Ant and roach pest control is required for kitchens across the eri site, with the service schedule listing each kitchen by stand, building and floor. The scope covers roughly 100 kitchens spread over stands 14 to 46, including office blocks, workshops, training centres, canteens, stores and security buildings. Each service visit must be recorded on the schedule with the date, the provider's representative name and signature, and the kitchen service representative's signature. Bidders should price the full kitchen list and plan resources for the geographic spread of the site.
Key Requirements
Scope: ant and roach pest control for every kitchen listed in Annexure C, from Stand 14 (Oil Depot) through Stand 46 (TGS Strategic New Store), including multi-kitchen buildings such as TSS (4), TGS (5), RMF Office Block (3), TSS Office Block (3), 6 Storey Building 1st Floor (3), Bosbok (3) and Blesbok (3).
Service record: every visit must be signed off on the schedule by the provider's representative and the kitchen service representative, with the date recorded.
Site access: work is spread across stands 14 to 46 and multiple buildings per stand, so bidders must plan travel and access across the ERI site.
Closing: 9 December 2026 at 08:00; submit through the Eskom tender process for reference E1626SSERI.
Compliance: bidders must be registered on the Central Supplier Database and submit a valid tax compliance status, as required for Eskom tenders.
Pricing: price the full kitchen list in Annexure C; no partial kitchen list is provided.
Disqualification risk: omitting any kitchen from the schedule or failing to obtain the required signatures on service records.
Tenders in this industry often require registration with these bodies.
CIDB Registration
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Typical Documents
10 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
CIDB Registration Certificate
NHBRC Registration (if applicable)
Health & Safety Plan
Insurance Certificates
Previous Project Completion Certificates
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
11 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Eskom requires pest control services across a defined schedule of buildings and areas at its ERI facility, covering offices, waste disposal areas, a medical centre, training centres, a canteen, and office park units. The scope is set out as a unit-by-unit service schedule (Annexure D) listing each stand, building number, area and the number of units to be serviced.
Invitation to Tender (ITT) - The Provision of Pest Control Services.pdf
Eskom Rotek Industries SOC Limited requires pest control services for a period of five years, delivered under an NEC3 Term Service Contract (TSC3). The contract is awarded as a single award for the whole scope, and bidders must quote on every item in the pricing schedule.
Eskom requires the provision of pest control services under a contract governed by its supplier quality requirements. Bidders must accept Eskom's pre-contract and post-contract quality regime, including ISO 9001 alignment, supplier quality performance monitoring and quality audits.
NEC TSC3 - Term Services Contract- The Provision of Pest Control Services .pdf
Eskom Rotek Industries SOC Ltd requires a contractor to provide pest control services at its Rosherville property for a period of five years under an NEC3 Term Service Contract (TSC3), Option A priced contract with price list.
Eskom Rotek Industries (ERI) requires pest control services at its Rosherville facility in Gauteng on an as-and-when-required basis for a five-year period. The appointed principal contractor must meet detailed safety, health and environmental (SHE) specifications, including a SHE file, registered pest control operators, medical surveillance, chemical and pesticide management, and waste controls.
Eskom requires the provision of pest control services under a supplier quality management framework. Suppliers must operate a formal quality management system conforming to ISO 9001 and comply with Eskom's quality requirements across the contract lifecycle, from tender submission through to performance monitoring and audit.
Provision of pest control services for Eskom in Gauteng. Bidders must submit a health and safety (SHE) returnable pack that is evaluated on a recommended / not recommended basis.
Pest Control SOW and Technical Evaluation Criteria.pdf
Eskom Rotek Industries (ERI) requires an integrated pest control service for its Rosherville site in Gauteng over a five-year period, covering insects, rodents, birds, bats and other pests across offices, workshops, canteens, houses and common areas. The service includes scheduled monthly, bi-monthly and fortnightly treatments plus ad hoc callouts, with a competent registered technician based on site.
Eskom requires the provision of pest control services. Bidders must submit two years of the most recent audited or independently reviewed annual financial statements, with specific rules applying to joint ventures, special purpose vehicles and start-up enterprises.
Eskom requires pest control services for kitchens across its Rotek/ERI site, covering approximately 90 kitchen locations spread over stands 14 to 46, including oil depot, logistics, RMF, medical centre, TSS, TGS, training centres, office park units, construction head offices and stores buildings. Each kitchen is serviced as a discrete unit, with some buildings carrying multiple kitchens across floors.
Environmental Tender Evaluation and Scoring Card Signed.pdf
Eskom requires the provision of pest control services, with bidders assessed against environmental and SHE compliance criteria. The scope is classified under Eskom's high, medium and low risk work framework, and submissions are scored against environmental management key performance indicators.
Eskom requires pest control services across its Gauteng sites, covering rodent proofing and tamper-proof treatment of offices, workshops, stores, canteens, security areas and residential quarters. The scope is a site-by-site schedule of buildings and units, each with a quantity of one treatment.
Eskom Rotek Industries requires pest control services at its Rosherville site for a period of five years. Bidders must demonstrate a documented quality management system aligned to ISO 9001:2015 and submit the specified quality evidence.
Provision of pest control services for houses, covering both inside and outside treatment of each unit, with service records signed off by tenants. The service is required by ESKOM in Gauteng.
Eskom requires pest control services across its ERI (Rotating Machines) sites in Gauteng, covering door-to-door ant and roach treatment at 60 buildings and units including Heritage Office Park, single quarters, workshops, stores and offices. The service is scheduled per building, with door quantities ranging from 1 to 145 per site and a total of 1,731 doors to be serviced.
Eskom requires the provision of pest control services over a five-year contract period, covering treatment and removal of a wide range of pests including rodents, ants, cockroaches, termites, bees, wasps, snakes, birds, flies, mosquitoes, fleas and lizards across internal and external areas, canteens, kitchens, offices, houses and trucks.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Eskom requires all existing and potential suppliers and sub-suppliers to meet minimum quality requirements covering evaluation, selection, supplier registration, assessment, performance monitoring and auditing.
Suppliers must show commitment to developing, implementing and maintaining a quality management system conforming to ISO 9001.
The specification applies across Eskom divisions, subsidiaries, suppliers and sub-suppliers and forms part of all RFIs, RFQs, RFPs and procurement contracts.
Form A (Tender and Contract Quality Requirements, 240-68099512): complete and sign Sections A and E to acknowledge and accept the applicable quality category and ISO 9001 obligations.
Quality returnables for the category assigned in Form A, as listed in 240-12248652 (List of Tender Returnable).
Draft contract quality plan specific to the scope of work, meeting ISO 10005.
Example inspection and test plan (ITP) or quality control plan (QCP) from similar or previous work, where applicable.
Documented information for control of externally provided processes, products and services.
Records of management review meetings (agenda, minutes, attendance registers, reports, presentations).
Documented roles, responsibilities and authorities relating to the QMS (organograms, job descriptions, work instructions, procedures).
Category-specific evidence
Category 1: valid ISO 9001 or applicable QMS certificate; latest internal and external audit reports including nonconformities and remedial actions.
Category 2: objective evidence of a developed, implemented and maintained ISO 9001-conforming QMS — QMS manual or scope document, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, nonconformity and corrective action procedure; plus latest internal audit reports.
Submission format
Only one quality category applies to a procurement process; submit the returnables for that category only.
Additional scope-specific returnables may be added from E2 onwards in Section E of Form A.
Quality requirements are selected by Eskom's assigned quality representative using guideline 240-125473040 and recorded in Form A.
One quality category (1, 2, 3 or 4) applies per RFI, RFQ, RFP or contract.
Bidders must complete and sign Form A (Sections A and E) and submit the returnables listed for the assigned category in 240-12248652.
Category 1: valid ISO 9001 or applicable QMS certificate, latest internal and external audit reports with nonconformities and remedial actions, documented QMS roles and responsibilities, draft contract quality plan per ISO 10005, example ITP/QCP where applicable, documented control of externally provided processes, and management review records.
Category 2: objective evidence of a developed, implemented and maintained ISO 9001-conforming QMS (manual or scope document, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, nonconformity and corrective action procedure), latest internal audit reports, draft contract quality plan, example ITP/QCP where applicable, documented control of externally provided processes, documented QMS roles and responsibilities, and management review records.
The QMS requirement extends to sub-suppliers whose scope covers design and development, manufacturing, maintenance, testing, storage, delivery, installation, commissioning or project management, and to name changes, mergers, acquisitions and cessions.
Eskom may assess sub-supplier facilities.
Where quality management personnel lack relevant competence, Eskom may require their removal from contract site operations.
Minimum quality requirements for all existing and potential Eskom suppliers and sub-suppliers, covering evaluation, selection, supplier registration, assessment, performance monitoring and auditing.
Applies across Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and procurement contracts.
Quality management system
Suppliers and sub-suppliers must develop, implement, maintain and continually improve a formal QMS conforming to the latest ISO 9001 or an applicable QMS standard.
The QMS must include the documented information ISO 9001 requires — quality manual, quality plans, work procedures, work instructions, method statements and workflow documentation as applicable.
Unless excluded in the quality list of tender returnables for the assigned category, a valid ISO 9001 certificate from an accredited certification body is required, for the supplier and any manufacturing third parties.
New products or services without a SANS equivalent must follow recognised industry recommended practice or applicable codes (for example UL 9540 or IEEE 1790 for BESS).
Suppliers must notify Eskom before implementing changes to the QMS or quality-affecting staff.
The main supplier must run a sub-supplier performance management programme covering QMS verification, audits and surveillances, CQP assessment and QCP review, nonconformity and defect management, inspection and test plans, risk management, documentation and awareness communication.
Quality plans
Where required by the evaluation criteria or returnables list, every product, service and process must have a documented, implemented, reviewed and maintained contract/project quality plan and/or quality control plan (ITP).
Production and service provision must follow the agreed CQP and/or QCP/ITP.
The CQP must address quality assurance for the scope and specification; the QCP/ITP must address quality control.
Sub-supplier CQPs must follow ISO 10005 and the subcontracted scope, and must cover records management (material tests, positive material identification, material certification), free and uninhibited inspection access, final documentation and manufacturing data book submission before shipment, welding controls (welder qualification records, welding procedure specifications, procedure qualification records), special installation and fabrication procedures, qualification and statutory registration of personnel performing special processes, training needs and records, and storage, preservation and maintenance instructions.
CQPs must state the QMS aspects applied to the project, resources, communication channels, documents and records, management authority and responsibility for supplier and client, monitoring and measurement procedures, and contact details.
CQPs must be submitted before the initial scope kick-off or pre-fabrication meeting and before manufacturing starts, whichever is earlier; the Eskom CQP template may be used where the supplier has none.
Quality management personnel must be suitably qualified; Eskom may require removal of personnel lacking relevant competence.
Quality control plans / inspection and test plans
The main supplier must ensure sub-supplier QCPs/ITPs cover all quality-control activities in chronological order, from contract review through material verification, manufacturing, fabrication, assembly, final testing, commissioning, hand-over documentation and certification.
All manufacturing, fabrication, assembly and installation stages must be controlled by a QCP/ITP identifying verification activities, intervention points and test methods per ISO 10005, with attention to critical products and services.
QCPs/ITPs must be reviewed and accepted by Eskom or its inspection authority before work starts, and must allow Eskom hold and witness points to be inserted.
Changes to an accepted QCP/ITP need Eskom agreement before the affected activity starts.
ITPs must cover material certification, fabrication, in-process inspection, final acceptance tests, packaging and pre-shipment/transport, shipping inspections where contracted, preservation, site acceptance tests, construction and erection, and pre-commissioning and commissioning tests.
Sub-supplier QCP/ITP activity must use an Eskom-accepted supplier QCP/ITP based on the subcontracted scope; a separate QCP/ITP is required for each sub-supplier scope.
The supplier remains accountable for developing and implementing all sub-supplier QCPs/ITPs.
Eskom may select intervention points and perform surveillance or audits.
Signed ITPs and QCPs become addenda to the main contract and may be reviewed at Eskom's discretion based on performance or risk.
Each QCP/ITP must contain the Eskom contract number and title, supplier order number, area of works, work description with components, item numbers and activity dates, a unique QCP/ITP number, the sequence of operations including inspections and tests, reference to specifications, drawings or procedures with criticality risk rating, acceptance criteria with standard and clause references, supplier-nominated intervention points, provision for Eskom intervention points, dated and signed acceptance by all parties, and the inspection and test records to be generated and provided to Eskom.
Sub-supplier QCPs/ITPs must describe equipment and locations, verification activities and stages, reference documents with specific sections and pages, acceptance criteria, certifying documents using Eskom numbering, supplier, sub-supplier, approved inspection authority and Eskom activities with witness, hold, document review and verification points and sign-off, inspector qualification requirements, test procedures, tolerances, and signed acceptance before work starts.
A quality kick-off meeting is held at contract start and at the start of each subsequent phase if required; coordination meetings before order placement need 14 days' advance notice to Eskom.
Inspection personnel, including inspection agency personnel, must be competent and qualified per the Project Quality Personnel Qualification Specification.
Sub-suppliers must receive written inspection and testing protocols covering checklists and assignments, report format, content, processing, distribution and retention, results tracking and nonconformity resolution, FMECA reports and HAZOP reports where applicable.
The supplier must formally assess sub-supplier inspection and testing programmes, including report review and facility assessments, at a frequency set by scope, criticality and performance, with scope and schedule agreed with Eskom.
Purchased product compliance verification processes must obtain document return/review status before implementation.
Mandatory pre-inspection meetings are convened by Eskom or its inspection agency, attended by supplier and sub-supplier representatives including quality representatives, with records kept.
Eskom may appoint resident quality inspectors at supplier or sub-supplier premises and on site; the supplier must provide workspace at no cost.
Eskom may appoint any organisation as approved inspection authority or inspection agency, and the supplier and sub-suppliers may not obstruct that organisation's work.
The Eskom QCP/ITP template may be used where the supplier has none.
Preservation
The supplier's preservation management programme must cover the period from transfer of ownership or management responsibility through temporary or long-term storage and transit to the point of active use or installation.
Storage and material control must follow manufacturer recommendations, specifications and project requirements.
Special precautions must cover valves, electrical motors and components, mechanical and rotating equipment, piping and fittings, instrumentation, flange faces, gaskets, coatings and insulation, including periodic shaft rotation, engine turnover and lubrication.
Preservation requirements must be documented in purchase orders, work authorisations and supplier–sub-supplier communications, and communicated to logistics, construction management, quality, security and other functions.
Sub-supplier preservation responsibilities must be clearly designated, and Eskom must have free and unrestricted access to all preservation records for inspection and audit.
The supplier must develop and execute a preservation work plan and evaluate the performance of all parties engaged for material transportation, handling or storage.
Oversight of material quality preservation plan preparation and execution is required at all work locations.
A preservation programme records management process must comply with Eskom information management requirements and give Eskom ready access to all records.
A documented programme must identify pre-operation preservation requirements for all physical assets, including bulk materials, consumables, equipment systems, system components and other procured or supplied materials transferred to project control but not yet in operational use.
Where equipment and materials management is delegated, pre-operation preservation requirements must be clearly communicated to sub-suppliers.
Processes and procedures for monitoring compliance with programme requirements must be documented.
Compliance monitoring starts with inclusion of preservation requirements in engineering instructions and procurement documentation and continues until equipment or materials are incorporated in an operating system or structure.
Compliance evaluation frequency must anticipate transfers of responsibility between project functions (procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to construction) and between subcontracted service providers.
Supplier engineering must document preservation requirements for all systems, components, equipment, materials, customer-supplied materials and other procured goods, and communicate them to procurement, logistics, construction management, quality, security and other functions.
The programme must address temporary, long-term and in-transit preservation, including protection against atmospheric conditions, sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres and other physical conditions, and detailed procedures for applying, monitoring and maintaining coatings, coverings, fasteners, lines and other components for internal and external weather protection.
Develop, implement, maintain and continually improve a formal QMS conforming to the latest ISO 9001 or an applicable QMS standard.
Unless excluded in the quality list of tender returnables for the assigned category, hold a valid ISO 9001 certificate from an accredited certification body; the requirement applies equally to sub-suppliers and manufacturing third parties.
The QMS requirement extends to sub-suppliers whose scope covers design and development, manufacturing, maintenance, testing, storage, delivery, installation, commissioning or project management, and to name changes, mergers, acquisitions and cessions.
Notify Eskom before implementing QMS or quality-affecting staff changes.
Returnable forms and evidence
Form A (240-68099512): complete and sign Sections A and E to accept the assigned quality category and ISO 9001 obligations.
Quality returnables for the assigned category per 240-12248652.
Category 1: valid ISO 9001 or applicable QMS certificate; latest internal and external audit reports with nonconformities and remedial actions; documented QMS roles and responsibilities; draft contract quality plan per ISO 10005; example ITP/QCP where applicable; documented control of externally provided processes; management review records.
Category 2: objective evidence of a developed, implemented and maintained ISO 9001-conforming QMS (manual or scope document, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, nonconformity and corrective action procedure); latest internal audit reports; draft contract quality plan; example ITP/QCP where applicable; documented control of externally provided processes; documented QMS roles and responsibilities; management review records.
Personnel and access
Personnel performing special processes must be suitably qualified and, where legally required, registered with statutory bodies; training records must meet regulatory or statutory requirements including unit standards, NQF and provider accreditation numbers.
Quality management personnel must be suitably qualified; Eskom may require removal of personnel lacking relevant competence from contract site operations.
Eskom may request and perform assessments at sub-supplier facilities and may appoint resident quality inspectors; the supplier must provide workspace at no cost.
Eskom may appoint any organisation as approved inspection authority or inspection agency, and the supplier and sub-suppliers may not obstruct that organisation's work.
No tender-specific health and safety requirements are stated; the SHEQ Policy (32-727) is listed as an informative reference only.
DocumentQuality tender ReturnablesPest Control 2026.pdfReview complete
Description
Source: Quality tender ReturnablesPest Control 2026.pdf
Pest control services are required for Eskom Rotek Industries (ERI) at Rosherville over a five-year contract period.
Contact Information
Source: Quality tender ReturnablesPest Control 2026.pdf (unknown)
Eskom representative
Name: Susan Pretorius
Enquiry and submission contacts are not stated in the available text.
Submission Guidelines
Source: Quality tender ReturnablesPest Control 2026.pdf (unknown)
Returnable documents
Form A: completed and signed quality requirements declaration.
Section A evidence: QMS manual or scope document, approved quality policy, approved quality objectives, document and record control procedure, control of nonconforming outputs procedure, nonconformity and corrective action procedure, internal audit procedure.
Section B evidence: organisation chart and responsibility matrix showing the quality management function, and external provider control procedure covering evaluation, selection, performance monitoring and re-evaluation.
Submission method and address are not stated in the available text.
Evaluation Criteria
Source: Quality tender ReturnablesPest Control 2026.pdf (unknown)
Quality requirements are scored per the tender quality requirements reference 240-105658000.
Section A (ISO 9001 quality management system): 7 points.
Section B (evidence of QMS in operation): 2 points.
Section E (user-defined additional requirements): 1 point.
Total quality score: 10 points.
Each listed deliverable carries an indicator of 1 and must be submitted to score.
ISO 9001 certification is not required; documented objective evidence of compliance is accepted.
Minimum qualifying score is not stated.
Technical Specifications
Source: Quality tender ReturnablesPest Control 2026.pdf (unknown)
Scope
Pest control services for Eskom Rotek Industries (ERI).
Site: Rosherville.
Contract period: five (5) years.
Quality deliverables
Documented quality management system aligned to ISO 9001:2015, with or without certification.
Quality policy and quality objectives approved by top management.
Documented control of documented information (ISO 9001 clause 7.5).
Documented control of nonconforming outputs (clause 8.7).
Documented nonconformity and corrective action process (clause 10.2).
Documented internal audit process (clause 9.2).
Organisation chart and responsibility matrix covering the quality management role (clause 5.3).
External provider control procedure with evaluation, selection, performance monitoring and re-evaluation criteria (clause 8.4).
Compliance Requirements
Source: Quality tender ReturnablesPest Control 2026.pdf (unknown)
Quality management system
ISO 9001:2015 compliance must be demonstrated through documented evidence; certification is not mandatory.
Quality policy and quality objectives must be approved by top management.
Documented procedures required for document control, nonconforming outputs, corrective action and internal audit.
Organisation chart and responsibility matrix must identify the quality management function.
External provider control procedure must cover evaluation, selection, monitoring and re-evaluation.
Returnable form
Form A: signed declaration confirming the quality requirements are met.
Health & Safety
Source: Quality tender ReturnablesPest Control 2026.pdf
The contract covers pest control services at Eskom Rotek Industries (ERI), Rosherville, for five years. No health and safety requirements are stated in the available text.
Section
Source: Quality tender ReturnablesPest Control 2026.pdf
Quality evaluation is scored out of 10 points.
Section A: ISO 9001 quality management system evidence, 7 points.
Section B: evidence that the QMS is operating, 2 points.
Each deliverable carries an indicator of 1 and must be present to earn its point.
ISO 9001 certification is not a prerequisite; documented compliance is accepted.
DocumentEnvironmental Tender Evaluation and Scoring Card Signed.pdfReview complete
Description
Source: Environmental Tender Evaluation and Scoring Card Signed.pdf
Provision of pest control services for Eskom, assessed through an environmental evaluation and scoring card covering low, medium and high risk work categories.
Submission Guidelines
Source: Environmental Tender Evaluation and Scoring Card Signed.pdf (unknown)
Returnable documents
Annexure B: signed acknowledgement of Eskom's SHE rules and requirements, attached to the bid.
Environmental Management Plan covering the minimum content for the applicable risk category.
Environmental (or SHE/SHEQ) policy signed by the company owner, CEO or managing director.
High risk only: detailed, itemised costing for environmental management (not a lump sum).
Medium and high risk only: identification of environmental aspects and impacts, with methodology and controls.
High risk only: CVs and qualification certificates for environmental officer, environmental control officer and incident investigator(s).
Part B alternative: signed Annexure B plus a valid ISO 14001 Environmental Management Standard certificate.
Scoring of submissions
Each item is scored 0 (not submitted, or submitted but below the minimum requirements) or 1 (submitted and meets the minimum requirements).
The total score determines whether the bid is Approved or Not Approved.
Evaluation Criteria
Source: Environmental Tender Evaluation and Scoring Card Signed.pdf (unknown)
Evaluation is a pass/fail environmental screening, not a points-based preference system.
Part A — Environmental Management Plan route
Pre-requisite: signed Annexure B (Eskom SHE rules acknowledgement) attached to the bid.
Environmental Management Plan must address the minimum content for the risk category:
Medium risk: the low-risk items plus environmental incident management and emergency planning for environmental incidents.
High risk: the medium-risk items plus environmental management structure and professional registration of environmental resources, method statements for activities with significant environmental impacts, approach to meeting environmental compliance obligations, environmental competency, training and appointments, and environmental communication and awareness.
High risk only: detailed environmental management costing, broken down rather than a lump sum.
Medium and high risk only: identification, assessment and control of activities with environmental impact, with the methodology and the controls to be applied during contract execution.
All bidders: environmental (or SHE/SHEQ) policy signed by the owner, CEO or MD, committing to environmental compliance obligations and the environmental duty of care.
High risk only: environmental competency evidenced by CVs and qualifications or certificates for environmental officer, environmental control officer and incident investigator(s).
Part B — ISO 14001 route
Signed Annexure B.
Valid ISO 14001 Environmental Management Standard certificate.
Scoring
Each item scores 0 or 1.
0 = document not submitted, or submitted but does not meet the minimum requirements.
1 = document submitted and content meets the minimum requirements.
The total score determines Approved or Not Approved.
Technical Specifications
Source: Environmental Tender Evaluation and Scoring Card Signed.pdf (unknown)
Scope
Provision of pest control services for Eskom.
Environmental Management Plan content by risk category
Medium risk: the low-risk content plus environmental incident management and emergency planning for environmental incidents.
High risk: the medium-risk content plus:
environmental management structure, including professional registration of environmental resources and assigned responsibility and accountability;
method statements for activities with significant environmental impacts, showing how impacts and risks are managed;
approach to ensuring compliance with environmental compliance obligations;
environmental competency, training and appointments;
environmental communication and awareness.
Aspects and impacts (medium and high risk)
Identify, assess and control activities that have or may have an environmental impact.
Provide the methodology used, the activities identified from the scope of work, and the controls to be applied during contract execution.
Environmental costing (high risk)
Detailed costing for environmental management across the overall scope of work, broken down into components rather than a lump sum.
Environmental competency (high risk)
CVs and qualifications or certificates for environmental officer, environmental control officer and incident investigator(s).
Financial Requirements
Source: Environmental Tender Evaluation and Scoring Card Signed.pdf (unknown)
High risk bidders must submit detailed costing for environmental management relating to the overall scope of work.
The cost must be broken down into its components.
A lump-sum figure is not acceptable.
Compliance Requirements
Source: Environmental Tender Evaluation and Scoring Card Signed.pdf (unknown)
Pre-requisite
Signed Annexure B acknowledging Eskom's SHE rules and requirements, attached to the bid.
Environmental policy
Environmental (or SHE/SHEQ) policy signed by the company owner, CEO or managing director.
The policy must commit to compliance with environmental compliance obligations and to the environmental duty of care.
Environmental Management Plan
Must meet the minimum content for the risk category applicable to the work (low, medium or high).
Alternative compliance route (Part B)
Signed Annexure B, plus a valid ISO 14001 Environmental Management Standard certificate.
Health & Safety
Source: Environmental Tender Evaluation and Scoring Card Signed.pdf
Bidders must sign and attach Annexure B, acknowledging Eskom's SHE rules and requirements, as a pre-requisite to the bid.
The Environmental Management Plan must cover environmental incident management and emergency planning for environmental incidents for medium and high risk work.
Environmental
Source: Environmental Tender Evaluation and Scoring Card Signed.pdf
Medium risk: the low-risk content plus environmental incident management and emergency planning for environmental incidents.
High risk: the medium-risk content plus:
environmental management structure, including professional registration of environmental resources and responsibility and accountability;
method statements for activities with significant environmental impacts, showing methodology and approach to managing impacts and risks;
approach to ensuring compliance with environmental compliance obligations;
environmental competency, training and appointments;
environmental communication and awareness.
Aspects and impacts (medium and high risk)
Identify, assess and control activities that have or may have an environmental impact.
Provide the methodology, the activities identified from the scope of work, and the controls to be applied during contract execution.
Environmental costing (high risk)
Detailed costing for environmental management across the overall scope of work, broken down rather than a lump sum.
Environmental competency (high risk)
CVs and qualifications or certificates for environmental officer, environmental control officer and incident investigator(s).
Environmental policy (all bidders)
Signed by the company owner, CEO or managing director.
Commits to environmental compliance obligations and the environmental duty of care.
Alternative route (Part B)
Signed Annexure B plus a valid ISO 14001 Environmental Management Standard certificate.
Scoring
Each item scores 0 (not submitted, or below minimum requirements) or 1 (submitted and meets minimum requirements).
The total determines Approved or Not Approved.
DocumentAnnexure D ERI FLY - UNIT SERVICE.pdfReview complete
Description
Source: Annexure D ERI FLY - UNIT SERVICE.pdf
Pest control service register covering the ERI site, organised by stand and building. Each listed area is a treatment point, with the number of units per area recorded. Coverage spans logistics and administration offices, the medical centre, TSS and TGS office blocks, training centres, the canteen, the Bosbok and Blesbok units, office park units 9 to 12, 17, 28, 30 and 33, the Construction South Link reception and the new NDT building.
Technical Specifications
Source: Annexure D ERI FLY - UNIT SERVICE.pdf (unknown)
Pest control service schedule — ERI site, unit-by-unit treatment register
Logistics and administration
Stand 14, Building 114001: main office open areas, west and east (1 each)
Stand 15, Modular Building: logistics operations open office area (1)
Stand 15, Portable Unit: logistics operations open office area (1)
Stand 15, Portable Unit (RMF): north and south areas (1 each)
Medical and office blocks
Stand 17, Building 117037: medical centre reception (1)
Stand 18, Building 117053: TSS office block — ground floor open area, SHEQ office area, top floor open area (1 each)
Stand 18, Building 117073: TGS top floor open area (2)
Stand 19, Building 119000: six-storey reception lobby (1)
Training and canteen
Stand 21, Building 121012: TGS Training Centre A open office area (1)
Stand 21, Building 121015: Training Centre East B open office area (1)
Stand 23, Building 123004: canteen — dining area 1 (2), dishing area (1), dining area 2 (1), food preparation area (1), cooking area (2)
Stand 23 office units
Building 12311 (Bosbok): ground, first and second floors (1 each)
Building 12312 (Blesbok): ground, first and second floors (1 each)
Office park units — Stand 34
Unit 33: open office areas (1)
Unit 30: open office areas (1)
Unit 28: open office areas (1)
Unit 17: open office areas (1)
Units 9 to 12: open office areas (1)
Construction and NDT
Stand 43, Building 143026: Construction South Link reception (1)
Stand 46, Building 146081: NDT new building open office areas (2)
Service record
Each unit is signed off by the service provider representative and the ERI representative, with date and unique ERI confirmation number recorded per visit.
Health & Safety
Source: Annexure D ERI FLY - UNIT SERVICE.pdf
SHEQ office area on the ground floor of the TSS office block (Stand 18, Building 117053) is included as a treatment point in the service schedule.
DocumentNEC TSC3 - Term Services Contract- The Provision of Pest Control Services .pdfReview complete
Description
Source: NEC TSC3 - Term Services Contract- The Provision of Pest Control Services .pdf
The Employer, Eskom Rotek Industries SOC Ltd, requires pest control services at its Rosherville site for a five-year term under an NEC3 Term Service Contract (TSC3). The contract is structured in three parts: Part C1 (Agreements and Contract Data), Part C2 (Pricing Data) and Part C3 (Scope of Work). The detailed scope of work pages are blank in the available text. The Contractor must invoice monthly, within one week of the Service Manager's payment certificate, and each invoice must carry the information listed in the Service Information, including the Employer's VAT number 4330196330. A separate Confidentiality Agreement applies, under which exchanged information must be kept secret for five years.
Important Dates
Source: NEC TSC3 - Term Services Contract- The Provision of Pest Control Services .pdf (unknown)
Closing date: 9 December 2026 (closing time not stated).
Service period: five years from the starting date, which is left blank in the Contract Data.
Payment assessment interval: monthly, between the 1st day of each successive month.
Payment period: 4 weeks after the payment certificate.
Tax invoice: to be submitted within one week of receiving the Service Manager's payment certificate.
Compensation event notification: within eight weeks of becoming aware of the event, failing which no price adjustment is allowed.
B-BBEE status change: notify the Employer within seven days; submit the updated verification certificate within thirty days.
Joint venture key person: notify the Service Manager within two weeks of the Contract Date.
Contractor's first plan: submission period is not applicable (N/A).
No compulsory briefing or site visit is stated.
Contact Information
Source: NEC TSC3 - Term Services Contract- The Provision of Pest Control Services .pdf (unknown)
No dedicated SCM enquiry contact is stated in the available text.
Submission Guidelines
Source: NEC TSC3 - Term Services Contract- The Provision of Pest Control Services .pdf (unknown)
Returnable documents
Form of Offer and Acceptance (C1.1): signed offer stating the total prices exclusive and inclusive of VAT, with the tenderer's CIDB registration number.
Contract Data Part Two (C1.2b): contractor's name, address, telephone and tendered total of the Prices.
Price List (C2.2): completed and priced in accordance with Option A.
Confidentiality Agreement: signed undertaking to keep exchanged information confidential for five years.
Submission method and address are not stated in the available text. The closing date is 9 December 2026; the closing time is not stated.
Evaluation Criteria
Source: NEC TSC3 - Term Services Contract- The Provision of Pest Control Services .pdf (unknown)
Evaluation stages and scoring are not set out in the available text. The contract is awarded on the NEC3 Term Service Contract Option A (priced contract with price list), with secondary options X2, X17, X18, X19, X20 and Z1 to Z11. No preference point system or minimum qualifying score is stated.
Technical Specifications
Source: NEC TSC3 - Term Services Contract- The Provision of Pest Control Services .pdf (unknown)
Service
Provision of pest control services at Eskom Rotek Industries, Rosherville (the Affected Property).
Contract period: five years.
Service Information is Part C3: Scope of Work and all documents and drawings it references.
The detailed scope of work pages are blank in the available text; no treatment frequencies, target pests, areas or quantities are stated.
Contractor obligations
Provide the service in accordance with the Service Information.
Prepare a first plan for acceptance; the submission period is not applicable (N/A).
Submit a Task Order programme to the Service Manager; the period is not applicable (N/A).
Maintain a risk register as indicated by the Service Manager.
Comply with the Construction Regulations 2014 under the Occupational Health and Safety Act, and accept appointment as Principal Contractor if required.
Comply with all applicable environmental laws and the contract's environmental rules.
Keep contract information confidential; taking images of the Affected Property requires the Service Manager's prior written consent, and all image rights vest in the Employer.
Subcontractors must comply with the confidentiality, health and safety, and environmental obligations.
Invoicing
Address the tax invoice as directed by the Service Manager.
Each invoice must show: contractor and Service Manager names and addresses; contract number and title; contractor's VAT number; the Employer's VAT number 4330196330; a description of each service item based on the Price List; and the amounts excluding VAT, the VAT and the total including VAT.
Pricing Schedule
Source: NEC TSC3 - Term Services Contract- The Provision of Pest Control Services .pdf
Pricing is under NEC3 Term Service Contract Option A, a priced contract with a price list.
Price List (C2.2)
Items may be priced as lump sums or as an expected quantity multiplied by a rate.
Lump-sum prices are not adjusted if the actual quantity of work differs; only a compensation event changes the Prices.
The Contractor's plan must show how each Price List item relates to the operations on the plan.
Items must include everything necessary and incidental to providing the service in accordance with the Service Information, and correcting defects not caused by an Employer's risk.
Work not shown as a separate item must be priced within the rates or prices of other items.
Contract Data Part Two
The Contractor must state its name, address, telephone number and the tendered total of the Prices.
Form of Offer
The offer must state the total exclusive of VAT, VAT at 15%, and the total inclusive of VAT.
Financial Requirements
Source: NEC TSC3 - Term Services Contract- The Provision of Pest Control Services .pdf (unknown)
Pricing
NEC3 Term Service Contract Option A: a priced contract with a price list.
Items may be priced as lump sums or as an expected quantity multiplied by a rate.
Lump-sum prices are not adjusted if the actual quantity of work differs; only a compensation event changes the Prices.
The tendered total of the Prices must be stated in the Contract Data Part Two.
The Form of Offer must state the total exclusive of VAT, VAT at 15%, and the total inclusive of VAT.
Payment
Assessment interval: monthly, from the 1st day of each successive month.
Payment period: 4 weeks after the payment certificate.
Currency: South African Rand.
Interest on late payment: the Standard Bank prime rate for Rand amounts, or the 6-month LIBOR rate for other currencies.
A tax invoice must be submitted within one week of the payment certificate; late submission extends the payment date by the same period.
Insurance and liability
The Employer provides insurance as set out in the Format TSC3 policies; the Contractor covers the deductibles under those policies.
The Contractor provides any additional insurance it considers necessary.
Minimum indemnity for death or bodily injury to the Contractor's employees: R500 000 per event, plus cover required by the Compensation for Occupational Injuries and Diseases Act No. 130 of 1993.
The Contractor's liability for indirect or consequential loss is limited to R0.00.
The Contractor's total liability is limited to the total of the Prices, except for excluded matters (design defects, off-site manufacture defects, property damage, death or injury, and intellectual property infringement), which are unlimited.
The Employer's liability for the Contractor's indirect or consequential loss is limited to R0.00.
Securities
Securities, bonds, guarantees and proof of insurance must be arranged with the Employer's agent within two weeks of receiving the signed agreement; failure to do so is a repudiation of the contract.
Compliance Requirements
Source: NEC TSC3 - Term Services Contract- The Provision of Pest Control Services .pdf (unknown)
Legal entity
The bidder must be a registered legal entity and provide its company registration number.
The Form of Offer requires the tenderer's CIDB registration number.
B-bbee
The Contractor must notify the Employer within seven days of any change to its B-BBEE status.
An updated B-BBEE verification certificate and supporting documents must be submitted within thirty days of that notification.
A decrease in B-BBEE status may lead to renegotiation or termination; failure to notify may also lead to termination.
Ethics
Coercive, collusive, corrupt, fraudulent or obstructive actions during procurement or execution are prohibited and may lead to termination.
Health, safety and environment
Comply with the Construction Regulations 2014 and the Occupational Health and Safety Act, and accept Principal Contractor appointment if required.
Comply with all applicable environmental laws and the contract's environmental rules.
Joint ventures
Members are jointly and severally liable.
The key person authorised to bind the joint venture must be notified to the Service Manager within two weeks of the Contract Date.
The composition of the joint venture may not change without the Employer's written consent.
No CSD registration, tax compliance status, or minimum B-BBEE level is stated in the available text.
Health & Safety
Source: NEC TSC3 - Term Services Contract- The Provision of Pest Control Services .pdf
The Contractor must take all reasonable precautions to protect the health and safety of persons affected by the service. The Employer may appoint the Contractor as Principal Contractor under the Construction Regulations 2014 (Occupational Health and Safety Act). The tendered Prices must include sufficient allowance for full compliance with the Construction Regulations, all applicable health and safety laws, and the contract's health and safety rules and procedures. The Contractor must ensure that its subcontractors, employees and others under its direction comply with these obligations.
Environmental
Source: NEC TSC3 - Term Services Contract- The Provision of Pest Control Services .pdf
The Contractor must comply with all applicable environmental laws, regulations, rules, guidelines and procedures, and must ensure that its subcontractors, employees and others under its direction comply as well.
Contractual Terms
Source: NEC TSC3 - Term Services Contract- The Provision of Pest Control Services .pdf
Contract form
NEC3 Term Service Contract (TSC3), April 2013 edition.
Main Option A: priced contract with price list.
Dispute resolution Option W1.
Secondary options: X2 (changes in law), X17 (low service damages), X18 (limitation of liability), X19 (task order), X20 (key performance indicators), and Z1 to Z11 (additional conditions).
Law of the contract: South African law. Language: English.
Period for reply: one week.
Payment
Assessment interval: monthly, from the 1st day of each successive month.
Payment period: 4 weeks.
Currency: South African Rand.
Interest rate: Standard Bank prime rate for Rand amounts; 6-month LIBOR for other currencies.
Liability
Contractor's liability for indirect or consequential loss: R0.00.
Contractor's total liability: limited to the total of the Prices, except for excluded matters, which are unlimited.
Employer's liability for the Contractor's indirect or consequential loss: R0.00.
Disputes
Adjudicator selected from the ICE-SA panel; if the parties cannot agree, appointed by AFSA.
Adjudicator's costs shared equally.
Arbitration under the Rules of the Association of Arbitrators (Southern Africa), held in South Africa.
Additional conditions (Z clauses)
Z1: no cession, delegation or assignment without the Employer's written consent; the Employer may cede to its subsidiaries or restructured entities.
Z2: joint ventures are jointly and severally liable; the authorised key person must be notified within two weeks; composition changes need written consent.
Z3: B-BBEE status changes must be notified within seven days, with an updated certificate within thirty days; a decrease may lead to renegotiation or termination.
Z4: prohibited actions (coercive, collusive, corrupt, fraudulent, obstructive) may lead to termination without a court finding.
Z5: confidentiality obligations; images of the Affected Property require prior written consent and all rights vest in the Employer.
Z6: no waiver or estoppel unless agreed in writing.
Z7: health, safety and environmental compliance, including the Construction Regulations 2014.
Z8: tax invoice within one week of the payment certificate; late submission extends the payment date; the Employer's VAT number 4330196330 must appear on each invoice.
Z9: compensation events must be notified within eight weeks, failing which no price adjustment.
Z10: the Employer's liability for the Contractor's indirect or consequential loss is limited to R0.00.
Z11: termination may follow a business rescue order against the Contractor.
Termination
Termination procedures P1, P2, P3 and P4 apply, with amounts due A1 and A3, as stated in clauses 92 and 93.
DocumentSHE Pest Control SHE requirments.pdfReview complete
Description
Source: SHE Pest Control SHE requirments.pdf
Eskom Rotek Industries (ERI) requires pest control services at its Rosherville site for a five-year period, on an as-and-when-required basis. The contractor must develop a SHE plan that meets ERI’s minimum SHE requirements and all applicable legislation. ERI does not assume the contractor’s legal responsibilities; the contractor remains accountable for the health and safety of its own employees and any appointed contractors. The SHE specification is a minimum standard and does not replace the contractor’s own organisational SHE requirements. The contractor must comply with local authority by-laws and environmental legislation where applicable.
Contact Information
Source: SHE Pest Control SHE requirments.pdf (unknown)
Eskom contacts
Contract Manager: Voli Sompa
Health and Safety Manager: Ntokozo Ngubane
Procurement Manager: Nelisile Ngwenya
SHEQ Business Partner (document developer): Ntokozo Ngubane
Service location
Eskom Rotek Industries (ERI)
Rosherville
Technical Specifications
Source: SHE Pest Control SHE requirments.pdf (unknown)
Scope
Provision of pest control services at Eskom Rotek Industries (ERI), Rosherville.
Contract term: five (5) years, services rendered as and when required.
Contractor obligations
Develop and maintain a SHE plan that meets the Eskom SHE specification and all applicable legislation.
Remain accountable for the health and safety of own employees and any appointed contractors.
Appoint sub-contractors in writing; appointments form part of the SHE plan.
SHE file (minimum contents)
SHE policy and contract-specific SHE plan.
Scope of work and project organogram.
Legal register and compliance evaluation.
COIDA letter of good standing.
PCO registrations and relevant registration categories.
Appointment and responsibility letters.
Baseline and task risk assessments.
Approved method statements.
Induction, training and competency records.
Medical fitness and surveillance records.
Safety Data Sheets, labels, product registration evidence and chemical inventory.
PPE issue, inspection and respirator fit-test records.
Vehicle, equipment and spill-kit inspection records.
Emergency response and spill management arrangements.
Incident reporting and investigation procedure.
Waste management plan and disposal records.
Inspection, audit and corrective-action records.
Service reports, site maps and bait-station register.
Monthly SHE and pest trend reports.
Chemical and pesticide management
Use only products legally registered for the target pest and intended use.
Follow the approved label, SDS, dosage, application method, re-entry period and disposal instructions.
Keep products in original, legibly labelled containers; unlabelled or decanted chemicals are prohibited unless legally permitted and fully controlled.
Maintain an up-to-date chemical inventory and usage register.
Store chemicals in a secure, ventilated, bunded area, segregated from food, incompatible chemicals and ignition sources.
Transport chemicals upright, secured and segregated from passengers, food and personal items.
Service vehicles must carry current SDSs, a suitable spill kit, fire extinguisher, first-aid supplies and emergency contacts.
Mix only in an authorised area with secondary containment; never pour residues into drains, soil or watercourses.
Environmental and waste controls
Prevent contamination of soil, stormwater, drains, groundwater and surface water.
Protect indigenous vegetation, birds, wildlife, pets, livestock, pollinators and other non-target organisms.
Use the minimum effective quantity and avoid broad-area application where targeted treatment is practicable.
Place baits to prevent access by children, unauthorised persons and non-target species.
Immediately retrieve poisoned pests and carcasses to prevent secondary poisoning.
Segregate contaminated absorbents, disposable PPE, pesticide residues and containers as hazardous waste where applicable.
Do not reuse pesticide containers; triple-rinse only where permitted by the label and approved disposal arrangements.
Use appropriately authorised waste service providers and retain waste manifests or disposal certificates.
Statutory appointments
Appoint competent employees in accordance with the OHS Act, including but not limited to: Fire Fighter, Evacuation Warden, First Aider, 16(2) appointee, Hazardous Chemical Agents Controller, PPE Inspector and Risk Assessor.
Ensure appointees are trained and informed of their responsibilities before accepting appointment.
Risk assessments and method statements
Conduct baseline and task-specific risk assessments; review and update when processes change or new hazards arise.
Develop method statements or safe operating procedures for all critical activities and ensure employees work according to them.
Induction and medicals
All employees and appointed contractor employees must complete ERI Rosherville induction training before starting work; attendance registers must be kept.
Pre-employment medical examination and fitness certificate required before induction; copy kept in the SHE file.
Medical surveillance: entry, periodic and exit examinations; annual renewal for non-office-bound employees (including drivers) and every 3 years for office-bound employees.
Pre-entry medical examination required before starting work if the contract exceeds three (3) days.
Documented process required for managing employees with conditional certificates of fitness.
Emergency management
Develop an emergency preparedness and response plan for the contractor’s activities, compatible with the Rosherville Emergency Preparedness plan.
Conduct periodic emergency drills and keep records.
Keep emergency equipment (spill kits, first-aid box) and emergency contact details, including ERI ambulance services.
For incidents: stop work, isolate the area, provide first aid per SDS, contain spills, notify the Eskom representative immediately, preserve the scene and participate in investigations.
First aid
Comply with OHS Act GSR 3.
Appoint first aiders trained to level 2 (level 1 recommended for all employees).
Provide one first aid box for the first 5 persons and one for every 50 or team of workers thereafter, or as required by risk assessment.
Display emergency numbers on notice boards.
Check first aid boxes monthly and keep a content checklist.
Personal protective equipment (PPE)
Provide a detailed PPE programme covering issuing, maintenance and replacement.
Comply with OHS Act GSR 2.
Compile a risk-based PPE matrix.
All PPE must comply with relevant SANS standards.
Visitors must wear correct PPE; contractor provides PPE where visitors do not have it.
High-visibility vests must be worn where required.
Housekeeping
Maintain high standards of housekeeping on sites and in vehicles.
Remove waste, scrap, rubbish and packaging immediately.
Clear work area on completion.
Conduct weekly safety/housekeeping inspections and keep records.
Tools and equipment
Identify, maintain and inspect all tools and equipment; keep an inventory list.
Inspect at least monthly or as required by legislation and risk assessments.
Number or tag equipment for monitoring.
Keep approved test or calibration documentation on site; maintenance calibration per manufacturer’s requirements.
Fuel-driven equipment maintained per manufacturer’s recommendations and legal requirements.
ERI may inspect tools and equipment; defective items must be removed from site immediately.
Welfare facilities
Dining areas: suitable tables and chairs; kept clean and hygienic.
Ablution facilities: use client facilities; provide portable facilities if insufficient, serviced regularly.
Drinking water: provide suitable drinking water free of charge; keep as cold as possible; draw only from designated safe taps.
Changing areas and lockers: provide suitable facilities or use ERI facilities by agreement; change contaminated clothing promptly.
Camp/office welfare: if ERI does not provide, contractor must provide shower, sanitary, changing, eating areas and drinking water at strategic locations.
Contractor provides own accommodation for workers.
Occupational health programme
Develop an Occupational Health, Hygiene and Rehabilitation programme to manage exposure to hazardous chemical and biological agents.
Medical surveillance conducted by an Occupational Health Practitioner with a qualification in occupational health.
Each employee must have a person job specification (profile) listing work description, hazards, exposure limits, physical hazards and required physical attributes.
Smoking
Observe national smoking policy; smoking only in designated areas (Eskom Smoking Procedure 32-36).
SHE deliverables and acceptance criteria
Approved SHE file: before mobilisation; complete, current and contract-specific.
Task risk assessment and method statement: before each activity; relevant to location, product and exposure scenario.
Service/treatment report: after each visit; signed, traceable and records product/quantity/location.
Chemical usage and inventory register: monthly; reconciled, current and supported by labels/SDSs.
Pest trend analysis: monthly; identifies hotspots, causes, controls and follow-up.
Incident notification: immediate; escalated through the agreed ERI channel.
Investigation and corrective actions: as required; root cause addressed and evidence of closure supplied.
Waste records: as generated; traceable to an appropriate disposal route.
Close-out pack: contract completion; outstanding actions closed and records handed over.
Methodology
Source: SHE Pest Control SHE requirments.pdf
The contractor must develop method statements or written safe operating procedures for all critical activities and ensure that employees work according to them. Task-specific risk assessments must be conducted before each activity and must be relevant to the location, product and exposure scenario. Method statements and risk assessments form part of the SHE file and must be approved before work commences.
Experience & Qualifications
Source: SHE Pest Control SHE requirments.pdf
The contractor must appoint competent persons as defined in the OHS Act — individuals with the knowledge, training, experience and qualifications specific to the work or task, and where appropriate, registered in terms of the South African Qualifications Authority Act, 1995. Statutory appointments must include, but are not limited to: Fire Fighter, Evacuation Warden, First Aider, 16(2) appointee, Hazardous Chemical Agents Controller, PPE Inspector and Risk Assessor. First aiders must be trained to level 2. Medical surveillance must be conducted by an Occupational Health Practitioner holding a qualification in occupational health. The contractor must hold pest control operator (PCO) registrations and relevant registration categories, evidenced in the SHE file.
Quality Management
Source: SHE Pest Control SHE requirments.pdf
Substance abuse
Comply with Eskom Procedure 32-37 and Life Saving Rule 4 (BE SOBER).
Permissible alcohol and drug level is 0%.
Anyone entering ERI may be subjected to alcohol testing; confirmed intoxication may lead to dismissal.
Contractors are encouraged to conduct their own regular alcohol testing; test records are confidential and kept in the employee’s personal file.
Housekeeping
Maintain high standards of housekeeping on sites and in vehicles.
Remove waste, scrap, rubbish and packaging immediately.
Clear work area on completion.
Conduct weekly safety/housekeeping inspections and keep records.
Tools and equipment
Identify, maintain and inspect all tools and equipment; keep an inventory list.
Inspect at least monthly or as required by legislation and risk assessments.
Number or tag equipment for monitoring.
Keep approved test or calibration documentation on site; maintenance calibration per manufacturer’s requirements.
Fuel-driven equipment maintained per manufacturer’s recommendations and legal requirements.
ERI may inspect tools and equipment; defective items must be removed from site immediately.
No extra payment or extension of time for delays caused by ERI’s instructions to remove defective equipment.
Life Saving Rules
Comply with all six Eskom Life Saving Rules.
Non-compliance is serious misconduct and may lead to disciplinary action, including dismissal.
Complete the Life Saving Rules Evaluation Report (240-94026805 and 24094026879) monthly and submit to the Product Group/SHEQ Department by close of business on the second day of each month.
Compliance Requirements
Source: SHE Pest Control SHE requirments.pdf (unknown)
Legal compliance
Section 37(2) agreement: must be signed between Eskom and the principal contractor at award; principal contractor must put equivalent agreements in place with all appointed contractors. Original retained by contractor, copy by responsible manager, copy in SHE file.
OHS Act: up-to-date copy of the Act and regulations available to all employees.
Child labour: no use of child labour; any permitted work by children to comply with the Regulations on Hazardous Work by Children.
Eskom requirements
COIDA: registered with an appropriate employment compensation commissioner and hold a valid letter of good standing (LoGS) maintained throughout the contract; copy in SHE file and SHE plan.
SHE policy: signed by the CE or appointed assistant to the CE (OHS Act Section 16(2)); displayed prominently; copy in all SHE files and as annexure to SHE plans.
Eskom Life Saving Rules: comply with all six rules; non-compliance is serious misconduct and may lead to dismissal.
Substance abuse: comply with Eskom Procedure 32-37 and Life Saving Rule 4 (BE SOBER); permissible alcohol and drug level is 0%; anyone entering ERI may be subjected to alcohol testing.
Non-conformance: non-compliance with any health and safety requirement is subject to discipline under the Eskom Procurement and Supply Management Procedure; principal contractors must implement a non-conformance procedure.
PCO registration
Bidders must hold pest control operator (PCO) registrations and relevant registration categories, evidenced in the SHE file.
B-bbee
Minimum B-BBEE Level: 2.
Health & Safety
Source: SHE Pest Control SHE requirments.pdf
Contractor SHE file
Must be developed, issued and maintained; accepted by the client before work commences.
Must contain the minimum documents listed in the technical specifications.
SHE policy
Signed by the CE or appointed assistant to the CE (OHS Act Section 16(2)).
Displayed prominently in the workplace.
Copy filed in all SHE files and as annexure to SHE plans.
Coida
Registered with an appropriate employment compensation commissioner.
Valid letter of good standing (LoGS) maintained throughout the contract; copy in SHE file and SHE plan.
Eskom Life Saving Rules
Six rules apply to all employees, agents, consultants and contractors.
Non-compliance is serious misconduct and may lead to dismissal.
Rules: (1) open, isolate, test, earth, bond and/or insulate before touch; (2) hook up at heights; (3) buckle up; (4) be sober; (5) permit to work; (6) ensure safe live working.
Life Saving Rules Evaluation Report (240-94026805 and 24094026879) must be completed monthly and submitted to the Product Group/SHEQ Department by close of business on the second day of each month.
Substance abuse
Comply with Eskom Procedure 32-37 and Life Saving Rule 4 (BE SOBER).
Permissible alcohol and drug level is 0%.
Anyone entering ERI may be subjected to alcohol testing; confirmed intoxication may lead to dismissal.
Contractors are encouraged to conduct their own regular alcohol testing; test records are confidential and kept in the employee’s personal file.
Housekeeping
Maintain high standards of housekeeping on sites and in vehicles.
Remove waste, scrap, rubbish and packaging immediately.
Clear work area on completion.
Conduct weekly safety/housekeeping inspections and keep records.
Tools and equipment
Identify, maintain and inspect all tools and equipment; keep an inventory list.
Inspect at least monthly or as required by legislation and risk assessments.
Number or tag equipment for monitoring.
Keep approved test or calibration documentation on site; maintenance calibration per manufacturer’s requirements.
Fuel-driven equipment maintained per manufacturer’s recommendations and legal requirements.
ERI may inspect tools and equipment; defective items must be removed from site immediately.
No extra payment or extension of time for delays caused by ERI’s instructions to remove defective equipment.
Welfare facilities
Dining areas: suitable tables and chairs; kept clean and hygienic.
Ablution facilities: use client facilities; provide portable facilities if insufficient, serviced regularly.
Drinking water: provide suitable drinking water free of charge; keep as cold as possible; draw only from designated safe taps.
Changing areas and lockers: provide suitable facilities or use ERI facilities by agreement; change contaminated clothing promptly.
Camp/office welfare: if ERI does not provide, contractor must provide shower, sanitary, changing, eating areas and drinking water at strategic locations.
Contractor provides own accommodation for workers.
Occupational health programme
Develop an Occupational Health, Hygiene and Rehabilitation programme to manage exposure to hazardous chemical and biological agents.
Medical surveillance conducted by an Occupational Health Practitioner with a qualification in occupational health.
Each employee must have a person job specification (profile) listing work description, hazards, exposure limits, physical hazards and required physical attributes.
Medical surveillance
Entry, periodic and exit medical examinations.
Annual renewal for non-office-bound employees (including drivers); every 3 years for office-bound employees.
Pre-entry medical examination required before starting work if the contract exceeds three (3) days.
Documented process required for managing employees with conditional certificates of fitness.
Smoking
Observe national smoking policy; smoking only in designated areas (Eskom Smoking Procedure 32-36).
Statutory appointments
Appoint competent employees in accordance with the OHS Act, including but not limited to: Fire Fighter, Evacuation Warden, First Aider, 16(2) appointee, Hazardous Chemical Agents Controller, PPE Inspector and Risk Assessor.
Ensure appointees are trained and informed of their responsibilities before accepting appointment.
Risk assessments and method statements
Conduct baseline and task-specific risk assessments; review and update when processes change or new hazards arise.
Develop method statements or safe operating procedures for all critical activities and ensure employees work according to them.
Induction
All employees and appointed contractor employees must complete ERI Rosherville induction training before starting work; attendance registers must be kept.
Pre-employment medical examination and fitness certificate required before induction; copy kept in the SHE file.
All employees and visitors must carry proof of induction training.
Incident investigation
Investigate all incidents in terms of OHS Act General Administrative Regulations 8 and 9, using Eskom Procedure 32-95 as a reference.
Report injuries contemplated in sections 24 and 25 to the Department of Labour.
Use the standard General Administrative Regulation Annexure 1 “Recording of an Incident” form for all incident investigation reports.
Emergency management
Develop an emergency preparedness and response plan for the contractor’s activities, compatible with the Rosherville Emergency Preparedness plan.
Conduct periodic emergency drills and keep records.
Keep emergency equipment (spill kits, first-aid box) and emergency contact details, including ERI ambulance services.
For incidents: stop work, isolate the area, provide first aid per SDS, contain spills, notify the Eskom representative immediately, preserve the scene and participate in investigations.
Submit preliminary notification within the contract/site timeframe and a formal investigation with corrective actions as required.
First aid
Comply with OHS Act GSR 3.
Appoint first aiders trained to level 2 (level 1 recommended for all employees).
Provide one first aid box for the first 5 persons and one for every 50 or team of workers thereafter, or as required by risk assessment.
Display emergency numbers on notice boards.
Check first aid boxes monthly and keep a content checklist.
Personal protective equipment (PPE)
Provide a detailed PPE programme covering issuing, maintenance and replacement.
Comply with OHS Act GSR 2.
Compile a risk-based PPE matrix.
All PPE must comply with relevant SANS standards.
Visitors must wear correct PPE; contractor provides PPE where visitors do not have it.
High-visibility vests must be worn where required.
Non-conformance
Non-compliance with any health and safety requirement is subject to discipline under the Eskom Procurement and Supply Management Procedure.
Principal contractors must implement a non-conformance procedure for issuing to contractors for transgressions.
Where non-conformances are issued by Eskom, the contractor’s responsible manager must explain the non-conformance and the preventative action.
Failure to provide adequate PPE or enforce its use is a transgression of legislative and Eskom requirements.
SHE deliverables and acceptance criteria
Approved SHE file: before mobilisation; complete, current and contract-specific.
Task risk assessment and method statement: before each activity; relevant to location, product and exposure scenario.
Service/treatment report: after each visit; signed, traceable and records product/quantity/location.
Chemical usage and inventory register: monthly; reconciled, current and supported by labels/SDSs.
Pest trend analysis: monthly; identifies hotspots, causes, controls and follow-up.
Incident notification: immediate; escalated through the agreed ERI channel.
Investigation and corrective actions: as required; root cause addressed and evidence of closure supplied.
Waste records: as generated; traceable to an appropriate disposal route.
Close-out pack: contract completion; outstanding actions closed and records handed over.
Environmental
Source: SHE Pest Control SHE requirments.pdf
The contractor must comply with local authority by-laws and environmental legislation applicable to pest control services. The contractor must prevent contamination of soil, stormwater, drains, groundwater and surface water; protect indigenous vegetation, birds, wildlife, pets, livestock, pollinators and other non-target organisms; use the minimum effective quantity of chemicals and avoid broad-area application where targeted treatment is practicable; place baits to prevent access by children, unauthorised persons and non-target species; immediately retrieve poisoned pests and carcasses to prevent secondary poisoning; segregate contaminated absorbents, disposable PPE, pesticide residues and containers as hazardous waste where applicable; not reuse pesticide containers (triple-rinse only where permitted by the label and approved disposal arrangements); and use appropriately authorised waste service providers, retaining waste manifests or disposal certificates. In an emergency, the contractor must stop work, isolate the area and prevent further exposure or environmental release.
Section
Source: SHE Pest Control SHE requirments.pdf
Bidders must submit a legal register and compliance evaluation as part of the SHE file. The SHE file must demonstrate that the contractor’s arrangements align with Eskom’s Safety, Health, Environmental and Quality Policy and that the contractor accepts accountability for the health and safety of its employees and appointed contractors.
DocumentAnnexure E ERI RODENT BOX SERVICE.pdfReview complete
Description
Source: Annexure E ERI RODENT BOX SERVICE.pdf
Rodent box service across Eskom ERI depots, buildings and residential quarters.
Scope
Provision of pest control by servicing numbered rodent boxes installed at fixed locations across the ERI site.
Boxes are grouped by depot area, building and facility, including offices, workshops, stores, plant areas, security buildings, training centre, residential single quarters and heritage park units.
Each box carries a unique number and is serviced and signed off individually.
Service record
Box number, service date, service provider signature, and ERI representative confirmation with date are recorded for every box serviced.
Technical Specifications
Source: Annexure E ERI RODENT BOX SERVICE.pdf (unknown)
Rodent box service schedule for Eskom ERI sites, organised by depot area and building.
Service model
Each listed location carries a numbered rodent box with a unique box number.
Each box is serviced individually and the service is recorded per box.
Service records capture the box number, the service date, the service provider's signature and the ERI representative's confirmation and date.
Locations covered (by area and building)
Main yard and logistics: oil tamper, logistics tamper (three units), prefab buildings 114001 and 115000, stands 14 and 15.
Offices and stores: top and bottom offices, stores, medical office, main office, TSS office, guard house, control room, change rooms, despatch, record block, old workshop, NDT, security.
Plant and services: transformer workshop, 6 storey services, 6 storey postal, bushing, green area and annex, site store, locker rooms, smokers area, training centre (multiple blocks), church, canteen.
Residential quarters: single quarters at Pumula, Eland, Springbok, Rietbok, Ribbok and Bosbok lodges, plus single quarters rooms 330, 350, 101–201, 301–401 and 401–448.
Heritage park units: units 1/2 through 36, including unit 34/35 and unit 36, each with its own office and box.
External areas: east flat, west flat, MAN truck, common areas.
Construction and facilities: new construction, BMS, security, NDT, bearing, TGS, logistics, satellite, strategic stores, workshop services, head office, north and south office buildings, blading store, TGS capacity store.
Quantities
One box per numbered location, with box numbers running from 1 to 433 across the schedule.
DocumentAnnexure B ERI HOUSE ANT SERVICE.pdfReview complete
Technical Specifications
Source: Annexure B ERI HOUSE ANT SERVICE.pdf (unknown)
Service coverage: pest control treatment of ERI houses, with separate inside and outside treatments recorded per house.
Houses listed for service:
101 to 127
128 to 154
57 to 64
Record keeping: each service entry is signed off by the tenant and dated, with tenant comments captured for both the inside and outside treatment.
Bidders must submit the two most recent years of audited or independently reviewed annual financial statements.
Joint ventures and special purpose vehicles formed for this bid must submit audited or independently reviewed financial statements for every participant.
Start-up enterprises formed within the last 12 months must submit independently reviewed annual financial statements.
Two years of the most recent audited or independently reviewed annual financial statements.
Joint ventures and special purpose vehicles: audited or independently reviewed financial statements for each participant.
Start-ups formed within the last 12 months: independently reviewed annual financial statements.
DocumentInvitation to Tender (ITT) - The Provision of Pest Control Services.pdfReview complete
Description
Source: Invitation to Tender (ITT) - The Provision of Pest Control Services.pdf
Eskom Holdings SOC Ltd invites tenders for the provision of pest control services for Eskom Rotek Industries SOC Limited for a period of five years. The contract is a single award covering the whole scope. Tender documents are supplied free of charge. Submission of a tender is deemed acceptance of Eskom's Standard Conditions of Tender, available at www.eskom.co.za. All queries must be addressed in writing to the Eskom Representative; no other Eskom official may be approached.
Important Dates
Source: Invitation to Tender (ITT) - The Provision of Pest Control Services.pdf (TENDER)
Closing date and time: 09 December 2026 at 10:00
Late tenders will not be accepted.
Clarification meeting (non-compulsory): 26 November 2026 at 12:00
Bidders must confirm their intention to attend with the Eskom Representative, stating the name, position and contact details of each proposed attendee.
Clarification query deadline: 10 working days before the tender submission deadline.
Tender validity period: 180 days from the closing date and time.
Issue date: 18 November 2026.
Contact Information
Source: Invitation to Tender (ITT) - The Provision of Pest Control Services.pdf (TENDER)
Method: electronic upload via the Eskom Tender Bulletin on the Eskom e-tendering platform.
No physical submission address is provided; no hard copies are accepted.
Submission Guidelines
Source: Invitation to Tender (ITT) - The Provision of Pest Control Services.pdf (TENDER)
Submission method
Electronic submission only, via the Eskom Tender Bulletin on the Eskom e-tendering platform.
No hard copy submissions will be accepted.
Upload documents under the folders: Technical, Commercial, Financial and Other.
All documents must be in PDF format; the price list must also be submitted as a PDF.
Maximum upload size: 500 MB per document; total submission limited to 4 GB.
Zip or compressed files are not permitted.
If a tender is resubmitted, only the latest version will be accepted; earlier submissions become null and void.
The submission status must show as complete.
Returnable documents (mandatory at closing — disqualifiable if not fully completed, signed and submitted):
Annexure A: Authorisation Form — confirms the signatory is empowered to bind the bidder.
Annexure B: Acknowledgement Form — confirms receipt and completeness of tender documents and addenda.
Annexure C: Tenderer's Particulars — records the bidder's registration, contact and CIDB details.
Annexure D: Integrity Declaration Form — commits the bidder to the Eskom Supplier Integrity Pact.
Annexure E: CPA Requirements for Local Goods/Services — declares contract price adjustment basis (if applicable).
Annexure G1–G4: SBD 6.2 Declaration Certificate for Local Production and Local Content — declares local content (only if designated materials are included).
Annexure H: SBD 1 Invitation to Bid — the bidder's formal offer.
Annexure J: SBD 4 Bidder's Disclosure — discloses interests of directors and shareholders.
E-tendering Help Manual acknowledgement form.
Returnable documents required at closing (non-disqualifiable — may be requested within 5 working days):
Annexure I: SBD 6.1 Preference Points Claim Form — claims B-BBEE preference points under the PPPFA 2022 regulations.
Returnable documents required at closing for evaluation (failure to submit scores zero, not disqualification):
Specific Goals evidence — proof of the bidder's specific goal claims.
Additional documents required in the event of a joint venture:
Letter of intent or valid JV/consortium agreement confirming each partner's rights, obligations and profit-sharing ratios.
Written confirmation that the JV will operate as a single incorporated business entity for the contract duration.
Details and confirmation of a single designated bank account in the JV's name, independent of individual partners.
Documents required prior to contract award:
Proof of valid CSD registration (CSD number or CSD report).
Tax clearance certificate (foreign tenderers without a CSD footprint) or SARS e-filing PIN / CSD profile (local tenderers).
Tax Evaluation Questionnaire (if included as an annexure).
Employment Equity Act compliance proof, including submission of the Employment Equity report to the Department of Labour (South African tenderers only).
COIDA: original certificate of good standing or proof of application issued by the Compensation Fund or a licensed compensation insurer (South African tenderers only) — Annexure X.
Quality requirements — Annexure W.
Other safety/quality documents as required by the scope of work.
Signed NEC3 Term Service Contract.
Completed Pricing Schedule / Bill of Quantities (Annexure Z).
Additional documents such as ECSA, SACPCMP, CVs, permits, licences or specific registrations (if applicable to the scope).
Audited financial statements for the previous 24 months (or the last year if 24 months are unavailable); JV/SPV participants must each submit statements; start-up enterprises formed within the last 12 months are exempt but must furnish first-year statements once available.
Disqualification risks:
Late submission.
Failure to upload all mandatory returnables by the closing date and time.
Failure to quote on all items in the BOQ/Pricing Schedule.
Submission of more than one tender, individually or as a JV partner.
Tender signed by an unauthorised person.
Conflict of interest.
Subcontracting 100% of the scope of work.
Submission by a bidder restricted by National Treasury or on the Tender Defaulters list.
Submission by a bidder under restriction to do business with Eskom or State-Owned Companies.
Submission by a bidder with the nationality of a sanctioned country (applies to subcontractors and suppliers).
JV/consortium agreement that does not state joint and several liability.
Evaluation Criteria
Source: Invitation to Tender (ITT) - The Provision of Pest Control Services.pdf (TENDER)
Evaluation stages
Eligibility and basic compliance: bidders must meet the eligibility criteria, submit a complete tender with commercial, financial and technical information, and submit all mandatory returnables by the deadlines.
Functionality/technical evaluation: a weighted score-card approach against the specifications. Minimum qualifying score: 70% overall to proceed to further evaluation. Refer to Appendix A for the criteria.
Price and specific goals evaluation under the 80/20 preference point system.
Contractual requirements assessment after evaluation and ranking, before contract award.
Scoring
Price: scored out of 80 points.
Specific goals: scored out of 20 points.
Ranking: price score plus specific goals score, ranked highest to lowest.
Price evaluation basis
Prices are evaluated inclusive of VAT.
Arithmetic errors are corrected.
Contingencies in any bill of quantities or activity schedule are excluded.
Acceptable variations, deviations or alternative tenders are adjusted for.
Net present value comparison based on the tendered programme and prices, estimated price adjustment factors, exchange rate fluctuations and other risk parameters (where applicable).
Unconditional discounts are taken into account.
Conditional discounts are not taken into account for evaluation but are applied when payment is effected.
Specific goals
Failure to submit evidence of a specific goal claim does not disqualify the bidder but scores zero for that goal.
Contractual requirements (assessed after ranking, before award)
Proof of CSD registration.
SHE requirements — Annexure X.
Financial viability: two years of most recent audited or independently reviewed annual financial statements.
Failure to meet contractual requirements by the stipulated deadlines may render the bidder non-responsive and ineligible for award.
Other evaluation notes
Alternative tenders are not allowed.
Reverse e-auction is not applicable.
There will be no public opening of tenders; tenders are downloaded electronically and prices are not read out.
Technical Specifications
Source: Invitation to Tender (ITT) - The Provision of Pest Control Services.pdf (TENDER)
Scope
Provision of pest control services for Eskom Rotek Industries SOC Limited.
Contract period: five (5) years.
Single award contract for the whole scope; bidders must quote in full on all items in the BOQ/Pricing Schedule.
Contract framework
The contract conditions are the NEC3 Term Service Contract (TSC3).
Scope of work is detailed in Annexure V.
Quality requirements are set out in Annexure W.
Safety, health and environmental requirements are set out in Annexure X.
Pricing Schedule / Bill of Quantities is Annexure Z and must be submitted in PDF format.
Technical evaluation
A weighted score-card approach is used to evaluate technical compliance against the specifications.
Minimum qualifying score: 70% overall to proceed to further evaluation.
Technical evaluation criteria are set out in Appendix A.
Quality Management
Source: Invitation to Tender (ITT) - The Provision of Pest Control Services.pdf
Quality requirements are set out in Annexure W and must be complied with. Full compliance with SHEQ specifications is an objective criterion. Quality-related documents required by the scope of work must be submitted prior to contract award. The technical evaluation assesses compliance with the specifications through a weighted score-card, with a minimum qualifying score of 70% overall.
Pricing Schedule
Source: Invitation to Tender (ITT) - The Provision of Pest Control Services.pdf
Pricing Schedule / Bill of Quantities is Annexure Z and must be submitted in PDF format. Bidders must quote in full on every item; failure to do so renders the tender non-responsive and disqualifies it. The contract is a single award for the whole scope. Prices are evaluated inclusive of VAT, corrected for arithmetic errors, excluding contingencies, and adjusted for acceptable variations. Contract price adjustment may apply for contracts longer than 12 months, from year two onwards; failure to submit a CPA formula means pricing is treated as fixed; exchange rate adjustment is not permitted; local indices may not be used for imported components; separate local and foreign CPA formulae are required.
Financial Requirements
Source: Invitation to Tender (ITT) - The Provision of Pest Control Services.pdf (TENDER)
Pricing
Bidders must quote in full on all items in the BOQ/Pricing Schedule (Annexure Z).
Failure to quote on all items renders the tender non-responsive and disqualifies the bid.
Prices are evaluated inclusive of VAT.
The price list must be submitted in PDF format.
Contract price adjustment (CPA)
CPA may apply where the contract duration exceeds 12 months.
For contracts of 12 months or less, a fixed-price offer must be submitted.
For contracts longer than 12 months, CPA does not apply in year one and applies from year two onwards.
Failure to propose a CPA formula with the tender means pricing is treated as fixed.
Exchange rate adjustment may not be included in any CPA formula.
Local indices may not be used for imported components.
Separate CPA formulae are required for local and foreign escalation; they may not be combined.
Payment terms
Contracts valued below R50 000 000 including VAT: payment within 30 days of receipt of undisputed invoices.
Contracts valued above R50 000 000 including VAT: payment within 60 days of receipt of undisputed invoices.
Financial capacity
Two years of most recent audited or independently reviewed annual financial statements are required.
JV/SPV participants must each submit audited financial statements.
Start-up enterprises formed within the last 12 months are exempt from submitting audited statements but must furnish first-year statements once available.
Security
Provision of security for performance is not applicable.
Price negotiation
Eskom reserves the right to negotiate with preferred bidders after a competitive bidding process or price quotations if tendered prices are not market-related.
Compliance Requirements
Source: Invitation to Tender (ITT) - The Provision of Pest Control Services.pdf (TENDER)
Eligibility
Bidders must not be under restriction to do business with Eskom or State-Owned Companies.
Bidders must not be restricted by National Treasury or listed on the Tender Defaulters list.
Bidders must not have the nationality of a country on any international sanctions list; this applies to subcontractors and suppliers.
A bidder may submit only one tender, individually or as a JV partner.
JV/consortium agreements must state that the parties are jointly and severally liable for contract execution.
Bidders must not have a conflict of interest.
Bidders may not subcontract 100% of the scope of work.
Tenders must be signed by an authorised person.
Registration and tax
CSD registration: proof of valid and current CSD registration (CSD number or CSD report) is required prior to award.
Tax compliance: local tenderers must provide a SARS e-filing PIN or CSD profile for verification; foreign tenderers with a South African footprint but no CSD registration must provide a certified tax clearance certificate; foreign suppliers with no South African footprint must complete SBD 1 but need not provide proof of tax compliance.
CIPC registration number or CIPC disclosure certificate (for companies and each JV member) or trust number.
VAT registration number (for companies and each JV member).
B-bbee
B-BBEE status is claimed through SBD 6.1 (Annexure I) under the PPPFA 2022 regulations.
Proof of B-BBEE status level means a certificate issued by an authorised body or person, a sworn affidavit as prescribed by the B-BBEE Codes of Good Practice, or any other requirement prescribed under the Broad-Based Black Economic Empowerment Act.
Failure to submit specific goals evidence scores zero for those points but does not disqualify the bid.
CIDB
CIDB requirements are not applicable.
Employment equity
Designated employers under the Employment Equity Act must provide proof of compliance, including proof of submission of the Employment Equity report to the Department of Labour (South African tenderers only).
Safety and quality
COIDA: original certificate of good standing or proof of application issued by the Compensation Fund or a licensed compensation insurer (South African tenderers only) — Annexure X.
Quality requirements — Annexure W.
Other safety/quality documents as required by the scope of work.
Professional registrations
ECSA, SACPCMP, CVs, permits, licences or specific registration documents may be required where applicable to the scope of work.
Mandatory forms
Annexure A: Authorisation Form — confirms the signatory is empowered to bind the bidder.
Annexure B: Acknowledgement Form — confirms receipt and completeness of tender documents.
Annexure C: Tenderer's Particulars — records registration and contact details.
Annexure D: Integrity Declaration Form — commits the bidder to the Eskom Supplier Integrity Pact.
Annexure E: CPA Requirements for Local Goods/Services — declares contract price adjustment basis (if applicable).
Annexure G1–G4: SBD 6.2 Declaration Certificate for Local Production and Local Content — declares local content (only if designated materials are included).
Annexure H: SBD 1 Invitation to Bid — the bidder's formal offer.
Annexure J: SBD 4 Bidder's Disclosure — discloses interests of directors and shareholders.
E-tendering Help Manual acknowledgement form.
Health & Safety
Source: Invitation to Tender (ITT) - The Provision of Pest Control Services.pdf
SHE requirements are set out in Annexure X and must be complied with. South African tenderers must provide an original COIDA certificate of good standing, or proof of application, issued by the Compensation Fund or a licensed compensation insurer. Other safety and quality documents required by the scope of work must be submitted prior to contract award. Full compliance with SHEQ specifications is an objective criterion.
Contractual Terms
Source: Invitation to Tender (ITT) - The Provision of Pest Control Services.pdf
Contract conditions: NEC3 Term Service Contract (TSC3).
Contract period: five years.
Payment terms:
Contracts below R50 000 000 including VAT: payment within 30 days of receipt of undisputed invoices.
Contracts above R50 000 000 including VAT: payment within 60 days of receipt of undisputed invoices.
Price adjustment: CPA may apply for contracts longer than 12 months, from year two onwards; no exchange rate adjustment; separate local and foreign formulae required.
Subcontracting: main contractors are discouraged from subcontracting to subsidiaries; any such subcontract must be declared in the tender.
Price negotiation: Eskom may negotiate with preferred bidders if tendered prices are not market-related.
Security for performance: not applicable.
Section
Source: Invitation to Tender (ITT) - The Provision of Pest Control Services.pdf
Functionality/technical evaluation uses a weighted score-card against the specifications; bidders need a weighted score of 70% overall or more to qualify for further evaluation (Appendix A). Price is scored out of 80 points and specific goals out of 20 points under the 80/20 preference point system; the two scores are added and bidders ranked highest to lowest. Failure to submit evidence of a specific goal claim scores zero for that goal but does not disqualify. Contractual requirements (CSD registration, SHE requirements per Annexure X, and two years of audited or independently reviewed financial statements) are not evaluation criteria; they are assessed after ranking and before award, and failure to meet them may render the bidder non-responsive. Alternative tenders are not allowed and reverse e-auction is not applicable.
DocumentPest Control SOW and Technical Evaluation Criteria.pdfReview complete
Description
Source: Pest Control SOW and Technical Evaluation Criteria.pdf
Eskom Rotek Industries (ERI) requires pest control services at its Rosherville site for a five-year period. The contract protects the site from insects, rodents and parasites that can carry disease. ERI Office Services manages deep cleaning, pest control, horticulture and washroom services across properties scattered throughout Rosherville; all areas are listed on a matrix with notional stand numbers and a site map. A SHEQ file must be compiled and approved before any work starts. Services are delivered on an as-and-when-required basis because buildings may be under construction or closed.
Submission Guidelines
Source: Pest Control SOW and Technical Evaluation Criteria.pdf (unknown)
Returnable documents for technical evaluation
Technical Evaluation Criteria document, completed and submitted with the bid.
Certified copies of a previous contract and/or purchase order demonstrating pest control experience.
DALRRD registration certificate or letter as a Structural Pest Control and Rodent Control PCO.
Proof of registration with the relevant authority or institute for waste management.
Method statement for the sterilisation and treatment of feral cats.
Method statement for the removal of birds and bats.
Proof that the waste transporter is registered with the relevant authorities.
Proof of registration of the waste disposal facility.
Training and registration certificates for technicians.
COIDA registration and a current Letter of Good Standing.
Public Liability registration.
SHE Plan and SHEQ file for approval before work commences.
Proposed product register for ERI management approval.
Safety data sheets (SDS) and product labels in English.
Pricing schedule (Annexure F).
Submission method and address are not stated in the available document text. Bidders must confirm the submission channel and address through the Eskom tender portal or the enquiry contact.
Evaluation Criteria
Source: Pest Control SOW and Technical Evaluation Criteria.pdf (unknown)
Evaluation is a weighted technical scorecard. A minimum overall technical score of 70% is required to proceed to further evaluation.
Weighting
Track record of the company: 20%
Technical compliance, technical skills and resources: 70%
Skills and competency of staff: 10%
Scoring detail
Track record (20 points)
Certified copy of a previous contract and/or purchase order showing more than 2 years of pest control service: 20 points.
Same evidence showing less than 1 year of service: 10 points.
No certified copies submitted: 0 points.
Technical compliance, skills and resources (70 points)
DALRRD registration as a Structural Pest Control and Rodent Control PCO (certificate or letter): 20 points; no certificate or letter: 0 points.
Registration with the relevant authority or institute for waste management (certificate or letter): 10 points; none: 0 points.
Method statement for sterilisation and treatment of feral cats: 10 points; not submitted: 0 points.
Method statement for removal of birds and bats: 10 points; not submitted: 0 points.
Proof that the waste transporter is registered with relevant authorities: 10 points; not submitted: 0 points.
Proof of registration of the waste disposal facility: 10 points; not provided: 0 points.
Skills and competency of staff (10 points)
Technician training and registration certificate showing more than 2 years of service: 10 points.
Same certificate showing less than 2 years of service: 5 points.
No certificate submitted: 0 points.
Technical Specifications
Source: Pest Control SOW and Technical Evaluation Criteria.pdf (unknown)
Scope
Provision of integrated pest control services for Eskom Rotek Industries (ERI) at the Rosherville site for a period of five years.
Services cover all areas listed on the site matrix and notional stand numbers; areas and quantities may change depending on building availability and occupation.
Services are scheduled monthly, bi-monthly (every second month), fortnightly (every second week) and ad hoc.
Service requirements
Maintain premises in a pest-free and hygienic condition using an Integrated Pest Management approach.
Prevent pest ingress, harbourage and breeding through inspection, monitoring, proofing and sanitation recommendations.
Apply pesticides only when justified, using registered products, approved labels and competent registered personnel.
Provide traceable records, trend analysis, corrective actions and auditable service reports.
Respond promptly to infestations, health risks, complaints and emergency callouts.
A competent, registered technician must be based on site.
Treatment schedule and specific areas
Monthly treatments for ants and roaches throughout the ERI Rosherville farm.
Bi-monthly servicing of rodent boxes, fly units and ant treatments.
All sixty-two house gardens and common areas treated for ants using spray, gel or granules.
Houses treated internally for ants using gel, granules or other approved applications; spraying inside houses only with a special arrangement through the ERI leasing officer.
Offices treated internally for ants and roaches using gel, granules or other approved applications.
Rodent boxes on building exteriors at entrances and exits serviced every second month; service reports must include a service matrix; follow-up treatments when rodent activity is detected; boxes must be clearly identified and marked with the last service date.
Glue boards for fly units provided and serviced bi-monthly; in the canteen, fly traps must be placed to prevent killed pests from contacting food or food-contact surfaces.
The entire canteen must be treated for ants and roaches in compliance with legal requirements.
Office areas may be sprayed or treated on request; pre-treatment notices must prohibit entry and warn employees of the treatment time and duration.
Rodents in offices and workshops treated as an ad hoc service on request; folded paper boxes installed in affected areas.
Flying insects (flies, mosquitoes, moths, wasps, bees): monitor breeding and entry points, maintain traps, treat only where necessary; bee work must prioritise safe removal or relocation where practicable.
Rodents (rats and mice): risk-based baiting and trapping, tamper-resistant stations, proofing recommendations and carcass removal.
Stored-product pests (weevils, beetles, moths): inspect affected goods and areas, isolate sources, advise on disposal and apply approved treatment.
Termites and wood-destroying organisms (subterranean termites, dry-wood termites, wood-boring beetles): specialist inspection and treatment by a PCO registered for the applicable field.
Birds and nuisance animals (pigeons, bats and other nuisance species): humane, lawful deterrence and exclusion only; no poisoning; obtain permits where legally required.
Other pests: submit a species-specific method statement for client approval before treatment.
Equipment, chemicals and reporting
The service provider must supply all equipment and apparatus necessary to execute the tasks.
Chemicals must be certified and registered with an applicable authority; safety data sheets must be available on request.
All work must be accompanied by a service certificate report, verified and signed off by an ERI representative on completion.
Chemicals used for spraying must be changed when their effectiveness is inadequate or no longer suitable.
Method statements must be provided for the removal of birds and bats as per the pricing schedule; birds and bats must be removed and not killed.
No chemicals may be stored on ERI premises.
Original labelled containers only; empty containers and pesticide waste must be managed according to the label and waste requirements, with disposal evidence where required.
Waste must be transported to and disposed of at an authorised dumping site.
Poison used must be low-odour, effective and not harmful to people.
Chemicals, equipment and PPE
Submit a proposed product register to ERI management for approval, showing product name, active ingredient, registration number, target pest, application method and area of use.
Provide current safety data sheets and product labels in English and in formats accessible to workers; keep copies at the work area and in service vehicles.
Store and transport pesticides securely, upright and segregated from food, feed, clothing and incompatible materials; vehicles must carry spill-control and first-aid equipment.
All application equipment must be suitable, maintained, leak-free and serviceable; maintenance records must be available for audit.
PPE must be selected from the SDS, label and risk assessment and supplied at the service provider's cost; contaminated PPE must be cleaned, stored or disposed of safely.
Methodology
Source: Pest Control SOW and Technical Evaluation Criteria.pdf
Rodent boxes on building exteriors at entrances and exits must be serviced every second month, with a service matrix in the report; follow-up treatments are required when rodent movement is detected; boxes must be clearly identified and marked with the last service date. All sixty-two house gardens and common areas must be treated for ants using spray, gel or granules. Houses must be treated internally for ants using gel, granules or other approved applications; spraying inside houses only with a special arrangement through the ERI leasing officer. Offices must be treated internally for ants and roaches using gel, granules or other approved applications. Chemicals used for spraying must be changed when their effectiveness is inadequate or no longer suitable. Method statements must be provided for the removal of birds and bats as per the pricing schedule; birds and bats must be removed and not killed. Method statements are also required for the sterilisation and treatment of feral cats.
Experience & Qualifications
Source: Pest Control SOW and Technical Evaluation Criteria.pdf
Track record carries 20% of the technical score. Bidders must submit certified copies of a previous contract and/or purchase order for pest control services. More than 2 years of service scores 20 points; less than 1 year scores 10 points; no certified copies score 0 points. Staff competency carries 10%: technician training and registration certificates showing more than 2 years of service score 10 points; less than 2 years score 5 points; no certificate scores 0 points.
Quality Management
Source: Pest Control SOW and Technical Evaluation Criteria.pdf
Service delivery must follow an Integrated Pest Management approach: prevent pest ingress, harbourage and breeding through inspection, monitoring, proofing and sanitation recommendations; apply pesticides only when justified, using registered products and competent personnel; keep traceable records, trend analysis, corrective actions and auditable service reports; and respond promptly to infestations, health risks, complaints and emergency callouts. A competent, registered technician must be based on site. Services run monthly, bi-monthly, fortnightly and ad hoc, and areas or quantities may change with building availability.
Pricing Schedule
Source: Pest Control SOW and Technical Evaluation Criteria.pdf
Pricing must be submitted on Annexure F – Pricing Schedule. The schedule covers the services described in Annexures A to E: door ant and roach service, house ant service, kitchen ant and roach service, fly unit service, and rodent box service.
Financial Requirements
Source: Pest Control SOW and Technical Evaluation Criteria.pdf (unknown)
Pricing
Pricing must be submitted on Annexure F – Pricing Schedule.
Bid security, guarantees, retention and payment terms are not stated in the available document text.
Compliance Requirements
Source: Pest Control SOW and Technical Evaluation Criteria.pdf (unknown)
Mandatory registrations and certifications
Registered as a Structural Pest Control and Rodent Control PCO with the Department of Agriculture, Land Reform and Rural Development (DALRRD).
Registered with the relevant authority or institute for waste management.
Registered for COIDA and Public Liability, with a current Letter of Good Standing.
Waste transporter registered with the relevant authorities.
Waste disposal facility registered.
Technicians must hold valid training and registration certificates.
Safety, health, environmental and quality (SHEQ)
Comply with SHEQ requirements and develop, submit and maintain a SHE Plan and file for approval before work commences.
Conduct documented task risk assessments and toolbox talks; use barricading, signage, area isolation and re-entry controls as required.
The service provider will be audited for SHEQ regulatory and legal compliance.
Work must follow manufacturer or product procedures and SDS requirements; SDS must not be older than 5 years.
Use environmentally friendly, registered chemicals and products with approved labels and SDS.
Notify the client immediately of any spill, exposure, environmental release, injury, property damage, non-conformance or potential food contamination.
Prevent pollution of soil, stormwater, surface water and drains; no pesticide rinse or container may be discharged to the environment or sewer unless lawfully authorised.
Apply environmentally responsible controls and protect non-target organisms, including pollinators, pets and wildlife.
Provide a safety disposal certificate for all pest control waste collected on site.
Legal and technical compliance
Fertilizers, Farm Feeds, Agricultural Remedies and Stock Remedies Act, 1947; Pest Control Operator Regulations, 2011; Regulations Relating to Agricultural Remedies, 2023.
Occupational Health and Safety Act, 1993, including the Regulations for Hazardous Chemical Agents, 2021.
Hazardous Substances Act, 1973, where applicable.
National Environmental Management Act, 1998 and National Environmental Management: Waste Act, 2008, including lawful waste handling and disposal.
Regulations Governing General Hygiene Requirements for Food Premises, Transport of Food and Related Matter under the Foodstuffs, Cosmetics and Disinfectants Act.
Compensation for Occupational Injuries and Diseases Act, 1993, with a current Letter of Good Standing.
SANS 10206: Handling, Storage and Disposal of pesticides.
Applicable municipal environmental health, food premises, access, fire, security and waste requirements.
Health & Safety
Source: Pest Control SOW and Technical Evaluation Criteria.pdf
A SHE Plan and SHEQ file must be developed, submitted and approved before work starts. The service provider must conduct documented task risk assessments and toolbox talks, and apply barricading, signage, area isolation and re-entry controls as required. SHEQ compliance will be audited. Work must follow manufacturer or product procedures and SDS requirements, with SDS not older than 5 years. Environmentally friendly, registered chemicals with approved labels and SDS must be used. The PCO must be registered with DALRRD as a Structural Pest Control and Rodent Control PCO and comply with DFFE and other pest control regulators under the Fertilizers, Farm Feeds, Agricultural Remedies and Stock Remedies Act, 1947. COIDA and Public Liability registration are required. The canteen must be treated for ants and roaches in line with legal requirements. The provider must immediately report spills, exposures, environmental releases, injuries, property damage, non-conformances or potential food contamination; prevent pollution of soil, stormwater, surface water and drains; protect non-target organisms; and provide a safety disposal certificate for all pest control waste collected on site. PPE must be selected from the SDS, label and risk assessment and supplied at the provider's cost; contaminated PPE must be cleaned, stored or disposed of safely. Pesticides must be stored and transported securely, upright and segregated from food, feed, clothing and incompatible materials, and vehicles must carry spill-control and first-aid equipment.
Environmental
Source: Pest Control SOW and Technical Evaluation Criteria.pdf
No chemicals may be stored on ERI premises. Only original labelled containers may be used. Empty containers and pesticide waste must be managed according to the label and applicable waste requirements, with disposal evidence where required. Waste must be transported to and disposed of at an authorised dumping site. The service provider must prevent pollution of soil, stormwater, surface water and drains, and must not discharge pesticide rinses or containers to the environment or sewer unless lawfully authorised. Environmentally responsible controls must protect non-target organisms, including pollinators, pets and wildlife. A safety disposal certificate is required for all pest control waste collected on site. Compliance is required with the National Environmental Management Act, 1998, the National Environmental Management: Waste Act, 2008, SANS 10206 for handling, storage and disposal of pesticides, and applicable municipal environmental health, food premises, access, fire, security and waste requirements.
Section
Source: Pest Control SOW and Technical Evaluation Criteria.pdf
Technical evaluation uses a weighted scorecard. Bidders must achieve an overall weighted score of at least 70% to qualify for further evaluation. The scorecard is divided into track record (20%), technical compliance, skills and resources (70%), and staff competency (10%). Detailed scoring for each criterion is set out in the main evaluation criteria section.
DocumentAnnexure A ERI DOOR ANT & ROACH SERVICE.pdfReview complete
Description
Source: Annexure A ERI DOOR ANT & ROACH SERVICE.pdf
Pest control service schedule — door ant and roach treatment
The schedule lists ERI buildings by stand number, unique number, building name and the number of doors to be treated.
Each line records the service date, the provider's representative and the ERI representative's signature.
Total doors listed: 1,731.
Buildings and door counts
132006 MAN truck: 22
133000 Heritage Conference Centre: 57
Unit 3&4 Heritage Office Park: 11
Unit 5&6 Heritage Office Park: 11
Unit 7&8 Heritage Office Park: 20
Unit 9&10 Heritage Office Park: 34
Unit 11&12 Heritage Office Park: 34
Unit 13&14 Heritage Office Park: 16
Unit 15&16 Heritage Office Park: 9
Unit 17 Heritage Office Park: 17
Unit 18&19 Heritage Office Park: 20
Unit 20&21 Heritage Office Park: 21
Unit 22&23 Heritage Office Park: 28
Unit 24&25 Heritage Office Park: 25
Unit 26&27 Heritage Office Park: 19
Unit 28&29 Heritage Office Park: 18
Unit 30&31 Heritage Office Park: 16
Unit 32&33 Heritage Office Park: 20
Unit 34&35 Heritage Office Park: 19
Unit 36&37 Heritage Office Park: 17
135000 Maintenance Offices and Stores: 11
135002 Facilities Offices and Store: 11
123013 Springbok Single Quarters (rooms 101–136): 49
123006 Rietbok Single Quarters (rooms 301–350): 110
123007 Ribbok Single Quarters (rooms 401–448): 110
143009 Construction West Building: 47
143026 Construction South Building: 60
143008 BMS North Building: 58
119000 6 Storey building and annex: 145
119014 Services locker rooms: 3
119006 6 Storey smokers' area: 1
114001 Oil depot main building: 10
115000 Logistics main building: 27
Prefab Logistics yard operations offices: 6
Prefab Logistics multi axle offices: 18
RMF office building: 36
117054 NDT old: 10
117054 Security control room: 6
117073 TSS workshop offices: 26
117073 TGS workshop offices: 70
117081 300T balancing: 9
121012 Training centre A: 43
121110 Training centre B: 28
121016 Training centre C: 19
123011 Bosbok: 35
123012 Blesbok: 35
146084 Security head office: 26
146085 TGS capacity building: 14
146081 NDT new offices: 18
146024 NDT new workshop: 5
146076 Bearing Services: 10
146001 TGS OSM Offices: 13
146017 Construction Workshop and Plant: 19
146020 Logistics Store Offices: 12
146019 Satellite store office and green area: 7
146018 Strategic store office and green area: 15
146016 Blading store offices: 7
TGS plant maintenance: 11
117037 Medical centre: 32
117041 Main stores and offices: 16
117053 TSS office block top and bottom: 26
117054 TSS receiving & despatch: 6
117033 TSS block 2 change room & green area: 6
117029 Security guard house: 2
118097 Switchgear workshop offices: 4
118097 TSS maintenance offices: 5
118052/99 Bushing and tapping workshop: 4
118098/96 Bushing workshop: 4
118094 Transformer site office & green area: 4
118050 Workshop green area: 4
120002 Postal building: 4
120001 RRR training centre: 40
Technical Specifications
Source: Annexure A ERI DOOR ANT & ROACH SERVICE.pdf (unknown)
Pest control service schedule — door ant and roach treatment
The schedule lists ERI buildings by stand number, unique number, building name and the number of doors to be treated.
Each line records the service date, the provider's representative and the ERI representative's signature.
Total doors listed: 1,731.
Buildings and door counts
132006 MAN truck: 22
133000 Heritage Conference Centre: 57
Unit 3&4 Heritage Office Park: 11
Unit 5&6 Heritage Office Park: 11
Unit 7&8 Heritage Office Park: 20
Unit 9&10 Heritage Office Park: 34
Unit 11&12 Heritage Office Park: 34
Unit 13&14 Heritage Office Park: 16
Unit 15&16 Heritage Office Park: 9
Unit 17 Heritage Office Park: 17
Unit 18&19 Heritage Office Park: 20
Unit 20&21 Heritage Office Park: 21
Unit 22&23 Heritage Office Park: 28
Unit 24&25 Heritage Office Park: 25
Unit 26&27 Heritage Office Park: 19
Unit 28&29 Heritage Office Park: 18
Unit 30&31 Heritage Office Park: 16
Unit 32&33 Heritage Office Park: 20
Unit 34&35 Heritage Office Park: 19
Unit 36&37 Heritage Office Park: 17
135000 Maintenance Offices and Stores: 11
135002 Facilities Offices and Store: 11
123013 Springbok Single Quarters (rooms 101–136): 49
123006 Rietbok Single Quarters (rooms 301–350): 110
123007 Ribbok Single Quarters (rooms 401–448): 110
143009 Construction West Building: 47
143026 Construction South Building: 60
143008 BMS North Building: 58
119000 6 Storey building and annex: 145
119014 Services locker rooms: 3
119006 6 Storey smokers' area: 1
114001 Oil depot main building: 10
115000 Logistics main building: 27
Prefab Logistics yard operations offices: 6
Prefab Logistics multi axle offices: 18
RMF office building: 36
117054 NDT old: 10
117054 Security control room: 6
117073 TSS workshop offices: 26
117073 TGS workshop offices: 70
117081 300T balancing: 9
121012 Training centre A: 43
121110 Training centre B: 28
121016 Training centre C: 19
123011 Bosbok: 35
123012 Blesbok: 35
146084 Security head office: 26
146085 TGS capacity building: 14
146081 NDT new offices: 18
146024 NDT new workshop: 5
146076 Bearing Services: 10
146001 TGS OSM Offices: 13
146017 Construction Workshop and Plant: 19
146020 Logistics Store Offices: 12
146019 Satellite store office and green area: 7
146018 Strategic store office and green area: 15
146016 Blading store offices: 7
TGS plant maintenance: 11
117037 Medical centre: 32
117041 Main stores and offices: 16
117053 TSS office block top and bottom: 26
117054 TSS receiving & despatch: 6
117033 TSS block 2 change room & green area: 6
117029 Security guard house: 2
118097 Switchgear workshop offices: 4
118097 TSS maintenance offices: 5
118052/99 Bushing and tapping workshop: 4
118098/96 Bushing workshop: 4
118094 Transformer site office & green area: 4
118050 Workshop green area: 4
120002 Postal building: 4
120001 RRR training centre: 40
DocumentAnnexure F ERI Pest Control Pricing Schedule.pdfReview complete
Pricing Schedule
Source: Annexure F ERI Pest Control Pricing Schedule.pdf
Annexure F — Pest Control Pricing Schedule (5-year contract)
Structure
Each line carries a unit price, a 5-year contract price and an extended total.
Quantities are stated monthly, yearly and over the 5-year term; the 5-year quantity determines the contract value.
A grand total across all lines must be carried to the summary.
Scope of priced items
Crawling insects (ants, roaches, mites, spiders, fleas, ticks): internal and external treatment priced per m².
Flying insects (flies, mosquitos, wasps, bees): treatment priced per m².
Rodents: treatment and nest removal.
Termites: treatment and nest removal.
Reptiles, snakes, lizards, birds and moles: removal services.
Fly boxes: new supply, installation and rental.
Rodent boxes: rental and servicing.
Bait stations and roach boxes: supply and servicing.
Site areas priced individually: canteen, kitchen, office, house, truck, door and canteen-area treatments.
Sterilisation treatments as listed.
Service frequencies to be priced
Monthly.
Every second month.
Every second week.
Once-off treatments.
Ad hoc call-outs.
Pricing rules
Every line must be completed; no line may be left blank.
Rates are fixed for the 5-year contract period.
Unit of measure is per m² for treatment lines and per unit for box, station and removal lines.
Financial Requirements
Source: Annexure F ERI Pest Control Pricing Schedule.pdf (unknown)
Pricing schedule (Annexure F) — 5-year contract
Bidders must price each line item as a unit rate and a 5-year contract price, with an extended total per line.
Quantities are given as monthly, yearly and 5-year figures; the 5-year quantity column drives the contract price.
Line items cover, among others:
Crawling insect treatment (ants, roaches, mites, spiders, fleas, ticks) — internal and external, per m².
Flying insect treatment (flies, mosquitos, wasps, bees) — per m².
Rodent treatment and rodent nest removal.
Termite treatment and termite nest removal.
Snake, lizard, bird and mole removal.
Fly box supply, installation and rental; rodent box rental; bait station servicing.
Canteen, kitchen, office, house, truck, door and canteen-area treatments.
Sterilisation and fumigation-type treatments listed on the schedule.
Recurring service frequencies appear on the schedule (monthly, every second month, every second week, once-off and ad hoc), and each frequency must be priced separately.
All rates are contract prices for the full 5-year term; bidders must complete every line and the grand total.
DocumentSHE evaluation criteria for Pest control.pdfReview complete
Description
Source: SHE evaluation criteria for Pest control.pdf
SHE evaluation criteria for the provision of pest control services on Eskom premises, covering the health and safety returnables a bidder must submit.
Submission Guidelines
Source: SHE evaluation criteria for Pest control.pdf (unknown)
Returnable SHE documents — all must be completed and submitted with the bid:
Health and Safety Plan/file: scope- or project-specific, aligned with the client's health and safety specification, and addressing the OHS risks of the pest control work.
Baseline OHS Risk Assessment (BRA): identifies, assesses and manages OHS risks for the scope of work, covers routine and non-routine tasks, and includes the risk assessment methodology.
Valid Letter of Good Standing: COIDA registration with the Compensation Commissioner, a licensed mutual company, or an equivalent for international bidders.
OHS policy signed by the CEO: must comply with Section 7 of the OHS Act.
Section 37(2) Agreement: signed by the service provider and the Eskom project manager at tender award.
Evaluation Criteria
Source: SHE evaluation criteria for Pest control.pdf (unknown)
SHE compliance evaluation
Each returnable SHE document is assessed as Yes, No or Not applicable.
The outcome is recorded as Recommended or Not Recommended.
A bid that does not meet the SHE requirements is not recommended for award.
Technical Specifications
Source: SHE evaluation criteria for Pest control.pdf (unknown)
Scope
Provision of pest control services on Eskom premises.
SHE documentation requirements
OHS plan/manual: documented plan in line with the client's SHE requirements and OHS Act Section 8(1) and Construction Regulations 5(1)(i, m, n); must be scope- or project-based and set out method statements, processes and resources to manage SHE risk throughout the project lifecycle.
Baseline OHS Risk Assessment: identifies and assesses SHE hazards, aspects, risks and impacts before project inception and start of operations; must cover routine and non-routine tasks and state the assessment methodology.
Letter of Good Standing: proof of COIDA registration under Chapter 9, Section 80 of the COID Act, or registration with a licensed mutual company or an equivalent for international bidders.
SHE policy: signed statement of intent by the employer under OHS Act Section 7 (32-136, 32-726), providing a framework for SHE objectives, management commitment to employee wellbeing and duty of care to the environment.
Section 37(2) Agreement: the service provider accepts responsibility for health and safety of its employees working on Eskom premises under the scope of work; signed by the service provider and the Eskom project manager at tender award.
Compliance Requirements
Source: SHE evaluation criteria for Pest control.pdf (unknown)
SHE compliance
Health and Safety Plan/file: scope- or project-specific and aligned with the client's health and safety specification.
Baseline OHS Risk Assessment (BRA): covers routine and non-routine tasks and includes the methodology.
Valid Letter of Good Standing: COIDA or equivalent.
OHS policy signed by the CEO: complies with OHS Act Section 7.
Annexure B: Eskom requirement 32-726.
Section 37(2) Agreement: signed at tender award by the service provider and the Eskom project manager.
Health & Safety
Source: SHE evaluation criteria for Pest control.pdf
Returnable SHE documents
Health and Safety Plan/file: scope- or project-based, aligned with the client's SHE requirements and OHS Act Section 8(1) and Construction Regulations 5(1)(i, m, n); must document method statements, processes and resources for managing SHE risk over the project lifecycle.
Baseline OHS Risk Assessment: identifies and assesses SHE hazards, aspects, risks and impacts before project inception and start of operations; covers routine and non-routine tasks and states the assessment methodology.
Valid Letter of Good Standing: COIDA registration under Chapter 9, Section 80 of the COID Act, a licensed mutual company, or an equivalent for international bidders.
SHE policy: signed by the CEO, compliant with OHS Act Section 7 (32-136, 32-726), setting SHE objectives and management commitment to employee wellbeing and environmental duty of care.
Section 37(2) Agreement: the service provider accepts responsibility for health and safety of its employees on Eskom premises; signed by the service provider and the Eskom project manager at tender award.
Section
Source: SHE evaluation criteria for Pest control.pdf
SHE returnables are assessed as Yes, No or Not applicable and the bidder is rated Recommended or Not Recommended.
DocumentQuality Form A.pdfReview complete
Description
Source: Quality Form A.pdf
Pre-contract award
Category 3 quality requirements apply under clause 4.1 of specification 240-105658000.
Categories 1, 2 and 4 do not apply.
The main supplier and sub-supplier capability and capacity assessment does not apply.
Post-contract award
Contract execution, supplier quality performance monitoring and supplier quality audit apply under clause 5.
Standard conditions
Eskom rights of access, rights to information, preservation, quality audit conditions, management of nonconformities and special processes apply under clause 6.
Iso 9001
Clauses 4 to 10 and quality principles 1 to 7 apply.
Submission Guidelines
Source: Quality Form A.pdf (unknown)
Returnable document
Form A (Tender & Contract Quality Requirements, document 240-68099512 Rev 10): the bidder's quality representative must complete and sign it to acknowledge and accept Eskom's supplier quality requirements under specification 240-105658000 and ISO 9001.
Only one pre-contract award quality category may be selected on the form; Category 3 is the applicable category for this enquiry.
The form must indicate whether a site assessment applies.
Evaluation Criteria
Source: Quality Form A.pdf (unknown)
Pre-contract award quality requirements
Category 3 of specification 240-105658000 applies; no other category may be selected.
The main supplier and sub-supplier capability and capacity assessment is not applicable.
Eskom's standard quality conditions apply: rights of access, rights to information, preservation, quality audits, management of nonconformities and special processes.
Technical Specifications
Source: Quality Form A.pdf (unknown)
Scope
Provision of pest control services to Eskom.
Quality system
The supplier's quality management system must address ISO 9001 clauses 4 to 10: context of the organisation, leadership, planning, support, operation, performance evaluation and improvement.
The seven ISO 9001 quality principles apply: customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making and relationship management.
Post-award obligations
Eskom may exercise rights of access and rights to information, require preservation of records, conduct quality audits, manage nonconformities and nonconforming outputs, and apply special process controls.
Methodology
Source: Quality Form A.pdf
ISO 9001 clauses applied
Clause 4: context of the organisation.
Clause 5: leadership.
Clause 6: planning.
Clause 7: support.
Clause 8: operation.
Clause 9: performance evaluation.
Clause 10: improvement.
Quality principles applied
Customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making and relationship management.
Eskom may exercise rights of access and rights to information, require preservation, conduct quality audits, manage nonconformities and nonconforming outputs, and apply special process controls.
Acknowledgement
The bidder's quality representative must sign Form A to accept specification 240-105658000 and ISO 9001.
Compliance Requirements
Source: Quality Form A.pdf (unknown)
Quality acknowledgement
Form A must be completed and signed by the bidder's quality representative.
The bidder must accept Eskom Supplier Quality Requirements per specification 240-105658000 and the ISO 9001 standard.
Only one pre-contract award quality category may be selected; Category 3 applies.
Section
Source: Quality Form A.pdf
Quality requirements
Pre-contract award quality requirements apply, with Category 3 selected.
Post-contract award supplier quality performance monitoring and supplier quality audit apply.
Quality audit related conditions apply.
DocumentAnnexure C ERI KITCHENS ANT & ROACH SERVICE.pdfReview complete
Description
Source: Annexure C ERI KITCHENS ANT & ROACH SERVICE.pdf
Pest control service targeting ants and cockroaches in kitchens across the ERI site. The schedule lists each kitchen by stand, building and floor, with the number of kitchens at each location. Service delivery is confirmed by recording the date, the provider's representative name and signature, and the kitchen service representative's signature for each visit.
Technical Specifications
Source: Annexure C ERI KITCHENS ANT & ROACH SERVICE.pdf (unknown)
Service: ant and roach pest control for kitchens across the ERI site.
Kitchen locations by stand and building (each line lists the kitchen areas and the number of kitchens):
Stand 14, Building 114001 (Oil Depot): Kitchen 1 — 1 kitchen.
Stand 15, Building N/A (Logistics Main Office): Kitchen 1 — 1 kitchen.
Stand 15, Building Prefab (Logistics Multi Axles): Kitchen 1 — 1 kitchen.
Stand 15, Building Modular Building (Waste Disposal Offices): Kitchen 1 — 1 kitchen.
Stand 15, Building Portable Unit (Logistic Waste Disposal Area): Kitchen 1 — 1 kitchen.
Stand 15, Building Portable Unit (Logistic Operations Area): Kitchen 1 — 1 kitchen.
Stand 17, Building 117037 (Medical Centre): Kitchen 1 — 1 kitchen.
Stand 17, Building 117053 (TSS Office Block): Bottom Kitchen 1; SHEQ Kitchen 1; 1st Floor Kitchen 1 — 3 kitchens.
Stand 17, Building 117053 (NDT Old): Kitchen 1 — 1 kitchen.
Stand 17, Building 117081 (300T Balancing): Kitchen 1 — 1 kitchen.
Stand 17, Building 117081 (Security Control Room): Kitchen 1 — 1 kitchen.
Stand 18, Building 117041 (Main Stores): Kitchen 1 — 1 kitchen.
Stand 18, Building 118097 (TSS Switchgear): Kitchen 1 — 1 kitchen.
Stand 18, Building 118073 (TSS): Production Office Kitchen 1; Test Bay Kitchen 1; Winding Kitchen 1; 200 T Kitchen 1 — 4 kitchens.
Stand 18, Building 118073 (TGS): Works Engineering Kitchen 1; Generator Service Kitchen 1; Works Engineering Kitchen 1; Mechanical Office Services Kitchen 1; TGS Receive and Despatch Kitchen 1 — 5 kitchens.
Stand 19, Building 119000 (6 Storey Building, 6th Floor): Kitchen 1 — 1 kitchen.
Stand 19, Building 119000 (6 Storey Building, 5th Floor): Kitchen 1 — 1 kitchen.
Stand 19, Building 119000 (6 Storey Building, 3rd Floor): Kitchen 3 — 1 kitchen.
Stand 19, Building 119000 (6 Storey Building, 2nd Floor): Kitchen 1 — 1 kitchen.
Stand 19, Building 119000 (6 Storey Building, 1st Floor): Kitchen 1; Kitchen 2; Kitchen 3 — 3 kitchens.
Stand 19, Building 119000 (Sun Building): Kitchen 1; Kitchen 2 — 2 kitchens.
Stand 19, Building 119000 (Annex): Kitchen 1 — 1 kitchen.
Stand 20, Building 120002 (Postal): Kitchen 1 — 1 kitchen.
Stand 20, Building 120001 (RRR Computer Training Centre): 1st Floor Kitchen 1 — 1 kitchen.
Stand 21, Building 121012 (TGS Training Centre A New Building): Kitchen Top Floor 1 — 1 kitchen.
Stand 21, Building 121012 (TGS Training Centre A): Office Kitchen 1; Training Hall Kitchen 1; Workshop Kitchen 1 — 3 kitchens.
Stand 21, Building 121015 (Training Centre B East): Siemens Kitchen 1 — 1 kitchen.
Stand 21, Building 121014 (Training Centre B West): Workshop Kitchen 1; Alstom Kitchen 1 — 2 kitchens.
Stand 21, Building 121016 (Training Centre C Bottom): Kitchen Workshop 1; Kitchen Office 1 — 2 kitchens.
Stand 23, Building 123004 (Canteen Construction Office): Kitchen 1 — 1 kitchen.
Stand 23, Building 123011 (Bosbok): Kitchen Ground Floor 1; Kitchen 1st Floor 1; Kitchen 2nd Floor 1 — 3 kitchens.
Stand 23, Building 123012 (Blesbok): Kitchen Ground Floor 1; Kitchen 1st Floor 1; Kitchen 2nd Floor 1 — 3 kitchens.
Stand 32, Building 132006 (Roshcon Construction & Stores): Workshop Kitchen 1; Gate Office Block Kitchen 1 — 2 kitchens.
Stand 33, Building 133000 (H.C.C): Kitchen 1st Floor 1; Kitchen Ground Floor 1 — 2 kitchens.
Stand 33, Building 133000 (Roshcon HCC): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 3 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 5 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 6 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 9/12 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 13/14 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 15 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 17 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 18 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 19 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 22/23 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 24/25 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 26/27 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 28/29 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 30/31 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 32/33 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 34 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 36 (Office Park): Kitchen 1 — 1 kitchen.
Stand 34, Building Unit 37 (Office Park): Kitchen 1 — 1 kitchen.
Stand 35, Building 135002 (PAS Store): Kitchen 1 — 1 kitchen.
Stand 43, Building 143026 (Construction Head Office South): Kitchen 1 — 1 kitchen.
Stand 43, Building 143026 (Construction Head Office South, 1st Floor): Kitchen 1 — 1 kitchen.
Stand 43, Building 143026 (Construction Head Office South, 2nd Floor): Kitchen 1 — 1 kitchen.
Stand 43, Building 143009 (Construction Head Office West, Ground Floor): Kitchen 1 — 1 kitchen.
Stand 43, Building 143009 (Construction Head Office West, 1st Floor): Kitchen 1 — 1 kitchen.
Stand 43, Building 143009 (Construction Head Office West, 2nd Floor): Kitchen 1 — 1 kitchen.
Stand 43, Building 143008 (Construction Head Office North, Ground Floor): Kitchen 1 — 1 kitchen.
Stand 43, Building 143008 (BMS Head Office North, 1st Floor): Kitchen 1 — 1 kitchen.
Stand 43, Building 143008 (BMS Head Office North, 2nd Floor): Kitchen 1 — 1 kitchen.
Stand 46, Building 146084 (North Gate Security Ablution): Kitchen 1 — 1 kitchen.
Stand 46, Building 146085 (TGS Capacity): Kitchen 1 — 1 kitchen.
Stand 46, Building 146083 (New Security Office): Kitchen 1 — 1 kitchen.
Stand 46, Building 146081 (NDT New): Kitchen 1 — 1 kitchen.
Stand 46, Building 146019 (TGS Satellite Store): Kitchen 1 — 1 kitchen.
Stand 46, Building 146018 (TGS Strat. Store): Kitchen 1 — 1 kitchen.
Stand 46, Building 146016 (TGS Turbine Blading Store): Kitchen 1 — 1 kitchen.
Stand 46, Building 146076 (Bearing Services): Kitchen 1 — 1 kitchen.
Stand 46, Building 146001 (TGS OSM Workshop): Kitchen 1 — 1 kitchen.
Stand 46, Building 146008 (Roshcon Plant Canteen): Kitchen 1 — 1 kitchen.
Stand 46, Building 146009 (Roshcon Plant Offices): Kitchen 1 — 1 kitchen.
Stand 46, Building 146020 (Logistics Warehouse): Kitchen 1 — 1 kitchen.
Stand 46, Building Modular Unit (TGS Plant Maintenance): Kitchen 1 — 1 kitchen.
Stand 46, Building 146018 (TGS Strategic New Store (Rollfab)): Kitchen 1 — 1 kitchen.
Service confirmation: each service visit must be recorded on the schedule with the date, the provider's representative name and signature, and the kitchen service representative's signature.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.