Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Eskom Tender, Office Millenium Building, 90 Hans van Rensburg Street, Polokwane, 0699 - Polokwane - POLOKWANE - 0700
Organization Type
GOVERNMENT
Published
20 Oct 2026
OCDS Reference
ocds-9t57fa-174766
ESKOM requires the installation of 24-core optical ground wire (opgw) between five pairs of substations in limpopo: rampheri–unin, hlanganani–mashau, paradise–mandala, silimela mts–wolwekral, and uchoba–der brochen. The tender is an open request for bid for electrical engineering services. Bidders must comply with local content requirements under sats 1286:2011, including submitting declaration c by the closing date and time, and be prepared to provide detailed evidence of imported and local content calculations.
Closing date and time: 13 November 2026 at 10:00 (as per tender record).
Local content declaration: Declaration C (Local Content Declaration – Summary Schedule) must be submitted with the tender by the closing date and time.
Supporting declarations: Declarations D (Imported Content Declaration) and E (Local Content Declaration – Supporting Schedule) must be completed and may be requested by the tender authority; if the bid is successful, all three declarations must be updated with actual values for the contract duration.
Local content calculation: Must follow SATS 1286:2011; local content is the tender price less imported content, expressed as a percentage.
Imported content evidence: For any imported components, materials, or services, bidders must provide verifiable evidence (e.g. commercial invoices, bills of entry) and obtain Declaration D from third-party suppliers.
Deemed imported content: If the origin of components, parts, or materials is not available, it will be deemed imported content.
Exchange rate: The tender exchange rate must be provided as per SBD/MBD 6.2.
Exemptions: Any exemptions to imported content must be granted by the Department of Trade, Industry and Competition (the dti) and evidence included in Annexure D.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Friday, 13 November 2026 - 10:00
Venue
Microsoft Team
Categories
Request for Bid(Open-Tender)
Eskom Tender, Office Millenium Building, 90 Hans van Rensburg Street, Polokwane, 0699 - Polokwane - POLOKWANE - 0700
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Professional Engineering Technologist (Pr.Tech Eng), CESA Membership
AI Document Analysis Stages
Description
20 Oct
2026
Tender Published
Tender was published
13 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NRS 061-2 Published.pdf
Installation of 24-core OPGW (optical ground wire) between five pairs of substations in Limpopo, as specified by Eskom. The work includes stringing, tensioning, earthing, jointing and terminating the OPGW, and must comply with the NRS 061-2:2022 installation guidelines.
NEC Fibre Optic OPGW Line Installation Paradise and Mandala 132 kV line Services.pdf
Eskom is procuring the installation of 24-core OPGW (optical ground wire) between Paradise and Mandala substations, with a contract period of two months. The contract is based on the NEC3 Engineering and Construction Contract (Option B: Priced contract with bill of quantities) and includes associated testing, commissioning, and compliance with Eskom's standard conditions.
SDLI Strategy Setting for Bidders - Rampheri OPGW 1.pdf
Installation of 24-core OPGW fibre optic cable between five pairs of Eskom substations in Limpopo — Rampheri and UNIN, Hlanganani and Mashau, Paradise and Mandala, Silimela MTS and Wolwekraal, and Uchoba and der Brochen — over a 3-month contract period. Bids are evaluated on the 80/20 preference system with B-BBEE status as the specific goal, and carry binding socio-economic (SDL&I) commitments measured against designated-sector local content thresholds.
BOQ _OPGW Installation on Overhead 132kV Hlanganani - Mashau Line 19.10.2026.xlsx
Eskom requires the installation of 24-core OPGW fibre optic cable on five routes in Limpopo: Rampheri–Unin, Hlanganani–Mashau, Paradise–Mandala, Silimela MTS–Wolwekraal and Uchoba–der Brochen. The scope runs from patch panel to patch panel and covers stringing and regulation of OPGW, ADSS and duct cable, tower dressing, road, rail, HV and river crossings, directional drilling, trenching, patch panels, Sarel boxes, splicing and end-to-end fibre testing. Pricing is a bill of quantities keyed to Eskom SAP service numbers.
Guidelines to complete Local Content Documents.pdf
Installation of 24 core OPGW (optical ground wire) between five pairs of substations in Limpopo — Rampheri and Unin, Hlanganani and Mashau, Paradise and Mandala, Silimela MTS and Wolwekral, and Uchoba and der Brochen — for Eskom. Bids close on 13 November 2026 at 10:00.
Form A- OPGW- Paradise 2.pdf
Installation of a new 24-core OPGW (optical ground wire) cable between five pairs of substations in Limpopo: Rampheri–Unin, Hlanganani–Mashau, Paradise–Mandala, Silimela MTS–Wolwekral, and Uchoba–der Brochen. The contract is issued by Eskom and is subject to the quality requirements of specification 240-105658000 and ISO 9001.
240-60725641 rev 4 Specification for standard 19 inch equipment cabinets.pdf
Eskom requires the installation of 24-core OPGW (optical ground wire) between five pairs of substations in Limpopo: Rampheri–Unin, Hlanganani–Mashau, Paradise–Mandala, Silimela MTS–Wolwekral, and Uchoba–der Brochen. The contract covers supply, installation, and associated works for the optical fibre cabling between these substations.
240-126469599_Method Statement template Rev2 .pdf
Installation of 24 Core OPGW (optical ground wire) between five pairs of substations in Limpopo, for Eskom. The work involves supplying and installing 24-core OPGW between Rampheri and Unin, Hlanganani and Mashau, Paradise and Mandala, Silimela MTS and Wolwekral, and Uchoba and der Brochen substations.
Labelling of Fibre-Optic Cables Standard.pdf
Eskom requires the installation of 24-core OPGW (Optical Ground Wire) cable between five pairs of substations in Limpopo: Rampheri–Unin, Hlanganani–Mashau, Paradise–Mandala, Silimela MTS–Wolwekral, and Uchoba–der Brochen. The work falls under Eskom Transmission and Distribution and must comply with Eskom's labelling standard for fibre optic cables.
NEC Fibre Optic OPGW Line Installation Rampheri 132 kV line Services.pdf
Installation of 24-core OPGW (optical ground wire) between five pairs of substations in Limpopo, South Africa, under an NEC3 Engineering and Construction Contract (Option B: Priced contract with bill of quantities). The contract is issued by Eskom Holdings SOC Ltd and covers a period of 3 months per project, with specific completion dates to be defined in Project Specific Agreements.
NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf
Installation of 24-core OPGW (optical ground wire) between Silimela MTS and Wolwekraal substation, with a contract period of 2 months, under an NEC3 Engineering and Construction Contract (Option B, priced contract with bill of quantities). The employer is Eskom Holdings SOC Ltd, and the contract includes provisions for sectional completion, delay damages, retention, and various additional conditions.
SDLI Strategy Setting for Bidders - Mandala Paradise.pdf
Installation of 24-core OPGW fibre optic cable between specified substations in Limpopo, with a project duration of 3 months. The tender is issued by Eskom and includes SDL&I objectives, local content requirements, and B-BBEE preference points.
Quality Control Plan or Inspection Test Plan (QCP or ITP) Template.pdf
Installation of 24-core OPGW (optical ground wire) cable between five pairs of substations in Limpopo, South Africa, under an Eskom contract. The work involves supply and installation of the cable and associated quality control and inspection activities.
Distribution Frame Patch Panel standard 240-70733995.pdf
Installation of 24-core OPGW (Optical Ground Wire) cable between five pairs of substations in Limpopo, for Eskom. The work includes supply, delivery, installation, testing, and commissioning of the OPGW and associated optical distribution frames/patch panels/boxes.
Form A- OPGW- Hlanganani.pdf
Installation of 24-core OPGW (optical ground wire) between five pairs of substations in Limpopo, South Africa, for Eskom. The contract is for the Hlanganani Substation to Mashau Substation route, with quality requirements aligned to ISO 9001 and Eskom's specific quality clauses.
NRS 078-2 2022 Published.pdf
Installation of 24-core OPGW (optical ground wire) cable between five pairs of substations in Limpopo, for Eskom. The work includes stringing, tensioning, jointing, terminating, and testing of the fibre optic cable, following the NRS 078-2:2022 installation guidelines.
BOQ_OPGW Installation on Overhead Fibre Silimela Wolwekraal 19.10.2026.xlsx
Installation of 24-core OPGW (optical ground wire) fibre optic cable between five pairs of substations in Limpopo, South Africa, for Eskom. The scope includes stringing and regulation of OPGW and ADSS cables, splicing, joint boxes, crossings (roads, rail, HV lines, rivers), duct cable installation, trenching, patch panels, Sarel boxes, fibre splicing and testing, and associated preliminary and general works.
SDLI Strategy Setting for Bidders - Uchoba Der Brochen.pdf
Installation of 24-core OPGW fibre optic cable between five pairs of substations in Limpopo, for Eskom. The project duration is 2 months, and the tender is evaluated under the 80/20 preference points system, with up to 20 points for B-BBEE status.
NEC Fibre Optic OPGW Line Installation Uchoba and Der Brochen 132 kV line Services.pdf
Eskom is procuring the installation of 24-core OPGW (optical ground wire) between Uchoba and Der Brochen substations in Limpopo, under an NEC3 Engineering & Construction Contract (Option B: Priced contract with bill of quantities). The contract duration is 2 months, with completion and key dates to be defined in a Project Specific Agreement. The tender pack includes standard NEC3 contract data, pricing data, and forms of securities, but lacks detailed scope, site information, and evaluation criteria.
BOQ_OPGW Installation on Overhead 132kV Uchoba - Der Brochen Line 19.10.2026.xlsx
Eskom requires the installation of 24 core OPGW fibre optic cable between five substation pairs in Limpopo: Rampheri–Unin, Hlanganani–Mashau, Paradise–Mandala, Silimela MTS–Wolwekral, and Uchoba–der Brochen. The scope runs from stringing and regulation of OPGW and ADSS, splicing and joint boxes, crossings and tower dressing, through to duct installation, patch panels, Sarel boxes and end-to-end acceptance testing. Bidders are evaluated on capability, equipment, previous fibre experience and methodology before price.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf
Installation of 24 core OPGW between Rampheri and Unin, Hlanganani and Mashau, Paradise and Mandala, Silimela MTS and Wolwekraal, and Uchoba and der Brochen substations for Eskom in Limpopo. Service contractors must complete the PAYE Questionnaire for Service Contracts (2026/2027 tax year) for PAYE classification. Closing date: 13 November 2026 at 10:00.
LOCAL CONTENT ANNEX CDE.xls
Installation of 24 core OPGW fibre optic cable between five pairs of substations in Limpopo: Rampheri and Unin, Hlanganani and Mashau, Paradise and Mandala, Silimela MTS and Wolwekral, and Uchoba and der Brochen. Bidders must price the work and submit local and imported content declarations in line with SATS 1286.2011.
SDLI Strategy Setting for Bidders - Hlanganani Mashau.pdf
Installation of 24-core OPGW fibre optic cable between five pairs of substations in Limpopo, with a project duration of three months. The contract is awarded under the 80/20 preferential procurement system, with up to 20 points for B-BBEE status and specific goals.
SANS61386-1_2017_Ed2Am1.pdf
Installation of 24-core OPGW (optical ground wire) cable between five pairs of substations in Limpopo, for Eskom. The work involves supplying and installing the OPGW along the specified routes, likely including associated hardware and testing.
SANS61386-24.pdf
Eskom requires the installation of 24-core OPGW (optical ground wire) between five pairs of substations in Limpopo: Rampheri–Unin, Hlanganani–Mashau, Paradise–Mandala, Silimela MTS–Wolwekral, and Uchoba–der Brochen. The tender also references SANS 61386-24:2005, which specifies requirements for conduit systems buried underground, indicating that underground conduit installation is part of the scope.
NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf
Eskom requires the installation of 24-core OPGW (optical ground wire) between Hlanganani and Mashau substation in Limpopo, delivered under an NEC3 Engineering and Construction Contract (April 2013) over a period of 2 months. The advertised package covers five separate substation pairs, with this contract data set drafted for the Hlanganani and Mashau route.
Form A- OPGW- Paradise.pdf
Eskom requires the installation of 24-core OPGW (optical ground wire) between five pairs of substations in Limpopo: Rampheri–Unin, Hlanganani–Mashau, Paradise–Mandala, Silimela MTS–Wolwekraal, and Uchoba–der Brochen. Bidders must complete the tender and contract quality requirements form, confirming applicability of Eskom specification 240-105658000 and the ISO 9001 standard clauses.
SDLI Strategy Setting for Bidders - Silimela Wolwekraal.pdf
Eskom requires the installation of 24-core OPGW fibre optic cable on the Silimela–Wolwekraal substation route in Limpopo, delivered over a 2-month contract period. Award is made on the 80/20 preference point system, with up to 20 points for B-BBEE status level added to price points, and is subject to mandatory local production and content thresholds for optical fibre cable.
240-70732888 Fibre Optic Cable system acceptance testing.pdf
Installation of 24 core OPGW between five pairs of Eskom substations in Limpopo: Rampheri–Unin, Hlanganani–Mashau, Paradise–Mandala, Silimela MTS–Wolwekral and Uchoba–der Brochen. Acceptance testing of the new fibre optic cable system is governed by Eskom standard 240-70732888, which sets the splice, optical testing, dispersion and documentation requirements the installation must meet.
BOQ_OPGW Installation on Overhead 132kV Paradise - Mandala Line 19.10.2026.xlsx
Installation of 24-core OPGW (optical ground wire) fibre optic cable between five pairs of substations in Limpopo, South Africa, for Eskom. The scope includes stringing and regulation of OPGW and ADSS cables, splicing, joint boxes, crossings (roads, rail, rivers, HV lines), duct cable installation, trenching, patch panels, Sarel boxes, fibre splicing and testing, and associated preliminary and general (P&G) works.
Form A- OPGW-Silimela.pdf
Installation of 24-core OPGW (optical ground wire) between five pairs of substations in Limpopo, South Africa, for Eskom. The contract covers pre-contract award quality requirements (Category 4) and post-award quality management under ISO 9001.
BOQ OPGW Installation on Overhead 132kV Unin - Ramphere Line 19.10.2026.xlsx
Eskom requires the installation of 24-core OPGW (Optical Ground Wire) cable between five pairs of substations in Limpopo: Rampheri–Unin, Hlanganani–Mashau, Paradise–Mandala, Silimela MTS–Wolwekral, and Uchoba–der Brochen. The scope covers stringing, splicing, testing, duct cable installation, patch panels, Sarel boxes, and associated civil works, with a closing date of 13 November 2026 at 10:00.
E-tendering Help Manual for supplier.pdf
Installation of 24 Core OPGW (optical ground wire) between five pairs of substations in Limpopo, for Eskom. The work involves supplying and installing 24-core OPGW cabling between the listed substations.
Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf
Eskom requires the installation of 24 core OPGW (optical ground wire) on five separate routes linking named substation pairs in Limpopo: Rampheri to Unin, Hlanganani to Mashau, Paradise to Mandala, Silimela MTS to Wolwekraal, and Uchoba to der Brochen. The work is tendered under Eskom's Standard Conditions of Tender, with submission closing on 13 November 2026 at 10:00.
Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf
Installation of 24 core OPGW fibre optic cable between five pairs of substations — Rampheri and Unin, Hlanganani and Mashau, Paradise and Mandala, Silimela MTS and Wolwekral, and Uchoba and der Brochen — for Eskom in Limpopo. The work is let as five separate NEC3 Engineering and Construction Contracts, with one Invitation to Tender covering all five.
Form A- OPGW-Uchoba.pdf
Eskom requires the installation of 24 core OPGW (optical ground wire) on five substation routes in Limpopo: Rampheri to Unin, Hlanganani to Mashau, Paradise to Mandala, Silimela MTS to Wolwekral, and Uchoba to der Brochen. Bids close on 13 November 2026 at 10:00. Quality compliance is governed by Eskom specification 240-105658000 and the ISO 9001 standard.
Form A- OPGW-Rampheri.pdf
Installation of a new 24 Core OPGW link between Rampheri Substation and UNIN Substation, forming one section of a wider Eskom programme covering five substation-pair installations across Limpopo. Bidders must complete and sign Form A, which sets the tender and contract quality requirements against the ISO 9001 standard for this section.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 687 500
Range
Based on CIDB grading. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Eskom requires standard 19-inch equipment cabinets for mounting miscellaneous rack-mounted equipment in substation control rooms. Cabinet types include standard equipment cabinets (Types A, B, C), swing frame cabinets, internal swing frame cabinets, metering equipment cabinets, protection fixed frame cabinets, protection swing frame cabinets, circuit breaker panels, and AC supply modules.
Submission Guidelines
Source: 240-60725641 rev 4 Specification for standard 19 inch equipment cabinets.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: 240-60725641 rev 4 Specification for standard 19 inch equipment cabinets.pdf (unknown)Bidders must complete the technical A/B schedules; failure to do so renders the tender non-compliant. A prototype inspection is performed to ensure sound construction and compliance with the specification. A final visual inspection by the purchaser's quality assurance representative is performed prior to dispatch to sites. No other evaluation criteria (e.g., price, functionality, preference points) are stated in the provided document.
Technical Specifications
Source: 240-60725641 rev 4 Specification for standard 19 inch equipment cabinets.pdf (unknown)Eskom requires the design and manufacture of standard 19-inch equipment cabinets for mounting miscellaneous rack-mounted equipment in substation control rooms. The following cabinet types are covered:
Key technical requirements:
Methodology
Source: 240-60725641 rev 4 Specification for standard 19 inch equipment cabinets.pdf (unknown)The specification provides detailed technical requirements for design and manufacture, including materials, dimensions, mounting, earthing, ventilation, corrosion protection, and testing. A prototype of each item must be supplied to Eskom for inspection and testing before acceptance. If construction differs from Eskom Master Drawings, the supplier's general arrangement drawings must be submitted for approval prior to construction.
Quality Management
Source: 240-60725641 rev 4 Specification for standard 19 inch equipment cabinets.pdfQuality requirements include compliance with QM-58 (Supplier Contract Quality Requirements) and ISO 9001 (informative). Testing includes continuity testing of exposed metal parts to ensure 0.1 ohm or less. Test certificates must be kept on file and supplied with each order. A prototype inspection and final visual inspection by the purchaser's quality assurance representative are required.
Pricing Schedule
Source: 240-60725641 rev 4 Specification for standard 19 inch equipment cabinets.pdf (unknown)A transport rate table is provided with daily rates per running kilometre based on tonnage and distance ranges. Suppliers must itemise transport costs where requested.
Financial Requirements
Source: 240-60725641 rev 4 Specification for standard 19 inch equipment cabinets.pdf (unknown)Transport rate table provided with daily rates per running kilometre based on tonnage and distance ranges (100–450 km up to 2501–3000 km; 0–1 ton and 1.1–3 ton). Suppliers must itemise transport costs where requested. No other financial requirements (e.g., bid security, guarantees, payment terms) are stated in the provided document.
Compliance Requirements
Source: 240-60725641 rev 4 Specification for standard 19 inch equipment cabinets.pdf (unknown)Compliance with the following standards is required (most recent editions):
No other eligibility thresholds (e.g., CSD, B-BBEE, CIDB) are stated in the provided document.
Health & Safety
Source: 240-60725641 rev 4 Specification for standard 19 inch equipment cabinets.pdfSafety considerations: gland plates must have rounded edges and no sharp corners to protect installation staff; sharp edges must be removed from all cabinet parts. Hexavalent yellow passivation is prohibited due to its hazardous nature; trivalent blue passivation must be used.
Environmental
Source: 240-60725641 rev 4 Specification for standard 19 inch equipment cabinets.pdfHexavalent chromium passivation is prohibited; trivalent blue passivation must be used instead.
Contractual Terms
Source: 240-60725641 rev 4 Specification for standard 19 inch equipment cabinets.pdfThe specification is the technical basis for any supply contract. Incomplete tender submissions are non-compliant. The supplier must not change the content of the specification. For each A/B schedule clause, the supplier must state "Comply" or "Do not Comply" and provide deviation details with reference numbers. All additional options must be detailed.
Section
Source: 240-60725641 rev 4 Specification for standard 19 inch equipment cabinets.pdfNo additional evaluation criteria beyond the requirement to complete A/B schedules and provide a prototype for inspection are stated in the provided document.
Description
Source: NEC Fibre Optic OPGW Line Installation Rampheri 132 kV line Services.pdf (unknown)Installation of 24-core OPGW on the Rampheri–Unin 132 kV line, between Rampheri Substation and Unin Substation, over a 3-month contract period.
Contact Information
Source: NEC Fibre Optic OPGW Line Installation Rampheri 132 kV line Services.pdf (unknown)Employer
Megawatt Park
Maxwell Drive
Sandton
Johannesburg
Project Manager
Supervisor
Submission Guidelines
Source: NEC Fibre Optic OPGW Line Installation Rampheri 132 kV line Services.pdf (unknown)Returnable documents (from the contract's returnable schedule)
Submission mechanics
Technical Specifications
Source: NEC Fibre Optic OPGW Line Installation Rampheri 132 kV line Services.pdf (unknown)Scope
Key dates and milestones
Technical standards and interfaces
Experience & Qualifications
Source: NEC Fibre Optic OPGW Line Installation Rampheri 132 kV line Services.pdf (unknown)Key persons
Quality Management
Source: NEC Fibre Optic OPGW Line Installation Rampheri 132 kV line Services.pdf (unknown)Defects and testing
Pricing Schedule
Source: NEC Fibre Optic OPGW Line Installation Rampheri 132 kV line Services.pdf (unknown)Pricing form
Financial Requirements
Source: NEC Fibre Optic OPGW Line Installation Rampheri 132 kV line Services.pdf (unknown)Pricing basis
Payment
Securities and deductions
Liability limits
Insurance
Compliance Requirements
Source: NEC Fibre Optic OPGW Line Installation Rampheri 132 kV line Services.pdf (unknown)Contract framework
B-bbee
Statutory and safety compliance
Ethics and integrity
Joint ventures
Other obligations
Health & Safety
Source: NEC Fibre Optic OPGW Line Installation Rampheri 132 kV line Services.pdf (unknown)Health and safety
Asbestos
Environmental
Source: NEC Fibre Optic OPGW Line Installation Rampheri 132 kV line Services.pdf (unknown)Environmental obligations
Contractual Terms
Source: NEC Fibre Optic OPGW Line Installation Rampheri 132 kV line Services.pdf (unknown)Contract form
Time
Payment and interest
Risk allocation
Disputes
Termination and conduct
Description
Source: Form A- OPGW- Paradise 2.pdfInstallation of new 24 core OPGW on the Paradise Substation to Mandala Substation route, executed under Eskom specification 240-105658000.
Quality categorisation selected on Form A
Submission Guidelines
Source: Form A- OPGW- Paradise 2.pdf (unknown)Returnable document
No submission channel, address, closing time, copy count or packaging instruction appears in this document.
Technical Specifications
Source: Form A- OPGW- Paradise 2.pdf (unknown)Scope
Quality regime applying to the work
Eskom rights reserved during execution
Quality Management
Source: Form A- OPGW- Paradise 2.pdfThe bidder's quality system must satisfy specification 240-105658000 at pre-contract award level, with Category 4 selected, and must cover the ISO 9001 clauses and quality principles marked applicable on Form A. Post-contract award monitoring is not selected.
Compliance Requirements
Source: Form A- OPGW- Paradise 2.pdf (unknown)Quality management
No CSD, tax, B-BBEE, CIDB or local content thresholds are stated in this document.
Description
Source: 240-126469599_Method Statement template Rev2 .pdf (RFQ)The document provided is a Method Statement Template (Eskom document 240-126469599 Rev 2) to be completed by the bidder. It requires the bidder to outline the scope of work, list objectives, describe customer focus, competency, infrastructure, leadership, risk management, improvement actions, data analysis, and relationship management.
Important Dates
Source: 240-126469599_Method Statement template Rev2 .pdf (RFQ)Closing date: 13 November 2026 at 10:00.
No other dates (briefing, site visit, clarification deadlines) are stated in the provided document.
Contact Information
Source: 240-126469599_Method Statement template Rev2 .pdf (RFQ)No contact names, emails, or telephone numbers are provided in the document. The template references 'Client (Division/Operating/Business Unit as per tender/RFQ)' and 'Tender/RFQ Number' – these must be obtained from the full tender pack.
Submission Guidelines
Source: 240-126469599_Method Statement template Rev2 .pdf (RFQ)Returnable documents: The bidder must complete and submit the Method Statement Template (Eskom document 240-126469599 Rev 2) as part of the bid. The template requires details of the compiler, method statement title, client division, tender/RFQ number, and a detailed description of the scope of work. All sections of the template must be filled in.
Submission method and address: Not stated in the provided document. Refer to the full tender pack for submission instructions.
Closing time: 10:00 (from the tender record).
Evaluation Criteria
Source: 240-126469599_Method Statement template Rev2 .pdf (RFQ)No explicit evaluation criteria (e.g., price/functionality split, minimum qualifying score, preference point system) are stated in the provided document. The method statement template must be completed and submitted; the evaluation will likely consider the quality of the method statement, but specific scoring is not detailed here.
Technical Specifications
Source: 240-126469599_Method Statement template Rev2 .pdf (RFQ)Scope of work: Installation of 24 Core OPGW (Optical Ground Wire) between the following substations:
Method Statement Template requirements (to be completed by the bidder):
Methodology
Source: 240-126469599_Method Statement template Rev2 .pdf (RFQ)The method statement template requires the bidder to outline the scope of work, list 2-3 SMART objectives, describe how customer needs are identified and communicated, detail skills/competencies/training required, list PPE and tools/equipment needed, explain how the organisation's mission/vision/values are communicated, identify risks and mitigation actions, describe improvement actions, specify data collection and analysis for improvement, identify affected stakeholders and actions to address them, and explain supplier identification, selection, evaluation, and performance monitoring.
Quality Management
Source: 240-126469599_Method Statement template Rev2 .pdf (RFQ)The method statement template requires the bidder to describe how customer needs are identified and communicated, how the organisation's mission/vision/values are communicated, and how risks affecting outputs are identified and managed. It also requires listing PPE and tools/equipment needed to deliver the scope.
Financial Requirements
Source: 240-126469599_Method Statement template Rev2 .pdf (RFQ)No financial requirements (pricing format, bid security, bonds, guarantees, retention, payment terms, turnover) are stated in the provided document.
Compliance Requirements
Source: 240-126469599_Method Statement template Rev2 .pdf (RFQ)No specific compliance requirements (CSD registration, tax clearance, B-BBEE, CIDB, CIPC, local content) are stated in the provided document. The method statement template must be completed and submitted.
Section
Source: 240-126469599_Method Statement template Rev2 .pdf (RFQ)No additional evaluation criteria are stated in the provided document.
Description
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)The works are the installation of 24 Core OPGW between Silimela MTS and Wolwekraal Substation for a period of 2 months. The contract is between Eskom Holdings SOC Ltd and the Contractor, using the NEC3 Engineering and Construction Contract. Site boundaries are the various servitudes on which the distribution lines will be erected and the boundaries of substations. Site Information is in Part C4, Works Information in Part C3.
Important Dates
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)Closing date: 13 November 2026 at 10:00 (from tender record).
No briefing or site visit dates are stated in the document.
Contact Information
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)Project Manager: Eskom LIMLANGA Cluster (to be confirmed)
Supervisor: to be confirmed
Adjudicator: selected from ICE-SA Division of the South African Institution of Civil Engineering (see www.ice-sa.org.za); if parties do not agree, appointed by the Arbitration Foundation of Southern Africa (AFSA).
No email, telephone, or physical address for contacts is provided in the document.
Submission Guidelines
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)Returnable documents (all must be completed, signed and submitted):
Submission method: not stated in the document. Closing time: 10:00 on 13 November 2026 (from tender record).
Evaluation Criteria
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)The document does not state a scoring system, preference point system (80/20 or 90/10), or minimum qualifying score. Evaluation appears to be based on compliance with the NEC3 contract conditions and the tenderer's ability to meet the requirements. The Employer may require a parent company guarantee and/or performance bond based on a financial analysis report.
Technical Specifications
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)Scope: Installation of 24 Core OPGW (Optical Ground Wire) between Silimela MTS and Wolwekraal Substation.
Contract period: 2 months.
Key activities (key dates):
Site boundaries: the various servitudes on which the distribution lines will be erected, per the terms of the agreed servitudes, and the boundaries of substations.
Works Information is in Part C3 (Scope of Work) and all documents and drawings referenced therein.
Site Information is in Part C4.
Methodology
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)The document does not prescribe a specific methodology. The Contractor must provide a first programme for acceptance within 1 week after the Project Specific Agreement is issued, and revised programmes at intervals no longer than 2 weeks or as required by the Project Manager. Key dates include stringing and regulation, and end-to-end testing.
Experience & Qualifications
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)Contract Data Part Two requires the Contractor to provide key persons with names, jobs, responsibilities, qualifications, and experience, with CVs appended to a Tender Schedule.
Quality Management
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)The document does not specify a separate quality management system. Quality is addressed through the NEC3 contract's defect correction provisions: the defects date is 52 weeks after Completion, and the defect correction period is 5 working days. The Contractor is liable for defects due to his design if he did not use reasonable skill and care.
Pricing Schedule
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)Pricing Data includes: Form of Offer and Acceptance with offered total of Prices exclusive of VAT, VAT at 15%, and total inclusive of VAT; Contract Data Part Two requires tendered total of Prices (excluding VAT); direct fee percentage 10%, subcontracted fee percentage 10%; people overheads percentage 10%; design overheads percentage to be inserted; hourly rates for design outside Working Areas; bill of quantities in Part C2; method of measurement as stated in Part C2.1 Pricing Assumptions; rates fixed and firm for duration of project.
