Issuing Organization
Eskom National Transmission Company of South AfricaLocation
Mpumalanga
Closing Date
09 Oct 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Corner Jellico and Water Meyer Street - Witbank, Eskom Park - North Eastern Region - 1035
Organization Type
GOVERNMENT
Published
28 Aug 2026
OCDS Reference
ocds-9t57fa-167433
ESKOM national transmission company of south africa requires professional services to investigate potential subsurface instability near the ntcsa vulcan substation. The scope is limited to the investigation itself; NO further deliverables, quantities, standards or service levels are specified in the available information. The single most consequential requirement is the closing deadline of 9 october 2026 at 10:00.
Closing date and time: 9 October 2026 at 10:00
Submission method and address: not stated in the available text
Scope: professional services to investigate potential subsurface instability in the vicinity of the NTCSA Vulcan Substation
No further deliverables, quantities, standards or service levels are provided
Mandatory briefing or site visit: not stated in the available text
Returnable forms and documents: not stated in the available text
Eligibility thresholds (CSD, tax, B-BBEE, CIDB, professional registrations, local content): not stated in the available text
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 09 October 2026 - 10:00
Venue
Vulcan Substation Witbank
Adress link: https://maps.app.goo.gl/nPJR21SuEyERUUJ18?g_st=ac
Categories
Request for Bid(Open-Tender)
Corner Jellico and Water Meyer Street - Witbank, Eskom Park - North Eastern Region - 1035
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: 240-126469599_Method Statement template final 18 Oct2021.docx, BOQ.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
28 Aug
2026
Tender Published
Tender was published
09 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Sinkhole Investigation_BRA.xlsx
Eskom's North East Grid is procuring professional services to investigate potential subsurface instability in the vicinity of the NEG (North East Grid) Vulcan substation. The work involves a baseline occupational health and safety risk assessment covering activities such as driving, office administration, HV plant operation, and secondary plant work, with the risk assessment document serving as the technical reference for the investigation.
NEC PSC.pdf
NTCSA SOC Ltd is procuring professional geotechnical services, under an NEC3 Professional Services Contract (Option A, priced contract with activity schedule), to investigate potential subsurface instability and sinkhole risk at and around the Vulcan Transmission Substation in Emalahleni, Mpumalanga, including the Arnot Kendal 400 kV tower 227. The 8-month contract requires a professionally registered geologist (SACNASP) to conduct subsidence investigations, methane gas studies, drilling of boreholes, laboratory testing, and to compile a detailed report with mitigation proposals.
NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf
The National Transmission Company South Africa (NTCSA) SOC Ltd is procuring professional services to investigate potential subsurface instability in the vicinity of the NTCSA Vulcan Substation. The work is governed by a Non-Disclosure Agreement (NDA) that bidders must sign to protect confidential information disclosed during the tender process.
NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk)- Sinkhole Investigation Project.pdf
Eskom National Transmission Company of South Africa (NTCSA) is procuring professional services to investigate potential subsurface instability (sinkhole risk) in the vicinity of the Vulcan Substation in Mpumalanga. The tender is classified as high risk for occupational health and safety (OHS), requiring bidders to submit a comprehensive OHS tender returnable pack.
240-126469599_Method Statement template final 18 Oct2021.docx
Eskom National Transmission Company of South Africa seeks professional services to investigate potential subsurface instability in the vicinity of the NTC Vulcan Substation. The scope includes a method statement and associated deliverables as per the tender/RFQ title.
SHE Specification -Vulcan Sinkhole Investigation Project.pdf
Professional services to investigate potential subsurface instability (sinkhole) in the vicinity of the NTCSA Vulcan Substation, with a SHE specification governing contractor health, safety, and environmental obligations.
SCOPE OF WORK.pdf
Professional geotechnical and geophysical services are required to investigate potential subsurface instability, including sinkholes and spontaneous combustion, in the vicinity of the NTCSA Vulcan Substation in Emalahleni, Mpumalanga. The investigation will assess risks to the substation and the Arnot Kendal 400kV tower 227, using non-invasive methods (thermal imaging, ERT, microgravity, MASW), methane gas studies, and geotechnical boreholes, culminating in a detailed report with mitigation recommendations.
TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf
Eskom Transmission is procuring professional services for a detailed underground fires investigation and sinkhole rehabilitation at Vulcan Substation, including re-establishment of the perimeter fence and liaison with authorities. The tender is evaluated on a weighted scorecard with a minimum technical threshold of 70%.
BOQ.pdf
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom National Transmission Company of South Africa seeks professional services to investigate potential subsurface instability near the NTCSA Vulcan Substation in Mpumalanga. The tender is governed by Eskom's Supplier Quality Management specification (240-105658000), which sets out quality management system requirements for suppliers.
Annexure B-to be completed and signed.pdf
Professional services to investigate potential subsurface instability near the NTCSA Vulcan Substation, commissioned by Eskom National Transmission Company of South Africa in Mpumalanga. The work requires compliance with Eskom's OHS requirements and contractor management obligations.
NTCSA Supplier Declaration of Interest.docx
Professional services are being procured to investigate potential subsurface instability near the NTCSA Vulcan Substation, issued by Eskom National Transmission Company of South Africa. The tender requires bidders to complete a declaration of interest and conflict-of-interest disclosures as part of the submission.
eTendering_Supplier's User_Guide_v4.4.pdf
This document is a user manual for Eskom's eTendering system, which allows suppliers to submit tender documents electronically. It provides step-by-step instructions for registration, login, document upload, submission finalization, editing registration details, logging out, and password reset.
Copy of 240-43921804 Environmental Management Tender Returnable Vulcan Sinkholes.xls
Eskom National Transmission Company of South Africa is procuring professional services to investigate potential subsurface instability in the vicinity of the NTCSA Vulcan Substation in Mpumalanga. The tender requires bidders to submit comprehensive environmental documentation, including an Environmental Management Programme, Waste Management Plan, and related returnables, with a minimum weighted average score of 80% to be considered.
1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf
Professional services to investigate potential subsurface instability (sinkhole) in the vicinity of the NTCSA Vulcan Substation near Witbank, Mpumalanga, including design and method statement for rehabilitation and construction of concrete drainage channels.
240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Investigate subsurface instability at Vulcan Substation.pdf
Professional services to investigate potential subsurface instability in the vicinity of the NTCSA Vulcan Substation, issued by Eskom National Transmission Company South Africa.
SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf
Professional services to investigate potential subsurface instability in the vicinity of the NTCSA Vulcan Substation, for Eskom's National Transmission Company South Africa, in Mpumalanga. The project duration is 8 months, with a budget of R0 excluding VAT.
240-68099512 Form A_Cat 4_ Rev 9 - Investigate subsurface instability at Vulcan Substation.pdf
Professional services to investigate potential subsurface instability in the vicinity of the NTCVA Vulcan Substation, issued by Eskom National Transmission Company of South Africa.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 607 200
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Eskom Supplier Quality Management Specification (240-105658000, Revision 3, QM 58) defines minimum quality requirements for all existing and potential suppliers and sub-suppliers across Eskom Holdings SOC Ltd. It forms part of all Eskom RFIs, RFQs, RFPs and contracts for products and services. The specification requires suppliers to develop, implement, maintain and continually improve a QMS based on ISO 9001. It classifies supplier quality requirements into four categories (1–4) with escalating documentation requirements, selected per procurement via Form A. The document covers pre-contract award requirements (QMS, Quality Plans, CQPs, QCPs/ITPs), capability/capacity assessments, post-award execution, performance monitoring, audits, and standard conditions (access rights, information rights, preservation, audit conditions, nonconformity management, special processes). Normative references: ISO 9001, ISO 10005. Effective from authorisation date (17 October 2021); next review October 2024.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Specification effective date: date of authorisation (17 October 2021).
Next review date: October 2024.
No tender-specific closing date, briefing or site visit dates are stated in this specification; those are provided in the individual tender invitation.
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Eskom Quality representative/professional selects applicable requirements and completes Form A for each procurement.
No named SCM or technical contacts, emails, phones, or submission addresses are provided in this specification; refer to the specific tender invitation.
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Returnable documents — all must be completed, signed and submitted with the tender:
Specific returnables per tender are selected from the List of Tender Returnables document (240-12248652).
Disqualification risks:
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality evaluation is based on the supplier's demonstrated Quality Management System (QMS) conformance to ISO 9001 and this specification (240-105658000).
Suppliers are classified into one of four quality categories (Category 1–4) per procurement; only one category applies per tender. The applicable category is indicated in Form A.
Minimum requirements per category:
Capability and capacity assessments are performed pre-award for suppliers of high-risk products/services, critical plant items, or special processes.
Post-award monitoring includes contract execution oversight, supplier quality performance monitoring, and supplier quality audits by trained, accredited personnel.
Preference points are claimed via SBD 6.1 under the PPPFA 80/20 or 90/10 system (referenced in the specification).
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Scope: Minimum quality requirements for all existing and potential Eskom suppliers and sub-suppliers across Eskom Holdings SOC Ltd divisions and subsidiaries. Applies to all RFIs, RFQs, RFPs and contracts for products and services.
Normative references: ISO 9001 (QMS requirements), ISO 10005 (Quality Plans guidelines).
Informative references: ISO 9000, ISO 10006, ISO 9004, Eskom SHEQ Policy (32-727), PPPFA, CIDB 1004, IAEA GS-R-3.1, SANS 10845-1, Eskom Procurement Policy (32-1033) and Procedure (32-1034).
Key definitions: Hold Point (work cannot proceed without Eskom written authorisation), Witness Point (work may proceed after formal notification and waiver confirmation), Intervention Points (inspection, hold, surveillance, witness, review, verification), Special Process (results cannot be fully verified before delivery), Level 1/2/3 Plant Items (criticality classification), Nonconformity, Contract Quality Plan (CQP), Quality Control Plan/Inspection and Test Plan (QCP/ITP).
Supplier and sub-supplier QMS must conform to ISO 9001 (latest revision) and this specification. Valid ISO 9001 certificate required unless excluded by quality category.
Main supplier responsible for sub-supplier QA/QC elements, performance management programme (verification, audits, CQP/QCP reviews, NC management, ITPs, risk management).
Contract Quality Plan (CQP) must address ISO 10005 elements plus: records management (material tests, PMI, certifications), free access for inspection, final documentation submission prior to shipment, welding special processes (WQR, WPS, PQR), special installation/fabrication procedures, personnel qualification/certification (SETA, statutory), training records, storage/preservation/maintenance instructions, sub-supplier monitoring, communication channels, monitoring/measurement procedures.
CQPs submitted before initial kick-off or pre-fabrication meeting, whichever earlier. Eskom CQP template used as guideline where supplier lacks own.
Quality Control Plan (QCP/ITP) must cover all stages chronologically: contract review, materials verification, manufacturing, fabrication, assembly, final testing, commissioning, hand-over, certification. Must include hold/witness points, acceptance criteria, codes/standards, sub-supplier details, inspector qualifications, test procedures, sign-off sections. Eskom-accepted QCP/ITP becomes addendum to contract. Changes require Eskom agreement.
Mandatory pre-inspection meetings convened by Eskom/AIA. Eskom may appoint resident inspectors at supplier/sub-supplier premises (supplier provides workspace at no cost). Eskom may appoint any AIA/inspection agency; supplier may not object.
Quality kick-off meeting at contract start and each phase; 14 days' advance notice to Eskom.
Preservation management programme: special precautions for valves, motors, rotating equipment, piping, instrumentation, flanges, gaskets, coatings, insulation; periodic shaft rotation, engine turnover, lubrication; documented requirements in purchase orders; sub-supplier input documented; Eskom unrestricted access to preservation records.
Nonconformity management: Eskom-identified nonconformities managed per documented procedures.
Special processes: personnel certified competent via internal procedures or accredited external bodies (SETA); records maintained.
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Methodology requirements for quality execution:
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Experience and qualification requirements:
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality Management System (QMS) requirements:
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Mandatory compliance:
Returnable forms (compress to one line each):
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Health and safety requirements are referenced through:
No detailed HSE specifications, safety plans, or specific compliance requirements are provided in this document; these are addressed in project-specific tender documents.
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Standard conditions forming part of the contract:
Section
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality evaluation criteria are embedded in the four quality categories (1–4) defined in Section 3.5. Each category specifies minimum returnable documentation that serves as the evaluation baseline:
Only one category applies per procurement, indicated in Form A. Capability/capacity assessments are conducted pre-award for high-risk/critical/special process suppliers. Post-award evaluation includes performance monitoring and audits by trained, accredited personnel. PPPFA preference points (SBD 6.1) and CIDB 1004 guideline for quality evaluation in tenders are referenced.
Description
Source: NEC PSC.pdf (unknown)NEC3 Professional Services Contract (PSC3)
Important Dates
Source: NEC PSC.pdf (unknown)Key dates (conditions to be met): Safety file approval 4 weeks after contract award; Phase 1 geotechnical investigation and methane gas studies 2 weeks after safety file approval; Phase 2 geotechnical investigations 8 weeks after Phase 1 completion; Phase 3 drilling of boreholes 8 weeks after Phase 2 completion; laboratory testing 4 weeks; contractor's report 2 weeks. The starting date and completion date are TBC. The Consultant must submit a first programme for acceptance within 2 weeks of the Contract Date. The quality policy statement and quality plan are due within 5 working days of the Contract Date. The defects date is 12 weeks after Completion.
Contact Information
Source: NEC PSC.pdf (unknown)Employer's Agent: located at Cnr Watermeyer & Jellicoe Street, Emalahleni 1035. The Employer's Agent acts for the Employer for all purposes of this contract. No direct contact names or emails are provided in the document.
Submission Guidelines
Source: NEC PSC.pdf (unknown)Returnable documents: C1.1 Form of Offer & Acceptance (signed offer, including total price exclusive and inclusive of VAT), C1.2b Contract Data provided by the Consultant (key people, staff rates, activity schedule), C2.2 Activity Schedule (priced BOQ for sinkhole assessment), and Schedule of Deviations (if any). All must be completed and signed by a duly authorised representative. The offer must remain valid for the period stated in the Tender Data. Any deviations must be listed in the Schedule of Deviations; a covering letter is not part of the contract.
Evaluation Criteria
Source: NEC PSC.pdf (unknown)The contract is NEC3 PSC3 Option A (priced contract with activity schedule). No explicit scoring split or minimum qualifying thresholds are stated in the provided document. The tenderer must be a professionally registered geologist with SACNASP. The tenderer must complete Contract Data Part Two, including key people, staff rates, and activity schedule. The contract includes mandatory Z-clauses covering B-BBEE status changes (notification within 7 days; failure may lead to termination), ethics (prohibited actions), and insurance requirements. The Employer is NTCSA SOC Ltd; the contract is governed by South African law.
Technical Specifications
Source: NEC PSC.pdf (unknown)Scope: Investigate subsurface instability at and around the Vulcan Substation (Emalahleni) and adjacent areas, including the Arnot Kendal 400kV tower 227, to determine the risk of failure to NTCSA infrastructure. The area is affected by historic bord-and-pillar mining, underground voids, spontaneous combustion of coal pillars, and progressive subsidence. Services include: (1) comprehensive subsidence investigation methodology; (2) capture the extent of the phenomenon and impacts on critical infrastructure; (3) compile and issue a detailed report of findings and proposed mitigation solutions. Methane gas studies: review historical methane data, validate and reconcile datasets, identify gas accumulation zones, baseline and continuous monitoring of methane concentrations in subsurface voids and boreholes, assess migration pathways, evaluate explosion and asphyxiation risks, recommend mitigation measures (controlled venting, gas drainage), and provide a land subsidence and methane emission risk assessment report. Geotechnical investigations: desk study, site walkover, safe working procedure, geotechnical investigations (phases as per key dates), drilling of boreholes, laboratory testing, and contractor's report. Rehabilitation strategy: guidance on feasibility of open-cast mining as a rehabilitation intervention, including technical and economic feasibility, environmental authorisation, highwall stability and geotechnical modelling, and handling of exposed coal. The contract period is 8 months.
Methodology
Source: NEC PSC.pdf (unknown)Period of 8 months
11.2(9) The services are
conducting subsidence investigations at
and around the Vulcan Substation and
adjacent areas to determine the level of
risk of failure NTCSA infrastructure (i.e.
The Employer requires a professionally Geologists (referred to hereafter as the Contractor) to:
2.2.1 Investigation Methodology
2.2.1.1 Desk Study
Experience & Qualifications
Source: NEC PSC.pdf (unknown)2 Name:
Job
Responsibilities:
Only if CV's (and further key persons data including
required CVs) are appended to Tender Schedule
entitled .
