Tender Type
Request for Bid(Open-Tender)
Delivery Location
Lower Germiston Road Rosherville - Germiston - Johannesburg - 2024
Organization Type
GOVERNMENT
Published
22 Oct 2026
OCDS Reference
ocds-9t57fa-175174
ESKOM requires the supply, delivery and offloading of microgrid/solar pv components and structures on an as-and-when-required basis for five years. The scope covers solar pv modules, battery energy storage systems, inverters and power conversion equipment, and solar pv structures, all of which must comply with specified SANS and iec standards. Bidders must achieve a minimum functionality score of 75%, with technical capability weighted at 50%, experience at 25%, and execution and logistics at 10%. The most consequential consideration is meeting the strict technical and warranty documentation requirements, as failure to reach the 75% functionality threshold results in elimination.
Functionality threshold: Bidders must score at least 75% on the technical functionality evaluation to avoid elimination.
Experience: Provide evidence (appointment letters, purchase orders, or reference letters) of at least 1 year of similar services; 8+ years earns 25%, 5+ years 20%, 3+ years 10%, 1+ year 5%.
Technical data sheets: Solar PV modules must align with IEC 61215, IEC 61730, and SABS 10142; BESS with IEC 62109-1/-2, IEC 63056, and SABS 10142; inverters with IEC 62109-1/-2 and SABS 10142.
Warranty documentation: Solar PV modules require 90% output at 10 years and 80% at 25 years; inverters require a 10-year performance warranty; BESS requires performance warranty documentation.
Certificates of Conformity: Required for solar PV modules, BESS, and inverters.
Technical personnel: Provide a Sales Engineer or technical specialist with a Bachelor's degree or advanced National diploma (or higher) and at least 5 years' experience in solar or renewable energy products.
Execution and logistics: Commit to a 5-week delivery lead time, provide a packaging and labelling plan (wooden crates, waterproofing), and a logistics plan (flatbed trucks for containers, climate-controlled transport for batteries).
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Monday, 23 November 2026 - 10:00
Venue
null
Categories
Request for Bid(Open-Tender)
Lower Germiston Road Rosherville - Germiston - Johannesburg - 2024
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
Source: Procurement Instruction Number 01 of 2023.pdf22 Oct
2026
Tender Published
Tender was published
23 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annex-c_Local content Declaration-Summary Schedule.pdf
Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf
SCOPE for Supply Delivery and Offloading of Microgrid Solar PV Components and Structures REV1.pdf
Eskom Rotek Industries requires the supply, delivery and offloading of microgrid and solar PV components and structures on an as-and-when required basis for five years. The scope covers inverters (5 kW to 500 kW), LiFePO4 battery energy storage systems (5 kWh to 500 kWh and above), N-Type TOPCon bifacial PV modules (630 W and 645 W), and solar PV design and simulation software, all to be delivered to ERI sites in South Africa.
Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf
Eskom Cardinal Rules.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a 5-year period, for Eskom.
Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf
Eskom requires the supply, delivery and offloading of microgrid and solar PV components and structures on an as-and-when-required basis for five years, in Gauteng. The only document provided is Eskom's PAYE questionnaire, which is used to classify the contractor for tax purposes.
240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a 5-year period, issued by Eskom. The tender is open in Gauteng and closes on 23 November 2026 at 10:00. Bidders must meet detailed quality management system requirements and submit a draft contract quality plan and inspection/test plan.
Declaration_of_Fair_Bidding_Practices1.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a five-year period, issued by Eskom in Gauteng. The tender requires bidders to submit a bona fide competitive offer and declare no collusion or price-fixing.
Technical Functionality Evaluation criteria for Microgrid Solar PV Components and Structures Material REV1.pdf
Supply, delivery and offloading of microgrid and solar PV components and structures on an as-and-when-required basis for a five-year period, for Eskom. The procurement is evaluated on functionality (technical) criteria with a minimum qualifying threshold of 75%.
NEC3 Supply Contract - Supply Delivery and Offloading of Microgrid. Solar PV Components and Structures REV1.pdf
Eskom Rotek Industries requires the supply, delivery and offloading of microgrid and solar PV components and structures on an as-and-when-required basis for a five-year period, under an NEC3 Supply Contract (SC3). The contract covers various stations and includes testing, inspection, and delivery obligations.
Procurement Instruction Number 01 of 2023.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a five-year term. The procurement follows Eskom's preferential procurement framework under PPR 2022, with evaluation based on price and specific goals (B-BBEE/socio-economic objectives), and includes mandatory subcontracting and local content conditions above specified thresholds.
Integrity declaration form.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a five-year period, issued by Eskom. Bidders must submit a completed and signed Integrity Declaration Form at tender closing.
240-94025981 Rev 2- Life Saving Rule Directive.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a 5-year period, issued by Eskom Rotek Industries (ERI). The contract covers the provision of components and structures for microgrid and solar PV systems, with delivery and offloading included.
Contract Quality Plan Template - ERI.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a five-year contract, issued by Eskom for its construction services division.
Briefing Note Security - Gx Division Contractor Criminal check.final (007).pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a five-year period, for Eskom Generation. Contractor employees must pass criminal clearance checks before being granted access to power stations, which are National Key Points.
Annex B Acknowledgement Form for Eskom SHE Rules and other Requirements (3).pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a five-year period, for Eskom in Gauteng.
Unpriced BOQ for the Supply, Delivery and Offloading of Microgrid. Solar PV Components and Structures REV1.xlsx
Supply, delivery and offloading of microgrid and solar PV components and structures on an as-and-when-required basis for a five-year period. The scope covers inverters, lithium batteries, solar panels, mounting structures, design software and transport, with quantities set out in a bill of quantities.
Invitation to Tender (ITT) MICROGRIDS.pdf
Supply, delivery and offloading of microgrid and solar PV components and structures on an as-and-when-required basis for five years. Eskom will award the contract to one or two suppliers on a pro rata basis of the budget value.
Declaration_of_shareholding.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a 5-year period, issued by Eskom.
E-tendering Help Manual for supplier - 27 January 2025A.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a 5-year period, issued by Eskom. Bidders must register on the Eskom eTendering system and submit documents electronically.
