Tender Type
Request for Bid(Open-Tender)
Delivery Location
Dithakong Village( Near Kuruman) Coordinates : 27.06'37.18''S 23.54'02.63 E - - Kuruman -
Organization Type
GOVERNMENT
Published
29 Sept 2026
OCDS Reference
ocds-9t57fa-172092
Completion construction work on dithakong (jtg) school and hostel – phase 3a at dithakong village near kuruman, northern cape, comprising all building trades, programme control, quality testing, waste management and handover of guarantees for the northern cape department of education. The contract runs 18 months with late-completion penalties of r10 000 per calendar day. Only bidders holding a valid CIDB grade 8gb or higher, registered on the csd, and able to evidence up to five completed building projects each worth at least r50 million can clear pre-qualification and the 70-point functionality threshold. Bids close 12 november 2026 at 11:00 by online submission through a link requested from [email protected], And only contractors who sign the register at the compulsory site briefing on 8 october 2026 at 11:00 will be considered.
Compulsory briefing: site meeting at JTG School, Dithakong Village on 8 October 2026 at 11:00, attendance register must be signed, and only contractors who attend will be evaluated — a non-attendance disqualifies the bid.
Closing: 12 November 2026 at 11:00, submitted online through a link obtained by emailing [email protected]; offers received after the closing time are not considered.
CIDB: valid and active Grade 8GB or higher for the bidder; joint ventures must be made up of individually CIDB-registered members with a consolidated grading meeting the required grade and a JV agreement signed by all parties.
Functionality gate: minimum 70 out of 100 before price and preference points are scored; the largest weight is 40 points for up to five completed building projects each valued at R50 million or more, each supported by an appointment letter, completion certificate and reference letter, with any missing document forfeiting that project's points.
Key personnel: a Project Manager registered with the South African Council for the Project and Construction Management Professions and a Quantity Surveyor registered with the South African Council for the Quantity Surveying Profession, each with at least 5 years post-registration experience, a CV, proof of registration and a company letter confirming awareness of the bid and availability — the 15 points are forfeited without these.
Mandatory returnables: CSD registration verified by MAAA number, original valid Tax Clearance Certificate, CIPC registration proof and equity-holder details, certified IDs of all equity holders, valid COIDA certificate (COIDA or FEM for every JV partner), bank letter of good standing, previous financial year financial statements, project programme, detailed Bill of Quantities completed in ink with the final amount carried over to the signed Form of Offer, signed OHS agreement, and authority to sign where the company has more than one director.
Local obligations: 30% of the project value must be subcontracted to local subcontractors through the Community Liaison Officer and Ward Councillor, with first preference to ward SMMEs registered at CIDB 8GB or higher, and at least 30% of labour drawn from the local community (30% women, 20% youth up to 35, 2% persons with disabilities).
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Check the registered grade against the tender conditions, or estimate a possible grade. Check CIDB registration · Estimate a CIDB grade.
Date & Time
Thursday, 12 November 2026 - 11:00
Venue
Dithakong High School & Hostel , Northern Cape - JTG District
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
Dithakong Village( Near Kuruman) Coordinates : 27.06'37.18''S 23.54'02.63 E - - Kuruman -
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: JTG PHASE 3A SCM Document.pdf29 Sept
2026
Tender Published
Tender was published
04 Feb
2027
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdf
The Northern Cape Department of Education requires construction of Dithakong High School and Hostel, Phase 3A, in the Northern Cape. The works include alterations, earthworks, concrete, masonry, waterproofing, roof coverings, carpentry, ceilings, floor coverings, and ironmongery, with all quantities provisional and subject to remeasurement.
Contract Data - PHASE 3A.pdf
The Northern Cape Department of Education requires construction of the JTG Dithakong High School and Hostel Phase 3A, comprising one hostel block, in Kuruman. The contract is a JBCC Principal Building Agreement (Edition 6.2, May 2018) for organs of state, with a construction period of 18 months and possession of site on 30 November 2026.
JTG PHASE 3A SCM Document.pdf
Construction of Dithakong High School and Hostel Phase 3A in Dithakong Village, Northern Cape, for the Northern Cape Department of Education. The project involves completing construction of the school and hostel, with a contract period of 18 months and a penalty of R10,000 per calendar day for late completion.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Northern Cape - EducationMatched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Completion of construction of JTG School and Hostel – Phase 3A at Dithakong Village, Kuruman, Northern Cape. The contract covers all work required to complete the school and hostel.
Important Dates
Source: JTG PHASE 3A SCM Document.pdf (TENDER)Tender issue date: 25 September 2026.
Compulsory briefing session: 8 October 2026 at 11:00, on site at JTG School. Attendance is compulsory and the attendance register must be signed; only offers from contractors who attend will be considered.
Closing date and time: 12 November 2026 at 11:00.
Offer validity: 120 calendar days from submission.
Contract period: 18 months.
Briefing Session
Source: JTG PHASE 3A SCM Document.pdf (TENDER)Compulsory briefing session on 8 October 2026 at 11:00, on site at JTG School. Attendees must sign the attendance register. Only offers from contractors who attend the briefing session will be considered.
Contact Information
Source: JTG PHASE 3A SCM Document.pdf (TENDER)Document enquiries
Submission
Briefing venue
JTG School
Dithakong Village
Kuruman
Northern Cape
Submission Guidelines
Source: JTG PHASE 3A SCM Document.pdf (TENDER)Submission method: electronic — bids must be submitted online through a link issued to each bidder.
Link request: email [email protected] to ask for the submission link.
Closing: 12 November 2026 at 11:00. Bids received after the closing date and time will not be considered.
Format: complete the offer in ink, initial every page, initial every change, and use no correction fluid — strike out a mistake once in ink and have the signatory sign in full at each correction.
Returnable documents (all must be completed in full, initialled on every page and signed where applicable):
Disqualification risks:
Returnable Documents
Source: JTG PHASE 3A SCM Document.pdf (TENDER)Form of Offer — priced offer signed by the authorised signatory.
Form of Proxy — authority to sign, with proof of that authority.
Occupational Health and Safety Agreement — signed acceptance of the OHS obligations.
Witness — at least one witness signs the Form of Offer.
Certified copies of the identity documents of all equity holders.
Acceptable audit trail: CIPC registration, details of all equity holders, valid original Tax Clearance Certificate.
Bank letter of good standing.
Financial statements for the previous financial year.
CSD registration; the MAAA number is used for verification.
Valid and active CIDB grading certificate, Grade 8GB or higher.
Valid COIDA certificate; COIDA or FEM for all JV partners.
Detailed Bill of Quantities completed in ink.
Project programme.
Joint Venture Agreement signed by all parties, if applicable.
Confirmation of addendum, if applicable.
Signed compulsory briefing session attendance register.
All returnable documents must be completed in full, initialled on every page and signed where applicable; failure to supply the required information may invalidate the offer.
Evaluation Criteria
Source: JTG PHASE 3A SCM Document.pdf (TENDER)Three-phase evaluation.
Phase 1 — Pre-qualification against the hurdle requirements. No points are scored; a bid that fails any hurdle requirement does not proceed.
Phase 2 — Functionality. Minimum qualifying score: 70 out of 100. A bid below 70 is unacceptable and is not evaluated further.
Functionality scoring (100 points):
Phase 3 — 90/10 preference point system, open only to bids that reached 70 functionality points:
Total: 100 points.
Other evaluation matters: the department may request written clarification, conduct due diligence including interviewing customers, shortlist bidders and call for presentations, and appoint a specialist or consultant to assist with evaluation.
Award: the highest-scoring bidder is recommended, but the department may award to an emerging enterprise, may apply its procurement philosophy and local goals, and bases the award decision on the proposal closest to the Quantity Surveyor's cost estimate. Bidders must disclose projects currently under construction; a contractor already too committed may be excluded. Post-tender negotiations may be held before award.
Technical Specifications
Source: JTG PHASE 3A SCM Document.pdf (TENDER)Scope: all work necessary to complete construction of JTG School and Hostel – Phase 3A, Dithakong Village, Kuruman, Northern Cape.
Programme: a computer-generated critical path programme must be handed over at the first site meeting, detailed enough for the Principal Agent to assess weekly progress, showing procurement and off-site manufacture lead times and key dates for information and for sub-contractor appointments. A fortnightly bar-chart programme covering the next 14 days must also be maintained. No programme change without Principal Agent approval; the approved programme must be displayed in the site office and copies given to the Principal Agent.
