CAPE TOWN INTERNATIONAL AIRPORT SOUTHERN OFFICE BLOCK BUILDING GROUND FLOOR, RECEPTION, PROCUREMENT - Matroosfontein - Cape Town - 7490
Organization Type
GOVERNMENT
Published
13 Nov 2026
OCDS Reference
ocds-9t57fa-178212
Summary
Airports company south africa requires a qualified plumbing service provider for a six-month contract at cape town international airport. The scope covers plumbing maintenance as defined in the nec3 term service contract. Bidders must hold a valid CIDB grading of 2 so or higher, attend a compulsory briefing and site inspection, and achieve a minimum functionality score of 70 out of 100 to proceed to price evaluation. The contract is awarded under the 80/20 preference point system, with price and b-bbee specific goals determining the final ranking.
Key Requirements
Mandatory attendance: Compulsory briefing and site inspection on 27 November 2026 at 10:00 at Southern Office Block Building, ground floor, Cape Town International Airport, Matroosfontein, Cape Town, 7490. Bring ID (not driving licence), safety boots, and reflector vest. Sign the attendance list in the name of the tendering entity.
Eligibility: Valid CIDB contractor grading 2 SO or higher; CSD registration is mandatory; tax matters must be in order with SARS (submit TCS PIN or CSD number).
Submission: Email bids to [email protected] by 09 December 2026 at 16:00 (South African time). Split submission into at least four attachments of 4 MB each. Do not Cc or Bcc any ACSA employee.
Functionality threshold: Minimum 70 out of 100 points. Resources (CVs and certified qualifications for Contract Manager, Supervisor/Site Foreman, and Health & Safety Officer) – 30 points; Company References (minimum 4 reference letters, not older than 10 years, combined value at least R500,000) – 30 points; Company Experience (8+ years – 40 points; 3–7 years – 22 points; below 3 years – zero) – 40 points.
Disqualification risks: Missing CVs or certified qualification certificates for key personnel leads to automatic disqualification. Only reference letters or completion certificates are accepted for references; award letters, contracts, and work orders are not considered. Fewer than 4 references scores zero.
Pricing: Fixed prices for the full contract duration; include all duties, taxes (except VAT) and levies applicable 14 days before closing; show VAT separately; prices in Rand. No price adjustments.
Preference points: 80/20 system (price 80 points, specific goals 20 points). B-BBEE Level 1 – 5 points; Level 2 – 4.5; Level 3 – 4; Level 4 – 3; Level 5 – 2; Level 6 – 0.5; Level 7 – 0.3; Level 8 – 0.1; Black youth majority-owned – 5; Black women majority-owned – 5; Company majority owned by people with disabilities – 5. Provide sworn affidavit or SANAS-accredited B-BBEE certificate; JVs need consolidated certificate.
REQUEST FOR QUOTATION FOR THE PROVISION OF PLUMBING SERVICE FOR A PERIOD OF (6) SIX MONTHS AT AIRPORTS COMPANY SOUTH AFRICA FOR CAPE TOWN INTERNATIONAL AIRPORT.
Tender context
Return to this tender’s issuing organisation, province, or category.
Request for quotation for the provision of plumbing service for a period of (6) six months at airports company south africa for cape town international airport.
Briefing SessionCompulsory
Date & Time
Wednesday, 09 December 2026 - 16:00
Venue
CAPE TOWN INTERNATIONAL AIRPORT SOUTHERN OFFICE BLOCK BUILDING GROUND FLOOR, RECEPTION
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentBOQ_PLUMBING SERVICES SHORT TERM.xlsxReview complete
Description
Source: BOQ_PLUMBING SERVICES SHORT TERM.xlsx
Important Dates
13 Nov
2026
PUBLICATION
Tender Published
Tender was published
09 Dec
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Provision of plumbing maintenance services at Cape Town International Airport for a six-month period for Airports Company South Africa. Bidders price a bill of quantities covering contract administration, day-shift maintenance resources, grease trap servicing, spares and materials, and after-hours labour rates.
