PRASA requires maintenance of fire detection systems on an as-and-when-required basis for 36 months across its western cape operations. The contract is awarded under an 80/20 or 90/10 preference-point system depending on final value, with 80 points for price and 20 points for specific b-bbee and ownership goals. The single most consequential consideration is that the award is strictly conditional on PRASA securing budget allocation before contract signature — IT may cancel the tender at any stage prior to award if funding is not secured, and bidders waive all claims for losses arising from non-award for this reason.
Key Requirements
Compulsory tender briefing: 28 October 2026 at 11:00 at Boardroom 163, 12 Liesbeeck Parkway, Salt River, Cape Town 7925 — non-attendance disqualifies the bidder.
Closing: 13 November 2026 at 12:00; deliver to PRASA, No. 3 Old Marine Drive, Opposite Neotel Building, Cape Town 8000 — late bids rejected.
Tax evidence: submit SARS TCS PIN or printed TCS certificate with bid; if no TCS PIN available, submit CSD number. Each JV/consortium/subcontractor party must submit separate tax evidence.
B-BBEE and ownership points (20 points total): Level 2 or higher (4 points); 51% black woman owned (4 points); 51% black youth owned (4 points); black people with disabilities ownership (4 points); 51% black-owned EME or QSE (4 points). Proof must accompany bid or points are forfeited.
CIDB grade: not stated in the document — no construction grading requirement identified.
Funding contingency: award is conditional on PRASA securing budget allocation; PRASA may cancel the tender at any stage before award without liability, and bidders must acknowledge this risk in Form H.
Experience: Form E must list completed works with client, nature, value, contract period and telephone number for which the bidder was directly responsible.
Disqualification grounds: state employment of bidder/directors/members; listing on Register for Tender Defaulters or List of Restricted Suppliers; false disclosure; collusion; failure to attend compulsory briefing; use of non-prescribed forms.
As and when required maintenance of fire detection for period of 36 months
Briefing SessionCompulsory
Date & Time
Friday, 13 November 2026 - 12:00
Venue
Metrorail, 12 Liesbeeck Parkway, Room 163, Infrastructure, Salt River
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Requirements & Eligibility
Eligibility Criteria
* Bidders need to download the documents themselves from e-tender, NO documents will be issued to them *bidders need to attend the compulsory tender briefing on 28 october 2026 at 11h00, doors will be locked at 11h15 thereafter NO bidder will be allowed to enter the tender briefing venue *CIDB grading 4sf or higher is applicable
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentANNEXURE 5 - SHE Specification - Tender 01-2026-CTN-INFRA.pdfReview complete
Description
Important Dates
21 Oct
2026
PUBLICATION
Tender Published
Tender was published
13 Nov
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
As-and-when-required maintenance of fire detection systems for 36 months on PRASA's Western Cape rail infrastructure, governed by the railway safety specification SPK 7/1 for work on, over, under or adjacent to railway lines and near high-voltage equipment.
ANNEXURE 5 - SHE Specification - Tender 01-2026-CTN-INFRA.pdf
PRASA requires as-and-when-required maintenance of fire detection systems at its sites and premises in the Western Cape over a 36-month period, under bid 01/2026/CTN/INFRA. The occupational health and safety specification sets the minimum legislative and organisational requirements the appointed principal contractor must meet, including a tender-stage OHS plan, a site OHS file, statutory appointments, risk assessments and incident reporting.
PRASA requires as-and-when-required maintenance of fire detection systems over a 36-month period in the Western Cape. The contract is tendered under the 80/20 preference point system and any award is subject to PRASA securing the necessary budget allocation.
PRASA requires as-and-when maintenance of fire detection systems across Western Cape rail infrastructure for a 36-month period. The contract is priced on a schedule of rates for labour (technicians and labourers) across normal hours, after-hours, Sundays/public holidays, and scheduled maintenance, plus a material markup percentage. All rates are required for each of the three contract years.
As-and-when-required maintenance of fire detection systems for Passenger Rail Agency of South Africa (PRASA) in the Western Cape, over a 36-month contract period. The contract includes an employer option to extend the scope to redesign of the fire detection services.
As and when required maintenance of fire detection systems for PRASA's Western Cape operations, covering inspection, testing, cleaning, calibration, battery replacement, software updates, and emergency repairs over a 36-month period. The contract requires compliance with SANS 10139 and aims to address a maintenance backlog and non-compliance at stations and server rooms.