Materials: only the specified materials, fittings and finishes may be used; written Principal Agent approval for any alternative must be obtained before tender submission. Proprietary branded products must be handled, stored and installed strictly per the manufacturers' instructions.
Testing and quality: testing at the standard minimum frequency, increased where necessary; results, measurements and levels must be furnished to the Principal Agent on completion of each part of the work. Approval of tests does not relieve the contractor of responsibility until the end of the Defects Liability Period.
Standards: National Building Regulations and the latest applicable SABS specifications apply, failing which the latest applicable British Standard.
Existing services: the Principal Agent must be consulted before any service is disconnected; damage to foreseeable or indicated services is for the contractor's account.
Waste: chutes and adequate waste skips must be provided at positions agreed in writing; full skips must be removed within 24 hours, failing which the department may appoint others and deduct the cost.
Site conduct: dust, nuisance and noise must be minimised, with effective silencing devices on pneumatic tools and plant. The contract price includes hard-wearing dust barriers of uniform colour and specification, hoarding of new boards painted black of equal lengths and heights, rubble chutes and waste skips, plus access permits, uniforms, PPE and identification cards for all personnel.
Drawings: issued only through the Principal Agent's office with stamp and signature; unauthorised drawings are used at the contractor's risk and errors are rectified at the contractor's cost. Damaged or obscured drawings must be returned for replacement.
Other contractors: the employer may appoint other contractors concurrently; the contractor must give them access and reasonable storage space and has no claim to profit or builder's discount on their work.
Scope changes: the employer may increase or decrease quantities and contract value; no claims for additional expense, rate changes or loss and expense will be entertained.
Overtime: rates are inclusive of overtime work; no additional overtime cost will be paid.
Handover: guarantees, operating and maintenance manuals, data and record drawings must be handed to the Principal Agent on practical completion, and all warranties and guarantees ceded to the employer on final completion.
Methodology
Source: JTG PHASE 3A SCM Document.pdfEvaluation runs in three phases: Phase 1 pre-qualification against the hurdle requirements, where no points are scored but failure ends the bid; Phase 2 functionality against the stated criteria and weights; Phase 3 price and preference points for bids that meet the functionality threshold.
Experience & Qualifications
Source: JTG PHASE 3A SCM Document.pdfCompany experience: 8 points per completed building project with a minimum value of R50 million, up to five references (40 points). Each project requires an appointment letter, completion certificate and reference letter; missing any of these forfeits that project's points.
Key staff (15 points): a Project Manager registered with the South African Council for the Project and Construction Management Professions (7.5 points) and a Quantity Surveyor registered with the South African Council for the Quantity Surveying Profession (7.5 points), each with at least 5 years' post-registration experience, a CV and proof of registration. A letter on company letterhead confirming the individual is aware of the bid and available for the role is required; without it the points are forfeited.
Locality (15 points): proof of an official business address in Northern Cape — Joe Morolong Local Municipality 15, John Taolo District Municipality 10, elsewhere in the province 5, outside the province or no proof 0.
Quality Management
Source: JTG PHASE 3A SCM Document.pdfThe contractor must provide, at its own cost, a quality control system and technical staff, transport, instruments and equipment to ensure adequate supervision and positive control of the works at all times. Supervision and process control costs, including testing, are included in the quoted amount.
Testing must meet the standard minimum frequency and be increased where necessary; results, measurements and levels must be submitted to the Principal Agent on completion of each part of the work.
Approval of tests does not relieve the contractor of responsibility for the work until the end of the Defects Liability Period.
Materials must be exactly as specified; written Principal Agent approval for alternatives must be obtained before tender submission.
Pricing Schedule
Source: JTG PHASE 3A SCM Document.pdfThe Bill of Quantities must be completed in full in ink; it may be on company letterhead but the final amount must be carried over to the Form of Offer, which must accompany the document.
BOQ rates are deemed to exclude VAT, with VAT provided for on the summary page; bidders are advised that prices entered must include VAT.
Rates are deemed to include all obligations under the contract — making, conveying, delivering, unloading, storing, unpacking, hoisting, setting, fitting and fixing, cutting and waste, patterns, models and templates, plant, temporary works and return of packings — as well as overtime.
The offer must remain valid for 120 calendar days.
The employer may increase or decrease quantities and value; no additional expense or rate changes are claimable and no loss-and-expense claims will be entertained for changes the employer implements.
Financial Requirements
Source: JTG PHASE 3A SCM Document.pdf (TENDER)Pricing: Bill of Quantities rates are deemed to exclude VAT, with VAT provided for on the summary page; bidders are advised that prices entered must include VAT. The BOQ may be on company letterhead but the final amount must be carried over to the Form of Offer, which must accompany the document.
Rates are deemed to include all obligations under the contract — making, conveying, delivering, unloading, storing, unpacking, hoisting, setting, fitting and fixing, cutting and waste, patterns, models and templates, plant, temporary works and return of packings — as well as overtime.
Offer validity: 120 calendar days from submission, during which the offer may be accepted and may not be withdrawn or weakened.
Payment: within 31 calendar days after the end of the month in which the service was rendered, against a valid tax invoice, subject to the department's accounts payable cut-off dates.
Penalty for late completion: R10 000 per calendar day.
Contract period: 18 months.
Scope variation: quantities and contract value may be increased or decreased, and no loss-and-expense claims are entertained for changes the employer implements.
Compliance Requirements
Source: JTG PHASE 3A SCM Document.pdf (TENDER)CSD: bidders must be registered on the Central Supplier Database; the MAAA number is used to verify registration.
CIDB: valid and active grading of 8GB or higher. Joint ventures must submit a consolidated CIDB grading meeting the required grade, and every JV member must be CIDB registered.
Tax: valid original Tax Clearance Certificate.
CIPC: proof of company registration and details of all equity holders.
COIDA: valid COIDA certificate; for joint ventures every partner must submit a COIDA or FEM certificate.
Bank: letter of good standing from the bank.
Financial statements: previous financial year's financial statements.
Compulsory briefing: attendance and a signed attendance register.
Local subcontracting: 30% of the project value must be subcontracted to local subcontractors in consultation with the Community Liaison Officer and Ward Councillor; first preference goes to ward SMMEs; targeted enterprises must be CIDB-registered at 8GB or higher.
Employment targets: at least 30% of total labour from the local community, of which at least 30% women, at least 20% youth aged up to 35, and at least 2% persons with disabilities; equal pay for work of equal value.
Local upliftment: the department may prefer a local contractor, or a juristic person whose 51% majority shareholding is held by persons historically disadvantaged by unfair discrimination on grounds of race, gender or disability, who resides or conducts business in the location or province.
SBD forms: SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim) and SBD 7.2 (Contract Form) — each JV or consortium party must complete these individually.
Vetting: all bidders are subject to a vetting process.
B-BBEE Requirements
Source: JTG PHASE 3A SCM Document.pdf (TENDER)Preference points are not scored on B-BBEE levels; the 10 preference points are for local specific goals — Black people 2, Youth 2, Women 4, Disabilities 2 — awarded in full where at least 51% ownership is held by the relevant group.
Local upliftment: the department may decline to award automatically to the highest scorer and may prefer a local contractor who is a person, or a juristic person whose 51% majority shareholding is held by persons historically disadvantaged by unfair discrimination on grounds of race, gender or disability, and who resides or conducts business in the location or province.
Procurement philosophy: increase the economic participation of black people, engage youth and black women-owned and managed enterprises, support businesses from disadvantaged communities, promote local, regional and provincial contractors, and stimulate local economic development; quotations may be sourced from community-based vendors.
Preferential procurement deliverables: business opportunities for targeted enterprises per the CIDB SSED; local SMMEs sourced through the Community Liaison Officer and Ward Councillor with first preference to ward SMMEs.
Participation goals: minimum 30% local labour, 30% women, 20% youth, 2% persons with disabilities.
Health & Safety
Source: JTG PHASE 3A SCM Document.pdfOccupational Health and Safety Agreement must be completed and signed by an individual with sufficient authority.
Valid COIDA certificate required; for joint ventures every partner must submit a COIDA or FEM certificate.
The contract price is deemed to include PPE, uniforms, identification cards and access permits for all personnel on site.
Functionality scoring covers an OHS plan aligned to the scope of work (4 points), safe working procedure (3 points), a safety officer in the organogram with CV (2 points), a safety-related qualification (3 points) and a risk management plan (3 points).
Environmental
Source: JTG PHASE 3A SCM Document.pdfDust, nuisance and inconvenience from the works must be minimised; pneumatic tools and other plant must have effective silencing devices to stay within local authority noise limits.
Waste must be removed rapidly using chutes where required, with adequate waste skips positioned as directed by the Principal Agent in writing. Full skips must be removed within 24 hours; if the contractor fails, the department may appoint others and deduct the cost from amounts due.
The contract price includes hard-wearing dust barriers of uniform colour and specification, hoarding of new boards painted black of equal lengths and heights, and rubble chutes and waste skips.
The contractor must repair or replace existing work damaged by itself or its subcontractors at its own cost.
Contractual Terms
Source: JTG PHASE 3A SCM Document.pdfGoverning law: South African law; disputes resolved in South Africa.
Transfer: the project may not be transferred to another company without the department's written consent.
Contradictions: ambiguities or inconsistencies in description, measurements, quality or quantities must be referred to the department's representative before that part of the work starts.
Deviations: any deviation from the specifications must be clearly described in the offer; the department may reject it.
Breach: the department may issue a written warning to remedy a breach within a fixed period; if not remedied it may take over the work or place it elsewhere, and the contractor is liable for the resulting loss.
Payment: within 31 calendar days after the end of the month in which the service was rendered, against a valid tax invoice.
Insolvency: sequestration, liquidation, surrender of estate, assignment for creditors or similar events entitle the department to terminate the contract without recourse and to claim damages.
Offer validity: the offer remains open for acceptance for the stated period and may not be withdrawn or weakened.
Code of conduct: no gratification may be given to department staff or officials; contravention cancels the contract immediately. No social functions, union meetings or unauthorised meetings on department premises, and the department's address or logo may not be used for the contractor's correspondence.
Cancellation: the department may disqualify the bidder or cancel the contract for inducements, unsatisfactory execution, non-compliance with conditions, or fraudulent or bad-faith conduct.
Award: the department may award in whole or in part without giving reasons, may negotiate post-tender, and may terminate negotiations at any stage.
Subcontracting: 30% of the project value must go to local subcontractors in consultation with the Community Liaison Officer and Ward Councillor; the ward where the project is located is prioritised, with neighbouring wards considered only if no suitable local contractor is available.
Conflicts: where the tender form and a covering letter differ, the tender form prevails.
Corrections: changes must be initialled; no correction fluid — strike out once in ink and have the signatory sign in full at each correction.
Evaluation conduct: the department may shortlist contractors, request presentations, and take measures to protect the confidentiality and integrity of tenders.
Special Conditions
Source: JTG PHASE 3A SCM Document.pdf (TENDER)Hurdle requirements apply as listed; non-compliance invalidates the offer.
A list of key personnel registered with a professional body must be provided for subcontracted work.
The Bill of Quantities may be on company letterhead but the final amount must be carried over to the Form of Offer, which must accompany the document.
Award will be based on the proposal closest to the Quantity Surveyor's cost estimate.
Local community priority follows municipal demarcations — the ward where the project is located, with neighbouring wards considered only if no suitable local contractor is available.
Local SMMEs are sourced through the Community Liaison Officer and Ward Councillor, with first preference to ward SMMEs.
Preferential procurement deliverables follow the CIDB Specification for Social and Economic Deliverables in Construction Works Contracts (SSED): targeted enterprises must be CIDB-registered at 8GB or higher, and targeted enterprise declarations and letters of undertaking must be submitted within 3 months of contract commencement.
Employment and skills development for targeted labour: earthworks performed by hand (trench excavation and backfill compaction in areas not subject to traffic, clearing and grubbing, shaping, loading, hauling, off-loading, spreading, compaction and grassing), stone pitching and rubble masonry, and manufacturing elements. Wages must be comparable to local unskilled rates, sufficient to incentivise work but not above the local average; men, women, disabled persons and the aged receive equal pay for work of equal value.
Participation goals: at least 30% of total labour from the local community, at least 30% women, at least 20% youth aged up to 35, and at least 2% persons with disabilities.
Design procedures: interface with existing structures and plant, temporary works requirements, design integration before and during construction, all works and design changes approved by the department and its consultants before implementation, and documents marked with the correct file number and properly filed.
Requirements
Source: JTG PHASE 3A SCM Document.pdf (TENDER)Minimum CIDB grading: 8GB or higher.