Financial Requirements
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)Pricing: NEC3 Option B – Priced contract with bill of quantities.
Payment:
Retention: 2.5% (Option X16).
Delay damages: R2,000 per day, up to a limit of 5% of total project cost (Option X7).
Performance bond: only if required by financial analysis (Option X13).
Parent company guarantee: only if required by financial analysis (Option X4).
Liability limits:
Insurance: Contractor must provide insurances per Insurance Table A (e.g., loss/damage to works, equipment, third-party liability). Employer provides insurances per Insurance Table B (e.g., assets all risk, contract works, environmental liability, public liability).
Compliance Requirements
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)Legal entity: must be a company or joint venture capable of entering into a contract.
CIDB: registration number requested in the Form of Offer (if applicable).
Tax: must comply with VAT Act and include Employer's VAT number 4740101508 on invoices; valid tax clearance implied.
B-BBEE: status must be verifiable; any change in status must be notified within 7 days, and updated verification certificate submitted within 30 days. A decrease in status may lead to renegotiation or termination.
Joint ventures: if a JV, all members are jointly and severally liable; must notify Project Manager of key person with authority to bind within 2 weeks of Contract Date; cannot change composition without written consent.
Ethics: prohibited actions (coercive, collusive, corrupt, fraudulent, obstructive) may lead to termination.
Health & safety: must comply with Construction Regulations 2014 and all applicable health & safety laws; may be appointed as Principal Contractor.
Environmental: must comply with all applicable environmental laws and regulations.
Asbestos: must comply with Employer's Asbestos Standard 32-303 and Asbestos Regulations; removal/disposal only by registered asbestos contractor at Employer's expense.
Health & Safety
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)The Contractor must take all reasonable precautions to maintain health and safety, may be appointed as Principal Contractor under Construction Regulations 2014, warrants that Prices include sufficient amount for compliance with health & safety laws, and must comply with all applicable health & safety regulations and rules. Asbestos provisions: Employer ensures ambient air conforms to prescribed standards; OEL for asbestos is 0.2 fibres/ml as 4-hour TWA; Contractor may stop work if asbestos identified; removal/disposal by registered asbestos contractor at Employer's expense.
Environmental
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)The Contractor must comply with all applicable environmental laws and regulations and rules, guidelines and procedures provided for under the contract, and ensure subcontractors and others under its control do likewise.
Contractual Terms
Source: NEC Fibre Optic OPGW Line Installation Silimela and Wolwekraal 132 kV line Services.pdf (unknown)The contract is an NEC3 Engineering and Construction Contract (April 2013) with main Option B (Priced contract with bill of quantities), dispute resolution Option W1, and secondary Options X1 (not applicable), X2, X4, X5, X7, X13, X15, X16, X18, and additional conditions Z1 to Z15. Key terms include: law of contract is South African law; language is English; period for reply is 1 week; completion date per Project Specific Agreement; key dates include stringing and regulation, and end-to-end testing; access dates per Project Specific Agreement; first programme due 1 week after Project Specific Agreement issued; starting date to be advised; revised programmes every 2 weeks or as required; Employer not willing to take over works before Completion Date; defects date 52 weeks after Completion; defect correction period 5 working days; assessment interval 1 month; currency is South African Rand; payment period 4 weeks; interest rate is prime plus 0% (Standard Bank) or LIBOR for other currencies; weather recording at Contractor's site camps and closest Weather Bureau Station, with excessive wind defined as >10 m/s or 36 km/h; additional Employer's risks include community unrest and riots; adjudicator selected from ICE-SA Panel, or appointed by AFSA; tribunal is arbitration under Association of Arbitrators (Southern Africa) rules; delay damages R2,000 per day up to 5% of total project cost; retention 2.5%; limitation of liability: indirect/consequential loss limited to R0; property damage liability limited to R15m for Generation, R7.5m for Transmission, R1m for Distribution; total liability limited to total of Prices; end of liability date 24 months after defects date for latent defects; additional conditions include cession restrictions, joint venture liability, B-BBEE status change notification, confidentiality, waiver, health/safety/environment compliance, tax invoice requirements, compensation event notification, employer's liability limitation, termination for business rescue, delay damages termination, ethics provisions, insurance requirements, nuclear liability, and asbestos management.
Description
Source: Labelling of Fibre-Optic Cables Standard.pdfThe standard applies to all Eskom Transmission and Distribution substations where fibre optic cables are installed for substation automation, telecommunication and teleprotection purposes. It defines the labelling convention for fibre optic cables, covering intra-control room cabling, HV yard conventional cabling, and HV yard Breaker and a half cabling.
Technical Specifications
Source: Labelling of Fibre-Optic Cables Standard.pdf (unknown)The standard defines the labelling convention for fibre optic cables in Eskom Transmission and Distribution substations.
Labelling convention: (Originating panel).(Voltage Level).(Destination panel).(Main 1/2)
Voltage level prefixes:
Cabling scenarios:
Intra-control room labelling:
HV yard conventional labelling:
HV yard Breaker and a half labelling:
Panel labelling:
Patch leads labelling:
Reference direction: from Yard (Junction Box) to Control room; for panels inside control room, from higher voltage panel to lower voltage panel.
Each fibre cable labelled with: bay prefix, voltage level number, destination cabinet, and main 1/2 number (where applicable).
Methodology
Source: Labelling of Fibre-Optic Cables Standard.pdf (unknown)The labelling convention is (Originating panel).(Voltage Level).(Destination panel).(Main 1/2). Voltage level prefixes: 765kV=8, 400kV=1, 275/220kV=2, 132kV=3, 88/66/44kV=4, 33/22/11kV=5. For intra-control room cabling, the fibre switching panel is always the destination. For HV yard conventional, label from JB to protection panel. For HV yard breaker and a half, label from JB to DIP. Patch panels are labelled with full description of originating bay. Patch leads are labelled as (Voltage Level).(Originating panel). Examples are provided for each scenario.
Compliance Requirements
Source: Labelling of Fibre-Optic Cables Standard.pdf (unknown)The standard references ISO 9001 Quality Management Systems as a normative reference.
Description
Source: SDLI Strategy Setting for Bidders - Mandala Paradise.pdfInstallation of 24-core OPGW fibre optic cable at Mandala Paradise. Project duration: 3 months.
Important Dates
Source: SDLI Strategy Setting for Bidders - Mandala Paradise.pdf (TENDER)Closing date: 13 November 2026 at 10:00 (from tender record).
No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Contact Information
Source: SDLI Strategy Setting for Bidders - Mandala Paradise.pdf (TENDER)No contact information is provided in the document.
Submission Guidelines
Source: SDLI Strategy Setting for Bidders - Mandala Paradise.pdf (TENDER)Returnable documents:
Submission method: not specified in the document.
Disqualification risks:
Evaluation Criteria
Source: SDLI Strategy Setting for Bidders - Mandala Paradise.pdf (TENDER)Evaluation is under the 80/20 preference point system.
Objective criteria (local production and content) are not scored but are a condition for award. If not met, the second-ranked tenderer may be recommended.
If documentation for preference points is not provided, the bidder is not disqualified but scores 0 out of 20 for specific goals and may only score out of 80 for price.
Technical Specifications
Source: SDLI Strategy Setting for Bidders - Mandala Paradise.pdf (TENDER)Scope: Installation of 24-core OPGW (Optical Ground Wire) fibre optic cable at Mandala Paradise.
Project duration: 3 months.
Local content thresholds (designated sectors):
Procurement from designated groups (target):
Employment:
Financial Requirements
Source: SDLI Strategy Setting for Bidders - Mandala Paradise.pdf (TENDER)SDL&I performance security:
Penalty:
No other financial requirements (bid security, bonds, guarantees, payment terms) are stated.
Compliance Requirements
Source: SDLI Strategy Setting for Bidders - Mandala Paradise.pdf (TENDER)B-bbee:
Sworn affidavit validity requirements:
Local content:
B-BBEE Requirements
Source: SDLI Strategy Setting for Bidders - Mandala Paradise.pdf (TENDER)Specific goals (B-BBEE) are scored under the 80/20 system, with points from Level 1 (20) to non-compliant (0). Required evidence: valid B-BBEE certificate or sworn affidavit, proof of ownership, certified ID copies of shareholders, proof of disability if applicable. Missing documentation means 0 points for specific goals and price scored out of 80 only.
Contractual Terms
Source: SDLI Strategy Setting for Bidders - Mandala Paradise.pdf (TENDER)SDL&I obligations are contractual. Failure to meet them incurs a penalty of 2.5% of order value. Eskom retains 2.5% of each invoice (excluding VAT) as security; release is conditional on receipt of progress reports, fulfilment of obligations, and an approved compliance report.
Special Conditions
Source: SDLI Strategy Setting for Bidders - Mandala Paradise.pdf (TENDER)SDL&I objectives: bidders must submit proposals for procurement from designated groups (target: 4.9% from EME/QSE >51% black-owned in Limpopo) and for jobs created/retained. Local communities must be prioritised for employment; unskilled labour sourced locally.
Reporting: quarterly SDL&I reports to Eskom; Eskom reviews within 30 days; corrective measures required if obligations not met, else retention clauses invoked. SDL&I Implementation Schedule must be returned within 28 days of award.
Requirements
Source: SDLI Strategy Setting for Bidders - Mandala Paradise.pdf (TENDER)Objective criteria (local production and content) are a condition for award. Designated sector thresholds: HDPE pipes 100%, optical fibre cables 90%, ducting and structural pipework 10%. SBD 6.2 and Annex C are mandatory returnables.
Sworn affidavits for B-BBEE must meet validity requirements: deponent details, ownership percentages, revenue, financial year end, status level, empowering supplier status, and signature dates.
Section
Source: SDLI Strategy Setting for Bidders - Mandala Paradise.pdfEvaluation uses the 80/20 preference point system. Price is scored out of 80; specific goals (B-BBEE status) out of 20. Total points rounded to two decimal places; highest scorer wins. Objective criteria (local content) are not scored but are a condition for award.
Description
Source: NRS 078-2 2022 Published.pdf (unknown)This document is NRS 078-2:2022, Part 2 of the NRS 078 series, providing installation guidelines for long-span all-dielectric self-supporting (ADSS) fibre optic cables used on overhead power lines. It covers stringing, tensioning, jointing, and terminating of ADSS cable. The document is a rationalized user specification issued by Eskom's Technical Governance Department, not a South African National Standard. It references NRS 078-1 for product specification and various SANS/IEC standards for testing.
Contact Information
Source: NRS 078-2 2022 Published.pdf (unknown)Contact: Dr eThekwini
Email: [email protected]
Department: Eskom
Address: Private Bag X13, Halfway House 1685
Submission Guidelines
Source: NRS 078-2 2022 Published.pdf (unknown)Returnable documents: none specified beyond the standard tender forms. Bidders must submit a complete bid with all required forms signed. Late submissions will be disqualified.
Evaluation Criteria
Source: NRS 078-2 2022 Published.pdf (unknown)Bidders must be authorised by the local utility to work on energised or de-energised lines, in accordance with the Occupational Health and Safety Act. Must comply with legal requirements for lifting equipment and portable earthing (SANS 61230). Must have an ISO 9001-certified quality management system. Must provide all pre-installation documentation (electric field plots, leakage current plots, sagging plans, structure loading calculations) for customer approval. Must use only manufacturer-approved fittings and installation procedures. Must return defective drums at supplier's cost; contractor responsible for cable protection until handover.
Technical Specifications
Source: NRS 078-2 2022 Published.pdf (unknown)Scope: Installation of 24 Core OPGW between the following substations:
Installation must follow NRS 078-2:2022 guidelines for long-span all-dielectric self-supporting (ADSS) fibre optic cables. Key requirements:
Quality Management
Source: NRS 078-2 2022 Published.pdf (unknown)Quality management requirements:
Compliance Requirements
Source: NRS 078-2 2022 Published.pdf (unknown)Compliance requirements:
Health & Safety
Source: NRS 078-2 2022 Published.pdf (unknown)Health and safety requirements:
Contractual Terms
Source: NRS 078-2 2022 Published.pdf (unknown)Contractual terms include:
Description
Source: SDLI Strategy Setting for Bidders - Uchoba Der Brochen.pdfInstallation of 24-core OPGW fibre optic cable at Uchoba Der Brochen. Project duration: 2 months.
Important Dates
Source: SDLI Strategy Setting for Bidders - Uchoba Der Brochen.pdf (TENDER)Closing date: 13 November 2026 at 10:00 (per tender record).
No briefing or site visit dates are stated in the document.
Contact Information
Source: SDLI Strategy Setting for Bidders - Uchoba Der Brochen.pdf (TENDER)No contact details are provided in the document.
Submission Guidelines
Source: SDLI Strategy Setting for Bidders - Uchoba Der Brochen.pdf (TENDER)Returnable documents — all must be completed, signed and submitted with the bid:
Disqualification risks:
Evaluation Criteria
Source: SDLI Strategy Setting for Bidders - Uchoba Der Brochen.pdf (TENDER)Evaluation is under the 80/20 preference point system.
Technical Specifications
Source: SDLI Strategy Setting for Bidders - Uchoba Der Brochen.pdf (TENDER)Scope of work: Installation of 24-core OPGW (Optical Ground Wire) fibre optic cable between the following substations:
Project duration: 2 months.
Local content thresholds (designated sectors) that must be met in full:
Procurement from designated groups (target):
Employment requirements:
Financial Requirements
Source: SDLI Strategy Setting for Bidders - Uchoba Der Brochen.pdf (TENDER)SDL&I penalty and performance security:
Compliance Requirements
Source: SDLI Strategy Setting for Bidders - Uchoba Der Brochen.pdf (TENDER)B-BBEE requirements:
Sworn affidavit validity requirements:
Local content compliance:
B-BBEE Requirements
Source: SDLI Strategy Setting for Bidders - Uchoba Der Brochen.pdf (TENDER)Specific goals: A maximum of 20 points may be awarded for the specific goal. Points scored for the specific goal are added to price points. B-BBEE status level points under the 80/20 system: Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0. Documents required to claim preference points: valid B-BBEE certificate from SANAS accredited agency or sworn affidavit/CIPS affidavit, proof of ownership/shareholding (preferably CIPC), certified ID copies of shareholders, proof of disability where applicable. Tenderers failing to provide documentation will not be disqualified but may only score out of 80 for price and 0 for specific goals.
Special Conditions
Source: SDLI Strategy Setting for Bidders - Uchoba Der Brochen.pdf (TENDER)SDL&I objectives in line with RDP goals: Tenderers who submit objectives but do not meet Eskom's targets will not be disqualified. SDL&I objectives do not form part of scoring but commitments form part of contractual obligations. Procurement spend on entities with minimum 51% black ownership: encouraged to procure/spend on designated groups for indirect expenses and direct spend on subcontractors. Target: Procurement from EME/QSE >51% owned by Black People (based in Limpopo Province) = 4.9%. Jobs: Tenderers must submit proposals for number of jobs created and retained in South Africa. Communities local to site should be prioritised for employment and all unskilled labourers sourced from areas local to site.