Provision of plumbing maintenance services for a six-month period at Cape Town International Airport on behalf of Airports Company South Africa. The work is contracted under the NEC3 Term Service Contract, with rates and prices fixed for the full duration.
Airports Company South Africa requires a six-month NEC3 Term Service Contract for plumbing maintenance at Cape Town International Airport, covering landside, airside and remote sites. The contractor must deliver preventative, routine, planned and unplanned maintenance across water, sewer, stormwater, grease-trap and roof-drainage systems, including after-hours call-outs.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Supplies: GeneralFind supplies: general tenders and contract opportunities in South Africa. Browse active government procurement opportunities updated daily.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Bill of Quantities pricing schedule for the provision of plumbing services at Cape Town International Airport over a six-month period. It covers preliminary and general contract administration costs, an activity schedule for maintenance work and day shift resources, and a schedule of labour rates for after-hours and call-out work.
Technical Specifications
Source: BOQ_PLUMBING SERVICES SHORT TERM.xlsx (unknown)
Scope
Provision of plumbing maintenance services at Cape Town International Airport over a six-month contract period.
All plumbing maintenance must be carried out in line with the standards set out in Part C3 (scope of work).
Day shift maintenance covers daily shift work such as inspections as detailed in the scope of works.
Grease traps and drains
Sucking, cleaning, pumping and disposal of fats from approximately 45 grease traps of about 4.5 m³ located outside buildings.
The same service for 20 mini grease traps of about 1.5 m³ located inside buildings.
Charges for this work must cover dumping fees and all labour.
Day shift resources (07:00 to 16:00)
Contract Manager: 72 hours per month, twice a week, 1 resource.
Health & Safety Officer: 180 hours per month, Monday to Friday, 1 resource.
Supervisor: 180 hours per month, Monday to Friday, 1 resource.
Artisan: 180 hours per month, Monday to Friday, 2 resources.
Semi-skilled labour: 180 hours per month, Monday to Friday, 2 resources.
Labourer: 180 hours per month, Monday to Friday, 2 resources.
After-hours and call-out work
Labour rates must be quoted for after-hours weekdays, Saturdays, Sundays and public holidays.
A travel charge per call-out must be quoted as a fixed rate per kilometre.
Close-out
A detailed close-out report assessing the completed infrastructure must be prepared by the contractor at the end of the contract and submitted for approval; payment is subject to approval of the submitted report.
Financial Requirements
Source: BOQ_PLUMBING SERVICES SHORT TERM.xlsx (unknown)
Pricing basis
Bill of Quantities pricing schedule; all rates are quoted VAT exclusive.
Quantities in the BOQ are estimates used to compare tender prices, not actual volumes, and may change according to the works.
Only the yellow cells are completed by the tenderer; all other cells are formulas.
Section A — Preliminary & General (contract administration)
Site establishment, including delivery of equipment, tools, vehicles and parking fees: R140,000 once off.
Health & safety and environmental requirements, including safety file cost and medical examinations: R20,000 once off.
Insurance: monthly charge, quantity 60.
Vehicle permits, branding and security visibility features as per airport requirements, plus personal permits: provisional sum of R50,800; the contractor bears any cost above this amount.
Section A total: R210,800.
Contract administration costs are not paid upfront; they are drawn down from this amount as and when required.
Preliminaries and generals are paid at proven cost.
The safety file cost is paid once off against proof of payment and examination.
Section B — Activity Schedule
Spares and materials: provisional sum of R200,000.
Mark-up on third-party procured parts and supplies: 10% (cost plus mark-up; VAT is excluded from the mark-up calculation; not included in totals).
Section B monthly rate: R200,000; over six months: R1,200,000.
Section C — Schedule of Labour Rates
Rates for after-hours weekdays, Saturdays, Sundays and public holidays, plus a travel charge per call-out per kilometre.
Section C total: R0.
Contract value
Six-month contract value excluding VAT: R1,410,800.
VAT at 15%: R211,620.
Six-month contract value including VAT: R1,622,420, to be carried to the Form of Offer.
