Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Freemantle Boys High School Eastern Cape - - Freemantle Boys High School Eastern Cape -
Organization Type
GOVERNMENT
Published
29 Sept 2026
OCDS Reference
ocds-9t57fa-172060
Supply, installation, testing, commissioning, and handover of a ground-mounted photovoltaic (pv) system with battery energy storage (bess) at freemantle boys high school in the eastern cape, procured by ESKOM. the scope covers the full delivery of the renewable energy system, and bidders must comply with eskom's standard conditions of tender, including e-tender submission and mandatory returnables. The most consequential consideration is the strict closing deadline of 21 october 2026 at 10:00 sast, with NO late submissions accepted.
Closing: 21 October 2026 at 10:00 SAST; submit via Eskom Tender Bulletin e-tendering page only; no paper or email submissions.
Mandatory returnables: complete all forms and certificates by closing; missing or incomplete returnables disqualify the bid.
Compulsory site visit/clarification: attendance is mandatory if stipulated in the Tender Data; failure to attend results in disqualification.
CIDB: if grading is a qualification criterion, be registered at closing or capable of registration within 21 working days; proof of registration is mandatory at closing.
B-BBEE: if a pre-qualification criterion, provide valid proof (certificate, CSD number, or CSD report) at closing; otherwise the bid is disqualified.
SHEQ: provide proof of safety, health, environmental, and quality systems at closing and/or contract award; include all SHEQ costs in the tender.
Pricing: include all duties, taxes (including VAT) in rates; prices fixed for contract duration; state in South African Rand.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 21 October 2026 - 10:00
Venue
https://teams.microsoft.com/meet/33122886310099?p=qFfTtteLVSFKbdAkxd
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Quotation
Freemantle Boys High School Eastern Cape - - Freemantle Boys High School Eastern Cape -
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
29 Sept
2026
Tender Published
Tender was published
21 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdf
Eskom is procuring a contractor to supply, install, test, commission and hand over a ground-mounted photovoltaic (PV) system with battery energy storage (BESS) at Freemantle Boys High School in the Eastern Cape. The contract is an NEC3 Engineering and Construction Contract (Option B, priced contract with bill of quantities) and includes design responsibility, with key dates for site establishment, construction, commissioning and handover.
Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdf
Supply, installation, testing, commissioning, and handover of a Ground-mounted PV with BESS system at Freemantle Boys High School, Eastern Cape, procured by Eskom Holdings SOC Ltd.
Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdf
Eskom requires the supply, installation, testing, commissioning, and handover of a ground-mounted 51.2 kWp photovoltaic (PV) system with a 50 kW / 71 kWh Battery Energy Storage System (BESS) at Freemantle Boys High School in the Eastern Cape. The system must use 80 x 640 W monocrystalline modules, a hybrid inverter with single DC bus, LiFePO4 batteries, and integrate with the school's existing distribution boards. The contractor must also provide a 12-month workmanship warranty, transfer all OEM warranties, and obtain a Certificate of Compliance.
Eskom - Standard Conditions of Tender (February 2022).pdf
Supply, installation, testing, commissioning and handover of a ground-mounted photovoltaic system with battery energy storage (BESS) at Freemantle Boys High School in the Eastern Cape, procured by Eskom. The material issued is Eskom's Standard Conditions of Tender, which set the rules for submitting, clarifying and evaluating tenders rather than the technical scope. Project-specific thresholds, the returnable list, the venue and site visit details sit in the Tender Data.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.pdf
Supply, installation, testing, commissioning and handover of a ground-mounted photovoltaic (PV) system with battery energy storage (BESS) at Freemantle Boys High School in the Eastern Cape, procured by Eskom. The works are governed by a Quality Control Plan / Inspection and Test Plan (QCP/ITP) that sets out intervention points, inspection and test methods, acceptance criteria and inspection records.
Environmental Tender Evaluation criteria -.xlsx
Eskom requires the supply, installation, testing, commissioning, and handover of a ground-mounted photovoltaic (PV) system with battery energy storage (BESS) at Freemantle Boys High School in the Eastern Cape. Bidders must submit a complete set of environmental management documents as detailed in the tender's evaluation criteria.
240-109253698 CQP Template 2021.pdf
Supply, installation, testing, commissioning, and handover of a ground-mounted photovoltaic (PV) system with battery energy storage (BESS) at Freemantle Boys High School in the Eastern Cape, for Eskom.
240-68099512 Form A Rev 10.pdf
Supply, installation, testing, commissioning and handover of a ground-mounted PV system with battery energy storage system (BESS) at Freemantle Boys High School, Eastern Cape, for ESKOM, including warranty provision for materials and services on completed work.
SHE SPECIFICATIONS FOR THE PV BESS SCHOOLS PROJECT.pdf
Eskom is procuring a ground‑mounted photovoltaic (PV) system with battery energy storage system (BESS) for Freemantle Boys High School in the Eastern Cape. The tender closes on 21 October 2026 at 10:00 GMT. Bidders must comply with Eskom’s SHE Specification (DXSHEQSF0036 Rev 2), which sets out health, safety, environmental and quality requirements for the project, including risk assessments, PPE, training, site establishment, incident management and hand‑over procedures.
240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Analysis completed but response format was invalid
Copy of Copy of Technical Schedule A B - Customer PV Schools(21-05-2026).xlsx
Provision for the Supply, installation, testing, commissioning, and handover of a Groundmounted PV with BESS system at Freemantle Boys High School, Eastern Cape, South Africa. The tender is managed by ESKOM and closes on Wednesday 21 October 2026 at 10:00 GMT+0000.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This is a Supplier Quality Management specification (QM 58) for Eskom, defining minimum quality requirements for all suppliers and sub-suppliers. It applies to all Eskom divisions and subsidiaries and forms part of all RFIs, RFQs, RFPs and contracts. The specification is effective from 01 July 2026 and is next reviewed in May 2030.
Important Dates
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Closing date: 21 October 2026 at 10:00 (from tender record).
Effective date of specification: 01 July 2026.
Next review date: May 2030.
No briefing or site visit dates are stated in this document.
Contact Information
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)No specific contact details (name, email, telephone) are provided in this document. The functional area is Procurement and Supply Chain Management.
Submission Guidelines
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Returnable documents (all must be completed, signed and submitted):
Submission method and address: not stated in this document.