Secure PRASA tenders with AI Matching & Recommendations, rail-infrastructure intelligence, compliance analysis, and bid support for rolling stock and station upgrades.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Source: ANNEXURE 5 - SHE Specification - Tender 01-2026-CTN-INFRA.pdf (RFP)
OHS Specification purpose and scope
Sets minimum legislative and organisational OHS requirements for principal contractors at PRASA sites.
Forms integral part of contract; principal contractor must flow down to sub-contractors.
Does not absolve contractor from other legal obligations.
Contractor must demonstrate suitable OHS plan, competencies, experience and resources.
OHS management follows ISO 14001 and OHSAS 18001 principles.
Scope: specific PRASA Technical project per tender documents.
Contractual relationship: independent contractor per Labour Relations Act; principal contractor fully accountable for sub-contractors; Section 37(2) OHS Act agreement.
Normative references: OHS Act, Railway Safety Regulator Act, Labour Relations Act, Mines Health and Safety Act, COID Act, Covid-19 Regulations, Construction Regulations 2014, NEMA, PRASA OHSE Policy, SPK7 1-2, incident reporting procedure, Environmental Management Plan, Fall Arrest Standard, Medical Surveillance, SANS 3000 series, ARP084/SANS 10405.
Abbreviations and definitions provided for key terms (Client, Construction Regulations, Contract, Contractor, Health and Safety File/Plan/Specification, Occupation, Principal Contractor, Risk Assessment, Sub-contractor).
Important Dates
Source: ANNEXURE 5 - SHE Specification - Tender 01-2026-CTN-INFRA.pdf (RFP)
Closing date and time: 13 November 2026 at 12:00
No compulsory briefing or site visit dates mentioned in this document.
Evaluation Criteria
Source: ANNEXURE 5 - SHE Specification - Tender 01-2026-CTN-INFRA.pdf (RFP)
Preconditions for bid acceptance (OHS plan assessment)
A draft occupational health and safety plan based on this specification and the OHS Act must be included in the tender submission (Construction Regulation 5).
The OHS plan will be assessed against this specification, SPK7/2 and other applicable standards.
OHS management system must align with ISO 14001 and OHSAS 18001 principles.
No explicit price/functionality split or minimum qualifying score stated in this annexure.
Technical Specifications
Source: ANNEXURE 5 - SHE Specification - Tender 01-2026-CTN-INFRA.pdf (RFP)
OHS specification for principal contractors performing as-and-when fire detection maintenance at PRASA sites
Scope
Applies to PRASA Technical project as detailed in the main tender documents.
Must ensure safe railway operations during all construction/maintenance activities.
Access control, housekeeping, decommissioning and waste disposal to high standards.
Compliance with approved plans and specifications mandatory.
Normative references
OHS Act and Construction Regulations 2014
Railway Safety Regulator Act 16/2002
National Environmental Management Act
COID Act, Labour Relations Act, Basic Conditions of Employment Act, Covid-19 regulations
SANS 3000 series (railway safety management)
PRASA OHSE Policy, SPK7 1-2, Environmental Management Plan Procedure
Key requirements
Hazard identification and risk assessment by competent person before work starts; review when scope changes, new risks emerge, after incidents, or new employees introduced.
Written appointments for all roles per Construction Regulations (construction manager, supervisor, CHSO, scaffold inspector, lifting equipment inspector, electrical inspector, excavation supervisor, fall protection supervisor, first-aiders, fire equipment inspector, flagmen, hazardous chemical supervisor, incident investigator, ladder inspector, machinery responsible person, risk assessor, scaffolding supervisor, stacking supervisor, traffic management supervisor, train control officer).
CHSO must be registered and in good standing with SACPCMP.
SHE representatives: one per 50 employees (if >20 employees), weekly inspections, included in incident investigations, attend H&S committee meetings.
H&S committee: monthly meetings, defined agenda.
Medical surveillance: valid fitness certificates for all employees specific to construction work.
Training: general induction, site-specific induction, operator/driver licences, refresher training.
Emergency preparedness: appointed emergency controller, contingency plans, regular drills.
First aid: equipment, qualified first-aiders, transport arrangements.
Security: site camp fencing minimum 1.6 m, lockable gates with security, access control rules.
