Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
South African Forestry Company LimitedLocation
Mpumalanga
Closing Date
04 Sept 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
20 PAUL KRUGER STREET - ABSA SQUARE BUILDING, THIRD FLOOR (Reception) - NELSPRUIT - 1200
Organization Type
GOVERNMENT
Published
12 Aug 2026
OCDS Reference
ocds-9t57fa-165398
SAFCOL is appointing a service provider to conduct forest enumeration services across approximately 120,000 hectares of komatiland forests plantations, covering four enumeration types over a three-year period. The contract requires the contractor to provide transport, accommodation, equipment, and teams of two people, with an estimated six teams per year. The most consequential requirement is the compulsory briefing session on 19 august 2026, as failure to attend will lead to disqualification.
Compulsory briefing session: 19 August 2026, 11H00-12H30, on Microsoft Teams; failure to attend leads to disqualification.
Bids must be hand-delivered or couriered to SAFCOL Nelspruit Office, ABSA Square, 3rd Floor Reception, 20 Paul Kruger Street, Mbombela, Nelspruit, by 04 September 2026 at 12H00; late bids are not accepted.
Bidders must be registered on the Central Supplier Database (CSD); the tender will not be awarded to unregistered bidders (foreign suppliers with no local entity exempt).
Bids must be submitted on official forms (SBD 1, SBD 3.1, SBD 4, SBD 6.1) with original signature in black ink; an original and a copy must be submitted.
Total bid price (including VAT) is mandatory and must match the pricing schedule; all prices must be VAT inclusive in ZAR.
Bidders must provide proof of tax compliance (SARS PIN, printed TCS, or CSD number); each JV/consortium/subcontractor party must submit separate proof.
Bidders must provide certified CIPC registration or share certificates, and if a consortium/JV/subcontractor is used, signed agreements stipulating work split and rand value.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 04 September 2026 - 12:00
Venue
https://teams.microsoft.com/meet/375314919783761?p=uJV5fhJMtXxRZnnafS
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
20 PAUL KRUGER STREET - ABSA SQUARE BUILDING, THIRD FLOOR (Reception) - NELSPRUIT - 1200
AI Document Analysis Stages
Description
Source: Draft TSC4 Enumeration Services.pdf (unknown)12 Aug
2026
Tender Published
Tender was published
04 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf
SAFCOL is appointing a service provider to render enumeration services for a three-year period, with a compulsory briefing session and a closing date of 4 September 2026.
Draft TSC4 Enumeration Services.pdf
Komatiland Forests SOC Limited (KLF) is appointing a service provider to render forest enumeration services for a three-year period, covering approximately 120,000 hectares of plantations across Mpumalanga and surrounding areas. The contract is an NEC4 Term Service Contract (TSC4) under Main Option A (priced contract with price list), with services including early enumeration, thinning control, working plan enumeration, and pre-clearfell enumeration.
To download these documents and access AI-powered analysis, visit the main tender page.
Win SAFCOL tenders with AI Tender Discovery, forestry intelligence, compliance analysis, and application support for timber and land-management operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 1 515 868
Range
Based on 6 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Part C4: Affected Property
AP 100 Property owned by the Client that is affected by the work of the Contractor
AP 105 All Plantations
AP 200 Property not owned by the Client that is affected by the work of the Contractor
Ap 205
AP 300 Property owned by the Client that is used by the Contractor in providing the Service
S 2005
AP 400 property not owned by the Client that is used by the Contractor in Providing the Service
Ap 205
NEC4 Term Service Contract (TSC4) of 22
Contact Information
Source: Draft TSC4 Enumeration Services.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"ractor in the conditions of contract identified in the Contract Data."}
Submission Guidelines
Source: Draft TSC4 Enumeration Services.pdf (unknown)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Draft TSC4 Enumeration Services.pdf (unknown)Accuracy and quality of work, rather than quantity, are the key performance measures.
Low performance damages apply if average deviation in diameter and/or stems per hectare exceeds allowable percentages; the compartment must be redone at the contractor's cost.
If only tree height deviation exceeds allowable percentages, no fine is given, but heights must be remeasured.
If more than two compartments exceed the maximum allowable deviation, a written warning is issued.
If plots are not marked in the field or no GPS points are received, a 20% reduction in tendered price per plot applies.
B-BBEE requirements apply as per tender requirements.
Local labour must be sourced from surrounding communities where possible.
Technical Specifications
Source: Draft TSC4 Enumeration Services.pdf (unknown)Scope: Provision of enumeration services at KLF plantations covering 120,000 hectares, from north and east of Louis Trichardt (Entabeni plantation) to south of Vryheid (Ngome plantation).
Types of enumerations:
Measurement procedures:
Client-provided items: A3 map with plantation locations or GPS coordinates; GIS shape files and grid layer for plot layout; list of working plan enumerations at start of financial year.
All information collected during the contract must be retained by the client at the end.
Work is issued via call-off instructions specifying scope, location, quantities, and completion dates.
Methodology
Source: Draft TSC4 Enumeration Services.pdf (unknown)Plot Centre procedures: Place the transponder pole vertically at the plot center, capture the center point with GPS and assign a plot number, mark each plot center with a painted stick at least 30 cm tall, and number the nearest unmarked tree with the plot number facing the cruising line. Plot Boundary procedures: Use the Vertex to determine which trees fall within the plot radius, measure all trees within the radius, take at least two Vertex readings from opposite sides for border trees, hold the Vertex at mid-diameter height aligned with DBH measurement height. DBH Measuring procedures: Use electronic callipers, ensure all three sides of the calliper arms touch the stem, measure DBH at 1.3 m above ground, exclude dead or broken trees, measure all planted trees regardless of DBH (Pine: DBH ≥ 10 cm, Eucalyptus: DBH ≥ 8 cm for natural regeneration). Height Measuring procedures: Use a Vertex hypsometer aimed at the tree tip, record DBH and height on the electronic calliper or field form, heights must be in meters accurate to 10 cm, take at least 40 height measurements per compartment with one per plot minimum, mark trees measured for height with a painted dot facing the plot centre. Management of the service: The Contractor and Service Manager use early warning processes to review progress, allow the Contractor to demonstrate progress from the current Accepted Plan, act as a combined management team, and cultivate co-operation and mutual trust. Early warning meetings may be convened at either Party's premises on an alternating basis. Communication system: All communications shall be in writing and communicated by electronic mail. Communications relating to Early Warnings, Compensation Events, instructions, submissions, payment applications, reports, incidents, and contractual notices shall be submitted electronically. Management procedures: The Contractor shall establish and maintain management procedures, ensure suitably qualified supervisory personnel are always available, attend all meetings called by the Service Manager, and prepare and submit meeting agendas and minutes where requested. Work call-off arrangements: Work instructions will be issued as and when required indicating scope, location, and required completion dates. The Employer issues a formal Call-Off Instruction specifying scope, location, quantities, and required completion period. The Contractor acknowledges the instruction, mobilises resources, and executes the work in accordance with contract requirements.