Evaluation Criteria
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Quality criteria for evaluation, selection, assessment, performance monitoring and auditing of suppliers are defined in this specification. The specific scoring split, minimum qualifying score and preference point system (80/20 or 90/10) are not stated in this document. Suppliers are classified into four quality categories (1 to 4); only one category applies per procurement, and the applicable category is indicated in Form A. The Tender Evaluation Scorecard (240-168873697) and Guideline for QM 58 Selection Criteria (240-125473040) are referenced for evaluation.
Technical Specifications
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)The document is a Supplier Quality Management specification (QM 58) applicable to all Eskom suppliers and sub-suppliers. It requires suppliers to develop, implement, maintain and continually improve a Quality Management System (QMS) conforming to ISO 9001. Key requirements include:
Methodology
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfMethodology requirements include:
Quality Management
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfPost-contract award: suppliers must submit scope-specific CQPs within 30 days, provide monthly quality performance reports, and undergo quality performance monitoring. Eskom has rights of access, can suspend deliveries, and manages nonconformities with contractual remedies and escalation for repeated issues. Special processes require certification (e.g., ISO 3834 for welding).
Pricing Schedule
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfNo pricing schedule or payment terms are provided in this document.
Financial Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)No specific financial requirements (bid security, guarantees, retention, payment terms, turnover) are stated in this document.
Compliance Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)ISO 9001 certification (or applicable QMS certificate) is required unless excluded by the quality category.
Health & Safety
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfThe specification references the Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) as an informative reference. No specific OHS requirements are detailed in this document.
Contractual Terms
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfContractual conditions include:
Section
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfThe specification defines quality criteria for evaluation, selection, assessment, performance monitoring and auditing of suppliers. Suppliers are classified into four quality categories (1 to 4); the applicable category is indicated in Form A. The Tender Evaluation Scorecard (240-168873697) and Guideline for QM 58 Selection Criteria (240-125473040) are referenced for evaluation.
Description
Source: SHE SPECIFICATIONS FOR THE PV BESS SCHOOLS PROJECT.pdfThis specification applies to the Ground-mounted photovoltaic (PV) with BESS system to be installed at the Mqikela Senior Secondary School as outlined in User Requirement Specification (URS) 559-670486771. The scope encompasses: a) Site Assessment: Perform a thorough site evaluation, including an assessment of the equipment arrangement. b) Verify that the drawings are correlating with the site. c) Identify cable routing to various Distribution Boards (DBs'). d) Verify the size of the main circuit breaker and confirm with the Design Engineer to ensure proper protection cascading with other DBs'.
Important Dates
Source: SHE SPECIFICATIONS FOR THE PV BESS SCHOOLS PROJECT.pdf (unknown)Closing date: 21 October 2026 at 10:00
Briefing session: Not specified
Contact Information
Source: SHE SPECIFICATIONS FOR THE PV BESS SCHOOLS PROJECT.pdf (unknown)Safety Officer: Thembie Ntsantsa
Designer: ML Damane
Evaluation Criteria
Source: SHE SPECIFICATIONS FOR THE PV BESS SCHOOLS PROJECT.pdf (unknown)Bidders must be registered contractors with a valid COID certificate and a current Letter of Good Standing from the Compensation Commissioner. They must comply with Eskom SHE Specification DXSHEQSF0036 Rev 2, including risk assessments, PPE, training, site safety, and incident management. Bidders must demonstrate the necessary competencies and resources to safely execute the PV-BESS installation at the specified school.
Technical Specifications
Source: SHE SPECIFICATIONS FOR THE PV BESS SCHOOLS PROJECT.pdf (unknown)Scope: Supply, installation, testing, commissioning, and handover of a ground-mounted PV with BESS system at Freemantle Boys High School, Eastern Cape.
Site assessment: Perform a thorough site evaluation, including assessment of equipment arrangement.
Verify that drawings correlate with the site.
Identify cable routing to various Distribution Boards (DBs).
Verify the size of the main circuit breaker and confirm with the Design Engineer to ensure proper protection cascading with other DBs.
Quality Management
Source: SHE SPECIFICATIONS FOR THE PV BESS SCHOOLS PROJECT.pdfContractors must comply with the Department of Labour (DoL) requirements and Eskom project manager instructions regarding procedure requirements, non-conformances, corrective actions, audits, and inspection schedules. Relevant inspection reports must be maintained. Contractors must undergo breathalyser and drug testing while entering or being on any Eskom work site.
Compliance Requirements
Source: SHE SPECIFICATIONS FOR THE PV BESS SCHOOLS PROJECT.pdf (unknown)Bidders must be registered contractors with a valid COID certificate and a current Letter of Good Standing from the Compensation Commissioner.
Compliance with Eskom SHE Specification DXSHEQSF0036 Rev 2 is mandatory.
A Section 37(2) agreement must be signed at procurement during the signing of the NEC contract.
The principal contractor must notify the provincial director of the Department of Labour in writing of all construction work if it falls within the scope of Regulation 4 of the Construction Regulations.
Construction professional registration is required.
The contractor must develop a SHE plan meeting Eskom and legislative requirements.
The contractor must appoint a full or part-time safety officer or construction safety officer registered with SACPCMP.
The contractor must ensure pre-employment, periodic, and exit medicals are carried out by a registered Occupational Health Practitioner.
The contractor must provide a certified copy of the Compensation Commissioner's valid letter of good standing before commencement of work.
The contractor must hand over a consolidated health and safety file to the Eskom project manager on completion of the project.
Health & Safety
Source: SHE SPECIFICATIONS FOR THE PV BESS SCHOOLS PROJECT.pdfThe contractor must comply with Eskom SHE Specification DXSHEQSF0036 Rev 2, which sets out minimum SHE requirements for the contract. The contractor must develop a SHE plan that meets these requirements and all applicable legislation. The contractor remains accountable for the health and safety of their employees and appointed contractors.
Key responsibilities include:
Construction Managers/Contract Managers must:
Working within an existing school: Risks are identified.
Child labour must not be used.
OHS Act regulations will be available to all employees.
Legislative compliance: The DoL provides a letter of approval; a copy must be sent to the Eskom Project Manager. Statutory appointments must be made in accordance with the OHS Act, including competent persons in relevant roles.
Environmental
Source: SHE SPECIFICATIONS FOR THE PV BESS SCHOOLS PROJECT.pdfThe contractor must comply with local authority, municipal by-law, and environmental legislation. An Environmental Management Plan must be implemented during the project life-cycle. On completion, the contractor must rehabilitate the environment where required by law and the Eskom Environmental Management plan.
Activities requiring risk assessment include manual loading/offloading of poles/steel members, excavations, concrete work, assembling steel structures, working at heights, stringing and tensioning, driving, stacking of material, environmental management, drilling, compacting, tensioning, crane operating, use of hydraulic machines, testing and commissioning, weather conditions, use of ladders, high voltage operating, working in live chambers, working with petrol-driven drills, and lifting using crane trucks.
The SHE plan must be submitted at least 1 month prior to commencement of work. Turnaround for evaluation is 1 week. Anticipated commencement date and project duration are to be announced.
Relevant legislation includes the National Environmental Management Act 1998, Environment Conservation Act 1989, National Water Act 1998, Civil and Building Work Act, National Road Traffic Act, Compensation for Occupational Injuries and Diseases Act, and applicable SANS standards.
Description
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.pdfThe document is a blank template for a Quality Control Plan / Inspection and Test Plan (QCP/ITP). It contains no project-specific scope, quantities, or requirements.
Quality Management
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.pdfThe document is a blank Quality Control Plan / Inspection and Test Plan (QCP/ITP) form. It defines intervention points (Hold, Witness, Document Review, Surveillance, Verification) and inspection/test methods (e.g. visual, NDT, dye penetrant). No project-specific quality requirements are stated.
Description
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdfThe works are the supply, installation, testing, commissioning, and handover of a ground-mounted PV with BESS system at Freemantle Boy's High School, Eastern Cape.
Site boundaries: within the servitude of Freemantle Boy's High School.
Site Information is in Part C4; Works Information is in Part C3.
The contract is between Eskom Holdings SOC Ltd and the Contractor.
Important Dates
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdf (unknown)Closing date: 21 October 2026 at 10:00 (from tender record).
Key dates (from Contract Data Part 1):
Site access: complete site available 1 week after contract award.
No briefing or site visit is stated.
Contact Information
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdf (unknown)Project Manager:
Supervisor:
Employer:
Submission address: not stated.
Submission Guidelines
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdf (unknown)Returnable documents:
Submission method: not stated in the document.
Disqualification risks:
Evaluation Criteria
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdf (unknown)Evaluation is based on the NEC3 ECC (April 2013) contract, Option B (priced contract with bill of quantities).
Preference point system: not stated in the document.
Minimum qualifying score: not stated.
Evaluation stages: not stated.
Bidders must complete the Form of Offer and Acceptance (C1.1) and provide a priced Bill of Quantities (Part C2).
Bidders must complete Contract Data Part 2 (C1.2b) including fee percentages, key persons, and completion date.
Bidders must be registered on the CSD and have a valid SARS tax clearance.
Bidders must have a valid B-BBEE certificate (or affidavit) and meet any B-BBEE requirements.
Bidders must have a CIDB registration if applicable.
Bidders must not have a change in B-BBEE status that decreases since the contract date without notification.
Bidders must not take any prohibited action (corrupt, fraudulent, collusive, coercive, obstructive).
Bidders must comply with the Schedule of Deviations (if any).
Bidders must provide securities, bonds, guarantees, and proof of insurance within two weeks of receiving the signed agreement.
Bidders must be able to provide a tax invoice with Eskom's VAT number 4740101508.
Bidders must be willing to accept the NEC3 ECC contract terms, including delay damages, retention, and limitation of liability.
Technical Specifications
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdf (unknown)The works comprise the supply, installation, testing, commissioning, and handover of a ground-mounted PV with BESS system at Freemantle Boy's High School, Eastern Cape.
Site boundaries: within the servitude of Freemantle Boy's High School.
Works Information is in Part C3: Scope of Work; Site Information is in Part C4.
Bill of quantities includes:
Key dates and conditions:
Contractor to submit first programme within 2 weeks of contract date; revised programmes at intervals no longer than 2 weeks.
Defects date: 52 weeks after completion of the whole of the works. Defect correction period: 2 weeks upon notification.
Methodology
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdf (unknown)Key dates and conditions:
Contractor to submit first programme within 2 weeks of contract date; revised programmes at intervals no longer than 2 weeks.
Site access: complete site available 1 week after contract award.
Weather measurements to be recorded at the established site camp/office area: cumulative rainfall (mm), number of days with rainfall >10 mm, number of days with minimum air temperature <0°C, number of days with snow lying at 09:00 SAST.
Weather data for compensation events: records from SA Weather Bureau (Pretoria, 012-3676000; King Williams Town, Eastern Cape) as per Annexure A.
Experience & Qualifications
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdfContract Data Part 2 requires the Contractor to provide:
Quality Management
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdfKey dates and conditions:
Defects date: 52 weeks after completion of the whole of the works. Defect correction period: 2 weeks upon notification.
Contractor to submit first programme within 2 weeks of contract date; revised programmes at intervals no longer than 2 weeks.
Employer is not willing to take over the works before the Completion Date.
Testing requirements: DCP tests (3) and concrete cube tests (6) to be conducted and submitted to the Civil Engineer.
Pricing Schedule
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdfPricing is under NEC3 ECC Option B – priced contract with bill of quantities (re-measurement contract).
The bill of quantities is a pricing document only; specifications are in the Works Information.
Prices and rates are fully inclusive of all work, risks, liabilities, obligations, overheads, profit and everything necessary.
Items with no price entered are treated as covered by other prices or rates.
Quantities in the bill may not be final; actual quantities assessed and certified by the Project Manager determine payments.
Units of measurement are metric (e.g., m, m², m³, kg, t, No., sum).
Bill of quantities includes:
Payment: Eskom pays within 30 days for contracts below R50,000,000 (incl. VAT), within 60 days for contracts above R50,000,000 (incl. VAT). Interest at prime rate if late.
Financial Requirements
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdf (unknown)Pricing: NEC3 ECC Option B – priced contract with bill of quantities (re-measurement contract). The bill of quantities is a pricing document only; rates and lump sums are fully inclusive of all work, risks, liabilities, overheads, and profit.
Payment terms:
Retention: retention free amount NIL; retention percentage 10%.
Delay damages: 0.1% of Contract Value per day, up to a limit of 10% of Contract Value.
Tax invoice: Contractor must provide a tax invoice within one week of receiving a payment certificate, including Eskom's VAT number 4740101508. Late submission extends payment period.
Securities, bonds, guarantees, and proof of insurance must be delivered within two weeks of receiving the signed agreement; failure constitutes repudiation.
Insurance: Contractor provides insurances per Insurance Table A (replacement cost for works, plant, materials, equipment; liability for property damage and bodily injury). Employer provides insurances per Insurance Table B (assets all risk, contract works, environmental liability, general and public liability, transportation, motor fleet, terrorism, cyber liability, nuclear material damage).
Compliance Requirements
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdf (unknown)CSD registration: required.
SARS tax clearance: valid TCS or tax pin required.
B-BBEE: valid certificate or affidavit required. Any change in B-BBEE status must be notified to the Employer within 7 days; updated verification certificate must be submitted within 30 days. A decrease in B-BBEE status may lead to re-negotiation or termination.
CIDB: registration number required if applicable (form asks for it).
Health and safety: Contractor may be appointed Principal Contractor under Construction Regulations 2014; must comply with all applicable health & safety laws and ensure subcontractors comply.
Environmental: Contractor must comply with all applicable environmental laws and regulations and ensure subcontractors comply.
Asbestos: Contractor must comply with Asbestos Regulations, including exposure limits (OEL 0.2 fibres/ml as 4-hour TWA; short-term 0.6 fibres/ml as 10-minute TWA). Asbestos removal and disposal must be done by a registered asbestos contractor instructed by the Employer at the Employer's expense.
Ethics: Contractor must not take any prohibited action (coercive, collusive, corrupt, fraudulent, obstructive).
Confidentiality: Contractor must not disclose information arising from the contract; images of the works require prior written consent of the Project Manager.
Joint ventures: if the Contractor is a joint venture, all parties are jointly and severally liable; composition cannot be altered without Employer's consent.
Cession and assignment: Contractor cannot cede, delegate or assign rights without written consent of the Employer.
Health & Safety
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdfContractor must take all reasonable precautions to maintain health and safety of persons in and about the execution of the works.
Employer may appoint the Contractor as Principal Contractor under the Construction Regulations 2014 (promulgated under the Occupational Health & Safety Act).
Contractor warrants that the total of the Prices includes sufficient amount for proper compliance with the Construction Regulations and all applicable health & safety laws.
Contractor must comply with the Construction Regulations and all applicable health & safety laws, and ensure subcontractors, employees and others under its direction comply.
Asbestos: Contractor must comply with the Asbestos Regulations, including exposure limits (OEL 0.2 fibres/ml as 4-hour TWA; short-term 0.6 fibres/ml as 10-minute TWA). If asbestos is identified, risk assessment and control measures must be implemented. Contractor's personnel may stop work and leave contaminated area until declared safe. Asbestos removal and disposal must be done by a registered asbestos contractor instructed by the Employer at the Employer's expense.
Environmental
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdfContractor must comply with all applicable environmental laws and regulations and ensure subcontractors, employees and others under its direction comply.
Employer's additional risks include the Safety, Health and Environmental Specifications.
Asbestos management: Employer manages asbestos and ACM according to its Asbestos Standard 32-303; removal and disposal by registered contractor at Employer's expense.
Contractual Terms
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdfContract: NEC3 Engineering and Construction Contract, April 2013 (ECC3), with main Option B (priced contract with bill of quantities), dispute resolution Option W1, and secondary Options X2 (changes in law), X7 (delay damages), X16 (retention), X18 (limitation of liability), and Z (additional conditions).
Law of contract: Republic of South Africa. Language: English. Period for reply: 5 working days.
Delay damages: 0.1% of Contract Value per day, limit 10%.
Retention: free amount NIL, percentage 10%.
Limitation of liability: Contractor's liability for indirect/consequential loss limited to loss from negligent acts of its personnel; liability for defects due to design limited to greater of total Prices or amounts excluded from Employer's assets policy; total liability limited to total Prices (except additional excluded matters); end of liability date 7 years after defects date for latent defects, or prescription date for other matters.
Additional conditions Z1-Z15:
Section
Source: NEC ECC FOR FREEMANTLE SSS PV SOLAR GROUND MOUNT.pdfEvaluation is based on the NEC3 ECC contract, Option B.
No specific evaluation criteria (e.g., price/functionality split, minimum scores) are stated in the document.
Bidders must complete the Form of Offer and Acceptance, provide a priced Bill of Quantities, and complete Contract Data Part 2.
Compliance with CSD, SARS tax clearance, B-BBEE, and CIDB (if applicable) is required.
Description
Source: Environmental Tender Evaluation criteria -.xlsxThe tender is for the supply, installation, testing, commissioning, and handover of a ground-mounted photovoltaic (PV) system with a battery energy storage system (BESS) at Freemantle Boys High School in the Eastern Cape. The provided document is the Environmental Tender Evaluation & Scoring Card (Annexure C1), which lists the environmental documentation required for evaluation.
Evaluation Criteria
Source: Environmental Tender Evaluation criteria -.xlsx (unknown)Environmental evaluation uses a binary scoring system: each required document is scored 0 or 1. A score of 0 is given if the document is not submitted or does not satisfy minimum requirements; a score of 1 is given if the document is submitted and satisfies minimum requirements. Bidders must submit all required environmental documentation listed in the evaluation criteria. The tender references ISO 14001:2015 for detailed environmental management system requirements and definitions.
Technical Specifications
Source: Environmental Tender Evaluation criteria -.xlsx (unknown)The tender is for the supply, installation, testing, commissioning, and handover of a ground-mounted photovoltaic (PV) system with a battery energy storage system (BESS) at Freemantle Boys High School in the Eastern Cape. The document provided is the Environmental Tender Evaluation & Scoring Card (Annexure C1), which lists the environmental documentation required for evaluation.
