Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Drakensberg Pumped Storage Scheme - Bergville - Bergville -
Organization Type
GOVERNMENT
Published
27 Nov 2026
OCDS Reference
ocds-9t57fa-180374
Replacement of the potable water pipeline and surface water tanks at eskom's drakensberg pumped storage scheme near jagersrust, kwazulu-natal, covering design refinement, materials procurement, construction, testing, disinfection, commissioning and handover of a complete potable water transfer, storage and distribution system. The works include galvanised pipeline replacement and realignment, asbestos cement pipeline replacement, a new surface water storage tank, replacement of the deluge fire-system tank, piping to the visitor's centre, valve chambers, scour and air valve assemblies, thrust and anchor blocks, manholes, access structures, and fibre optic cabling with instrumentation for real-time water level monitoring. Bidders must budget for and implement a full she programme, including a she plan, a sacpcmp-registered safety officer, a full-time competent construction supervisor, a valid compensation commissioner letter of good standing, medicals and induction training. Bids close on 14 january 2027 at 08:00.
Closing and site: bids close on 14 January 2027 at 08:00; the site is Eskom Drakensberg Pumped Storage Scheme, off the R74 between Bergville and Harrismith, Jagersrust, KwaZulu-Natal, 3354.
SHE plan: the contractor must compile a SHE plan meeting the specification and all applicable legislation, remains accountable for its own health and safety programme, and a Section 37(2) legal agreement applies.
Safety officer and supervisor: appoint a full- or part-time construction safety officer registered with SACPCMP and a full-time competent construction supervisor, both in writing; no work may start or continue without the appointed supervisor or manager on site.
Letter of good standing: a certified copy of the Compensation Commissioner's valid letter of good standing, reflecting the contractor's company name, must be provided before work starts, with renewal letters during the project.
Competencies: SAMTRAC, HIRA, incident investigation training, legal liability, ISO 45001 knowledge, a minimum of 2 years' work experience and an OHS Diploma for contracts longer than 3 years.
Medicals and substance abuse: pre-employment, periodic and exit medicals by a registered Occupational Health Practitioner, with physical and psychological fitness examinations for work at heights; a 0% alcohol and drug tolerance applies under Eskom procedure 32-37 and Life-saving Rule 4 (Be Sober), with breathalyser and drug testing on entry and on site.
Induction and training: all project personnel and appointed contractors must complete health and safety induction and task-specific training before work starts, and visitors must undergo site induction.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tenderβs issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Categories
Request for Bid(Open-Tender)
Drakensberg Pumped Storage Scheme - Bergville - Bergville -
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
27 Nov
2026
Tender Published
Tender was published
14 Jan
2027
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Attachment 1 E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
Replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme, procured by Eskom. The work involves replacing existing water infrastructure to ensure continued reliable water supply at the scheme.
Attachment 31 SHEQ Policy.pdf
Eskom requires the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The work involves construction and installation of water infrastructure, with a strong emphasis on safety, health, environment, and quality (SHEQ) compliance.
Attachment 10- Tax Evaluation questionnaire.pdf
Eskom requires contractors to complete a PAYE classification questionnaire to determine their tax status for service contracts, including the replacement of potable water pipelines and surface water tanks at the Drakensberg Pumped Storage Scheme. The questionnaire determines whether a contractor is an independent contractor, personal service provider, labour broker, or dependent contractor, affecting PAYE withholding.
Attachment 19 Health and safety specification.pdf
Eskom is procuring the replacement of the potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme, including design refinement, materials procurement, construction, testing, commissioning, and handover of new potable water infrastructure. The project covers galvanised and asbestos cement pipeline replacement, a surface water storage tank, a deluge tank replacement, piping to the Visitor's Centre, associated valve chambers and structures, fibre optic cabling and instrumentation, and disinfection and commissioning.
Attachment 29 - 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdf
Eskom is replacing the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The work involves construction and replacement of water infrastructure, requiring compliance with Eskom's PPE standard (240-44175132) for all personnel on site.
Attachment 24 - Work at height standard (Doc 32-418) effective on 02.03.2020 exp in 2025.pdf
Attachment 7 -240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Eskom requires the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The contract is governed by Eskom's Supplier Quality Management specification (QM 58), which mandates that suppliers develop, implement, and maintain a quality management system conforming to ISO 9001, and comply with detailed quality planning, control, and audit requirements.
Attachment 6 -240-68099512 Form A_Cat 1_ Rev 9.pdf
Eskom requires the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The work falls under a tender and contract governed by Eskom's Supplier Quality Requirements (specification 240-105658000) and the ISO 9001 standard, with pre- and post-contract award quality obligations.
E3907GXPOU - Invitation to Tender (ITT) - Jagersrust Water Pipeline Replacement Works for Drakensberg Pumped (002).pdf
Eskom requires the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The works include the construction of a new pipeline and replacement of surface water tanks, with a compulsory site clarification meeting and a 12-week tender validity period.
Attachment 27 - 240-62196227 Life-Saving Rules Standard_rev7 (Final)_February 2025_signed.pdf
Eskom is replacing the potable water pipeline and surface water tanks at the Jagersrust section of the Drakensberg Pumped Storage Scheme. The work falls under a national tender and requires strict adherence to Eskom's Life-Saving Rules, which are detailed in the provided standard.
Attachment - 9 Tender Technical Evaluation Strategy for the Jagersrust water pipeline replacement Drakensberg Power Station.pdf
Replacement of the Jagersrust potable water transmission and distribution pipelines (galvanised steel and asbestos cement) with HDPE, plus installation of new surface potable water storage tanks and a deluge tank with reinforced concrete foundations, at Eskom's Drakensberg Pumped Storage Scheme. The works include design and construction of pipelines, tanks, and associated civil infrastructure.
Attachment 18 -240-77471651 Annexure C1-Tender Evaluation Template.pdf
Eskom requires the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The work is classified as high risk for occupational health and safety, and bidders must submit a comprehensive OHS tender returnable pack for evaluation.
Atachment 4 - NEC3 ECC.pdf
Eskom requires the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme, under an NEC3 Engineering and Construction Contract (Option A: priced contract with activity schedule). The works include material delivery, installation and commissioning, with key dates in 2027. The contract includes standard Eskom additional conditions (Z1βZ15) covering cession, B-BBEE status changes, confidentiality, health and safety, ethics, insurance, intellectual property and asbestos.
Attachment 22 - PPE NON COMPLIANCE MEMO.pdf
Eskom is procuring the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The work involves construction and replacement of water infrastructure, with strict adherence to Eskom's PPE Standard (240-44175132) and consequence management for non-compliance.
Attachment 2 E-tendering Help Manual for supplier - 27 January 2025.pdf
Eskom requires the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The work involves the construction and installation of a new potable water pipeline and replacement of surface water tanks at the scheme.
Attachment 21 - 32-520 OHS Risk assessment procedure revision. 5.pdf
Replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme, owned by Eskom. The work involves construction and associated occupational health and safety risk management in line with Eskom's mandatory procedures.
Attachment 17-Baseline Risk Assessment_Pipeline and Surface Water Tank Replacement_DPSS.pdf
Eskom requires the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The work includes construction activities with significant occupational health and safety risks, requiring contractors to manage hazards such as working at heights, near water, and with heavy equipment.
Attachment 20 - 167A-13846- OHS&Q Management Plan.pdf
Replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme, undertaken for Eskom. The contract is governed by Eskom's Peaking Contractor OHS&Q Management Plan, which sets out safety, health, and quality requirements for contractors.
Attachment 5-240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf
Eskom requires replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The tender is open to suppliers who can meet stringent quality management requirements, including ISO 9001 certification or equivalent evidence of a functioning quality management system, and who can provide a contract quality plan and inspection/test plans specific to the scope.
Attachment 16 -240-77471499 Annexure B.pdf
Eskom requires the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The work includes compliance with extensive OHS requirements and management of contractors and suppliers.
Attachment 28 - 240-62946386 - Vehicle and Driver Safety Management Procedure - Rev 7.pdf
Eskom is procuring the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The work involves construction-related activities, and bidders must comply with Eskom's Driver and Vehicle Safety Management Procedure, which mandates strict driver permits, vehicle safety standards, and zero tolerance for at-risk behaviour.
Attachment 30 - 167A-16147 - Working in Confined Spaces WI_Nov 2025.pdf
Eskom requires the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme, a project that will involve working in confined spaces. The work instruction provided details the mandatory confined space entry procedures, including gas testing, permits, safety watches, and emergency rescue plans that bidders must follow.
Attachment 25 - 32-37_Management_of_Substance_Abuse_in_the_Workplace (Rev 5 exp 2028).pdf
Eskom requires the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The work is subject to Eskom's substance abuse management procedure, which prohibits access to site or continued work for anyone under the influence of alcohol or drugs, and mandates screening and testing of all persons on Eskom premises.
Attachment 32 OHS Incident Management Procedure.pdf
Eskom requires the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The work involves the management of occupational health and safety incidents in accordance with Eskom's OHS Incident Management Procedure, which mandates reporting, investigation, and corrective actions for all incidents, including near-misses.