Hurdle requirements, non-compliance with which invalidates the offer: Form of Offer completed in full and signed by the person authorised on the Form of Proxy, with proof of that authority; Form of Proxy completed and signed; Occupational Health and Safety Agreement completed and signed; at least one witness signing the Form of Offer; certified copies of all equity holders' identity documents; acceptable audit trail including CIPC registration, details of all equity holders and a valid original Tax Clearance Certificate; bank letter of good standing; previous financial year's financial statements; attendance of the compulsory briefing session; returnable documents completed in full, initialled on each page and signed where applicable; the required CIDB grading; submission of a project programme.
Joint ventures: every member must be CIDB registered; the combined grading must meet or exceed the grade required for the tendered sum; a Joint Venture Agreement signed by all parties must be submitted; each party must complete SBD 4, SBD 6.1 and SBD 7.2 individually; all partners must submit COIDA or FEM certificates.
All bidders must be registered on the Central Supplier Database.
A list of key personnel registered with a professional body must be provided for subcontracted work.
Section
Source: JTG PHASE 3A SCM Document.pdfPhase 1 — pre-qualification against the hurdle requirements; no points, but failure ends the bid.
Phase 2 — functionality, minimum qualifying score 70 out of 100.
Phase 3 — 90/10 preference point system for bids that reached 70 functionality points: up to 90 points for price and up to 10 points for local specific goals (Black people 2, Youth 2, Women 4, Disabilities 2). Price formula: Ps = 90(1 − (Pt − Pmin)/Pmin).
Functionality weights: company experience 40 (5 references at 8 points each, projects of at least R50 million), locality 15, key staff 15, safety health environmental and quality 15, method statement, programme and cashflow 10, plant and equipment 5.
Description
Source: JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdfConstruction of JTG School (Dithakong High School and hostel), Phase 3A — alterations and building works measured in an unpriced bill of quantities. The JBCC Principal Building Agreement (Edition 6.2, May 2018) and JBCC General Preliminaries (May 2018) are incorporated, together with the ASAQS General Preambles for Trades (2017). A detailed preliminaries breakdown, calculation and cash flow must be submitted with the tender for adjudication and monthly valuation.
Submission Guidelines
Source: JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdf (unknown)Pricing submission
Alternative products
No submission channel, submission address or returnable-form list is stated in the document.
Evaluation Criteria
Source: JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdf (unknown)Adjudication
Technical Specifications
Source: JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdf (unknown)Scope
Bill sections and principal quantities
Site facilities
Methodology
Source: JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdf (unknown)The contractor must submit a detailed breakdown, calculation and cash flow for the preliminaries over the anticipated contract period with the tender. This cash flow is used for tender adjudication and as the basis for monthly valuation of preliminaries in payment certificates.
Quality Management
Source: JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdfWorkmanship and materials must comply with the JBCC and ASAQS preambles. Concrete testing: 24 sets of 150 x 150 x 150 mm cubes to be made and tested (provisional). Previous work must be checked for dimensional accuracy and defects, and adjoining properties inspected.
Pricing Schedule
Source: JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdf (unknown)Unpriced bill of quantities to be priced in full, covering preliminaries and general, alterations, earthworks (provisional), concrete/formwork/reinforcement, masonry, waterproofing, roof coverings, carpentry and joinery, ceilings and partitions, floor coverings, and ironmongery. Each item carries a quantity, rate and amount. Preliminaries are priced as fixed, value-related and time-related amounts. Quantities are provisional and subject to re-measurement. Contract price adjustment (escalation) applies.
Financial Requirements
Source: JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdf (unknown)Payment
Compliance Requirements
Source: JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdf (unknown)Occupational health and safety
Other
Health & Safety
Source: JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdfOHS Act, 1993 and Construction Regulations compliance is compulsory and priced in the preliminaries; non-compliance may hold back progress payment certificates with no compensation. Required: Department of Labour notification (Reg 3); health and safety plan (Reg 5.4); Compensation Fund registration and good standing (Reg 5.3(f)); on-site health and safety file handed over on completion (Reg 5.7); written appointment of a construction supervisor and safety officer (Reg 6); risk assessment (Reg 7); fall protection plan (Reg 8); fitness records for elevated work (Reg 8.2(b)); certified plant operators (Reg 21); training programme (Reg 8(c)); demolition method statement (Reg 12). COVID-19 measures, PPE (250 each of vests, bibs, hard hats, footwear, earplugs, dust masks, face masks, surgical gloves, goggles), medical examinations, first aid boxes, thermometers, hand sanitiser, cleaning detergents, logbooks and waste management must be priced. A full-time construction health and safety officer is required.
Environmental
Source: JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdfContractor must protect and isolate existing works, secure the works, give notice before covering work, avoid disturbance, manage environmental disturbance, clean and clear the works, control vermin, and comply with advertising restrictions. COVID-19 waste management and cleaning obligations apply, including waste bins and cleaning detergents. Green building requirements must be allowed for.
Contractual Terms
Source: JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdfJBCC Principal Building Agreement (Edition 6.2, May 2018) clauses incorporated, covering definitions, law and regulations, offer and acceptance, cession, documents, employer's agents, design responsibility, works risk, indemnities, insurances, securities, obligations of the parties, setting out, subcontractors, contract instructions, completion, defects liability, payment, adjustment of contract value, suspension and termination, and dispute resolution. Amendments: no payment guarantee will be issued by the employer; certified amounts are payable within 31 calendar days of the payment certificate issue date.
Special Conditions
Source: JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdf (unknown)Temporary storage facilities: one office (6x3), one board room (6x3) and two storage units (6x3) for the contract duration, lockable and watertight with security gates and burglar proofing; two units fitted with HVAC. Dedicated area to be level, fenced at least 2.1 m high with a double gate at least 4 m wide, surfaced for heavy vehicles, with storm water management and temporary external security lights. Main notice board 3 m x 3 m with project, client, contractor and professional team details. Contract drawings are a guide only; clarification must be obtained in writing from the principal agent before tendering. Alternative products require written approval before the closing date. Condom dispensers with daily replenishment. Green building requirements apply. Contract price adjustment applies. Preliminaries paid under Option B and adjusted under Option A. Quantities provisional and subject to re-measurement. All concrete ready-mix.
Section
Source: JTG SCHOOL-PHASE 3A UNPRICED BOQ FINAL.pdfNo evaluation criteria are stated beyond the use of the preliminaries cash flow for tender adjudication. Alternative products of equal quality require the principal agent's written approval before the closing date; otherwise the specified product is deemed tendered.
Description
Source: Contract Data - PHASE 3A.pdfProject: JTG Dithakong High School and Hostel, Phase 3A — completion of JTG School Phase 3A, including one hostel block. Site at JTG School, Kuruman, Northern Cape, under John Taolo District Municipality.
Important Dates
Source: Contract Data - PHASE 3A.pdf (unknown)Closing: 12 November 2026 at 11:00.
Possession of site: 30 November 2026.
Practical completion: 30 May 2028 — construction period 18 months, with 31 working days allowed for inspection by the principal agent.
Payment certificates: issued on the 25th of each month.
Contractor's annual holiday, Year 1: 12 December 2026 to 3 January 2027.
Contractor's annual holiday, Year 2: 11 December 2027 to 2 January 2028.
Contact Information
Source: Contract Data - PHASE 3A.pdf (unknown)Employer
Principal agent
Quantity Surveyor
Architect
Civil Engineer
Structural Engineer
Mechanical Engineer
Electrical Engineer
Address (all agents)
Block 4A North Gate Office Park
18 Aureole Avenue
2188
Submission Guidelines
Source: Contract Data - PHASE 3A.pdf (unknown)Returnable documents
Contract documents on appointment
Technical Specifications
Source: Contract Data - PHASE 3A.pdf (unknown)Scope
Contract framework
Services and site facilities
Pricing Schedule
Source: Contract Data - PHASE 3A.pdf (unknown)Preliminaries
Financial Requirements
Source: Contract Data - PHASE 3A.pdf (unknown)Currency: ZAR.
Insurances by contractor
Securities
Payment
Preliminaries
Penalty
Contractual Terms
Source: Contract Data - PHASE 3A.pdfContract basis
Insurances
Site and programme
Payment
Dispute resolution
General preliminaries selections
Special Conditions
Source: Contract Data - PHASE 3A.pdf (unknown)Contractor's annual holiday periods
Securities
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Dithakong Village( Near Kuruman) Coordinates : 27.06'37.18''S 23.54'02.63 E - - Kuruman -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
09 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 5 139 642
Range
Based on 3 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.