Tenders in this industry often require registration with these bodies.
CIDB Registration
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Typical Documents
10 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
CIDB Registration Certificate
NHBRC Registration (if applicable)
Health & Safety Plan
Insurance Certificates
Previous Project Completion Certificates
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
11 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Repair and localised asbestos roof encapsulation of buildings at Armscor Dockyard, Simon's Town, Western Cape, on an ad hoc basis for 36 months or until the contract value is depleted. Work is issued through written Work Authorisations following joint site assessment and quotation.
Win Armscor tenders with AI-Powered Matching, defence acquisition intelligence, compliance analysis, and structured support for technology and logistics.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
CORROSION PROTECTION SERVICES ON AN 'AS AND WHEN REQUIRED' BASIS FOR
ELEVEN (11) ESKOM PEAKING SITES FOR A PERIOD OF 5 YEARS (GOURIKWA &
ANKERLIG GAS TURBINE, GARIEP, VANDERKLOOF & NCORA HYDROPOWER, INGULA,
DRAKENSBERG & PALMIET PUMPED STORAGE SCHEMES, SERE WIND FARM, PORT REX
AND ACCACIA AERODERIVATIVE)
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Scope summary
Appointment of a service provider for ad hoc critical repairs and localised asbestos roof encapsulation on identified buildings at Armscor Dockyard, Simon's Town, Western Cape.
Work is executed on an as-needed basis through written Work Authorisations (WAs) issued by Armscor.
The requirement addresses missing or damaged asbestos roof sheets, gutters, downpipes and localised roof leaks causing water ingress and health and safety risks.
It does not cover complete encapsulation of every listed building, demolition of asbestos roofs, or full roof replacement with new roofing systems.
Contract value is a maximum ceiling, not a guaranteed order value.
Compulsory briefing session and site inspection: 19 November 2026 at 11:00, Armscor Dockyard, Simon's Town, Western Cape. Attendance is mandatory; bidders must sign the attendance register.
RFQ closing date and time: 01 December 2026 at 11:00.
Queries must be received in writing at least three working days before the closing date.
Submit by email only to [email protected] on or before 01 December 2026 at 11:00.
Do not copy, cc, bcc or send the quotation to any other ARMSCOR official; doing so automatically disqualifies the quotation with no right to correct it.
Email at least one hour before closing time to allow for transmission delays. The bidder bears the risk of late or failed email delivery.
Late submissions are not accepted.
File format and packaging
All electronic submissions must be in PDF format protected from modification, deletion or addition.
Financial/pricing information must be in a separate attachment from the technical/functional response.
Mark every submission prominently with the RFQ number and bidder name.
Returnable documents
CSD registration report or Unique Registration Reference Number.
Valid Tax Clearance Certificate(s) or SARS-issued verification PIN code or proof of application endorsed by SARS.
CIPC registration documents listing all members and shareholding percentages.
Valid proof of B-BBEE status for the bidder and its sub-contractor(s).
Local production and content documentation where applicable (Annexure C, D and E, DTIC exemption letter and manufacturer's letter).
Completed pricing schedule with every line item priced; failure to price any line item disqualifies the bid.
Quotation validity: 90 days from the bid closing date.
Phase 2: Critical criteria or functionality – paper based.
Phase 3: Functionality – presentation, demonstration or site inspection.
Phase 4: Price and specific goals.
Phase 5: Objective criteria.
Scoring
80/20 preference point system: Price 80 points, Specific goals 20 points, Total 100 points.
Applicable to bids up to R50 000 000,00 (all applicable taxes included).
Price points calculated as 80 × (1 − (Pt − Pmin) / Pmin), where Pt is the bid under consideration and Pmin is the lowest acceptable bid.
Specific goals points (80/20)
EME or QSE, 100% black-owned: 20 points.
EME or QSE, at least 51% black-owned: 18 points.
EME or QSE, at least 35% black-owned: 16 points.
EME or QSE, at least 25% black-owned: 10 points.
Mandatory criteria (failure eliminates the bid)
Compulsory briefing and site inspection on 19 November 2026 at 11:00 at Armscor Dockyard, Simon's Town; attendance registers signed.
CIDB registration as a General Building contractor, grade 3GB or higher, valid at closing date.
Type 3 registered asbestos contractor authorisation from the Chief Inspector, Department of Employment and Labour.
At least one client reference letter or completion certificate for asbestos roof repair, replacement, encapsulation or removal completed within the past 10 years.
Confidential security clearance for the bidder and all onsite employees; only South African citizens permitted onsite.
Objective criteria
Armscor will not award to bidders with a proven poor record or poor performance on previous Armscor projects.
Blacklisted, restricted bidders, or those guilty of fraud and misrepresentation are eliminated.
Bidders failing the financial stability assessment will not be awarded.
Armscor may award the bid in part or in full.
Abnormally low prices compared to the market may be disregarded.
Ad hoc critical repairs and localised asbestos roof encapsulation on identified buildings at Armscor Dockyard, Simon's Town, Western Cape.
Contract period: 36 months or until the capped contract value is depleted, whichever occurs first.
Work is performed only under a written Work Authorisation (WA) issued by Armscor after joint assessment, measurement, quotation and approval.
The WA defines the exact building, location, roof section, quantities and activities. No work may start without an approved WA.
The contract value is a ceiling, not a guaranteed order value; Armscor does not guarantee any minimum number of WAs or quantities.
Normal working hours
Mondays to Thursdays: 08:00 to 16:00.
Fridays: 08:00 to 12:00.
Work authorisation process
Acknowledge ADY's written communication and inspect the affected building within 3 working days of receipt (shorter for urgent or safety-related work).
Submit an assessment report identifying defects, proposed remedy, measurements and images.
Submit a detailed quotation within 3 working days after the assessment, using only the rates in Appendix A.
Do not exceed the WA value or quantity without prior written approval from ADY.
Scope activities
Localised leak and defect identification: trace water ingress; check sheet cracks, laps, fasteners, flashings, capping, gutters and downpipes.
Localised asbestos roof encapsulation: apply encapsulation coating to the square metres stated in the WA only.
Damaged or missing asbestos roof sheets: remove and replace only the sheets stated in the WA with Nutec fibre-cement sheeting matching the existing profile and length; replace fasteners, washers, closures and flashings.
Roof ridge capping and side flashings: replace authorised sections; conduct a witnessed leak test after completion.
Gutters and downpipes: replace only authorised lengths with new uPVC; test for free flow and leakage.
Fascia boards, barge boards and roof-edge components: replace authorised localised sections with Nutec fibre-cement.
Asbestos-specific requirements
Be a Type 3 registered asbestos contractor with the Chief Inspector, Department of Employment and Labour.
Notify the Chief Director, Provincial Operations, Department of Employment and Labour, at least 7 days before Type 2 or Type 3 asbestos work.
Submit an approved plan of work and appoint an asbestos supervisor in writing for each asbestos work site.
Use an Approved Inspection Authority (AIA) for Type 2 or Type 3 work; AIA performs air monitoring and issues an asbestos clearance certificate.
Dispose of all asbestos-containing material as asbestos waste and submit a valid disposal certificate.
Filter all run-off water before it enters the stormwater system.
Do not disturb asbestos-containing material except under the approved asbestos work method.
Quality and personnel
SHE officer/practitioner registered with SACPCMP as Construction Health and Safety Officer, Manager or Professional Agent (candidate registration acceptable); valid certificate submitted with the RFQ.
Appoint an asbestos removal supervisor for the duration of the contract; submit valid competency certification with the RFQ.
Third-party coating inspector (if not OEM) must hold NACE/SSPC Coating Inspector Level 1 or SAQCC Coating Inspector Level 1.
Submit a Quality Control Plan (QCP) to the APM for acceptance before work commences.
Encapsulation product must be from a SABS-approved paint manufacturer, suitable for weathered asbestos-cement roofing and coastal exposure; submit technical data sheet, safety data sheet, application method and warranty before use.
Minimum 5-year product and application warranty on encapsulation; 5-year workmanship guarantee.
Replacement sheeting profile and colour must match existing roof sheeting.
Safe roof access using cherry pickers, scaffolding, crawling boards or roof ladders; personnel must not walk directly on asbestos sheets.
High wind speeds above 50 km/h require additional roof securing and APM approval.
Experience & Qualifications
Source: RR69088-26_27 (Asbestos roof repair).pdf
Mandatory experience
At least one client reference letter or completion certificate for asbestos roof repair, replacement, encapsulation or removal completed within the past 10 years.
The reference must be signed by a duly authorised client representative or Principal Agent and confirm: the service provider's name; confirmation of the asbestos roof project; and the project completion date.
If the completion certificate does not indicate the asbestos roof work, submit additional supporting documents from the client or Principal Agent confirming the work.
Personnel qualifications
SHE officer/practitioner registered with SACPCMP (Construction Health and Safety Officer, Manager or Professional Agent; candidate registration acceptable).
Appointed asbestos removal supervisor for the contract duration with valid asbestos-specific competency certification.