Attachment 3 SDLI Strategy Setting Template for Bidders - Provision of Jagersrust Water Pipeline Replacement Services -Drakensberg.pdf
Eskom requires the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme, with a project duration of 36 months. The tender includes specific goals for B-BBEE preference points, mandatory local content thresholds for designated sectors, and a compulsory CIDB skills development contribution.
Attachment 26 - 32-95 Occupational Health and Safety Incident Management Procedure (1).pdf
Eskom requires the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The work is governed by Eskom's Occupational Health and Safety Incident Management Procedure, which sets out mandatory incident reporting, investigation, and corrective action requirements for all contractors and employees.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
RΒ 931Β 225
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
This document is the Eskom Supplier Quality Management Specification (240-105658000, Revision 4, QM 58). It defines the minimum quality requirements for all existing and potential Eskom suppliers, including criteria for evaluation, selection, registration, assessment, performance monitoring, and auditing. The specification requires suppliers to develop, implement, maintain and continually improve a quality management system based on ISO 9001. It applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all Eskom RFIs, RFQs, RFPs and contracts for products and services.
Important Dates
Source: Attachment 7 -240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Closing date: 14 January 2027 at 08:00 (from tender record).
Note: The document header shows an authorisation date of 01 July 2026, which is not the closing date.
Contact Information
Source: Attachment 7 -240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)No specific contact details (name, email, phone) are provided in the document.
Department: Procurement and Supply Chain Management, Eskom Holdings SOC Ltd.
Submission Guidelines
Source: Attachment 7 -240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Returnable documents (per the List of Tender Returnables, 240-12248652):
Disqualification risks:
Evaluation Criteria
Source: Attachment 7 -240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Evaluation is based on the supplier's quality management system and documentation.
Technical Specifications
Source: Attachment 7 -240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)This document is a specification for supplier quality management, not the technical scope of the pipeline/tanks project.
Scope of the specification:
Key requirements:
Quality plans:
Special processes:
Preservation:
Methodology
Source: Attachment 7 -240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfPreservation work plan development and execution performance evaluation of all parties engaged in material transportation, handling, or storage services.
Quality Management
Source: Attachment 7 -240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfQuality management system requirements:
Quality plans:
Quality kick-off meeting:
Eskom rights:
Pricing Schedule
Source: Attachment 7 -240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfNo pricing schedule or financial details are provided in this document.
Financial Requirements
Source: Attachment 7 -240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)No specific financial requirements (bid security, guarantees, retention, payment terms, turnover) are stated in this document.
Compliance Requirements
Source: Attachment 7 -240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Quality management system:
Returnable forms:
Other references:
No specific B-BBEE level or CIDB grading is stated in this document.
Health & Safety
Source: Attachment 7 -240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfThe document references the Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) as an informative reference. No specific OHS requirements are detailed in this specification.
Contractual Terms
Source: Attachment 7 -240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfPreservation management programme requirements:
Description
Source: Attachment 28 - 240-62946386 - Vehicle and Driver Safety Management Procedure - Rev 7.pdfThis procedure guides the Eskom business in addressing the risks relating to frequent travelling on Eskom business, especially over long distances, and in enhancing the general standard of driver and vehicle safety, as well as learning from positive practices associated with safe driving.
It describes the purpose, scope, sequence of activities, control points, and responsibilities required to perform a high-level managerial, administrative, and technical function regarding the management of driver and vehicle safety, including mobile equipment safety training and assessment across Eskom Holdings SOC Limited, including its subsidiaries.
The purpose is to standardise driver and vehicle safety requirements across Eskom and to ensure that effective driver and vehicle safety management programmes are implemented by the divisional/operating unit (OU)/business unit (BU) managers responsible for achieving safe driving practices, thereby preventing vehicle accidents and/or incidents.
This procedure applies to all drivers and vehicles used when performing work for Eskom Holdings SOC Limited and its subsidiaries, including contractors and consultants (who are using Eskom-subsidised transport) and any person insured directly or indirectly by Eskom and driving a vehicle outside the borders of South Africa.
This procedure will be effective from the date of authorisation.
Evaluation Criteria
Source: Attachment 28 - 240-62946386 - Vehicle and Driver Safety Management Procedure - Rev 7.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid SARS tax clearance (or tax pin).
Bidders must comply with Eskom's Driver and Vehicle Safety Management Procedure, including driver permit requirements.
Contractors must ensure all vehicles used for Eskom business are roadworthy and meet Eskom Vehicle Safety Specifications (32-345).
Any retrofitted vehicles must have approval from the licensing authority.
Bidders must complete all mandatory returnable forms as specified in the tender documentation.
Experience & Qualifications
Source: Attachment 28 - 240-62946386 - Vehicle and Driver Safety Management Procedure - Rev 7.pdfA competent driver is any driver who has the necessary knowledge, skills, training, experience, and qualifications and is specifically licensed for a particular class of vehicle and/or specialised vehicles/equipment to perform the required work safely.
Driver training must be provided by an accredited service provider listed by, and in accordance with, the Eskom Academy of Learning (EAL) processes.
Driver training also includes internal structured interventions aimed at positively changing behaviour and informing Eskom drivers regarding their skills, experience, qualifications, and changes to legislation/policies.
Quality Management
Source: Attachment 28 - 240-62946386 - Vehicle and Driver Safety Management Procedure - Rev 7.pdfVehicles used for Eskom business must be inspected and maintained in a roadworthy condition.
Drivers must perform a pre-trip inspection before every trip in Eskom-owned vehicles and sign the inspection sheet.
For other vehicles used for Eskom business, drivers must visually inspect the vehicle licence, tyres, indicators, lights, oil and water, and any aspect related to roadworthiness.
Fleet managers must conduct a full vehicle inspection at least once a year for Eskom-owned vehicles.
Responsible managers must ensure annual vehicle inspections are conducted to comply with Eskom Vehicle Safety Specification (32-345).
Vehicles not fitted with safety belts must be retrofitted according to the vehicle manufacturer and SANS specifications.
Vehicles must comply with Eskom Vehicle Safety Specifications (32-345) when purchased or rented for Eskom business, where available.
Private vehicles used for Eskom business require written permission from the employer and must comply with Eskom Vehicle Safety Specifications (32-345).
Health & Safety
Source: Attachment 28 - 240-62946386 - Vehicle and Driver Safety Management Procedure - Rev 7.pdfEskom takes a zero-tolerance stance on at-risk behaviour relating to health and safety.
All drivers and passengers must wear safety belts while travelling in a vehicle.
No person may be transported on the back of a vehicle such as an LDV or a truck.
Vehicles must be fitted with anti-lock brakes (ABS) and dual air bags, excluding specialised vehicles that cannot be fitted with such.
The use of motorcycles for Eskom business is prohibited, except where it is the only option and divisional OHS departments have considered risks and implemented control measures.
Quad bikes may only be used for work-related duties if the user is declared competent by a pre-approved Eskom driver assessor.
Specialised golf carts used for maintenance and transporting employees on Eskom premises are only permitted if the user has a valid Code B driver's licence and is declared competent by the supplier.
Single-person upright wheelers are used for patrolling inside Eskom premises and are only permitted if the user is trained and declared competent by the supplier.
Drivers must not use cell phones while driving, except for emergency calls via hands-free or Bluetooth.
Employees are not allowed to attend MS Teams meetings while driving.
Drivers must take a rest at a safe place at least every two hours when driving long distances on the same working day.
Drivers must drive with dipped-beam headlights during poor visibility during the day.
Dangerous goods must be transported and labelled in accordance with the National Road Traffic Act and relevant SANS requirements.
Route risk assessments must be conducted for each area of responsibility and kept for planning purposes.
All work-related vehicle incidents must be investigated, and action taken as required by the Eskom Procedure for Incident Management (32-95).
Contractual Terms
Source: Attachment 28 - 240-62946386 - Vehicle and Driver Safety Management Procedure - Rev 7.pdfDrivers must park vehicles so they do not pose a hazard to other road users.
Drivers must adapt their driving to prevailing conditions.
Failure to adhere to the rules for identified risk areas or at-risk behaviour will result in a disciplinary process, and a breach could lead to severe penalties, including dismissal.
Submission Guidelines
Source: Attachment 16 -240-77471499 Annexure B.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: Attachment 16 -240-77471499 Annexure B.pdf (unknown)Bidders must sign the Acknowledgement Form for Eskom OHS legal and other requirements. The form must be completed and submitted with the bid.
Compliance Requirements
Source: Attachment 16 -240-77471499 Annexure B.pdf (unknown)OHS compliance requirements:
Contractual Terms
Source: Attachment 16 -240-77471499 Annexure B.pdfContractor management obligations:
Description
Source: Attachment 5-240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdfThe tender covers replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The document provided focuses on quality management requirements for the bidder.
Submission Guidelines
Source: Attachment 5-240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Returnable documents (Category 1 β Quality Requirements):
All returnables must be submitted with the bid; failure to provide them may affect evaluation.
Evaluation Criteria
Source: Attachment 5-240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Quality requirements are evaluated as pass/fail indicators (Apply = 1). Sections and maximum scores:
Total possible score: 13 points. Bidders must either hold a valid ISO 9001 certificate (with relevant scope, valid expiry, and recognised international accreditation) or demonstrate a functioning QMS via Section B evidence.