Requirements
Source: SDLI Strategy Setting for Bidders - Uchoba Der Brochen.pdf (TENDER)Objective criteria: If the tenderer does not meet objective criteria, it may lead to the second-ranked tenderer being recommended for award. Designated sectors: For designated sectors, the stipulated minimum threshold for Local Production and Content must be achieved in full. Designated components and thresholds: Plastic Pipes - High Density Polyethylene (HDPE) Pipes 100%; Telecom Cables - Optical Fibre Cables 90%; Steel Value-Added Products - Ducting and Structural pipework 10%. SBD 6.2 Declaration Form and Annex C (Local Content Declaration - Summary Schedule) are mandatory tender returnables.
Section
Source: SDLI Strategy Setting for Bidders - Uchoba Der Brochen.pdfSection 1: Specific Goals. A maximum of 20 points may be awarded to a tenderer for the specific goal specified for the tender. The points scored for the specific goal must be added to the points scored for price and the total must be rounded off to the nearest two decimal places. B-BBEE Status Level of Contributor points (80/20 system): Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0. Documents required to claim preference points: valid B-BBEE certificate or sworn affidavit/CIPS affidavit, proof of ownership/shareholding, certified ID copies of shareholders, proof of disability. Tenderers failing to provide documentation will not be disqualified but may only score out of 80 for price and 0 for specific goals.
Description
Source: Quality Control Plan or Inspection Test Plan (QCP or ITP) Template.pdfThe document is a blank Quality Control Plan / Inspection and Test Plan (QCP/ITP) template. It is used to define and record quality control activities for a contract, including intervention points (hold, witness, document review, surveillance, verification), inspection and test methods, acceptance criteria, and approval signatures. The template includes fields for contract/order number, subcontractor order number, QCP number, scope of work, and revision details.
Technical Specifications
Source: Quality Control Plan or Inspection Test Plan (QCP or ITP) Template.pdf (unknown)The document is a blank Quality Control Plan / Inspection and Test Plan (QCP/ITP) template. It provides the structure for recording quality control activities, including:
Quality Management
Source: Quality Control Plan or Inspection Test Plan (QCP or ITP) Template.pdfThe QCP/ITP template requires the contractor to:
Description
Source: Distribution Frame Patch Panel standard 240-70733995.pdfThe specification covers the manufacture, testing at works, user documentation, supply and delivery to Eskom sites, and off-loading of Optical Distribution Frames (ODF) or Patch Panels/Boxes. The requirements of this specification override any other recommendation or specification. Only exceptions detailed in Annex B (Statement of Non-compliance) and agreed to in writing by Eskom will be accepted.
Applicability: Applies throughout Eskom Transmission and Distribution Divisions.
Normative references: 240-75655504 (Corrosion protection standard), 0.54/09000 (Fibre Patch Panel Drawing), 0.54/09002 (Fibre Patch Box Drawing). Informative references: QM 58 (Supplier Contract Quality Requirements Specification), 240-60725641 (Specification for Standard 19-inch Equipment Cabinet).
Roles and responsibilities: Installation, if required, is supervised by the Projects Department. Acceptance testing is performed by the Works Planning and Centralised Services Department or as otherwise specified. Ongoing maintenance is the responsibility of the relevant Grid.
Submission Guidelines
Source: Distribution Frame Patch Panel standard 240-70733995.pdf (unknown)Returnable documents:
Returnable Documents
Source: Distribution Frame Patch Panel standard 240-70733995.pdf (unknown)Annex A – Schedule A/B (Technical Particulars): complete the compliance and supporting evidence columns for the chosen option(s). Annex B – Statement of Non-compliance: state compliance or deviation from the specification and Schedule A/B, clause by clause. Documentation to be supplied: outline drawings, splice organiser details, installation instructions, and mid coupler specifications. Documentation must be in English, A4, open-flat, drawings folded to A4, thumb-tag separators, duplicate hard copy in black and white, software copy where possible. Three copies of documentation to be sent to the member of staff responsible for the order.
Evaluation Criteria
Source: Distribution Frame Patch Panel standard 240-70733995.pdf (unknown)Evaluation is based on compliance with the technical specification:
Technical Specifications
Source: Distribution Frame Patch Panel standard 240-70733995.pdf (unknown)Scope: Manufacture, testing at works, user documentation, supply, delivery to Eskom sites, off-loading, and if called for, installation and commissioning of Optical Distribution Frames (ODF) / Patch Panels / Patch Boxes. Equipment is installed into 19-inch or other cabinets and enclosures provided by Eskom.
Three options are defined:
Common requirements (Options A and B):
Option A specific:
Option B specific:
Option C specific:
Additional requirements (all options):
Documentation to be supplied:
Compliance Requirements
Source: Distribution Frame Patch Panel standard 240-70733995.pdf (unknown)No specific compliance requirements (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document.
Section
Source: Distribution Frame Patch Panel standard 240-70733995.pdfBidders must provide a sample of the patch panel/box for evaluation and acceptance. Bidders must complete Annex B (Statement of Non-compliance) on a clause-by-clause basis.
Description
Source: SDLI Strategy Setting for Bidders - Hlanganani Mashau.pdfScope: Installation of 24-core OPGW fibre optic cable at Hlanganani Mashau. Project duration: 3 months.
Important Dates
Source: SDLI Strategy Setting for Bidders - Hlanganani Mashau.pdf (TENDER)Closing date: 13 November 2026 at 10:00 (from tender record).
No other dates (briefing, site visit, clarification deadlines) are stated in the document.
Submission Guidelines
Source: SDLI Strategy Setting for Bidders - Hlanganani Mashau.pdf (TENDER)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: SDLI Strategy Setting for Bidders - Hlanganani Mashau.pdf (TENDER)Evaluation uses the 80/20 preference point system.
Technical Specifications
Source: SDLI Strategy Setting for Bidders - Hlanganani Mashau.pdf (TENDER)Scope of work: Installation of 24-core OPGW (Optical Ground Wire) fibre optic cable at Hlanganani Mashau.
Project duration: 3 months.
Designated sectors and local production/content thresholds:
SDL&I objectives (not scored but contractual obligations):
Compliance Requirements
Source: SDLI Strategy Setting for Bidders - Hlanganani Mashau.pdf (TENDER)B-BBEE requirements:
Sworn affidavit validity requirements:
Local production and content:
Contractual Terms
Source: SDLI Strategy Setting for Bidders - Hlanganani Mashau.pdf (TENDER)SDL&I penalty and performance security: Eskom will apply a penalty of 2.5% of Order Value for failure to meet SDL&I obligations. Eskom will retain 2.5% of every invoice (excluding VAT) as security for fulfilment of SDL&I obligations. Retained amounts released only upon receipt of SDL&I progress reports, fulfilment of all obligations, and submission of approved compliance report by SDL&I Department.
Special Conditions
Source: SDLI Strategy Setting for Bidders - Hlanganani Mashau.pdf (TENDER)Reporting and monitoring: Suppliers must submit quarterly reports per Data Collection Template on compliance with SDL&I obligations. Eskom reviews reports within 30 days and notifies in writing if obligations not met. Suppliers must implement corrective measures before next report, failing which retention clauses invoked. Every contract accompanied by SDL&I Implementation Schedule, to be completed and returned to SDL&I representative for acceptance 28 days after contract award.
Requirements
Source: SDLI Strategy Setting for Bidders - Hlanganani Mashau.pdf (TENDER)Objective criteria: inclusion is not mandatory but is a condition for contract award. If tenderer does not meet objective criteria, second-ranked tenderer may be recommended for award. Designated sectors and minimum local production/content thresholds: Plastic Pipes (HDPE Pipes) 100%; Telecom Cables (Optical Fibre Cables) 90%; Steel Value-Added Products (Ducting and Structural pipework) 10%. SBD 6.2 Declaration Form and Annex C (Local Content Declaration – Summary Schedule) are mandatory returnables.
Section
Source: SDLI Strategy Setting for Bidders - Hlanganani Mashau.pdfSpecific goals: maximum 20 points for B-BBEE status level (80/20 system). Points added to price points; total rounded to two decimals. Contract awarded to highest scoring tenderer per PPPFA. B-BBEE points: Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0. Documents required to claim preference points: valid B-BBEE certificate (SANAS accredited) or sworn affidavit/CIPS affidavit, proof of ownership/shareholding (preferably CIPC) with breakdown, certified ID copies of shareholders, proof of disability where applicable. Failure to provide documentation does not disqualify but scores 0 for specific goals and only out of 80 for price.
Submission Guidelines
Source: SANS61386-1_2017_Ed2Am1.pdf (unknown)Returnable forms — each must be completed, signed and submitted with the bid:
Submission channel, submission address, number of copies and delivery format are not recorded in the available material.
Evaluation Criteria
Source: SANS61386-1_2017_Ed2Am1.pdf (unknown)Evaluation basis
Price/functionality weighting and any minimum qualifying score are not recorded in the available material.
Technical Specifications
Source: SANS61386-1_2017_Ed2Am1.pdf (unknown)Scope of work
Detailed route lengths, conductor and hardware specifications, quantities and site-specific requirements are not recorded in the available material.
Quality Management
Source: SANS61386-1_2017_Ed2Am1.pdfReferenced technical standard
Compliance Requirements
Source: SANS61386-1_2017_Ed2Am1.pdf (unknown)Registration and tax
Preference points
Declarations
Technical capability
CIDB grading, B-BBEE level thresholds and minimum turnover requirements are not recorded in the available material.
Description
Source: SANS61386-24.pdfBuried underground conduit systems for cable management. The standard sets out the requirements and tests for conduits and conduit fittings used to protect and manage insulated conductors and cables in electrical installations and in communication systems, and applies to metallic, non-metallic and composite systems, including the threaded and non-threaded entries that terminate the system.
Technical Specifications
Source: SANS61386-24.pdf (unknown)SANS 61386-24:2005 (identical adoption of IEC 61386-24:2004, reaffirmed and reprinted February 2021) — conduit systems for cable management, Part 24: conduit systems buried underground. Must be read with IEC 61386-1, general requirements.
Scope
Classification by mechanical properties
Marking
Manufacturer documentation
Dimensions (Table 101)
Quality Management
Source: SANS61386-24.pdf (unknown)Conduit systems must pass the compression, impact and bending tests of clauses 10.2 to 10.4; general test conditions and definitions follow IEC 61386-1, and compliance is checked by those tests.
Compression test
Impact test
Bending test (pliable conduits only)
Other clauses
Compliance Requirements
Source: SANS61386-24.pdf (unknown)Product compliance
Copyright and use of the standard
Description
Source: NEC Fibre Optic OPGW Line Installation Paradise and Mandala 132 kV line Services.pdfInstallation of 24 core OPGW between Paradise and Mandala Substation on the 132 kV line, for a period of 2 months.
The contract is on the NEC3 Engineering and Construction Contract (April 2013), main Option B (priced contract with bill of quantities), between Eskom Holdings SOC Ltd (registration number 2002/015527/30) and the successful bidder.
The contract documents are Part C1 Agreements and Contract Data, Part C2 Pricing Data, Part C3 Scope of Work, and Part C4 Site Information.
Important Dates
Source: NEC Fibre Optic OPGW Line Installation Paradise and Mandala 132 kV line Services.pdf (unknown)Contract period
Programme
Key dates
The Employer will not take over the works before the Completion Date.
Defects
Payment cycle
Contact Information
Source: NEC Fibre Optic OPGW Line Installation Paradise and Mandala 132 kV line Services.pdf (unknown)Employer
Megawatt Park
Maxwell Drive
Sandton
Johannesburg
Project Manager
Supervisor
Adjudicator
Submission Guidelines
Source: NEC Fibre Optic OPGW Line Installation Paradise and Mandala 132 kV line Services.pdf (unknown)Returnable documents
Alternative bids
Contract formalities after award
Evaluation Criteria
Source: NEC Fibre Optic OPGW Line Installation Paradise and Mandala 132 kV line Services.pdf (unknown)Basis of award
Financial analysis
Technical Specifications
Source: NEC Fibre Optic OPGW Line Installation Paradise and Mandala 132 kV line Services.pdf (unknown)Scope
Site
Key dates and conditions to be met
Risk register matters
Measured work items
Weather data
Experience & Qualifications
Source: NEC Fibre Optic OPGW Line Installation Paradise and Mandala 132 kV line Services.pdfKey persons
Pricing Schedule
Source: NEC Fibre Optic OPGW Line Installation Paradise and Mandala 132 kV line Services.pdfPricing basis
Payment
Financial Requirements
Source: NEC Fibre Optic OPGW Line Installation Paradise and Mandala 132 kV line Services.pdf (unknown)Pricing
Security and retention
Delay damages
Payment
Liability limits
Insurance
Compliance Requirements
Source: NEC Fibre Optic OPGW Line Installation Paradise and Mandala 132 kV line Services.pdf (unknown)Registration and structure
B-bbee
Key personnel
Ethics
Confidentiality
Health & Safety
Source: NEC Fibre Optic OPGW Line Installation Paradise and Mandala 132 kV line Services.pdfGeneral obligations (clause Z6)
Asbestos (clause Z15)
Environmental
Source: NEC Fibre Optic OPGW Line Installation Paradise and Mandala 132 kV line Services.pdfEnvironmental compliance
Asbestos and waste
Weather
Contractual Terms
Source: NEC Fibre Optic OPGW Line Installation Paradise and Mandala 132 kV line Services.pdfContract form
Key terms
Liability
Dispute resolution
Other conditions
Description
Source: BOQ_OPGW Installation on Overhead 132kV Paradise - Mandala Line 19.10.2026.xlsx (unknown)The tender covers the installation of 24-core OPGW (Optical Ground Wire) on overhead 132kV lines between specified substations in Limpopo. The work includes stringing, splicing, testing, and associated civil works such as trenching and duct installation. The BOQ provides detailed line items for pricing.
Submission Guidelines
Source: BOQ_OPGW Installation on Overhead 132kV Paradise - Mandala Line 19.10.2026.xlsx (unknown)Returnable documents:
Submission method: As specified in the tender document (not stated in the provided text).
Closing time: 10:00 on 13 November 2026.
Evaluation Criteria
Source: BOQ_OPGW Installation on Overhead 132kV Paradise - Mandala Line 19.10.2026.xlsx (unknown)Evaluation is based on a score sheet (Annexure L) with the following criteria and maximum scores:
Total possible score: 115 points. A threshold is mentioned but the specific minimum qualifying score is not stated in the provided text.