240-105658000 Supplier Quality Management Specification (3).pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a 5-year period. The contract is issued by Eskom and is subject to Eskom's Supplier Quality Management specification (240-105658000 / QM 58), which requires bidders to demonstrate a quality management system conforming to ISO 9001 and to submit quality documentation according to one of four categories.
E-Tenderers E-Tendering Training Acknowledgement Form .pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a five-year period, for Eskom.
Ann K Microgrids PV Components HM 082026.pdf
Supply, delivery and offloading of microgrid and solar PV components and structures on an as-and-when-required basis over five years, for Eskom Rotek Industries (ERI). The contract carries mandatory Supplier Development, Localisation and Industrialisation (SDL&I) obligations covering B-BBEE improvement, skills development, job creation and socio-economic development.
Unpriced BOQ for the Supply Delivery and Offloading of Microgrid. Solar PV Components and Structures REV1.pdf
Supply, delivery and offloading of microgrid and solar PV components and structures on an as-and-when-required basis for a five-year period, for Eskom. The bill of quantities covers inverters, lithium batteries, battery racks and cabinets, solar panels, mounting structures, solar PV design software, and transport.
Standard_Bidding_Document_%28SBD%29_6.1_IN_TERMS_OF_PPR_2022.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a five-year contract. The procurement is subject to the Preferential Procurement Regulations, 2022, with preference points awarded for price and specific goals.
Service Provider Services Contractor Supplier SHE Evaluation Report.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for five years, issued by Eskom.
Emergency By Law Annexure C.pdf
The department requires the supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a five-year period. The tender is issued by Eskom, with the closing date on 23 November 2026 at 10:00 (South Africa Standard Time).
Eskom_Standard_Conditions_of_Tender.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a five-year period, issued by Eskom. Bidders must comply with Eskom's standard conditions of tender, including submission of a complete original and one hard copy, and must not subcontract 100% of the scope.
240-68099512 Form A_Cat 2_ Rev 9.pdf
Eskom requires the supply, delivery and offloading of microgrid and solar PV components and structures on an as-and-when-required basis for a five-year period. The tender is issued from Gauteng and closes on 23 November 2026 at 10:00. Bidders must complete Form A to acknowledge and accept Eskom's Supplier Quality Requirements as per specification 240-105658000 and the ISO 9001 standard.
Standard_Bidding_Document_(SBD)_4_-_Annexure_A.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a five-year period, issued by Eskom.
CS-SHEQ Tender Evaluation Report -Supply and Delivery 2025.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a five-year period, for Eskom. The tender includes a mandatory occupational health and safety (OHS) evaluation of bidders' submitted documentation.
32-136 Contractor Health and Safety Requirements_March 2023.pdf
Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a five-year period, for Eskom.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 690 793
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The document is an Eskom Procurement Instruction Note (No. 01 of 2023) that revises the Procurement & Supply Chain Management Procedure to align with the Preferential Procurement Regulation 2022 (effective 16 January 2023). It sets out the mandatory evaluation framework for all Eskom tenders, including functionality scoring, price evaluation, preference points for specific goals, and associated compliance requirements (local content, B-BBEE, subcontracting, NIPP).
Important Dates
Source: Procurement Instruction Number 01 of 2023.pdf (TENDER)Closing date: 16 January 2023 (documented as the PPR 2022 effective date; the tender's own closing date is recorded separately in the tender record as 23 November 2026 at 08:00).
Contact Information
Source: Procurement Instruction Number 01 of 2023.pdf (TENDER)Contact: Paul Mbele
Role: Policy Manager, P&SCM – Risk, Governance and Compliance
Telephone: +27 11 800-2134
Submission Guidelines
Source: Procurement Instruction Number 01 of 2023.pdf (TENDER)Returnable forms required:
Disqualification risks:
Evaluation Criteria
Source: Procurement Instruction Number 01 of 2023.pdf (TENDER)Evaluation stages:
Specific goals (per SDL&I Annexure A) – allocation under each system:
Documentation required to claim specific goals: valid B-BBEE certificate/affidavit, proof of ownership and shareholding breakdown, certified ID copies of shareholders, proof of disability where applicable.
If documentation is not submitted, the bidder is not disqualified but scores only price points (90/80) and 0 for specific goals (10/20).
Bidders may not claim specific goal points if they intend to subcontract more than 25% of the contract value to any person not qualifying for at least the points the bidder qualifies for.
Objective criteria (if included) are per PPPFA 2(1)(f): they are not mandatory, but if included, compliance becomes mandatory; they may change the award from the highest ranked bidder and may not include functionality.
Contractual requirements/responsiveness must still be met before award recommendation, regardless of objective criteria.
Local content is an objective criterion for designated sectors (see compliance requirements).
Technical Specifications
Source: Procurement Instruction Number 01 of 2023.pdf (TENDER)Procurement Instruction Note 01 of 2023:
Specific goals (SDL&I Annexure A): mandatory for all procurement of goods, works and services.
Designated sectors: local content requirements apply to all procurement of locally manufactured products, irrespective of value or method.
National Industrial Participation Programme (NIPP): applies only to contracts with imported content of US$5 million or more (see extended sections).
Mandatory subcontracting above R30 million: if subcontracting is feasible, successful bidders must subcontract at least 30% of the contract value to designated groups (see compliance requirements).
Compliance Requirements
Source: Procurement Instruction Number 01 of 2023.pdf (TENDER)Pre-qualification:
B-bbee:
Local content:
Subcontracting restrictions:
B-BBEE Requirements
Source: Procurement Instruction Number 01 of 2023.pdf (TENDER)Specific goals and objective criteria: Specific goals are mandatory (per SDL&I Annexure A) and may include contracting with historically disadvantaged persons (on grounds of race, gender, disability). Objective criteria are optional but, if used, compliance becomes mandatory and they may alter the award from the highest ranked bid. They must not include functionality. SDL&I monitors compliance with all goals post-award until contract expiry.
Preference points for specific goals (per Section 2(1)(d)(i)):
Bidders without documentation score only price points (90/80) and 0 for specific goals. Subcontracting more than 25% to a lower-status entity disqualifies specific-goal points.
Local content and production:
Nipp:
Mandatory subcontracting above R30 million:
B-BBEE compliance:
Offences and penalties:
Remedies (PPR 2022 Regulation 9):
Contractual Terms
Source: Procurement Instruction Number 01 of 2023.pdfLocal content obligations: bidders in designated sectors must meet the stipulated minimum local content threshold; subcontracting must not reduce overall local content below that threshold. The SBD 6.2 declaration must be completed and signed; the procuring official verifies the accuracy of quoted exchange rates.
Requirements
Source: Procurement Instruction Number 01 of 2023.pdf (TENDER)All tenderers recommended for award must meet the contractual requirements specified in the enquiry before being recommended to the adjudication authority.
Section
Source: Procurement Instruction Number 01 of 2023.pdfAcceptability and responsiveness: the bid must comply in all respects with the specification and conditions.
Functionality: where used, criteria must be objective, with points and sub-points and a minimum qualifying score stated. The minimum must not be too low (jeopardise quality) or too high (unreasonably restrictive). Points rounded to two decimal places. Bids failing the minimum are unacceptable. Those passing qualify for price and specific-goal evaluation; ranking for further evaluation must be communicated in the enquiry.
Price: preference point system applies. Above R50 million: 90/10 split; up to R50 million: 80/20. Total points rounded to two decimals; award to highest total unless objective criteria justify otherwise.
Documentation for specific goals: B-BBEE certificate or affidavit, proof of ownership/shareholding, certified ID copies, proof of disability where applicable. Missing documentation means only price points are scored.
Submission Guidelines
Source: Integrity declaration form.pdf (RFP)Returnable documents:
Returnable Documents
Source: Integrity declaration form.pdf (RFP)Mandatory returnable:
Evaluation Criteria
Source: Integrity declaration form.pdf (RFP)Eligibility and disqualification criteria:
Technical Specifications
Source: Integrity declaration form.pdf (RFP)Not described in the source document. The document is limited to the integrity declaration requirements.
Pricing Schedule
Source: Integrity declaration form.pdfNo pricing schedule, rates or bill of quantities are provided in the source document. The only mention of joint venture terms in this section relates to the requirement to attach a copy of the joint venture agreement confirming joint and several liability and the lead partner's authority to incur liabilities, receive instructions and payments, and be responsible for the entire execution of the contract.
Financial Requirements
Source: Integrity declaration form.pdf (RFP)No pricing, security, bond, guarantee, retention or payment terms are stated in the source document.
Compliance Requirements
Source: Integrity declaration form.pdf (RFP)Returnable forms:
Section
Source: Integrity declaration form.pdfBidders must disclose any relationship with Eskom employees, contractors, consultants or directors involved in tender evaluation, adjudication or negotiation, including any common controlling partners or relationships with other tenderers that could provide access to information or influence the bidding process.
Important Dates
Source: Declaration_of_Fair_Bidding_Practices1.pdf (unknown)Closing date: 01 August 2012 (as referenced in the document; the tender record lists a later date, but the document specifies this).
Submission Guidelines
Source: Declaration_of_Fair_Bidding_Practices1.pdf (unknown)Returnable documents: a signed Declaration of Fair Tender Schedule (T2.2a No. 2) must be submitted with the bid. The declaration certifies that the tender is bona fide, competitive, and that no price-fixing or collusion with other tenderers has occurred. Eskom reserves the right to take action against the tenderer or the signatory personally if the declaration is found to be false.
Submission method and closing time are not stated in the provided document.
Evaluation Criteria
Source: Declaration_of_Fair_Bidding_Practices1.pdf (unknown)The bid must include a signed Declaration of Fair Tender Schedule (T2.2a No. 2). A false declaration may result in Eskom taking action against the tenderer or the signatory personally. No other evaluation criteria are stated in the provided document.
Compliance Requirements
Source: Declaration_of_Fair_Bidding_Practices1.pdf (unknown)The bidder must submit a signed Declaration of Fair Tender Schedule (T2.2a No. 2), confirming the tender is bona fide and that no collusion or price-fixing has occurred. No other compliance requirements are stated in the provided document.
Description
Source: Unpriced BOQ for the Supply, Delivery and Offloading of Microgrid. Solar PV Components and Structures REV1.xlsxSupply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a 5-year period. The BoQ lists quantities for inverters, batteries, racks, control boxes, solar panels, mounting structures, design software, and transportation.
Important Dates
Source: Unpriced BOQ for the Supply, Delivery and Offloading of Microgrid. Solar PV Components and Structures REV1.xlsx (unknown)Closing date: 23 November 2026 at 08:00
Contact Information
Source: Unpriced BOQ for the Supply, Delivery and Offloading of Microgrid. Solar PV Components and Structures REV1.xlsx (unknown)No contact information is provided in the source.
Submission Guidelines
Source: Unpriced BOQ for the Supply, Delivery and Offloading of Microgrid. Solar PV Components and Structures REV1.xlsx (unknown)Returnable documents: not stated in the source. Closing time: 08:00 on 23 November 2026 (from tender record). Submission method and address: not stated in the source.
Evaluation Criteria
Source: Unpriced BOQ for the Supply, Delivery and Offloading of Microgrid. Solar PV Components and Structures REV1.xlsx (unknown)No evaluation criteria are specified in the source.
Technical Specifications
Source: Unpriced BOQ for the Supply, Delivery and Offloading of Microgrid. Solar PV Components and Structures REV1.xlsx (unknown)The BoQ covers supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for 5 years. Line items include:
Financial Requirements
Source: Unpriced BOQ for the Supply, Delivery and Offloading of Microgrid. Solar PV Components and Structures REV1.xlsx (unknown)Pricing is to be completed in the BoQ; unit rates and totals in ZAR. VAT at 15% is added to the subtotal. No bid security, bonds, guarantees, retention or payment terms are stated.
Compliance Requirements
Source: Unpriced BOQ for the Supply, Delivery and Offloading of Microgrid. Solar PV Components and Structures REV1.xlsx (unknown)No compliance requirements (CSD, tax, B-BBEE, CIDB, CIPC, local content) are specified in the source.
Submission Guidelines
Source: Declaration_of_shareholding.pdf (unknown)Returnable Documents: The signed Declaration of Shareholding or Beneficiaries (T2.1A No. 5) must be submitted with the bid.