Submit a Quality Control Plan (QCP) to the Armscor Project Manager for consultation and acceptance before work commences.
All quality coating inspection documentation and checklists must be signed off and approved by the contractor or its third party and submitted to Armscor.
Coating inspection
If the contractor is the OEM of the waterproofing or encapsulating coating, provide a quality data pack with all relevant checklists signed off by the contractor.
If not the OEM, appoint a third-party coating inspector holding NACE/SSPC Coating Inspector Level 1 or SAQCC Coating Inspector Level 1.
The encapsulation product system must be from a SABS-approved paint manufacturer; submit proof of SABS conformance.
Submit product technical data sheet, safety data sheet, application method, coverage rate and minimum film-build requirement before use.
Do not substitute the approved product without prior written approval from the APM.
Apply the encapsulation coating as per the manufacturer's recommendations; suspend application when weather falls outside manufacturer limits.
Pricing Schedule
Source: RR69088-26_27 (Asbestos roof repair).pdf
Pricing schedule structure
Appendix A contains the pricing schedule; quantities are for evaluation only under the 80/20-point system and do not guarantee minimum or maximum order volumes.
All line items must be filled in with costing; failure to price any line item results in disqualification.
Prices exclude VAT; show subtotal, VAT and total including VAT.
Section A – Mandatory core items (include in every authorised repair WA)
A1: Joint site inspection, measurements, photographs, defect assessment and fixed-schedule WA quotation (one per WA).
A2: WA-specific safety documentation, asbestos work method statement, permits and statutory notifications, closeout records (one per WA).
A3: Transport of personnel, tools and standard materials to the work area; barriers, protection, preparation and clearing after one authorised repair visit.
A4: Completion dossier: before/after photos, measured quantities, test records, waste documentation and signed completion certificate (one per WA).
Section B – Conditional repair items (priced at tender; only selected items used per WA)
Access, safety and supervision items including temporary fall-restraint systems, MEWP hire (daily and weekly), independent scaffold bays.
Asbestos waste transport, disposal and container items.
General construction waste skip and disposal items.
Actual payment quantities are determined per approved WA.
Registered on the National Treasury Central Supplier Database (CSD); submit CSD registration report or Unique Registration Reference Number.
Tax compliant for the duration of the contract; submit valid Tax Clearance Certificate(s) or SARS-issued verification PIN or proof of application.
CIPC registration documents listing all members and shareholding percentages; latest share register and share certificate signed by the Company Secretary or registered Auditor.
CIPC Beneficial Ownership Declaration (latest lodged with CIPC).
B-BBEE and specific goals
Valid proof of B-BBEE status: sworn affidavit commissioned and deposed on the same day before a Commissioner of Oaths (certified copy not acceptable), or a B-BBEE Certificate from CIPC or a SANAS-accredited verification agency.
Unincorporated joint ventures or consortia must submit a consolidated B-BBEE Certificate in the name of the JV or consortium from a SANAS-accredited agency.
B-BBEE status must be based on the latest financial year-end information.
Specific goals points under 80/20: 20 points for 100% black-owned EME/QSE, 18 for 51% or more, 16 for 35% or more, 10 for 25% or more.
CIDB
CIDB registration as a General Building contractor, grade 3GB or higher, valid at the closing date; submit valid CIDB registration letter or status with unique CRS number.
Joint ventures: every member registered with CIDB; lead partner at 3GB or not lower than one level below; combined grading equal to or higher than required.
Asbestos and safety
Type 3 registered asbestos contractor authorisation from the Chief Inspector, Department of Employment and Labour.
SACPCMP-registered SHE officer or practitioner.
Appointed asbestos removal supervisor for the contract duration.
Safety file submitted before commencement of work; updated annually including re-signing the 37.2 agreement.
All employees must obtain Confidential security clearance; only positive results allow access to the Naval Base.
Only South African citizens permitted onsite.
Locality and local content
Municipality bill or local councillor's letter not older than 3 months (lessee: bill plus lease agreement; owner: bill in bidder's name).
Local production and content documentation where applicable: Annexure C, D and E, DTIC exemption letter and manufacturer's letter.
Health & Safety
Source: RR69088-26_27 (Asbestos roof repair).pdf
Asbestos work
Be a Type 3 registered asbestos contractor with the Chief Inspector, Department of Employment and Labour.
Notify the Chief Director, Provincial Operations, Department of Employment and Labour, at least 7 days before Type 2 or Type 3 asbestos work.
Submit an approved plan of work and appoint an asbestos supervisor in writing for each asbestos work site.
Use an Approved Inspection Authority (AIA) for Type 2 or Type 3 work; AIA performs personal and environmental air monitoring and issues an asbestos clearance certificate.
