OR Tambo International Airport - Kempton Park - Johannesburg - 1627
Organization Type
GOVERNMENT
Published
16 Nov 2026
OCDS Reference
ocds-9t57fa-178323
Summary
The department requires maintenance of fire water pump stations, fire sprinklers, fire hose reels and fire hydrants at o.R. Tambo international airport for a six‑month period. Bidders must submit a fully completed and signed nec3 tsc form of offer and acceptance (c1.1) As the mandatory returnable at closing. The highest‑scoring bidder under the 80/20 price and preference evaluation will win, provided they meet the minimum 75/100 functionality score and all eligibility requirements.
Key Requirements
Bidders must submit the NEC3 TSC Form of Offer and Acceptance (C1.1) fully completed and signed by the closing time of 09 December 2026 at 12:00pm, using email to [email protected] with each attachment under 4 MB.
Bidders must provide a valid SARS tax compliance PIN (or CSD number if no PIN) and meet all tax compliance requirements.
Bidders must achieve a minimum functionality score of 75 out of 100 to be eligible for price and preference evaluation.
Bidders must present a B‑BBEE certificate and scorecard (or QSE/EME affidavit) and any required disability medical certificate to claim preference points.
Bidders must submit all mandatory returnable documents listed in Section 4, including the Declaration of Interest, SBD 4 Bidder’s Disclosure, SBD 6.1 Preference Points Claim, Confidentiality Agreement, and signed ACSA terms and conditions.
Bidders must ensure no person is counted in more than one resource role, that all foreign qualifications have a SAQA letter, and that the bid is not altered after closing; any of these omissions will disqualify the bid.
Request for quotation for the maintenance of fire water pump stations, fire sprinklers, fire hose reels and fire hydrants for a period of six (6) months at or tambo international airport.
OR Tambo International Airport - Kempton Park - Johannesburg - 1627
Professional Services & Consulting Industry Profile
Regulatory Bodies
SAGCSAICA
Tenders in this industry often require registration with these bodies.
Typical Documents
5 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
RFQTender document RFQ 74918 - 16 Nov 2026.pdfReview complete
Description
Source: Tender document RFQ 74918 - 16 Nov 2026.pdf
Important Dates
16 Nov
2026
Tender published
Tender Published
Tender was published
09 Dec
2026
Submission deadline
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFQ 74918 - NEC 3 TSC for Maintenance of fire water pump stations fire sprinklers fire hose reels and fire hydrants (002).pdf
Maintenance of fire water pump stations, fire sprinklers, fire hose reels and fire hydrants at O. R. Tambo International Airport for a period of six (6) months, under an NEC3 Term Service Contract (April 2013) with main Option A (priced contract with price list).
Maintenance of fire water pump stations, fire sprinklers, fire hose reels and fire hydrants at O.R. Tambo International Airport for a six-month period, covering fire suppression system servicing under an NEC3 Term Service Contract.
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Publication of Names of Bidders in Respect of Advertised Competitive for the Appointment of a Specialist Quality Control Inspectorate (QCI) Service Provider for a Period of six (06) years.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
ACSA requires a service provider to maintain the fire suppression infrastructure at O.R. Tambo International Airport for six months.
Fire water pump stations, including electric and diesel engine driven pumps.
Fire sprinkler systems.
Fire hose reels.
Fire hydrants.
The attached NEC3 Term Service Contract carries the full scope, bill of quantities and technical requirements.
Important Dates
Source: Tender document RFQ 74918 - 16 Nov 2026.pdf (RFQ)
Issue date: 16 November 2026
Clarification deadline: 23 November 2026 at 16:00
Briefing or site inspection: none scheduled
Closing: 09 December 2026 at 12:00
Contact Information
Source: Tender document RFQ 74918 - 16 Nov 2026.pdf (RFQ)
Black youth majority-owned: 5; black women majority-owned: 5; majority owned by persons with disabilities: 5.
Preference points not claimed with supporting proof at submission are forfeited.
Award
The highest points score wins unless objective criteria justify another bidder.
ACSA may split or part-award, negotiate with shortlisted bidders, reject the lowest acceptable bid, or cancel the bid.
Technical Specifications
Source: Tender document RFQ 74918 - 16 Nov 2026.pdf (RFQ)
Scope
Maintenance of fire water pump stations, fire sprinklers, fire hose reels and fire hydrants at O.R. Tambo International Airport.
Contract period: six months.
The full scope, bill of quantities and technical requirements sit in the attached NEC3 Term Service Contract (TSC).
Equipment covered
Fire water pumps, electric and diesel engine driven.
Fire sprinkler systems.
Fire hose reels.
Fire hydrants.
Minimum team to be proposed
1 site supervisor.
3 artisans.
3 assistants.
1 administrator or storeman.
Additional support resources improve the organogram score.
Site conditions
ACSA is a National Key Point; personnel may be security vetted and a bidder that fails vetting will not be contracted.
Experience & Qualifications
Source: Tender document RFQ 74918 - 16 Nov 2026.pdf
Site Supervisor (20 points: 10 qualification, 10 experience)
Qualification, 10 points: SAQA-accredited trade test as Fitter or Millwright, plus an N6 technical diploma or higher, plus an OHS training certificate.
Qualification, 6 points: SAQA-accredited trade test as Fitter or Millwright plus an OHS training certificate.
Experience, 10 points: more than 5 years post-trade-test on pump or fire sprinkler maintenance, at least 2 years supervisory, at least 2 years OHS.
Experience, 6 points: 3 to 4 years post-trade-test on pump or fire sprinkler maintenance, 2 years OHS, 2 years supervisory.
Qualification, 5 points: Electrical or Mechanical Engineering studies at N3 or higher.
Qualification, 3 points: N2.
Experience, 5 points: more than 2 years maintaining mechanical systems.
Experience, 3 points: 1 to 2 years.
Organogram (10 points)
10 points: balanced team of 1 supervisor, 3 artisans, 3 assistants and 1 administrator or storeman, with additional support resources and clearly allocated responsibilities.
6 points: the same core team without additional support resources.
0 points: unbalanced team or responsibilities not allocated.
Company references (10 points)
10 points: two or more references for installation or maintenance of water pump stations (electric and diesel driven pumps) or fire sprinklers.
6 points: one such reference.
0 points: none.
Each reference letter must be on the referee's letterhead, describe the work performed, give the contract start and end dates, and provide email and telephone contact details.
CVs must carry proof of qualifications and experience; foreign qualifications need a SAQA letter.
Pricing Schedule
Source: Tender document RFQ 74918 - 16 Nov 2026.pdf
Pricing form
SBD 3.3 Pricing Schedule (Professional Services) must be completed.
The Form of Offer and Acceptance in the NEC3 TSC contract must be completed and signed.
Rates and quantities are set out in the NEC3 TSC bill of quantities.
Prices must hold for 120 working days.
Award goes to the highest points scorer unless objective criteria justify another bidder.
Financial Requirements
Source: Tender document RFQ 74918 - 16 Nov 2026.pdf (RFQ)
Pricing
Complete the SBD 3.3 Pricing Schedule (Professional Services).
Complete the Form of Offer and Acceptance in the NEC3 TSC contract.
Rates and quantities are priced in the NEC3 TSC bill of quantities.
Price validity
Quoted prices must remain firm for 120 working days from closing.
Compliance Requirements
Source: Tender document RFQ 74918 - 16 Nov 2026.pdf (RFQ)
Registration and tax
Valid SARS tax compliance status PIN; ACSA will not award to a bidder whose tax affairs are not in order.
Central Supplier Database report.
Certificate of Incorporation showing the ownership split.
VAT questionnaire.
Consortia, joint ventures and subcontractors: each party provides its own tax PIN or certificate and its own CSD number.
B-bbee
B-BBEE certificate and scorecard, or a QSE/EME sworn affidavit, to claim preference points.
Verifiable medical certificate where a disability ownership claim is made.
Declarations and forms
Declaration of Interest and Politically Exposed Persons form.
SBD 4 Bidder's Disclosure.
SBD 6.1 Preference Points Claim.
Confidentiality and Non-Disclosure Agreement.
Signed ACSA terms and conditions.
Personnel
SAQA letter for every foreign qualification.
No person may be counted in more than one resource role.
Security
ACSA is a National Key Point; security vetting may apply and non-compliance bars award.
Contractual Terms
Source: Tender document RFQ 74918 - 16 Nov 2026.pdf
Contract form
NEC3 Term Service Contract (TSC); the successful bidder must sign a written contract after award.
Duration: six months.
Bid validity
120 working days, with prices firm throughout.
Confidentiality
ACSA will not release bidder information without written approval.
Bidder names stay confidential until the process is finalised.
Third parties consulted on the bid must sign confidentiality agreements, submitted with the bid.
ACSA's rights
Award in whole or in part, split the award, negotiate with shortlisted bidders, award to a bidder other than the highest scorer on objective grounds, reject the lowest acceptable bid, or cancel the bid.
Bid document integrity
The bid document may not be altered; any change disqualifies the bid.
Security
ACSA is a National Key Point; security vetting may be required and a bidder failing it will not be contracted.
Section
Source: Tender document RFQ 74918 - 16 Nov 2026.pdf
Preference point system: 80/20.
Price: 80 points, scored against the lowest acceptable price.
Points not claimed with supporting documentation at submission are forfeited.
ACSA may require substantiation of any claim before or after adjudication.
Fraudulent claims can lead to disqualification, recovery of costs, contract cancellation and restriction from state business for up to 10 years.
DocumentRFQ 74918 - NEC 3 TSC for Maintenance of fire water pump stations fire sprinklers fire hose reels and fire hydrants (002).pdfReview complete
Description
Source: RFQ 74918 - NEC 3 TSC for Maintenance of fire water pump stations fire sprinklers fire hose reels and fire hydrants (002).pdf
ACSA requires maintenance of the fire water pump stations, fire sprinklers, fire hose reels and fire hydrants at O.R. Tambo International Airport for six months. The work is let as an NEC3 Term Service Contract on a priced price-list basis, running from ACSA's signature until the six months expire or the offer amount is used up. Detailed service requirements are set out in Part C3 Service Information.
Contact Information
Source: RFQ 74918 - NEC 3 TSC for Maintenance of fire water pump stations fire sprinklers fire hose reels and fire hydrants (002).pdf (unknown)
Employer
Airports Company South Africa SOC Limited
Registration number: 1993/004149/30
VAT number: 4930138393
Telephone: 011 921 6911
Address
3rd Floor, ACSA North Wing Offices
O.R. Tambo International Airport
Private Bag X1
Kempton Park, 1627
Service delivery
O.R. Tambo International Airport (the affected property)
Submission Guidelines
Source: RFQ 74918 - NEC 3 TSC for Maintenance of fire water pump stations fire sprinklers fire hose reels and fire hydrants (002).pdf (unknown)
Returnable documents
Form of Offer and Acceptance (C1.1): signed by a duly authorised representative and witnessed; records the offered total exclusive of VAT, VAT at 15% and the total inclusive of VAT.
Contract Data provided by the Contractor (C1.2b): company registration number, VAT number, address, telephone and fax, the fee percentages and the named key personnel.
Resource Proposal (Annex F): CVs for every key person, showing qualifications and experience.
Pricing Data (Part C2): completed price list; the amount in the Form of Offer prevails over the Pricing Data subtotal if the two conflict.
Occupational Health and Safety Agreement (C1.3): signed by a section 16.2 appointee holding written authority from the chief executive.
Schedule of Deviations: the only route for amendments to the contract documents; anything not recorded there has no effect.
Technical Specifications
Source: RFQ 74918 - NEC 3 TSC for Maintenance of fire water pump stations fire sprinklers fire hose reels and fire hydrants (002).pdf (unknown)
Scope
Maintenance of fire water pump stations, fire sprinklers, fire hose reels and fire hydrants at O.R. Tambo International Airport.
Service period: six months from ACSA's signature, or until the amount in the Form of Offer is spent, whichever comes first.
Detailed service requirements, service levels and drawings sit in Part C3 Service Information and its annexes.
Key personnel
Site Manager/Supervisor.
Fire systems practitioner (water-based systems).
Artisan (fitter/millwright).
Assistant.
Performance and reporting
Average availability must stay at or above 91%, measured over a continuous 24 weeks on the ACSA IMCS system (R22); falling below this is grounds for termination.
Key performance indicator report every three months.
First programme for acceptance within eight weeks of the contract date.
Task Order programme within five days of receiving the task order.
Period for reply to communications: three working days.
Forecasts of the final total of the Prices at intervals of no more than four weeks.
Risk register
Working in proximity to airport users, with risk of financial loss or injury to third parties.
Lifting and moving heavy objects near contract staff and airport users.
Work in confined spaces.
Work with flammable and toxic gases.
Further risks are listed in Annexure E.
Experience & Qualifications
Source: RFQ 74918 - NEC 3 TSC for Maintenance of fire water pump stations fire sprinklers fire hose reels and fire hydrants (002).pdf
Key personnel — CVs to be appended to the Resource Proposal (Annex F)
Site Manager/Supervisor: qualifications and experience relevant to the contract.
Fire systems practitioner (water-based systems): qualifications and experience relevant to the contract.
Artisan (fitter/millwright): qualifications and experience relevant to the contract.
Assistant: qualifications and experience relevant to the contract.
Pricing Schedule
Source: RFQ 74918 - NEC 3 TSC for Maintenance of fire water pump stations fire sprinklers fire hose reels and fire hydrants (002).pdf
Pricing basis
NEC3 Option A priced contract with a price list; all amounts in South African rand.
Form of Offer records the total exclusive of VAT, VAT at 15% and the total inclusive of VAT, plus the amount in words.
Totals are built from the Pricing Data (Part C2) using Subtotal F; if the Form of Offer and the Pricing Data differ, the Form of Offer amount governs.
Direct fee percentage: 10%. Subcontracted fee percentage: 10%.
Payment cycle
Assessment between the 1st and 15th of each month; payment within 30 days.
Interest on late payment at the Nedbank prime rate, but not where the contractor's incorrect VAT invoice caused the delay.
Price adjustment for inflation on the contract anniversary only, using the CPI index at the starting date.
Forecasts of the final total of the Prices at intervals of no more than four weeks.
Financial Requirements
Source: RFQ 74918 - NEC 3 TSC for Maintenance of fire water pump stations fire sprinklers fire hose reels and fire hydrants (002).pdf (unknown)
Pricing
NEC3 Option A: priced contract with a price list, in South African rand.
The offer states the total exclusive of VAT, VAT at 15% and the total inclusive of VAT; the Form of Offer amount prevails over the Pricing Data subtotal in any conflict.
Direct fee percentage: 10%. Subcontracted fee percentage: 10%.
Price adjustment for inflation applies only on the contract anniversary, using the CPI index at the starting date.
Payment
Assessment interval: between the 1st and 15th day of each month.
Payment within 30 days of assessment.
Late payment interest at the Nedbank prime lending rate; no interest where the delay results from the contractor's own failure to submit a correct VAT invoice.
ACSA may set off amounts owed to it against money due to the contractor.
Security and insurance
No performance bond or parent company guarantee is required.
Contractor must carry professional indemnity insurance.
ACSA provides contract works, SASRIA special risks, marine and air cargo, and public liability cover; limits are in the C1.5 Insurance Schedule.
Liability
Contractor's total direct liability is capped at the total of the Prices; neither party is liable for indirect or consequential loss.
Liability ends 52 weeks after the end of the service period.
Low service damages apply as set out in Annex G section 6 of the Service Information.
Compliance Requirements
Source: RFQ 74918 - NEC 3 TSC for Maintenance of fire water pump stations fire sprinklers fire hose reels and fire hydrants (002).pdf (unknown)
Occupational health and safety
A written OHS Act section 37(2) agreement must be concluded before any work starts, signed by a section 16.2 appointee with written authority from the chief executive.
Baseline risk assessment by a competent person before work begins.
Written appointment of a Construction Manager under Construction Regulation 8, plus the full safety checklist, submitted seven days before work starts.
COID Act cover for all employees, with a letter confirming good standing with the Compensation Fund or a licensed insurer before site work.
Public liability insurance, plus any further cover adequate for losses arising on ACSA premises.
Competent, trained appointees; PPE issued and worn; permits obtained before permit-controlled work; incidents reported to the Provincial Director of Labour and to ACSA.
No alcohol or intoxicating substances on site.
Contracting
Contractor must be a juristic person able to contract under South African law.
Joint ventures, consortia and unincorporated groupings carry joint and several liability; the composition may not change without ACSA's written consent.
The person authorised to bind the contractor must be named to the Service Manager and ACSA within one week of the starting date.
No cession, delegation or assignment without ACSA's written consent.
Health & Safety
Source: RFQ 74918 - NEC 3 TSC for Maintenance of fire water pump stations fire sprinklers fire hose reels and fire hydrants (002).pdf
OHS agreement
A section 37(2) OHS Act agreement and Construction Regulation 5.1(k) undertaking must be signed before any work starts.
Only a section 16.2 appointee with written authority from the chief executive may sign.
No work may start until the signed agreement is received by ACSA.
Site requirements
Baseline risk assessment by a competent person before work begins, covering hazard identification, risk evaluation, safe work procedures and a monitoring plan.
Construction Manager appointed in writing under Construction Regulation 8; full safety checklist submitted seven days before work starts.
COID Act cover for all employees and a good standing letter from the Compensation Fund or licensed insurer.
Public liability insurance plus any further cover needed for losses on ACSA premises.
Trained, competent staff; close supervision of all work; PPE issued and worn.
Written safe work procedures enforced and communicated to all staff.
Permits obtained before any permit-controlled work.
Incidents reported to the Provincial Director of Labour and to ACSA.
No alcohol or intoxicating substances; anyone suspected of being under the influence is removed from site.
No use of ACSA plant, equipment or substances without written approval.
ACSA may stop unsafe work; a stop instruction is not a compensation event.
Non-compliance may lead to immediate cancellation of the contract.
Site hazards
Proximity to airport users, heavy lifting, confined spaces and flammable or toxic gases are recorded risks; Annexure E lists further risks.
Contractual Terms
Source: RFQ 74918 - NEC 3 TSC for Maintenance of fire water pump stations fire sprinklers fire hose reels and fire hydrants (002).pdf
Contract framework
NEC3 Term Service Contract, April 2013, with ACSA's particular conditions and Z clauses.
Main Option A (priced contract with price list); dispute resolution Option W1; secondary options X1, X2, X17, X18, X19 and X20.
Starting date: on ACSA's signature. Service period: six months, or until the offer amount is spent, whichever is first.
Document precedence: contract data and conditions first, then pricing data, then service information and annexes, then the Z clauses, then schedules and drawings.
Termination and step-in
ACSA may terminate if average availability stays below 91% for 24 continuous weeks on the IMCS system; termination procedures P1, P3 and P4 apply with amounts A1 and A2.
Business rescue proceedings are an additional termination trigger.
If the contractor fails to remedy a default within two weeks of notice, ACSA may step in and recover the reasonable cost from the contractor.
Disputes
Adjudication by a person from the ICE-SA list, decided on written submissions only; termination disputes go directly to arbitration.
Arbitration in Johannesburg under the Association of Arbitrators (Southern Africa) rules.
Other conditions
Confidentiality covers all contract information and any images of the service or affected property; ACSA owns the rights in those images.
Intellectual property stays with the originator, with a royalty-free licence to ACSA for operating and maintaining the service.
Anti-corruption undertakings apply; proven corrupt practice is grounds for termination.
The contractor warrants the service results are fit for purpose and is responsible for setting out and for correcting errors at its own cost.
The contractor keeps equipment free of liens and waives liens against ACSA.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
O. R. Tambo International Airport, Shop R7, First Floor, Domestic Terminal, O.R. Tambo Airport Rd, O.R. Tambo, Kempton Park, 1627, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
16 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.