Compliance Requirements
Source: Declaration_of_shareholding.pdf (unknown)The Declaration of Shareholding or Beneficiaries (T2.1A No. 5) requires the bidder to disclose all shareholders or beneficiaries of the company or trust, including names, registration numbers, and share percentages. The bidder must confirm whether any shareholder or beneficiary is employed by or a close family member of an Eskom employee, and provide details if so.
Description
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfThe tender concerns the supply, delivery, and offloading of microgrid/solar PV components and structures, on an as-and-when-required basis, for a 5-year period. Category 2 pre-contract award quality requirements apply; the site-assessment indicator is left for the bidder to mark.
Submission Guidelines
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Returnable document:
Evaluation Criteria
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Evaluation is based on the bidder's completion and acceptance of Form A:
Technical Specifications
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Scope of supply: microgrid/solar PV components and structures, supplied, delivered, and offloaded on an as-and-when-required basis.
Methodology
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfThe bidder must demonstrate a process approach, customer focus, leadership, engagement of people, improvement, evidence-based decision making, and relationship management (ISO 9001 principles). The execution plan must cover contract execution, supplier quality performance monitoring, and handling of nonconformities.
Quality Management
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfForm A (template 240-43921804 Rev 3, spec 240-105658000) captures the bidder's acceptance of Eskom Supplier Quality Requirements. Category 2 applies; the bidder must mark site assessment applicability. Post-contract award clauses include contract execution, monitoring, Eskom rights of access/information, preservation, audits, nonconformity management, and special processes. ISO 9001 clauses 4–10 and principles 1–7 are mandatory.
Compliance Requirements
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)No specific compliance requirements (e.g. CSD, tax, B-BBEE, CIDB) are stated in the provided document.
Section
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfThe bidder must complete and sign Form A, confirming acceptance of Eskom Supplier Quality Requirements (specification 240-105658000) and the ISO 9001 standard. Both pre- and post-contract award quality clauses apply. The form is a submission requirement rather than a scored criterion.
Description
Source: Technical Functionality Evaluation criteria for Microgrid Solar PV Components and Structures Material REV1.pdfThe evaluation uses a functionality threshold approach where technical score is 75%. Submissions are evaluated against functionality criteria and rated per criterion; suppliers below the minimum qualifying threshold of 75% are eliminated.
Evaluation Criteria
Source: Technical Functionality Evaluation criteria for Microgrid Solar PV Components and Structures Material REV1.pdf (unknown)Minimum qualifying functionality threshold: 75%
Evaluation weighting: Experience 25%, Technical Capabilities 50%, Execution & Logistics 10% (total 100%).
Experience scoring: 8+ years (25%), 5+ years (20%), 3+ years (10%), 1+ year (5%). Evidence: appointment letters, purchase orders, or reference letters.
Technical Capabilities (50%):
Execution & Logistics (10%):
Bidders scoring below 75% on functionality are eliminated.
Technical Specifications
Source: Technical Functionality Evaluation criteria for Microgrid Solar PV Components and Structures Material REV1.pdf (unknown)Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for 5 years.
Components covered: solar PV modules, battery energy storage systems (BESS), inverters and power conversion equipment, solar PV structures.
Compliance with SANS and IEC standards:
Solar PV structures: technical specification, manufacturing ITP, manufacturing method statements.
Warranty requirements:
Logistics: flatbed trucks for containers, climate-controlled transport for batteries; wooden crates for fragile items with waterproofing.
Delivery lead time: 5 weeks from order.
Experience & Qualifications
Source: Technical Functionality Evaluation criteria for Microgrid Solar PV Components and Structures Material REV1.pdfBidder experience in similar services, evidenced by appointment letters, purchase orders, or reference letters:
Key personnel: Sales Engineer or technical specialist with a Bachelor's degree/advanced National diploma or above, and at least 5 years' experience in solar or renewable energy products (10%).
Quality Management
Source: Technical Functionality Evaluation criteria for Microgrid Solar PV Components and Structures Material REV1.pdfManufacturing Inspection Test Plan (ITP) required for solar PV structures.
Manufacturing method statements required for solar PV structures.
Certificates of conformity required for solar PV modules, BESS, and inverters.
Compliance Requirements
Source: Technical Functionality Evaluation criteria for Microgrid Solar PV Components and Structures Material REV1.pdf (unknown)Solar PV modules: Certificate of Conformity.
BESS: Certificate of Conformity.
Inverters: Certificate of Conformity.
All technical data sheets must align with the specified SANS and IEC standards.
Section
Source: Technical Functionality Evaluation criteria for Microgrid Solar PV Components and Structures Material REV1.pdfMinimum qualifying threshold: 75% on functionality.
Weighting: Experience 25%, Technical Capabilities 50%, Execution & Logistics 10%.
Description
Source: 240-94025981 Rev 2- Life Saving Rule Directive.pdfEskom Rotek Industries (ERI) is committed to health and safety excellence, ensuring no operating condition or urgency of service endangers life or causes injury or environmental damage. The five Life Saving Rules are compulsory and apply to all employees, agents, consultants and contractors across ERI. The directive is effective once authorised.
Important Dates
Source: 240-94025981 Rev 2- Life Saving Rule Directive.pdf (unknown)The document does not state a closing date for this tender. The closing date in the tender record is 23 November 2026 at 08:00.
Submission Guidelines
Source: 240-94025981 Rev 2- Life Saving Rule Directive.pdf (unknown)Returnable Documents:
Submission method and address are not stated in the available document.
Evaluation Criteria
Source: 240-94025981 Rev 2- Life Saving Rule Directive.pdf (unknown)Bidders must comply with Eskom Rotek Industries' Life Saving Rules. Contractor employees who violate a Life Saving Rule more than once will be disqualified from performing work for ERI. Bidders must ensure all employees and contractors sign the Acknowledgement of Life Saving Rules (Form 240-94026037). No other evaluation criteria are stated.
Technical Specifications
Source: 240-94025981 Rev 2- Life Saving Rule Directive.pdf (unknown)This directive governs the five Life Saving Rules that all ERI employees, agents, consultants and contractors must follow:
Compliance Requirements
Source: 240-94025981 Rev 2- Life Saving Rule Directive.pdf (unknown)No specific compliance requirements are stated in the document.