Compliance Requirements
Source: Environmental Tender Evaluation criteria -.xlsx (unknown)Bidders must submit the following environmental documents as part of the tender evaluation:
Description
Source: 240-109253698 CQP Template 2021.pdfThe scope of work must be described in full as per the NEC or FIDIC document. Categories to be indicated include design, manufacturing, supply and delivery/transportation, construction/installation/maintenance, commissioning, professional services, and other.
Important Dates
Source: 240-109253698 CQP Template 2021.pdf (unknown)Closing date: 21 October 2026 at 10:00 (from tender record).
No other dates are stated in the provided document.
Contact Information
Source: 240-109253698 CQP Template 2021.pdf (unknown)No contact information is stated in the provided document.
Submission Guidelines
Source: 240-109253698 CQP Template 2021.pdf (unknown)Returnable documents:
Submission method and closing time are not stated in the provided document.
Evaluation Criteria
Source: 240-109253698 CQP Template 2021.pdf (unknown)No evaluation criteria are stated in the provided document. The only requirement is completion of the Contract Quality Plan template as part of the tender submission.
Technical Specifications
Source: 240-109253698 CQP Template 2021.pdf (unknown)Scope of work: Supply, installation, testing, commissioning, and handover of a ground-mounted PV with BESS system at Freemantle Boys High School, Eastern Cape.
Scope of work categories to be indicated in the CQP (mark as applicable):
Communication channels between supplier and Eskom for quality-related issues must be defined, including documentation, supplier representative details, emails, minutes of meetings, fixed contract meetings, weekly progress meetings and reporting. All documentation must be submitted per the contract agreement.
An organogram must be provided showing designations, roles, responsibilities and outputs, including QA and QC functions, personnel responsible for management of activities/processes, team member responsibilities and qualifications, and work verification (who carries out a task and who checks the work).
Methodology
Source: 240-109253698 CQP Template 2021.pdfMethod statements, safe working procedures, PQRs, and repair procedures must be submitted to Eskom during and at completion of the contract. A register of non-conformances, defects, punch items, and audit findings must be maintained with analysis reports. Databook status registers must be updated monthly (milestone-based).
Experience & Qualifications
Source: 240-109253698 CQP Template 2021.pdfThe organogram must include team member responsibilities and qualifications necessary to fulfil stated duties, including work verification (who carries out a task and who checks the work).
Quality Management
Source: 240-109253698 CQP Template 2021.pdfThe Contract Quality Plan (CQP) template requires the supplier to plan for meeting client/contract quality expectations, referencing SANS 466:2005 / ISO 10005:2005. The CQP must include:
Compliance Requirements
Source: 240-109253698 CQP Template 2021.pdf (unknown)No specific compliance requirements (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document.
Health & Safety
Source: 240-109253698 CQP Template 2021.pdfMethod statements must describe in a logical sequence how a job is to be carried out safely, including all risks identified in the risk assessment and the measures needed to control those risks.
Contractual Terms
Source: 240-109253698 CQP Template 2021.pdfPost-delivery activities must be defined, including warranty period and conditions, customer satisfaction measurement, technical support, defect correction period and retention funds, considering statutory, regulatory and scope of work requirements.
Description
Source: Copy of Copy of Technical Schedule A B - Customer PV Schools(21-05-2026).xlsxSupply, installation, testing, commissioning and handover of a ground-mounted solar PV system with battery energy storage at Freemantle Boys High School, Eastern Cape, for Eskom. The solution must meet Eskom Standard 240-171000418 and Eskom Specification 240-171000566, with compliance demonstrated through a clause-by-clause technical evaluation and a deviation schedule.
Important Dates
Source: Copy of Copy of Technical Schedule A B - Customer PV Schools(21-05-2026).xlsx (unknown)Closing: 21 October 2026 at 10:00.
Submission Guidelines
Source: Copy of Copy of Technical Schedule A B - Customer PV Schools(21-05-2026).xlsx (unknown)Completion requirements
Returnable evidence (mandatory)
Evaluation Criteria
Source: Copy of Copy of Technical Schedule A B - Customer PV Schools(21-05-2026).xlsx (unknown)Three-part technical evaluation; each part carries a category weight and a minimum pass rate.
Method
Technical Specifications
Source: Copy of Copy of Technical Schedule A B - Customer PV Schools(21-05-2026).xlsx (unknown)Scope
Major equipment
Inverters
PV modules
Battery system
Protective devices and cabling
Remote monitoring and control
SCADA gateway, remote engineering access and metering
Structural and civil
Fire detection and suppression
HVAC
Compliance Requirements
Source: Copy of Copy of Technical Schedule A B - Customer PV Schools(21-05-2026).xlsx (unknown)Mandatory technical criteria — bids that do not meet these are not evaluated further
Submission conditions
Description
Source: 240-68099512 Form A Rev 10.pdfScope: Supply, installation, testing, commissioning, and handover of a ground-mounted PV with BESS system at Freemantle Boys High School and Mqikela Senior Secondary School, including warranty (material and service) on the complete installation for a set period.
Submission Guidelines
Source: 240-68099512 Form A Rev 10.pdf (unknown)Returnable documents:
Submission method: not stated in the document. Closing time: 10:00 on 21 October 2026.
Evaluation Criteria
Source: 240-68099512 Form A Rev 10.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) with valid tax clearance. Bidders must hold a valid B-BBEE status level of general compliance. For construction works, a CIDB grading appropriate to the project value is required. The evaluation will apply the preference point system (80/20 or 90/10) as per the PPPFA. No minimum qualifying score is stated.
Technical Specifications
Source: 240-68099512 Form A Rev 10.pdf (unknown)Scope: Supply, installation, testing, commissioning, and handover of a ground-mounted PV with BESS system at Freemantle Boys High School and Mqikela Senior Secondary School, Eastern Cape.
Quality Management
Source: 240-68099512 Form A Rev 10.pdfQuality requirements: The tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Compliance Requirements
Source: 240-68099512 Form A Rev 10.pdf (unknown)CSD registration: required.
Tax clearance: valid tax clearance required.
B-BBEE: valid status level of general compliance required.
CIDB grading: appropriate to project value required (construction works).
Quality: tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Section
Source: 240-68099512 Form A Rev 10.pdfEvaluation criteria: Bidders must be registered on CSD with valid tax clearance, hold a valid B-BBEE status level of general compliance, and have a CIDB grading appropriate to the project value. Preference point system (80/20 or 90/10) applies.
Description
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdfProvision for the supply, installation, testing, commissioning, and handover of a ground-mounted PV with BESS system at Freemantle Boys High School, Eastern Cape. Tender number E3618DXECOU. Issue date 29 September 2026. Closing date 21 October 2026 at 10:00 SAST. Tender validity 120 days.
Important Dates
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdf (TENDER)Closing date: 21 October 2026 at 10:00 SAST
Compulsory clarification meeting: 07 October 2026 at 10:30, via MS Teams (attendance mandatory; non-attendance disqualifies).
Meeting link: https://teams.microsoft.com/meet/33122886310099?p=qFfTtteLVSFKbdAkxd
Meeting ID: 331 228 863 100 99
Passcode: TG32Tz7C
Clarification queries deadline: 2 working days before the tender submission deadline.
Tender validity: 120 days from closing date and time.
Contact Information
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdf (TENDER)Eskom Representative (for all queries and clarifications):
Fraud and corruption reporting:
Submission: via Eskom E-Tendering site (https://www.eskom.co.za/tenders/).
Submission Guidelines
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdf (TENDER)Submission method: electronic only, via the Eskom E-Tendering site (https://www.eskom.co.za/tenders/). No hard copies accepted.
Format: all documents in PDF; the price list must be in PDF and a copy in Excel. Upload size per document 500 MB, total submission 4 GB. No zip/condensed files.
Resubmission: if a tender is resubmitted, the latest version is accepted and all previous submissions are null and void. Ensure the submission status is marked complete.
Returnable forms (all must be completed, signed where required, and submitted by closing time unless noted):
Disqualification risks:
Returnable Documents
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdf (TENDER)Mandatory at closing (disqualifiable): Annexure A (Authorisation), B (Acknowledgement), C (Tenderer's Particulars), D (Integrity Pact), E (CPA local), G1-G4 (SBD 6.2 and local content), H (SBD 1), J (SBD 4).
Non-disqualifiable at closing: Annexure I (SBD 6.1), Specific Goals proof, Tax Clearance Certificates, Tax Evaluation Questionnaire, Employment Equity compliance, NEC 3 Contract, Pricing schedule.
Additional JV documents: letter of intent, single bank account confirmation.
Mandatory for contract award: CSD registration, financial statements (2 years).
Evaluation Criteria
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdf (TENDER)Evaluation stages:
Preference system: 80/20 (price 80, specific goals 20). If uncertain, the lowest acceptable tender determines the applicable system.
Price evaluation: inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered; conditional discounts applied at payment.
Specific goals: failure to submit evidence results in 0 points for that goal, not disqualification.
Objective criteria and reverse e-auction: not applicable.
Technical Specifications
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdf (TENDER)Scope: supply, installation, testing, commissioning, and handover of a ground-mounted PV with BESS system at Freemantle Boys High School, Eastern Cape.
Mandatory technical requirements (must be met or tender is not evaluated):
Methodology
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdfMethod statement required for quality management (based on scope). Baseline OHS Risk Assessment methodology must be provided. No further methodology details specified.
Quality Management
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdfQuality requirements (Category 3): QMS per ISO-9001 (policy, objectives, control of documented information, nonconforming outputs, corrective action, internal audit), evidence of QMS in operation (roles, responsibilities, control of external providers), Contract Quality Plan (ISO 10005), Quality Control Plan/ITP, additional user-defined requirements including Form A.
Pricing Schedule
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdfPricing schedule/BOQ in PDF and Excel. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered. Prices scored out of 80 points.
Financial Requirements
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdf (TENDER)Pricing: submit completed pricing schedule/BOQ in PDF and Excel. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, NPV comparison.
Payment terms: Eskom pays within 30 days of receipt of undisputed invoices for contracts below R50 million (incl. VAT); within 60 days for contracts above R50 million.
Performance security: if a performance bond or demand guarantee is required, the tenderer must select at least two financial institutions from the Eskom-approved list.
Financial statements: submit recent 2 years' financial statements for financial analysis, including auditor's/independent reviewer's/accounting officer's report, signed director's report, annual financial statements (statement of financial position, comprehensive income, changes in equity, cash flows, notes), ITA 34C if not audited, and Public Interest Score. Statements must be received within 18 months after year end.
Eskom reserves the right to negotiate with preferred bidders if prices are not market-related.
Compliance Requirements
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdf (TENDER)Eligibility: must not be under any restriction to do business with Eskom or State-Owned Companies; must not be on international sanctions lists, Tender Defaulters list, or restricted by National Treasury or Eskom; no conflict of interest; JV/consortium must state joint and several liability; must not subcontract 100% of scope.
CSD registration: mandatory for contract award (CSD number/report).
Tax compliance: certified tax clearance certificate required from foreign tenderers with a SA footprint not on CSD, and from local tenderers not providing SARS e-filing PIN or CSD number. Foreign suppliers with no SA footprint need not provide tax compliance proof.
B-BBEE: proof of B-BBEE status level contributor (certificate, sworn affidavit, or other per B-BBEE Act). Specific goals scored out of 20 points under PPPFA.
Employment Equity: designated employers must provide proof of compliance, including EE report submission to Department of Labour (SA tenderers only).
Local content thresholds (designated materials): Solar PV mounting structures 90%, Inverters 40%, Fabricated steel products 100%, Electrical and telecoms cables 90%, Industrial lithium battery 50%. Mandatory returnables for contract award: SBD 6.2 Local Content Declaration, Annexure C Local Content Declaration Summary, DTIC exemption letter if threshold cannot be met, and delegation of authority letter if signatory is not in executive authority.
SHEQ and SDL&I requirements: evaluated; one opportunity to correct and resubmit within a stipulated time.
B-BBEE Requirements
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdf (TENDER)Specific goals scored out of 20 points under PPPFA. Proof of B-BBEE status level contributor: certificate, sworn affidavit, or other per B-BBEE Act. Local content thresholds: Solar PV mounting structures 90%, Inverters 40%, Fabricated steel products 100%, Electrical and telecoms cables 90%, Industrial lithium battery 50%. Mandatory returnables for contract award: SBD 6.2, Annexure C, DTIC exemption letter if threshold not met, delegation of authority letter if signatory not in executive authority.
Health & Safety
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdfSafety requirements: Annexure B acknowledgement, Health and Safety Plan, detailed OHS costing, Baseline OHS Risk Assessment (BRA) with methodology, valid COIDA letter, OHS policy signed by CEO (OHS Act Section 7), OHS competency evidence (CVs, qualifications).
Environmental
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdfEnvironmental requirements: Environmental Policy signed by CEO/Director, organogram showing environmental roles, Waste Management Plan (WMP), Environmental Emergency Preparedness & Response Plan, environmental incident register, environmental competency training certificates and matrix.
Contractual Terms
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdfContract form: NEC3 Engineering and Construction Contract (ECC3). Mandatory contractual requirement: proof of CSD on contract award. Additional contractual requirements: SHEQ and SDL&I, evaluated with one opportunity to correct.
Special Conditions
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdf (TENDER)Electronic submission only via Eskom E-Tendering. No hard copies. PDF format, price list in PDF and Excel. Upload size 500 MB per document, total 4 GB. No zip files. Resubmission nullifies previous. Tender validity 120 days. Alternative tenders not allowed. Cataloguing may be required. Performance security: select at least two Eskom-approved financial institutions. Payment terms: 30 days (below R50m), 60 days (above). Eskom may negotiate with preferred bidders. Subcontracting with subsidiaries discouraged and must be declared.
Requirements
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdf (TENDER)Eligibility: no sanctions nationality, no multiple tenders, JV must state joint and several liability, no conflict of interest, authorised signatory, not restricted by National Treasury or Eskom, not on Tender Defaulters list, no 100% subcontracting.
Mandatory technical requirements: qualified personnel, design documentation for 2 projects, PV module compliance (600-640 Wp, mono/bifacial, monocrystalline, SANS 61215:2015), inverter compliance (three-phase hybrid 40kW, NRS097-2-1, communication device), battery compliance (SANS/IEC 62619:2022, ≥80% DoD, ≥5,000 cycles, modular & scalable).
Section
Source: Invitation to Tender (ITT) Provision for the Supply installation testing commissioning handover of a Ground-mounted PV with BESS at Freemantle.pdfFunctionality: weighted score-card, minimum 80% to qualify. Price scored out of 80, specific goals out of 20. 80/20 system. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered. Specific goals: failure to submit evidence results in 0 points.
Description
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdfEskom Distribution has initiated a project to establish a ground-mounted PV system with battery backup at Freemantle Boy's High School. Objectives: reduce Eskom's carbon footprint, provide continuous supply during grid loss, supply renewable electricity for own consumption, export excess solar energy to the grid, and support future peak energy shaving.
Important Dates
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdf (unknown)Closing date: 21 October 2026 at 10:00.
No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Contact Information
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdf (unknown)No contact information is provided in the document.
Submission Guidelines
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdf (unknown)Returnable documents (all must be completed, signed and submitted):
Submission method and address: not stated in the document.
Closing time: 10:00 on 21 October 2026.
Evaluation Criteria
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdf (unknown)Evaluation will be based on the Technical Evaluation Criteria, which the bidder must complete and submit. The document does not specify the scoring split, minimum qualifying score, or the preference point system (80/20 or 90/10) in the provided text.
Technical Specifications
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdf (unknown)Scope: Supply, installation, testing, commissioning, and handover of a ground-mounted PV with BESS system at Freemantle Boy's High School, Eastern Cape.
Location: GPS coordinates 31°42'29.19"S & 27°11'16.29"E, Freemantle Boy's High School, Eastern Cape.
System components:
Cable distribution to blocks (approx. distances):
Modes of operation: seamless islanding and synchronisation; user-configurable prioritisation of PV to essential loads or battery; export excess energy to grid; scheduled grid charge/discharge with at least six programmable time-periods per day; load shaving up to 100% of BESS peak AC discharge rate.
Warranties: minimum 12 months base warranty and 12 months workmanship warranty. All OEM warranties transferred to Eskom.
Methodology
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdf (unknown)Methodology and execution:
Quality Management
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdfQuality management:
Pricing Schedule
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdfPricing schedule:
Financial Requirements
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdf (unknown)Pricing format: Priced BOQ (Bill of Quantities) / BOM (Bill of Materials) must be submitted, including detail of individual inverters.
No bid security, bonds, guarantees, retention, payment terms, or financial capacity thresholds are stated in the document.
Compliance Requirements
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdf (unknown)Mandatory registrations and certifications:
Statutory and regulatory compliance:
Health & Safety
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdfHealth and safety:
Environmental
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdfEnvironmental requirements:
Contractual Terms
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdfWarranties:
Requirements
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdf (unknown)Key design constraints:
Statutory, regulatory and municipal requirements:
Section
Source: Ground-mounted PV with BESS Specification Freemantle Boy's High School - 27-08-2026_signed 31Aug26.pdfAdditional evaluation criteria:
Description
Source: Eskom - Standard Conditions of Tender (February 2022).pdfThe procurement is for the supply, installation, testing, commissioning, and handover of a ground-mounted PV with BESS system at Freemantle Boys High School, Eastern Cape. No further scope details are provided in this document.
Important Dates
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Closing date and time: 21 October 2026 at 10:00 (SAST).
Site visit / clarification meeting: attendance is compulsory if stipulated; failure results in disqualification. Details (date, time, venue) are in the Tender Data.
Briefing Session
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Site visit or clarification meeting is compulsory if stipulated; failure to attend results in disqualification. Details are in the Tender Data. Questions may be asked during the meeting.
Contact Information
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Enquiries must be addressed in writing to the Eskom Representative only. No other Eskom official may be contacted.
Eskom will publish all queries and responses on the platform where the tender was advertised.
No specific contact name, email, or telephone number is provided in this document.
Submission Guidelines
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Submission method: e-tendering via the Eskom Tender Bulletin site on the Eskom E-tendering page. Paper submissions are not permitted for e-tendering.
Closing time: 21 October 2026 at 10:00 (SAST, GMT+2). Late tenders will not be accepted; the e-tendering system will not allow finalisation after closing.
Documents must be uploaded and finalised before closing; ensure PDF/Excel files are not corrupt or unreadable.
Tender must be submitted in English, completed in ink (not pencil), and signed by an authorised signatory.
Returnable documents (all must be completed and submitted by closing):
Disqualification risks:
Returnable Documents
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Mandatory returnables must be submitted by closing date and time. All documents must be completed and valid. Original tender plus one copy in paper form is required (for paper submissions); for e-tendering, upload in the relevant folders (Technical, Commercial, Financial). Proof of authority for agents is required. SDL&I Undertaking must be submitted by contract award.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Evaluation stages:
Arithmetical errors: amount in words prevails over figures; errors in decimal points, omissions, multiplication, addition, or exchange rates are corrected; tenderer must confirm or accept corrections or the tender is rejected.
Objective criteria: award may go to a non-highest scorer only per Section 2(1)(f) of the PPPFA, if stipulated; functionality and B-BBEE elements cannot be used as objective criteria.
Reverse e-auction: if used, tenderers submit a complete tender without prices; any included prices will not be considered.
Technical Specifications
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Scope: supply, installation, testing, commissioning, and handover of a ground-mounted PV with BESS system at Freemantle Boys High School, Eastern Cape.
No further technical details (quantities, capacities, standards) are provided in this document.
Quality Management
Source: Eskom - Standard Conditions of Tender (February 2022).pdfTenderers must provide proof that safety, health, environmental, and quality (SHEQ) systems are in place at closing and/or contract award. All SHEQ costs must be included in the tender.
Pricing Schedule
Source: Eskom - Standard Conditions of Tender (February 2022).pdfPrices must include all duties, taxes (including VAT), and levies. Prices are fixed for the contract duration unless otherwise stated. Prices must be in South African Rand. Arithmetical errors are corrected; amount in words prevails. If a bill of quantities or pricing schedule applies, line-item totals prevail over unit rates in case of multiplication errors.
Financial Requirements
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Pricing: include all duties, taxes (including VAT), and levies in rates and prices; these are those applicable 14 days prior to closing.
Prices must be fixed for the contract duration unless otherwise stated in the Invitation.
Prices must be stated in South African Rand unless instructed otherwise.
Insurance: Eskom may not provide full cover; tenderers should seek qualified advice.
Security for performance: if required, tenderers must name at least two financial institutions they will approach; Eskom may reject unsuitable institutions.
No bid security, retention, or payment terms are specified in this document.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)CSD registration: B-BBEE level is scored from the CSD report or certificate/affidavit; if B-BBEE is a pre-qualification criterion, proof (certificate, CSD number, or CSD report) must be provided at closing or the tender is disqualified.
B-BBEE: for preference point allocation, a missing, expired, or fraudulent certificate/affidavit results in zero points but not disqualification if otherwise responsive.
CIDB: if CIDB grading is a qualification criterion, tenderers must be registered with CIDB at closing or be capable of registration within 21 working days. Proof of registration is mandatory at closing; if only application proof is available, actual proof must be submitted by contract award.
SHEQ: proof that safety, health, environmental, and quality systems are in place must be provided at closing and/or contract award; all SHEQ costs must be reflected in the tender.
Compliance with legislation: National Treasury Instruction Notes, CIDB Regulations, PPPFA Regulations, Amended B-BBEE Codes, COIDA, OHS Act, and Eskom SHEQ requirements.
Contract Skills Development Goal (CSDG): if awarded, must achieve CSDG per CIDB Standard; applies to contracts of 12 months or more, R5 million or more for professional/service contracts, or CIDB grade 7 or higher for construction works.
Contract Participation Goals (CPG): must achieve CPG for engagement of targeted enterprises; applies to construction works in GB and CE classes, minimum 6 months duration, and where at least 25% of the main contract is subcontracted in specified CIDB classes.
Misrepresentation: falsified information, certificates, or affidavits lead to disqualification, reporting to the B-BBEE Commission, and suspension from State-Owned Company business for up to 10 years.
B-BBEE Requirements
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)B-BBEE level is scored from the CSD report or certificate/affidavit. If B-BBEE is a pre-qualification criterion, proof must be provided at closing or the tender is disqualified. For preference point allocation, missing or expired proof scores zero but does not disqualify if otherwise responsive. Fraudulent certificates are reported to the B-BBEE Commission.
Health & Safety
Source: Eskom - Standard Conditions of Tender (February 2022).pdfCompliance with the OHS Act and Eskom SHEQ requirements is mandatory. Proof of SHEQ systems must be provided. Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) apply to qualifying contracts.
Contractual Terms
Source: Eskom - Standard Conditions of Tender (February 2022).pdfEskom may cancel the tender at any time before contract conclusion and is not liable for any losses incurred by tenderers. Eskom may negotiate with selected tenderers. Tender validity must be maintained for the validity period; extensions may be requested. Confidentiality of procurement matters is required. Site visits or clarification meetings are compulsory if stipulated. Insurance cover from Eskom may be insufficient; tenderers should seek advice. Security for performance may be required, naming at least two financial institutions. The successful tenderer must sign the Form of Agreement.
Special Conditions
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Tenders must be received by closing date and time; late tenders are not accepted. Proof of posting or courier does not equal proof of delivery. Time is SAST. Tender validity must be maintained; extensions may be requested. Alterations to documents must be initialled; correction fluid is not permitted. Alternative tenders only with a main tender. Cataloguing may be required; pricing schedule must include a line item for cataloguing. Addenda may be issued; tenderers must check regularly. Late tenders are returned unopened. Acceptance is notified before validity expiry.
Requirements
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Eligibility: tenderer must meet eligibility criteria in the Tender Data and not be under restriction to do business with Eskom or State-Owned Companies. 100% sub-contracting is not permitted. CIDB registration is required if stipulated. CSDG and CPG obligations apply to qualifying contracts. Misrepresentation leads to disqualification and possible suspension.
Section
Source: Eskom - Standard Conditions of Tender (February 2022).pdfEvaluation follows the PPPFA 80/20 or 90/10 system. Price and Specific Goals scores are added and tenders ranked highest to lowest. Functionality, if applicable, has a minimum threshold. B-BBEE and Specific Goals are scored with supporting documentation; missing proof scores zero but does not disqualify if otherwise responsive. Objective criteria may be used only if stipulated in the Invitation. Reverse e-auction may be used; if so, tenders must be submitted without prices.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Freemantle Boys High School Eastern Cape - - Freemantle Boys High School Eastern Cape -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
11
Last checked
01 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Median Estimate
R 1 190 920
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog