337JS Speekfontein - EMalahleni - EMalahleni - 1035
Organization Type
GOVERNMENT
Published
17 Nov 2026
OCDS Reference
ocds-9t57fa-178442
ESKOM requires a five-year contract for the rubber lining of pipes and vessels at duvha power station, executed on an as-and-when-required basis. The work falls under mechanical engineering works and carries a mandatory CIDB construction skills development goal (csdg) commitment of 0.25%, With failure to meet IT rendering a bid non-responsive. Bidders must also achieve 100% local content for bulk material handling rubber and commit to subcontracting at least 5% of the contract value to a black-owned eme or qse. The most consequential consideration is that sdl&i commitments become binding contractual obligations backed by a 1.5% Retention on every invoice and penalties of up to 1.5% Of the contract value.
Closing: 14 January 2027 at 08:00; late submissions are not accepted.
CIDB CSDG: mandatory 0.25% Construction Skills Development Goal for Mechanical Engineering Works; failure to meet this percentage makes the bid non-responsive.
Local content: 100% local content threshold for bulk material handling rubber; SBD 6.2 and Annex C are returnable where applicable.
B-BBEE evidence: valid SANAS-accredited certificate, sworn affidavit or CIPS affidavit plus proof of shareholding and certified shareholder IDs; missing documents forfeit specific-goal points but do not disqualify.
Subcontracting: minimum 5% of contract value to an EME or QSE that is 51% owned by black people living in rural or underdeveloped areas or townships; signed agreement or letters of intent with CK and B-BBEE documents required.
SDL&I obligations: transformation plan, local procurement, job creation, skills development and subcontracting commitments become contractual; 1.5% of every invoice (excluding VAT) is retained as security and penalties of 1.5% of invoice or contract value apply for non-compliance.
Post-award deadlines: B-BBEE improvement or retention plan within 30 days of signing; SDL&I Implementation Schedule within 28 days of contract award; quarterly SDL&I progress reports thereafter.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Check the registered grade against the tender conditions, or estimate a possible grade. Check CIDB registration · Estimate a CIDB grade.
Date & Time
Thursday, 14 January 2027 - 10:00
Venue
MS Teams
Categories
Request for Quotation
337JS Speekfontein - EMalahleni - EMalahleni - 1035
AI Document Analysis Stages
Description
17 Nov
2026
Tender Published
Tender was published
14 Jan
2027
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Invitation to Tender (ITT) or Request for Proposal (RFP) Ruber linning.pdf
Eskom requires rubber lining of pipes and vessels at Duvha Power Station on an as-and-when-required basis over a five-year term, delivered under an NEC Term Service Contract by a contractor holding CIDB grading 5ME or higher. The work covers both manufacture and installation of chemical-resistant rubber lining, with technical capability assessed before price.
SOW Maintenance Scope of Work Rubber lining Contract (002).pdf
TSC3 - Rubber lining 5 year Contract .....pdf
Rubber lining of pipes and vessels on an as-and-when-required basis for Duvha Power Station over a five-year period under an NEC3 Term Service Contract (Option A). Eskom Holdings SOC Ltd requires a contractor to provide priced services through a schedule of rates covering core crew, equipment hire, materials, and transport. Payment is assessed after completion of each Task Order.
Rubber lining of pipes & vessels on as and when SHE SPEC 2026.pdf
Rubber lining of pipes and vessels on an as-and-when-required basis at Duvha Power Station near Witbank, Mpumalanga, for a 5-year contract period. Bidders must work to Eskom's occupational health and safety requirements for high-risk activities and put in place an OHS plan that satisfies both this specification and all applicable South African legislation.
Tenderer - (SDLI) Strategy Setting Rubber lining of pipes vessels on as and when required basis for Duvha Power Station for a period of 5 year (003).....pdf
Rubber lining of pipes and vessels on an as-and-when-required basis for Duvha Power Station in Mpumalanga over a five-year period. Award combines price points with B-BBEE specific-goal points, and the contract carries designated-sector local content, CIDB skills-development and SDL&I penalty conditions.
SM Signed Form A- Rubber Lining of Pipes and Vessels - 07 Aug 2026.pdf
The procurement involves the rubber lining of pipes and vessels on an as-and-when-required basis for the Duvha Power Station over a five-year period. Bidders must comply with Eskom's Supplier Quality Requirements (240-105658000) under Category 1 and ISO 9001 standards.
240-77471651 Annexure C1 High Risk- Rubber lining of pipes & vessels on as and when at Duvha PS.pdf
Rubber lining of pipes and vessels on an as-and-when-required basis for Duvha Power Station over a five-year period. The work is classified as high risk, and bidders must submit a health and safety plan, baseline risk assessment and detailed OHS costing aligned to the scope.
Environmental requirements Rubber lining of pipes & vessels on as and when required basis for Duvha Power Station for a period of 5 years.pdf
Rubber lining of pipes and vessels on an as-and-when-required basis for Duvha Power Station over a five-year period.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf
Supply and install rubber lining for pipes and vessels at Duvha Power Station on an as‑and‑when‑required basis for a five‑year term.
Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.pdf
Rubber lining of pipes and vessels on an as-and-when-required basis at Eskom's Duvha Power Station in Mpumalanga, for a period of 5 years. Bidders sign Eskom's non-disclosure agreement as the Receiving Party before confidential project information is shared.
240-77471499 Annexure B Acknowledgement of OHS requirements.pdf
Rubber lining of pipes and vessels at Duvha Power Station in Mpumalanga on an as-and-when-required basis for five years. Eskom requires the successful bidder to provide rubber lining services as needed over the contract period.
E-tendering Help Manual for supplier - 27 January 2025.pdf
The procurement involves the rubber lining of pipes and vessels on an as-and-when-required basis for Duvha Power Station over a five-year period. The contract is managed by Eskom, and bids must be submitted via the Eskom eTendering system by 14 January 2027 at 10:00.
E-Tenderers E-Tendering Training Acknowledgement Form.pdf
Rubber lining of pipes and vessels for Duvha Power Station on an as‑and‑when‑required basis for five years. The work must be carried out in Mpumalanga province.
Eskom Supplier Integrity Pact - 02 June 2023.pdf
Rubber lining of pipes and vessels at Duvha Power Station in Mpumalanga on an as-and-when-required basis for five years.
Declaration of shareholding or beneficiaries form.pdf
Integrity Declaration Form - 29 July 2026.pdf
Rubber lining of pipes and vessels on an as-and-when-required basis for Duvha Power Station in Mpumalanga over a period of 5 years, for Eskom.
SM Signed - Cat 1 - 240-12248652_List of Tender Returnables - Rubber Lining of Pipes and Vessels - 07 Aug 2026.pdf
The department requires rubber lining of pipes and vessels on an as and when required basis for Duvha Power Station over a period of five years. The procurement covers rubber lining for pipes and vessels at the power station for a five-year period. Prospective bidders must meet the quality requirements for the period.
Eskom life-saving rules.pdf
Rubber lining of pipes and vessels at Duvha Power Station in Mpumalanga on an as-and-when-required basis for five years. The work is for Eskom Holdings SOC Ltd. Bidders must comply with Eskom's Life Saving Rules, which are enforced with zero tolerance.
TES Duvha Power Station WTP Rubber lining - Technical Evaluation Strategy.pdf
Rubber lining of pipes and vessels on an as-and-when required basis for Duvha Power Station over a five-year period, covering inspection, testing, rubber removal, sand blasting, patch repairs and full repairs across the Demineralisation and CPP trains, the CPP and Demin hot water tank, and chemical bulk tank piping.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 7 860 363
Range
Based on 16 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Scope
Compliance note
Important Dates
Source: Tenderer - (SDLI) Strategy Setting Rubber lining of pipes vessels on as and when required basis for Duvha Power Station for a period of 5 year (003).....pdf (TENDER)Closing date: 14 January 2027 at 08:00.
B-BBEE improvement or retention plan: submit within 30 days of signing the contract.
SDL&I Implementation Schedule: submit within 28 days after contract award.
SDL&I progress reports: submit quarterly.
Eskom review of SDL&I reports: within 30 days of receipt.
Contact Information
Source: Tenderer - (SDLI) Strategy Setting Rubber lining of pipes vessels on as and when required basis for Duvha Power Station for a period of 5 year (003).....pdf (TENDER)Buyer
Business unit
Submission Guidelines
Source: Tenderer - (SDLI) Strategy Setting Rubber lining of pipes vessels on as and when required basis for Duvha Power Station for a period of 5 year (003).....pdf (TENDER)Returnable documents
Disqualification risks
Evaluation Criteria
Source: Tenderer - (SDLI) Strategy Setting Rubber lining of pipes vessels on as and when required basis for Duvha Power Station for a period of 5 year (003).....pdf (TENDER)Preference point system
B-BBEE points
Objective criteria
SDL&I commitments
Technical Specifications
Source: Tenderer - (SDLI) Strategy Setting Rubber lining of pipes vessels on as and when required basis for Duvha Power Station for a period of 5 year (003).....pdf (TENDER)Scope
Local content
Skills development
Subcontracting
Methodology
Source: Tenderer - (SDLI) Strategy Setting Rubber lining of pipes vessels on as and when required basis for Duvha Power Station for a period of 5 year (003).....pdfSkills development delivery
Pricing Schedule
Source: Tenderer - (SDLI) Strategy Setting Rubber lining of pipes vessels on as and when required basis for Duvha Power Station for a period of 5 year (003).....pdfPricing format
Financial Requirements
Source: Tenderer - (SDLI) Strategy Setting Rubber lining of pipes vessels on as and when required basis for Duvha Power Station for a period of 5 year (003).....pdf (TENDER)Pricing
Penalties and security
Compliance Requirements
Source: Tenderer - (SDLI) Strategy Setting Rubber lining of pipes vessels on as and when required basis for Duvha Power Station for a period of 5 year (003).....pdf (TENDER)B-bbee
Sworn affidavit validity
CIDB
Local content
Section
Source: Tenderer - (SDLI) Strategy Setting Rubber lining of pipes vessels on as and when required basis for Duvha Power Station for a period of 5 year (003).....pdfPreference point system
B-BBEE points
Documentation
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
337JS Speekfontein - EMalahleni - EMalahleni - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
19
Last checked
17 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our Blog