Technical Specifications
Source: Attachment 5-240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Scope: Replacement of Jagersrust potable water pipeline and surface water tanks at Drakensberg Pumped Storage Scheme.
Quality management deliverables required:
Compliance Requirements
Source: Attachment 5-240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)ISO 9001 certification (Option 1) or documented QMS evidence (Section B). Certification authority must have recognised international accreditation. Certificate must be valid at time of tender.
Contact Information
Source: Attachment 18 -240-77471651 Annexure C1-Tender Evaluation Template.pdf (unknown)Development Team:
Submission Guidelines
Source: Attachment 18 -240-77471651 Annexure C1-Tender Evaluation Template.pdf (unknown)Returnable OHS documents (all must be submitted):
Failure to submit any required returnable may lead to disqualification.
Evaluation Criteria
Source: Attachment 18 -240-77471651 Annexure C1-Tender Evaluation Template.pdf (unknown)OHS evaluation results in a recommendation of 'Recommended' or 'Not Recommended'. Bidders must submit all mandatory OHS returnables. The document does not specify a scoring split, minimum qualifying score, or preference point system.
Technical Specifications
Source: Attachment 18 -240-77471651 Annexure C1-Tender Evaluation Template.pdf (unknown)Scope of work: Jagersrust potable water pipeline and surface water tanks replacement at Drakensberg Pumped Storage Scheme. OHS requirements must address the project/scope OHS risks and align with the health and safety specification.
Experience & Qualifications
Source: Attachment 18 -240-77471651 Annexure C1-Tender Evaluation Template.pdfOHS competency requirements: provide CVs and qualifications/certificates of OHS personnel, considering scope of work, risks, OHS plan, and applicability.
Compliance Requirements
Source: Attachment 18 -240-77471651 Annexure C1-Tender Evaluation Template.pdf (unknown)OHS compliance requirements:
Health & Safety
Source: Attachment 18 -240-77471651 Annexure C1-Tender Evaluation Template.pdfMandatory OHS returnables:
Section
Source: Attachment 18 -240-77471651 Annexure C1-Tender Evaluation Template.pdfOHS evaluation template (Annexure C1) for high-risk work. Bidders are assessed on submission of all mandatory OHS returnables, resulting in a 'Recommended' or 'Not Recommended' outcome.
Description
Source: E3907GXPOU - Invitation to Tender (ITT) - Jagersrust Water Pipeline Replacement Works for Drakensberg Pumped (002).pdfThe tender is for the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The works are engineering and construction works under CIDB class 6CE. The contract will be the NEC3 Engineering and Construction Contract. The scope of work is included in the NEC contract (Attachment 4).
Important Dates
Source: E3907GXPOU - Invitation to Tender (ITT) - Jagersrust Water Pipeline Replacement Works for Drakensberg Pumped (002).pdf (TENDER)Closing date and time: 14 January 2027 at 10H00
Tender validity period: 12 weeks from closing date
Compulsory site clarification meeting (physical): 08 December 2026 at 10H00, Drakensberg Pumped Storage Scheme, Visitors Center
Compulsory site clarification meeting (virtual): 08 December 2026 at 10H00, MS Teams (link provided in tender document)
Clarification queries deadline: 5 working days before tender submission deadline
Contact Information
Source: E3907GXPOU - Invitation to Tender (ITT) - Jagersrust Water Pipeline Replacement Works for Drakensberg Pumped (002).pdf (TENDER)Eskom Representative (all queries):
Procurement Manager (signatory):
Fraud and corruption reporting:
Submission: electronic via Eskom E-tendering site (Eskom Tender Bulletin)
Submission Guidelines
Source: E3907GXPOU - Invitation to Tender (ITT) - Jagersrust Water Pipeline Replacement Works for Drakensberg Pumped (002).pdf (TENDER)Submission method: electronic only via the Eskom E-tendering site (Eskom Tender Bulletin). No hard copies accepted.
Returnable forms (disqualifiable if not completed, signed where required, and submitted by closing):
Returnables required at closing for evaluation (non-disqualifiable, but score zero if not submitted):
Returnables required prior to contract award:
Disqualification risks:
Evaluation Criteria
Source: E3907GXPOU - Invitation to Tender (ITT) - Jagersrust Water Pipeline Replacement Works for Drakensberg Pumped (002).pdf (TENDER)Evaluation stages:
Ranking: total score = price score + specific goals score, ranked highest to lowest.
Contractual requirements (not evaluation criteria, but must be met before award):
No reverse e-auction, no objective criteria, no alternative tenders allowed.
Technical Specifications
Source: E3907GXPOU - Invitation to Tender (ITT) - Jagersrust Water Pipeline Replacement Works for Drakensberg Pumped (002).pdf (TENDER)Scope: Replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme.
Pricing Schedule
Source: E3907GXPOU - Invitation to Tender (ITT) - Jagersrust Water Pipeline Replacement Works for Drakensberg Pumped (002).pdfPricing schedule requirements:
Financial Requirements
Source: E3907GXPOU - Invitation to Tender (ITT) - Jagersrust Water Pipeline Replacement Works for Drakensberg Pumped (002).pdf (TENDER)Payment terms:
Performance security:
Pricing schedule:
Financial statements:
Compliance Requirements
Source: E3907GXPOU - Invitation to Tender (ITT) - Jagersrust Water Pipeline Replacement Works for Drakensberg Pumped (002).pdf (TENDER)Eligibility:
CIDB grading:
CSD registration:
Tax compliance:
B-bbee:
Employment Equity:
Safety:
Quality:
Other:
Health & Safety
Source: E3907GXPOU - Invitation to Tender (ITT) - Jagersrust Water Pipeline Replacement Works for Drakensberg Pumped (002).pdfHealth and safety requirements:
Contractual Terms
Source: E3907GXPOU - Invitation to Tender (ITT) - Jagersrust Water Pipeline Replacement Works for Drakensberg Pumped (002).pdfContract conditions: NEC3 Engineering and Construction Contract (ECC).
Section
Source: E3907GXPOU - Invitation to Tender (ITT) - Jagersrust Water Pipeline Replacement Works for Drakensberg Pumped (002).pdfAdditional evaluation criteria:
Description
Source: Attachment 25 - 32-37_Management_of_Substance_Abuse_in_the_Workplace (Rev 5 exp 2028).pdfEskom is committed to protecting the safety, health, and well-being of all employees and others in the workplace. The substance abuse procedure (32-37) sets out the process for managing substance abuse to comply with statutory requirements, provide a healthy and safe working environment, identify and prevent substance abuse, and offer rehabilitation assistance. It applies to all Eskom employees, contractors, consultants, and visitors on Eskom premises or business.
Evaluation Criteria
Source: Attachment 25 - 32-37_Management_of_Substance_Abuse_in_the_Workplace (Rev 5 exp 2028).pdf (unknown)Bidders must comply with Eskom's substance abuse procedure as a condition of working on the project. All persons entering Eskom premises are subject to substance abuse testing. Contractors must ensure their employees adhere to the procedure and may be required to arrange transport for any employee found under the influence.
Technical Specifications
Source: Attachment 25 - 32-37_Management_of_Substance_Abuse_in_the_Workplace (Rev 5 exp 2028).pdf (unknown)Eskom requires compliance with its substance abuse management procedure (32-37) for all persons on its premises, including contractors, consultants, and visitors. The procedure covers:
Quality Management
Source: Attachment 25 - 32-37_Management_of_Substance_Abuse_in_the_Workplace (Rev 5 exp 2028).pdfThe procedure references ISO 9001 Quality Management Systems as a normative reference. Testing and screening equipment must be calibrated and maintained per manufacturer specifications, with calibration at least every six months. Testers and screeners must be trained and appointed, with refresher training every two years.
Compliance Requirements
Source: Attachment 25 - 32-37_Management_of_Substance_Abuse_in_the_Workplace (Rev 5 exp 2028).pdf (unknown)Bidders must comply with Eskom's substance abuse procedure (32-37) as a condition of working on the project. This includes ensuring their employees adhere to the procedure. No specific B-BBEE, CIDB, or other compliance thresholds are stated in the provided document.
Health & Safety
Source: Attachment 25 - 32-37_Management_of_Substance_Abuse_in_the_Workplace (Rev 5 exp 2028).pdfEskom has adopted an Occupational Health and Safety (OHS) Strategy and the Zero Harm value. The substance abuse procedure is part of this commitment. Key safety requirements:
Contractual Terms
Source: Attachment 25 - 32-37_Management_of_Substance_Abuse_in_the_Workplace (Rev 5 exp 2028).pdfThe document is an internal Eskom procedure for managing substance abuse in the workplace. It applies to all Eskom employees, contractors, consultants, and visitors on Eskom premises or business. Contractors must ensure their employees comply with the procedure. Key obligations include:
Section
Source: Attachment 25 - 32-37_Management_of_Substance_Abuse_in_the_Workplace (Rev 5 exp 2028).pdfThe document does not specify evaluation criteria for a tender. It is an internal procedure. Bidders must comply with the substance abuse procedure as a condition of working on the project.
