Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
george - George - George - 6529
Organization Type
GOVERNMENT
Published
28 Oct 2026
OCDS Reference
ocds-9t57fa-175982
SENTECH limited requires a service provider to supply, deliver and install a concrete palisade fence at the c5 george site under the george operational centre in the western cape. The procurement is a request for quotation, and the only stated bidder obligation in the supplied document is to complete and sign the SENTECH supplier consent form, which authorises SENTECH to process personal information for evaluation, verification, background checks and fica compliance. The closing date is 25 november 2026 at 10:00.
Closing date and time: 25 November 2026 at 10:00.
Mandatory form: The Sentech Supplier Consent Form must be completed and signed by an authorised representative who warrants due authorisation.
Consent: By signing, the bidder consents to Sentech processing personal information for evaluating the quotation, verification, background screening and Know Your Customer obligations under the Financial Intelligence Centre Act.
Withdrawal of consent: If consent is withdrawn, Sentech may be unable to process the quotation or retain the supplier on its database.
No other eligibility, pricing, evaluation or technical requirements are stated in the supplied document.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tenderβs issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Wednesday, 25 November 2026 - 12:00
Venue
Engen George Eco Stop(https://maps.app.goo.gl/tQSqffut31cNe8yd6)
Categories
Request for Quotation
george - George - George - 6529
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Evaluation Criteria
Source: Revised Standard Bidding Document (SDB) 4_Annexure A (3) ZZZZZZ.pdf (TENDER)28 Oct
2026
Tender Published
Tender was published
25 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SENTECH SUPPLIER CONSENT FORMZZZZ.pdf
Sentech Limited requires a service provider to supply, deliver and install a concrete palisade fence at the C5 George site under the George Operational Centre in the Western Cape. The procurement is managed through a Request for Proposal process, and bidders must consent to the processing of personal information for evaluation and supplier registration.
Revised Standard Bidding Document (SDB) 4_Annexure A (3) ZZZZZZ.pdf
Supply, delivery and installation of a concrete palisade fence at the C5 George site under the George Operational Centre, for Sentech Limited in the Western Cape.
RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdf
Sentech Limited requires a service provider to supply, deliver and install approximately 530 metres of reinforced concrete palisade fencing, including a heavy-duty steel double-swing gate, at the C5 George Site under the George Operational Centre in the Western Cape. The works include removal of existing fencing, earthworks, concrete foundations, installation of precast concrete components, and associated civil works, with a contract period of eight weeks and a twelve-month defects liability period.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
RΒ 2Β 513Β 574
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Bidders must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers. Submission of SBD 4 (Bidder's Disclosure) is mandatory; it requires disclosure of any state employment of directors, shareholders or controlling persons, relationships with any person employed by the procuring institution, and interests in related enterprises. Bidders must certify that the bid was prepared independently, without collusion, and that its terms have not been and will not be disclosed to competitors before bid opening or contract award. False or incomplete disclosure may lead to disqualification and referral to the Competition Commission or NPA.
Compliance Requirements
Source: Revised Standard Bidding Document (SDB) 4_Annexure A (3) ZZZZZZ.pdf (TENDER)Bidders must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers.
Evaluation Criteria
Source: SENTECH SUPPLIER CONSENT FORMZZZZ.pdf (RFP)Bidders must sign the Sentech Supplier Consent Form, consenting to Sentech processing personal information for evaluating the quotation, conducting verification, background checks and Know Your Customer obligations under the Financial Intelligence Centre Act. The signatory must be an authorised representative warranting due authorisation. No other eligibility criteria are stated in the supplied document.
Compliance Requirements
Source: SENTECH SUPPLIER CONSENT FORMZZZZ.pdf (RFP)The Sentech Supplier Consent Form must be completed and signed, covering consent to process personal information for evaluation, verification, background screening and FICA obligations.
Description
Source: RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdfSentech is a state-owned company providing broadcasting signal distribution services. The purpose of this RFQ is to appoint a suitably qualified contractor to supply, deliver and install a reinforced concrete palisade fence at the C5 George Site, which falls under the George Operational Centre. The works include replacing the existing fence where applicable, constructing reinforced concrete foundations, installing the palisade fencing, access gates and concertina wire, and all associated civil works to deliver a complete and secure perimeter fence. The contractor is responsible for all labour, supervision, plant, equipment, transport, materials, consumables and incidentals. Other obligations include conducting the works per the specification, attending the compulsory site briefing, verifying site conditions, submitting a construction programme within 10 days after award, and providing weekly progress reports.
