Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
South African National Petroleum CompanyLocation
Western Cape
Closing Date
28 Jan 2027
Documents available on tender detail page
Tender Type
Request for Information
Delivery Location
151 Frans Conradie Drive, Parow (PetroSA building) - Parow - Cape Town - 7500
Organization Type
GOVERNMENT
Published
13 Nov 2026
OCDS Reference
ocds-9t57fa-178193
Sanpc is seeking proposals from capable organisations, individually or as consortia, to support the future refurbishment, repurposing and commercial utilisation of the milnerton tank farm in cape town. The facility comprises 39 above-ground storage tanks (each about 200,000 barrels), with about 70% dormant for over 20 years and repairs needed before recommissioning. This RFI will inform the business case and establish a pre-qualified panel for future project-specific bids; IT does not constitute a contract award or guarantee of work. Bidders must pass a technical evaluation threshold of 70 out of 100 to be considered for panel inclusion.
Mandatory bid elimination criteria: Must answer 'Yes' and provide supporting evidence for all five criteria (bidder details, contact and authority, consortium roles if applicable, tank requirements, and tank and product schedule) or be immediately disqualified.
Technical threshold: Must score at least 70 out of 100 in the technical evaluation to be recommended for panel inclusion; criteria and weightings apply equally to local and international bidders.
Financial evidence: Submit latest available audited financial statements for the past three years demonstrating capability to invest as proposed; provide an indicative funding plan linked to tank numbers, products and phases (binding finance not required at this stage).
Strategic stockholding: Proposals must explain how they will accommodate strategic stockholding, including indicative capacity, segregation, stock access and rotation, and operational arrangements.
Submission package: Submit a signed company letter, completed SANPC RFI response template, indicative development proposal, and indexed supporting documents cross-referenced to response items; responses must be in English with translations for other languages.
No contract guarantee: Panel inclusion provides no guarantee of work or revenue; bidders bear their own participation costs and must disclose conflicts of interest.
Facility condition: Bidders must account for further condition verification and product-specific engineering assessments; existing pipeline connections to Astron Refinery and Port of Cape Town do not confirm access rights or suitability for finished-product operations.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Thursday, 28 January 2027 - 11:00
Venue
TEAMS
Request for Information
151 Frans Conradie Drive, Parow (PetroSA building) - Parow - Cape Town - 7500
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Description
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdf13 Nov
2026
Tender Published
Tender was published
28 Jan
2027
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFI Milnerton Tank Farm 13 Nov 2026.pdf
SANPC seeks indicative development proposals from local and international organisations, individually or as consortia, for the future refurbishment, repurposing and commercial utilisation of the Milnerton Tank Farm. Proposals must address demand, technical suitability, funding, logistics access and regulatory and environmental requirements, and will inform SANPC's business case and a pre-qualified panel for later project-specific bids.
Annexure A Scope and Evaluation 13 November 2026.pdf
SANPC invites local and international organisations, individually or as consortia, to submit indicative development proposals for the refurbishment, repurposing and commercial utilisation of the Milnerton Tank Farm in Cape Town — 39 above-ground welded steel tanks of approximately 200,000 barrels (31,800 m3) each. The RFI informs SANPC's business case and establishes a pre-qualified panel for future Milnerton project-specific commercial bids. Proposals must address demand, technical suitability, funding, logistics access, and regulatory and environmental requirements, including strategic stockholding.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
South African National Petroleum CompanyMatched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 837 774
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
SANPC is calling for proposals from capable organisations, individually or as consortia, to support the future refurbishment, repurposing and commercial utilisation of the Milnerton Tank Farm. Submissions must address market demand, technical suitability, funding, logistics access, and regulatory and environmental requirements. The RFI informs SANPC's business case and creates a pre-qualified panel of capable, technically acceptable service providers for future Milnerton project-specific work on an as-and-when-required basis for 5 years. Panel inclusion grants no contract, preferred bidder status, partnership, financial commitment or tank allocation, and SANPC has not prescribed proceeds, split, concession term or operating model. Bidders must supply a signed company letter, a completed response template, an indicative development proposal and indexed supporting documents, state assumptions, conditions and unavailable information, and disclose conflicts of interest; confidential material must be clearly marked. Detailed scope and bid elimination criteria appear in Annexure A.
Important Dates
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdf (RFP)Issue date: 13 November 2026
Non-compulsory briefing: 25 November 2026 at 11:00, via MS Teams. Attendance is strongly encouraged but not compulsory. Interested parties must email their company name to [email protected] to receive the Teams link.
Clarification queries close: 3 days before the closing date.
Closing: 28 January 2027 at 11:00
Bid validity period: 120 days
Contact Information
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdf (RFP)Enquiries (bidding procedure and technical)
Submission address (tender box)
SANPC Facility (PetroSA head office)
3rd Floor Reception
151 Frans Conradie Drive
Parow
Cape Town
7500
Online submission
www.etenders.gov.za
Briefing session
MS Teams — link issued on request to [email protected]
Submission Guidelines
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdf (RFP)Submission channels
Copies and format
Returnable documents
Disqualification risks
Evaluation Criteria
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdf (RFP)Evaluation runs in three stages
Minimum qualifying threshold
Technical criteria and weights
Scoring detail
Technical Specifications
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdf (RFP)Scope
What is required at this stage
Purpose and limits
Other obligations
Methodology
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdfBidders must submit a project-specific methodology showing how the project will be developed across its full life cycle, supported by an indicative development programme setting out key milestones, timelines and critical dependencies.
Scored out of 5 on a 15-point criterion:
Experience & Qualifications
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdfPre-qualification: bidders must pass the administrative responsiveness check (on-time receipt and complete, valid returnable documents) and the substantive responsiveness check against the scope of work and the bid elimination criteria in Annexure A, submitting written evidence of compliance. Failure to meet any bid elimination criterion in Annexure A disqualifies the bid immediately, and both steps must be passed to reach the technical evaluation.
Relevant industry experience (20 points): bidders must list development projects with contactable references in petroleum storage, terminals, logistics or comparable hazardous industrial projects, scored one point per project up to five. Technical and delivery capability, including the methodology criterion, carries a further 15 points.
Quality Management
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdfGovernance and ethical conduct (5 points): bidders must show a governance structure and delegated authority, ethics and anti-corruption policies, conflict declarations, and disclosure of material investigations or sanctions with remedial actions. Scoring runs from 0 (no governance or ethics evidence) through 3 (structure, ethics controls, policies, procedures and relevant declarations provided) to 5 (evidence of oversight, monitoring and corrective action supporting effective implementation).
Collaboration, local participation and skills transfer (10 points): bidders must provide a project-specific stakeholder and collaboration approach and a local supplier or partner participation and skills-transfer plan with indicative roles, milestones and measures, applying equally to local and international respondents. Scoring runs from 0 (no approach) through 3 (a practical plan addressing collaboration, local participation and skills transfer) to 5 (an implementable plan supported by prior outcomes or partner evidence and monitoring arrangements).
Pricing Schedule
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdfNo pricing schedule, rate card or priced bid is required at this RFI stage, and binding finance is not required. Submissions are opened as soon as possible after the closing date and time; SANPC will not disclose confidential details such as pricing or delivery information to other companies, although the names and locations of bidders may be released on request.
Financial Requirements
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdf (RFP)Pricing
Information to be provided
Evaluation weight
Other financial matters
Compliance Requirements
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdf (RFP)Registration and tax
B-bbee
Foreign bidders
Returnable forms — complete, sign and submit with the bid
Disqualification and exclusion
Personal information
Environmental
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdfProposals for the refurbishment, repurposing and commercial utilisation of the Milnerton Tank Farm must address the regulatory and environmental requirements applicable to the project, alongside market demand, technical suitability, funding and logistics access.
Contractual Terms
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdfNo contract arises from this RFI or from inclusion on the panel, and SANPC is not committed to any course of action by issuing the RFI or receiving proposals.
SANPC reserves the right to:
SANPC may also exclude any bidder found guilty of a serious breach of law in the preceding five years, including breaches of the Competition Act, which must be declared in the Breach of Law Form. Data protection: bidders may process personal information only for purposes connected with this RFI, must follow SANPC's directions, comply with POPI, and secure the integrity and confidentiality of that information against loss, damage, unauthorised destruction, unlawful access or unlawful processing. A bidder that fails to comply is liable to SANPC and must indemnify SANPC against all claims, damages, costs or administrative fines, except to the extent SANPC caused the failure. SANPC processes bidder personal information in line with its published Privacy Policy and may appoint external service providers to help evaluate responses. Bidders will not be reimbursed for preparatory costs.
Section
Source: RFI Milnerton Tank Farm 13 Nov 2026.pdfStage 1 tests responsiveness in two steps: an administrative check (on-time receipt, all returnable documents completed and returned by the closing date and time, validity of those documents) and a substantive check against the scope of work and the technical bid elimination criteria in Annexure A, with written evidence. Failure to meet every bid elimination criterion in Annexure A means immediate disqualification, and a proposal cannot move to Stage 2 without passing both steps. Stage 2 scores functionality/technical merit out of 100 with a minimum threshold of 70%: relevant industry experience 20 points; technical and delivery capability with methodology and indicative development programme 15; governance and ethical conduct 5; collaboration, local participation and skills transfer 10; financial capability based on three years of audited financial statements 10; indicative funding credibility 30; and alignment with Milnerton objectives and market opportunity 10. Stage 3 establishes the pre-qualified panel invited to the second-stage project-specific RFP.
Submission Guidelines
Source: Annexure A Scope and Evaluation 13 November 2026.pdf (unknown)Submission method: RFI response package, in English, with English translations for supporting documents in other languages.
Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Annexure A Scope and Evaluation 13 November 2026.pdf (unknown)Evaluation process: compliance screening, followed by technical, financial, commercial and governance assessment (technical evaluation).
Technical threshold: 70 out of 100. Bidders passing the threshold and compliance requirements may be recommended for panel inclusion, subject to verification and internal approval.
Criteria and weightings apply equally to local and international bidders.
Scoring: each criterion scored 0 to 5, weighted as shown.
Technical evaluation criteria:
Total: 100 points.
Panel inclusion provides no guarantee of work or revenue.
Technical Specifications
Source: Annexure A Scope and Evaluation 13 November 2026.pdf (unknown)SANPC seeks capable organisations to support the future refurbishment, repurposing and commercial utilisation of the Milnerton Tank Farm.
Proposals should address demand, technical suitability, funding, logistics access and regulatory and environmental requirements.
Facility background:
Strategic stockholding:
RFI purpose:
Methodology
Source: Annexure A Scope and Evaluation 13 November 2026.pdfTechnical and delivery capability (15 points): a project-specific methodology outlining the proposed approach to developing the project across its full life cycle, including an indicative development programme showing key milestones, timelines and critical dependencies. Scoring 0 to 5 based on completeness and credibility.
Governance and ethical conduct (5 points): governance structure, delegated authority, ethics and anti-corruption policies, conflict declarations, and disclosure of material investigations or sanctions with remedial actions.
Collaboration, local participation and skills transfer (10 points): project-specific stakeholder and collaboration approach, proposed local supplier or partner participation, and skills-transfer plan with indicative roles, milestones and measures. Apply equally to local and international respondents.
Financial capability (10 points): latest available audited financial statements for the past three years demonstrating capability to invest as proposed.
Indicative funding credibility (30 points): funding plan linked to the number of tanks, products and phases in the Tank and Product Schedule, including supporting infrastructure; state own-funding and external funding amounts, funding gaps, conditions and approval timelines. Binding finance not required at this RFI stage.
Financial Requirements
Source: Annexure A Scope and Evaluation 13 November 2026.pdf (unknown)Financial capability: latest available audited financial statements for the past three years demonstrating capability to invest as proposed.
Indicative funding credibility: funding plan linked to the number of tanks, products and phases in the Tank and Product Schedule, including supporting infrastructure; state own-funding and external funding amounts, funding gaps, conditions and approval timelines.
Binding finance is not required at this RFI stage.
Bidding companies bear their own participation costs.
Compliance Requirements
Source: Annexure A Scope and Evaluation 13 November 2026.pdf (unknown)Bid elimination criteria (mandatory, must answer 'Yes' and provide supporting evidence):
Encouraged (not disqualifying) proposal content:
Health & Safety
Source: Annexure A Scope and Evaluation 13 November 2026.pdfThe facility comprises 39 above-ground welded steel storage tanks, each with approximate nominal capacity of 200,000 barrels (31,800 m3). Approximately 70% of terminals have been dormant for more than 20 years; 30% of tanks refurbished in 1999–2001. Last recorded product movement in 2015. API 653 integrity inspection findings indicate refurbishment potential, with repairs required to tank floors, shells, roofs, piping and safety systems before recommissioning. Respondents must allow for further condition verification and product-specific engineering assessments.
Environmental
Source: Annexure A Scope and Evaluation 13 November 2026.pdfProposals must address regulatory and environmental requirements for the refurbishment, repurposing and commercial utilisation of the Milnerton Tank Farm.
Section
Source: Annexure A Scope and Evaluation 13 November 2026.pdfBid elimination criteria: failure to answer 'Yes' and provide supporting evidence for any criterion results in immediate disqualification without progressing to technical evaluation. Criteria include bidder details, contact and authority, consortium and roles (if applicable), tank requirements, and tank and product schedule. Technical threshold is 70 out of 100. Criteria and weightings apply equally to local and international bidders.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
151 Frans Conradie Dr, Avondale, Cape Town, 7500, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
14 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
021-524-2700[email protected]petrosa.com151 Frans Conradie Dr, Avondale, Cape Town, 7500, South Africa
Key Personnel
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other professional, scientific and technical activities. Unlock full pricing strategies, bid frequency, and historical win rates.