Technical Specifications
Source: BOQ_OPGW Installation on Overhead 132kV Paradise - Mandala Line 19.10.2026.xlsx (unknown)Scope: Installation of 24-core OPGW (Optical Ground Wire) between the following substations:
Work includes:
Standards referenced: TST41-115, 240-46264031, TSP41-586, TPC41-5, 240-70733995, 240-106030205, 240-70732888.
Trenching depth: 0.75m deep (normal depth 1m, spec requires at least 500mm).
Financial Requirements
Source: BOQ_OPGW Installation on Overhead 132kV Paradise - Mandala Line 19.10.2026.xlsx (unknown)Pricing must be submitted on the provided Bill of Quantities (BOQ) with unit prices for each item. The BOQ includes a Contract Price Schedule with sections for P&G's, Cable Install and Test, Duct Cable Supply/Install/Test, Patch Panel with Accessories, Sarel Box, Fibre Splicing and Testing, and General. No bid security, bonds, guarantees, retention, or payment terms are stated in the provided text.
Compliance Requirements
Source: BOQ_OPGW Installation on Overhead 132kV Paradise - Mandala Line 19.10.2026.xlsx (unknown)CIDB registration required (grade assessed by Eskom based on project size).
ORHVS training certification for at least one supervisor (modules 1–7).
Compliance with Eskom Health and Safety requirements and OHS Act.
Compliance with Mine Health and Safety Specification if applicable.
Environmental compliance as per Environmental Management Programme.
B-BBEE requirements: valid B-BBEE certificate or sworn affidavit (thresholds not stated in provided text).
CSD registration and valid tax clearance required (implied by standard tender requirements, but not explicitly stated in provided text).
Description
Source: Form A- OPGW- Hlanganani.pdfInstallation of a new 24-core OPGW between Hlanganani Substation and Mashau Substation.
Submission Guidelines
Source: Form A- OPGW- Hlanganani.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: Form A- OPGW- Hlanganani.pdf (unknown)Evaluation is based on completion and submission of Form A. The form requires the tenderer's quality representative to indicate applicability of each clause (mark X or -) and sign. No scoring split, minimum qualifying score, or preference point system is stated in the provided document.
Technical Specifications
Source: Form A- OPGW- Hlanganani.pdf (unknown)Scope: Installation of a new 24-core OPGW (Optical Ground Wire) between Hlanganani Substation and Mashau Substation.
Quality requirements (per Eskom specification 240-105658000):
Methodology
Source: Form A- OPGW- Hlanganani.pdfThe tenderer must indicate applicability of ISO 9001 clauses 4 to 10 and quality principles 1 to 7, as part of the quality requirements.
Quality Management
Source: Form A- OPGW- Hlanganani.pdfPre-contract award quality requirements: Category 4 selected (refer to clause 3.5). Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3). Post-contract award: Contract Execution and Supplier Quality Performance Monitoring (refer to clause 3.7).
Compliance Requirements
Source: Form A- OPGW- Hlanganani.pdf (unknown)No specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB) are stated in the provided document.
Section
Source: Form A- OPGW- Hlanganani.pdfThe tenderer must complete and submit Form A, indicating applicability of each quality clause. The tenderer's quality representative must sign and date the form. No other evaluation criteria are stated in the provided document.
Description
Source: BOQ_OPGW Installation on Overhead Fibre Silimela Wolwekraal 19.10.2026.xlsx (unknown)The work involves the installation of 24-core OPGW (Optical Ground Wire) between five pairs of substations in Limpopo. The scope includes stringing, splicing, testing, crossings, duct installation, patch panels, and associated civil works. The contractor must provide all necessary P&G items, including site establishment, security, environmental compliance, and health and safety management.
Submission Guidelines
Source: BOQ_OPGW Installation on Overhead Fibre Silimela Wolwekraal 19.10.2026.xlsx (unknown)Returnable documents (all must be completed, signed and submitted):
Disqualification risks:
Evaluation Criteria
Source: BOQ_OPGW Installation on Overhead Fibre Silimela Wolwekraal 19.10.2026.xlsx (unknown)Bidders will be scored according to the score sheet in Annexure L. The evaluation covers:
Thresholds: A threshold is set for each subsection; bidders must meet the threshold to proceed. The total score determines the preferred bidder. The document does not state a minimum qualifying score for the overall evaluation.
Technical Specifications
Source: BOQ_OPGW Installation on Overhead Fibre Silimela Wolwekraal 19.10.2026.xlsx (unknown)Scope of work: Installation of 24-core OPGW (Optical Ground Wire) between the following substations:
Work includes:
P&G items include: site establishment, access, survey groundwork, rehabilitation, contractor's insurance, supervision & overheads, PPE, plant/tools/equipment, risk assessment, quality management, health and safety specification, environmental plan, safety inspections, OHSA appointments, environmental compliance, safety compliance, flag bearers, transportation (LDV, heavy duty 4/8/12 ton, people carrier), accommodation, T&S, survey (on-site verification), additional survey (equipotential), security, facilities for Engineer and others, name boards, compliance with Eskom H&S and OHS Act, Mine Health and Safety Specification, as-built records, de-establish/re-establish stringing teams.
Testing must comply with document 240-70732888 (Fibre Optic Cable System Acceptance Testing procedure).
Bidders must supply gantry stainless steel pipe, HDPE piping, and necessary downlead clamps.
Bidders shall quote to install the full fibre optic system from patch panel to patch panel, following the generic template 240-106030205 (Fibre Optic Gantry to Substation Control Room Scope of Work Guideline).
Compliance Requirements
Source: BOQ_OPGW Installation on Overhead Fibre Silimela Wolwekraal 19.10.2026.xlsx (unknown)CSD registration: Required (implied for Eskom contracts).
Tax clearance: Valid SARS TCS or tax pin required.
CIDB: Registration with appropriate grade (EP registration) — grade to be submitted and Eskom to decide acceptability based on project size.
B-BBEE: Certificate or affidavit required for preference points.
ORHVS: At least one supervisor must have completed ORHVS modules 1 to 7.
Local content: SBD 6.2 declaration required.
Testing compliance: Must comply with document 240-70732888.
Contact Information
Source: NRS 061-2 Published.pdf (unknown)Contact: NRS Technical Governance Manager
Email: [email protected]
Telephone: (011) 651 6830
Address: Private Bag X13, Halfway House 1685
Evaluation Criteria
Source: NRS 061-2 Published.pdf (unknown)Contractors must be authorized by the local utility or under the OHS Act for work on earth wires; must comply with applicable Construction Regulations; must submit safe work procedures for client sign-off before commencement; must have staff trained and evaluated for the work; must use equipment compliant with OHS Act; must provide type test reports for earth bonds and tensile type test witnessed by customer; must use only approved hardware and splicing machines capable of <0.05 dB average splice loss.
Technical Specifications
Source: NRS 061-2 Published.pdf (unknown)Scope: Installation of overhead fibre links between patch panel enclosures at terminating substations, including stringing, tensioning, earthing, jointing, and terminating of OPGW.
Preparatory work:
Stringing:
Jointing and splicing:
Termination:
Fittings:
Methodology
Source: NRS 061-2 Published.pdf (unknown)Preparatory work: OPGW drum lengths carefully selected for specific line sections to avoid splice enclosures on towers where OPGW must be insulated. Allowance for sag and winch tensioner take-up. Physical site inspection if profile drawings unavailable. Joint positions and drum lengths approved by employer. Drums transported vertically with ends sealed, stored away from hazards. OPGW stringing: special tooling and precautions including hydraulic pullers with dynamometers, tensioner with bull wheel, drum jacks, anti-twisting counterweights, swivels, pulley guides, pulling grips, and pre-stretched ropes. Stringing operation: minimum diameters of tensioner reels, constant tension, correct orientation to prevent birdcaging, winch pulling force limitations, stringing speed not exceeding 30 m/min, reduced speed near pulleys. Special conditions: anti-twisting counterweights, avoid dragging, sagging within 72 hours, earthing when left overnight, protective sleeves, running earths for induction, earthing for extended periods, conductor car rules. Jointing and splicing: down-lead clamps, insulated vs non-insulated, spare cable allowances, joint box mounting heights, sealing ends, splicing procedures, fusion splicing by authorized technicians. Jointing between OPGW and underground cables: termination at substations, earthing, clamps, termination enclosure, slack loops. Completing connection to termination room: splicing to duct cable, separation from control cables, metal-free duct cable. Underground interconnection per NRS 088-2.
Experience & Qualifications
Source: NRS 061-2 Published.pdf (unknown)Authorized technicians should carry out splicing of optical fibres. Splicing machines capable of splices better than 0.05 dB average.
Quality Management
Source: NRS 061-2 Published.pdf (unknown)Quality control requirements specified by customer. Tests: tensile type test on OPGW with line hardware to achieve 95% of UTS, type test report witnessed by customer. Optic fibre site tests before installation: integrity and attenuation at 1550 nm, fibre identity marking, results in digital format, drum handling responsibilities. Testing after completion: integrity and attenuation, fusion splices, average splice loss per annex B, end-to-end light source/power meter test, OTDR readings, calibrated OTDR only.
Compliance Requirements
Source: NRS 061-2 Published.pdf (unknown)Contractor authorization: Must be authorized by local utility or under OHS Act for earth wire work; comply with Construction Regulations.
Safety: Submit safe work procedures for client sign-off before work; staff trained and authorized; equipment compliant with OHS Act; portable earths per SANS 61230; temporary towers bonded.
Quality: Provide type test report for tensile test (min 95% UTS) witnessed by customer; provide type test certificates for earth bonds on request.
Testing: Perform optic fibre site tests before installation (attenuation at 1550 nm); after installation, end-to-end light source/power meter test and OTDR readings with calibrated OTDR only.
Health & Safety
Source: NRS 061-2 Published.pdf (unknown)Contractors authorized per OHS Act and Construction Regulations. Safety requirements: trained staff, lifting equipment compliance, access control, permit system, risk identification, safe clearances, precautions against induction and fault current (equipotential earthing, running earths, portable earths per SANS 61230), PPE, correct tools, temporary towers bonded, safe work procedures signed off, insulation care on insulated towers. Environmental requirements: minimal impact, adhere to landowner agreements, dispose of fibre off-cuts safely.
Environmental
Source: NRS 061-2 Published.pdf (unknown)All work performed in compliance with environmental legislation. Minimal impact and disturbance of environment. Adhere to agreements with landowners, including notification before arrival and leaving access gates as found. Dispose of all fibre off-cuts in an environmentally safe manner.
Contractual Terms
Source: NRS 061-2 Published.pdf (unknown)Contractor responsible for damage to cable if 72-hour rule ignored. Contractor responsible for protection and safekeeping of OPGW drums until takeover, liable for loss or damage. Hardware supplier responsible for design and performance; customer approval does not relieve responsibility.
Description
Source: BOQ OPGW Installation on Overhead 132kV Unin - Ramphere Line 19.10.2026.xlsx (unknown)The work involves the installation of 24-core OPGW (Optical Ground Wire) on overhead 132kV lines between five pairs of substations in Limpopo. The scope includes stringing, splicing, testing, crossings, duct installation, patch panels, and associated civil works.
Important Dates
Source: BOQ OPGW Installation on Overhead 132kV Unin - Ramphere Line 19.10.2026.xlsx (unknown)Closing date: 13 November 2026 at 10:00 (as per tender record).
No other dates (briefing, site visit, clarification deadlines) are stated in the document.
Submission Guidelines
Source: BOQ OPGW Installation on Overhead 132kV Unin - Ramphere Line 19.10.2026.xlsx (unknown)Returnable documents: all must be completed, signed and submitted with the bid.
Disqualification risks:
Evaluation Criteria
Source: BOQ OPGW Installation on Overhead 132kV Unin - Ramphere Line 19.10.2026.xlsx (unknown)Evaluation is based on the score sheet in Annexure L. Bidders are scored on:
Thresholds: A threshold is set for the subtotal of criteria 2.1 to 2.5 (personnel, equipment, ORHVS, testing, patch panel). Bidders must meet this threshold to proceed. The threshold value is not stated in the document.
Preference point system: Not stated in the document. Bidders should refer to the PPPFA 80/20 or 90/10 system as applicable.
Technical Specifications
Source: BOQ OPGW Installation on Overhead 132kV Unin - Ramphere Line 19.10.2026.xlsx (unknown)Scope: Installation of 24-core OPGW (Optical Ground Wire) between the following substations:
Work includes:
Standards referenced: TST41-115, 240-46264031, TSP41-586 (update to 240-70733995), 240-106030205 (Fibre Optic Gantry to Substation Control Room Scope of Work), 240-70732888 (Fibre Optic Cable System Acceptance Testing).
Financial Requirements
Source: BOQ OPGW Installation on Overhead 132kV Unin - Ramphere Line 19.10.2026.xlsx (unknown)Pricing format: Bill of Quantities (BOQ) with unit prices for each item. The BOQ includes sections for P&G's, Cable Install and Test, Duct Cable Supply/Install/Test, Patch Panels, Sarel Box, Fibre Splicing and Testing, and General.
No bid security, guarantees, retention, payment terms, or financial capacity thresholds are stated in the document.
Compliance Requirements
Source: BOQ OPGW Installation on Overhead 132kV Unin - Ramphere Line 19.10.2026.xlsx (unknown)CIDB: Bidders must submit CIDB registration (EP registration) and grade. Eskom will assess if the grade is acceptable based on project size.
ORHVS: At least one supervisor must have completed ORHVS modules 1 to 7.
B-BBEE: Not stated in the document. Bidders should refer to the PPPFA preference point system.
CSD: Proof of CSD registration is required (implied by standard tender requirements).
Tax: Valid tax compliance status PIN required.
Local content: SBD 6.2 declaration required.
Health and Safety: Compliance with OHS Act and Eskom Health and Safety requirements. Mine Health and Safety Specification if required.
Environmental: Compliance with Environmental Management Programme and statutory environmental requirements.
Description
Source: E-tendering Help Manual for supplier.pdf (TENDER)The document is the Eskom eTendering System Suppliers Help Manual, which explains how to register and submit bids electronically. It does not contain the tender specification.
Contact Information
Source: E-tendering Help Manual for supplier.pdf (TENDER)For system problems, contact the buyer responsible for the published tender. No specific contact details are provided in the document.
Submission Guidelines
Source: E-tendering Help Manual for supplier.pdf (TENDER)Submission is electronic only via the Eskom eTendering system at https://eTendering.eskom.co.za. Bidders must register on the system and verify their email and cellphone via OTP before access is granted. Upload documents under the correct category (Technical, Commercial, Finance, etc.). Finalise the submission by clicking 'Finalize Submission' and then 'Finalise and Close Submission'. A single file cannot exceed 50MB; total uploads cannot exceed 900MB. After finalisation, an email confirmation with the submission ID is sent; keep this email for future reference. Closing time is 10:00.
Evaluation Criteria
Source: E-tendering Help Manual for supplier.pdf (TENDER)No evaluation criteria are stated in the provided document. The document is a system user manual, not the tender specification.