Description
Source: Attachment 3 SDLI Strategy Setting Template for Bidders - Provision of Jagersrust Water Pipeline Replacement Services -Drakensberg.pdfScope of work: Provision of Jagersrust Water Pipeline Replacement Services for the Drakensberg Pumped Storage Scheme. Project duration: 36 months.
Important Dates
Source: Attachment 3 SDLI Strategy Setting Template for Bidders - Provision of Jagersrust Water Pipeline Replacement Services -Drakensberg.pdf (TENDER)Closing date: 14 January 2027 at 08:00 (from tender record).
Note: The document states a project duration of 36 months.
Submission Guidelines
Source: Attachment 3 SDLI Strategy Setting Template for Bidders - Provision of Jagersrust Water Pipeline Replacement Services -Drakensberg.pdf (TENDER)Returnable forms (all must be completed, signed and submitted with the bid):
Disqualification risks:
Evaluation Criteria
Source: Attachment 3 SDLI Strategy Setting Template for Bidders - Provision of Jagersrust Water Pipeline Replacement Services -Drakensberg.pdf (TENDER)Evaluation is based on the 90/10 or 80/20 preference point system, with specific goals (B-BBEE status level) contributing a maximum of 10 points (90/10) or 20 points (80/20).
Points for B-BBEE status level (90/10 system / 80/20 system):
Specific goal points are added to price points, and the total is rounded to two decimal places. The contract is awarded to the tenderer scoring the highest total points, subject to the Preferential Procurement Policy Framework Act.
Tenderers who fail to provide B-BBEE documentation are not disqualified but:
Objective criteria (Section 2) are not mandatory but are a condition for contract award. If a tenderer does not meet objective criteria, the second-ranked tenderer may be recommended for award.
Technical Specifications
Source: Attachment 3 SDLI Strategy Setting Template for Bidders - Provision of Jagersrust Water Pipeline Replacement Services -Drakensberg.pdf (TENDER)Scope of work: Provision of Jagersrust Water Pipeline Replacement Services for the Drakensberg Pumped Storage Scheme.
Project duration: 36 months.
Designated sectors and local content thresholds (mandatory):
CIDB skills development:
Pricing Schedule
Source: Attachment 3 SDLI Strategy Setting Template for Bidders - Provision of Jagersrust Water Pipeline Replacement Services -Drakensberg.pdfPricing must be separated into components as per the Price Schedule included with the tender documents, distinguishing local and imported goods/services. Local procurement content is total spending minus the imported component.
Financial Requirements
Source: Attachment 3 SDLI Strategy Setting Template for Bidders - Provision of Jagersrust Water Pipeline Replacement Services -Drakensberg.pdf (TENDER)Pricing must be separated into components as per the Price Schedule included with the tender documents, distinguishing local and imported goods/services.
Local procurement content is total spending minus the imported component.
SDL&I penalty and performance security:
Compliance Requirements
Source: Attachment 3 SDLI Strategy Setting Template for Bidders - Provision of Jagersrust Water Pipeline Replacement Services -Drakensberg.pdf (TENDER)B-BBEE requirements:
B-BBEE improvement/retention plan:
Sworn affidavit validity requirements:
Local content:
CIDB:
CSD registration and tax clearance are implied for Eskom tenders (not explicitly stated in this document).
Section
Source: Attachment 3 SDLI Strategy Setting Template for Bidders - Provision of Jagersrust Water Pipeline Replacement Services -Drakensberg.pdfEvaluation is based on the 90/10 or 80/20 preference point system, with specific goals (B-BBEE status level) contributing a maximum of 10 points (90/10) or 20 points (80/20).
Points for B-BBEE status level (90/10 system / 80/20 system):
Specific goal points are added to price points, and the total is rounded to two decimal places. The contract is awarded to the tenderer scoring the highest total points, subject to the Preferential Procurement Policy Framework Act.
Tenderers who fail to provide B-BBEE documentation are not disqualified but:
Objective criteria (Section 2) are not mandatory but are a condition for contract award. If a tenderer does not meet objective criteria, the second-ranked tenderer may be recommended for award.
Important Dates
Source: Attachment 1 E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Closing date: 27 January 2025
Submission Guidelines
Source: Attachment 1 E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: Attachment 1 E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Submission of the fully completed E-Tendering Training Acknowledgement Form within the prescribed period is mandatory. Failure to submit the form fully completed will render the bidder non-responsive and disqualified from the procurement process.
Description
Source: Attachment 17-Baseline Risk Assessment_Pipeline and Surface Water Tank Replacement_DPSS.pdfThe work involves replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme, under the Drakensberg - Risk and Assurance - Safety department.
Contact Information
Source: Attachment 17-Baseline Risk Assessment_Pipeline and Surface Water Tank Replacement_DPSS.pdf (unknown)Department: Drakensberg - Risk and Assurance - Safety
Evaluation Criteria
Source: Attachment 17-Baseline Risk Assessment_Pipeline and Surface Water Tank Replacement_DPSS.pdf (unknown)Bidders must comply with the Occupational Health and Safety Act 85 of 1993 and Eskom's safety procedures. The tender includes a baseline risk assessment template (identifier 240-70044602) that bidders must use. No other eligibility criteria (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document.
Technical Specifications
Source: Attachment 17-Baseline Risk Assessment_Pipeline and Surface Water Tank Replacement_DPSS.pdf (unknown)Scope of work: Replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme.
Key hazards identified in the baseline risk assessment include:
Required controls include:
Quality Management
Source: Attachment 17-Baseline Risk Assessment_Pipeline and Surface Water Tank Replacement_DPSS.pdfQuality and safety controls required include:
Compliance Requirements
Source: Attachment 17-Baseline Risk Assessment_Pipeline and Surface Water Tank Replacement_DPSS.pdf (unknown)Bidders must comply with the Occupational Health and Safety Act 85 of 1993 and Eskom's safety procedures. The baseline risk assessment template (identifier 240-70044602) must be used. No other compliance requirements (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document.
Health & Safety
Source: Attachment 17-Baseline Risk Assessment_Pipeline and Surface Water Tank Replacement_DPSS.pdfBidders must comply with the Occupational Health and Safety Act 85 of 1993 and Eskom's safety procedures. The baseline risk assessment identifies key hazards and required controls:
Health & Safety
Source: Attachment 21 - 32-520 OHS Risk assessment procedure revision. 5.pdfEskom's OHS risk assessment procedure (32-520, revision 5) sets out the mandatory process for identifying, analysing, evaluating, and controlling occupational health and safety hazards and risks across Eskom and its controlled entities. Compliance is mandatory. The procedure defines four risk assessment types: baseline (project and routine), issue-based (including pre-task daily assessments), continuous, and occupational hygiene hazard identification and risk assessment (OH HIRA). Contractors must develop a Contractor Baseline Risk Assessment (CBRA) based on the client's baseline risk assessment, which forms part of the OHS plan and is considered during tender evaluation. The CBRA must cover all planned activities, be periodically reviewed, and be submitted to the client at agreed times. Issue-based risk assessments must be conducted before each task and submitted to the client before work commences on construction projects. Risk is rated using a consequence/likelihood matrix with priority levels I (very high, immediate action) to IV (low, minor or no action). Controls follow the hierarchy: elimination, substitution, engineering, administrative, PPE. Risk assessments must be reviewed every two years unless legislation prescribes otherwise, and all results must be documented and communicated to affected stakeholders.
Description
Source: Attachment 19 Health and safety specification.pdfProject
Scope
Purpose of the specification
Contact Information
Source: Attachment 19 Health and safety specification.pdf (unknown)Eskom Safety Representative
Contract Manager / End User
Technical Specifications
Source: Attachment 19 Health and safety specification.pdf (unknown)Scope
Works
Site
Methodology
Source: Attachment 19 Health and safety specification.pdfSafe work procedures / method statements
Quality Management
Source: Attachment 19 Health and safety specification.pdfSite
Scope
Reporting lines
Substance testing
Compliance Requirements
Source: Attachment 19 Health and safety specification.pdf (unknown)Statutory compliance
Appointments and competencies
Records and medicals
Substance abuse
Training
Health & Safety
Source: Attachment 19 Health and safety specification.pdfHealth and safety specification β topics covered
Environmental
Source: Attachment 19 Health and safety specification.pdfApplicable environmental legislation
Environmental management
Contractual Terms
Source: Attachment 19 Health and safety specification.pdfContractor competencies
Notification of construction work
Description
Source: Attachment 29 - 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdfThis is an Eskom internal standard prescribing minimum requirements for generic Personal Protective Equipment (PPE) used across Eskom and its subsidiaries. It provides guidance on selection, use, care, and maintenance of PPE. It does not cover specialised equipment such as live work or fall arrest systems, which are addressed in separate standards.
Important Dates
Source: Attachment 29 - 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdf (unknown)Closing date: 14 January 2027 at 08:00 (from tender record). No other dates are stated in the document.
Evaluation Criteria
Source: Attachment 29 - 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdf (unknown)Bidders must comply with Eskom's PPE standard (240-44175132) and the applicable SANS standards referenced therein. No specific evaluation scoring or preference point system is stated in the provided document.