11.2(3) The completion date for the whole of the
services is
11.2(10) The following matters will be included in
the Risk Register
2 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 011 803 3009 or www.ecs.co.za
PART C2: PRICING DATA PAGE xviii C2 PSC3/A COVER
NTCSA SOC Ltd CONTRACT NO.
Investigate potential subsurface instability in the vicinity of the ntcsa vulcan substation for a
Period of 8 months
11.2(13) The staff rates are: name/designation rate
Either complete here or cross refer to a schedule
in Part C2.2
25.2 The Employer provides access to the access to access date
following persons, places and things
31.1 The programme identified in the Contract
Data is
50.3 The expenses stated by the Consultant item amount
are
A Priced contract with activity schedule
11.2(14) The activity schedule is in
11.2(18) The tendered total of the Prices is R (in figures)
(in words), excluding VAT
PART C2: PRICING DATA PAGE xix C2 PSC3/A COVER
NTCSA SOC Ltd CONTRACT NO.
Investigate potential subsurface instability in the vicinity of the ntcsa vulcan substation for a
Period of 8 months
Part 2: pricing data
PSC3 Option A
Document Title No of
reference pages
C2.1 Pricing assumptions: Option A [●]
C2.2 The activity schedule [●]
PART C2: PRICING DATA PAGE xx C2 PSC3/A COVER
NTCSA SOC Ltd CONTRACT NO.
Investigate potential subsurface instability in the vicinity of the ntcsa vulcan substation for a
Period of 8 months
C2.1 Pricing assumptions: Option A
How work is priced and assessed for payment
Option A is a lump sum form of contract where the work to be done is broken down into well defined activities
each listed in the activity schedule and priced by the tendering consultant as a lump sum. (See clause
11.2(18)).
Only completed activities which are without Defects are assessed for payment at each assessment date; no
part payment is made if the activity is not completed by the assessment date. (See clause 11.2(15)).
The activity schedule may change after the Contract Date as a result of compensation events. (See clause
11.2(14)).
Function of the Activity Schedule
The Activity Schedule is only a pricing document. Clause 53.1 in Option A states: “Information in the Activity
Schedule is not Scope”. Specifications and descriptions of the service or any constraints on how it is to be
done are included in the Scope and per Clause 21.1, “The Consultant Provides the Services in accordance
with the Scope” and therefore not in accordance with the Activity Schedule.
Link to the programme
Clause 31.4 states that “The Consultant provides information which shows how each activity on the Activity
Schedule relates to the operations on each programme which he submits for acceptance”. Ideally the
tendering consultant will develop a high level programme first then resource each activity on the programme
and thus arrive at the lump sum price for that activity both of which can be entered into the activity schedule.
Preparing the activity schedule
Generally it is the tendering consultant who prepares the activity schedule by breaking down the work
described within the Scope into suitable activities which can be well defined, shown on a programme and
priced as a lump sum.
The description of each activity must be sufficient to determine exactly what work is included within it and to
know when it has been completed.
The Employer, in his Instructions to Tenderers or in a Tender Schedule, may have listed some items that
he requires the Consultant to include in his activity schedule and be priced accordingly.
It is assumed that in preparing his activity schedule the Consultant:
submits for acceptance by the Employer;
and incidental to Providing the Service in accordance with the Scope, as it was at the Contract Date,
as well as correct Defects except correcting a Defect for which the Consultant is not liable;
activities in order to fulfil the obligation to complete the service for the tendered total of the Prices.
quantity, of work within that activity later turns out to be different to that which the Consultant
Part c2: pricing data c2.1 PSC3/A pricing assumptions
NTCSA SOC Ltd CONTRACT NO.
Investigate potential subsurface instability in the vicinity of the ntcsa vulcan substation for a
Period of 8 months
estimated at time of tender. The only basis for a change to the Prices is as a result of a compensation
event.
However, the Consultant does not have to allow in his Prices for matters that may arise as a result of a
compensation event.
Expenses
Expenses are not included in the activity schedule items and are assessed separately at each assessment
date, unless an additional condition of contract (Z clause) is included which requires that expenses be
included within activity Prices and not paid separately.
Expenses associated with employing a staff member in Providing the Services are listed separately either
by the Employer in Contract Data provided by the Employer or by the Consultant in Contract Data provided
by the Consultant. As only the expenses listed may be claimed by the Consultant, all other cost to the
Consultant associated with Providing the Services must be included within the activity schedule prices or
staff rates.
Rate adjustment for inflation of expenses is explained in the PSC3 Guidance Notes.
Staff rates
When a compensation event occurs changes to the affected Activity Schedule item or new priced items in
the Activity Schedule are assessed as the actual Time Charge for work already done and the forecast Time
Charge for work not yet done. (See clause 63.1 and 63.14 in Option A)
The Time Charge is the sum of the products of each of the staff rates multiplied by the total staff time
appropriate to that rate properly spent on work in this contract. (Clause 11.2(13))
Tendering consultants are advised to consult the NEC3 Professional Services Contract Guidance Notes and
Flow Charts before entering staff rates into Contract Data, or in C2.2 below.
This is because staff rates can be established in one of three ways:
Rate adjustment for inflation, if necessary, can be based either on actual salary adjustments or by using
Option X1: Price adjustment for inflation. See pages 13 and 14 in the PSC3 Guidance Notes.
Part c2: pricing data c2.1 PSC3/A pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER
Vulcan sinkhole investigation for north east grid for a period of 8 months
C2.2 the activity schedule
Kindly see attached BOQ for Sinkhole Assessment
Part c3: scope of work 1 c3 psc3 cover page
Part 3: scope of work
Document Title No of
reference pages
This cover
C3.1 Employer’s Scope
C3.2 Consultant’s Scope
Total number of pages
DOCUMENT C2.1 PAGE ii PRICING
Data
NTCSA SOC Ltd CONTRACT NUMBER
Project and contract title
C3.1: Employer’s scope
Contents
When the document is complete, insert a ‘Table of Contents’. To do this go to: Insert, → Reference, → Index
and tables → Table of Contents. Three levels and the title (but not the subtitle) may be shown if the formats
used in this template are retained.
Otherwise insert list of contents manually.
CONTRACT - iii - PSC3 COVER PAGES
NTCSA SOC Ltd CONTRACT NUMBER
Project and contract title
Description of the services
Executive overview
The Vulcan Transmission Substation is located in Emalahleni (Witbank CLN), an area extensively impacted
by historic underground and surface coal mining activities. Decades of bord-and-pillar mining have resulted in
significant underground voids, many of which are unstable or have partially collapsed. In addition, spontaneous
combustion of remnant coal pillars has caused persistent underground fires, leading to thermal fracturing of
the overburden, oxidation of support pillars, and progressive subsidence. These conditions have materially
contributed to the formation and ongoing enlargement of sinkholes in the broader Emalahleni region. The
historical undermining map has been received from the current mine owner and indicates the Arnot Kendal
400kV tower 227 is currently placed on a mine pillar (List of drawings) and indicated the sinkholes North
West of Vulcan substation.
The area under consideration presents a material risk to public safety and to critical national electricity
infrastructure. The Vulcan Transmission Substation, together with the associated 400 kV transmission
infrastructure, is located directly above coal seams affected by historic mining. Progressive subsidence and
underground combustion threaten the structural integrity of the substation and transmission assets. If not
addressed, these risks could result in prolonged operational disruptions, loss of supply to key industrial
customers, significant financial exposure, infrastructure failure, and potential serious injury or loss of life.
No details are available on the depth and details of the historically undermined area therefore the extent of the
risk to the powerline structures cannot be fully established. Numerous factors can contribute to spontaneous
combustion, such as a substantial electrical short beneath the surface or soil composition containing easily
combustible materials. Hence the Employer intends to investigate as subsidence at Vulcan substation and
adjacent areas caused by spontaneous combustion, to define the severity of the risk to NTCSA infrastructure.
Interpretation and terminology:
Construction work - The erection, maintenance, alteration, renovation, repair, demolition or dismantling of or
addition to a building or any similar structure. The installation, erection, dismantling or maintenance of a fixed
plant where such work includes the risk of a person falling. The construction, maintenance, demolition or
dismantling of any bridge, dam, canal, road, railway, runway, sewer or water reticulation system or any similar
civil engineering structure
Contractor- An employer who performs scope of work and includes principal contractors
Professionally registered Geologist- Professional Geologist is a licensed geoscientist qualified to provide
geological services that impact public safety, environmental health, and engineering project registered with
SACNASP (South African Council for Natural Scientist Professions).
The following abbreviations are used in this Scope:
Abbreviation Meaning given to the abbreviation
CFT Cross Functional Team
NTCSA National Transmission Company South Africa
NEG North East Grid
OHS Act Occupational Health and Safety Act
ORHVS Operating Regulations for High Voltage Systems
PPE Personal Protective Equipment
SACNASP South African Council for Natural Scientist Professions
SANAS South African National Accreditation System
SANS South African National Standards
SHEQ Safety Health Environment and Quality
CONTRACT - iv - PSC3 COVER PAGES
NTCSA SOC Ltd CONTRACT NUMBER
Project and contract title
SOW Scope of Work
SWP Safe Work Procedure
Specification and description of the services
The Employer requires a professionally Geologists (referred to hereafter as the Contractor) to:
Vulcan Substation and adjacent areas to determine the level of risk of failure NTCSA infrastructure
(i.e. Vulcan substation and Arnot Kendal tower 227), refer to figures 1 and 2(List of drawings)
defined in bullet above.
risk/s
Stage 1 Preparation
1.1 Site walkover
The Contractor (and all necessary team members/sub-contractors):
conduct a site walkover of the impacted area/s,
identifies areas of notable ground features and contributing environmental factors,
identifies areas of notable adjacent and bisecting infrastructure,
makes notes and observations to ensure that the works are not encumbered by the overall site
conditions,
ensures works take into consideration the necessary safety considerations for the stability of the area.
1.2 Safe working procedure
The Contractor produces a Safe Work Procedure (SWP) prior to commencement of any works on site. The
SWP outlines the tasks to be conducted during fieldworks and elaborates on how the tasks will be conducted
safely. The SWP is reviewed and accepted by the Employer prior to commencement of site works..
Stage 2 Concept
2.1 Geotechnical investigation and methane gas studies
The scope of the investigation will depend upon the size of the proposed investigation area (local or
regional). For illustration purposes, we used the polygon highlighted in red in Figure 2 of the approximately
17ha Vulcan Substation area of interest (AOI) near Witbank in Mpumalanga Province.
2.1.1 Subsurface assessment by non-invasive methods
The non-invasive methods include airborne monitoring (Thermal Imagery) and ground geophysics:
a) Thermal Imaging with a drone: Conduct a thorough thermal scanning survey encompassing the
complete specified perimeter and internal infrastructure of the substation. The supplier is expected to identify
and document all thermal anomalies or hotspot, providing detailed reports including location, severity, and
potential implications.
b) 2D Electrical Resistivity Tomography (ERT): Utilized to identify electrical anomalies in the soil that
could be potential sources of combustion. Resistivity anomalies are contingent on the soil composition, with
dry materials likely exhibiting high resistivity anomalies compared to the host rock. An example of a singleframe thermal image is shown below in Figure 3.
CONTRACT - v - PSC3 COVER PAGES
NTCSA SOC Ltd CONTRACT NUMBER
Project and contract title
c) Microgravity Surveys: Applied to map density variations in subsurface formations. Areas with
combustible materials are anticipated to display low-density anomalies in contrast to the host rock. An
example of a single-frame thermal image is shown below in Figure 4.
Figure 3. Example of an electrical resistivity section displaying the sub-surface geology along a
traverse line to a maximum depth of 80 m
CONTRACT - vi - PSC3 COVER PAGES
NTCSA SOC Ltd CONTRACT NUMBER
Project and contract title
Figure 4. Example of a gravity residual Bouguer anomaly map showing inferred features.
d) Multichannel Analysis of Surface Waves (MASW): This geophysical method maps velocity variations in
surface wave propagation, reflecting density distribution within the host rock mass. Areas with combustible
materials may exhibit reduced surface wave velocity anomalies due to density changes. An example of a single
frame thermal image is shown below in Figure 5
Figure 5. Example of a derived 3D geological model map showing inferred features..
CONTRACT - vii - PSC3 COVER PAGES
NTCSA SOC Ltd CONTRACT NUMBER
Project and contract title
2.1.2 Methane Gas Studies
Provision of detailed methane gas monitoring and assessment to evaluate the presence,
concentration, and migration of methane within and surrounding the affected mining areas, including:
a) Compilation and review of historical methane gas data from previous investigations, including borehole
gas readings, mine ventilation records, and any prior gas monitoring studies conducted within the affected
mining blocks.
b) Validation and reconciliation of historical datasets with current site conditions to identify trends, data
gaps, and potential changes in methane migration behaviour over time.
may approach explosive limits
c) Baseline and continuous monitoring of methane concentrations in subsurface voids, boreholes, and at
surface interfaces; for methane gas release (ventilation)
may facilitate gas movement toward surface or infrastructure.
d) Evaluation of explosion and asphyxiation risks in relation to Eskom NTCSA infrastructure and
surrounding communities.
systems, and monitoring protocols to ensure ongoing safety and regulatory compliance.
f) Rehabilitation Strategy
during rehabilitation
2.2 Geotechnical Investigations
The primary objective of a preliminary investigation is to assess the soil and rock profile for the stratigraphical
study purposes
The following specific items should be dealt with in the investigation:
Seismic assessment and classification of the site
2.2.1 Investigation Methodology
2.2.1.1 Desk Study
Review of existing regional, site and surface information. Sources of information should include:
drainage channels and erosion features of the site.
the proposed site.
2.2.1.2 Scanning for underground services
CONTRACT - viii - PSC3 COVER PAGES
Qualifications:
Experience:
2 Name:
Qualifications:
Experience:
Only if CV's (and further key persons data including
required CVs) are appended to Tender Schedule
entitled .
11.2(3) The completion date for the whole of the
services is
11.2(10) The following matters will be included in
the Risk Register
2 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 011 803 3009 or www.ecs.co.za
PART C2: PRICING DATA PAGE xviii C2 PSC3/A COVER
Quality Management
Source: NEC PSC.pdf (unknown)Period of 8 months
3 (Phase 2) Geotechnical 8 weeks after
Investigations phase 1
completion
4 (Phase 3) Drilling of 8 weeks after
boreholes phase 2
completion
Laboratory Testing 4 weeks
Contractors report 2 weeks
31.1 The Consultant is to submit a first
programme for acceptance within Two weeks of the Contract Date.
32.2 The Consultant submits revised
programmes at intervals no longer than As and when required
occupational hygiene inspection body, i.e. a SANAS accredited and Department of
Pricing Schedule
Source: NEC PSC.pdf (unknown)(Reg No. 2021/539129/30)
and [Insert at award stage]
(Reg No. )
for INVESTIGATE POTENTIAL SUBSURFACE INSTABILITY IN THE VICINITY OF
The ntcsa vulcan substation for a period of 8 months
Contents: No of
pages
Part C1 Agreements & Contract Data [●]
Part C2 Pricing Data [●]
Part C3 Scope of Work: The Scope [●]
CONTRACT No. [Insert at award stage]
DOCUMENT C2.1 PAGE i PRICING
pages
C1.1 Form of Offer & Acceptance [●]
[to be inserted from Returnable Documents at award stage]
C1.2a Contract Data provided by the Employer [●]
C1.2b Contract Data provided by the Consultant [●]
[to be inserted from Returnable Documents at award stage]
C1.3 Securities proforma [●]
PART C2: PRICING DATA PAGE ii C2 PSC3/A COVER
signature of Date
witness
PART C2: PRICING DATA PAGE iii C2 PSC3/A COVER
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: The Scope
and drawings and documents (or parts thereof), which may be incorporated by reference into the above listed
PART C2: PRICING DATA PAGE v C2 PSC3/A COVER
Tel No. [●]
Fax No. [●]
1 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 011 803 3009 and www.ecs.co.za
PART C2: PRICING DATA PAGE vi C2 PSC3/A COVER
caption “Money Rates” in The Wall Street Journal
for the applicable currency or if no rate is quoted
for the currency in question then the rate for
it shall not be necessary to prove
PART C2: PRICING DATA PAGE viii C2 PSC3/A COVER
Arbitrators (Southern Africa) or its successor
body.
The place where arbitration is to be held is [●] South Africa
PART C2: PRICING DATA PAGE ix C2 PSC3/A COVER
appropriate action to prevent or remedy the situation, without limiting any other rights or
remedies the Employer has. It is not required that the Committing Party had to have been
PART C2: PRICING DATA PAGE xiii C2 PSC3/A COVER
PART C2: PRICING DATA PAGE xv C2 PSC3/A COVER
Period of 8 months
11.2(13) The staff rates are: name/designation rate
11.2(14) The activity schedule is in
11.2(18) The tendered total of the Prices is R (in figures)
(in words), excluding VAT
PART C2: PRICING DATA PAGE xix C2 PSC3/A COVER
Period of 8 months
Part 2: pricing data
PSC3 Option A
reference pages
C2.1 Pricing assumptions: Option A [●]
C2.2 The activity schedule [●]
PART C2: PRICING DATA PAGE xx C2 PSC3/A COVER
Period of 8 months
C2.1 Pricing assumptions: Option A
The Activity Schedule is only a pricing document. Clause 53.1 in Option A states: “Information in the Activity
Schedule is not Scope”. Specifications and descriptions of the service or any constraints on how it is to be
done are included in the Scope and per Clause 21.1, “The Consultant Provides the Services in accordance
with the Scope” and therefore not in accordance with the Activity Schedule.
submits for acceptance by the Employer;
and incidental to Providing the Service in accordance with the Scope, as it was at the Contract Date,
as well as correct Defects except correcting a Defect for which the Consultant is not liable;
activities in order to fulfil the obligation to complete the service for the tendered total of the Prices.
quantity, of work within that activity later turns out to be different to that which the Consultant
Part c2: pricing data c2.1 PSC3/A pricing assumptions
staff rates.
Rate adjustment for inflation of expenses is explained in the PSC3 Guidance Notes.
appropriate to that rate properly spent on work in this contract. (Clause 11.2(13))
Tendering consultants are advised to consult the NEC3 Professional Services Contract Guidance Notes and
Flow Charts before entering staff rates into Contract Data, or in C2.2 below.
Option X1: Price adjustment for inflation. See pages 13 and 14 in the PSC3 Guidance Notes.
Part c2: pricing data c2.1 PSC3/A pricing assumptions
DOCUMENT C2.1 PAGE ii PRICING
Financial Requirements
Source: NEC PSC.pdf (unknown)Pricing: NEC3 PSC3 Option A — lump sum priced contract with activity schedule. The tenderer must complete the activity schedule (C2.2) with lump sum prices for each activity, and provide staff rates in Contract Data. The offered total of the Prices must be stated exclusive of VAT, with VAT at 15% added, and the total inclusive of VAT. Payment: assessments between the 25th day of each successive month; payments made within 4 weeks. Interest on late payments at the prime rate of Standard Bank (for ZAR) or LIBOR (for other currencies). Expenses are not included in activity schedule items and are assessed separately unless a Z-clause requires inclusion. Delay damages: 2% of contract value per day, capped at 10% of contract cost, for each of the five activities (geotechnical investigation and methane gas studies, geotechnical investigations report, drilling of boreholes, laboratory test and report, contractor's report). The Consultant's total liability to the Employer is limited to the total of the Prices. Liability for indirect or consequential loss is limited to R0.00. Liability for defects found after the defects date is limited to the total of the Prices. End of liability date is 5 years after Completion.
Compliance Requirements
Source: NEC PSC.pdf (unknown)The tenderer must be a professionally registered geologist with SACNASP (South African Council for Natural Scientist Professions). The contract requires compliance with the NEC3 Professional Services Contract (April 2013) and its Z-clauses. B-BBEE: any change in B-BBEE status must be notified to the Employer within 7 days, with an updated verification certificate within 30 days; a decrease in status may lead to renegotiation or termination. Insurance: the Consultant must provide professional indemnity insurance (as deemed necessary), public liability, and employer's liability as per Insurance Table A; the Employer provides assets all risk, contract works, environmental liability, general and public liability, transportation, motor fleet, terrorism, cyber liability, and nuclear-related insurances as per Insurance Table B. Asbestos: the Consultant must comply with the Employer's Asbestos Standard 32-303 and the Asbestos Regulations under the OHS Act; personnel may stop work if asbestos is identified. Ethics: no coercive, collusive, corrupt, fraudulent, or obstructive actions are permitted; breach may lead to termination. Joint ventures: if the Consultant is a JV, all parties are jointly and severally liable; the key person with authority to bind must be notified within 2 weeks of the Contract Date. Cession, delegation, or assignment requires the Employer's written consent. Confidentiality: the Consultant must not disclose information arising from the contract; images of the Employer's project works require prior written consent.
Health & Safety
Source: NEC PSC.pdf (unknown)signature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and Acceptance.
PART C2: PRICING DATA PAGE iv C2 PSC3/A COVER
227), refer to SOW (List of drawings)
its impacts to other critical infrastructure
in the area as defined in bullet above.
finding and proposed solutions to mitigate
the potential risk/s
11.2(10) The following matters will be included in the 1. Site access issues
Risk Register 2. Rainy weather conditions
11.2(11) The Scope is in Part 3: Scope of Work
12.2 The law of the contract is the law of the Republic of South Africa
13.1 The language of this contract is English
13.3 The period for reply is 5 working days
13.6 The period for retention is Three months (3) following Completion or earlier
termination.
2 The Parties’ main responsibilities
25.2 The Employer provides access to the access to access date
following persons, places and things
1 Vulcan Site (Kendal) After contract
award
2 Eskom Park (Induction) After safety file
approval
31.2 The starting date is. TBC
11.2(3) The completion date for the whole of the
services is. TBC
11.2(6) The key dates and the conditions to be met Condition to be met key date
are:
contract award
2 (Phase 1) Geotechnical 2 weeks after
investigation and methane safety file
gas studies approval
PART C2: PRICING DATA PAGE vii C2 PSC3/A COVER
clauses
X7 Delay damages
X7.1 Delay damages for late Completion of the 2% of contract value capped at 10% of the
whole of the services are contract cost for each activity listed below.
section Activity/Services amount per day
1 Geotechnical 2% of contract
investigation and value capped at
methane gas studies 10%
(invasive and non-
invasive methods)
report submission as
per accepted
program
2 Geotechnical 2% of contract
submission as per 10%
accepted program
3 Drilling of boreholes 2% of contract
report submission as value capped at
per accepted 10%
program
4 Laboratory test and 2% of contract
report submitted as value capped at
per the accepted 10%
program
5 Contractors report as 2% of contract
per accepted value capped at
program 10%
X9 Transfer of rights There is no reference to Contract Data in this
images vests exclusively in the Employer.
Z5 Waiver and estoppel: Add to core clause 12.3:
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
the regulations published in GNR February 2002, under the Occupational Health
and Safety Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2
regulated asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous
period of four hours, and the short term exposure limit of 0.6 regulated asbestos fibres per
millilitre of air as a 10-minute TWA, averaged over any 10 minutes, measured in accordance
with HSG248 and monitored according to HSG173 and OESSM.
Z14.2 Upon written request by the Consultant, the Employer certifies that these conditions prevail.
and related control measures at the Consultant’s expense. For the purposes of compliance
the results generated from Parallel Measurements are evaluated only against South African
statutory limits as detailed in clause Z14.1. Control measures conform to the requirements
stipulated in the AAIA-approved asbestos work plan.
Z14.3 The Employer manages asbestos and ACM according to the Standard.
Z14.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration
of above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
PART C2: PRICING DATA PAGE xvi C2 PSC3/A COVER
emergency asbestos work plan, if applicable.
Z14.6 The Consultant continues to Provide the Services, without additional control measures
presented, on presentation of Safe Levels. The contractually agreed dates to Provide the
risk to the powerline structures cannot be fully established. Numerous factors can contribute to spontaneous
combustion, such as a substantial electrical short beneath the surface or soil composition containing easily
combustible materials. Hence the Employer intends to investigate as subsidence at Vulcan substation and
adjacent areas caused by spontaneous combustion, to define the severity of the risk to NTCSA infrastructure.
geological services that impact public safety, environmental health, and engineering project registered with
SACNASP (South African Council for Natural Scientist Professions).
(i.e. Vulcan substation and Arnot Kendal tower 227), refer to figures 1 and 2(List of drawings)
defined in bullet above.
risk/s
Stage 1 Preparation
1.1 Site walkover
The Contractor (and all necessary team members/sub-contractors):
conduct a site walkover of the impacted area/s,
identifies areas of notable ground features and contributing environmental factors,
identifies areas of notable adjacent and bisecting infrastructure,
makes notes and observations to ensure that the works are not encumbered by the overall site
conditions,
ensures works take into consideration the necessary safety considerations for the stability of the area.
1.2 Safe working procedure
The Contractor produces a Safe Work Procedure (SWP) prior to commencement of any works on site. The
Environmental
Source: NEC PSC.pdf (unknown)dates are extended by the notification periods required by regulations 3 and 21 of the
Asbestos Regulations, 2001.
Z14.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
PART C2: PRICING DATA PAGE xvii C2 PSC3/A COVER
concentration, and migration of methane within and surrounding the affected mining areas, including:
a) Compilation and review of historical methane gas data from previous investigations, including borehole
gas readings, mine ventilation records, and any prior gas monitoring studies conducted within the affected
mining blocks.
b) Validation and reconciliation of historical datasets with current site conditions to identify trends, data
gaps, and potential changes in methane migration behaviour over time.
may approach explosive limits
c) Baseline and continuous monitoring of methane concentrations in subsurface voids, boreholes, and at
surface interfaces; for methane gas release (ventilation)
may facilitate gas movement toward surface or infrastructure.
d) Evaluation of explosion and asphyxiation risks in relation to Eskom NTCSA infrastructure and
surrounding communities.
systems, and monitoring protocols to ensure ongoing safety and regulatory compliance.
f) Rehabilitation Strategy
during rehabilitation
2.2 Geotechnical Investigations
Contractual Terms
Source: NEC PSC.pdf (unknown)Liability of the Consultant for claims made Whatever the Consultant From the starting
against him arising out of his failure to deems necessary in date until the earlier
use the skill and care normally used by respect of each claim, of Completion and
professionals providing services similar to without limit to the number the date of the
the services of claims. termination
certificate.
Liability for death of or bodily injury to a Loss of or damage to From the starting
person (not an employee of the property: date until the earlier
Consultant) or loss of or damage to The replacement cost of Completion and
property resulting from an action or failure where not covered by the the date of the
to take action by the Consultant Employer’s insurance termination
certificate.
The Employer’s policy
deductible, as at Contract
Date, where covered by
the Employer’s insurance
Bodily injury to or death
of a person:
The amount required by
the applicable law.
Liability for death of or bodily injury to The amount required by From the starting
employees of the Consultant arising out the applicable law date until the earlier
of and in the course of their employment of Completion and
in connection with this contract the date of the
certificate.
81.3 The Employer provides the insurances stated in the Insurance Table B.
PART C2: PRICING DATA PAGE xiv C2 PSC3/A COVER
NTCSA SOC Ltd CONTRACT NO.
Investigate potential subsurface instability in the vicinity of the ntcsa vulcan substation for a
Period of 8 months
Insurance table b
Insurance against or name Minimum amount of cover or minimum limit of indemnity
of policy
Assets All Risk Per the insurance policy document
Contract Works insurance Per the insurance policy document
Environmental Liability Per the insurance policy document
General and Public Liability Per the insurance policy document
Transportation (Marine) Per the insurance policy document
Motor Fleet and Mobile Plant Per the insurance policy document
Terrorism Per the insurance policy document
Cyber Liability Per the insurance policy document
Nuclear Material Damage and Per the insurance policy document
Business Interruption
Nuclear Material Damage Per the insurance policy document
Terrorism
Z13 Nuclear Liability
Z13.1 The Employer is the operator of the Koeberg Nuclear Power Station (KNPS), a nuclear
installation, as designated by the National Nuclear Regulator of the Republic of South Africa,
and is the holder of a nuclear licence in respect of the KNPS.
Z13.2 The Employer is solely responsible for and indemnifies the Consultant or any other person
against any and all liabilities which the Consultant or any person may incur arising out of or
resulting from nuclear damage, as defined in Act , save to the extent that any
liabilities are incurred due to the unlawful intent of the Consultant or any other person or the
presence of the Consultant or that person or any property of the Consultant or such person at
or in the KNPS or on the KNPS site, without the permission of the Employer or of a person
acting on behalf of the Employer.
Z13.3 Subject to clause Z13.4 below, the Employer waives all rights of recourse, arising from the
aforesaid, save to the extent that any claims arise or liability is incurred due or attributable to
the unlawful intent of the Consultant or any other person, or the presence of the Consultant or
that person or any property of the Consultant or such person at or in the KNPS or on the
KNPS site, without the permission of the Employer or of a person acting on behalf of the
Employer.
Z13.4 The Employer does not waive its rights provided for in section 30 (7) of Act , or any
replacement section dealing with the same subject matter.
Z13.5 The protection afforded by the provisions hereof shall be in effect until the KNPS is
decommissioned.
Z14 Asbestos
For the purposes of this Z-clause, the following definitions apply:
AAIA means approved asbestos inspection authority.
PART C2: PRICING DATA PAGE xv C2 PSC3/A COVER
NTCSA SOC Ltd CONTRACT NO.
Investigate potential subsurface instability in the vicinity of the ntcsa vulcan substation for a
Period of 8 months
ACM means asbestos containing materials.
AL means action level, i.e. a level of 50% of the OEL, i.e. 0.1 regulated asbestos
fibres per ml of air measured over a 4 hour period. The value at which proactive
actions is required in order to control asbestos exposure to prevent exceeding the
Oel.
Ambient Air means breathable air in area of work with specific reference to breathing zone,
which is defined to be a virtual area within a radius of approximately 30cm from the
nose inlet.
Compliance means compliance sampling used to assess whether or not the personal exposure
Monitoring of workers to regulated asbestos fibres is in compliance with the Standard’s
requirements for safe processing, handling, storing, disposal and phase-out of
asbestos and asbestos containing material, equipment and articles.
OEL means occupational exposure limit.
Parallel means measurements performed in parallel, yet separately, to existing
Measurements measurements to verify validity of results.
Safe Levels means airborne asbestos exposure levels conforming to the Standard’s
requirements for safe processing, handling, storing, disposal and phase-out of
asbestos and asbestos containing material, equipment and articles.
Standard means the Employer’s Asbestos Standard 32-303: Requirements for Safe
Processing, Handling, Storing, Disposal and Phase-out of Asbestos and Asbestos
Containing Material, Equipment and Articles.
SANAS means the South African National Accreditation System.
TWA means the average exposure, within a given workplace, to airborne asbestos
fibres, normalised to the baseline of a 4 hour continuous period, also applicable to
short term exposures, i.e. 10-minute TWA.
Z14.1 The Employer ensures that the Ambient Air in the area where the Consultant will Provide the
Services conforms to the acceptable prescribed South African standard for asbestos, as per
the regulations published in GNR February 2002, under the Occupational Health
and Safety Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2
regulated asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous
period of four hours, and the short term exposure limit of 0.6 regulated asbestos fibres per
millilitre of air as a 10-minute TWA, averaged over any 10 minutes, measured in accordance
with HSG248 and monitored according to HSG173 and OESSM.
Z14.2 Upon written request by the Consultant, the Employer certifies that these conditions prevail.
All measurements and reporting are effected by an independent, competent, and certified
occupational hygiene inspection body, i.e. a SANAS accredited and Department of
Employment and Labour approved AAIA. The Consultant may perform Parallel Measurements
and related control measures at the Consultant’s expense. For the purposes of compliance
the results generated from Parallel Measurements are evaluated only against South African
statutory limits as detailed in clause Z14.1. Control measures conform to the requirements
stipulated in the AAIA-approved asbestos work plan.
Z14.3 The Employer manages asbestos and ACM according to the Standard.
Z14.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration
of above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
PART C2: PRICING DATA PAGE xvi C2 PSC3/A COVER
NTCSA SOC Ltd CONTRACT NO.
Investigate potential subsurface instability in the vicinity of the ntcsa vulcan substation for a
Period of 8 months
Z14.5 The Consultant’s personnel are entitled to stop working and leave the contaminated area
forthwith until such time that the area of concern is declared safe by either Compliance
Monitoring or an AAIA approved control measure intervention, for example, per the
emergency asbestos work plan, if applicable.
Z14.6 The Consultant continues to Provide the Services, without additional control measures
presented, on presentation of Safe Levels. The contractually agreed dates to Provide the
Services, including the Completion Date, are adjusted accordingly. The contractually agreed
dates are extended by the notification periods required by regulations 3 and 21 of the
Asbestos Regulations, 2001.
Z14.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
PART C2: PRICING DATA PAGE xvii C2 PSC3/A COVER
NTCSA SOC Ltd CONTRACT NO.
Investigate potential subsurface instability in the vicinity of the ntcsa vulcan substation for a
Period of 8 months
C1.2 Contract Data
Part two - Data provided by the Consultant
[Instructions to the tendering consultant: (delete these notes in the final draft of a contract)
2013 and the relevant parts of its Guidance Notes (PSC3-GN)2 in order to understand the
implications of this Data which the tenderer is required to complete. An example of the completed
Data is provided on pages 158 & 159 of the PSC3 April 2013 Guidance Notes.
each statement however other clauses may also use the same data.
be required in relation to the option selected. The Employer should already have made the selection
and deleted the rows not required.
Completion of the data in full, according to Options chosen, is essential to create a complete contract.
Clause Statement Data
10.1 The Consultant is (Name):
Address
Tel No.
Fax No.
22.1 The key people are:
1 Name:
Job:
Responsibilities:
of Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
clauses and the clauses for main Option
A: Priced contract with activity schedule
dispute resolution Option W1: Dispute resolution procedure
and secondary Options
X7: Delay damages
X9: Transfer of rights
X10 Employer’s Agent
X18: Limitation of liability
Z: Additional conditions of contract
of the NEC3 Professional Services Contract
(April 2013)1
10.1 The Employer is (Name): NTCSA SOC Ltd (reg no: 2021/539129/30), a state
owned company incorporated in terms of the
company laws of the Republic of South Africa
in The Wall Street Journal then the rate as quoted
by the Reuters Monitor Money Rates Service (or
such service as may replace the Reuters Monitor
Money Rates Service) on the due date for the
payment in question, adjusted mutatis mutandis
every 6 months thereafter and as certified, in the
event of any dispute, by any manager employed in
the foreign exchange department of The Standard
section of the core clauses and terms in italics
used in this section are identified elsewhere in
this Contract Data.
82.1 The Consultant’s total liability to the The total of the Prices
dispute to him. (see www.ice-sa.org.za). If the
Period of 8 months
The authority of the Employer’s Agent is Acts for the Employer for all purposes of this
contract
X18 Limitation of liability
X18.1 The Consultant’s liability to the Employer for R0.00 (Zero Rand)
indirect or consequential loss is limited to:
X18.2 The Consultant’s liability to the Employer for The total of the Prices
defects date is limited to:
X18.3 The end of liability date is five years after Completion of the whole of the
services/task order.
Period of 8 months
Z3.4 Failure by the Consultant to notify the Employer of a change in its B-BBEE status may constitute
a reason for termination. If the Employer terminates in terms of this clause, the procedures on
termination are those stated in core clause 91. The payment on termination includes a deduction
of the forecast of the additional cost to the Employer of completing the whole of the services in
addition to the amounts due in terms of core clause 92.1.
Z4 Confidentiality
Z4.1 The Consultant does not disclose or make any information arising from or in connection with this
contract available to Others. This undertaking does not, however, apply to information which at
the time of disclosure or thereafter, without default on the part of the Consultant, enters the public
domain or to information which was already in the possession of the Consultant at the time of
disclosure (evidenced by written records in existence at that time). Should the Consultant
disclose information to Others in terms of clause 23.1, the Consultant ensures that the provisions
of this clause are complied with by the recipient.
Z4.2 If the Consultant is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Employer.
Z4.3 In the event that the Consultant is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Consultant, to the extent permitted by law prior to
disclosure, notifies the Employer so that an appropriate protection order and/or any other action
can be taken if possible, prior to any disclosure. In the event that such protective order is not, or
cannot, be obtained, then the Consultant may disclose that portion of the information which it is
required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z4.4 The taking of images (whether photographs, video footage or otherwise) of the Employer’s
project works or any portion thereof, in the course of Providing the Services and after
estoppel unless the Parties agree otherwise and confirm such agreement in writing.
Z6 Provision of a Tax Invoice. Add to core clause 51
Z6.1 The Consultant (if registered in South Africa in terms of the companies Act) is required to comply
with the requirements of the Value Added Tax Act, no (as amended) and to include
the Employer’s VAT number 4710303126 on each invoice he submits for payment.
Z7 Notifying compensation events
Z7.1 Delete from the last sentence in core clause 61.3, “unless the Employer should have notified the
event to the Consultant but did not”.
Z8 Employer’s limitation of liability
Z8.1 The Employer’s liability to the Consultant for the Consultant’s indirect or consequential loss is
limited to R0.00 (zero Rand)
PART C2: PRICING DATA PAGE xii C2 PSC3/A COVER
Period of 8 months
Termination: Add to core clause 90.1, at the second main bullet point, fourth sub-bullet
Z9
point, after the words "against it":
Z9.1 or had a business rescue order granted against it.
Z10 Delay damages: Addition to secondary Option X7 Delay damages (if applicable in this
contract)
Z10.1 If the Consultant’s payment of delay damages reaches the limits stated in this Contract Data for
Option X7 or Options X5 and X7 used together, the Employer may terminate the Consultant’s
obligation to Provide the Services.
Z10.2 If the Employer terminates in terms of this clause, the procedures on termination are those stated
in core clause 91. The payment on termination includes a deduction of the forecast of the
additional cost to the Employer of completing the whole of the services in addition to the amounts
due in terms of core clause 92.1.
Z11 Ethics
Period of 8 months
found guilty, in court or in any other similar process, of such Prohibited Action before the
Employer can terminate the Consultant’s obligation to Provide the Services for this reason.
Z11.3 If the Employer terminates the Consultant’s obligation to Provide the Services for this reason,
the amounts due on termination are those intended in core clauses 92.1 and 92.2.
Z11.4 A Committing Party co-operates fully with any investigation pursuant to alleged Prohibited
Z12 Insurance
Z12.1 Replace core clause 81 with the following:
81.1 When requested by a Party, the other Party provides certificates from his insurer or broker stating
that the insurances required by this contract are in force.
81.2 The Consultant provides the insurances stated in the Insurance Table A from the starting date
until the earlier of Completion and the date of the termination certificate.
whole of the
services or earlier
termination
against him arising out of his failure to deems necessary in date until the earlier
use the skill and care normally used by respect of each claim, of Completion and
professionals providing services similar to without limit to the number the date of the
the services of claims. termination
certificate.
person (not an employee of the property: date until the earlier
Consultant) or loss of or damage to The replacement cost of Completion and
property resulting from an action or failure where not covered by the the date of the
to take action by the Consultant Employer’s insurance termination
certificate.
The Employer’s policy
deductible, as at Contract
the Employer’s insurance
employees of the Consultant arising out the applicable law date until the earlier
of and in the course of their employment of Completion and
in connection with this contract the date of the
termination
certificate.
81.3 The Employer provides the insurances stated in the Insurance Table B.
PART C2: PRICING DATA PAGE xiv C2 PSC3/A COVER
Transportation (Marine) Per the insurance policy document
Z13 Nuclear Liability
Z13.1 The Employer is the operator of the Koeberg Nuclear Power Station (KNPS), a nuclear
installation, as designated by the National Nuclear Regulator of the Republic of South Africa,
and is the holder of a nuclear licence in respect of the KNPS.
Z13.2 The Employer is solely responsible for and indemnifies the Consultant or any other person
against any and all liabilities which the Consultant or any person may incur arising out of or
resulting from nuclear damage, as defined in Act , save to the extent that any
liabilities are incurred due to the unlawful intent of the Consultant or any other person or the
presence of the Consultant or that person or any property of the Consultant or such person at
or in the KNPS or on the KNPS site, without the permission of the Employer or of a person
acting on behalf of the Employer.
Z13.3 Subject to clause Z13.4 below, the Employer waives all rights of recourse, arising from the
aforesaid, save to the extent that any claims arise or liability is incurred due or attributable to
the unlawful intent of the Consultant or any other person, or the presence of the Consultant or
that person or any property of the Consultant or such person at or in the KNPS or on the
Submission Guidelines
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)The provided document is a method statement template, not the full tender pack. It contains no submission instructions, closing address, format requirements, or disqualification rules. Bidders must obtain the complete RFQ/tender document from Eskom for submission details.
Evaluation Criteria
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)The provided document is a method statement template, not the full tender pack. It contains no evaluation criteria, scoring split, preference point system, minimum qualifying thresholds, or evaluation stages. Bidders must obtain the complete RFQ/tender document from Eskom for evaluation details.
Technical Specifications
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)The method statement template requires bidders to address the following when preparing their submission:
Compliance Requirements
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)The provided document is a method statement template and does not state any compliance requirements such as CSD registration, tax clearance, B-BBEE level, CIDB grading, professional registrations, or local content. Bidders must obtain the complete RFQ/tender document from Eskom for compliance details.
Description
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)The tender seeks professional services to investigate potential subsurface instability near the NTCSA Vulcan Substation. Bidders must demonstrate a documented quality management system aligned to ISO 9001:2015 and submit specific quality deliverables including a method statement, quality policy, quality objectives, organisational responsibility matrix, external provider control procedures, and a signed Form A.
Contact Information
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)Eskom representative: Siyabulela Nciweni. Date issued: 01-Jul-26. No SCM or technical contact details, email, phone, or submission address are provided in the document.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)Returnable documents required:
All returnables must be submitted with the tender; omission of any listed item may lead to disqualification.
Returnable Documents
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)Mandatory returnables:
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)Quality evaluation is scored across three sections:
Overall quality score = 7 points. No price/functionality split, preference point system, or minimum qualifying threshold is stated in the provided document.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)Scope: Provide professional services to investigate potential subsurface instability in the vicinity of the NTCSA Vulcan Substation.
Quality deliverables required:
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)Quality management system must comply with ISO 9001:2015 (certification not mandatory; documented QMS that meets the standard is acceptable).
Mandatory returnable documents as listed in submissionGuidelines.
No CSD registration, tax compliance, B-BBEE, CIDB, CIPC, professional registration, or local-content requirements are mentioned in the provided document.
Requirements
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)Bidders must meet the following requirements:
Section
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)Quality evaluation uses a 7-point scoring model across three sections:
Each indicator scores 1 point if compliant. No minimum threshold or price/functionality weighting is specified.
Submission Guidelines
Source: Annexure B-to be completed and signed.pdf (unknown)Returnable documents: completed and signed Annexure B — Acknowledgement Form for Eskom OHS Legal and Other Requirements (Eskom Identifier 240-43921804 Rev 5). The form must be signed by an authorised person (CEO, Director or Managing Director) and witnessed by two witnesses. No other submission instructions, closing details or delivery address are provided in this document.
Evaluation Criteria
Source: Annexure B-to be completed and signed.pdf (unknown)Bidders must sign the Acknowledgement Form for Eskom OHS legal and other requirements (Annexure B, Eskom Identifier 240-43921804 Rev 5). No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: Annexure B-to be completed and signed.pdf (unknown)Professional services to investigate potential subsurface instability in the vicinity of the NTCSA Vulcan Substation. The main contractor must demonstrate the process and selection criteria used when appointing subcontractors or suppliers, notify Eskom before appointing them, ensure they have adequate resources and competencies, and remain accountable for their OHS compliance. The main contractor must monitor subcontractors through audits and assessments, define grounds for termination of subcontractor work, and manage all non-conformances through performance and penalty processes. Eskom reserves the right to verify subcontractor management and may request testimonials, references and client contact details for similar previous work.
Compliance Requirements
Source: Annexure B-to be completed and signed.pdf (unknown)Mandatory compliance with: Eskom Contractor Health and Safety Requirements Standard 32-136; project-specific OHS specification/requirements; Occupational Health and Safety Act (Act 85 of 1993); Compensation for Occupational Injuries and Diseases Act (Act 130 of 1993). After contract award, the supplier must fully align its processes to Eskom's OHS requirements (policies, procedures, standards). Penalties apply to the main supplier for any non-conformance with Eskom or statutory OHS requirements by the main supplier, its contractors or suppliers. All employees (including contractors and suppliers) must undergo the relevant Eskom induction and the company's own induction. Signed acknowledgement of understanding and acceptance of these requirements (Annexure B) is required.
Health & Safety
Source: Annexure B-to be completed and signed.pdf (unknown)OHS legal and other requirements (Annexure B, Eskom Identifier 240-43921804 Rev 5, effective May 2021):
Contractual Terms
Source: Annexure B-to be completed and signed.pdf (unknown)Main contractor obligations for subcontractor management:
Description
Source: NTCSA Supplier Declaration of Interest.docx (unknown)The document is a supplier declaration of interest form for NTCSA procurement. It requires the signatory to certify under oath that the information provided is true and correct. NTCSA reserves the right to take action against the supplier or the signatory if the declaration proves false. The form defines key terms: private work, commercial activity, close family, associate, participation in the procurement process, and business courtesy. It also requires disclosure of any other services the supplier is currently rendering to NTCSA business units, subsidiaries, suppliers of primary energy or strategic commodities, and key industrial customers, if the supplier is acting as a consultant.
Submission Guidelines
Source: NTCSA Supplier Declaration of Interest.docx (unknown)Returnable documents: the NTCSA Supplier Declaration of Interest form must be completed, signed, and submitted with the bid. The form requires the signatory's full name, capacity, and the supplier's registered legal name and company registration number. The declaration must be submitted under oath. Bidders must delete inapplicable options (e.g., enquiry/tender/negotiation) where indicated. No other submission instructions are stated in the available document.
Evaluation Criteria
Source: NTCSA Supplier Declaration of Interest.docx (unknown)The only stated evaluation-related requirement is the submission of the Supplier Declaration of Interest form. The form requires disclosure of: (1) any interest holder employed by or serving as a director at NTCSA; (2) any close family member or associate of an NTCSA employee/director participating in the procurement; (3) any business courtesy given to or received from an NTCSA employee/director in the last 12 months; and (4) any other services currently provided to NTCSA business units, subsidiaries, or related entities. No other evaluation criteria (e.g., price, functionality, B-BBEE points) are stated in the available document.
Technical Specifications
Source: NTCSA Supplier Declaration of Interest.docx (unknown)The document is solely a supplier declaration of interest form. It does not contain technical specifications for the investigation of subsurface instability at the NTCSA Vulcan Substation. No scope, deliverables, quantities, standards, or service levels are stated.
Compliance Requirements
Source: NTCSA Supplier Declaration of Interest.docx (unknown)Bidders must complete and submit the NTCSA Supplier Declaration of Interest form. The form requires an oath certifying the truthfulness of the information. Bidders must disclose any conflicts of interest, including employment with NTCSA, family or associate relationships with NTCSA employees/directors, business courtesies exchanged in the last 12 months, and other services provided to NTCSA or related entities. No other compliance requirements (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the available document.
Important Dates
Source: BOQ.pdf (unknown)Closing date and time: 9 October 2026 at 10:00. Submission method and address not stated in the available text.
Technical Specifications
Source: BOQ.pdf (unknown)Scope: professional services to investigate potential subsurface instability in the vicinity of the NTCSA Vulcan Substation. No further deliverables, quantities, standards or service levels are provided in the available text.
Compliance Requirements
Source: BOQ.pdf (unknown)Insufficient searchable text - AI extraction recommended
Description
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced
in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg
No 2021/539129/30
of 74
File name: 559-235050781 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
Refer to
contractual
proposal and method statement proposal/Construction full scope of works, National
report for the Vulcan Substation method statement which Standards and Eskom
Sinkhole Rehabilitation, addressing outlines method Technical Requirements.
ALL scope as outlined in 240- statement of how the
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced
in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg
No 2021/539129/30
of 74
File name: 559-235050781 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
98155775 scope and specification sinkhole will be
document. rehabilitated and
concrete drainage
channels will be
constructed.
Geotechnical Certification with 1936: 1-4; National
Engineering/Geohydrology/Engineeri SACNASP/ECSA and Environmental Management
ng Geology with ECSA/SACNASP. copy of degree/diploma. Act, ).
The support technical staff involved
in compiling of the document and
generating of designs need to have a
degree/diploma in Civil
Engineering/Geology/Geohydrology.
the 240-98155775 scope and projected values for all within market-related prices.
specification document. the investigation.
completing a minimum of 3-4 detailing the completion competent in executing the
projects for geotechnical of the geotechnical works outlined in 240-
investigations similar with the scope investigations. 98155775 scope and
outlined in 240-98155775 scope and Appointment letters and specification document.
specification document. list of projects will not be
considered without
reference letters.