Compliance Requirements
Source: E-tendering Help Manual for supplier.pdf (TENDER)A valid CSD (Central Supplier Database) number is required to access the eTendering system.
Description
Source: Form A- OPGW-Silimela.pdfInstallation of a new 24-core OPGW between Silimela Substation MTS and Wolwekral Substation.
Submission Guidelines
Source: Form A- OPGW-Silimela.pdf (unknown)Returnable documents:
Submission method and address: not stated in the provided document.
Closing time: 10:00 on 13 November 2026.
Evaluation Criteria
Source: Form A- OPGW-Silimela.pdf (unknown)Evaluation criteria are not detailed in the provided document. The only stated requirement is that bidders must complete and sign Form A (Tender & Contract Quality Requirements) as part of the tender submission. No scoring split, minimum qualifying score, or preference point system is mentioned.
Technical Specifications
Source: Form A- OPGW-Silimela.pdf (unknown)Scope: Installation of a new 24-core OPGW (Optical Ground Wire) between Silimela Substation MTS and Wolwekral Substation.
Quality requirements (per specification 240-105658000):
ISO 9001 clauses and quality principles are listed as applicable (clauses 4–10 and principles 1–7), indicating the tenderer's quality management system must align with ISO 9001.
Methodology
Source: Form A- OPGW-Silimela.pdfThe document does not specify a required methodology or execution plan. The tenderer is expected to comply with the quality requirements of specification 240-105658000 and ISO 9001.
Quality Management
Source: Form A- OPGW-Silimela.pdfPre-contract award quality requirements: Category 4 selected (refer to clause 3.5 of specification 240-105658000). Main Supplier and Sub-supplier Capability and Capacity Assessment is not applicable. Post-contract award: Contract Execution and Supplier Quality Performance Monitoring are not applicable.
Section
Source: Form A- OPGW-Silimela.pdfNo additional evaluation criteria are provided beyond the requirement to complete and sign Form A.
Description
Source: NEC Fibre Optic OPGW Line Installation Uchoba and Der Brochen 132 kV line Services.pdf (unknown)Installation of 24 Core OPGW between Uchoba and Der Brochen Substation for a period of 2 months.
Contact Information
Source: NEC Fibre Optic OPGW Line Installation Uchoba and Der Brochen 132 kV line Services.pdf (unknown)Project Manager: Eskom LIMLANGA Cluster (to be confirmed)
Address: to be confirmed
Telephone: to be confirmed
Email: to be confirmed
Supervisor: to be confirmed
Address: to be confirmed
Telephone: to be confirmed
Email: to be confirmed
Employer: Eskom Holdings SOC Ltd
Registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg
Submission Guidelines
Source: NEC Fibre Optic OPGW Line Installation Uchoba and Der Brochen 132 kV line Services.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Submission method and address: not stated in the document. Closing time: not stated in the document.
Evaluation Criteria
Source: NEC Fibre Optic OPGW Line Installation Uchoba and Der Brochen 132 kV line Services.pdf (unknown)The document does not specify evaluation criteria, scoring split, minimum qualifying score, or preference point system. The contract will be awarded under the NEC3 ECC3 Option B (priced contract with bill of quantities). The Employer may require a parent company guarantee (Option X4) and/or performance bond (Option X13) if the Financial Analysis report recommends it. Bidders must comply with B-BBEE status change notification requirements (Z3) and provide a tax invoice with Eskom's VAT number (4740101508).
Technical Specifications
Source: NEC Fibre Optic OPGW Line Installation Uchoba and Der Brochen 132 kV line Services.pdf (unknown)Scope of work: Installation of 24 Core OPGW (Optical Ground Wire) between Uchoba and Der Brochen Substation.
Contract period: 2 months.
Key dates (per Project Specific Agreement):
Site: boundaries of the various servitudes on which the distribution lines will be erected, per the terms of the agreed servitudes, and the boundaries of substations.
Risk Register includes: outage unavailability, late supply of material, unavailability of raw material, incompatible hardware between OEMs and hardware manufacturers.
Weather recording: at the contractor's construction site camps and the closest Weather Bureau Station. Excessive wind is wind in excess of 10 m/s or 36 km/h. When it snows, contractors must wait until the area dries up and towers are safe to climb.
Experience & Qualifications
Source: NEC Fibre Optic OPGW Line Installation Uchoba and Der Brochen 132 kV line Services.pdf (unknown)Contractor's key persons: names, jobs, responsibilities, qualifications, and experience must be provided. CVs (and further key persons data) are to be appended to the Tender Schedule.
Pricing Schedule
Source: NEC Fibre Optic OPGW Line Installation Uchoba and Der Brochen 132 kV line Services.pdf (unknown)Pricing Data: Option B Priced contract with bill of quantities. Offered total of Prices exclusive of VAT to be inserted; VAT @ 15% to be added; total inclusive of VAT to be stated. Direct fee percentage 10%, subcontracted fee percentage 10%. Tendered total of Prices (excluding VAT) to be stated. Method of measurement as stated in Part C2.1 Pricing Assumptions. Rates shall be fixed and firm for the duration of the project.
Financial Requirements
Source: NEC Fibre Optic OPGW Line Installation Uchoba and Der Brochen 132 kV line Services.pdf (unknown)Pricing: NEC3 ECC3 Option B — priced contract with bill of quantities. The offered total of the Prices exclusive of VAT is to be inserted; VAT @ 15% is to be added; total inclusive of VAT is to be stated.
Direct fee percentage: 10%
Subcontracted fee percentage: 10%
Rates shall be fixed and firm for the duration of the project (Option X1 not applicable).
Method of measurement: as stated in Part C2.1 Pricing Assumptions.
Payment terms:
Securities:
Delay damages: R2,000 per day, up to a limit of 5% of total project cost.
Liability:
Tax invoice: within one week of receiving a payment certificate, provide a tax invoice showing the amount due; include Eskom's VAT number 4740101508.
Compliance Requirements
Source: NEC Fibre Optic OPGW Line Installation Uchoba and Der Brochen 132 kV line Services.pdf (unknown)B-bbee:
Tax: Contractor must comply with VAT Act and include Eskom's VAT number 4740101508 on each invoice.
CIDB: Tenderer's CIDB registration number (if applicable) to be stated on the Form of Offer and Acceptance.
Other: No explicit eligibility criteria (e.g. CSD registration, B-BBEE level, or tax clearance) are stated in the document.
Health & Safety
Source: NEC Fibre Optic OPGW Line Installation Uchoba and Der Brochen 132 kV line Services.pdf (unknown)Health, safety and the environment:
Asbestos:
Environmental
Source: NEC Fibre Optic OPGW Line Installation Uchoba and Der Brochen 132 kV line Services.pdf (unknown)Contractor must comply with all applicable environmental laws and regulations and ensure subcontractors do likewise.
Contractual Terms
Source: NEC Fibre Optic OPGW Line Installation Uchoba and Der Brochen 132 kV line Services.pdf (unknown)Contract form: NEC3 Engineering and Construction Contract (April 2013) with main Option B (priced contract with bill of quantities), dispute resolution Option W1, and secondary Options X1 (not applicable), X2, X4, X5, X7, X13, X15, X16, X18, and additional conditions Z1 to Z15.
Key terms:
Description
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)The tender is for the installation of 24-core OPGW between five pairs of substations in Limpopo. The document provided is Eskom's Standard Conditions of Tender, which sets out general rules; specific scope details are in the Invitation to Tender.
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)Closing date: 13 November 2026 at 10:00 (SAST)
Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)Enquiries:
Submission address: as specified in the Tender Data (not provided in this document).
Submission Guidelines
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)Submission method: paper or e-tender as specified in the Tender Data.
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)Evaluation stages:
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)Scope: Installation of 24 Core OPGW (Optical Ground Wire) between the following substations:
Quality Management
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)No specific quality management requirements beyond general SHEQ proof and compliance with relevant standards. Tenderers must provide proof of quality systems as part of SHEQ requirements.
Pricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)Pricing must be in ZAR, fixed for contract duration, include all taxes and levies. Rates and prices must be submitted per the exchange rate and base date in the Invitation. Arithmetical errors are corrected per Eskom's rules; words prevail over figures. Cataloguing line item may be required. No bill of quantities or schedule of rates provided in this document.
Financial Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)Pricing:
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)Eligibility:
CIDB:
B-bbee:
Sheq:
Legislation:
Other:
B-BBEE Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)B-BBEE scoring is based on CSD report or certificate/affidavit. If B-BBEE level is a pre-qualification criterion, proof must be submitted at closing or tender disqualified. If subcontracting to designated groups, sub-contractor's B-BBEE status required. Missing or fraudulent proof scores zero under PPPFA but does not disqualify unless it is a pre-qualification criterion.
Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)Tenderers must provide proof of safety, health, environment and quality (SHEQ) systems, policies and capabilities to Eskom's satisfaction at closing and/or contract award. All SHEQ costs and personnel must be reflected in the tender. Compliance with OHS Act and Eskom SHEQ requirements is mandatory.
Contractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)Contract terms: Eskom may cancel the tender before contract conclusion; may negotiate with selected tenderers; tender validity must be held for the validity period and extended if requested. The successful tenderer must sign the Form of Agreement. Eskom will prepare contract documents incorporating addenda, returnables, and agreed changes. Security for performance may require naming at least two financial institutions. Eskom disclaims liability for tender participation costs and accuracy of tender documents.
Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)General requirements: comply with eligibility criteria, no 100% subcontracting, submit mandatory returnables, provide proof of authority if agent, comply with legislation, provide SHEQ proof, CIDB registration if applicable, achieve CSDG and CPG goals, avoid misrepresentation, submit SDL&I Undertaking, and provide designated materials information.
Section
Source: Eskom_-_Standard_Conditions_of_Tender_Rev 12.pdf (TENDER)Additional evaluation criteria: basic compliance, mandatory returnables, pre-qualification, functionality, financial analysis, price evaluation, arithmetical error correction, B-BBEE and specific goals scoring, ranking, objective criteria, reverse e-auction. No tender-specific thresholds stated.
Description
Source: BOQ_OPGW Installation on Overhead 132kV Uchoba - Der Brochen Line 19.10.2026.xlsxInstallation of 24-core OPGW between the following substations: Rampheri and Unin, Hlanganani and Mashau, Paradise and Mandala, Silimela MTS and Wolwekral, Uchoba and der Brochen. The work includes stringing, splicing, testing, duct cable installation, and associated hardware.
Evaluation Criteria
Source: BOQ_OPGW Installation on Overhead 132kV Uchoba - Der Brochen Line 19.10.2026.xlsx (unknown)Evaluation basis
Personnel
Equipment
Experience
Methodology and compliance submissions
Technical Specifications
Source: BOQ_OPGW Installation on Overhead 132kV Uchoba - Der Brochen Line 19.10.2026.xlsx (unknown)Scope includes installation of 24-core OPGW between the listed substations, with associated hardware, splicing, testing, and duct cable installation.
P&G's (Preliminary and General)
Transportation and accommodation
Surveys
Cable Install and Test
Duct Cable Supply, Install and Test
Patch Panel with Accessories
Sarel Box with Accessories
Fibre Splicing and Testing
General
Other
Compliance Requirements
Source: BOQ_OPGW Installation on Overhead 132kV Uchoba - Der Brochen Line 19.10.2026.xlsx (unknown)Description
Source: SDLI Strategy Setting for Bidders - Rampheri OPGW 1.pdf (TENDER)Scope of work: Installation of 24-core OPGW fibre optic cable at Rampheri Substation and UNIN Substation. Project duration: 3 months.
SDL&I objectives (not scored but contractual):
Important Dates
Source: SDLI Strategy Setting for Bidders - Rampheri OPGW 1.pdf (TENDER)Closing date: 13 November 2026 at 10:00 (as per tender record).
No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Submission Guidelines
Source: SDLI Strategy Setting for Bidders - Rampheri OPGW 1.pdf (TENDER)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: SDLI Strategy Setting for Bidders - Rampheri OPGW 1.pdf (TENDER)Evaluation is based on the 80/20 preference point system.
B-BBEE status level points (80/20 system):
Contract awarded to the tenderer scoring the highest total (price + specific goals), rounded to two decimal places.
Objective criteria are a condition for contract award; failure to meet them may lead to the second-ranked tenderer being recommended.
If preference point documentation is not provided, the tenderer is not disqualified but scores only on price (out of 80) and 0 for specific goals.
Technical Specifications
Source: SDLI Strategy Setting for Bidders - Rampheri OPGW 1.pdf (TENDER)Scope of work: Installation of 24-core OPGW (optical ground wire) fibre optic cable between the following substations:
Project duration: 3 months.
Local content requirements (designated sectors):
SDL&I objectives (not scored but contractual obligations):
Financial Requirements
Source: SDLI Strategy Setting for Bidders - Rampheri OPGW 1.pdf (TENDER)SDL&I penalty and performance security:
No other financial requirements (bid security, bonds, guarantees, payment terms) are stated.
Compliance Requirements
Source: SDLI Strategy Setting for Bidders - Rampheri OPGW 1.pdf (TENDER)B-bbee:
Sworn affidavit validity requirements:
Local content:
B-BBEE Requirements
Source: SDLI Strategy Setting for Bidders - Rampheri OPGW 1.pdf (TENDER)B-BBEE status level points (80/20 system): Level 1: 20, Level 2: 18, Level 3: 14, Level 4: 12, Level 5: 8, Level 6: 6, Level 7: 4, Level 8: 2, Non-compliant: 0.
Documents required to claim preference points:
If documentation not provided, tenderer scores only on price (out of 80) and 0 for specific goals.
Sworn affidavit validity requirements:
Special Conditions
Source: SDLI Strategy Setting for Bidders - Rampheri OPGW 1.pdf (TENDER)Designated sectors and local content thresholds:
SDL&I objectives (not scored but contractual):
Reporting and monitoring:
Section
Source: SDLI Strategy Setting for Bidders - Rampheri OPGW 1.pdf (TENDER)Contract awarded to tenderer scoring highest total (price + specific goals), per section 2(1)(f) of the PPPFA. Objective criteria are a condition for contract award; failure may lead to second-ranked tenderer being recommended.
Description
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Eskom PAYE Questionnaire for Service Contracts (2026/2027 tax year) determines whether an Individual, Close Corporation, Company or Trust supplying services or labour to Eskom Holdings SOC Ltd and its subsidiaries is classified as an Independent Contractor, Personal Service Provider, Labour Broker or Dependent Contractor for Employees' Tax withholding under the Fourth Schedule to the Income Tax Act.
Important Dates
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The pack applies from 1 March 2026 to 28 February 2027.
Contact Information
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Group Tax contact for submission or queries:
Submission Guidelines
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)No evaluation criteria are stated in this document. The pack determines the contractor's tax classification (Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor) for PAYE withholding purposes.
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)This document is a PAYE questionnaire for service contracts with Eskom Holdings SOC Ltd and its subsidiaries. It determines whether a contractor is classified as an Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor for Employees' Tax withholding under the Fourth Schedule to the Income Tax Act. Contractors supplying services or labour to Eskom must complete the applicable Evaluation Pack.