Technical Specifications
Source: Attachment 29 - 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdf (unknown)The document prescribes minimum requirements for generic Personal Protective Equipment (PPE) used across Eskom Holdings SOC Ltd and its subsidiaries. It covers specifications for:
Key requirements include:
Quality Management
Source: Attachment 29 - 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdfQuality requirements are embedded in the technical specifications: all PPE must comply with the relevant SANS standards, and garments must be free from defects, with stitching per SANS 10101 and threads per SANS 1362. Garment manufacturers must obtain a certificate of compliance from the fabric manufacturer confirming compliance with SANS and EN specifications.
Compliance Requirements
Source: Attachment 29 - 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdf (unknown)No specific eligibility criteria (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document. Bidders must ensure compliance with the Occupational Health and Safety Act and the referenced SANS standards.
Health & Safety
Source: Attachment 29 - 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdfThe standard is issued under the Occupational Health and Safety Act. Employers must conduct risk assessments before selecting PPE, provide training on PPE use and limitations, and ensure PPE is suitable and maintained. Employees must use PPE as prescribed, report loss or damage, and not modify issued PPE. PPE-free zones may be declared only after a risk assessment confirms it is safe.
Contractual Terms
Source: Attachment 29 - 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdfThe document is an internal Eskom standard, not a contract. It states that PPE must be issued free of charge to employees, and that Eskom-branded items must be returned on termination of employment. Losses due to negligence are subject to Eskom disciplinary procedures.
Section
Source: Attachment 29 - 240-44175132 Eskom Personal Protective Equipment (PPE) Standard.pdfNo evaluation criteria are stated in the document. Bidders must comply with the PPE standard and relevant SANS standards.
Health & Safety
Source: Attachment 27 - 240-62196227 Life-Saving Rules Standard_rev7 (Final)_February 2025_signed.pdfEskom enforces zero tolerance for six life-saving rules covering electrical isolation, working at height, seatbelt use, sobriety, permits to work, and safe live working. Contractors and their employees must comply at all Eskom sites. Violations are treated as serious misconduct and trigger disciplinary action within five working days. Contractors must remove any employee who breaches a rule and report the sanction to Eskom.
Description
Source: Attachment - 9 Tender Technical Evaluation Strategy for the Jagersrust water pipeline replacement Drakensberg Power Station.pdfThe project involves replacing the existing Jagersrust potable water transmission pipeline, which has reached the end of its service life. Works include full replacement of the galvanised steel pipeline between the Water Treatment Plant and the Jagersrust reservoirs, and the asbestos cement distribution pipelines supplying the village and surrounding communities. These pipelines will be upgraded to HDPE. New surface potable water storage tanks and a new deluge tank with reinforced concrete foundations will be installed. The completed works will deliver a more durable, efficient, and sustainable potable water supply system for all connected users. The document is the Tender Technical Evaluation Strategy for this project, applicable to Drakensberg Pumped Storage Scheme.
Important Dates
Source: Attachment - 9 Tender Technical Evaluation Strategy for the Jagersrust water pipeline replacement Drakensberg Power Station.pdf (unknown)Closing date: 14 January 2027 at 08:00 (from tender record).
Compulsory site clarification meeting: date and time not stated in this document; refer to tender documents.
Submission Guidelines
Source: Attachment - 9 Tender Technical Evaluation Strategy for the Jagersrust water pipeline replacement Drakensberg Power Station.pdf (unknown)Returnable documents (all must be completed, signed and submitted with the tender):
Disqualification risks:
Evaluation Criteria
Source: Attachment - 9 Tender Technical Evaluation Strategy for the Jagersrust water pipeline replacement Drakensberg Power Station.pdf (unknown)Evaluation stages:
Weighted criteria (total 100%):
Scoring guideline (no scores of 1 or 3 allowed):
Experience scoring (criterion 1.1):
Methodology scoring (criterion 2.1):
Quality Management scoring (criterion 3.1):
Project Execution Programme scoring (criterion 4.1):
Project Team scoring (criterion 5.1):
Technical Specifications
Source: Attachment - 9 Tender Technical Evaluation Strategy for the Jagersrust water pipeline replacement Drakensberg Power Station.pdf (unknown)Scope of works:
Location: Drakensberg Pumped Storage Scheme (DPSS).
Design and construction capability required:
Key personnel requirements:
Acceptable technical risks:
Unacceptable technical risks:
Acceptable exceptions/conditions:
Unacceptable exceptions/conditions:
Methodology
Source: Attachment - 9 Tender Technical Evaluation Strategy for the Jagersrust water pipeline replacement Drakensberg Power Station.pdfTechnical Approach & Methodology is a weighted evaluation criterion (30% of total). Bidders must submit detailed method statements for the design and construction of potable water pipelines, surface water tanks, and all associated civil works and infrastructure. Data sheets for all proposed pipes, fittings, valves, tanks, and fibre optic components must demonstrate compliance with specifications. Scoring rewards method statements that are fully detailed, technically sound, and aligned with the Works Information.
Experience & Qualifications
Source: Attachment - 9 Tender Technical Evaluation Strategy for the Jagersrust water pipeline replacement Drakensberg Power Station.pdfTenderer's Experience is a weighted evaluation criterion (30% of total). Bidders must demonstrate experience on similar projects by submitting five (5) or more completed projects within the last five (5) years from the date of tender closing. Projects must be in the category of design and construction of potable water pipelines, surface water tanks, and associated civil works and infrastructure. The list must include project name, contactable reference, detailed description of work performed, project value (for scope performed), and project start and end dates. Supporting completion or reference letters from previous clients are required.
Project Team and Organogram is a weighted evaluation criterion (20% of total). Bidders must submit detailed CVs of proposed key personnel, demonstrating qualifications, professional registrations, and relevant experience. Design personnel must be ECSA-registered (Pr. Eng. or Pr. Tech. Eng.), and construction personnel must be SACPCMP-registered. A detailed project organogram is required.
Quality Management
Source: Attachment - 9 Tender Technical Evaluation Strategy for the Jagersrust water pipeline replacement Drakensberg Power Station.pdfQuality Management is a weighted evaluation criterion (10% of total). Bidders must submit a Quality Control Plan (QCP) and Inspection & Test Plan (ITP) for the works. Scoring is based on the detail and completeness of the QCP, including work activities, procedures, risks, intervention points, and check sheets/checklists. ISO 9001 is referenced as an informative standard.
Compliance Requirements
Source: Attachment - 9 Tender Technical Evaluation Strategy for the Jagersrust water pipeline replacement Drakensberg Power Station.pdf (unknown)Mandatory compliance:
No B-BBEE, CIDB, CSD, or tax compliance requirements stated in this document.
Contractual Terms
Source: Attachment - 9 Tender Technical Evaluation Strategy for the Jagersrust water pipeline replacement Drakensberg Power Station.pdfNo contractual terms are stated in this document. The document is a technical evaluation strategy, not a contract.
Section
Source: Attachment - 9 Tender Technical Evaluation Strategy for the Jagersrust water pipeline replacement Drakensberg Power Station.pdfAdditional evaluation criteria details are covered in the main evaluationCriteria section. This document defines mandatory criteria (attendance at compulsory site clarification meeting) and qualitative criteria (weighted scoring with 70% minimum threshold).
Description
Source: Attachment 30 - 167A-16147 - Working in Confined Spaces WI_Nov 2025.pdfThis is an internal Eskom work instruction (document 167A/16147, revision 1) titled "Working in Confined Spaces" for the Peaking Operating Unit. It sets out the procedure for safe entry, work, and exit of permit-required and non-permit-required confined spaces at Peaking power stations. It applies to all employees, contractors, and visitors. The document is not a tender specification; it is a safety procedure that bidders would need to comply with if performing confined space work.
Health & Safety
Source: Attachment 30 - 167A-16147 - Working in Confined Spaces WI_Nov 2025.pdfThe work instruction applies to all Peaking employees, contractors, and visitors entering confined spaces at Peaking power stations. Entry is only permitted after the atmosphere has been tested and evaluated by a competent person. The following controls apply:
Acceptable gas levels:
Confined spaces are classified:
Description
Source: Attachment 31 SHEQ Policy.pdfEskom Holdings SOC Ltd is South Africa's primary electricity supplier, wholly owned by the South African Government. The SHEQ Policy governs principles and rules to fulfil Eskom's commitment to people, the environment, and quality. The policy applies throughout Eskom Holdings SOC Ltd divisions, subsidiaries, and entities in which Eskom has a controlling interest or influence.
Contact Information
Source: Attachment 31 SHEQ Policy.pdf (unknown)No contact information stated in the provided document.
Submission Guidelines
Source: Attachment 31 SHEQ Policy.pdf (unknown)Returnable documents: SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination). All forms must be completed and signed. Submission method and address not stated in the provided document.
Evaluation Criteria
Source: Attachment 31 SHEQ Policy.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance (SARS TCS or tax pin). Bidders must comply with Eskom's SHEQ Policy, including Zero Harm and Zero Defects principles. Contractors must meet applicable safety, health, environment, and quality compliance obligations. No scoring split or minimum qualifying score stated.
