Published
27 Oct 2026
OCDS Reference
ocds-9t57fa-175929
The playhouse company requires a suitably qualified plumbing contractor to survey and reline existing cast iron drainage pipework at its theatre building in durban using trenchless cured-in-place pipe (cipp) technology. The work is split into two phases: phase 1 involves cleaning, CCTV inspection and a condition report; phase 2 relines only the sections approved in writing, against a provisional quantity of 300 m. Bidders must attend a compulsory site briefing, hold a CIDB grade 1 or 2 so grading, employ a pirb-registered plumber, and score at least 70 out of 100 on functionality to proceed to price evaluation.
Compulsory site briefing: attendance is mandatory for qualification; venue is The Playhouse Company, Theatre Building, 231 Anton Lembede Street, entrance at Stage Door (Acutt Street). Date and time not stated in the document.
Mandatory compliance (non-compliance = disqualification): CSD registration, valid SARS tax PIN, CIDB Grade 1 or 2 SO grading, and a PIRB-registered licensed plumber employed or contracted to sign off the works.
Functionality threshold: minimum 70 out of 100 points to proceed to price evaluation; criteria include at least 3 reference letters for similar CIPP relining projects in the last 5 years (30 points), proposed relining system (25 points), key personnel CVs and certificates (20 points), equipment list (10 points), and methodology and programme (15 points).
Pricing: bill of quantities with fixed rates for the contract period; Phase 2 quantities are provisional and re-measured, with payment only for instructed and installed lengths. A 15% contingency is included; VAT at 15% is added.
Guarantee: written guarantee of at least 10 years on relining materials and workmanship, plus a 12-month defects liability period on all other work.
Site constraints: the venue remains operational; noisy work, flow shut-offs and work in public areas only at agreed times; after-hours or weekend work may be required at no extra rate unless priced separately. At least one working ablution facility per floor must be maintained.
Closing date and time: 11 November 2026 at 09:00. Submission method and address are not stated in the document.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Wednesday, 11 November 2026 - 11:00
Venue
231 Anton Lembede Street, Stage Door.
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Request for Quotation
231 Anton Lembede Street - Durban - Durban - 4001
Recommended Certifications
Having these can improve your winning chances: WISA Membership, IWMSA Membership
AI Document Analysis Stages
Description
27 Oct
2026
Tender Published
Tender was published
11 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Bid Specification Relining of Cast Iron Drainage Pipework.pdf
The Playhouse Company requires a suitably qualified plumbing contractor to carry out a two-phase project: Phase 1 involves cleaning and CCTV inspection of existing cast iron drainage pipework to assess condition, and Phase 2 involves trenchless relining (CIPP) of approved sections, with a provisional quantity of 300 m of lined pipe. The work is a measured contract with provisional quantities, re-measured on completion, at the Theatre Building in Durban, KwaZulu-Natal.
RFQ Document - Relining of Cast Iron Drainage Pipework.docx
The Playhouse Company requires the inspection and relining of cast iron drainage pipework at its premises in Durban. The procurement follows a quotation process with a compulsory site briefing, and evaluation will use the 80/20 preference point system.
ViewTenderNoticePdf.pdf
The Playhouse Company requires inspection and relining of existing cast iron drainage pipework at its premises in Durban, KwaZulu-Natal. Bidders must attend a compulsory clarification meeting and submit tenders by 11 November 2026.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The Playhouse Company requires inspection and relining of its existing cast iron drainage pipework. The work is to be done in two phases: Phase 1 (investigation) involves cleaning and CCTV inspection to identify the condition of pipes and recommend relining; Phase 2 (relining) involves relining the approved sections using cured-in-place pipe (CIPP) technology. The contract type is a measured contract with provisional quantities, re-measured on completion.
Important Dates
Source: Bid Specification Relining of Cast Iron Drainage Pipework.pdf (unknown)Closing date and time: 11 November 2026 at 09:00
Compulsory site briefing: date and time not stated in the document; attendance is mandatory. Venue: The Playhouse Company, Theatre Building, 231 Anton Lembede Street, entrance at Stage Door (Acutt Street).
Contact Information
Source: Bid Specification Relining of Cast Iron Drainage Pipework.pdf (unknown)Employer: The Playhouse Company
Address: Theatre Building, 231 Anton Lembede Street, Entrance at Stage Door (Acutt Street) (site address)
Facilities Manager: contact for site conditions (no name or contact details provided in the document).
No other contact details (email, telephone) are stated in the document.
Submission Guidelines
Source: Bid Specification Relining of Cast Iron Drainage Pipework.pdf (unknown)Returnable documents (all must be completed, signed and submitted with the bid):
Submission method and address: not stated in the document. Bids must be submitted before the closing date and time of 11 November 2026 at 09:00 (as per the tender notice).
Disqualification risks:
Evaluation Criteria
Source: Bid Specification Relining of Cast Iron Drainage Pipework.pdf (unknown)Evaluation stages:
Functionality criteria (100 points total):
Preference point system: not stated in the document. Bids will be evaluated on price and functionality; the exact price/functionality split is not given in the extracted text.
Technical Specifications
Source: Bid Specification Relining of Cast Iron Drainage Pipework.pdf (unknown)Scope of work: CCTV inspection and relining (cured-in-place pipe, CIPP) of existing cast iron drainage pipework at The Playhouse Company premises.
The work is in two phases:
Site: Theatre Building, 231 Anton Lembede Street, entrance at Stage Door (Acutt Street).
Materials requirements:
Standards and regulations (latest editions):
Phase 1 deliverables:
Phase 2 requirements:
Phase 2 deliverables:
Site conditions:
Experience & Qualifications
Source: Bid Specification Relining of Cast Iron Drainage Pipework.pdfBidders must provide at least 3 reference letters for similar CIPP relining of building drainage projects completed in the last 5 years. Key personnel include a supervisor and certified installers, with CVs and certificates. Required roles: 1 Registered Plumber and 2 Artisan Plumbers. Equipment list of owned or hired CCTV and relining equipment must be provided.
Quality Management
Source: Bid Specification Relining of Cast Iron Drainage Pipework.pdfWork must comply with SANS 10400-P, SANS 10252-2, ISO 11296-4/7, the Occupational Health and Safety Act and Construction Regulations 2014, eThekwini Municipality water and sanitation by-laws, and manufacturer's instructions. Finished liner must be free of folds, blisters, delamination, dry spots and unbonded areas. Each relined line to be water- or air-tested for tightness per SANS 10252-2 before and after reinstating connections.
Pricing Schedule
Source: Bid Specification Relining of Cast Iron Drainage Pipework.pdfPricing is by bill of quantities with a provision for 300 m of lined pipe for Phase 2. Items are priced per unit (e.g., per metre for jetting, CCTV and relining) and per number for access points and repairs. A contingency of 15% of the subtotal must be included. VAT of 15% is added to the total. Rates are fixed for the contract period and must include all costs.
Financial Requirements
Source: Bid Specification Relining of Cast Iron Drainage Pipework.pdf (unknown)Pricing format: bill of quantities (measured contract with provisional quantities, re-measured on completion).
Rates: fixed for the contract period.
Phase 2 quantities are provisional and will be re-measured; payment only for lengths instructed and installed.
Rates must include labour, materials, plant, transport, access, protection, testing and making good.
Pricing schedule items (quantities provisional unless noted):
Preliminaries:
Phase 1 – Investigation:
Phase 2 – Relining (provisional):
VAT: 15% to be added to the subtotal.
No bid security, guarantee or retention is stated in the document.
Compliance Requirements
Source: Bid Specification Relining of Cast Iron Drainage Pipework.pdf (unknown)Mandatory requirements (non-compliance = disqualification):
Additional compliance:
B-BBEE: not stated in the document.
Health & Safety
Source: Bid Specification Relining of Cast Iron Drainage Pipework.pdfBidders must submit a site-specific Health and Safety Plan, risk assessment and method statement before site handover, per the Construction Regulations, 2014. Ventilate work areas during resin mixing and curing; provide MSDS for all chemicals. Proof of good standing with the Compensation Fund (COIDA) or a licensed insurer is required. Health and safety file, plan and safety officer (part time) is a provisional sum item in the pricing schedule.
Environmental
Source: Bid Specification Relining of Cast Iron Drainage Pipework.pdfResin used must be solvent-free and low-odour, suitable for occupied buildings; no styrene-based resins indoors. The liner must be seamless and suitable for building drainage. Waste, debris and spent resin must be removed daily and hazardous waste disposed of at licensed facilities.
Contractual Terms
Source: Bid Specification Relining of Cast Iron Drainage Pipework.pdfWork is executed in two phases. Phase 2 may not start until the Employer has accepted the Phase 1 report and issued written instructions stating the lines and lengths to be relined. The Employer reserves the right to reduce, increase or omit Phase 2 quantities based on survey findings. A written guarantee of at least 10 years on relining materials and workmanship is required, plus a 12-month defects liability period on all other work, from date of practical completion. Defects found on post-lining CCTV must be rectified at the Contractor's cost.
Section
Source: Bid Specification Relining of Cast Iron Drainage Pipework.pdfFunctionality is scored out of 100 points with a minimum qualifying score of 70. The criteria and point allocation are: experience in CIPP relining of building drainage (30 points), proposed relining system (25 points), key personnel (20 points), equipment (10 points), and methodology and programme (15 points). A bidder must achieve at least 70 out of 100 to proceed to price evaluation.
Description
Source: RFQ Document - Relining of Cast Iron Drainage Pipework.docxThe Playhouse Company invites quotations for the inspection and relining of cast iron drainage pipework at its premises.
Important Dates
Source: RFQ Document - Relining of Cast Iron Drainage Pipework.docx (unknown)Compulsory site briefing: 4 November 2026 at 11:00
Venue: Stage Door, 231 Anton Lembede, Durban
Closing: 11 November 2026 at 11:00
Contact Information
Source: RFQ Document - Relining of Cast Iron Drainage Pipework.docx (unknown)Submission emails:
Telephone: (031) 369 9507, (031) 369 9425, (031) 369 9485
Site briefing venue address:
Stage Door
231 Anton Lembede
Durban
Submission Guidelines
Source: RFQ Document - Relining of Cast Iron Drainage Pipework.docx (unknown)Returnable documents:
Submission method: email only, to the specified submission addresses.
Disqualification risks:
Evaluation Criteria
Source: RFQ Document - Relining of Cast Iron Drainage Pipework.docx (unknown)Evaluation stages:
Preference points are allocated under the 80/20 system. Points for specific goals are as follows (maximum total 20 points):
Points are calculated by multiplying the allocated points by the percentage ownership claimed (to be completed by the tenderer). Failure to submit a valid B-BBEE certificate or affidavit results in zero points for the specific goals.
Technical Specifications
Source: RFQ Document - Relining of Cast Iron Drainage Pipework.docx (unknown)The Playhouse Company requires a single service provider to inspect and reline cast iron drainage pipework at its premises.
Detailed technical specifications are provided in the attached specification document.
Scope includes inspection, relining, and associated works as detailed in the specification.
Financial Requirements
Source: RFQ Document - Relining of Cast Iron Drainage Pipework.docx (unknown)Prices must be quoted in South African Rand and inclusive of VAT (if applicable). Provide a detailed breakdown of costs.
Quotations must remain valid for a minimum of 30 days from the closing date.
Compliance Requirements
Source: RFQ Document - Relining of Cast Iron Drainage Pipework.docx (unknown)CSD registration is required (all active companies linked to directors must be disclosed).
B-BBEE: valid B-BBEE certificate or affidavit required to claim preference points.
No other specific compliance requirements stated.
Important Dates
Source: ViewTenderNoticePdf.pdf (RFQ)Closing date: Wednesday, 11 November 2026 at 11:00
Compulsory clarification meeting: Wednesday, 04 November 2026 at 11:00 at the stage door, 231 Anton Lembede Street, Durban
Contact Information
Source: ViewTenderNoticePdf.pdf (RFQ)Enquiries:
Documents also available on request from the same email.
Clarification meeting venue: 231 Anton Lembede Street, Durban (meet at the stage door)
Submission Guidelines
Source: ViewTenderNoticePdf.pdf (RFQ)Tenders must be submitted on the tender documentation issued for this RFQ. Late tenders will not be accepted.
Returnable documents: the completed and signed tender documentation as issued (the invitation, pricing schedule, and standard SBD forms included in the pack). Bidders should note that the Tender Data specifies requirements for sealing, addressing, delivering, opening and assessment of tenders.
Evaluation Criteria
Source: ViewTenderNoticePdf.pdf (RFQ)Mandatory requirement: bidders must hold a CIDB contractor grading of 1SO or higher. No evaluation scoring split or preference point system is stated in the document.
Technical Specifications
Source: ViewTenderNoticePdf.pdf (RFQ)Scope: surveying (inspection) and relining of the existing cast iron drainage pipework at the Playhouse Company premises.
Work category: drainage pipework, construction-related.
Location: Playhouse Company premises, 231 Anton Lembede Street, Durban.
Compliance Requirements
Source: ViewTenderNoticePdf.pdf (RFQ)CIDB: contractor grading of 1SO or higher is required. No other compliance requirements (such as CSD registration, tax clearance, B-BBEE, or local content) are stated in the document.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve water, sanitation, wastewater, bulk water, or related infrastructure.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve waste collection, refuse, recycling, hazardous waste, or disposal services. Relevant because this tender appears to involve water, sanitation, wastewater, bulk water, or related infrastructure.
Act 59 of 2008
Relevant to waste handling, transport, disposal, recycling and waste-management licences.
Relevant because this tender appears to involve waste collection, refuse, recycling, hazardous waste, or disposal services.
Act 36 of 1998
Relevant to water use, sanitation, bulk water infrastructure and DWS authorisations.
Relevant because this tender appears to involve water, sanitation, wastewater, bulk water, or related infrastructure.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve waste collection, refuse, recycling, hazardous waste, or disposal services. Relevant because this tender appears to involve water, sanitation, wastewater, bulk water, or related infrastructure.
Address
231 Anton Lembede St, Durban Central, Durban, 4001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
28 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
031-369-9507[email protected]playhousecompany.com231 Anton Lembede St, Durban Central, Durban, 4001, South Africa
Key Personnel
Median Estimate
R 2 556 096
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Water supply; sewerage, waste management and remediation activities. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog