 Impala
Category: technical
Road, Glenvista by not later than the time and date of 16:30 on 26 February 2026.
Category: technical
▪ RFI Responses reaching RAND WATER later than the cut-off time and date
Category: technical
specified above may, in the RAND WATER’s sole discretion, be rejected without
Category: technical
further consideration.
Category: technical
▪ RFI Responses may be submitted prior to the cut-off time and date specified
Category: technical
above, however only complete RFI Responses will receive attention from the
Category: technical
RAND WATER.
Category: technical
▪ All costs incurred by a Respondent in connection with this Document and the
Category: technical
preparation of its RFI Responses shall be borne by the Respondent.
Category: technical
▪ Responses submitted by companies must be signed by a person or persons duly
MandatoryCategory: technical
authorised thereto in a form of a resolution so passed by the appropriate governing
Category: technical
structure or letter of Delegation by an authorised Official of such Company.
Category: technical
15.2 Language of the RFI Response
Category: technical
▪ The RFI Response and all documents forming part of it shall be in English.
Category: technical
▪ Any printed literature submitted with the RFI Response may be in another
Category: technical
language so long as it is accompanied by an English translation (made by an
Category: technical
accredited translator) of the entire document.
Category: technical
▪ All correspondence and any other documentation and oral communication
Category: technical
exchanged between the Respondent and the organisation shall be in English.
Category: technical
15.3 Further Information
Category: technical
▪ RAND WATER reserves the right to seek additional information from the
Category: technical
Respondent regarding its RFI Response, as it may, in its sole discretion,
Category: technical
determine, whether such information has been requested under this Document or
Category: technical
otherwise, and may require the Respondent to make oral presentations for
Category: technical
clarification purposes or to present supplementary information, in respect of its
Category: technical
RFI Response if so, required by the RAND WATER.
MandatoryCategory: technical
RW SCM 00073 F Rev No: 01 of 17
Category: technical
Form No: RW SCM 00073 F REQUEST FOR INFORMATION
Category: technical
Revision No: 01
Category: technical
Effective Date: 26 Jan 2026
Category: technical
▪ The Respondent may, following the submission of a RFI Response, be requested
Category: technical
to engage with RAND WATER. Any meetings are likely to take place at RAND
Category: technical
WATER offices, which is at the following address: 522 Impala Road, Glenvista
Category: technical
2058, South Africa.
Category: technical
15.4 Contact with the Supply Chain Office
Category: technical
▪ All queries and requests for clarification in respect of this Document must be
MandatoryCategory: technical
addressed to the Supply Chain Office of Rand Water. E-mailed or oral requests
Category: technical
and queries addressed to persons other than a Supply Chain Official, at the
Category: technical
address, will not be entertained and will not receive a response. RAND WATER
Category: technical
will endeavour, in good faith, to respond to all reasonable written queries and
Category: technical
requests for clarification raised by the Respondent Rand Water will provide a final
Category: technical
response on clarifications by no later than ten (10) calendar days before the
Category: technical
closing date.
Category: technical
▪ The Respondent must give the name and contact details of the person whom it
MandatoryCategory: technical
appoints to undertake all contact with the SCM Office in its RFI Response.
Category: technical
▪ After the submission of its RFI Response, the Respondent may only communicate
Category: technical
with RAND WATER through such person and RAND WATER shall be entitled, at
Category: technical
its sole discretion, to disregard any communication from the Respondent, that
Category: technical
does not come from such contact person, and that does not go directly to the
Category: technical
Supply Chain Office.
Category: technical
15.5 Compliance, Ethics and Market Conduct
Category: technical
▪ Respondents warrant that their submissions are prepared independently and
Category: technical
without collusion, consultation, coordination or agreement with any other
Category: technical
respondent. Any conduct that may constitute collusive behaviour, anti-competitive
Category: technical
practices or market manipulation may result in exclusion from future procurement
Category: technical
processes and referral to the appropriate regulatory authorities.
Category: technical
▪ Respondents must comply with all applicable legislation, including the Protection
MandatoryCategory: technical
of Personal Information Act (POPIA), and confirm that any information submitted
Category: technical
has been lawfully obtained and may be shared with Rand Water for the purposes
Category: technical
of this RFI.
Category: technical
RW SCM 00073 F Rev No: 01 of 17
Category: technical
Form No: RW SCM 00073 F REQUEST FOR INFORMATION
Category: technical
Revision No: 01
Category: technical
Effective Date: 26 Jan 2026
Category: technical
ANNEXURE A: CHECKLIST
Category: technical
This checklist is provided for information-gathering purposes only and does not constitute
Category: technical
evaluation criteria, minimum eligibility requirements or scoring mechanisms for any future
Category: technical
procurement process.
Category: technical
A. ADMINISTRATIVE AND GENERAL INFORMATION
Category: technical
☐ Cover letter confirming submission of a non-binding RFI response.
Category: technical
☐ Acknowledgement that the RFI does not constitute a tender or procurement commitment.
Category: technical
☐ Confirmation that the respondent understands and accepts the PFMA and SCM status of
Category: technical
the RFI.
Category: technical
☐ Authorised signatory details (name, designation, contact details).
Category: technical
☐ Company registration details (legal name, registration number, country of incorporation).
Category: technical
B. EXECUTIVE SUMMARY
Category: technical
☐ Concise executive summary of the proposed solution(s).
Category: technical
☐ Overview of proposed electricity supply model to Rand Water.
Category: technical
☐ Summary of key differentiators and value propositions.
Category: technical
☐ High-level indication of suitability for direct supply to Rand Water meters.
Category: technical
C. COMPANY PROFILE AND CORPORATE INFORMATION
Category: technical
☐ Detailed company profile and ownership structure.
Category: technical
☐ Shareholding and consortium structure (if applicable).
Category: technical
☐ Details of local presence in South Africa.
Category: technical
☐ Empowerment credentials (e.g. B-BBEE status or equivalent).
Category: technical
☐ Details of consortium partners, subcontractors, or OEMs (if applicable).
Category: technical
D. RELEVANT EXPERIENCE AND TRACK RECORD
Category: technical
☐ Description of similar IPP or utility-scale projects delivered.
Category: technical
☐ Installed generation capacity portfolio (MW).
Category: technical
☐ Experience with critical infrastructure clients (water, utilities, industry etc).
Category: technical
☐ Experience with South African regulatory and grid environments.
Category: technical
RW SCM 00073 F Rev No: 01 of 17
Category: technical
Form No: RW SCM 00073 F REQUEST FOR INFORMATION
Category: technical
Revision No: 01
Category: technical
Effective Date: 26 Jan 2026
Category: technical
☐ References or case studies (optional but highly recommended).
Category: technical
E. TECHNICAL SOLUTION OVERVIEW
Category: technical
☐ Description of proposed generation technology/technologies.
Category: technical
☐ Confirmation that proposed technologies are proven and bankable.
Category: technical
☐ Suitability of technology for critical water infrastructure operations.
Category: technical
☐ Compliance with applicable South African technical standards and codes.
Category: technical
F. ELECTRICITY SUPPLY CONFIGURATION (KEY REQUIREMENT)
Category: technical
☐ Description of direct electricity supply to Rand Water meters.
Category: technical
☐ Voltage levels supported (6.6 kV / 11 kV / 44 kV / 88 kV).
Category: technical
☐ Redundancy philosophy (N-1 / N-2).
Category: technical
☐ Islanding and black-start capability (critically important).
Category: technical
☐ Description of any proposed wheeling arrangements (if applicable), including clear
Category: technical
motivation for why direct supply is not feasible (not preferred by Rand Water).
Category: technical
G. TARGET SUPPLY LOCATIONS
Category: technical
☐ Identification of Rand Water sites or clusters proposed to be supplied.
Category: technical
☐ Indication of whether supply is for:
Category: technical
☐ Centralised nodes.
Category: technical
☐ smaller sites.
Category: technical
☐ Ability to serve multiple sites or clusters (if applicable).
Category: technical
H. CAPACITY AND SCALABILITY
Category: technical
☐ Proposed installed capacity (MW).
Category: technical
☐ Respondent’s capacity available to Rand Water.
Category: technical
☐ Scalability to meet future demand growth up to 2050.
Category: technical
☐ Alignment with phased implementation approaches.
Category: technical
I. LAND AND SITING REQUIREMENTS
Category: technical
RW SCM 00073 F Rev No: 01 of 17
Category: technical
Form No: RW SCM 00073 F REQUEST FOR INFORMATION
Category: technical
Revision No: 01
Category: technical
Effective Date: 26 Jan 2026
Category: technical
☐ Confirmation of land requirements per MW.
Category: technical
☐ Identification of preferred siting (on-site / adjacent / nearby).
Category: technical
☐ Construction footprint and access requirements.
Category: technical
☐ Identification of any environmental or land-use sensitivities.
Category: technical
J. REGULATORY AND LEGAL COMPLIANCE
Category: technical
☐ Understanding of NERSA licensing or registration requirements.
Category: technical
☐ Compliance with South African Grid Code and embedded generation standards.
Category: technical
☐ Understanding of Environmental Impact Assessment (EIA) requirements.
Category: technical
☐ Compliance with Occupational Health and Safety Act.
Category: technical
☐ Compliance with Government Immovable Asset Management Act.
Category: technical
☐ Confirmation that all regulatory approvals remain the responsibility of the IPP.
Category: technical
K. COMMERCIAL AND FINANCIAL INFORMATION (INDICATIVE & NON-BINDING)
Category: technical
☐ Indicative capital expenditure (CAPEX).
Category: technical
☐ Indicative operating expenditure (OPEX).
Category: technical
☐ Expected Levelised Cost of Energy (LCOE).
Category: technical
☐ Proposed tariff structure and indexation principles.
Category: technical
☐ Indicative PPA tenure assumptions.
Category: technical
☐ Fuel supply arrangements (where applicable).
Category: technical
☐ High-level project financing structure.
Category: technical
L. IMPLEMENTATION APPROACH AND TIMELINES
Category: technical
☐ Indicative development and permitting timeline.
Category: technical
☐ Indicative timeline to financial close.
Category: technical
☐ Indicative construction period.
Category: technical
☐ Indicative Commercial Operation Date (COD).
Category: technical
☐ Identification of opportunities for fast-track implementation.
Category: technical
RW SCM 00073 F Rev No: 01 of 17
Category: technical
Form No: RW SCM 00073 F REQUEST FOR INFORMATION
Category: technical
Revision No: 01
Category: technical
Effective Date: 26 Jan 2026
Category: technical
M. RISK MANAGEMENT AND RESILIENCE
Category: technical
☐ Identification of key technical risks.
Category: technical
☐ Identification of key commercial and financial risks.
Category: technical
☐ Identification of regulatory and fuel supply risks.
Category: technical
☐ Proposed mitigation measures.
Category: technical
☐ Business continuity and resilience strategy.
Category: technical
N. ADDITIONAL VALUE PROPOSITIONS
Category: technical
☐ Innovation or technology enhancements.
Category: technical
☐ Contributions to decarbonisation and just energy transition.
Category: technical
☐ Skills development, localisation, or socio-economic benefits.
Category: technical
☐ Any additional information relevant to Rand Water’s objectives.
Category: technical
O. DECLARATION
Category: technical
☐ All information provided is true and correct to the best of the respondent’s knowledge.
Category: technical
☐ Information is provided for non-binding RFI purposes only, with no commitment to pricing,
Category: technical
volumes or contractual terms.
Category: technical
RW SCM 00073 F Rev No: 01 of 17
Category: technical
Form No: RW SCM 00073 F REQUEST FOR INFORMATION
Category: technical
Revision No: 01
Category: technical
Effective Date: 26 Jan 2026
Category: technical
ANNEXURE B: ENERGY PROFILE
Category: technical
Eskom-Supplied Stations
Category: technical
Station Average MW/month
Category: technical
Zuikerbosch 97.62 MW
Category: technical
Lethabo 9.89 MW
Category: technical
Zwartkopjes 27.25 MW
Category: technical
Palmiet 46.13 MW
Category: technical
BWD Pumping 9.59 MW
Category: technical
Total Eskom Supply 190.48 MW
Category: technical
Non-Eskom (Municipal) Supply
Category: technical
Station Average MW/month
Category: technical
Vereeniging – Emfuleni 26.89 MW
Category: technical
Eikenhof – City Power 35.90 MW
Category: technical
Mapleton – Ekurhuleni 13.05 MW
Category: technical
BWD Pumping – Emfuleni 1.87 MW
Category: technical
BWD Pumping – City Power 1.92 MW
Category: technical
BWD Pumping – Metsimaholo 1.28 MW
Category: technical
Total Other Supply 80.92 MW
Category: technical
RW SCM 00073 F Rev No: 01 of 17
Category: technical
Form No: RW SCM 00073 F REQUEST FOR INFORMATION
Category: technical
Revision No: 01
Category: technical
Effective Date: 26 Jan 2026
Category: technical
ANNEXURE C: GEOGRAPHICAL INFORMATION
Category: technical
Site Long Lat
Category: technical
Airfield Break Pressure Tank Site 28° 13' 18.466"" E 26° 8' 33.152"" S
Category: technical
Amanzimtoti Pumping Station 27° 53' 50.410"" E 26° 35' 48.840"" S
Category: technical
Barnardsvlei Reservoir Site 27° 30' 44.255"" E 25° 46' 27.346"" S
Category: technical
Barrage Site 27° 40' 51.824"" E 26° 45' 52.812"" S
Category: technical
Benoni Reservoir Site no.1 28° 18' 38.215"" E 26° 9' 39.051"" S
Category: technical
Benoni Reservoir Site no.2 28° 18' 29.461"" E 26° 9' 47.707"" S
Category: technical
Bloemendal Pumping Station 28° 34' 0.775"" E 26° 20' 34.413"" S
Category: technical
Blyvooruitzicht Reservoir Site 27° 24' 32.570"" E 26° 22' 40.715"" S
Category: technical
Borehole ZM30 27° 47' 24.983"" E 26° 19' 16.705"" S
Category: technical
Brakfontein Reservoir Site 28° 9' 40.655"" E 25° 55' 27.833"" S
Category: technical
Bronberg Reservoir Site 28° 20' 30.620"" E 25° 47' 34.161"" S
Category: technical
Buffelshoek Break Pressure Tank Site 27° 33' 54.348"" E 25° 48' 32.119"" S
Category: technical
Cullinan Pumping Station 28° 31' 44.252"" E 25° 40' 48.885"" S
Category: technical
Daleside Reservoir Site 28° 1' 58.728"" E 26° 30' 31.080"" S
Category: technical
Driefontein Reservoir Site 27° 26' 33.635"" E 26° 24' 43.764"" S
Category: technical
Eikenhof Pumping Station 27° 58' 28.167"" E 26° 18' 32.971"" S
Category: technical
Esselen Park Break Pressure Tank & Re28° 15' 21.743"" E 26° 1' 8.457"" S
Category: technical
Forest Hill No1 & No3 Res. Sites 28° 2' 28.850"" E 26° 15' 43.795"" S
Category: technical
Forest Hill Res. Site No 2 28° 2' 34.063"" E 26° 15' 28.625"" S
Category: technical
Germiston Reservoir Site 28° 8' 59.990"" E 26° 11' 12.603"" S
Category: technical
Hartebeesthoek Reservoir 28° 4' 50.176"" E 25° 40' 29.202"" S
Category: technical
Ironsyde Pumping Station 27° 54' 46.831"" E 26° 29' 22.363"" S
Category: technical
Isando Reservoir Site 28° 12' 8.685"" E 26° 7' 57.800"" S
Category: technical
Klipfontein Reservoir Site 28° 11' 11.863"" E 26° 4' 41.943"" S
Category: technical
Klipriviersberg Reservoir Site 28° 4' 13.784"" E 26° 16' 13.592"" S
Category: technical
Krugersdorp Reservoir Site 27° 48' 30.098"" E 26° 6' 43.510"" S
Category: technical
Langerand Reservoir Site 27° 52' 56.631"" E 26° 35' 9.015"" S
Category: technical
Lethabo Pumping Station & Barrier 27° 59' 34.900"" E 26° 43' 52.302"" S
Category: technical
Libanon Reservoir Site 27° 37' 32.927"" E 26° 21' 35.780"" S
Category: technical
Mamelodi Booster Pumping Station 28° 26' 14.410"" E 25° 41' 10.908"" S
Category: technical
Mapleton Pumping Station 28° 15' 21.959"" E 26° 21' 36.957"" S
Category: technical
Meredale Reservoir Site 27° 58' 27.475"" E 26° 16' 59.742"" S
Category: technical
Meyer's Hill Reservoir Site 28° 4' 53.221"" E 26° 15' 30.189"" S
Category: technical
Modderfontein East Reservoir Site 28° 25' 26.481"" E 26° 10' 36.729"" S
Category: technical
Northridge Reservoir Site 28° 11' 1.499"" E 26° 10' 10.975"" S
Category: technical
Olifantsfontein- Pretoria -Anode Site 28° 14' 28.763"" E 25° 49' 11.040"" S
Category: technical
Palmiet Pumping Station 28° 5' 21.492"" E 26° 18' 22.227"" S
Category: technical
Panfontein Sludge Disposal Site 28° 2' 45.261"" E 26° 43' 6.724"" S
Category: technical
Roodepoort Booster Pumping Station 27° 55' 41.802"" E 26° 11' 45.955"" S
Category: technical
Sasolburg Reservoir Site 27° 50' 33.719"" E 26° 48' 45.975"" S
Category: technical
Spioenkop Reservoir Site 27° 55' 18.998"" E 26° 25' 39.231"" S
Category: technical
Townlands 27° 13' 21.322"" E 25° 36' 44.905"" S
Category: technical
Trichardt Pumping Station 29° 14' 10.322"" E 26° 27' 35.325"" S
Category: technical
Vereeniging Pump Station 27° 54' 33.278"" E 26° 41' 14.423"" S
Category: technical
Vereeniging Pumping Station 27° 54' 54.156"" E 26° 41' 18.387"" S
Category: technical
Vlakfontein Reservoir Site 28° 22' 15.656"" E 26° 8' 35.895"" S
Category: technical
Waterkloof Break Pressure Tank Site 27° 39' 56.253"" E 25° 57' 57.970"" S
Category: technical
Waterval Reservoir Site 27° 57' 14.076"" E 26° 9' 38.541"" S
Category: technical
Wildebeestfontein Reservoir Site 29° 9' 4.196"" E 26° 26' 55.109"" S
Category: technical
Witpoortjie Reservoir Site 27° 47' 30.813"" E 26° 9' 20.696"" S
Category: technical
Zuikerbosch Control Works 28° 4' 38.124"" E 26° 49' 37.555"" S
Category: technical
Zuikerbosch Pumping Station 28° 1' 0.904"" E 26° 41' 13.519"" S
Category: technical
Zuurbekom No. 2 PS-Borehole Pumpho27° 47' 29.662"" E 26° 18' 48.490"" S
Category: technical
Zwartkopjes Pumping Station 28° 4' 36.465"" E 26° 22' 39.023"" S
Category: technical
RW SCM 00073 F Rev No: 01 of 17
Category: technical
No specific requirements found
MandatoryCategory: compliance
04 Feb
2026
Tender Published
Tender was published
26 Feb
2026
Closing Date
Tender closing date
Pending
Awaiting Award of Contract
This tender has not yet been awarded. The contracting authority is expected to publish the award notice in due course.
26 Feb
2026
Submissions Closed
No further submissions were accepted after this date.
Organization
Rand WaterRand Water is the largest water utility in Africa, supplying bulk potable water to Gauteng and surrounding regions.
Contact Person
Sandisile Zulu
Phone
011-682-0708
Rand Water is the largest water utility in Africa, supplying bulk potable water to Gauteng and surrounding regions.
Matched by category & region
Learn how to submit a winning bid with these related articles
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
522 Impala Rd, Dikole Section, Johannesburg South, 2058, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
05 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
011-682-0708[email protected]www.randwater.co.za522 Impala Rd, Dikole Section, Johannesburg South, 2058, South Africa
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 2 156 250
Range
Based on CIDB grading. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.