Note: A response of “NO” to any of the Mandatory Evaluation Criteria would results in immediate
disqualification of the Tender and discontinue further evaluation
3.13 Functionality requirements are applicable
The following criteria will be applicable for this transaction under functionality criteria
No Description Weightin Sub- Tender Returnable Scoring criteria
g weightin
g
6.1 Geotechnical 100%
Engineering
Professional
Services
Important Dates
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)Issue date: 28 August 2026
Closing date and time: 09 October 2026 at 10:00 SAST
Tender validity period: 120 days from closing date (extendable by NTCSA; tenderers agreeing may not modify tender)
Non-compulsory site clarification meeting: 16 September 2026 at 11:00 at Vulcan Substation (Witbank). Address link: https://maps.app.goo.gl/nPJR21SuEyERUUJ18?g_st=ac
Clarification queries deadline: 10 working days before tender closing date
Addenda and clarifications posted on e-tender portal and Tender Bulletin
Briefing Session
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)Non-compulsory site clarification meeting required at Vulcan Substation (Witbank) on 16 September 2026 at 11:00am. Address link: https://maps.app.goo.gl/nPJR21SuEyERUUJ18?g_st=ac. Clarification queries must be submitted 10 working days before tender closing date. Addenda and clarifications posted on e-tender portal and Tender Bulletin.
Contact Information
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)NTCSA Representative: Tshifhiwa Modau
Tel: 011 629 5553
Email: [email protected]
Procurement Manager: Vukosi Maluleke
Escalation path:
Communication restrictions: Tenderers must not contact any NTCSA employee involved in the tender other than the NTCSA Representative. Escalation must follow the defined path.
Submission Guidelines
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)Submission method: Electronic only via NTCSA Tender Bulletin site on Eskom E-tendering platform. Documents must be uploaded under Technical, Commercial, Financial, and Other folders. All documents in PDF format; price list also required in Excel format. Upload size limit: 500 MB per document, 4 GB total. No zip/condensed files. No hard copies accepted. Resubmission replaces previous submission; only latest version considered. Submission status must show as complete. Tender closing: 09 October 2026 at 10:00 SAST. Late tenders not accepted.
Returnable documents (disqualifiable if missing at closing):
Returnable documents (non-disqualifiable at closing; 5 working days to remedy if missing):
Returnable documents for evaluation (zero score if missing):
Not applicable: CIDB grading, Reverse e-auction, Building/Civil CSDG, CIDB Indirect Targeting, Contract Participation Goals, Insurance Deductibles, List of Acceptable Guarantors, Standard Terms and Conditions, Additional documents (ECSA/SACPCMP/CVs/permits/licenses).
Returnable Documents
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)Returnable documents categorised as: (1) Disqualifiable at tender closing: Basic Compliance (electronic PDF copy, price list in PDF and Excel), Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer's Particulars (Annexure C), Integrity Declaration Form (Annexure D), CPA Requirements for Local Goods/Services (Annexure E), SBD 1 Invitation to Bid (Annexure H), SBD 4 Bidders Disclosure (Annexure J), SBD 6.1 Preference Points Claim Form (Annexure I), JV documents (letter of intent, JV agreement, single entity confirmation, single bank account), E-tendering Help Manual Acknowledgement Form, Supplier Non-Disclosure Agreement, SD&L Undertaking, Mandatory Contractual Requirement - Proof of valid CSD Registration. (2) Non-disqualifiable at tender closing: Tax Clearance Certificates, Tax Evaluation Questionnaire, Specific Goals proof, Compliance with Employment Equity Act. (3) For evaluation (zero score if missing): Scope of Work, NEC/Contract, Pricing Schedule/BOQ (must be filled in full), Functionality/Technical requirements. Additional: CIDB grading (not applicable), Reverse e-auction (not applicable), Building/Civil CSDG (not applicable), CIDB Indirect Targeting (not applicable), Contract Participation Goals (not applicable), Insurance Deductibles (not applicable), List of Acceptable Guarantors (not applicable), Standard Terms and Conditions (not applicable), Additional documents (ECSA/SACPCMP/CVs/permits/licenses - not applicable). Mandatory contractual supporting evidence: COIDA certificate of good standing (SA tenderers only), Quality, Safety, Environmental documents per scope, Due Diligence/Financial Analysis - Audited Financial Statements for previous 18 months (or last year), JV/SPV participants each to submit audited statements, start-ups within 12 months exempt initially but must furnish first year statements if awarded.
Evaluation Criteria
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)Two-stage evaluation:
Scoring method: 5=100% compliant, 4=80% compliant with qualifications, 2=40% non-compliant, 0=0% deficient. Scores 1 and 3 not used.
Price evaluation (80 points): inclusive of VAT, corrected for arithmetic errors, excluding contingencies, adjusted for variations, NPV comparison based on tendered programme, price adjustment factors, exchange fluctuations, risk. Unconditional discounts considered; conditional discounts not considered for evaluation but implemented at payment.
Specific Goals (20 points) per PPPFA 80/20 system. B-BBEE status points: Level 1=20, 2=18, 3=14, 4=12, 5=8, 6=6, 7=4, 8=2, Non-compliant=0. Failure to submit proof = 0 points (not disqualified).
Ranking: Combined price + specific goals score, highest to lowest.
Objective criteria may justify award to other than highest scoring tenderer if clearly stated. Designated Sector and CIDB Skills Development not applicable. Reverse e-auction not applicable.
Technical Specifications
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)Scope: Professional services to investigate potential subsurface instability in the vicinity of NTCSA Vulcan Substation (Witbank) and design sinkhole rehabilitation with concrete drainage channels. Full scope defined in document 240-98155775.
Mandatory technical deliverables:
Professional registration requirements:
Key personnel experience levels:
Legislative compliance: SANS 1936: 1-4; National Environmental Management Act.
Referenced documents: 240-68099512 Form A_Cat 4_Rev 9, 240-105658000 Supplier Quality Management Specification, 240-126469599 Method Statement template final.
Methodology
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)proposal and method statement proposal/Construction full scope of works, National
report for the Vulcan Substation method statement which Standards and Eskom
240-68099512 Form A_Cat 4_ Rev 9 - Investigate subsurface instability at Vulcan Substation
240-105658000 Supplier Quality Management Specification (3)
240-126469599_Method Statement template final
Financial Sustainability - Financial Analysis of Tenderers Financial Statements (to determine the
contractors’ financial viability).
Experience & Qualifications
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)for Proposal Effective Date July 2024
Review Date July 2027
Any addenda or clarifications to the Invitation to Tender (ITT) will be
posted on the e-tender portal and the Tender Bulletin. Tenderers must
review these platforms for updates before finalizing their bid
submissions. NTCSA will not be responsible for any disadvantages or
disqualifications resulting from Tenderers not accessing the latest ITT
information.
2.22 Alternative tenders Alternative tenders are not allowed
2.33 Cataloguing The successful tenderer may be required to provide the cataloguing
information per item after contract award, and in that instance, will need
will to ensure that all materials delivered to NTCSA are labelled in line
with NTCSA’s labelling specifications as may be stipulated. Where
cataloguing is a requirement, the Pricing Schedule must also include a
line item for cataloguing, which tenderers are required to quote for.
for Proposal Effective Date July 2024
Review Date July 2027
work detailed in out based on 240- clearly how the service will be
the scope and 985775 scope and delivered above and beyond
minimum requirements specification specification
2 = 40% = Barely adequate levels of document document. Please
required scope proposal
see attached 0 = 0% = less than minimum level
addendum for how required scope proposal or irrelevant
the score will be
determined
6.1.2 Company's 30% Demonstrate 5 = 100% = More than 5 completed
background and experience on projects of similar nature
experience on similar projects. 4 = 80% = 5 completed projects of
for Proposal Effective Date July 2024
Review Date July 2027
6.1.4 CV's of key 20% Provide CV's (with 5 = 100% = Level 4 Expert geo-
personnel evidence of professional (registered + 10 years
attached post registration experience in
certificates) of key geotechnical investigations and
personnel as reporting/Dolomitic Stability
specified below: The investigations where necessary)
lead engineer or 4 = 80% = Level 3 experienced geo
lead engineering professional (registered 5 years post
geologist required to registration experience in
meet minimum geotechnical investigations and
criteria as registered reporting/Dolomitic Stability
geo-professional. investigations where necessary)
A geotechnical 3 = 60% = Registered geo-
engineer and professional
engineering 0 = 0% = TOTALLY DEFICIENT OR
geologist should be NON-RESPONSIVE
assigned to the
project. Only one
needs to be a
registered geo-
professional.
in this tender.
5 100 compliant
requirements.
4 80 compliant with associated qualifications
2 40 non-compliant
0 0 totally deficient or non-responsive
Note 1: The scoring does not allow for 1 and 3
Note 2: Foreseen acceptable and unacceptable risk(s), exceptions and conditions shall be
unambiguously defined in the relevant Tender Technical Evaluation Strategy
3.14 Evaluation of Price Prices will be evaluated as follows:
Quality Management
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)Quality requirements referenced per contractual requirements. Legislative compliance per SANS 1936: 1-4 and National Environmental Management Act. Professional registration with ECSA/SACNASP required as quality assurance.
Pricing Schedule
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)1.1.28 Pricing Attached Y √ NB: The Bill
Schedule/BOQ (if of Quantities
not contained in must be
Contract) filled in full
and failure
to complete
the BOQ in
full will be
regarded as
non-
responsive
1.1.29 Additional Not Applicable
documents
required (ECSA/
evaluation criteria
6.1.1 Proposal which 40% Technical proposal 5 = 100% =Excellent response
details how which includes demonstrates ability to deliver
service far in excess of minimum company will method in which
requirement execute scope of scope will be carried
4 = 80% = Good response detailing
Goal, it will not be disqualified. However, it will be awarded 0 points for
that Specific Goal.
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for
the [80/20] system. NTCSA will add the score from Pricing and Specific
Financial Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)Pricing Schedule/BOQ attached and must be filled in full; failure to complete BOQ in full regarded as non-responsive. Price list to be submitted in PDF and Excel format.
Price evaluation basis:
Payment terms:
Financial due diligence: Audited Financial Statements for previous 18 months (or last year if 18 months not available). JV/SPV participants each to submit audited statements. Start-ups formed within last 12 months exempt initially but must furnish first year statements if awarded.
Tender validity: 120 days from closing date. NTCSA may extend; tenderers agreeing may not modify tender (modification leads to disqualification).
Provision of Security for Performance: Not applicable.
Cataloguing: Successful tenderer may be required to provide cataloguing information post-award with labelling per NTCSA specifications; pricing schedule must include cataloguing line item.
Compliance Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)Mandatory eligibility:
Mandatory contractual supporting evidence:
Tax compliance:
B-BBEE and Specific Goals:
Local content:
Employment Equity Act compliance (SA tenderers only): Proof of compliance and submission of Employment Equity report to Department of Labour (if designated employer).
JV requirements: Letter of intent/JV agreement, confirmation of single incorporated entity, single designated bank account.
Standard forms required: SBD 1, SBD 4, SBD 6.1, SBD 6.2 (if applicable), Supplier Non-Disclosure Agreement, SD&L Undertaking, E-tendering Help Manual Acknowledgement Form.
CIDB grading: Not applicable.
CSDG, CPG, Indirect Targeting: Not applicable.
B-BBEE Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)B-BBEE evaluation under 80/20 PPPFA system. Specific Goals scored out of 20 points. B-BBEE status level points: Level 1=20, 2=18, 3=14, 4=12, 5=8, 6=6, 7=4, 8=2, Non-compliant=0. Required documentation: Valid B-BBEE certificate (SANAS accredited verification agency/sworn affidavit/CIPC affidavit), proof of ownership/shareholding (CIPC documentation with breakdown), certified ID copies of shareholders, proof of disability (where applicable). Failure to submit proof = 0 points for Specific Goals (not disqualified). SBD 6.1 Preference Points Claim Form (Annexure I) required. SBD 6.2 Declaration for Local Production and Content (Annexure G1-G4) not applicable unless designated materials included. CPA Requirements for Local Goods/Services (Annexure E) and CPA(IG) for Foreign Goods/Services (Annexure F) required; if not submitted, prices evaluated as fixed and firm for contract duration.
Health & Safety
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)Annexure B-to be completed and signed
NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk)- Sinkhole Investigation Project
SHE Specification -Vulcan Sinkhole Investigation Project
Sinkhole Investigation_BRA
Quality Requirements
240-12248652_List of Tender Returnables_Cat 4_ Rev 7 - Investigate subsurface instability at Vulcan
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced
in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg
No 2021/539129/30
of 74
File name: 559-235050781 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
Substation
240-68099512 Form A_Cat 4_ Rev 9 - Investigate subsurface instability at Vulcan Substation
240-105658000 Supplier Quality Management Specification (3)
240-126469599_Method Statement template final
Financial Sustainability - Financial Analysis of Tenderers Financial Statements (to determine the
contractors’ financial viability).
Contractual Requirements are not evaluation criteria. They will be assessed after the evaluation and
ranking of the tenders. Proof that the tenderer recommended for award has met the stipulated
contractual requirements must be submitted prior to contract award.
Failure to meet stipulated Contractual Requirements by the stipulated deadlines may result in the
tenderer being regarded as non-responsive and ineligible for contract award.
Payment Terms Tenderers are requested to bear in mind NTCSA's standard
payment terms as stipulated hereunder when submitting tenders
and concluding contracts with NTCSA:
For contracts valued below R50 000 000 (Fifty Million Rand) including
VAT, NTCSA is committed to paying Suppliers within 30 days of receipt
of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including
VAT, NTCSA is committed to paying suppliers within 60 days of receipt
of undisputed invoices.
2.29-2.30 Contract Skills Not Applicable
Development Goal (CSDG) and
Contract Participation Goals (CPG)
2.28 CIDB Requirements (where CIDB Requirements are not applicable
applicable for Engineering and
Construction Works Contracts)
3.22. Contractual Conditions The conditions of contract are the NEC3 Term Service Contract.
3.24 Sign Form of Agreement Not Applicable
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced
in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg
No 2021/539129/30
of 74
File name: 559-235050781 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
Please note:
Tenderers are requested to bear in mind NTCSA's standard payment terms as stipulated
hereunder when submitting tenders and concluding contracts with NTCSA:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, NTCSA is committed
to paying Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, NTCSA is committed
to paying suppliers within 60 days of receipt of undisputed invoices.
NTCSA reserves the right to negotiate with preferred bidders after a competitive bidding process
or price quotations should the tendered prices not be market-related.
Main contractors/ suppliers are discouraged from subcontracting with their subsidiary
companies as this may be interpreted as subcontracting with themselves and / or using their
subsidiaries for fronting. Where a main contractor subcontracts with a subsidiary, this must be
declared in its tender documents.
A report containing a list of potential sub-contractors may be drawn by accessing the following
link: www.csd.gov.za
“proof of B-BBEE status level of contributor” means-
(a) the B-BBEE status level certificate issued by an authorised body or person; or
(b) a sworn affidavit as prescribed by the B-BBEE Codes of Good Practice; or
(c) any other requirement prescribed in terms of the Broad-Based Black Economic
Empowerment Act
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced
in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg
No 2021/539129/30
of 74
File name: 559-235050781 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
in excel format
(The upload size
per document is
500 megabytes
and total
submission is
restricted to 4
gigabytes))
(Excel
spreadsheet will
be submitted on
request)
1.1.2 *Authorisation Annexure A Y √
Form
1.1.3 *Acknowledgeme Annexure B Y √
nt form
1.1.4 *Tenderer’s Annexure C Y √
particulars
1.1.5 *Integrity Annexure D Y √
shall achieve in
the performance
of the contract
the CSDG
established in
the CIDB
contracts
published in GN
1779,
Goals (CPG)
(if applicable)
[Note that the
requirements of
a contract
participation
goal relating to
the engagement
of targeted
enterprises as
established in
the aforesaid
standard applies
to:
(a) construction
works contracts
in the General
Building (GB)
and to Civil
(Csd
number/CSD
Report)
[applicable to all
tenderers of local
origin and foreign
tenderers with
local footprint]
ADDITIONAL CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE [where applicable
and as stipulated under tender Data]
1.1.36 Safety √
contractual
requirements
below.
1.1.38 Other √
safety/quality
documents as
required per
scope of works
completed projects
consisting of the
following
information:
where project is
executed
investigation was
carried out and
completed
(reference) and
Minimum 3-4
projects
6.1.3 Project 10% Project Programme 5 = 100% = COMPLIANT
Programme containing the
following activities: requirement(s)/AND
SHE file compiling
by consultant and in meeting technical
auditing by ESKOM requirements
Mobilising and 4 = 80% = COMPLIANT WITH
establishing of ASSOCIATED QUALIFICATIONS
contractors and
2 = 40% = NON-COMPLIANT subcontracts
0 = 0% = totally deficient or
Environmental
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)Copy of 240-43921804 Environmental Management Tender Returnable Vulcan Sinkholes
contractual
requirements
below.
1.1.39 Environmental √
Environmental Requirements
Copy of 240-43921804 Environmental Management Tender Returnable Vulcan Sinkholes
Safety Requirements
Contractual Terms
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)1.1.33 Insurance Not Applicable
sanctions list. A tenderer shall be found to have the nationality of a
country if the tenderer is a national or is constituted, incorporated, or
registered and operates in conformity with the provisions of the laws
of that country. This criterion shall also apply to the determination of
the nationality of proposed subcontractors or suppliers for any part of
the Contract including related services.
or as a partner in a joint venture (JV) or consortium, except on an E-
Tendering system where there is a limit size (The upload size per
document is 500 megabytes and total submission is restricted to 4
gigabytes).
measures against these suppliers; and
b) Other suppliers implicated in serious misconduct and a breach of
the Eskom Supplier Integrity Pact by a forensic report or other
source of credible information, such as the SAPS, the NPA, the SIU
or other related source.
c) List of Restricted Suppliers and Defaulters as per PRECCA as
issued by National Treasury
The implications of this “flag” are as follows:
o No new contracts or extension of existing contracts may be
awarded to the supplier pending finalisation of supplier disciplinary
processes against the supplier. Where a As such, the supplier’s bid
should be removed from any tender evaluation at the “eligibility” or
“compliance” assessment stage of the evaluation.
payment terms as stipulated hereunder when submitting tenders
and concluding contracts with NTCSA:
For contracts valued below R50 000 000 (Fifty Million Rand) including
VAT, NTCSA is committed to paying Suppliers within 30 days of receipt
of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including
VAT, NTCSA is committed to paying suppliers within 60 days of receipt
of undisputed invoices.
2.29-2.30 Contract Skills Not Applicable
Development Goal (CSDG) and
Contract Participation Goals (CPG)
2.28 CIDB Requirements (where CIDB Requirements are not applicable
applicable for Engineering and
Construction Works Contracts)
3.22. Contractual Conditions The conditions of contract are the NEC3 Term Service Contract.
3.24 Sign Form of Agreement Not Applicable
hereunder when submitting tenders and concluding contracts with NTCSA:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, NTCSA is committed
to paying Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, NTCSA is committed
to paying suppliers within 60 days of receipt of undisputed invoices.
Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)Eligibility criteria: Tenderers must not be restricted from doing business with NTCSA or State-Owned Companies. Ineligible if: nationality of sanctioned country; submit more than one tender; JV/consortium agreement lacks joint and several liability; conflict of interest (common controlling partner/majority shareholder, or relationship enabling access to competitor's tender info or influence on employer decisions); tender signed by non-authorised person; restricted by National Treasury; on Tender Defaulters list; sub-contracts 100% of Scope of Work; flagged supplier (implicated in Zondo Report/SIU misconduct, forensic report breach of Supplier Integrity Pact, or on National Treasury Restricted Suppliers/Defaulters list per PRECCA). Basic compliance: meet eligibility criteria, submit complete electronic tender with commercial/financial/technical information, submit mandatory commercial returnables by deadline. Mandatory technical criteria (disqualifying if 'NO'): 1) Design proposal and method statement for Vulcan Substation Sinkhole Rehabilitation per scope 240-98155775; 2) Professional registration for Geotechnical Engineering/Geohydrology/Engineering Geology with ECSA/SACNASP, support staff with degree/diploma in Civil Engineering/Geology/Geohydrology; 3) Filled BOQ with projected values; 4) Evidence of 3-4 completed geotechnical investigation projects similar to scope (reference letters required, appointment letters/list of projects insufficient).
Section
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_ eTendering Template- Vulcan sinkhole (003).pdf (RFQ)Functionality evaluation (threshold 70%): 6.1 Geotechnical Engineering Professional Services (100% weighting). Sub-criteria: 6.1.1 Proposal detailing execution method (40%) - scored 5 (100% excellent), 4 (80% good), 2 (40% barely adequate), 0 (0% less than minimum); 6.1.2 Company background and experience on similar projects (30%) - 5 (100% >5 projects), 4 (80% 5 projects), 2 (40% 3-4 projects), 0 (0% 0 projects) with testimonials/reference letters/completion certificates; 6.1.3 Project Programme (10%) - 5 (100% compliant), 4 (80% compliant with qualifications), 2 (40% non-compliant), 0 (0% deficient); 6.1.4 CVs of key personnel (20%) - Registered Geotechnical/Engineering Geologist (15%), Engineering Geologist/Geotechnical Engineer (5%) - 5 (100% Level 4 expert, registered +10 years), 4 (80% Level 3, registered 5 years), 3 (60% registered professional), 0 (0% deficient). Scoring method: 5=100% compliant, 4=80% compliant with qualifications, 2=40% non-compliant, 0=0% deficient. Price evaluation: inclusive of VAT, corrected for arithmetic errors, excluding contingencies, adjusted for variations, NPV comparison based on programme, price adjustment factors, exchange fluctuations, risk. Unconditional discounts considered, conditional discounts not considered for evaluation but implemented at payment. Price scored out of 80 points. Specific Goals scored out of 20 points per PPPFA. Ranking via 80/20 preferential point system. B-BBEE status points: Level 1=20, 2=18, 3=14, 4=12, 5=8, 6=6, 7=4, 8=2, Non-compliant=0. Failure to submit Specific Goals proof = 0 points (not disqualified). Objective criteria: Designated Sector (not applicable), CIDB Skills Development (not applicable). Reverse e-auction not applicable.
Description
Source: Copy of 240-43921804 Environmental Management Tender Returnable Vulcan Sinkholes.xls (unknown)Tender for professional services to investigate potential subsurface instability in the vicinity of the NTCSA Vulcan Substation. The returnable document pack (240-43921804) is an environmental management tender returnable used to assess whether the Contractor/Service Provider has submitted required environmental documentation complying with specified requirements. The evaluation covers Environmental Management System (EMS), Environmental Management Programme (EMPr), Waste Management Plan, Aspect and Impact Register, and employer-defined additional requirements including an Environmental Bill of Quantity and signed Contractor Environmental Requirements Proforma (240-180100129). Minimum threshold for consideration is a weighted average score of 80%. Key personnel must include an environmental monitoring/reporting/incident management officer with minimum N.Diploma or BSc/Bachelor Degree in Environmental Sciences/Management/Nature Conservation or related field. Applicable legislation includes the National Water Act (36 of 1998) and National Environmental Management: Waste Act (59 of 2008). Eskom contacts: Project Manager Geoffrey Small, Eskom Representative Mpho Nnzimeni. Enquiry Number: 240-43921804.
Contact Information
Source: Copy of 240-43921804 Environmental Management Tender Returnable Vulcan Sinkholes.xls (unknown)Eskom representative contacts identified in the document:
Enquiry Number: 240-43921804
Document Identifier: 240-43921804
Document dates: Revision July 2023, Review Date July 2025
Submission Guidelines
Source: Copy of 240-43921804 Environmental Management Tender Returnable Vulcan Sinkholes.xls (unknown)Returnable documents required for evaluation:
All documents must be submitted as part of the tender returnable pack. A weighted average score of at least 80% is required to be considered.
Evaluation Criteria
Source: Copy of 240-43921804 Environmental Management Tender Returnable Vulcan Sinkholes.xls (unknown)Evaluation uses a weighted scoring system across five sections:
Total Contractor/Service Provider Score = 100% (sum of all sections as a percentage).
Threshold: Tenderer must achieve a weighted average score of at least 80% to be taken into consideration. Each tenderer's scores serve as a numerical basis for tender comparison.
Technical Specifications
Source: Copy of 240-43921804 Environmental Management Tender Returnable Vulcan Sinkholes.xls (unknown)Scope: Provide professional services to investigate potential subsurface instability in the vicinity of the NTCSA Vulcan Substation.
Environmental management requirements per Eskom Transmission Environmental Management standards and Environmental Requirements for Contractors and/or Suppliers (document 240-180100134).
Key deliverables required:
Minimum personnel requirement: Environmental monitoring/reporting/incident management person must hold minimum N.Diploma or BSc/Bachelor Degree in Environmental Sciences/Management/Nature Conservation or related field.
Applicable legislation: National Water Act (36 of 1998), National Environmental Management: Waste Act (59 of 2008).
Compliance Requirements
Source: Copy of 240-43921804 Environmental Management Tender Returnable Vulcan Sinkholes.xls (unknown)Mandatory compliance documentation:
Description
Source: Sinkhole Investigation_BRA.xlsx (unknown)The document is an Occupational Health and Safety Baseline Risk Assessment template (identifier 240-70044602) for Eskom's North East Grid, covering the Sinkhole Project and Secondary Plant departments. It lists routine and non-routine activities with associated hazards, risks, existing controls, and additional controls across multiple risk categories including: driving-related risks (vehicle condition, unsecured loads, fatigue, adverse weather, poor roads, distractions, driver behaviour, reversing, idling, speeding); office administration risks (computer glare, poor illumination, ergonomics, ventilation, electrical appliances, fire, slips/trips/falls, structural defects, housekeeping); high voltage plant risks (electricution, uneven surfaces, tool handling, weather, insects/reptiles); secondary plant risks (dust/fly ash exposure, trench covers, workshop housekeeping); and psychosocial risks (work overload, extended hours, harassment, violence). Each risk is rated using consequence, likelihood, and risk control effectiveness matrices with reference to OHS Act 85 of 1993, Eskom SHEQ Policy 32-727, ORHVS regulations, and other Eskom procedures.
Technical Specifications
Source: Sinkhole Investigation_BRA.xlsx (unknown)The document is an Occupational Health and Safety Baseline Risk Assessment template (identifier 240-70044602) for Eskom's North East Grid, covering the Sinkhole Project and Secondary Plant departments. It lists routine and non-routine activities with associated hazards, risks, existing controls, and additional controls across multiple risk categories including: driving-related risks (vehicle condition, unsecured loads, fatigue, adverse weather, poor roads, distractions, driver behaviour, reversing, idling, speeding); office administration risks (computer glare, poor illumination, ergonomics, ventilation, electrical appliances, fire, slips/trips/falls, structural defects, housekeeping); high voltage plant risks (electricution, uneven surfaces, tool handling, weather, insects/reptiles); secondary plant risks (dust/fly ash exposure, trench covers, workshop housekeeping); and psychosocial risks (work overload, extended hours, harassment, violence). Each risk is rated using consequence, likelihood, and risk control effectiveness matrices with reference to OHS Act 85 of 1993, Eskom SHEQ Policy 32-727, ORHVS regulations, and other Eskom procedures.
Compliance Requirements
Source: Sinkhole Investigation_BRA.xlsx (unknown)CSD registration and valid SARS tax compliance status PIN.
B-BBEE certificate or sworn affidavit for preference points.
Professional registration: Key personnel must be registered with SACNASP (geotechnical/geohydrology) or ECSA (engineering).
CIDB grading: Not specified; confirm if civil/geotechnical works require grading.
OHS compliance: Valid Letter of Good Standing (COIDA), approved health and safety plan, and risk assessments per Eskom Procedure 32-520.
ORHVS authorisation for all personnel accessing high-voltage areas.
Medical surveillance certificates for staff exposed to dust, noise, and confined spaces.
Proof of professional indemnity insurance (amount not specified in source).
Description
Source: SHE Specification -Vulcan Sinkhole Investigation Project.pdf (unknown)This document is the Safety, Health and Environmental (SHE) Specification for the Vulcan Sinkhole Investigation contract (Eskom NTCSA North East Grid). It sets out the minimum SHE requirements that the principal contractor and any appointed contractors must meet for the duration of the contract. The specification covers legal compliance, Eskom-specific requirements, statutory appointments, risk assessments, safe work procedures, site management, training, communication, auditing, incident management, occupational health, working at heights, environmental management, and contract close-out. It references the OHS Act, Construction Regulations, NEMA, COIDA, and a suite of Eskom internal procedures and standards. The contractor remains fully accountable for its own health and safety programme; Eskom does not assume the contractor's legal responsibilities.
Important Dates
Source: SHE Specification -Vulcan Sinkhole Investigation Project.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ed work","is_compulsory":false}"}
Contact Information
Source: SHE Specification -Vulcan Sinkhole Investigation Project.pdf (unknown)Eskom Contract Manager: Tlholo Mafutsana
Eskom Health and Safety Manager: Thandi Magagula
Eskom Procurement Manager: Busi Mtungwa
Eskom Safety Officer: Beaular Falakahla
Evaluation Criteria
Source: SHE Specification -Vulcan Sinkhole Investigation Project.pdf (unknown)Contractors must be registered with the Compensation Commissioner (valid Letter of Good Standing). The construction safety officer must be registered with SACPCMP or similar professional body. Contractors must comply with the OHS Act and all referenced Eskom procedures and standards. No specific B-BBEE, CIDB, or CSD requirements are stated in the provided document.
Technical Specifications
Source: SHE Specification -Vulcan Sinkhole Investigation Project.pdf (unknown)Scope: Professional services to investigate potential subsurface instability in the vicinity of the NTCSA Vulcan Substation (North East Grid).
Contractor must develop a SHE plan meeting this specification and all applicable legislation.
Key requirements:
Quality Management
Source: SHE Specification -Vulcan Sinkhole Investigation Project.pdf (unknown)Quality management references:
Financial Requirements
Source: SHE Specification -Vulcan Sinkhole Investigation Project.pdf (unknown)Bidders must make detailed provision for the cost of safety and health measures throughout the project (costing for SHE within the project).
Valid Letter of Good Standing from the Compensation Commissioner (COIDA) required before commencement and on renewal; principal contractor must also provide letters for all appointed contractors.
Compliance Requirements
Source: SHE Specification -Vulcan Sinkhole Investigation Project.pdf (unknown)Mandatory compliance:
Health & Safety
Source: SHE Specification -Vulcan Sinkhole Investigation Project.pdf (unknown)Comprehensive health and safety specification covering:
Environmental
Source: SHE Specification -Vulcan Sinkhole Investigation Project.pdf (unknown)Environmental duty of care: any person causing or potentially causing significant pollution or degradation must take reasonable measures to prevent, minimise, and rectify such harm. An Environmental Management Plan must be prepared to enhance positive impacts and limit/prevent negative impacts during the project life-cycle, preferably forming part of Eskom's Environmental Management System. Compliance with NEMA and applicable municipal by-laws/environmental legislation is required. Where an Environmental Management Plan is in place, contractors must adhere to it and ensure minimal environmental damage.
Contractual Terms
Source: SHE Specification -Vulcan Sinkhole Investigation Project.pdf (unknown)Competency requirements for key appointments:
Description
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)eTendering system is a web based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
https://tenderbulletin.eskom.co.za or https://tenderbulletin.ntcsa.co.za - this is used by
members of the public, to view and access Eskom published tenders. eTendering hyperlink
will be found on this site. Members of the public may follow prompt instructions once they
have clicked on the eTendering link (https://eTendering.eskom.co.za). This link will allow
them to upload the required tender documentation.
https://eTendering.eskom.co.za - this is used by members of the public, to view information
about published tenders and submit their tender documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality of submitting tender documents via an ebox or online application called
eTendering instead of a physical submission.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser.
Type Eskom Tender Bulletin or Eskom Tender Bulletin (ntcsa.co.za) or Eskom E-Tendering
Click on the eTendering icon “ ”
eTendering system login page will be displayed:
Fig 1
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Registration Form Steps to follow
Plus prefix e.g +27
captcha picture to validate that you
are not a robot.
click on register button.
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button.
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address
and password.
Fig1.1
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP page will be displayed.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
button.
Landing page once OTP is verified.
Select the preferred “Ref No”
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
be submitted.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
mentioned disclaimers.
To submit tender documents, click on “Add file” button.
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
Continue to submit all the required documents under the correct category, i.e.: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 4GB.
will pop-up.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not, all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button.
submitted documents on email, Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender
#MPKUS10086PS closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-
08-23 15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power
Station Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd
EMAIL LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups, Fig2. Click on “Update” button to update registration details.
Fig1.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name.
Fig1.
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig1.
Fig2.
Fig3.
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
OTP successfully goes through and lands on the below screen, password is successfully
reset.
© 2025 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2025 Eskom of 19
Important Dates
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Tender closing date: 10:00 on 2022-11-30, as shown in the sample submission receipt (submission #MPKUS10086PS). Refer to the tender documents for the actual closing date for this specific tender.
Contact Information
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)For problems with the eTendering system, contact the buyer responsible for the published tender. [Source: system user guide only — no direct contact details provided.]
Submission Guidelines
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Submission is via the Eskom eTendering system (https://eTendering.eskom.co.za). Suppliers must be registered on the system and have a valid CSD number. Documents must be uploaded and finalised before the closing date/time — the finalised email confirmation is your proof of submission. Upload files individually up to 500MB each / 4GB total. Use Ms Edge for the best experience.
Evaluation Criteria
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)No evaluation criteria are stated in this source document — this is only the eTendering user guide.
Technical Specifications
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)No technical specifications are provided in this document; it is the eTendering supplier help manual, not the tender specification document. The actual technical specification and scope must be obtained from the tender documents on the eTendering portal.
Methodology
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)To submit tender documents via the eTendering portal: register by completing all fields (contact number must start with +27, fill in captcha), verify email, login with verified email and password, enter OTP sent to cell phone and email, select the preferred tender reference number, click 'Create New Submission', add files by naming the file, selecting the file type (Technical, Commercial, Finance, etc.), choosing the file, and clicking 'Upload'. Continue uploading all required documents under correct categories, then click 'Finalize Submission'. File size cannot exceed 500MB and total size of all uploaded files should not exceed 4GB. Confirm finalization by clicking 'Finalise and Close Submission'. After submission, an email with all submitted documents and the submission ID is sent; save this email for future reference. To view submitted tenders, use 'My Submissions' menu option.
Compliance Requirements
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Registration on the eTendering system is required and a CSD number is required to gain access to the eTendering system.
Special Conditions
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)A channel of communication has been created for users experiencing problems with the system. Users encountering difficulties with Tender bulletin, eTendering, or OpenText systems should contact the buyer responsible for the published tender.
Section
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)For problems with the system, contact the buyer responsible for the published tender.
Description
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)Project Title: Vulcan Substation. To provide professional services to investigate potential subsurface instability in the vicinity of the NTCSA.
Contact Information
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)NTCSA SOC Ltd: Megawatt Park, Maxwell Drive, Sunninghill ext.3, Sandton; P O Box 1091, Johannesburg 2000; Tel +27 11 800 ....; Fax +27 11 800 .... Notices deemed received: by hand on delivery date; by pre-paid registered post on 7th business day; by telefax when received in legible form. Parties may change domicilium with 30 business days written notice.
Evaluation Criteria
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)Bidders must be able to enter into a legally binding NDA with NTCSA SOC Ltd. The NDA requires that the receiving party's representatives (employees, agents, officers, directors, subsidiaries, associated companies, shareholders, advisers) agree to abide by the NDA terms. The NDA does not create a joint venture, partnership, or employment relationship. Bidders must not disclose confidential information without prior written consent. The NDA is governed by South African law.
Technical Specifications
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)Professional services to investigate potential subsurface instability in the vicinity of the NTCSA Vulcan Substation. Confidential Information includes all technical, commercial, financial, marketing information, strategies, operations, know-how, trade secrets, processes, machinery, designs, drawings, formulae, test data, equipment, notes, memoranda, methods, natural resources, technical specifications and data relating to the Project. Disclosure only to extent deemed necessary by Disclosing Party. Receiving Party may disclose to Representatives (employees, agents, officers, directors, subsidiaries, associated companies, shareholders, advisers) on need-to-know basis for Project purposes, provided they abide by Agreement terms. Receiving Party shall not use Confidential Information for any purpose other than the Project.
Compliance Requirements
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)Bidders must be able to enter into a legally binding NDA with NTCSA SOC Ltd (Reg No 2021/539129/30). Agreement governed by South African law. No assignment without prior written consent, except NTCSA may cede rights to its departments or entities resulting from ESI restructuring. No publicity without prior written consent. Each party represents authority to enter agreement. Disclosing Party warrants disclosure won't breach other agreements or infringe third-party rights and indemnifies Receiving Party against such claims.
Description
Source: SCOPE OF WORK.pdf (unknown)The Vulcan Transmission Substation in Emalahleni (Witbank), Mpumalanga, is located above historic bord-and-pillar coal mining areas with significant underground voids, unstable pillars, spontaneous combustion, and progressive subsidence causing sinkholes. Arnot Kendal 400kV Tower 227 sits on a mine pillar; sinkholes exist northwest of the substation. The area poses material risk to public safety and critical electricity infrastructure. The Employer requires a professionally registered Geologist (Contractor) to conduct comprehensive subsidence investigations at and around Vulcan Substation and adjacent areas to determine risk of failure to NTCSA infrastructure (substation and Tower 227), capture the extent of the phenomenon and impacts on other critical infrastructure, and compile a detailed report of findings and proposed mitigation solutions. The scope outlines minimum assessments using geotechnical investigations and non-invasive subsurface assessment methods. Applicable to Vulcan Substation and surrounding area (~17 ha area of interest).
Important Dates
Source: SCOPE OF WORK.pdf (unknown)Closing date and time: 2026-10-09 10:00 (from tender record). No mandatory briefing, site visit, or clarification deadlines are stated in the scope of works document.
Contact Information
Source: SCOPE OF WORK.pdf (unknown)No named SCM or technical contacts, emails, phones, or submission address are provided in the scope of works document. The document references NTCSA North East Grid, Geoscience/Real Estate Servitude & Land Management Department, and Environmental personnel from NTCSA for permit advice, but no individual contact details are given.
Submission Guidelines
Source: SCOPE OF WORK.pdf (unknown)Submission method and address are not specified in the scope of works document. The closing date and time are provided in the tender record (2026-10-09 10:00). Returnable documents required with the bid: comprehensive technical report (digital PDF, shape files/CAD files, and 2 hard copies), thermal imagery of the study area, 2D geophysical profiles and 3D models, zonation map of areas of incipient instability, methane gas concentration mapping, extent of spontaneous combustion mapping, final report with recommendations highlighting risk mapping. Written consent from the Employer is required for any deviations from the scope of works.
Returnable Documents
Source: SCOPE OF WORK.pdf (unknown)The Contractor report: Assesses the impacted area by intrusive and non-intrusive methods; Consolidates all field information and produces a comprehensive technical report of findings; A thermal imagery of the study area to provide details of surface features that may have high emissivity (thermal hot spot); Provide 2D geophysical profiles and 3D models; Zonation map of areas of incipient instability; Methane gas concentration mapping; Extent of spontaneous combustion mapping; Provide all digital dataset in cad or other agreed geospatial or engineering format; Final report and recommendation highlighting risks mapping. All documentation to be submitted in digital (word-friendly *.pdf format, shape files /Cad files) and hardcopy formats (2 x copies). Written consent must be received from the Employer for any and all deviations from the works as outlined herein.
Evaluation Criteria
Source: SCOPE OF WORK.pdf (unknown)No evaluation criteria, scoring split, preference point system (80/20 or 90/10), or minimum qualifying thresholds are stated in the scope of works document. The document references ISO 9001 (2015) Quality Management System as a normative reference but does not define evaluation stages or scoring.
Technical Specifications
Source: SCOPE OF WORK.pdf (unknown)Scope: Investigate potential subsurface instability at Vulcan Substation (Emalahleni/Witbank, Mpumalanga) and adjacent areas, including Arnot Kendal 400kV Tower 227, located above historic bord-and-pillar coal mining voids with spontaneous combustion and sinkhole risks. Area of interest: approximately 17 ha (red boundary in Figure 2).
Required investigations:
a) Drone thermal imaging survey of complete substation perimeter and internal infrastructure; report thermal anomalies/hotspots with location, severity, implications.
b) 2D Electrical Resistivity Tomography (ERT) to identify electrical anomalies in soil indicating combustion sources.
c) Microgravity surveys to map density variations; low-density anomalies indicate combustible materials.
d) Multichannel Analysis of Surface Waves (MASW) to map velocity/density variations.
Deliverables: comprehensive technical report consolidating all field data; thermal imagery; 2D geophysical profiles and 3D models; zonation map of incipient instability; methane gas concentration mapping; spontaneous combustion extent mapping; all digital datasets in PDF, shape files/CAD; final report with risk mapping recommendations; 2 hard copies. All in digital (word-friendly PDF, shape files/CAD) and hardcopy (2 copies).
Methodology
Source: SCOPE OF WORK.pdf (unknown)Investigation methodology:
a) Drone thermal imaging survey of complete substation perimeter and internal infrastructure; report thermal anomalies/hotspots with location, severity, implications.
b) 2D Electrical Resistivity Tomography (ERT) to identify soil electrical anomalies indicating combustion sources.
c) Microgravity surveys to map subsurface density variations; low-density anomalies indicate combustible materials.
d) Multichannel Analysis of Surface Waves (MASW) to map surface wave velocity/density variations.
a) Desk study: topographical/geological maps, aerial photos, existing geotechnical data, structure performance, groundwater, seismic data.
b) Underground services scanning before investigation.
c) Test pits (max 5 m, min 50 m x 50 m grid, profiled by registered Geotechnical Engineer/Engineering Geologist per Jennings et al. 1973, GPS WGS84, per SAICE Code of Practice 2007).
d) DPSH testing between trial holes where bedrock depth uncertain or soils loose/soft.
e) Gravity survey per SANS 1936:2, area 100 m wider than footprint.
f) Rotary core boreholes: 3 m into bedrock below coal seam, SPT N tests, undisturbed Shelby samples for collapse potential/expansiveness/heave, concrete plug after drilling.
g) Percussion boreholes: min 4 per hectare, to end of coal seam/refusal; 6 m into rock where shallow bedrock; into bedrock on gravity highs; 100 m or 6 m where de-watered; 15 m into rock if depth >15 m; 6 m into dolomite bedrock if applicable.
h) Laboratory testing per SANS 3001: classification (grading, Atterberg limits, hydrometer), compaction (bulk density, MDD, OMC), Mod AASHTO, CBR, DPSH, swelling pressure, free swell, specific gravity, heave, UCS on rock, XRD/XRF, proximate analysis, petrography, gas analysis.
Quality Management
Source: SCOPE OF WORK.pdf (unknown)Quality management requirements: compliance with ISO 9001:2015 Quality Management System (normative reference). Test pits must be profiled by a registered Geotechnical Engineer or Engineering Geologist per latest South African practice (Jennings et al. 1973). Test pit positions coordinated with calibrated handheld GPS (WGS84). Excavation per SAICE Code of Practice 2007: Safety of Persons Working in Small Diameter Shafts. Gravity survey per SANS 1936:2. Laboratory testing per SANS 3001 methods.
Financial Requirements
Source: SCOPE OF WORK.pdf (unknown)No pricing format, bonds, guarantees, payment terms, or financial capacity thresholds are stated in the scope of works document.
Compliance Requirements
Source: SCOPE OF WORK.pdf (unknown)Professional registration: Contractor must be a professionally registered Geologist with SACNASP (South African Council for Natural Scientific Professions). Site work must be undertaken by or supervised by a professionally registered Rock Engineer. Compliance with normative references: 240-47172520 (TRMSCAAC 6.0) Standard for Construction of Overhead Powerlines; SANS 10280 Overhead Power Lines; ISO 9001:2015 Quality Management; ISO 14001:2015 Environmental Management; NEMA (Act No. 107 of 1998); Occupational Health and Safety Act; 240-80605256 Access to Private Property Standard; 32-846 Eskom ORHVS. PPE required: dust mask, hard hat, gum boots, safety pants, safety top coat, apron, safety glasses, face shield, respirator, ear protection, safety harness, gloves, safety boots. Risk assessments with prevention/mitigation measures, emergency procedures, qualification/training requirements. Safety regulations for groundwork under power lines must be followed. Detailed safe work procedures per Construction Regulations. Environmental permits advised by NTCSA environmental personnel (work near active stream). General Environmental Authorisation (EA) and/or Water Use Licence Application (WULA) for any construction. Generic risk assessment matrix (Appendix A) references Construction Regulations 2014 (CR 8-30).
Health & Safety
Source: SCOPE OF WORK.pdf (unknown)Health and safety requirements: mandatory PPE — dust mask, hard hat, gum boots, safety pants, safety top coat, apron, safety glasses, face shield, respirator, ear protection, safety harness, gloves, safety boots. Risk assessments with prevention/mitigation measures required. Emergency procedures required. Qualification and training requirements for personnel. Safety regulations for groundwork under power lines must be followed. Detailed safe work procedures (SWP) by contractor per Construction Regulations; SWP reviewed and accepted by Employer before site works. Site risks: high security risk; burning/smoking sinkholes; ground hot spots from underground coal combustion; space constraints and access for heavy equipment; detailed inspection of impacted towers required before work; general Environmental Authorisation (EA) and/or Water Use Licence Application (WULA) for construction. Generic risk assessment matrix (Appendix A) references Construction Regulations 2014 (CR 8-30) covering site management, risk assessment, fall prevention, temporary works, rope access, construction vehicles, electrical safety, fire/explosion, drowning, environmental compliance, stacking/storage, fire protection, employee facilities.
Environmental
Source: SCOPE OF WORK.pdf (unknown)Environmental requirements: work in proximity to an active stream — NTCSA environmental personnel to advise on all necessary permits. General Environmental Authorisation (EA) and/or Water Use Licence Application (WULA) required for any construction. Compliance with National Environmental Management Act, 1998 (NEMA) and ISO 14001:2015 Environmental Management System (normative references). Rehabilitation strategy includes environmental authorisation and regulatory requirements for open-cast mining feasibility. Generic risk assessment includes non-compliance with environmental regulations, improper storage, waste disposal, fire causing environmental damage (CR 27, 29).
Requirements
Source: SCOPE OF WORK.pdf (unknown)Contractor requirements: professionally registered Geologist (SACNASP). Provide adequate resources and equipment. Source and review historical undermining information, confirm validity. Ensure timely and adequate recording of materials and ground checks. Manage cost and schedule. Execute full scope. Manage sub-contracted works and outputs. Provide regular progress feedback. Ensure all site work undertaken by or supervised by professionally registered Rock Engineer. Ensure all parties familiarised with Employer safety requirements, mine safety requirements (where applicable), and OHSA before works. Comply with all applicable licences and authorisations. Obtain all necessary approvals and acceptances. Apply discretion in subsidence/sinkhole areas. Promptly inform Employer of notable ground condition changes. Notify Employer immediately of impedance or ruptured services. Ensure work near live lines in NTCSA servitude supervised by Authorised Person (Employer provides). Maintain equipment height/width clearances per Employer/Authorised Person. Ensure equipment earthed to Employer satisfaction (per 240-47172520 Annexure C) overseen by Authorised Person. Implement ground truthing, structure position feasibility, viable foundation systems, ground rehabilitation. No fieldworks to trigger further ground instability (e.g., spontaneous combustion).
Section
Source: SCOPE OF WORK.pdf (unknown)No evaluation criteria, scoring methodology, preference point system, or minimum qualifying scores are defined in the scope of works document. The document references ISO 9001:2015 as a normative quality management standard but does not link it to bid evaluation.
Contact Information
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk)- Sinkhole Investigation Project.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"odology"}
Submission Guidelines
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk)- Sinkhole Investigation Project.pdf (unknown)OHS Tender Returnables required — all must be completed, signed and submitted with the tender:
Evaluation Criteria
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk)- Sinkhole Investigation Project.pdf (unknown)OHS evaluation for this high-risk tender uses a pass/fail returnable checklist. Each returnable is assessed as Yes, No or Not Applicable. Mandatory items include: completed Annexure B; Baseline OHS Risk Assessment with methodology and Risk Rating Matrix; Health and Safety Plan aligned to project risks and specification; detailed OHS costing (not lump sum); valid COIDA Letter of Good Standing; CEO-signed OHS policy per OHS Act Section 7; and all required competency certificates (Incident Management/Investigation Training, First Aider Level 2, HIRA, Firefighting, Working at Heights US 229998 if applicable, Legal Liability for Project Supervisor, Legal Liability OHSA Training for CEO/MD/16.2 Appointee). A recommendation of Recommended or Not Recommended is made by the Eskom OHS Representative.
Technical Specifications
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk)- Sinkhole Investigation Project.pdf (unknown)Scope of work: Vulcan Substation Sinkhole Investigation Project — professional services to investigate potential subsurface instability in the vicinity of the NTCSA Vulcan Substation. The OHS deliverables required are specific to this scope: Baseline OHS Risk Assessment with methodology and Risk Rating Matrix; Health and Safety Plan addressing project-specific OHS risks and aligned with the health and safety specification; and OHS competency certificates relevant to the scope, risks and OHS plan.
Experience & Qualifications
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk)- Sinkhole Investigation Project.pdf (unknown)Required OHS competency certificates (considering scope of work, risks and OHS plan):
Financial Requirements
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk)- Sinkhole Investigation Project.pdf (unknown)Detailed costing for Health and Safety management must be submitted, broken down by scope of work/service to be performed (not provided as a lump sum). The scope of work and risk assessment may serve as a guideline for the costing.
Compliance Requirements
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk)- Sinkhole Investigation Project.pdf (unknown)B-BBEE Minimum Level: 2 (from tender record).
Mandatory OHS compliance documents:
Description
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)This document is the Technical Evaluation Strategy for the Vulcan Underground Fires tender (Unique Identifier: 240-xxx, Revision 0). It establishes the evaluation framework for tenders responding to the request for professional services to investigate potential subsurface instability near the NTCSA Vulcan Substation (scope document 240-98155775). The strategy defines the Technical Evaluation Team (TET), their roles and responsibilities, mandatory and qualitative evaluation criteria, scoring methodology, and acceptable/unacceptable risks, exceptions, and conditions. It applies to Eskom Transmission: Substation Engineering and North East Grid. The document is governed by the Tender Engineering Evaluation Procedure (240-48929482) and references normative standards including SANS 1200, OHS Act Construction Regulations 2014, and SANS 1936.
Important Dates
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)Closing date: 9 October 2026 at 10:00 (from tender record).
No compulsory briefing session, site visit, or clarification deadline is mentioned in this evaluation strategy document. Bidders must consult the main tender document (240-98155775) for any briefing or site visit requirements.
Contact Information
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)No SCM or technical contact details, emails, phones, or submission address are provided in this evaluation strategy document. Refer to the main tender document (240-98155775) for enquiry channels.
Submission Guidelines
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)Submission method and address are not stated in this evaluation strategy document. Bidders must refer to the main tender document (reference 240-98155775) for submission channel, format, closing time, and venue.
Returnable documents required with the bid:
Disqualification risks:
Returnable Documents
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)Returnable documents required (as per mandatory and qualitative criteria):
Standard SBD/MBD forms are not listed in this evaluation strategy; they will be specified in the main tender pack.
Evaluation Criteria
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)Evaluation follows a two-stage gatekeeper and weighted scoring approach per the Tender Engineering Evaluation Procedure (240-48929482).
Stage 1 — Mandatory gatekeepers (all must be met; a single "NO" disqualifies):
Stage 2 — Qualitative technical scoring (minimum 70% weighted final score required):
Weighted criteria (total 100%):
Notes to tenderers:
Technical Specifications
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)Scope of work at Vulcan Substation (per evaluation strategy and referenced scope document 240-98155775):
Normative references governing the work:
Key technical requirements:
Methodology
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)Required methodology and approach:
Experience & Qualifications
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)Experience and qualification requirements:
Lead engineer or lead engineering geologist must be a registered geo-professional (ECSA/SACNASP) with 10+ years post-registration experience in geotechnical investigations and reporting/Dolomitic Stability investigations (Level 4 Expert = 100%).
5+ years post-registration experience = Level 3 experienced geo-professional (80%).
Registered geo-professional only = 60%.
Totally deficient = 0%.
A geotechnical engineer and engineering geologist (SACNASP member) must be assigned; only one needs to be a registered geo-professional.
CVs required for registered geotechnical engineer/registered engineering geologist (15% of personnel weighting) and engineering geologist or geotechnical engineer (5% of personnel weighting).
Quality Management
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)Quality management requirements:
Pricing Schedule
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)Pricing schedule requirements:
Financial Requirements
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)Pricing format: Bill of Quantities (BOQ) issued with scope document 240-98155775 must be completed with all investigation items. The BOQ is used to ensure projected values for services are within market-related prices.
No explicit bond, guarantee, insurance, or payment terms are stated in this evaluation strategy document. Financial capacity or turnover thresholds are not specified. Bidders must consult the main tender document for commercial terms.
Compliance Requirements
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)Mandatory compliance requirements (gatekeepers):
B-BBEE: Not explicitly stated in this evaluation strategy document. The main tender document should be consulted for the applicable preference point system (80/20 or 90/10) and any minimum B-BBEE level.
CIDB grading: Not mentioned (professional services tender, not construction works).
Standard returnable forms (SBD/MBD) are not listed in this evaluation strategy; they will be specified in the main tender pack.
Health & Safety
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)Health and safety requirements:
Environmental
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)Environmental requirements:
Requirements
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)In order to be eligible for evaluation the tenderer shall meet the gatekeepers specified on the table below: Table 3: Mandatory Evaluation Criteria. 1. Tenderer must submit a design proposal and method statement report for the Vulcan Substation Sinkhole Rehabilitation, addressing ALL scope as outlined in 240-98155775 scope and specification document. Technical proposal/Construction method statement which outlines how the sinkhole will be rehabilitated and concrete drainage channels will be constructed. Motivation: Demonstrate compliance to the full scope of works, National Standards and Eskom Technical Requirements. 2. Professional Registration for Geotechnical Engineering/Geohydrology/Engineering Geology with ECSA/SACNASP. Copy of Professional Certification with SACNASP/ECSA and copy of degree/diploma. The support technical staff involved in compiling of the document and generating of designs need to have a degree/diploma in Civil Engineering/Geology/Geohydrology. Motivation: Legislative Compliance (SANS 1936: 1-4; National Environmental Management Act). 3. Filled in BOQ. BOQ issued out with the 240-98155775 scope and specification document. BOQ filled in with all the investigation. Motivation: To ensure pricing of projected values for services is within market-related prices. 4. Tenderer must submit evidence of completing a minimum of 3-4 projects for geotechnical investigations with the scope outlined in 240-98155775 scope and specification document. Reference letters detailing the completion of the geotechnical investigations. Appointment letters and list of projects will not be considered without reference letters. Motivation: To ensure that the tenderer is competent in executing the works outlined in 240-98155775 scope and specification document. Note: A response of "NO" to any of the Mandatory Evaluation Criteria would results in immediate disqualification of the Tender and discontinue further evaluation.
Section
Source: TENDER EVALUATION STRATEGY - VULCAN DETAILED UNDERGROUND FIRES INVESTIGATION SIGNED.pdf (unknown)Evaluation criteria are fully covered in the main evaluationCriteria section above. This extended section repeats the same weighted scoring methodology (70% minimum threshold, 5/4/2/0 scale) and the four qualitative criteria with their weightings, returnables, and scoring descriptors. No additional criteria beyond those in the main evaluationCriteria section are present in this document.
Description
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)Construction Skills Development
Goal % (CSDG)
2.3 Mandatory Subcontracting as condition of award
N/a
2.3 National Industrial Participation Programme
N/a
Section 3: SDL&I Objectives in line with Reconstruction and Development Programme (RDP) Goals
Tenderers who complete and submit the objectives as required, but who do not meet NTCSA’s targets, will
Important Dates
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)Sworn affidavit must be signed in the presence of a Commissioner of Oath and must be signed and stamped by the Commissioner.
Contact Information
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)Buyer: Tshifhiwa Mudau. SDL&I contacts listed: Takalani Makhaphidzwa (Learner non-technical, Supplier Development Localisation & Industrialisation) and R. Tsikungulu (Senior Advisor, SDL&I), both dated 03 July 2026.
Submission Guidelines
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)Returnable documents include a valid B-BBEE certificate issued by a SANAS accredited verification agency, a sworn affidavit, or a CIPC affidavit to claim preference points. Since the commodity is not a designated sector, no local content threshold applies; however, the SDL&I Implementation Schedule must be completed and returned to the SDL&I representative within 28 days after contract award. Reports must be submitted quarterly to NTCSA in accordance with the Data Collection Template.
Evaluation Criteria
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)Objective criteria are included as a condition for contract award and align with PPPFA clause 2(1)(f). Non-compliance may lead to the second-ranked tenderer being recommended for award. Tenderers should also note that this commodity is not a designated sector, so no local content threshold must be met. CIDB compulsory training is not applicable. National Industrial Participation Programme does not apply.
Technical Specifications
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)The tender is for professional services for the investigation of instability at the NTCSA Vulcan Substation. Objective criteria may be included at award stage under PPPFA clause 2(1)(f). The commodity is not a designated sector so no local production threshold applies. No CIDB compulsory training applies and NIPP is not applicable.
Methodology
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)their supply network. In certain cases, the SETA’s accredited training providers can be approached to
participate in developing critical and scarce skills.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
File name: 559-156509788 (Rev 1) NTCSA SDL&I Input of 5
Document Identifier 559-156509788 Rev 1
SDL&I Input Effective Date July 2024
Review Date July 2027
Note: That these targets for skills development candidates categorically exclude Eskom employees
and registered learners. The tenderers are required to take full responsibility for the total cost of
developing the requisite skills, and Eskom shall not make any financial contribution towards the
fulfilment of this obligation. Tenderers also are advised to approach their relevant SETAs to access
grants, subsidies, and incentives as well as South African Revenue Services for tax rebates that
are earmarked for skills development initiatives
Section 4: SDL&I Penalty and Performance Security
NTCSA will apply a penalty of 2.5% of the invoice amount for failure to meet SDL&I obligations.
For the duration of the contract, NTCSA will retain 2.5% of every invoice (excluding VAT) as security
for the fulfilment of all SDL&I Obligations. The retained amounts shall only be released to the
Pricing Schedule
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)“Local Procurement Content” refers to value added in South Africa by South African resources. Where a
single contract involves a combination of local and imported goods and/or services, the tender response
must be separated into its components as per the Price Schedule included with the tender documents.
Financial Requirements
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)The bid estimate is R0 excluding VAT. Local procurement content target is 100%. Tenderers must complete the Price Schedule with their specific import/local content split. No designated sector threshold requirements. Bidders must submit proposals for jobs created and retained, and skills development targets.
Compliance Requirements
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)Mandatory for preference points: valid B-BBEE certificate issued by SANAS accredited verification agency, or sworn affidavit / CIPC affidavit. This commodity is NOT a designated sector (so no compulsory local content threshold), no CIDB compulsory training, no mandatory subcontracting, no National Industrial Participation Programme. A valid B-BBEE certificate from SANAS-accredited agency is required to claim preference points. Mandatory subcontracting and NIPP are marked N/A.
B-BBEE Requirements
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)Objective criteria: Valid B-BBEE certificate issued by a SANAS accredited verification agency / sworn affidavit / CIPC affidavit required to claim preference points. Designated Sectors: This commodity is not a designated sector. SBD 6.2 Declaration Form and Annex C (Local Content Declaration-Summary Schedule) are mandatory on contract award. CIDB Skills Development: No CIDB compulsory training. Mandatory Subcontracting: N/A. National Industrial Participation Programme: N/A.
Health & Safety
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)following key pointers to ensure their validity:
know that person is duly authorised to depose of an affidavit. (Mark the applicable option).
applicable, and enterprise business address.
specialised enterprises as per Statement 004, the percentage of black beneficiaries must be
reflected. (No blank spaces to be left).
statements or management account. (Mark the applicable option).
determine the total revenue. (Financial year end to be stipulated by day/month/year).
for the empowering supplier status.
affidavit must be signed in the presence of the Commissioner of Oath. Furthermore the
Commissioner must also sign and stamp)
person cannot by law, commission a sworn affidavit in which they have an interest.
Compiled by: Supported by:
Contractual Terms
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)SDL&I Penalty and Performance Security: NTCSA will apply a penalty of 2.5% of the invoice amount for failure to meet SDL&I obligations. NTCSA will retain 2.5% of every invoice (excluding VAT) as security for fulfilment of SDL&I obligations. Retained amounts released upon receipt of SDL&I progress reports, fulfilment of all obligations, and submission of approved compliance report by SDL&I Department.
Special Conditions
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)Reporting and Monitoring: Suppliers must submit quarterly reports to NTCSA in accordance with Data Collection Template. NTCSA reviews reports within 30 days and notifies suppliers in writing if obligations not met. Suppliers must implement corrective measures before next report, failing which retention clauses invoked. Every contract accompanied by SDL&I Implementation Schedule, to be completed and returned to SDL&I representative for acceptance 28 days after contract award.
Requirements
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)Market Research: Current Suppliers Providing the Services: NTCSA Vendor Database; Potential Supplier: CSD Suppliers.
Section
Source: SDL&I Inputs Instability in the vicinity of the NTCSA Vulcan Substation.pdf (TENDER)be allocated points in terms of a preference point system based on specific goals, NTCSA also requests that
Enterprise and must comply with all of the elements of QSE score card relevant to your sector unless an entity
Description
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)Indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
Category 2 (refer to clause 3.5.-105658000) -
Category 3 (refer to clause 3.5.-105658000) -
Category 4 (refer to clause 3.5.-105658000) X
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000) -
3 post-contract award(eskom)
Submission Guidelines
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)The tenderer must complete and sign the quality declaration form acknowledging Eskom's Supplier Quality Requirements, as per document 240-105658000 and ISO 9001. Only applicable quality categories, as indicated, may be selected. No other submission instructions were available in the provided source material.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)Tender evaluation will include assessment against Eskom's Supplier Quality Requirements. The tenderer must indicate acceptance of the applicable quality requirements by completing and signing the relevant sections of the quality documentation, including pre-contract award quality requirements, post-contract award requirementsainer—f the bid is awarded—including compliance with ISO 9001 quality management principles.
Technical Specifications
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)The tender concerns the provision of professional services to investigate potential subsurface instability at the NTCSA Vulcan Substation. The specific technical scope of the investigation is not detailed in the available documentation.
Methodology
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)CLAUSE 5 Leadership - PRINCIPLE 2 Leadership X
CLAUSE 6 Planning - PRINCIPLE 3 Engagement of people X(ESKOM)
C CLAUSE 7 Support - PRINCIPLE 4 Process approach X
CLAUSE 8 Operation - PRINCIPLE 5 Improvement X
CLAUSE 9 - Evidence based decision
Performance Evaluations PRINCIPLE 6 XSECTION making
CLAUSE 10 - Improvement PRINCIPLE 7 Relationship Management X
Quality Management
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)Authorisation Date January 2022
240-105658000 and
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Eskom Rights of Access (refer to clause 3.8.-105658000) X
Eskom Rights to Information (refer to clause 3.8.-105658000) X
Preservation (refer to clause 3.8.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Management of Nonconformities and Nonconforming Outputs Identified by Eskom (refer to clause 3.8.-
Special processes (refer to clause 3.8.-105658000) x
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
9001 standard clause description (x) as applicable principles principle description (x) as applicable
Or (-) if not or (-) if not
Representativesection (tenderer)
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-
105658000 Specification and ISO 9001 Standard.
Financial Requirements
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)No financial requirements, pricing format, or bond/guarantee details were provided in the available documentation.
Compliance Requirements
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)The tenderer must complete and sign the Eskom Supplier Quality Requirements form (240-105658000), acknowledging acceptance of Eskom's quality requirements including ISO 9001 standards. Category 4 of the quality requirements applies. The tenderer must also accept Eskom's rights of access, rights to information, preservation requirements, quality audit conditions, and management of nonconformities.
Section
Source: 240-68099512 Form A_Cat 4_ Rev 9 - Investigate subsurface instability at Vulcan Substation.pdf (unknown)Ard indicate with an quality iso 9001 standard indicate with an
Performance Evaluations PRINCIPLE 6 XSECTION making
Eskom’s quality
REPRESENTATIVE Siyabulela Nciweni Quality Management Officer 01 July 2026SECTION (ESKOM)
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240
TENDER & CONTRACT QUALITY Document Identifier 240-68099512 Rev 9
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Pre-contract award quality requirements x
B Contract Execution (refer to clause 3.7.-105658000) X CLAUSE Supplier Quality Performance Monitoring Phase (refer to clause 3.7.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
Performance Evaluations PRIN
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Lake Street, Germiston, Johanessburg, 1401, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
18
Last checked
29 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
021-980-7509[email protected]www.eskom.co.za/Pages/Landing.aspxLake Street, Germiston, Johanessburg, 1401, South Africa
Key Personnel
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
Definitive guide to Health Professions Council of South Africa registration for healthcare professionals bidding on government tenders. Covers the 12 professional boards, step-by-step registration, CPD requirements, foreign qualification evaluation, provincial health department tender opportunities, and how AI Tender Matching on Tenders-SA.org helps you find HPCSA-requiring contracts.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.