Experience & Qualifications
Source: Draft TSC4 Enumeration Services.pdf (unknown)Name (2)
Job
Responsibilities
11.2(8) The following matters will be included in the Early Warning Register:
2 The Contractor’s main responsibilities
If the Contractor is to provide Scope for its plan
11.2(16) and 21.1 The Scope provided by the Contractor for its plan is in Part C3 Scope of Work
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
3 Payment
11.2(21) The price list is in Part C2 Pricing Data
The tendered total of the Prices excluding VAT is
Resolving and avoiding disputes
W1.1(1) The Senior Representatives of the Contractor are
Name
Address for communications
Address for electronic
communications
Name (2)
Address for communications
Address for electronic
communications
Data for Short Schedule of Cost Components (only used with Option A)
11.2(28) and SSCC 11 The people rates are
category of person unit rate
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
Part C2 Pricing Data
C2.1 Pricing assumptions Option A Priced contract with Price List
How work is priced and assessed for payment
Clause 11 in NEC4 Term Service Contract, (TSC4) Option A states:
Identified and 11
defined terms 11.2 (22) Defined Cost is the cost of the components in the Short Schedule of Cost
Components.
(25) The Price for Service Provided to Date is the total of
completed and
multiplying the quantity which the Contractor has completed by the rate.
Completed work is work without notified Defects the correction of which will delay
the work of the Contractor, the Client or Others.
(27) The People Rates are the people rates unless later changed in accordance with
the contract.
(28) The Prices are the amounts stated in the Price column of the Price List. Where
a quantity is stated for an item in the Price List, the Price is calculated by
multiplying the quantity by the rate.
This confirms that Option A is a priced contract where the Prices are derived from a list of items of service which can be
priced as lump sums or as expected quantities of service multiplied by a rate or a mix of both.
Function of the Price List
Clause 55.1 in Option A states: “Information in the Price List is not Scope”. This confirms that instructions to do work
or how it is to be done are not included in the Price List but in the Scope. This is further confirmed by Clause 20.1 which
states, “The Contractor Provides the Service in accordance with the Scope”. Hence the Contractor does not Provide the
Service in accordance with the Price List. The Price List is only a pricing document.
Link to the Contractor’s plan
Clause 31.4 states “The Contractor provides information which shows how each item description on the Price List
relates to the operations on the plan and each Task Order programme submited for acceptance”. Hence when
compiling the price list, the tendering contractor needs to develop his first clause 31.2 plan in such a way that
operations shown on it can be priced in the price list and result in a satisfactory cash flow in terms of clause 11.2(25).
Preparing the price list
Before preparing the price list, both the Client and tendering contractors should read the TSC4 Preparing a Term
Service Contract User Guide pages 73 and 74. In an Option A contract, either Party may have entered items into the
price list either as a process of offer and acceptance (tendering) or by negotiation depending on the nature of the
service to be provided. Alternatively the Client, in his Instructions to Tenderers or in a Tender Schedule, may have
listed some items that it requires the Contractor to include in the price list to be prepared and priced by it.
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
It is assumed that in preparing or finalising the price list the Contractor:
to Option A;
Providing the Service in accordance with the Scope, as it was at the time of tender, as well as correct any
Defects not caused by a Client’s risk;
order to fulfil the obligation to complete the service for the tendered total of the Prices.
that item later turns out to be different to that which the Contractor estimated at time of tender. The only
basis for a change to the (lump sum) Prices is because of a compensation event.
Format of the price list
(From the example given in Chapter 5 of the TSC4 Preparing a Term Service Contract User Guide)
Entries in the first four columns in the price list in section C2.2 are made either by the Client or the tendering
contractor.
If the Contractor is to be paid an amount for the item which is not adjusted if the quantity of work in the item
changes, the tendering contractor enters the amount in the Price column only, the Unit, Expected Quantity and
Rate columns being left blank.
If the Contractor is to be paid an amount for an item of work which is the rate for the work multiplied by the
quantity completed, the tendering contractor enters the rate which is then multiplied by the Expected Quantity to
produce the Price, which is also entered.
If the Contractor is to be paid a Price for an item proportional to the length of time for which a service is provided,
a unit of time is stated in the Unit column and the expected length of time (as a quantity of the stated units of
time) is stated in the Expected Quantity column.
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
C2.2: The price list Option A
Item nr Description Unit Expected Rate Price
Quantity
The total of the Prices
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
Part C3 Scope of Work
C3.1: The Client’s scope
S 100 Description of the service
S 105 Client’s objectives Komatiland Forests (KLF) enumeration requirements cover an area of 120,000 hectares
(ha), from north and east of Louis Trichardt (Entabeni plantation) to south of Vryheid
(Ngome plantation).
Forest enumeration is a highly specialised activity conducted to obtain essential current
parameters within each compartment, including diameter at breast height (DBH), stems
per hectare, and tree height. It is therefore critical that enumeration teams deliver
consistently accurate results. Accuracy and quality of work, rather than the quantity of
work completed, will remain the key performance measures.
S 110 Description of the The following types of enumerations will be conducted:
service (general only)
lift. Purpose: update growth parameters (e.g., site index SI20) and allocate appropriate
silvicultural prescriptions (regimes) for the compartment.
marking quality to ensure the largest trees are retained, recalibrate growth models for
accurate volume projections, and estimate product volumes at thinning. The assessment
remains valid for three years and applies only to compartments larger than 3.0 ha, which
must still be marked.
operation. Purpose: update growth parameters to predict standing volume and project
future volumes accurately.
growth parameters and predict product volumes for comparison with actual harvested
volumes. Valid for two years.
Plot Centre
The GPS gridlines guide navigation to plot centres. The transponder pole marks the centre.
Follow these procedures:
transponder pole.
to mark plots will result in re-enumeration at the contractor’s expense.
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
Plot Boundary
Use the Vertex to determine which trees fall within the plot radius (distance from the
Vertex to the
transponder).
inclusion.
the transponder during readings.
DBH Measuring
Apply the following procedures:
o Pine: DBH ≥ 10 cm
o Eucalyptus: DBH ≥ 8 cm
Height Measuring
Follow these guidelines:
S 200 Constraints on how the Contractor Provides the Service
S 205 General The Contractor shall provide and perform all services necessary for the proper execution and
constraints completion of the works, including planning, supervision, administration, mobilisation,
coordination, safety management, quality control, environmental compliance, and site
housekeeping. Unless specifically stated otherwise, the costs associated with these services
shall be deemed to be included in the contract rates and prices, and no separate payment
shall be made. The Contractor remains responsible for ensuring that all services are delivered
in accordance with the contract requirements.
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
S 210 Confidentiality Resources must maintain highest level of confidentiality with regards to information they
will access.
S 215 Security and The Supplier shall ensure that all personnel accessing SAFCOL’s premises comply with
protection of the SAFCOL’s security and identification protocols.
Service Areas
S 220 Security & The Supplier shall ensure that all personnel accessing SAFCOL’s premises comply with
identification of people SAFCOL’s security and identification protocols.
This includes:
SAFCOL reserves the right to deny entry or remove any individual who does not comply with
these requirements.
S 225 Protection of The Contractor shall take all necessary measures to protect existing property, infrastructure,
Affected Property services, equipment, and the surrounding environment that may be affected by the execution
of the works. Any damage caused by the Contractor's operations shall be promptly repaired
or reinstated at the Contractor's cost to the satisfaction of the Employer. Appropriate
precautions, barriers, warning signs, and safe working practices shall be implemented to
prevent damage, disruption, or injury throughout the duration of the contract.
S 245 Industrial The Supplier is responsible for managing all industrial relations matters related to its
relations employees engaged in the execution of this contract.
The Supplier shall:
Relations Act, Basic Conditions of Employment Act, and relevant bargaining council
agreements (if applicable);
themselves appropriately when accessing Client premises;
execution of the contract;
delivery of services or performance under the contract;
disruption to services.
The Client may refuse entry to or request the removal of any personnel who, in their
reasonable opinion, pose a safety risk, breach site rules, or fail to comply with labour and
behavioural expectations
S 250 Control of works The Contractor shall plan, manage, supervise, and coordinate all aspects of the works to
ensure that activities are carried out safely, efficiently, and in accordance with the contract
requirements. Adequate resources, competent personnel, and effective communication shall
be maintained throughout the execution of the works. The Contractor shall monitor progress,
implement corrective actions where necessary, and ensure compliance with all quality,
environmental, and health and safety requirements. The Employer or Employer's
Representative may monitor the works to verify compliance with the contract.
S 255 Cleanliness The supplier shall ensure that the vehicles and personnel always maintain highest level of
hygiene.
S 260 Waste materials The Contractor shall manage, handle, store, transport, and dispose of all waste materials
generated during the execution of the works in accordance with applicable environmental
legislation, site requirements, and good industry practices. Waste shall be removed regularly
to maintain a safe and orderly worksite. Hazardous and non-hazardous waste shall be
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
segregated and disposed of at approved facilities. The Contractor shall be responsible for
preventing pollution and shall leave the site clean and free of waste upon completion of the
works.
S 270 BBB-EE As per tender requirements
Qualifications
Experience
Name (2)
Qualifications
Experience
11.2(8) The following matters will be included in the Early Warning Register:
2 The Contractor’s main responsibilities
Quality Management
Source: Draft TSC4 Enumeration Services.pdf (unknown)40.2 The period after the Contract Date within which the Contractor is to
submit a quality policy statement and quality plan is
Not applicable
5 Payment
51.1 The currency of the contract is the South African Rand
If the period in which payments are made is not three weeks
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
51.2 The period within which payments are made is 30 days from date of invoice
6 Compensation events
Compensation events are as defined in Clause 60 of the NEC4 Term Service Contract and shall be managed, assessed,
and implemented in accordance with Clauses 61 to 66.
7 Title
There is no reference to Contract Data in this section of the core clauses and terms in italics
used in this section are identified elsewhere in this Contract Data.
8 Liabilities and insurance
If there are additional Client’s liabilities
80.1 These are additional Client's liabilities
83.3 Insurance Table The minimum amount of cover for insurance against loss of or damage to property (except
row 3 Plant, Materials and Equipment) and liability for bodily injury to or death of a person (not
an employee of the Contractor) arising from or in connection with the Contractor Providing
the Service for any one event is:
whatever the Contractor deems necessary in addition to that provided by the Client.
83.3 Insurance Table The minimum amount of cover for insurance against death of or bodily injury to employees
row 4 of the Contractor arising out of and in the course of their employment in connection with
the contract for any one event is:
as prescribed by the Compensation for Occupational Injuries and Diseases Act No. and the Contractor’s common law liability for people falling outside the scope of the
Act with a limit of cover of not less than ________ ( Rands).
31.2 The starting date is
30.1 The service period is: 36 months
4 Quality management
40.2 The period after the Contract Date within which the Contractor is to
submit a quality policy statement and quality plan is
timely, and successful completion of the works in accordance with the contract requirements.
S 1000 Services and other things to be provided
S 1005 Services and The Contractor shall provide all services, facilities, equipment, information, documentation,
other things provided access, and reasonable assistance required by the Client, Service Manager, or other
by the Contractor for authorised parties to facilitate the execution, supervision, inspection, testing, monitoring, and
the use by the Client, administration of the works. Such provisions shall be made available as required by the
Pricing Schedule
Source: Draft TSC4 Enumeration Services.pdf (unknown)Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work
Part C4 Affected Property
and drawings and documents (or parts thereof), which may be incorporated by reference into the above listed Parts.
11.2(21) The price list is in Part C2 Pricing Data
communications
Data for Short Schedule of Cost Components (only used with Option A)
11.2(28) and SSCC 11 The people rates are
category of person unit rate
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
Part C2 Pricing Data
C2.1 Pricing assumptions Option A Priced contract with Price List
the work of the Contractor, the Client or Others.
(27) The People Rates are the people rates unless later changed in accordance with
the contract.
(28) The Prices are the amounts stated in the Price column of the Price List. Where
a quantity is stated for an item in the Price List, the Price is calculated by
multiplying the quantity by the rate.
Defects not caused by a Client’s risk;
order to fulfil the obligation to complete the service for the tendered total of the Prices.
that item later turns out to be different to that which the Contractor estimated at time of tender. The only
basis for a change to the (lump sum) Prices is because of a compensation event.
facilities shall be deemed to be included in the contract rates and prices.
Tsc 23.2
S 1010 Services and An A3 Map with the locations of KLF plantations or GPS coordinates will be provided that
other things to be will assist with the cost calculation for bidders.
provided by the Client.
Financial Requirements
Source: Draft TSC4 Enumeration Services.pdf (unknown)Pricing under Option A (Priced contract with Price List):
Payment terms:
Insurance:
Liability:
Compliance Requirements
Source: Draft TSC4 Enumeration Services.pdf (unknown)B-BBEE: As per tender requirements.
Local labour: Must source local labour from surrounding communities where possible.
Statutory compliance: Must comply with all applicable legislation including Occupational Health and Safety Act 1993, Compensation for Occupational Injuries and Diseases Act, Basic Conditions of Employment Act, Labour Relations Act, National Minimum Wage Act, Protection of Personal Information Act, environmental and forestry legislation, and municipal by-laws.
Security: All personnel must comply with SAFCOL security and identification protocols, including carrying valid ID, site induction, and access control.
Confidentiality: Highest level of confidentiality required for information accessed.
Subcontracting: Only with prior written approval; contractor remains fully responsible.
Ethics: Any corrupt practice is grounds for termination.
Cession: No cession, delegation, or assignment without written consent.
B-BBEE Requirements
Source: Draft TSC4 Enumeration Services.pdf (unknown)BBB-EE requirements are as per tender requirements. The tender must as far as possible, source local labour from surrounding communities.
Health & Safety
Source: Draft TSC4 Enumeration Services.pdf (unknown)signature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and Acceptance.
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
C1.2 TSC4 Contract Data
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
W1.4(1), W2.4(1) and The tribunal is Arbitration
W3.3(1)
W1.4(5), W2.4(4) and The arbitration procedure is the latest edition of Rules for the Conduct of Arbitrations
W3.3(4) published by The Association of Arbitrators (Southern
Africa) or its successor body.
Tsc 23.1
Property: TSC 60.1(6)
Tsc 71.2
Tsc 92.1
S 1025 Statutory The Supplier shall comply with all applicable statutory and regulatory requirements in
requirements performing the contract, including but not limited to legislation, regulations, by-laws, and
mandatory industry standards in force from time to time.
S 1100 Health and safety
addition to the requirements of law
Refer to section 3.2 for guidance on the inclusion of health and safety information in the Scope.
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
S 1105 Health and (i) All personnel performing work on site/s as part of this contract are required to obtain
safety requirements safety induction.
(ii) Over and above the obligations provided by the Occupational Health and Safety Act
Tsc 25.4
(OHS Act No and its Regulations, known as ‘the Act’), the Contractor must meet
with all relevant health and safety instructions as given to them by site safety personnel,
where relevant. Personal protection equipment including closed safety shoes, hard hats,
height safety equipment, and high visibility vests are worn at all times while on the Site. All
personnel are to obey the relevant instructions, including signage related to restricted
access on sites.
(iii) SAFCOL manages the Contractor in its capacity for the execution of this contract to
meet the provisions of the said Act and the regulations promulgated in terms thereof. The
Contractor’s team, submit a signed indemnity form prior to entering the Site and keep it in
the Contractor’s health and safety file where relevant.
S 1115 Statutory The Contractor shall comply with all applicable legislation, regulations, by-laws, codes of
requirements practice, permits, licences and statutory requirements applicable to the provision of
enumeration services in the Republic of South Africa, including but not limited to:
S 1200 Subcontracting
S 1205 Restrictions or The Contractor may subcontract portions of the work only with the prior approval of the
requirements for Employer or Employer's Representative, where required by the contract. The Contractor
subcontracting remains fully responsible and accountable for the performance, quality, safety, and
compliance of all subcontracted work. Subcontracting shall not relieve the Contractor of any
contractual obligations, and all subcontractors must comply with the conditions,
specifications, and requirements of the contract.
S 1210 Acceptance The Contractor submits the proposed subcontractor's details for review and approval. The
procedures Employer or Employer's Representative evaluates the subcontractor's qualifications,
experience, capacity, and compliance with contractual, legal, and safety requirements. Upon
TSC4 C, E 11.2(24) successful assessment, formal written approval is issued
S 1300 Work call off arrangements.
S 1305 Works and Work instructions will be issued as and when required, indicating the scope, location, and
services subject to call required completion dates. Resources shall be mobilised upon receipt of a valid call-off
off instruction, and all work shall be carried out in accordance with the agreed contract terms,
specifications, and safety requirements.
S 1310 Call off The Employer issues a formal Call-Off Instruction specifying the scope, location, quantities,
procedure. and required completion period. Upon receipt, the Contractor acknowledges the instruction,
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
mobilises the necessary resources, and executes the work in accordance with the contract
requirements. Progress is monitored throughout execution, and upon completion, the work
is inspected, certified, and processed for payment. The call-off is formally closed once all
required documentation has been submitted and accepted.
S 2000 Low performance damages (Option X17)
S 2005 Service level If the average deviation concerning diameter and/or stems per ha, of a compartment exceeds the
requirements above-mentioned percentages, then the team will redo the compartment at their cost.
Environmental
Source: Draft TSC4 Enumeration Services.pdf (unknown)S 255 Cleanliness The supplier shall ensure that the vehicles and personnel always maintain highest level of
hygiene.
S 260 Waste materials The Contractor shall manage, handle, store, transport, and dispose of all waste materials
generated during the execution of the works in accordance with applicable environmental
legislation, site requirements, and good industry practices. Waste shall be removed regularly
to maintain a safe and orderly worksite. Hazardous and non-hazardous waste shall be
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
segregated and disposed of at approved facilities. The Contractor shall be responsible for
preventing pollution and shall leave the site clean and free of waste upon completion of the
works.
S 270 BBB-EE As per tender requirements
requirements
S275 Use of local labour The tender must as far as possible, source local labour from surrounding communities.
S 800 Management of the service
S 805 Contract team – The Contractor and the Service Manager use the requirements of the early warning
Others processes described in core clause 15, to in addition manage the progress of the service
inclusive of
planned activities for the coming 4 weeks,
required in terms of the contract, and in doing so
who attend and
Contractual Terms
Source: Draft TSC4 Enumeration Services.pdf (unknown)There is no reference to Contract Data in this section of the core clauses
Resolving and avoiding disputes
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
W1.4(1), W2.4(1) and The tribunal is Arbitration
W3.3(1)
W1.4(5), W2.4(4) and The arbitration procedure is the latest edition of Rules for the Conduct of Arbitrations
W3.3(4) published by The Association of Arbitrators (Southern
Africa) or its successor body.
The place where arbitration is Anywhere in Gauteng, South Africa
to be held is
The person or organisation who will choose an arbitrator if the Parties cannot agree a
choice or if the arbitration procedure does not state who selects an arbitrator, is
The Chairman for time being or his nominee of the Association of Arbitrators (Southern
Africa) or its successor body.
W1.1(1) The Senior Representatives of the Client are
Name (1)
Address for communications
Address for electronic
communications
Name (2)
Address for communications
Address for electronic
communications
W1.2 The Adjudicator is (Name) the person selected from the ICE-SA Division (or
[It is always preferable to name the Adjudicator its successor body) of the South African
at time of award. If this can be done delete this Institution of Civil Engineering Panel of
data and insert the name and contact details
below.] Adjudicators by the Party intending to refer a
dispute to him. (see www.ice-sa.org.za
Address for communications ___
Address for electronic
communications
The Adjudicator nominating body is: the Chairman of ICE-SA a joint Division of the
South African Institution of Civil Engineering
and the London Institution of Civil Engineers.
(See www.ice-sa.org.za ) or its successor body.
X17: Low performance damages
X17.1 The service level table is
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
If the average deviation concerning diameter and/or stems per ha, of a compartment exceeds the above-
mentioned percentages, then the team will redo the compartment at their cost.
If only the deviation in tree height exceeds the above-mentioned percentages, then no fine will be given.
Only the heights must be remeasured.
The Forest Planner unauthorized the enumeration with the wrong tree heights until the tree heights were
replaced by the re-measured tree heights. Process and authorize the enumeration again with the correct
tree heights.
If more than two compartments exceed the maximum allowable deviation, then a written warning will be
given to the enumeration contractor.
If the plots are not marked in the field and/or no GPS points are received, then a 20% reduction in
tendered price per plot will be applied for these plots.
X18: Limitation of liability
X18.2 The Contractor’s liability to the Client for indirect or
consequential loss is limited to:
R
X18.3 For any one event, the Contractor’s liability to the Client for
loss of or damage to the Client’s property is limited to:
R
X18.4 The Contractor’s liability for Defects due to its design of an
item of Equipment is limited to Not Applicable
X19: Termination by either Party
X18.6 The minimum period of service is 36 months after the starting date.
The notice period is 60 days prior to expiry of contract
X23: Extending the Service Period
The maximum service period is 12 months after the starting date.
The periods for extension are
Order period for extension (months) notice date
First
Second
Third
Fourth
The criteria for extension are
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
(1) In progress of placing a new contract
Z: Additional conditions of contract
The additional conditions of contract are
1 Mandatory probation period
Z1.1 Service providers will be placed on a mandatory three (3) month probation period
commencing upon award of the contract. The NEC4 Term Service Contract (TSC) agreement will
be signed; however, should any of the required conditions not be fully met or implemented, the
applicable termination clause will be enforced.
2 Cession delegation and assignment
Z2.1 The Supplier does not cede, delegate or assign any of its rights or obligations to any
person without the written consent of the Purchaser.
Z2.2 Notwithstanding the above, the Purchaser may on written notice to the Supplier cede and
delegate its rights and obligations under this contract to any of its subsidiaries.
3 Ethics
Z3.1 Any offer, payment, consideration, or benefit of any kind made by the Supplier, which
constitutes or could be construed either directly or indirectly as an illegal or corrupt practice, as
an inducement or reward for the award or in execution of this contract constitutes grounds for
terminating the Supplier’s obligation to Provide the Goods and Services or taking any other
action as appropriate against the Supplier (including civil or criminal action).
Z3.2 The Purchaser may terminate the Supplier’s obligation to Provide the Goods and Services if
the Supplier (or any member of the Supplier where the Supplier constitutes a joint venture,
consortium or other unincorporated grouping of two or more persons or organisations) is found
guilty by a competent court, administrative or regulatory body of participating in illegal or
corrupt practices.
Such practices include making of offers, payments, considerations, or benefits of any kind or
otherwise, whether in connection with any procurement process or contract with the Purchaser
or other people or organisations and including in circumstances where the Supplier or any such
member is removed from an approved vendor data base of the Purchaser as a consequence of
such practice.
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
Part 2 – Data provided by the Contractor
1 General
10.1 The Contractor is
Name
Address for communications
Address for electronic communications
11.2(20) &16.3 The service areas are All Plantations
24.1 The key persons are
Name (1)
Job
Responsibilities
Deviations (if any), contact the Client’s agent (whose details are given in the Contract Data) to arrange the delivery of
any securities, bonds, guarantees, proof of insurance and any other documentation to be provided in terms of the
conditions of contract identified in the Contract Data at, or just after, the date this agreement comes into effect. Failure
to fulfil any of these obligations in accordance with those terms shall constitute a repudiation of this agreement.
11.1 The conditions of contract are the core clauses and the clauses for the following main
Option, the Option for resolving and avoiding disputes and secondary Options of the NEC4
Term Service Contract, June 2017 (with amendments January 2019).
Main Option A – Priced contract with price list
Option for resolving and avoiding disputes W1
Secondary Options X2 – Changes in Law
X17 – Low service damages
X18 – Limitation of liability
X19 – Termination by either party
X23 – Extending the service period
Z – Additional conditions of contract
11.2(15) The service is Provision enumeration services at KLF plantations
10.1 The Client is
Name Komatiland Forest SOC Limited (KLF)
If there are additional Client’s liabilities
80.1 These are additional Client's liabilities
83.3 Insurance Table The minimum amount of cover for insurance against loss of or damage to property (except
row 3 Plant, Materials and Equipment) and liability for bodily injury to or death of a person (not
an employee of the Contractor) arising from or in connection with the Contractor Providing
the Service for any one event is:
whatever the Contractor deems necessary in addition to that provided by the Client.
83.3 Insurance Table The minimum amount of cover for insurance against death of or bodily injury to employees
row 4 of the Contractor arising out of and in the course of their employment in connection with
the contract for any one event is:
as prescribed by the Compensation for Occupational Injuries and Diseases Act No. and the Contractor’s common law liability for people falling outside the scope of the
Act with a limit of cover of not less than ________ ( Rands).
9 Termination
communications
W1.2 The Adjudicator is (Name) the person selected from the ICE-SA Division (or
[It is always preferable to name the Adjudicator its successor body) of the South African
at time of award. If this can be done delete this Institution of Civil Engineering Panel of
data and insert the name and contact details
below.] Adjudicators by the Party intending to refer a
dispute to him. (see www.ice-sa.org.za
Address for communications ___
given to the enumeration contractor.
If the plots are not marked in the field and/or no GPS points are received, then a 20% reduction in
tendered price per plot will be applied for these plots.
X18: Limitation of liability
X18.2 The Contractor’s liability to the Client for indirect or
consequential loss is limited to:
R
X18.3 For any one event, the Contractor’s liability to the Client for
loss of or damage to the Client’s property is limited to:
R
X18.4 The Contractor’s liability for Defects due to its design of an
item of Equipment is limited to Not Applicable
X19: Termination by either Party
X18.6 The minimum period of service is 36 months after the starting date.
The notice period is 60 days prior to expiry of contract
X23: Extending the Service Period
The maximum service period is 12 months after the starting date.
Z1.1 Service providers will be placed on a mandatory three (3) month probation period
commencing upon award of the contract. The NEC4 Term Service Contract (TSC) agreement will
be signed; however, should any of the required conditions not be fully met or implemented, the
applicable termination clause will be enforced.
S 200 Constraints on how the Contractor Provides the Service
S 205 General The Contractor shall provide and perform all services necessary for the proper execution and
constraints completion of the works, including planning, supervision, administration, mobilisation,
coordination, safety management, quality control, environmental compliance, and site
housekeeping. Unless specifically stated otherwise, the costs associated with these services
shall be deemed to be included in the contract rates and prices, and no separate payment
shall be made. The Contractor remains responsible for ensuring that all services are delivered
in accordance with the contract requirements.
NEC4 Term Service Contract (TSC4) of 22
Appointment of a service provider to render enumeration services for a period of three (3) years
S 210 Confidentiality Resources must maintain highest level of confidentiality with regards to information they
will access.
S 215 Security and The Supplier shall ensure that all personnel accessing SAFCOL’s premises comply with
protection of the SAFCOL’s security and identification protocols.
agreements (if applicable);
themselves appropriately when accessing Client premises;
execution of the contract;
delivery of services or performance under the contract;
disruption to services.
reasonable opinion, pose a safety risk, breach site rules, or fail to comply with labour and
behavioural expectations
S 250 Control of works The Contractor shall plan, manage, supervise, and coordinate all aspects of the works to
ensure that activities are carried out safely, efficiently, and in accordance with the contract
requirements. Adequate resources, competent personnel, and effective communication shall
be maintained throughout the execution of the works. The Contractor shall monitor progress,
implement corrective actions where necessary, and ensure compliance with all quality,
environmental, and health and safety requirements. The Employer or Employer's
Special Conditions
Source: Draft TSC4 Enumeration Services.pdf (unknown)The Contractor shall provide and perform all services necessary for the proper execution and completion of the works, including planning, supervision, administration, mobilisation, coordination, safety management, quality control, environmental compliance, and site housekeeping. Costs associated with these services shall be deemed to be included in the contract rates and prices. Resources must maintain the highest level of confidentiality with regards to information they will access. The Supplier shall ensure that all personnel accessing SAFCOL's premises comply with SAFCOL's security and identification protocols, including always carrying valid identification while on site, undergoing site induction where required, and adhering to access control procedures. SAFCOL reserves the right to deny entry or remove any individual who does not comply. The Contractor shall take all necessary measures to protect existing property, infrastructure, services, equipment, and the surrounding environment. Any damage caused by the Contractor's operations shall be promptly repaired or reinstated at the Contractor's cost. The Supplier is responsible for managing all industrial relations matters related to its employees, ensuring compliance with all applicable labour laws and regulations, maintaining a professional and disciplined workforce, ensuring no unlawful industrial action interferes with execution, and promptly notifying the Client of any potential or actual labour disputes. The Contractor shall plan, manage, supervise, and coordinate all aspects of the works. The supplier shall ensure that vehicles and personnel always maintain the highest level of hygiene. The Contractor shall manage, handle, store, transport, and dispose of all waste materials in accordance with applicable environmental legislation, site requirements, and good industry practices. Hazardous and non-hazardous waste shall be segregated and disposed of at approved facilities. The Contractor shall be responsible for preventing pollution and shall leave the site clean and free of waste upon completion. The Contractor may subcontract portions of the work only with the prior approval of the Employer or Employer's Representative. The Contractor remains fully responsible and accountable for the performance, quality, safety, and compliance of all subcontracted work. The Contractor submits the proposed subcontractor's details for review and approval. Low performance damages: If the average deviation concerning diameter and/or stems per ha of a compartment exceeds the allowable percentages, the team will redo the compartment at their cost. If only the deviation in tree height exceeds the allowable percentages, no fine will be given but heights must be remeasured. If more than two compartments exceed the maximum allowable deviation, a written warning will be given. If plots are not marked in the field and/or no GPS points are received, a 20% reduction in tendered price per plot will be applied. Additional conditions of contract: Service providers will be placed on a mandatory three (3) month probation period commencing upon award of the contract. The Supplier does not cede, delegate or assign any of its rights or obligations to any person without the written consent of the Purchaser. Any offer, payment, consideration, or benefit of any kind made by the Supplier which constitutes or could be construed as an illegal or corrupt practice constitutes grounds for terminating the Supplier's obligation to Provide the Goods and Services.
Section
Source: Draft TSC4 Enumeration Services.pdf (unknown)4 Quality management
submit a quality policy statement and quality plan is
Description
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Appointment of a service provider to render enumeration services for three years for SAFCOL's subsidiary Komatiland Forests (KLF). Coverage: 120,000 hectares from north/east of Louis Trichardt (Entabeni) to south of Vryheid (Ngome). Forest enumeration obtains diameter at breast height (DBH), stems per hectare, and tree height. Accuracy and quality are key performance measures. Estimated areas: 2026 18,861 ha; 2027 18,353 ha; 2028 17,537 ha; average 18,250 ha. A3 map or GPS coordinates of plantations provided for cost calculation.
Important Dates
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Compulsory briefing session: 19 August 2026, 11H00-12H30, on Microsoft Teams (link provided). Failure to attend disqualifies. Closing date for questions/enquiries: 28 August 2026 at 12H00. Closing date: 04 September 2026 at 12H00. Bid validity: 90 days from closing date.
Contact Information
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)SCM inquiries: Ms. Lungile Moeketsi, [email protected]. Technical inquiries: Elvona Goliath, [email protected]. Submission address: SAFCOL Nelspruit Office, ABSA Square, 3rd Floor Reception, 20 Paul Kruger Street, Mbombela, Nelspruit.
Submission Guidelines
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Bids must be hand-delivered or couriered to the SAFCOL Nelspruit Office, ABSA Square, 3rd Floor Reception, 20 Paul Kruger Street, Mbombela, Nelspruit. The bid box is accessible 08h00 to 16h30 weekdays. Late bids are not accepted. Bids must be on official forms, not retyped, and signed in black ink. Submit an original and a copy. Returnable forms: SBD 1 (Invitation to Bid), SBD 3.1 (Pricing Schedule), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), plus certified CIPC registration or share certificates, consortium work-split breakdown, mandatory criteria responses, and CSD registration summary. Bids from RSA-based bidders cannot be submitted by email or internet. Disqualification risks: missing or unsigned forms, late delivery, incomplete information, false declarations, own terms and conditions, or non-attendance at the compulsory briefing.
Returnable Documents
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Checklist of documents to be submitted: Original bid document and a copy; SBD 1: Invitation to Tender (with signature of authorized representative); Specifications, Conditions of tender and Undertakings by Tenderer (with signature); SBD 3.1 Pricing Schedule; SBD 4 - Bidder's disclosure; SBD 6.1 Preference Point Claim Form; Certified copies of CIPC company registration documents listing all members with percentages (for close corporations); Certified copies of latest share certificates (for companies); A breakdown of how fees and work will be spread between members of the tendering consortium; Supporting documents to responses to Mandatory Criteria; Supporting documents – Central Supplier Database Registration Summary Report.
Evaluation Criteria
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Evaluation by a SAFCOL panel. 80/20 preference point system applies. Maximum 80 points for price, 20 for specific goals. Price points formula: Ps = 80(1 - (Pt - Pmin)/Pmin). Specific goals: black women owned entities (at least 30% ownership) 5 points, proof ID/CIPC/BBBEE certificate or affidavit; black owned entities (at least 51%) 10 points, proof BBBEE certificate or sworn affidavit; youth owned entities (at least 51%) 3 points, proof ID/CIPC; entities owned by persons with disabilities (at least 51%) 2 points, proof letter from medical doctor. Failure to submit proof means no points claimed. SAFCOL may conduct oral presentations, benchmarks, and pre-award surveys.
Technical Specifications
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Scope: conduct forest enumerations on all Komatiland Forests (KLF) plantations, covering 120,000 hectares from north/east of Louis Trichardt (Entabeni) to south of Vryheid (Ngome). Four enumeration types: Early (after first pruning, update growth parameters), Thinning Control (after thinning marked, valid 3 years, compartments >3.0 ha), Working Plan (5-year intervals, predict standing volume), Pre-Clearfell (within 2 years of clearfelling, valid 2 years). Estimated areas per year: 2026 18,861 ha; 2027 18,353 ha; 2028 17,537 ha; average 18,250 ha. Bidders quote per plot size (300 m2 or 500 m2). Contractor provides transport, accommodation, equipment (laptops, electronic calipers, Vertex hypsometers, GPS with 5 m accuracy, paint, brushes, PPE). Teams: 1 team = 2 people, estimated 6 teams per year. Data captured electronically for Microforest. Plot layout: systematic sampling with circular plots, grid overlays from GIS shape files. Plot sizes: 300 m2 when first plot >50 stems; radii 12.62 m (500 m2) and 9.77 m (300 m2). Mark plot centers with painted stick at least 30 cm tall; failure to mark results in re-enumeration at contractor's expense. DBH measured at 1.3 m with electronic calipers; exclude dead/broken trees; natural regeneration thresholds pine ≥10 cm, eucalyptus ≥8 cm. Heights via Vertex, accurate to 10 cm, at least 40 per compartment, one per plot minimum. Pruning height measured on one tree per plot. Areas of special interest (e.g., grave sites) captured with GPS. Monthly audits by Regional Forest Planners: minimum 8 compartments per region, 5 plots re-measured per compartment.
Methodology
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Enumeration types: Early (unthinned pine after first pruning, update growth parameters and silvicultural prescriptions); Thinning Control (after thinning marked, evaluate marking quality, recalibrate growth models, estimate product volumes, valid 3 years, compartments >3.0 ha); Working Plan (5-year intervals after last thinning, predict standing volume); Pre-Clearfell (within 2 years of clearfelling, predict product volumes). Data captured electronically for Microforest. Equipment: electronic calipers for DBH and height/DBH pairs; Vertex hypsometer for plot radius and tree heights; GPS for maps, plot centers, navigation. Teams: 1 team = 2 people, estimated 6 per year. Plot layout: systematic sampling, grid overlays from GIS, plot sizes 300 m2 or 500 m2 (300 m2 if first plot >50 stems; radii 12.62 m and 9.77 m). Plot center: place transponder pole vertically, capture with GPS, assign plot number, mark with painted stick ≥30 cm, number nearest unmarked tree facing cruising line. Plot boundary: Vertex readings, border trees need two readings from opposite sides, hold Vertex at mid-diameter height. DBH: electronic calipers, all three sides touch stem, horizontal, at 1.3 m, on slopes measure from side facing transponder, exclude dead/broken trees, oval stems measure smallest, measure all planted trees, natural regeneration thresholds (pine ≥10 cm, eucalyptus ≥8 cm), do not measure different genus, double stems measure largest. Height: Vertex with red crosshair, DBH for every height tree, heights in meters accurate to 10 cm, at least 40 per compartment with one per plot minimum, mark with painted dot, select across DBH range, exclude broken/forked/leaning/abnormal/dead/dying, on slopes same contour level, maintain one tree length distance, wait for stabilization in wind. Pruning height: one tree per plot (first DBH/height tree), recorded on GPS, just below lowest branch. Areas of special interest (e.g., grave sites) captured with GPS. Audits: monthly by Regional Forest Planners, 8 compartments per region, 5 plots re-measured, diameters compared.
Experience & Qualifications
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)SAFCOL requires bidders to demonstrate commitment and track record in B-BBEE areas: ownership, skills transfer, employment equity, and procurement practices (SMME development). The bid is subject to the Preferential Procurement Policy Framework Act and Preferential Procurement Regulations 2022.
Quality Management
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Accuracy and quality of enumeration work are key performance measures, not quantity. Data integrity is critical for management decisions, forecasts, and volume estimates. Enumerations must follow KLF procedures. Monthly audits by Regional Forest Planners: minimum 8 compartments per region, 5 plots re-measured per compartment, diameters compared with original enumeration. Failure to mark plots results in re-enumeration at contractor's expense.
Pricing Schedule
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Total bid price (including VAT) mandatory and must match pricing schedule; if different, pricing schedule figure prevails. All prices VAT inclusive in ZAR. State whether rates firm for full period; if not, provide adjustment basis (e.g., CPI) and cost breakdown. No price adjustments 100% linked to exchange rate variations. Indicate which portion of service price and monthly costs is exchange-rate linked. All additional costs specified. Offer valid 90 days from closing date.
Financial Requirements
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Total bid price (including VAT) is mandatory and must match the pricing schedule; if different, the pricing schedule figure prevails. All prices VAT inclusive in ZAR. State whether rates are firm for the full contract period; if not, provide adjustment basis (e.g., CPI) and cost breakdown. No price adjustments 100% linked to exchange rate variations. Indicate which portion of price and monthly costs is exchange-rate linked. All additional costs must be specified. Offer valid 90 days from closing date. No interest payable on disputed accounts.
Compliance Requirements
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)CSD registration mandatory; tender not awarded to unregistered bidders (foreign suppliers with no local entity exempt). Tax compliance: submit SARS PIN, printed TCS, or CSD number; each JV/consortium/subcontractor party must submit separate proof. No bids from persons in state service or companies/CCs with state-employed directors/members. B-BBEE certificate or sworn affidavit (for EMEs/QSEs) required for preference points. Returnable forms: SBD 1, SBD 3.1, SBD 4, SBD 6.1. Certified CIPC registration (CC) or share certificates (company). Signed consortium/JV/subcontractor agreements with work split and rand value. Proof of authority to sign (e.g., board resolution). COIDA registration and good standing with Compensation Fund. SAFCOL Supplier Code of Conduct (SCM-DOC-001) compliance mandatory.
B-BBEE Requirements
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)SAFCOL applies PPPFA and Preferential Procurement Regulations 2022. B-BBEE certificate or sworn affidavit (EMEs/QSEs) required for preference points. Specific goals: black women owned entities (≥30% ownership) 5 points; black owned entities (≥51%) 10 points; youth owned entities (≥51%) 3 points; entities owned by persons with disabilities (≥51%) 2 points. Proof required: ID/CIPC documents, BBBEE certificate or affidavit, medical doctor letter.
Health & Safety
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Bidder warrants all employees and subcontractors are covered under the Compensation for Occupational Injuries and Diseases Act, with cover maintained through adjudication and contract. SAFCOL may request proof of registration and good standing with the Compensation Fund. Contractor must provide Personal Protective Equipment to workers. Compliance with safety rules, standards, regulations, and company policies is compulsory.
Contractual Terms
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Contract governed by South African law; bidders choose domicilium citandi et executandi in RSA. Bidders' own terms and conditions are not acceptable. Bidder accepts full responsibility for contract execution. SAFCOL not liable for bid preparation costs. SAFCOL may cancel or reject any proposal, not accept lowest bid, split award, or not award. SAFCOL may request written clarification; failure to respond in time may disqualify. SAFCOL may conduct benchmarks and pre-award surveys. Withdrawal before validity expiry may incur costs. Correspondence by registered post deemed received after 2 days. If parties fail to agree on price adjustments, SAFCOL may cancel with 90 days written notice. Amendments only valid if written and signed by SAFCOL. Failure to enforce provisions is not a waiver. Subcontractors: primary contractor manages contract; no separate contract with subcontractors; signed agreements attached. All services must comply with South African law. No interest on disputed accounts. Contract may be terminated if specifications disregarded. Bidder's response included in final contract. SAFCOL may extend validity; bidder must respond in writing. Changed wording in document reverts to original. Confidentiality obligations apply to bidder and partners; documentation surrendered on demand. Personal information processed only for evaluation and award. RFP stipulations take precedence over other documents; PPPFA applies where RFP silent. No additional stipulations unless clearly marked recommendations. Formal contract based on RFP, appendices, and proposal; verbal offers not binding.
Special Conditions
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Subject to GCC and special conditions. Comply with SAFCOL Supplier Code of Conduct (SCM-DOC-001); non-compliance disqualifies. No news releases without SAFCOL consent. Bids in English. Security clearances may be required for personnel (cost for bidder). Non-disclosure agreements required. COIDA coverage for all employees and subcontractors. Disqualification for incomplete, fraudulent, or untrue information, or listing on National Treasury restricted suppliers database. No involvement in drafting specifications. No disclosure of bid terms to competitors. No false declarations on Standard Bidding Documents.
Requirements
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Mandatory: CSD registration; tax compliance (SARS PIN, TCS, or CSD number); B-BBEE certificate or sworn affidavit; no state employees as directors/members; full and accurate answers to mandatory questions with 'Comply' or 'Do not Comply'; no own conditions; signed consortium/JV/subcontractor agreements with work split and rand value; certified CIPC registration (CC) or share certificates (company); breakdown of fees/work spread for consortium; supporting documents for mandatory criteria; CSD registration summary report.
Section
Source: RFB010.2026 - ENUMARATION FOR 3 YEARS.pdf (RFP)Evaluation panel established by SAFCOL. 80/20 preference point system. Maximum 80 points price, 20 specific goals. Price formula: Ps = 80(1 - (Pt - Pmin)/Pmin). Specific goals: black women owned (≥30%) 5 points; black owned (≥51%) 10 points; youth owned (≥51%) 3 points; PWD owned (≥51%) 2 points. Proof required for each goal; failure to submit proof means no points.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
210 Aramist Ave, Menlyn, Pretoria, 0081, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
12 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
060-960-6573[email protected]www.safcol.co.za210 Aramist Ave, Menlyn, Pretoria, 0081, South Africa
Key Personnel
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.