Traffic management: road signs, warning lights, trained flag persons.
Fall protection: risk assessment for work >2 m, stable platforms, fall arrest systems with shock-absorbing lanyards, annual load testing.
Scaffolding: erected per Construction Regulation 14 and SABS 085 by trained persons.
Environmental: waste disposal, spill control, NEMA compliance.
Methodology
Source: ANNEXURE 5 - SHE Specification - Tender 01-2026-CTN-INFRA.pdf (RFP)
Method statements and operational procedures required in OHS file
Detailed method statement describing how work will be performed.
Safe working procedures (work instructions).
Toolbox talks system: proof of existence, maintained throughout contract, employee acknowledgement records kept.
Equipment maintenance records: calibrations, safe working load certificates.
Chemical substances list: all chemicals documented and filed.
MSDS for each chemical and proof of training on MSDS.
On-site plans for excavations, demolitions, working at heights, etc.
Sub-contractor declarations.
Consolidated health and safety file handed over to Project Manager/Consultant on completion, including drawings, designs, materials used, and all applicable records.
PRASA evaluates OHS file periodically.
Monthly KPI reporting: LIFR and TIFR displayed and reported to PRASA.
Notification of construction work to DoL using Annexure 2 (CR 2014) with DoL stamp; copy to PRASA.
Construction permit application by PRASA-appointed OHSE Agent if CIDB grading requires.
Medical surveillance certificates per Annexure 3 (CR 7(1)(g)).
Training syllabi included in OHS plan: general induction for site management and OHS appointees; site-specific induction for all employees based on risk assessments; operator/driver training and licences; awareness programme (toolbox talks, posters, competitions, suggestion schemes, safety circles).
Competence assurance: employees competent before work starts; refresher training as work progresses; records kept for audit.
Communication: OHS committee channel; direct to PRASA Risk/Project Manager; workforce consultation via supervisors, SHE reps, committee, union reps; contractor disseminates OHS info to sub-contractors; site safety walks with PRASA; weekly toolbox talks with records; senior manager attends all OHS meetings; meeting dates/times/venues agreed with PRASA.
Experience & Qualifications
Source: ANNEXURE 5 - SHE Specification - Tender 01-2026-CTN-INFRA.pdf (RFP)
Scaffolding personnel requirements
Scaffolding must be erected, altered or dismantled by persons with adequate training and experience in scaffolding work, or under continuous supervision of such a person.
Scaffolding must be properly planned, designed for loadings, maintained in sound condition, with sufficient material available.
Quality Management
Source: ANNEXURE 5 - SHE Specification - Tender 01-2026-CTN-INFRA.pdf (RFP)
Assessments, inspections and audits
PRASA conducts monthly compliance assessment per Construction Regulation 5(1)(o) to verify implementation of approved OHS plan.
PRASA reserves right to conduct ad-hoc assessments and site safety walks.
Contractor representative (CHSO and Construction Manager/Supervisor) must accompany PRASA on all assessments; each party responsible for own results.
Contractor must conduct internal assessments and inspections to verify compliance with own OHS plan, this specification, and sub-contractor compliance.
SHE representatives conduct monthly inspections of assigned areas; deviations reported to supervisor and tabled at H&S committee.
Other appointees conduct critical inspections (before machinery operation), area inspections, legal inspections per their appointments.
All inspection results recorded in writing, reviewed at H&S committee meetings, endorsed by chairperson, filed in OHS file.
Contractor provides PRASA with monthly safety and health performance report.
Compliance Requirements
Source: ANNEXURE 5 - SHE Specification - Tender 01-2026-CTN-INFRA.pdf (RFP)
Mandatory compliance documents and evidence
CSD registration and valid tax compliance status (implied, not explicit in this annexure).
Letter of registration and good standing from Compensation Commissioner (COID Act).
CHSO SACPCMP registration certificate (submitted in OHS plan and held on site).
All appointments in writing with responsibilities, period, and supporting CVs/qualifications.
Risk assessments (baseline from PRASA, activity-based from contractor, COVID-19).
Notification of construction work to Department of Labour (Annexure 2, CR 2014) with DoL stamp; copy to PRASA.
Construction permit application by PRASA-appointed OHSE Agent if project falls within required CIDB grading.
Valid medical certificates of fitness for all employees (Annexure 3, CR 7(1)(g)).
Proof of general induction training and site-specific induction training for all employees.
Proof of training and licences for operators, drivers, plant users.
Competence records for all appointed persons.
OHS file on site with 27 minimum contents (specification, scope, DoL notification, COID letter, employee list, organogram, SHE policy, SHE plan, COVID-19 plan, risk assessments, tool register, inductions, medical surveillance, appointments, tool inspections, PPE matrix, PPE records, training records, method statements, safe work procedures, toolbox talks, equipment maintenance records, chemical list, MSDS, MSDS training, on-site plans, sub-contractor declarations).
Monthly reporting of LIFR and TIFR to PRASA.
Incident reporting: serious incidents (fatality, unconsciousness, limb loss, likely permanent disability, 14+ days off work, major incident, dangerous substance spill, uncontrolled pressure release, machinery failure) to PRASA and Provincial Director of DoL within 1 hour by phone/fax/email; all other incidents within 7 calendar days.
Continuous Safety Monitors informed within 8 hours.
Incident investigation for all categories with preventative measures.
H&S committee monthly meetings with minutes.
Monthly compliance assessments by PRASA per Construction Regulation 5(1)(o).
Ad-hoc assessments and site safety walks by PRASA.
Contractor internal assessments and inspections.
SHE representative monthly inspections.
Health & Safety
Source: ANNEXURE 5 - SHE Specification - Tender 01-2026-CTN-INFRA.pdf (RFP)
Comprehensive OHS requirements summary
OHS management per ISO 14001/OHSAS 18001.
Risk assessments: baseline from PRASA, activity-based from contractor, COVID-19; reviewed on scope changes, new risks, new technology, incidents, new employees; approved by contractor PM, kept on file with signatures.
Legal compliance: OHS Act copy on site; COID good-standing letter; Basic Conditions of Employment Act.
Operational structure: CR 4(1)(c) principal contractor implements OHS plan; 16(1) appointee ensures OHS Act compliance; construction supervisors per CR 6.
Appointments: written with responsibilities, period, CVs, qualifications; roles per Construction Regulations (vehicle/machinery supervisor, construction manager, assistant, supervisor, assistant supervisor, CHSO (SACPCMP registered), COVID-19 officer, drivers/operators, electrical inspector, emergency/security/fire coordinator, excavation supervisor, fall protection supervisor, first-aiders, firefighting equipment inspector, flagmen, hazardous chemical supervisor, incident investigator, ladder inspector, lifting equipment inspector, H&S committee, H&S representatives, machinery responsible person, risk assessor, scaffolding supervisor, stacking supervisor, traffic management supervisor, train control officer).
SHE representatives: 1 per 50 employees (>20 total), weekly inspections, incident investigations, committee attendance.
H&S committee: monthly, defined agenda, employer reps not exceeding SHE reps.
CHSO: full-time, SACPCMP registered, certificate in OHS plan and on site.
OHS file: 27 mandatory contents, available on site for PRASA/OHSE Agent inspection.
KPIs: monthly LIFR/TIFR display and report.
DoL notification: Annexure 2 with stamp, copy to PRASA.
Construction permit: PRASA appoints OHSE Agent if CIDB grading requires.
Medical surveillance: valid fitness certificates per Annexure 3.
Confined spaces: ventilation, entry permits, safety equipment, training, records.
Environmental: waste disposal, spill control, NEMA compliance.
Rail safety: SANS 3000 series compliance.
COVID-19: per regulations.
Environmental
Source: ANNEXURE 5 - SHE Specification - Tender 01-2026-CTN-INFRA.pdf (RFP)
Environmental requirements
Compliance with National Environmental Management Act and all regulations.
Correct decommissioning and disposal of equipment and waste material generated during construction.
Environmental Management Plan Procedure referenced.
Incident reporting includes environmental incidents as a category.
Storage of flammable and hazardous chemicals per housekeeping section.
Spill control and emergency procedures for dangerous substances.
Railway safety management standards (SANS 3000 series) include environmental aspects.
Contractual Terms
Source: ANNEXURE 5 - SHE Specification - Tender 01-2026-CTN-INFRA.pdf (RFP)
Contractual relationship terms
Principal contractor engaged as independent contractor per Labour Relations Act; not an employee of PRASA.
Contractor employees not deemed PRASA employees.
Principal contractor fully accountable for sub-contractors per contractual conditions.