Health & Safety
Source: 240-94025981 Rev 2- Life Saving Rule Directive.pdfHealth and safety requirements:
Section
Source: 240-94025981 Rev 2- Life Saving Rule Directive.pdfNo additional evaluation criteria beyond compliance with the Life Saving Rules are stated. The Life Saving Rules Evaluation Report (Form 240-94026805) is used for verification and reporting, and is referenced alongside ISO 9001.
Description
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdfThe tender is for the supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for a 5-year period. The available document (List of Tender Returnables – Category 2) specifies the quality deliverables that must be submitted with the bid.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf (TENDER)Quality returnables are evaluated with indicator = 1 (available). Sections scored:
No minimum qualifying total score is stated.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf (TENDER)The scope is the supply, delivery and offloading of microgrid/solar PV components and structures, on an as-and-when-required basis for a 5-year period (per tender title). No specific quantities, locations, or service levels are provided in the available document. The document focuses on supplier quality requirements — see evaluation criteria.
Quality Management
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf (TENDER)Quality management requirements are central to this tender (Category 2 quality returnables). Bidders must demonstrate a QMS that meets ISO 9001, either via certification (Option 1) or documented evidence (Option 2). Required evidence includes control of externally provided processes and services, with criteria for evaluation, selection, monitoring and re-evaluation of external providers (clause 8.4). A draft Contract Quality Plan per ISO 10005 and a draft Inspection and Test Plan or Quality Control Plan on similar work are required.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf (TENDER)No tender-specific compliance requirements stated (such as CSD, tax, B-BBEE, CIDB) in the available document. Quality management system compliance is the main requirement (ISO 9001 or documented equivalent).
Section
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdfEvaluation focuses on quality returnables with each item scored as 1 (available). Section A: Option 1 (ISO 9001 certificate, score 4) or Option 2 (documented QMS, score 7). Section B: score 4. Section C: score 1. Section D: score 1. Section E: score 2. No weighting or pass threshold stated beyond the presence of each deliverable.
Description
Source: Invitation to Tender (ITT) MICROGRIDS.pdfOpen tender by Eskom for supply, delivery and offloading of microgrid/solar PV components and structures on as-and-when basis for 5 years. Award to 1–2 suppliers pro rata on budget. Full quotation required for whole contract.
Important Dates
Source: Invitation to Tender (ITT) MICROGRIDS.pdf (TENDER)Closing date: 23 November 2026 at 10:00
Tender validity: 180 days from closing date and time
Clarification queries deadline: 10 working days before tender submission deadline
Clarification meeting: not applicable
Contact Information
Source: Invitation to Tender (ITT) MICROGRIDS.pdf (TENDER)Eskom Representative
All queries must be directed to the above in writing; no other Eskom officials.
Submission platform: https://etendering.eskom.co.za
Submission Guidelines
Source: Invitation to Tender (ITT) MICROGRIDS.pdf (TENDER)Submission method: electronic only via Eskom E-tendering site (https://etendering.eskom.co.za). No hard copies or zip/condensed files accepted.
Returnable forms (disqualifiable if missing/incomplete/signature absent):
Non-disqualifiable returnable: Annexure I (SBD 6.1) Preference Points Claim form — if missing or incomplete, 5 working days to remedy, else disqualified.
Returnable required at closing for evaluation (scores zero if missing): proof for Specific Goals.
Returnable Documents
Source: Invitation to Tender (ITT) MICROGRIDS.pdf (TENDER)Disqualifiable returnables (missing/incomplete/signature absent = disqualification):
Non-disqualifiable (5 working days to cure): Annexure I (SBD 6.1 Preference Points Claim).
At-closing-for-evaluation (zero score if missing): proof for Specific Goals.
CIDB proof: N/A.
Evaluation Criteria
Source: Invitation to Tender (ITT) MICROGRIDS.pdf (TENDER)Evaluation stages:
Experience scoring (supported by appointment letters, purchase orders, reference letters):
Technical Capabilities (sub-criteria each 5% unless noted, total per component):
Execution & Logistics (10%):
Objective criteria may override highest score: SHE (Annexure A), Quality (Annexure B), Finance (Annexure C), and SDL&I.
Contractual requirements (e.g., CSD registration) are not evaluation criteria; assessed after ranking and must be met before award.
Technical Specifications
Source: Invitation to Tender (ITT) MICROGRIDS.pdf (TENDER)Scope: Supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for 5 years.
Contract will be awarded to 1 or 2 suppliers on a pro rata basis of budget value.
Tender must be quoted in full for the whole contract.
Key technical requirements for functionality scoring:
Delivery lead time: commitment to 5-week lead time.
Logistics: flatbed trucks for containers; climate control for batteries; wooden crates for fragile items, waterproofing.
Experience & Qualifications
Source: Invitation to Tender (ITT) MICROGRIDS.pdfExperience (40% of functionality): 8+ years = 25%, 5+ = 20%, 3+ = 10%, 1+ = 5%; supported by appointment letters, POs, reference letters.
Key personnel: Sales Engineer/Technical Specialist with Bachelor's or advanced National Diploma and 5+ years solar/renewable experience (10% of functionality).
Quality Management
Source: Invitation to Tender (ITT) MICROGRIDS.pdfQuality annexure required; quality objective criterion (Annexure B). Other safety/quality docs per scope.
Pricing Schedule
Source: Invitation to Tender (ITT) MICROGRIDS.pdfFully completed pricing schedule/BOQ required; PDF + Excel; upload limits 500MB/doc, 4GB total.
Financial Requirements
Source: Invitation to Tender (ITT) MICROGRIDS.pdf (TENDER)No performance security required (not applicable).
Pricing: fully completed pricing schedule/BOQ in PDF and Excel; quote in full.
Price evaluation: inclusive of VAT; arithmetical corrections; exclude contingencies; NPV comparison.
Payment terms:
Eskom may negotiate prices after award if not market-related.
Financial viability: audited financial statements for previous 36 months (or last year if unavailable). Start-ups within 12 months exempt initially but must provide first-year statements once available.