Important Dates
Source: RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdf (RFQ)Contact Information
Source: RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdf (RFQ)Quotations
Site building (briefing)
Site location
C5 George Site β George Operational Centre
Southern Region
(GPS coordinates provided in the document on the site photo)
Submission Guidelines
Source: RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdf (RFQ)Returnable requirements
Submission details
Disqualification risks
Evaluation Criteria
Source: RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdf (RFQ)Three-stage evaluation:
Mandatory eligibility criteria (failure disqualifies the bid)
Functional evaluation (total 100 points)
Minimum qualifying functional score is not stated (the document leaves the threshold blank).
Price and preference (80/20 system)
Technical Specifications
Source: RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdf (RFQ)Scope of works
The contractor must supply, deliver and install a reinforced concrete palisade fence at the C5 George Site, including:
The contractor provides all labour, supervision, plant, equipment, transport, materials, consumables and incidentals.
Fence specifications
Gate specification
Foundation and construction
Preliminary and general
Programme and reporting
House rules
Site access
Experience & Qualifications
Source: RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdfBidders must attach CVs for a site foreman with experience in the construction industry (fencing or civils). Scoring for foreman experience: 3 years or more = 20 points, 2 years = 10 points, 1 year or less = 5 points. The contractor is expected to be suitably qualified and experienced in erecting fencing. The evaluation also considers completed projects and client references as described in the functional criteria.
Quality Management
Source: RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdfThe contractor must implement a quality control system covering material approvals, inspection records, concrete test certificates, compliance certificates, dimensional inspections and a final quality inspection before handover. The contractor must submit material compliance certificates and quality control documentation. Quality assurance inspections are carried out at key dates and milestones established at the site handover meeting, including by the Infrastructure Services Manager or a Sentech trade-tested rigger. The contractor must submit a detailed construction programme within 10 days after award, showing activities, logical sequence, resources, critical path and milestones, plus weekly progress reports with photographs.
Pricing Schedule
Source: RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdfThe pricing schedule is a bill of quantities and lump-sum items. Section 1 includes a lump sum for preliminary and general (establishment and de-establishment, toilets, water, storage, debris removal) and a lump sum for occupational health and safety (safety file). Section 2 includes quantities for the concrete palisade fence (530 m), concrete footings and foundations (15 mΒ³), excavation of foundations (15 mΒ³), and one heavy-duty steel double-swing gate (5,000 Γ 2,800 mm). The pricing must include supply and delivery, labour, profit and markup. Contingencies of 7% and VAT at 15% are added. Prices are quoted in ZAR; the total inclusive of VAT must be stated in words and figures in the Form of Offer and Acceptance.
Financial Requirements
Source: RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdf (RFQ)Pricing
Pricing schedule items
Financial/insurance requirements
Compliance Requirements
Source: RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdf (RFQ)Mandatory eligibility
B-bbee
Other compliance
Health & Safety
Source: RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdfThe contractor must comply with the Occupational Health and Safety Act, Construction Regulations and Sentech Health and Safety Specifications. Before work starts, the contractor must submit an approved health and safety file, risk assessments, method statements, a fall protection plan (where applicable), proof of employee competency, and medical certificates where required. No work begins until the health and safety file is approved. Within 7 days of the purchase order or safety file specification, the contractor must submit the health and safety file to the Sentech OHS Specialist. Employees assigned to the project must have valid mast climbing certificates and medical fitness certificates from an occupational medical practitioner. The contractor must have valid public liability insurance, COID / FEM registration, and a health and safety compliance undertaking by the CEO/Managing Director. Inclement weather is a constraint; the contractor must allow for weather-related delays in the schedule, and any extensions of time granted carry no monetary compensation. The contractor must supply its own drinking water, electricity and ablution facilities, and keep the site clean.
Contractual Terms
Source: RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdfThe works are executed under the General Conditions of Contract for Construction Works (GCC 2025, 3rd Edition), the Occupational Health and Safety Act, Construction Regulations, applicable SANS standards, manufacturer's specifications, Sentech Technical Specifications, and the Employer's specifications, drawings and instructions.
Section
Source: RFQ George Perimeter Fence GEORGE REDUCED SCOPEzzzzzz (003).pdfThe RFQ is evaluated in three stages: administrative responsiveness, functional evaluation, then price and preference. Mandatory eligibility requires a valid COIDA Letter of Good Standing and a valid CIDB Certificate grade 2 SQ or above. Functional criteria (total 100 points) cover completed fencing projects (up to 30 points), client reference letters (up to 30 points), site foreman experience (up to 20 points), and a construction programme (up to 20 points). The minimum qualifying functional score is not stated (blank in the document). Preference points (up to 20) are awarded under the 80/20 system for black ownership, women ownership and disability, based on a valid B-BBEE certificate or doctor's note. Price points are calculated using the 80/20 formula with the lowest acceptable bid scoring the maximum.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
george - George - George - 6529
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
28 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
π‘ Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.