Technical Specifications
Source: Attachment 31 SHEQ Policy.pdf (unknown)The tender is for the replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme. The provided document is Eskom's SHEQ Policy (Attachment 31), which sets out Eskom's commitment to safety, health, environment, and quality. Contractors must align with this policy.
Methodology
Source: Attachment 31 SHEQ Policy.pdfEskom's SHEQ Policy requires application of the plan-do-check-act (PDCA) quality cycle. Risk-based assessment methodologies must be applied, including hazard identification and risk assessment, fitness for duty assessments, emergency preparedness responses, and medical surveillance.
Quality Management
Source: Attachment 31 SHEQ Policy.pdfEskom's SHEQ Policy requires implementation of management systems in accordance with ISO 9001, ISO 14001, and ISO 45001/OHSAS 18001. Quality objectives must be set and performance measured for continual improvement. Zero Defects is a stated goal.
Compliance Requirements
Source: Attachment 31 SHEQ Policy.pdf (unknown)CSD registration required. Valid tax clearance (SARS TCS or tax pin) required. Compliance with Eskom's SHEQ Policy required, including Zero Harm and Zero Defects. Contractors must meet applicable safety, health, environment, and quality compliance obligations.
Health & Safety
Source: Attachment 31 SHEQ Policy.pdfEskom's SHEQ Policy requires compliance with the Occupational Health and Safety Act, Compensation for Occupational Injuries and Diseases Act, and Mines Health and Safety Act. Life-saving Rules apply to all employees, contractors, and visitors: open, isolate, test, earth, bond, and/or insulate before touch; hook up at heights; buckle up; be sober; permit to work. Zero fatalities, zero injuries, and zero ill-health are targets.
Environmental
Source: Attachment 31 SHEQ Policy.pdfEskom's SHEQ Policy requires proactive management of environmental footprint, minimising pollution and degradation, pursuing a low-carbon future, prioritising energy and water efficiency, and transitioning to a cleaner energy mix. Zero environmental incidents is a target.
Description
Source: Atachment 4 - NEC3 ECC.pdfThe contract is for the replacement of the Jagersrust water pipeline at the Drakensberg Pumped Storage Scheme. The works include the replacement of the potable water pipeline and surface water tanks. The contract is between Eskom Holdings SOC Ltd and the contractor (to be inserted at award stage).
Contact Information
Source: Atachment 4 - NEC3 ECC.pdf (unknown)Project Manager:
Supervisor:
Submission Guidelines
Source: Atachment 4 - NEC3 ECC.pdf (unknown)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Atachment 4 - NEC3 ECC.pdf (unknown)The contract is a NEC3 Engineering and Construction Contract (April 2013) with main Option A (Priced contract with activity schedule).
Evaluation stages:
Technical Specifications
Source: Atachment 4 - NEC3 ECC.pdf (unknown)Scope: Replacement of the Jagersrust potable water pipeline and surface water tanks at the Drakensberg Pumped Storage Scheme.
Site boundaries: Drakensberg Pumped Storage Scheme, Jagersrust Water Treatment Plant, and Jagersrust Development.
Key dates:
Starting date: 30 October 2026.
Completion date for the whole of the works: to be confirmed (TBC).
Defects date: 52 weeks after completion of the whole of the works.
Defect correction period: two weeks.
Weather data: recorded at Drakensberg, KwaZulu-Natal; supplied by the SA Weather Bureau; used for compensation events.
Methodology
Source: Atachment 4 - NEC3 ECC.pdfContractor must submit a first programme for acceptance within two weeks of the Contract Date.
Revised programmes must be submitted at intervals no longer than two weeks.
Contractor must provide works information for contractor design as specified in Contract Data Part Two.
Contractor must provide key persons data including CVs appended to the Tender Schedule.
Experience & Qualifications
Source: Atachment 4 - NEC3 ECC.pdfContractor must provide key persons data including names, jobs, responsibilities, qualifications, and experience.
CVs (and further key persons data including CVs) are appended to the Tender Schedule.
Quality Management
Source: Atachment 4 - NEC3 ECC.pdfDefects date: 52 weeks after completion of the whole of the works.
Defect correction period: two weeks.
Latent defects: liability extends one year after the defects date for latent defects.
Inspection: Employer or Supervisor not required to carry out inspections beyond reasonable inspection.
Pricing Schedule
Source: Atachment 4 - NEC3 ECC.pdfPricing: Priced contract with activity schedule (Main Option A).
Contractor must provide fee percentages (direct and subcontracted) in Contract Data Part Two.
Contractor must provide data for Schedules of Cost Components or Shorter Schedule of Cost Components as applicable.
Price adjustment for inflation (Option X1): base date for indices is SARB exchange rate published 7 calendar days before closing date; 85% linked to StatsSA CPI, 15% non-adjustable.
Financial Requirements
Source: Atachment 4 - NEC3 ECC.pdf (unknown)Pricing: Priced contract with activity schedule (Main Option A).
Payment terms:
Securities and guarantees:
Delay damages:
Limitation of liability:
Tax invoice:
Price adjustment (Option X1):
Compliance Requirements
Source: Atachment 4 - NEC3 ECC.pdf (unknown)B-bbee:
Ethics and prohibited actions:
Business rescue:
Joint ventures:
Confidentiality:
Health, safety and environment:
Asbestos:
Intellectual property:
Insurance:
Health & Safety
Source: Atachment 4 - NEC3 ECC.pdfContractor must take all reasonable precautions to maintain health and safety of persons in and about the execution of the works.
Contractor must comply with the Construction Regulations 2014 (promulgated under the Occupational Health and Safety Act) and all applicable health & safety laws.
Contractor warrants that the total of the Prices includes sufficient amount for proper compliance with health & safety requirements.
Contractor must ensure subcontractors, employees, and others under its control comply.
Asbestos: OEL for asbestos is 0.2 regulated asbestos fibres per ml of air as a 4-hour TWA; short-term exposure limit 0.6 fibres per ml as a 10-minute TWA. Measurements by SANAS accredited and Department of Employment and Labour approved AAIA. If asbestos identified, risk assessment and control measures required. Removal and disposal by registered asbestos contractor.
Environmental
Source: Atachment 4 - NEC3 ECC.pdfContractor must comply with all applicable environmental laws and regulations and rules, guidelines, and procedures provided for under the contract.
Contractor must ensure subcontractors, employees, and others under its control comply.
Asbestos management: Employer manages asbestos and ACM according to the Employer Asbestos Standard 32-303.
Contractual Terms
Source: Atachment 4 - NEC3 ECC.pdfContract type: NEC3 Engineering and Construction Contract (April 2013) with main Option A (Priced contract with activity schedule), dispute resolution Option W1, and secondary Options X1, X2, X7, X13, X15, X16, X18, and Z (additional conditions).
Law and language: Law of the Republic of South Africa; English.
Period for reply: two weeks working days prior to site installation, and 24 hours during site installation.
Programme: First programme to be submitted within two weeks of Contract Date; revised programmes at intervals no longer than two weeks.
Employer not willing to take over works before Completion Date.
Dispute resolution: Adjudicator selected from ICE-SA Panel; if no agreement, appointed by AFSA. Tribunal is arbitration under the Association of Arbitrators (Southern Africa) rules; place of arbitration: Cape Town.
Additional conditions (Z-clauses):
Section
Source: Atachment 4 - NEC3 ECC.pdfNo additional evaluation criteria beyond those in the standard evaluationCriteria section.
Description
Source: Attachment 22 - PPE NON COMPLIANCE MEMO.pdfThis memorandum sets out PPE compliance requirements for all contractor and Eskom Peaking employees.
Important Dates
Source: Attachment 22 - PPE NON COMPLIANCE MEMO.pdf (unknown)Memorandum date: 04 February 2026
Contact Information
Source: Attachment 22 - PPE NON COMPLIANCE MEMO.pdf (unknown)Peaking Business Unit Durbanville Office
Evaluation Criteria
Source: Attachment 22 - PPE NON COMPLIANCE MEMO.pdf (unknown)PPE compliance is mandatory under the Eskom PPE Standard (240-44175132).
Technical Specifications
Source: Attachment 22 - PPE NON COMPLIANCE MEMO.pdf (unknown)Purpose: Clarify roles, responsibilities, and consequence management for PPE non-compliance across Eskom Peaking and contractor employees.
Compliance Requirements
Source: Attachment 22 - PPE NON COMPLIANCE MEMO.pdf (unknown)PPE compliance is mandatory under the Eskom PPE Standard (240-44175132).
Health & Safety
Source: Attachment 22 - PPE NON COMPLIANCE MEMO.pdfPPE compliance is mandatory under the Eskom PPE Standard (240-44175132).
Description
Source: Attachment 2 E-tendering Help Manual for supplier - 27 January 2025.pdfThe document is the Eskom eTendering System Suppliers Help Manual. It explains that the eTendering system replaces physical submission of tender documents. Suppliers must register on the portal, verify their email, and use an OTP sent to their cellphone and email to log in. The portal is accessible via the TenderBulletin public website (https://tenderbulletin.eskom.co.za) or directly at https://eTendering.eskom.co.za. A CSD number is required for access.
Contact Information
Source: Attachment 2 E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)For system problems, contact the buyer responsible for the published tender. No specific contact details are provided in the document.
Submission Guidelines
Source: Attachment 2 E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Submission is electronic only via the Eskom eTendering portal at https://eTendering.eskom.co.za. Bidders must register on the portal and have a valid CSD number. Upload each required document under the correct category (Technical, Commercial, Finance). A single file may not exceed 50MB; total uploads may not exceed 900MB. Finalise the submission before the closing time; the portal records the submission timestamp. Keep the confirmation email with the submission ID for future reference.
Evaluation Criteria
Source: Attachment 2 E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)No evaluation criteria are stated in the provided document. The document only describes the electronic submission process.
Technical Specifications
Source: Attachment 2 E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)The document is a user manual for the Eskom eTendering system, not the tender specification. It describes how to register, upload documents, and finalise a submission. No technical requirements for the pipeline and tank replacement are provided.
Compliance Requirements
Source: Attachment 2 E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)A valid CSD number is required to access the eTendering system. No other compliance requirements are stated in the document.
Section
Source: Attachment 2 E-tendering Help Manual for supplier - 27 January 2025.pdfNo evaluation criteria are provided in the document. It only mentions that closed tenders are sent directly to suppliers who meet selection and evaluation criteria, but does not specify those criteria.
Description
Source: Attachment 6 -240-68099512 Form A_Cat 1_ Rev 9.pdfThe tender relates to the Jagersrust potable water pipeline and surface water tanks replacement at Drakensberg Pumped Storage Scheme. Quality requirements per Eskom specification 240-105658000 and ISO 9001 apply. Category 1 (pre-contract award quality requirements) is selected; site assessment applicability must be indicated.
Submission Guidelines
Source: Attachment 6 -240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: Attachment 6 -240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Bidders must complete and sign Form A to accept Eskom Supplier Quality Requirements and ISO 9001. No other evaluation criteria are stated in the document.
Technical Specifications
Source: Attachment 6 -240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Quality requirements apply per Eskom specification 240-105658000 and ISO 9001. Category 1 (pre-contract award quality requirements) is selected. Site assessment applicability must be indicated. Post-contract award conditions include contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities, and special processes.
Methodology
Source: Attachment 6 -240-68099512 Form A_Cat 1_ Rev 9.pdfThe ISO 9001 clauses and quality principles apply, including context of the organisation, leadership, planning, support, operation, performance evaluation, and improvement.
Quality Management
Source: Attachment 6 -240-68099512 Form A_Cat 1_ Rev 9.pdfQuality requirements per Eskom specification 240-105658000 and ISO 9001. Post-contract award conditions include Eskom rights of access and information, preservation, quality audits, management of nonconformities and nonconforming outputs, and special processes.
Compliance Requirements
Source: Attachment 6 -240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)No specific compliance requirements stated beyond the quality requirements.
Description
Source: Attachment 32 OHS Incident Management Procedure.pdfEskom's SHEQ Policy sets out principles for occupational health, safety, environment and quality.
Incident management is part of risk management, aiming to reduce risk, prevent recurrence, ensure accurate classification and recording, and promote near-miss reporting.
The procedure applies to all Eskom employees, contractors, and affected members of the public.
It is effective from 1 April 2021.
Evaluation Criteria
Source: Attachment 32 OHS Incident Management Procedure.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance (SARS TCS or tax pin).
Bidders must comply with Eskom's OHS Incident Management Procedure, which applies to all contractors.
No specific B-BBEE level, CIDB grading, or local content percentage is stated in the provided document.
Technical Specifications
Source: Attachment 32 OHS Incident Management Procedure.pdf (unknown)Eskom's SHEQ Policy governs occupational health, safety, environment and quality.
Incident management aims to reduce risk, prevent recurrence, ensure accurate classification and recording, and promote near-miss reporting.
The procedure applies to all Eskom employees, contractors, and members of the public affected by Eskom activities.
Contractors must comply with this procedure for Eskom reporting purposes, including on multi-employer sites.
The procedure supersedes other procedures for OHS incident interpretation.
Effective date: 1 April 2021.
Quality Management
Source: Attachment 32 OHS Incident Management Procedure.pdfAll investigation reports are controlled disclosure documents.
All health and safety incidents must be investigated, excluding non-work-related incidents outside workplace boundaries.
Repeat incidents must consider ineffective corrective actions from previous incidents.
Contractors conducting their own investigations may involve Eskom employees; formal witness requests must go through the employee's manager.
Contractors or third parties seeking Eskom information must have requests evaluated by the relevant manager, with Legal and Compliance guidance if needed.
Investigation reports must include incident details, consequences, risk of recurrence, direct and root causes, system failures, corrective actions, lessons learnt and recommendations.
All incidents within workplace boundaries must be investigated regardless of work relatedness.
Non-work-related incidents outside the workplace need not be investigated unless the Responsible Manager requests it with good reason.
Government agency requests for investigation reports must be in writing; OU/BU should seek Legal and Sustainability Systems advice if unsure.
Employees have the right not to incriminate Eskom or themselves.
Contractor incidents require contractor involvement in the investigation.
If a contractor does not cooperate, Eskom will take further steps to identify causes and implement corrective actions.
Ineffective corrective actions must be closed out on SAP EH&S and new ones captured.
Risk assessments must ensure corrective actions do not introduce new risks.
Periodic status reports from SAP EH&S must be provided to site management until all recommendations are closed out.
Compliance Requirements
Source: Attachment 32 OHS Incident Management Procedure.pdf (unknown)No specific compliance requirements beyond CSD registration and valid tax clearance are stated in the provided document.
Health & Safety
Source: Attachment 32 OHS Incident Management Procedure.pdfThe OHS Incident Management Procedure (document 32-95, Rev 9) applies across Eskom Holdings SOC Ltd.
It is effective from 1 April 2021.
The procedure covers incident identification, emergency response, notification, prioritisation, classification, recording, investigation, corrective actions, close-out and communication.
It references the OHS Act, COIDA, and other legislation.
Contractors must comply with this procedure for Eskom reporting purposes.
Environmental
Source: Attachment 32 OHS Incident Management Procedure.pdfThe document revision history notes the exclusion of environmental requirements from the document.
No specific environmental requirements are stated in the provided document.
Contractual Terms
Source: Attachment 32 OHS Incident Management Procedure.pdfIn case of OHS Act notifications (sections 31 or 32), summons from the NPA, or potential liability, the OU/BU must immediately contact the Legal Department regarding attorney appointment.
If no attorney is deemed necessary, the OU/BU must provide a detailed motivation for assessment by Legal Department.
For serious incidents, the investigation committee composition is similar to OU/BU investigation, with exceptions.
The OU/BU where the incident occurred must support the investigation logistically and provide secretariat resources.
For fatalities, Sustainability Systems initiates a corporate investigation and mobilises personnel for evidence collection.
A preliminary investigation report must be generated before the corporate investigation.
Where the MHSA applies, its investigation process is followed.
Description
Source: Attachment 20 - 167A-13846- OHS&Q Management Plan.pdfThis document is the Eskom Peaking Operating Unit Contractor OHS&Q Management Plan for 2024/25 to 2026/27. It sets out the framework for managing contractor health, safety, and quality performance over three years, with annual reviews. It applies throughout Peaking OU and is supported by ISO standards and Eskom internal documents. The plan aims to improve contractor OHS&Q performance by 2026/27FY, aligned with Generation Improvement plan objective 5.
Evaluation Criteria
Source: Attachment 20 - 167A-13846- OHS&Q Management Plan.pdf (unknown)Contractors must comply with the OHS&Q Management Plan, including competency requirements for contractor representatives. Contractors must have a Quality Management System compliant with ISO 9001:2015. Contractors must include OHS compliance KPIs in their contracts. The document does not specify other eligibility criteria such as CSD registration, tax clearance, B-BBEE level, or CIDB grading.
Technical Specifications
Source: Attachment 20 - 167A-13846- OHS&Q Management Plan.pdf (unknown)The plan applies throughout Peaking OU and is implemented over three years, reviewed annually. It must be read with ISO 9001, ISO 14001, ISO 45001, ISO 31000, Eskom OHS Strategy (240-112651496), OHS Contractor Management Model (240-5430191841T), Improvement plan (240-56926886), Eskom Contractor Health and Safety Requirements Standard (32-136), and Contract and Contractor OHS Management (32-726).
Contractor OHS KPIs include:
Contractor quality KPIs include:
Contractors must establish, document, implement, and maintain a QMS compliant with ISO 9001:2015.
Contractor management must state commitment to quality in a quality or SHEQ policy, conduct management reviews, and provide required resources.
Contractors must conduct internal quality audits and forward audit reports to Eskom.
Contractors must ensure personnel competence, annual assessments, and necessary resources.
Contractors must perform project risks and opportunities review in line with Peaking Integrated Risk Management Plan (167A/8493).
Quality Management
Source: Attachment 20 - 167A-13846- OHS&Q Management Plan.pdfContractors must conduct internal quality audits to verify compliance with ISO 9001 and planned programmes, and assess effectiveness of the quality system. Audit reports must be forwarded to Eskom.
Compliance Requirements
Source: Attachment 20 - 167A-13846- OHS&Q Management Plan.pdf (unknown)Contractor representatives must meet competency requirements:
Health & Safety
Source: Attachment 20 - 167A-13846- OHS&Q Management Plan.pdfEskom's objective is Zero Harm. Contractors must adopt safe systems of work and improve safety performance. Key focus areas include reducing contractor-related medical incidents to zero, analysing root causes of struck against/stuck, contact with fumes/electricity, and wasp insect bites incidents, and strengthening safety culture through behaviour-based observations.
Contractors must comply with Eskom OHS specification and applicable legislation, maintain health and safety files, implement near miss reporting, and develop BSO and PJO programmes.
Safety engagements between BU leadership and contractor leadership must be held bi-annually.
OHS practitioners must support contractors to attend engagements and follow up on actions.
Contractors must be categorised by site-specific risk (H, M, L) and managed accordingly.
OHS audits must be conducted as per the OHS model/audit schedule.
Incident trends must be analysed quarterly and findings communicated to contractors.
GMR 2.1 must conduct outage permit reviews regularly; permit issuing and management during outages is the exclusive responsibility of Maintenance and Ops departments.
Weekly sampling and checks by Ops Supervisors, 6-monthly self-assessments, and periodic PSR/ORHVS peer-reviews are in place.
Site contract custodians must complete Legal Liability Training by 30 January 2024.
Contractor site managers, supervisors, and safety officers must meet competency requirements including HIRA, incident investigation, supervisor training, legal liability, SAMTRAC, and ISO 45001 knowledge.
Minimum work experience of 2 years required; OHS Diploma required for contracts of 3 years or more.
Environmental
Source: Attachment 20 - 167A-13846- OHS&Q Management Plan.pdfThe plan references ISO 14001 Environmental Management System as supporting documentation. No specific environmental requirements are stated in this document.
Contractual Terms
Source: Attachment 20 - 167A-13846- OHS&Q Management Plan.pdfEskom information resources are business critical assets requiring high-level protection against unauthorized modification, disclosure, or destruction. Contractors must comply with Eskom's information security policy.
Contractors must be categorised according to site-specific risk (H, M, L) and managed accordingly.
Contract managers must ensure contractor KPIs include OHS compliance requirements for all contracts entered into from 1 May 2024.
Site contract custodians must complete Legal Liability Training (LLT) by 30 January 2024; if not, EAL must be involved for training.
OHS file requirements must be standardised for all new contracts, with quarterly audits to verify standardisation.
OHS dashboard compliance must be monitored quarterly and submitted to OHS Manager for consolidation.
Description
Source: Attachment 10- Tax Evaluation questionnaire.pdfThis document is a PAYE questionnaire for service contracts with Eskom Group. It determines whether a contractor (individual, company, close corporation, or trust) should be classified as an independent contractor, personal service provider, labour broker, or dependent contractor for tax purposes. The questionnaire must be completed truthfully and returned with signed affidavits and declarations.
Important Dates
Source: Attachment 10- Tax Evaluation questionnaire.pdf (unknown)The pack applies from 1 March 2022 to 28 February 2023. No other dates are specified.
Contact Information
Source: Attachment 10- Tax Evaluation questionnaire.pdf (unknown)Group Tax email: [email protected]
Eskom Corporate Tax Department, Megawatt Park (for non-resident submissions).
Submission Guidelines
Source: Attachment 10- Tax Evaluation questionnaire.pdf (unknown)Returnable documents:
Submission method: Submit the completed pack to the Eskom contractor representative. The pack must be returned with the signed summary sheet and signed affidavits.
Evaluation Criteria
Source: Attachment 10- Tax Evaluation questionnaire.pdf (unknown)The questionnaire determines the contractor's tax classification for PAYE purposes. The classification depends on answers to a series of tests:
If classified as a Personal Service Provider or Dependent Contractor, PAYE will be withheld from payments. If classified as an Independent Supplier or Contractor, no PAYE is withheld.
Technical Specifications
Source: Attachment 10- Tax Evaluation questionnaire.pdf (unknown)This is a tax evaluation questionnaire, not a technical specification. It applies to contractors supplying services or labour to Eskom Holdings SOC Ltd and its subsidiaries. The questionnaire determines whether the contractor is an independent contractor, personal service provider, labour broker, or dependent contractor for PAYE purposes.
Pricing Schedule
Source: Attachment 10- Tax Evaluation questionnaire.pdfPAYE withholding rules based on contractor classification:
Financial Requirements
Source: Attachment 10- Tax Evaluation questionnaire.pdf (unknown)PAYE withholding implications:
Compliance Requirements
Source: Attachment 10- Tax Evaluation questionnaire.pdf (unknown)Contractors must complete the PAYE Evaluation Pack accurately and truthfully. The pack is based on the Income Tax Act for the 2022/2023 tax year. Contractors must provide accurate and complete information and notify Eskom of any changes. Non-resident contractors must sign Appendix 9 and submit the pack to Eskom's Group Tax Department.
Section
Source: Attachment 10- Tax Evaluation questionnaire.pdfThe evaluation determines the contractor's tax classification through a series of tests: residence, number of employees, connected persons, income concentration, place of work and control, and a dominant impression test. The outcome determines whether PAYE is withheld from payments.
Description
Source: Attachment 26 - 32-95 Occupational Health and Safety Incident Management Procedure (1).pdfEskom's SHEQ Policy underpins the approach to occupational health and safety, environment, and quality. Incident management aims to reduce risk, prevent recurrence, ensure effective management, accurate classification and recording, prompt investigation, promote near-miss reporting, improve OHS by learning from incidents, share information, report to stakeholders, analyse trends, and involve all stakeholders. Incident management is not for assigning blame but for identifying improvements. Eskom is committed to Zero Harm.
Submission Guidelines
Source: Attachment 26 - 32-95 Occupational Health and Safety Incident Management Procedure (1).pdf (unknown)Returnable documents: SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination). All forms must be completed, signed, and submitted with the bid. Submission method and address not specified in the provided document.
Evaluation Criteria
Source: Attachment 26 - 32-95 Occupational Health and Safety Incident Management Procedure (1).pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance (SARS TCS or tax pin). Bidders must comply with Eskom's OHS Incident Management Procedure, including all incident reporting and investigation obligations. Contractors must ensure their employees are covered by the Compensation for Occupational Injuries and Diseases Act (COIDA).
Technical Specifications
Source: Attachment 26 - 32-95 Occupational Health and Safety Incident Management Procedure (1).pdf (unknown)Eskom requires compliance with its OHS Incident Management Procedure (document 32-95, Revision 9) for all incidents occurring during Eskom business. The procedure applies to Eskom employees, contractors, and members of the public affected by Eskom activities. Contractors must adhere to incident identification, emergency response, notification, prioritisation, classification, recording, investigation, corrective actions, and close-out processes. All incidents must be recorded on SAP EH&S. Incident investigations must follow the procedure, including root cause analysis and corrective action management.
Quality Management
Source: Attachment 26 - 32-95 Occupational Health and Safety Incident Management Procedure (1).pdfAll investigation reports are controlled disclosure documents. All health and safety incidents must be investigated, excluding non-work-related incidents outside workplace boundaries. Investigation reports must include incident details, consequences, risk of recurrence, direct and root causes, system failures, corrective actions, lessons learnt, and recommendations. Corrective actions must be monitored and closed out on SAP EH&S.
Compliance Requirements
Source: Attachment 26 - 32-95 Occupational Health and Safety Incident Management Procedure (1).pdf (unknown)CSD registration required. Valid tax clearance (SARS TCS or tax pin) required. Compliance with Eskom's OHS Incident Management Procedure mandatory. COIDA coverage for contractor employees required.
Health & Safety
Source: Attachment 26 - 32-95 Occupational Health and Safety Incident Management Procedure (1).pdfEskom's OHS Incident Management Procedure (32-95, Rev 9) applies to all Eskom operations, including contractors. Contractors must comply with incident identification, emergency response, notification, prioritisation, classification, recording, investigation, corrective actions, and close-out. All incidents must be recorded on SAP EH&S. Contractors must ensure employees are covered by COIDA. The procedure is effective from 1 April 2021.
Environmental
Source: Attachment 26 - 32-95 Occupational Health and Safety Incident Management Procedure (1).pdfThe document does not contain specific environmental requirements; it focuses on occupational health and safety incident management.
Contractual Terms
Source: Attachment 26 - 32-95 Occupational Health and Safety Incident Management Procedure (1).pdfContractors must cooperate with Eskom investigations. If a contractor does not cooperate, Eskom will take further steps to identify causes and implement corrective actions. In case of potential liability, the Legal Department and Sustainability Systems must be informed. For fatalities, a corporate investigation will be initiated by Sustainability Systems, and a preliminary investigation report must be prepared by the OU/BU before the corporate investigation.
Section
Source: Attachment 26 - 32-95 Occupational Health and Safety Incident Management Procedure (1).pdfNo additional evaluation criteria beyond the standard requirements are specified in the provided document.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Drakensberg Pumped Storage Scheme - Bergville - Bergville -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
26
Last checked
28 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
π‘ Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.