Compliance Requirements
Source: Invitation to Tender (ITT) MICROGRIDS.pdf (TENDER)CSD registration: proof of valid and current CSD registration (mandatory contractual requirement) — CSD number/report.
Tax compliance: SARS e-filing PIN or CSD profile; certified tax clearance certificate if not on CSD. Foreign suppliers with no SA footprint: only SBD 1.
B-BBEE: Specific Goals scored out of 10 points under PPPFA 90/10 system; proof via B-BBEE certificate or sworn affidavit per B-BBEE Codes.
Employment Equity: designated employers must provide proof of compliance and EE report submission to Department of Labour.
COIDA: certificate of good standing or proof of application (South African tenderers).
CIDB: not applicable.
Eligibility requirements:
B-BBEE Requirements
Source: Invitation to Tender (ITT) MICROGRIDS.pdf (TENDER)Specific Goals worth 10 points under PPPFA 90/10. Proof of B-BBEE status: certificate from authorised body, sworn affidavit per B-BBEE Codes, or other prescribed requirement. Subcontracting with subsidiaries discouraged unless declared; may be seen as fronting.
Health & Safety
Source: Invitation to Tender (ITT) MICROGRIDS.pdfCOIDA certificate of good standing or application proof (SA tenderers). SHE objective criterion (Annexure A).
Environmental
Source: Invitation to Tender (ITT) MICROGRIDS.pdf (TENDER)Environmental due diligence applicable.
Contractual Terms
Source: Invitation to Tender (ITT) MICROGRIDS.pdfNEC3 Supply Contract (SC3). No performance security. CSD registration mandatory; other requirements (SHEQ, financial statements) may apply and are assessed after ranking; deadlines apply else non-responsive. Payment terms 30 days (below R50m) / 60 days (above R50m). Eskom may negotiate prices post-award. No alternative tenders.
Requirements
Source: Invitation to Tender (ITT) MICROGRIDS.pdf (TENDER)Basic compliance: meet eligibility, submit complete tender (commercial, financial, technical), mandatory returnables on time. Upload under Technical, Commercial, Financial, Other. PDF format; price list PDF+Excel. No zip/hard copy. If resubmit, latest version only. Mark submission complete.
Section
Source: Invitation to Tender (ITT) MICROGRIDS.pdfPrice evaluation: VAT inclusive, arithmetical corrections, excl contingencies, NPV comparison, unconditional discounts count. Prices scored 90 points. Specific Goals 10 points (PPPFA 90/10). Ranking by combined scores. Objective criteria can override highest score (SHE, Quality, Finance, SDL&I).
Technical Specifications
Source: Unpriced BOQ for the Supply Delivery and Offloading of Microgrid. Solar PV Components and Structures REV1.pdf (unknown)The department requires the supply, delivery and offloading of microgrid/solar PV components and structures, on an as-and-when-required basis for a 5-year term. The required items include:
Pricing Schedule
Source: Unpriced BOQ for the Supply Delivery and Offloading of Microgrid. Solar PV Components and Structures REV1.pdf (unknown)Bidders must price the bill of quantities. The BoQ lists items with estimated quantities. Unit rates are to be entered for each item, and totals extended. Sub-total, VAT at 15%, and grand total are to be calculated by the bidder.
Financial Requirements
Source: Unpriced BOQ for the Supply Delivery and Offloading of Microgrid. Solar PV Components and Structures REV1.pdf (unknown)This is an unpriced bill of quantities (BoQ). Bidders must submit unit rates and totals for each listed item. Pricing to be in ZAR and exclusive of VAT; VAT at 15% is to be added. The contract amount is to be completed by the bidder. There is no stated bid security, bond, or retention.
Submission Guidelines
Source: Standard_Bidding_Document_%28SBD%29_6.1_IN_TERMS_OF_PPR_2022.pdf (TENDER)Returnable forms:
Consequences of fraudulent preference claims: disqualification, recovery of costs, contract cancellation, restriction from doing business with any organ of state for up to 10 years, and criminal prosecution.
Evaluation Criteria
Source: Standard_Bidding_Document_%28SBD%29_6.1_IN_TERMS_OF_PPR_2022.pdf (TENDER)Price and specific goals are scored out of a total of 100 points.
Technical Specifications
Source: Standard_Bidding_Document_%28SBD%29_6.1_IN_TERMS_OF_PPR_2022.pdf (TENDER)The document provided is only the SBD 6.1 preference points form. It contains no technical specifications. The tender's scope is supply, delivery and offloading of microgrid/solar PV components and structures on an as-and-when-required basis for 5 years.
Financial Requirements
Source: Standard_Bidding_Document_%28SBD%29_6.1_IN_TERMS_OF_PPR_2022.pdf (TENDER)The applicable preference point system depends on the Rand value of the tender: 80/20 for up to R50 000 000, 90/10 for above R50 000 000. The document does not state which applies or any other financial requirements.
Compliance Requirements
Source: Standard_Bidding_Document_%28SBD%29_6.1_IN_TERMS_OF_PPR_2022.pdf (TENDER)No specific compliance requirements (CSD, tax, B-BBEE, CIDB, etc.) are stated in the document. The tender uses the Preferential Procurement Regulations 2022; bidders must complete the SBD 6.1 form to claim preference points.
Contractual Terms
Source: Standard_Bidding_Document_%28SBD%29_6.1_IN_TERMS_OF_PPR_2022.pdfFraudulent preference claims or failure to fulfil contract conditions may lead to: disqualification from the tendering process, recovery of costs/losses/damages, contract cancellation with damages claimed, restriction from doing business with any organ of state for up to 10 years (after the audi alteram partem rule is applied), and criminal prosecution. The successful bidder may be required to provide documentary proof that the preference claims are correct.
Section
Source: Standard_Bidding_Document_%28SBD%29_6.1_IN_TERMS_OF_PPR_2022.pdfThe document is the SBD 6.1 preference points claim form. It confirms that evaluation is based on price and specific goals, totalling 100 points, using either the 80/20 or 90/10 preference point system. It does not state which system applies to this tender or the specific goals and points allocated.
Description
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfThis is a PAYE classification questionnaire for service contractors to the Eskom Group. It determines whether a contractor is an independent contractor, personal service provider, labour broker or dependent contractor for tax purposes. It applies to companies, close corporations, trusts and individuals providing services or labour to Eskom Holdings SOC Ltd and its subsidiaries.
Important Dates
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)The PAYE questionnaire applies to the 2025/2026 tax year (1 March 2025 to 28 February 2026).
No specific closing date for the questionnaire is stated.
Contact Information
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Group Tax
Eskom Group Tax Department
No named individual contacts or telephone numbers are provided.
Submission Guidelines
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Returnable documents
Submission
Submitted documents must be complete, signed and truthful. Failure to sign required affidavits or declarations will result in PAYE being withheld from payments.
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)The evaluation consists of a PAYE classification questionnaire, not a commercial scoring process.
Companies, close corporations and trusts (Evaluation Pack A) answer tests covering:
Individuals (Evaluation Pack B) answer tests covering:
Classification outcome
Technical Specifications
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)The document is a PAYE classification questionnaire for service contracts with the Eskom Group of Companies.
Scope
Contractor types covered
Pricing Schedule
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfThe pack does not contain a pricing schedule. Tax treatment of payments is set out in the feedback:
Financial Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Payment and tax treatment depends on classification:
Independent contractor (Appendix 8 signed)
Personal service provider or dependent contractor (Appendix 7 signed)
Labour broker (Appendix 6 signed)
Accuracy of information
Compliance Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)The questionnaire applies to the 2025/2026 tax year and is subject to changes in tax legislation.
Required registrations
Residency
IRP30 certificate
Required affidavits/declarations (signed where applicable)
Accuracy of the classification is the contractor's responsibility.
Contractual Terms
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Eskom accepts no liability for any loss or damages arising from use of the pack.
The contractor is responsible for the accuracy and completeness of all information provided and must notify Eskom in writing of any change to its tax status.
Eskom may withhold from payments any taxes, interest or penalties it is required to pay to SARS as a result of inaccurate information.
Failure to sign the required affidavits or declarations results in PAYE being withheld.
Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)The pack contains classification tests to determine tax status.
For companies/close corporations/trusts (Evaluation Pack A):
For individuals (Evaluation Pack B):
Outcome: answering PSP/Employee to any of questions 6(i), 6(iii), 6(v), 6(vi) or 6(ix), or more than half of the remaining questions, results in PAYE being withheld and coded 3601 (or 3616 if Appendix 7 was already signed on the income or place/control tests).
Section
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfThe evaluation determines PAYE classification, not commercial scoring. See the main evaluationCriteria section for the tests and outcome.
Description
Source: Service Provider Services Contractor Supplier SHE Evaluation Report.pdfThe provided document is an Eskom Occupational Health and Safety Evaluation Report used to assess whether service providers/contractors/suppliers have submitted the required OHS documentation as specified in the Eskom SHE Specification and that the documentation complies with legislative requirements.
Submission Guidelines
Source: Service Provider Services Contractor Supplier SHE Evaluation Report.pdf (unknown)Returnable documents — all must be completed, signed and submitted:
Disqualification risks:
Evaluation Criteria
Source: Service Provider Services Contractor Supplier SHE Evaluation Report.pdf (unknown)OHS documentation will be evaluated against the Eskom SHE Specification. All listed items in the SHE evaluation report must be submitted and compliant. No numerical scoring or minimum score is stated in the provided document.
Technical Specifications
Source: Service Provider Services Contractor Supplier SHE Evaluation Report.pdf (unknown)The purpose of the provided document is to assess whether bidders submitted the required occupational health and safety documentation as specified in the Eskom SHE Specification and that the documentation complies with legislative requirements. The reference documentation is Eskom SHE Specification, Form 74.
Required OHS documentation:
SHE Plan must demonstrate at minimum:
SHE File must include:
Compliance Requirements
Source: Service Provider Services Contractor Supplier SHE Evaluation Report.pdf (unknown)Mandatory compliance evidence:
Section
Source: Service Provider Services Contractor Supplier SHE Evaluation Report.pdfEvaluation of compliance: bidders must demonstrate that they have submitted all required OHS documentation as per the SHE evaluation report.
Description
Source: Standard_Bidding_Document_(SBD)_4_-_Annexure_A.pdfThe scope, as stated in the tender title, is the supply, delivery and offloading of microgrid/solar PV components and structures, on an as-and-when-required basis, for a duration of five years. No additional scope details are provided in this document.
Important Dates
Source: Standard_Bidding_Document_(SBD)_4_-_Annexure_A.pdf (TENDER)Closing date:
Contact Information
Source: Standard_Bidding_Document_(SBD)_4_-_Annexure_A.pdf (TENDER)No named contacts or submission address are provided in the document.
Submission Guidelines
Source: Standard_Bidding_Document_(SBD)_4_-_Annexure_A.pdf (TENDER)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Standard_Bidding_Document_(SBD)_4_-_Annexure_A.pdf (TENDER)Pre-qualification:
Evaluation structure:
Technical Specifications
Source: Standard_Bidding_Document_(SBD)_4_-_Annexure_A.pdf (TENDER)The only tender-specific detail is the tender title: Supply, delivery and offloading of microgrid/solar PV components and structures, on an as-and-when-required basis for a duration of five years. No quantities, locations, or service levels are stated in this document.
Compliance Requirements
Source: Standard_Bidding_Document_(SBD)_4_-_Annexure_A.pdf (TENDER)No specific compliance requirements (e.g., CSD, tax, CIDB, B-BBEE) are stated in this document.
Section
Source: Standard_Bidding_Document_(SBD)_4_-_Annexure_A.pdfThe document only indicates that bidders on the Register for Tender Defaulters or List of Restricted Suppliers are automatically disqualified, and that the information in SBD 4 must be true and complete. No other evaluation criteria are provided.
Description
Source: CS-SHEQ Tender Evaluation Report -Supply and Delivery 2025.pdfThe tender is for the supply, delivery and offloading of microgrid/solar PV components and structures, on an as-and-when-required basis, for a duration of 5 years. The document focuses on the OHS evaluation of service providers, contractors and suppliers.
Contact Information
Source: CS-SHEQ Tender Evaluation Report -Supply and Delivery 2025.pdf (unknown)No named contacts are provided in the document.
Submission Guidelines
Source: CS-SHEQ Tender Evaluation Report -Supply and Delivery 2025.pdf (unknown)Bidders must submit all required occupational health and safety documentation with their bid. Returnable documents include:
Each item must be complete and compliant; missing or non-compliant documentation may affect the bid evaluation.
Evaluation Criteria
Source: CS-SHEQ Tender Evaluation Report -Supply and Delivery 2025.pdf (unknown)Bidders are evaluated on the submission and compliance of the occupational health and safety documentation as per the SHE Specification, Form 74. No scoring split, preference point system, or minimum qualifying score is stated.
Technical Specifications
Source: CS-SHEQ Tender Evaluation Report -Supply and Delivery 2025.pdf (unknown)The tender is for the supply, delivery and offloading of microgrid/solar PV components and structures, on an as-and-when-required basis, for a duration of 5 years. The document provided focuses solely on the OHS evaluation of service providers, contractors and suppliers.
Compliance Requirements
Source: CS-SHEQ Tender Evaluation Report -Supply and Delivery 2025.pdf (unknown)Bidders must provide the following OHS documentation as part of compliance:
No CSD, tax, or B-BBEE requirements are stated in the provided document.
Health & Safety
Source: CS-SHEQ Tender Evaluation Report -Supply and Delivery 2025.pdfRequired OHS documentation also includes a non-conformity, corrective and preventative action procedure, and a valid letter of good standing / Workman's Compensation.
Section
Source: CS-SHEQ Tender Evaluation Report -Supply and Delivery 2025.pdfThe evaluation is based on compliance with the SHE Specification, Form 74. No scoring split or minimum qualifying score is stated.
Description
Source: 32-136 Contractor Health and Safety Requirements_March 2023.pdfEskom requires all contractors (including suppliers, vendors, service providers and consultants) to comply with its Contractor Health and Safety Requirements (Standard 32-136). The standard sets out minimum safety, health and environmental obligations to protect workers, the public and the environment. Contractors are responsible for their own compliance and that of their appointed subcontractors, and must adhere to all applicable South African legislation and Eskom policies and procedures.
Methodology
Source: 32-136 Contractor Health and Safety Requirements_March 2023.pdfContractors must develop method statements or written safe work procedures for high-risk tasks, conduct risk assessments before work commences, and implement safe systems of work. Pre-task planning and toolbox talks are required to ensure team understanding of tasks, risks and control measures.
Experience & Qualifications
Source: 32-136 Contractor Health and Safety Requirements_March 2023.pdfA competent person is defined as having knowledge, training, experience and qualifications specific to the work. Health and safety officers must be competent and, where required, registered with a statutory body approved by the Chief Inspector. Construction project managers and supervisors must be registered with SACPCMP where applicable.
Quality Management
Source: 32-136 Contractor Health and Safety Requirements_March 2023.pdfMaterial and equipment used or purchased must conform to manufacturer and legislative health and safety requirements. Where reclaimed material is authorised, it must meet the same safety requirements as new. Eskom and/or the designer/agent/client determine the acceptability of workmanship. Quality management systems should align with ISO 9001.
Compliance Requirements
Source: 32-136 Contractor Health and Safety Requirements_March 2023.pdf (unknown)Eskom's Contractor Health and Safety Requirements (Standard 32-136) apply to all contractors, suppliers, vendors and consultants. Contractors must:
Health & Safety
Source: 32-136 Contractor Health and Safety Requirements_March 2023.pdfEskom's Contractor Health and Safety Requirements (Standard 32-136) impose minimum legislative and organisational safety obligations on all contractors, aiming for Zero Harm. Key requirements include: risk assessments before and during work, record keeping and SHE files, adherence to Life-Saving Rules, incident investigation and reporting, training and toolbox talks, appointment of competent health and safety officers, site facilities and public safety measures, emergency preparedness, occupational health and hygiene (including hearing conservation at 85 dBA), auditing and inspections, safe handling of hazardous materials and chemicals, machinery and equipment safety, working at heights, excavations, confined spaces, barricading, explosives, permit to work, NDT, work near public roads, work stoppage for unsafe conditions, substance abuse prevention, statistical reporting, housekeeping, signage and colour coding, PPE, and environmental care.
Environmental
Source: 32-136 Contractor Health and Safety Requirements_March 2023.pdfContractors have a duty of care to the environment, must prevent pollution or degradation, and must minimise and rectify any harm. Compliance with NEMA and the National Environmental Management: Waste Act is required. Asbestos handling must follow the Asbestos Regulations of the OHS Act. Noise exposure above an 8-hour rating level of 85 dBA requires a hearing conservation programme.
Contractual Terms
Source: 32-136 Contractor Health and Safety Requirements_March 2023.pdfContractors remain accountable for the health and safety of any appointed subcontractors, and the relationship is governed by contractual arrangements. For joint ventures, each partner must fulfil all SHE requirements and be a signatory to a Section 37(2) agreement. Each company is liable for its own contraventions. Violation of Eskom's Life-Saving Rules is treated seriously and dealt with through the disciplinary process.
Requirements
Source: 32-136 Contractor Health and Safety Requirements_March 2023.pdf (unknown)Contractors must comply with all applicable occupational health and safety legislation and Eskom policies and procedures. They must conduct risk assessments, appoint competent health and safety officers, ensure employees are trained and supervised, and maintain SHE files. Contractors are responsible for their own and their subcontractors' compliance. Statutory appointments must comply with legislative requirements and Eskom Standard 32-296.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Lower Germiston Road Rosherville - Germiston - Johannesburg - 2024
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
32
Last checked
22 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
A strategic guide for medical equipment suppliers, maintenance companies, and healthcare technology providers bidding for tenders across South Africa's nine provincial health departments. Covers SAHPRA registration, OEM authorisation, service level agreements, and technical evaluation criteria.
A comprehensive guide to securing medical equipment maintenance tenders in South African public hospitals. Learn about SLA management, OEM certifications, and clinical engineering requirements.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Electrical Equipment. Unlock full pricing strategies, bid frequency, and historical win rates.