Contract constitutes Section 37(2) OHS Act agreement: principal contractor assumes all health and safety responsibilities for its staff, sub-contractors, work performed, and equipment used on PRASA premises.
Section
Source: ANNEXURE 5 - SHE Specification - Tender 01-2026-CTN-INFRA.pdf (RFP)
Safety performance evaluation
OHS management and quality management system must follow ISO 14001 and OHSAS 18001 principles.
Construction safety management to follow best practices for benchmarking; quality not compromised.
No detailed scoring criteria or weightings provided in this annexure.
The service covers as-and-when-required fire-detection maintenance.
The contract records the appointment of Distinctive Choice 1272 CC t/a Turnmet after the contractor's bid was received.
The appointment includes an Employer option to redesign the service scope.
Scope is set by Annexure B and the main contract and must be delivered using good industry practice.
Initial-term discrepancy: The cover and title state 36 months, but the contract definition states 18 months.
Work is organised through a monthly schedule, agreed turnaround times and progress meetings; extra work follows a separate approval-and-quotation process.
The Employer may add or amend the redesign scope after trend and failure analysis, with the price agreed under Annexure T.
Service: As-and-when-required maintenance of fire detection.
Term conflict: The contract cover and title use 36 months, while the contract definition states 18 months.
Scope authority: Annexure B and the main contract; work must follow good industry practice, remain fit for its intended purpose, and have defects corrected.
Resources: Adequate numbers of appropriately skilled, qualified and experienced personnel, plus all equipment, assets and other resources needed for the services.
Contractor costs: Labour, equipment, tools, material, transport, consumables, stores, services, samples and temporary services needed for completion and commissioning are at the contractor's expense.
Hours and levels: Services are performed during working hours and in line with agreed service levels; Annexure D governs working hours and days.
Monthly planning: A schedule for the following month's work must reach the Employer before each month-end; work follows agreed schedules and turnaround times, with special requirements settled at progress meetings.
Additional work: Notify the Employer immediately, submit a separate quotation and obtain approval before starting.
Redesign option: The Employer may extend or amend the scope for redesign after trend and failure analysis; the parties agree the price and Annexure T applies.
Fire-detection standard: PRASA E4E (2004).
Rail and electrical standard: PRASA E7/1 (2012), covering services on, over, under or adjacent to railway lines and near high-voltage equipment.
The contractor must provide sufficient appropriately skilled, qualified and experienced personnel and all equipment, assets and resources required.
Necessary superintendence must be maintained throughout performance.
When work is underway, the contractor must be present or represented by an authorised agent with full authority.
The responsible agent must be competent, have adequate experience in similar work and exercise personal supervision.
Proposed or replacement subcontractors must provide experience, financial-standing and empowerment information, obtain written approval and have an executed subcontract imposing equivalent obligations.
The contractor remains fully liable for subcontractor personnel, acts, defaults and negligence.
Services must meet good industry practice, be fit for their intended purpose, and have defects corrected.
The contractor must supply everything needed to complete and commission the work.
A Final Approval Certificate records the Employer's acceptance of permanent services.
The Project Manager controls the drawings. Three copies are supplied free of charge, further copies are paid for by the contractor, and one copy must remain on site for inspection and use.
Contractor-designed plans or drawings must be submitted in triplicate on paper and receive the Project Manager's written approval before the related work starts.
Intellectual property in contractor-created documents generally remains with the contractor, subject to the Employer's licence. Employer-paid designs vest in the Employer, and jointly created work is jointly owned.
Price basis: Agreed prices; the bill of quantities forms part of the contractor's bid.
VAT: 15% is included in the contract price for the 36-month term shown on the cover.
Service payment schedule: Annexure S.
Additional work: A separate quotation must be approved before work begins; work covered by a supplementary contract is treated as a separate contract rather than a variation under clause 29.6.
Redesign payment: The price is agreed by the parties and paid under Annexure T.
Mobilisation fee: 10% of the contract price, paid upfront.
Performance bond: An unconditional, on-demand bank guarantee for 10% of the contract price, issued by a bank registered in South Africa.
Subcontractor payment: Pay in full within 7 days after receiving the Project Manager's payment certificate, without discount or deduction except any retention stated in the subcontract.
The bidder must be a duly incorporated, validly existing limited liability company with authority to enter into and perform the contract.
The bidder must not be a Restricted Enterprise or tender defaulter, and must not participate in corrupt activity.
All required insurance must be in place.
Proof of good standing for taxes, levies and required contributions may be requested by the Project Manager.
Material disclosures must be true, complete and accurate; no material facts or circumstances affecting the award may be withheld.
No litigation, arbitration, investigation or administrative proceeding likely to cause a material adverse effect may be pending or, to the bidder's knowledge, threatened.
No material obligation or non-compliance may be likely to impair performance.
No insolvency, winding-up, liquidation, deregistration, judicial-management or business-rescue process may be underway or, to the bidder's knowledge, threatened.
Applicable laws, required notices, fees, taxes, levies and charges must be observed. The Employer obtains planning approvals; the contractor obtains the related consents and permits needed for execution.
Change control and contracting
Assignment, cession or subcontracting requires written consent. The whole contract may not be subcontracted.
Changes to shareholding, composition, ownership, constitutional documents or B-BBEE require prior written approval from the Chief Procurement Officer and Group Chief Executive Officer where they affect B-BBEE status; breach permits immediate termination.
Failure to provide the performance bond within the condition-precedent period prevents the contract from taking effect.
The annexed occupational health and safety requirements form part of the contract.
OHS framework: General Administrative Regulations and General Safety Regulations 11(1) and 13D(3)(b) under the Occupational Health and Safety Act.
Site controls: Safety on Site, compliance with the OHS Act and regulations, contractual safety clauses and contractor confirmation.
Injury and disease: Compliance with the Compensation for Occupational Injuries and Diseases Act.
Rail and electrical risk: Work must follow PRASA E7/1 (2012) for services on, over, under or adjacent to railway lines and near high-voltage equipment.
Initial term: 36 months on the cover and title; 18 months in the contract definition.
Commencement: The first Business Day after fulfilment of the condition precedent.
Condition precedent: Delivery of the performance bond within 30 Business Days after signature, or by another date agreed in writing.
Failure to satisfy the condition prevents the contract from taking effect, except for a claim arising from breach of the condition-precedent obligation.
The initial term ends automatically. The Employer may extend it on at least 3 months' notice before expiry; it sets the extension period and may end the extension on 30 days' notice.
Document priority and interpretation
Priority: The contract, annexures and schedules; then the RFT; then the contractor's bid.
The Project Manager clarifies inconsistencies; unresolved matters follow the dispute-resolution process.
South African law governs, and the contract and written communications are in English.
Work administration
Extra work requires immediate notice, a separate quotation and Employer approval before work starts. Work covered by a supplementary contract is treated as a separate contract rather than a variation to this contract.
The Employer may exercise the redesign option; the parties agree the amount, payable under Annexure T.
Assignment, control and liability
Assignment or cession requires written consent from the Chief Procurement Officer and Group Chief Executive Officer.
The whole contract cannot be subcontracted. A portion may be subcontracted only with Employer approval; proposed or replacement subcontractors must submit experience, financial-standing and empowerment information and an executed subcontract.
The contractor remains fully responsible for subcontractor acts, defaults and negligence.
Joint ventures, consortia and unincorporated groupings are jointly and severally liable; a leader must be identified, and changes to composition or legal status need Employer consent.
Share transfers, changes to composition, ownership or constitutional documents, and B-BBEE changes require prior consent where they affect B-BBEE status. Breach permits immediate termination.
The contractor indemnifies the Employer against property loss, physical damage, injury and death connected with the services, subject to exceptions for Employer conduct and unavoidable occupation, nuisance, servitude or similar effects.
Defaults and intellectual property
Contractor default includes insolvency arrangements, liquidation, business rescue or similar processes, cessation of business and material breach.
Employer default includes non-payment under clause 29 and breach of a material term.
The contractor retains ownership of its own supplied documents, but grants the Employer a perpetual, non-transferable, non-exclusive, royalty-free licence, including modified use for further service work.
Employer-paid contractor designs vest in the Employer; jointly created work is jointly owned. No additional payment is due for the licence.
All labour, equipment, tools, materials, transport, consumables, stores, services, samples and temporary services needed for completion and commissioning are at the contractor's expense; defects must be remedied.
NIP applies where a single contract contains at least US$10 million of imported content, related contracts to one seller each exceed US$3 million and total more than US$10 million over two years, an exercised renewal option takes imported content above US$10 million, or multiple allocations of at least US$3 million each total more than US$10 million over two years.
The obligation equals 30% of imported content; multiple-supplier allocations share 30% of the total obligation pro rata.
The obligation must be discharged within seven years through investment, joint ventures, subcontracting, licensed production, export promotion, sourcing arrangements, research and development, or another arrangement agreed with the Department of Trade and Industry.
A successful bidder on a contract above R10 million must report the award to the Department of Trade and Industry.
Deliver the bid to the submission address by the closing time. Bids arriving after the deadline are rejected.
Use the issued official forms without retyping them, or follow the alternative format prescribed in the bid pack.
Submission address
PRASA
No. 3 Old Marine Drive
Opposite Neotel Building
Cape Town
8000
Mandatory returnables and supporting documents
Form A (Invitation to Bid): provides bidder and supplier details, tax status, offer particulars, signature and signing capacity.
Form B (Terms and Conditions for Bidding): records acceptance of the applicable bidding terms.
Form D (Site Inspection Certificate): confirms attendance at the site inspection or tender briefing.
Form E (Statement of Works Successfully Carried Out by Bidder): lists relevant completed works and the bidder's direct responsibility for them.
Form F (Security Screening Form): supplies company, ownership, litigation, debt and solvency information and consents to screening; security providers must also provide PSIRA registration and a letter of good standing.
Form G (Acknowledgment): certifies that the submitted information is correct.
Form H (Special Conditions: Funding Contingency): records the bidder's acceptance that an award is conditional on funding being secured.
SBD 4 (Bidder's Disclosure): discloses state-service connections, related interests and PEP/PIP exposure and confirms independent pricing without collusion or price disclosure.
SBD 5 (National Industrial Participation Programme): must be signed and submitted with the bid.
SBD 6.1 (Preference Points Claim Form under the Preferential Procurement Regulations 2022): provides company details and any specific-goal points claimed.
Proof of authority: provide an authorising resolution or other evidence that the signatory may bind the bidder.
Tax evidence: provide the applicable SARS TCS PIN or printed certificate, or the CSD number where a TCS PIN is unavailable.
Briefing access
The bid documents are available through the National Treasury eTender website from 21 October 2026.
Pre-closing access to the bid pack is conditional on attending the compulsory briefing.
Disqualification and invalidity risks
Non-attendance at the compulsory tender briefing results in disqualification.
Late submission, incomplete mandatory particulars, missing authority evidence or failure to use the prescribed forms may invalidate the bid.
No bid is considered from a person in the service of the state, a company with a director in the service of the state, or a close corporation with a member in the service of the state.
Bidders on the Register for Tender Defaulters or the List of Restricted Suppliers are automatically disqualified.
False SBD 4 information, collusion or price disclosure, an inaccurate Form G, or fraudulent preference claims may result in rejection, blacklisting, cancellation, damages, exclusion from public-sector business for up to 10 years, or prosecution.
The applicable system had not been selected when the bid pack was issued: 80/20 applies where the Rand value, including taxes, is up to R50 000 000, while 90/10 applies above R50 000 000. The lowest acceptable tender will confirm the applicable system after bids are received.
Stated 80/20 allocation
Price: 80 points.
Specific goals: 20 points.
Total: 100 points.
Price scoring
Formula: Ps = 80 × [1 − (Pt − Pmin) ÷ Pmin].
Ps is the price score; Pt is the tender price; Pmin is the lowest acceptable tender price.
Price includes all applicable taxes less unconditional discounts.
Specific-goal points
B-BBEE Level 2 or higher: 4 points.
51% black woman owned: 4 points.
51% black youth owned: 4 points.
Ownership by black people with disabilities: 4 points.
EME or QSE that is 51% black owned: 4 points.
Total specific goals: 20 points.
Claim substantiation
Failure to provide the required proof for a goal means that no points are claimed for that goal.
PRASA may request further substantiation before adjudication or after award.
Form E must identify the nature and value of completed works, the client, the contract number and the period for which the bidder was directly responsible.
Additional information must be provided separately if the form's table is insufficient.
National Industrial Participation financial conditions
Trigger: imported content of at least US$10 million, or a qualifying aggregation involving related contracts to one seller each above US$3 million and totalling above US$10 million over two years, an exercised renewal option taking imported content above US$10 million, or multiple allocations of at least US$3 million each to the same institution totalling above US$10 million over two years.
Obligation: 30% of imported content; in the multiple-allocation case, 30% of the total obligation is shared pro rata.
Discharge period: seven years.
Post-award guarantee: the successful contractor must provide a performance guarantee to the Department of Trade and Industry during the NIP process.
Reporting trigger: a successful contract above R10 million.
Reporting: after award, the contractor must promptly notify the Department of Trade and Industry and send the contract number, description of the works or services, acceptance date, institution details, contract value and imported content, if available, within five working days.
Bidders must comply with their tax obligations and provide their unique SARS Tax Compliance Status PIN.
A printed TCS certificate may be submitted with the bid.
If no TCS PIN is available but the bidder is registered on the Central Supplier Database, the CSD number must be provided.
Each consortium or joint-venture party and each subcontractor must provide a separate TCS certificate, PIN or CSD number.
A foreign supplier with no RSA residence, branch, permanent establishment, RSA-source income or RSA tax liability is not required to register for a TCS PIN.
A foreign supplier accredited in South Africa for the offered goods, services or works must attach proof of accreditation.
State service, disclosure and screening
No bid is considered from a person in the service of the state, a company with a director in the service of the state, or a close corporation with a member in the service of the state.
SBD 4 requires disclosure of state employment, connected relationships, related interests and PEP/PIP exposure, together with confirmation of independent pricing without collusion or price disclosure.
Persons on the Register for Tender Defaulters or the List of Restricted Suppliers are automatically disqualified.
False SBD 4 information may disqualify the bid or terminate an existing contract.
PRASA may decline a business relationship involving a PEP/PIP where objective factors and PRASA's best interests justify that decision.
Form F requires disclosure of previous convictions, civil judgments, pending proceedings or investigations, directors, outstanding debt and solvency status, together with consent to screening of the entity and its directors.
Form F requires confirmation that the bidder is not insolvent or liquidated and has not belonged to an entity liquidated during the previous five years.
Form F requires Annexure A where there are more than five directors or principals and Annexure C where more than three judgment or debt incidents are disclosed.
PSIRA registration and a letter of good standing are required only for security providers.
Form and experience obligations
SBD 5 must be signed and submitted with the bid.
SBD 6.1 must form part of the bid and state the company or firm name, registration number, entity type and points claimed.
Form E must list completed works, including the nature and value of the works, client, contract number and period for which the bidder was directly responsible.
Preference evidence
B-BBEE Level 2 or higher: CIPC documents, a B-BBEE certificate or a B-BBEE affidavit; 4 points.
51% black woman owned: certified identity documents of the owners; 4 points.
51% black youth owned: certified identity documents of the owners; 4 points.
Ownership by black people with disabilities: certified owner identity documents and a doctor's note confirming the disability; 4 points.
EME or QSE that is 51% black owned: audited annual financial statements, a B-BBEE certificate or a B-BBEE affidavit; 4 points.
Fraudulent preference claims
PRASA may disqualify the bidder, recover costs or damages, cancel the contract, restrict implicated parties from state business for up to 10 years, or refer the matter for criminal prosecution.
PRASA General Conditions of Purchase apply together with the General Conditions of Contract and any applicable special conditions.
NIP agreement and performance
The NIP agreement is concluded between the successful contractor and the Department of Trade and Industry, not PRASA.
The contractor and the Department agree the obligation, sign the NIP agreement, provide a performance guarantee, submit a business concept for approval, prepare detailed business plans, implement those plans and provide progress reports every six months.
Preference-claim remedy
PRASA may reject a bid, recover losses, cancel the contract, recommend restriction of implicated parties from state business for up to 10 years, or refer a fraudulent claim for prosecution.
The required budget provision and allocation had not been completed when the RFP was issued. PRASA obtained National Treasury approval under section 79 of the PFMA to proceed with the bidding process.
Any award is conditional on PRASA securing the funding allocation and confirming that sufficient budget exists.
PRASA may cancel the RFP at any stage before award if sufficient funding is not secured.
PRASA excludes liability for claims, losses or damages arising from a funding failure or from the resulting non-award. Bidders waive the right to institute proceedings in respect of those circumstances.
PRASA will keep bidders reasonably informed about the funding and budget process.
12 Liebeeck Parkway - Salt River - Cape Town - 7535
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
7
Last checked
21 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.