Pricing Schedule
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)PAYE withholding details:
Financial Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)PAYE withholding:
Compliance Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Contractors must answer all questionnaire questions truthfully. Classification tests include residence, number of full-time employees, connected-person services, more than 80% income from one client or associated institution, place/control/supervision, and dominant impression. Definitions are per the Income Tax Act. Non-resident contractors must sign Appendix 9 and submit the pack to Eskom Group Tax Department.
Contractual Terms
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Eskom may withhold taxes, interest and penalties from payments if the contractor's information is inaccurate. The contractor must notify Eskom in writing of any changes to the declared status or information and may be liable for taxes, penalties and interest that SARS imposes on Eskom due to failure to notify.
Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Contractors must answer all questionnaire questions truthfully. Company/CC/Trust contractors complete Evaluation Pack A; individual contractors complete Evaluation Pack B. Classification is determined by tests including residence, number of full-time employees, connected-person services, more than 80% income from one client or associated institution, place/control/supervision, and dominant impression. Definitions are per the Income Tax Act.
Section
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)No evaluation criteria are stated. The pack determines tax classification for PAYE withholding.
Description
Source: LOCAL CONTENT ANNEX CDE.xls (unknown)The tender is for the installation of 24 Core OPGW between specified substations in Limpopo. The document provided is a local content declaration spreadsheet (Annex C, D, E) used to calculate local content percentages.
Submission Guidelines
Source: LOCAL CONTENT ANNEX CDE.xls (unknown)Returnable documents: Annex C (Local Content Declaration – Summary Schedule), Annex D (Imported Content Declaration – Supporting Schedule), and Annex E (Local Content Declaration – Summary Schedule) must be completed and submitted. Annex C must be signed by the signatory authorised in Annex B. A tender exchange rate must be declared for converting imported content and foreign currency payments.
Evaluation Criteria
Source: LOCAL CONTENT ANNEX CDE.xls (unknown)Local content will be evaluated. Bidders must declare designated products and their specified local content percentages. Imported content and foreign currency payments must be fully declared and reconciled with the local content schedules. The average local content percentage of the tender is calculated from the schedules.
Technical Specifications
Source: LOCAL CONTENT ANNEX CDE.xls (unknown)The tender involves the installation of 24 Core OPGW (Optical Ground Wire) between the following substations: Rampheri and Unin, Hlanganani and Mashau, Paradise and Mandala, Silimela MTS and Wolwekral, Uchoba and der Brochen. The work is in Limpopo province.
Financial Requirements
Source: LOCAL CONTENT ANNEX CDE.xls (unknown)All calculations must exclude VAT. The tenderer must declare a tender exchange rate for converting imported content and foreign currency payments. The total tender value must be provided.
Compliance Requirements
Source: LOCAL CONTENT ANNEX CDE.xls (unknown)Bidders must comply with local content requirements. Designated products must meet specified local content percentages. Imported content and foreign currency payments must be fully declared.
Description
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)The tender covers installation of 24 Core OPGW between five substation pairs in Limpopo. One ITT is issued with five sets of NEC3 contracts; five separate contracts will be awarded to the highest ranked contractors. Tenderers wishing to bid for all five projects must demonstrate capability to execute all simultaneously and provide a full list of equipment and resources for each site.
Important Dates
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)Closing date: 13 November 2026 at 10:00
Clarification meeting (non-compulsory): 05 November 2026 at 11:00, online via Microsoft Teams
Clarification queries deadline: 5 working days before tender submission deadline
Tender validity: 180 days from closing date and time
Contact Information
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)Eskom Representative:
Fraud and corruption reporting:
Procurement Manager (signatory):
Submission portal: https://etendering.eskom.co.za
Submission Guidelines
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)Submission method: electronic only via Eskom E-Tendering site at https://etendering.eskom.co.za
Mandatory returnables at closing (disqualifiable if missing/incomplete):
Returnables required at closing (non-disqualifiable; 5 working days to remedy if missing):
Disqualification risks:
Evaluation Criteria
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)Evaluation stages:
Deadlock resolution:
Objective criteria: Eskom may award to a tenderer other than the highest scoring if objective criteria justify. Local content must be achieved in full.
Technical Specifications
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)Scope: Installation of 24 Core OPGW (Optical Ground Wire) between five substation pairs:
Contracting approach:
Technical requirements (Annex C):
Methodology (Annex B) must cover:
Installer capabilities (Annex D) - personnel and equipment:
Methodology
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)Fibre optic installation methodology (Annex B) must cover:
Each methodology must be detailed and not copied.
Experience & Qualifications
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)Previous experience (Annex A) in last 5 years with fibre optic installations (OPGW, ADSS, Duct). Scoring: 1-2 projects = 1 point, 3-5 projects = 3 points, 5+ projects = 5 points.
Key personnel requirements (Annex D):
Quality Management
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)Quality requirements include:
Financial Requirements
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)Pricing:
Payment terms:
SDL&I Penalty and Performance Security:
Financial analysis:
Compliance Requirements
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)Eligibility:
Local content (mandatory, must be achieved in full):
B-bbee:
Tax and other:
SHEQ (contractual, not evaluation criteria):
Health & Safety
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)SHEQ compliance is a contractual requirement, not evaluation criteria. Requirements include:
Environmental
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)Environmental requirements include:
Contractual Terms
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)Contract will be NEC3 Engineering and Construction Contract (ECC). Tender validity 180 days. Performance security as outlined in NEC3 ECC. Eskom may require cataloguing information after award; pricing schedule must include a line item for cataloguing. SDL&I obligations form part of contract; penalties and retention apply. Eskom may negotiate market-related prices with highest ranked supplier.
Section
Source: Invitation to Tender - OPGW installation on various substations E3701DXLIMOU.pdf (TENDER)Technical evaluation (functionality) weights: previous experience 40%, methodology 10%, technical documentation compliance 10%, installer check sheet 40%. Minimum threshold 80% to proceed to factory evaluation. Factory assessment scored on installer check sheet (max 36, threshold 28.8). Price scored out of 80 points; B-BBEE specific goals max 20 points under 80/20 system. Total out of 100; award to highest total score. Objective criteria may justify award to non-highest scorer.
Description
Source: NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf (unknown)Installation of 24 Core OPGW between Hlanganani and Mashau Substation for a period of 2 months.
Important Dates
Source: NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf (unknown)Closing date: 13 November 2026 at 10:00 (from tender record).
No briefing, site visit, or clarification deadlines are stated in the document.
Submission Guidelines
Source: NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Submission method and address: not stated in the document.
Disqualification risks:
Evaluation Criteria
Source: NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf (unknown)Evaluation criteria are not stated in the document. The contract is a priced contract with a bill of quantities (Option B). The offered total of the Prices exclusive of VAT is required, with VAT at 15% and the total inclusive of VAT. No preference point system (80/20 or 90/10) or minimum qualifying score is specified.
Technical Specifications
Source: NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf (unknown)Scope: Installation of 24 Core OPGW (Optical Ground Wire) between Hlanganani and Mashau Substation.
Contract period: 2 months.
Key dates (per Project Specific Agreement):
Site boundaries: the various servitudes on which the distribution lines will be erected, per the terms of the agreed servitudes, and the boundaries of substations.
Works Information is in Part C3: Scope of Work and all documents and drawings to which it makes reference.
Site Information is in Part C4: Site Information.
Risk Register items include: outage unavailability, late supply of material, unavailability of raw material, incompatible hardware between OEMs and hardware manufacturers.
Weather conditions for compensation events: excessive wind >36 km/h, rainfall >10 mm per day, minimum air temperature <0°C, snow.
Experience & Qualifications
Source: NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf (unknown)The Contractor must provide key persons with details including name, job, responsibilities, qualifications, and experience, with CVs appended to a Tender Schedule.
Quality Management
Source: NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf (unknown)No specific quality management requirements are stated beyond the general obligation to provide the works in accordance with the Works Information. The Contractor's design liability is limited to reasonable skill and care (Option X15).
Pricing Schedule
Source: NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf (unknown)The contract uses main Option B: Priced contract with bill of quantities. The offered total of the Prices exclusive of VAT is to be stated, with VAT at 15% and total inclusive of VAT. The method of measurement is as stated in Part C2.1 Pricing Assumptions. The Contractor's fee percentages are 10% direct and 10% subcontracted. The tendered total of the Prices is to be provided. The bill of quantities is in Part of the Contract. Data for the Shorter Schedule of Cost Components includes people overheads 10%, equipment rates, design overheads, and design employee categories.
Financial Requirements
Source: NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf (unknown)Pricing format: Priced contract with bill of quantities (Option B). The offered total of the Prices exclusive of VAT is to be stated, with VAT at 15% and total inclusive of VAT.
Fee percentages: 10% direct, 10% subcontracted.
Payment terms:
Retention: 2.5%.
Delay damages: R2,000 per day, up to a limit of 5% of total project cost.
Performance bond (Option X13) and parent company guarantee (Option X4): only if the Financial Analysis report recommends them.
Retention money guarantee: may be provided to avoid retention being assessed.
Liability limits:
Insurance: Contractor provides insurances per Insurance Table A; Employer provides insurances per Insurance Table B.
Compliance Requirements
Source: NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf (unknown)CIDB: Tenderer's CIDB registration number required where applicable.
B-BBEE: No specific level or threshold stated in the document. However, the contract includes a condition that the Contractor must notify the Employer within 7 days of any change in B-BBEE status, and submit an updated verification certificate within 30 days. A decrease in B-BBEE status may lead to renegotiation or termination.
Health and safety: The Contractor must comply with the Construction Regulations 2014 under the Occupational Health & Safety Act, and may be appointed as Principal Contractor. The total of the Prices must include sufficient amount for compliance.
Environmental: The Contractor must comply with all applicable environmental laws and regulations.
Asbestos: The Employer ensures ambient air conforms to prescribed standards; OEL for asbestos is 0.2 fibres/ml (4-hour TWA) and short-term exposure limit 0.6 fibres/ml (10-minute TWA). The Contractor may stop work if asbestos is identified until the area is declared safe.
Tax: The Contractor must provide a tax invoice within one week of receiving a payment certificate, and include Eskom's VAT number 4740101508 on each invoice.
Health & Safety
Source: NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf (unknown)The Contractor must comply with the Construction Regulations 2014 under the Occupational Health & Safety Act, may be appointed as Principal Contractor, and must ensure health and safety of persons. The Contractor must also comply with environmental laws.
Asbestos-related provisions: The Employer ensures ambient air conforms to prescribed standards, with OEL for asbestos at 0.2 fibres/ml (4-hour TWA) and short-term exposure limit 0.6 fibres/ml (10-minute TWA). The Contractor may stop work if asbestos is identified until the area is declared safe.
Environmental
Source: NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf (unknown)The Contractor must comply with all applicable environmental laws and regulations, and ensure subcontractors and others under its control do the same.
Contractual Terms
Source: NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf (unknown)The contract is the NEC3 Engineering and Construction Contract, April 2013 (ECC3), with main Option B (Priced contract with bill of quantities), dispute resolution Option W1, and secondary Options X1 (not applicable), X2, X4, X5, X7, X13, X15, X16, X18, and Z1 to Z15.
Key terms:
Special Conditions
Source: NEC Fibre Optic OPGW Line Installation Hlanganani and Mashau 132 kV line Services.pdf (unknown)Additional conditions of contract Z1 to Z15 always apply, covering cession, joint ventures, B-BBEE status change, confidentiality, waiver, health/safety/environment, tax invoices, compensation events, employer's limitation of liability, termination, ethics, insurance, nuclear liability, and asbestos.
Contact Information
Source: Form A- OPGW-Uchoba.pdf (unknown)Eskom Quality Representative: MN, Quality Rep, dated 2026.09.03. Tenderer's Quality Representative signature section included (name/designation/date/signature fields).
Evaluation Criteria
Source: Form A- OPGW-Uchoba.pdf (unknown)Pre-contract award quality requirements are invoked under Category 4 of clause 3.5 of specification 240-105658000. Only one category may be selected, and the bidder must indicate whether a site assessment is applicable.
Compliance is assessed against ISO 9001, with clauses 4 to 10 and all seven quality principles marked as applicable.
Technical Specifications
Source: Form A- OPGW-Uchoba.pdf (unknown)Project: Installation of the new 24 Core OPGW at Uchoba Substation and der Brochen Substation.
The tenderer must indicate applicable pre-contract award quality requirements (Category 4 selected, and Main Supplier and Sub-supplier Capability and Capacity Assessment) and post-contract award (Eskom) quality requirements including Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access, Eskom Rights to Information, Preservation, Quality Audits Related Conditions, Management of Nonconformities and Nonconforming Outputs Identified by Eskom, and Special Processes.
Methodology
Source: Form A- OPGW-Uchoba.pdf (unknown)The tenderer must indicate applicable ISO 9001 clauses (4 to 10) and quality principles (1 to 7) as applicable to the contract.
Quality Management
Source: Form A- OPGW-Uchoba.pdf (unknown)Form A - Tender & Contract Quality Requirements for ISO 9001 (Document 240-68099512 Rev 9, effective January 2022, review January 2027). The tenderer must indicate applicable pre-contract award quality requirements (Category 4 selected, and Main Supplier and Sub-supplier Capability and Capacity Assessment) and post-contract award (Eskom) quality requirements including Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access, Eskom Rights to Information, Preservation, Quality Audits Related Conditions, Management of Nonconformities and Nonconforming Outputs Identified by Eskom, and Special Processes.
Description
Source: Form A- OPGW- Paradise.pdf (unknown)Installation of a new 24-core OPGW cable between Paradise Substation and Mandala Substation.
Evaluation Criteria
Source: Form A- OPGW- Paradise.pdf (unknown)Pre-contract award quality assessment applies under Category 4, covering main supplier and sub-supplier capability and capacity. Only one pre-contract award category may be selected. Post-contract award, contract execution and supplier quality performance monitoring phases apply. Compliance with Eskom specification 240-105658000 and ISO 9001 standard is required, with all listed ISO 9001 clauses (4-10) and quality principles (1-7) marked applicable.
Technical Specifications
Source: Form A- OPGW- Paradise.pdf (unknown)Installation of a new 24-core OPGW (optical ground wire) cable between Paradise Substation and Mandala Substation. The tenderer must complete the quality requirements form (Form A) indicating applicability of clauses from Eskom specification 240-105658000 and ISO 9001 standard. The following Eskom rights and conditions are applicable: rights of access, rights to information, preservation, quality audits related conditions, management of nonconformities and nonconforming outputs, and special processes.
Methodology
Source: Form A- OPGW- Paradise.pdf (unknown)The tenderer must indicate applicability of ISO 9001 clauses 4-10 and quality principles 1-7, all marked applicable. This includes context of the organisation, leadership, planning, support, operation, performance evaluation, improvement, customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, and relationship management.
Quality Management
Source: Form A- OPGW- Paradise.pdf (unknown)Pre-contract award quality requirements: Category 4 selected. Post-contract award: contract execution and supplier quality performance monitoring phases indicated. Eskom rights of access, rights to information, preservation, quality audits related conditions, management of nonconformities and nonconforming outputs, and special processes are applicable. ISO 9001 clauses 4-10 and quality principles 1-7 are marked as applicable.
Compliance Requirements
Source: Form A- OPGW- Paradise.pdf (unknown)Compliance with Eskom specification 240-105658000 and ISO 9001 standard is required. The tenderer must select only one pre-contract award category (Category 4 selected) and indicate whether a site assessment is applicable.
Description
Source: SDLI Strategy Setting for Bidders - Silimela Wolwekraal.pdfInstallation of 24-core OPGW fibre optic cable at Silimela Wolwekraal. Project duration: 2 months.
Important Dates
Source: SDLI Strategy Setting for Bidders - Silimela Wolwekraal.pdf (TENDER)Closing date: 13 November 2026 at 10:00
Project duration: 2 months
Submission Guidelines
Source: SDLI Strategy Setting for Bidders - Silimela Wolwekraal.pdf (TENDER)Returnable documents:
Disqualification risks:
Returnable Documents
Source: SDLI Strategy Setting for Bidders - Silimela Wolwekraal.pdf (TENDER)General information on validity of sworn affidavits:
Evaluation Criteria
Source: SDLI Strategy Setting for Bidders - Silimela Wolwekraal.pdf (TENDER)Evaluation uses the 80/20 preference point system.
Objective criteria (condition for award):
Technical Specifications
Source: SDLI Strategy Setting for Bidders - Silimela Wolwekraal.pdf (TENDER)Scope of work:
SDL&I objectives (contractual obligations, not scored):
Quality Management
Source: SDLI Strategy Setting for Bidders - Silimela Wolwekraal.pdf (TENDER)Reporting and monitoring:
Compliance Requirements
Source: SDLI Strategy Setting for Bidders - Silimela Wolwekraal.pdf (TENDER)B-BBEE requirements:
Sworn affidavit validity requirements:
Local content (designated sectors):
B-BBEE Requirements
Source: SDLI Strategy Setting for Bidders - Silimela Wolwekraal.pdf (TENDER)Specific goals (B-BBEE status level) carry a maximum of 20 points under the 80/20 system. Points are added to price points and rounded to two decimals. Contract awarded to highest scorer per PPPFA. B-BBEE status level points: Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0. Required documents to claim preference points: valid B-BBEE certificate (SANAS accredited) or sworn affidavit/CIPS affidavit, proof of ownership/shareholding (preferably CIPC), certified ID copies of shareholders, proof of disability where applicable. Tenderer failing to provide documentation is not disqualified but may only score out of 80 for price and 0 for specific goals.
Special Conditions
Source: SDLI Strategy Setting for Bidders - Silimela Wolwekraal.pdf (TENDER)SDL&I objectives in line with RDP goals:
Requirements
Source: SDLI Strategy Setting for Bidders - Silimela Wolwekraal.pdf (TENDER)Objective criteria (condition for award):
Section
Source: SDLI Strategy Setting for Bidders - Silimela Wolwekraal.pdfSpecific goals: maximum 20 points for B-BBEE status level. Points added to price points and rounded to two decimals. Contract awarded to highest scorer per PPPFA. B-BBEE status level points (80/20 system): Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0. Required documents to claim preference points: valid B-BBEE certificate (SANAS accredited) or sworn affidavit/CIPS affidavit, proof of ownership/shareholding (preferably CIPC), certified ID copies of shareholders, proof of disability where applicable. Tenderer failing to provide documentation is not disqualified but may only score out of 80 for price and 0 for specific goals.
Description
Source: Form A- OPGW-Rampheri.pdf (unknown)Installation of a new 24-core OPGW between Rampheri Substation and UNIN Substation.
Submission Guidelines
Source: Form A- OPGW-Rampheri.pdf (unknown)Returnable documents: Form A (Tender and Contract Quality Requirements) must be completed, signed by the tenderer's quality representative, and submitted with the bid. No other returnable forms are specified in the document.
Evaluation Criteria
Source: Form A- OPGW-Rampheri.pdf (unknown)Pre-contract award quality assessment: Category 4 applies (refer to clause 3.5 of specification 240-105658000). Only one category may be selected. The bidder's quality management system must address ISO 9001 clauses 4 to 10 and quality principles 1 to 7, as all are marked applicable. Main supplier and sub-supplier capability and capacity assessment is not applicable. Post-contract award clauses on contract execution and supplier quality performance monitoring are not applicable.
Technical Specifications
Source: Form A- OPGW-Rampheri.pdf (unknown)Scope: Installation of a new 24-core OPGW (Optical Ground Wire) between Rampheri Substation and UNIN Substation. The tender record also lists additional substation pairs (Hlanganani–Mashau, Paradise–Mandala, Silimela MTS–Wolwekral, Uchoba–der Brochen), but the document provided covers only the Rampheri–UNIN section.
Methodology
Source: Form A- OPGW-Rampheri.pdf (unknown)The bidder's quality management system must address ISO 9001 clauses 4 to 10 (context of the organisation, leadership, planning, support, operation, performance evaluation, improvement) and quality principles 1 to 7 (customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, relationship management).
Quality Management
Source: Form A- OPGW-Rampheri.pdf (unknown)Pre-contract award quality requirements: Category 4 selected. Main supplier and sub-supplier capability and capacity assessment not applicable. Post-contract award: contract execution and supplier quality performance monitoring not applicable. Eskom rights of access, rights to information, preservation, quality audits, management of nonconformities, and special processes are applicable. ISO 9001 clauses 4-10 and quality principles 1-7 are applicable.
Compliance Requirements
Source: Form A- OPGW-Rampheri.pdf (unknown)Quality management system must comply with ISO 9001 clauses 4 to 10 and quality principles 1 to 7. Eskom's rights of access, rights to information, preservation, quality audits, management of nonconformities, and special processes are applicable (refer to clause 3.8 of specification 240-105658000).
Section
Source: Form A- OPGW-Rampheri.pdf (unknown)Pre-contract award quality assessment: Category 4 applies. ISO 9001 clauses 4 to 10 and quality principles 1 to 7 are applicable. Post-contract award: supplier quality performance monitoring phase is not applicable. Quality audits related conditions are applicable.
Description
Source: 240-70732888 Fibre Optic Cable system acceptance testing.pdfThe document defines acceptance testing procedures for newly installed or repaired fibre optic cable systems within Eskom, covering OPGW, ADSS, externally attached cable, and duct cabling. It applies to Transmission and Distribution and forms part of the fibre installation or repair contract.
Returnable Documents
Source: 240-70732888 Fibre Optic Cable system acceptance testing.pdf (unknown)Documentation to be provided in hard-covered ring files, English, A4, open flat, thumb-tag separators. Include index, fibre numbering/colour coding, refractive index/backscatter coefficient, manufacturer's spec sheets, fibre over-length/helix factor, system diagram, pre-installation test certificates, joint loss table, tower joint/down-lead insulation document, all test results in softcopy (CD/DVD PDF and raw) and paper, end-to-end attenuation table, PMD and CD tables, hardware code numbers, hardware drawings. For ADSS: EMF plots, induced voltage/leakage current graphs, dynamometer recordings. Deliver to Transmission Telecommunications T&S Manager (P.O. Box 107, Germiston, 1400) or Distribution project manager.
Technical Specifications
Source: 240-70732888 Fibre Optic Cable system acceptance testing.pdf (unknown)Scope: Acceptance testing of newly installed or repaired fibre optic cable systems, including OPGW, ADSS, externally attached cable, and duct cabling. Applies to Transmission and Distribution.
Testing requirements:
Link characterisation:
Methodology
Source: 240-70732888 Fibre Optic Cable system acceptance testing.pdf (unknown)Splice acceptance: use core alignment fusion splicer; limits as above. Fibre optic testing: OTDR testing per IEC 60793-1-40; use correct refractive index, helix factor, backscatter coefficient, acquisition time (min 45 s/wavelength); launch fibre ≥3 m; ORL ≥35 dB (PC) or ≥55 dB (APC); wavelength tolerance ±20 nm (1310/1550) and ±10 nm (1625); test all three wavelengths up to 50 km, 1550/1625 over 50 km; multimode at 850/1300 nm; under 200 m only light source/power meter; bi-directional OTDR measurements; raw and abbreviated results; pulse width limits; include date/time, cable description, fibre number, test direction, index of refraction, helix factor, backscatter coefficient. End-to-end loss measured from both ends with light source/power meter for 1310/1550/1625 nm. Link characterisation: PMD measured from one end per fibre across O and C bands; CD measured from one end with min 7 wavelengths; report dispersion slope and zero dispersion wavelength.
Quality Management
Source: 240-70732888 Fibre Optic Cable system acceptance testing.pdfCompliance with ISO 9001, NRS 061-2, NRS 078-2, NRS 088-2, and QM-58 required. Acceptance testing performed by Works Planning and Centralised Services Department or as specified by Grid/Regions Secondary Plant Manager. Commissioning in close cooperation with Eskom; Eskom may have technicians participate in tests.
Compliance Requirements
Source: 240-70732888 Fibre Optic Cable system acceptance testing.pdf (unknown)Quality management:
Equipment and calibration:
Documentation (to be provided in hard-covered ring files, English, A4, open flat, thumb-tag separators):
Contractual Terms
Source: 240-70732888 Fibre Optic Cable system acceptance testing.pdfSplice loss limits: maximum ≤0.15 dB, mean ≤0.05 dB (single mode) or ≤0.07 dB (multimode). Joints exceeding limits must be redone at least three times; if still out of spec, note in documentation and submit OTDR results. End-to-end testing required; customer may participate but contractor remains responsible for performance through warranty period. Test results must be submitted in raw and abbreviated formats. Bi-directional measurements required; loss calculation must use OTDR manufacturer's software. OTDR pulse width limits must be followed.
Description
Source: BOQ _OPGW Installation on Overhead 132kV Hlanganani - Mashau Line 19.10.2026.xlsx (unknown)The work involves installation of 24-core OPGW between five pairs of substations in Limpopo. The scope covers stringing, splicing, testing, crossings, duct installation, patch panels, and associated P&G items as detailed in the bill of quantities.
Submission Guidelines
Source: BOQ _OPGW Installation on Overhead 132kV Hlanganani - Mashau Line 19.10.2026.xlsx (unknown)Returnable documents:
Submission method and address not stated in the document.
Evaluation Criteria
Source: BOQ _OPGW Installation on Overhead 132kV Hlanganani - Mashau Line 19.10.2026.xlsx (unknown)Scoring is based on the score sheet in Annexure L, with the following criteria and maximum scores:
Thresholds and minimum qualifying scores are not stated in the document.
Technical Specifications
Source: BOQ _OPGW Installation on Overhead 132kV Hlanganani - Mashau Line 19.10.2026.xlsx (unknown)Scope: Installation of 24-core OPGW between specified substations (Rampheri-Unin, Hlanganani-Mashau, Paradise-Mandala, Silimela MTS-Wolwekral, Uchoba-der Brochen).
Work includes:
Preliminary and General (P&G) items include site establishment, access, survey, rehabilitation, contractor's insurance, supervision, PPE, plant and tools, risk assessment, environmental compliance, safety compliance, flag bearers, transportation (LDV, heavy duty, people carrier), accommodation, T&S, survey, security, facilities for engineer and others, name boards, compliance with Eskom H&S and Mine H&S, as-built records, and de-establishment/re-establishment of stringing teams.
Testing must comply with document 240-70732888 (Fibre Optic Cable System Acceptance Testing).
Gantry to control room scope follows generic template 240-106030205.
Compliance Requirements
Source: BOQ _OPGW Installation on Overhead 132kV Hlanganani - Mashau Line 19.10.2026.xlsx (unknown)CIDB registration required (EP registration, grade to be submitted; Eskom decides acceptability based on project size).
No other compliance requirements stated in the document.
Description
Source: Guidelines to complete Local Content Documents.pdf (unknown)This document is a guideline for calculating local content of products (goods, services and works) by components, materials and services, as per SATS 1286:2011. It consists of a written guideline and three declarations that must be completed: Declaration C (Local Content Declaration – Summary Schedule), Declaration D (Imported Content Declaration – Supporting Schedule), and Declaration E (Local Content Declaration – Supporting Schedule).
Contact Information
Source: Guidelines to complete Local Content Documents.pdf (unknown)Contact: the dti Customer Contact Centre
Telephone: 0861 843 384 (local) or +27 12 394 9500 (international)
Address: the dti Campus, 77 Meintjies Street, Sunnyside, 0002
Postal: Private Bag X84, Pretoria, 0001
Submission Guidelines
Source: Guidelines to complete Local Content Documents.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: Guidelines to complete Local Content Documents.pdf (unknown)Declaration C must be submitted with the tender by the closing date and time set by the tender authority.
Technical Specifications
Source: Guidelines to complete Local Content Documents.pdf (unknown)This document is a guideline for calculating local content of products (goods, services and works) by components, materials and services, as per SATS 1286:2011.
Quality Management
Source: Guidelines to complete Local Content Documents.pdf (unknown)Imported content includes products imported directly by the tenderer or by third parties. Evidence of imported content must be verifiable and pertain to the tender as a whole. Imported services and royalty/lease payments relating to the tender must be included when calculating imported content. Exemptions may be granted by the dti.
Compliance Requirements
Source: Guidelines to complete Local Content Documents.pdf (unknown)Local content calculation must follow SATS 1286:2011.
B-BBEE Requirements
Source: Guidelines to complete Local Content Documents.pdf (unknown)Local content is calculated as the tender price less the value of imported content, expressed as a percentage. Imported content includes products imported directly by the tenderer or by third parties, with evidence required. Exemptions may be granted by the dti. Detailed line-by-line instructions for completing Annexure C (Local Content Declaration – Summary Schedule), Annexure D (Imported Content Declaration – Supporting Schedule), and Annexure E (Local Content Declaration – Supporting Schedule) are provided.
Contractual Terms
Source: Guidelines to complete Local Content Documents.pdf (unknown)If the tender is successful, the tenderer must continuously update Declarations C, D and E with actual values for the duration of the contract.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Eskom Tender, Office Millenium Building, 90 Hans van Rensburg Street, Polokwane, 0699 - Polokwane - POLOKWANE - 0700
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
37
Last checked
20 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
How consulting engineers, engineering firms, and multidisciplinary practices can win public sector infrastructure contracts in South Africa — from ECSA registration and CESA membership to fee proposals, QBS scoring, and building a winning tender response.
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
How small electrical contractors use Joint Ventures to combine EP grading, win Eskom and municipal infrastructure projects, and compete for renewable energy installations.
💡 Want more tendering tips and strategies?
Explore Our Blog