Dispose of all asbestos-containing material as asbestos waste; submit a valid disposal certificate.
Filter all run-off water before it enters the stormwater system.
Do not disturb asbestos-containing material except under the approved asbestos work method.
Safety planning
Address the Armscor baseline risk assessment and health and safety specification in the service provider's health and safety plan.
Prepare a task-specific risk assessment, safe work procedure and fall-protection plan for each WA.
Treat existing asbestos-cement roofs as frail; personnel must not walk directly on roof sheets.
Use cherry pickers, scaffolding, crawling boards, roof ladders, platforms or other access systems.
Barricade and control work below to prevent entry into areas exposed to falling objects, coating or asbestos contamination.
Protect occupied workshops, machinery and electrical installations before work starts.
Stop work when weather or wind conditions create unsafe conditions or exceed equipment or product limits.
Waste management
Segregate asbestos-contaminated waste from general construction waste at all times.
Do not dispose of asbestos off-cuts, fragments, dust, contaminated PPE, filters, sludge or packaging at a general or non-hazardous landfill.
Remove general waste to an appropriately authorised facility with disposal receipts or other accepted evidence.
Personnel
SHE officer/practitioner registered with SACPCMP as Construction Health and Safety Officer, Manager or Professional Agent (candidate acceptable); submit valid certificate with the RFQ.
Appoint an asbestos removal supervisor for the contract duration; submit valid competency certification with the RFQ.
Environmental
Source: RR69088-26_27 (Asbestos roof repair).pdf
Applicable legislation
Comply with the National Environmental Management: Waste Act, as amended.
Comply with the Occupational Health and Safety Act and applicable regulations, Asbestos Abatement Regulations 2020, Construction Regulations 2014, National Building Regulations, SANS 10400 and SANS 967.
Asbestos waste
Dispose of asbestos-containing roof sheeting, gutters and downpipes as asbestos waste in accordance with the Asbestos Abatement Regulations.
Do not dispose of asbestos off-cuts, fragments, dust, contaminated disposable PPE, filters, sludge or packaging at a general or non-hazardous landfill.
Submit a valid disposal certificate to the APM.
Transport packaged asbestos waste by a licensed or authorised carrier to an approved facility.
Acceptance and disposal at an authorised facility per actual weighbridge kilogram, inclusive of facility fees and disposal receipt or certificate.
General waste
Remove general waste to an appropriately authorised facility, supported by disposal receipts or other accepted evidence.
Contractual Terms
Source: RR69088-26_27 (Asbestos roof repair).pdf
Contract basis
Ad hoc (when necessary or as needed), call-out basis.
Work only under written Work Authorisations (WAs) issued by Armscor.
Contract period: 36 months or until the capped contract value is depleted; unspent balance is forfeited at expiry.
Normal working hours: Mondays to Thursdays 08:00–16:00; Fridays 08:00–12:00.
All work classified as Confidential.
Cancellation and liability
Armscor may cancel the contract at any time, with or without cause, on written notice.
Armscor is liable only for costs approved under the contract before termination.
Security
Confidential Facility Security Clearance Certificate (FSC) required for the bidder's premises.
All employees must obtain Confidential security clearance; only South African citizens permitted onsite.
Security clearance costs approximately R4 400.00 excluding VAT per person, for the successful bidder's account.
Safety file
Submit a safety file before commencement of work; Armscor's Safety department approves or rejects it.
Safety file updated annually, including re-signing the 37.2 agreement.
Warranty
Minimum 5-year product and application warranty on the asbestos encapsulation system from WA completion date.
5-year workmanship guarantee for defects relating to the service provider's workmanship.
Section
Source: RR69088-26_27 (Asbestos roof repair).pdf
Evaluation phases
Phase 1: Mandatory requirements.
Phase 2: Critical criteria or functionality – paper based.
Phase 3: Functionality – presentation, demonstration or site inspection.
Phase 4: Price and specific goals (80/20).
Phase 5: Objective criteria.
Scoring
Price: 80 points. Specific goals: 20 points. Total: 100 points.
Applies to bids up to R50 000 000,00.
Specific goals: 100% black-owned EME/QSE = 20 points; 51% or more = 18 points; 35% or more = 16 points; 25% or more = 10 points.
Objective criteria
No award to bidders with proven poor record or performance on previous Armscor projects.
Blacklisted, restricted bidders or those guilty of fraud and misrepresentation are eliminated.
Bidders failing the financial stability assessment are not awarded.
Armscor may award in part or in full and may disregard abnormally low prices.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.