Cost inclusions
Item rates must include dumping fees, all labour rates, power tools, plant, equipment and vehicles/bakkies; no additional cost will be paid for hiring these.
Profit and overhead are included in the item rates; no mark-up may be added to these items.
Spares and materials are charged at net cost (excluding VAT, with all discounts deducted) plus mark-up.
Use of the spares and materials item must be agreed with the Service Manager or the Employer's appointed representative.
Permits are issued once a year; the contractor bears the cost of any lost or damaged permits.
Compliance Requirements
Source: BOQ_PLUMBING SERVICES SHORT TERM.xlsx (unknown)
Standards
Plumbing maintenance must meet the standards specified in Part C3 (scope of work).
Grease trap and drain work must comply with SANS 50858.
Day shift maintenance must comply with SABS 0400.
Safety and permits
A safety file is required, including medical examinations for personnel.
Airport vehicle permits, branding and security visibility features, and personal permits are required; permits are issued once a year and the contractor is responsible for the cost of any loss or damage.
Term service contract for the maintenance of plumbing services at Cape Town International Airport for a six-month period, appointed directly by ACSA.
Objective
Maintain plumbing serviceability of airport infrastructure sustainably at the lowest operating and maintenance cost, while complying with general safety and aviation legislation.
The contractor must be available every day of the year, including nights, weekends and public holidays; rates must allow for this.
Scope
Plumbing covers all water, sewer and stormwater services inside buildings; water pipes outside buildings up to 50 mm diameter; sewer pipes outside buildings up to 110 mm diameter.
Covers all ACSA facilities on landside and airside and other aerodrome areas pointed out by ACSA.
Work covers preventative, routine, planned and unplanned maintenance and maintenance-related projects.
Includes repairs to water pipes, sewer pipes, valves, manholes, toilets, urinals, handwash basins, kitchen sinks, showers, geysers and associated plumbing infrastructure.
Includes repairs, cleaning and pumping of grease sumps and grease traps.
Includes roof cleaning and repair and cleaning of downpipes, gutters and gullies.
Includes purchase of spare parts as required by ACSA.
Execution
Work is either day shift maintenance or ad hoc maintenance.
Day shift maintenance: 08:00 to 16:00, Monday to Friday, excluding weekends and public holidays, paid at a monthly rate.
Ad hoc maintenance: outside day shift hours; the contractor reports to the employer's representative, signs the register, and submits a written service report before leaving site.
Daily inspections at least three times per day (start, middle and end of shift) by a competent plumber.
Special inspections with airport management and the service manager roughly every two weeks.
The contractor must familiarise itself with the site to assess conditions and understand the scope.
Important Dates
Source: NEC 6 MONTHS_PLUMBING SERVICES 1.pdf (unknown)
Closing: 9 December 2026 at 14:00
Starting date: on signing of the contract by ACSA
Completion: 6 months from the starting date
Defects date: 12 months after completion of the whole of the works
Defects correction period: 2 weeks
Assessment interval: 15th day of each successive month
Payment period: within 4 weeks
Period of reply: 7 business days
Revised programmes: submitted at intervals no longer than 2 weeks
Forecasts of the final total of prices: at intervals no longer than 2 weeks
Contact Information
Source: NEC 6 MONTHS_PLUMBING SERVICES 1.pdf (unknown)
Airports Company South Africa SOC Limited, applicable at Cape Town International Airport
Address (employer and service manager)
Airports Company South Africa
3rd Floor ACSA, Southern Office Block
Cape Town International Airport
7525
Submission Guidelines
Source: NEC 6 MONTHS_PLUMBING SERVICES 1.pdf (unknown)
Returnable documents
Form of Offer and Acceptance (Part C1.1): signed by an authorised representative; the offered total price must be entered in both figures and words — an offer without the amount in words is treated as incomplete.
Contract Data Part two: contractor details and key personnel.
Pricing Data Part C2: Sections A (Preliminary & General), B (Activity Schedule) and C (Schedule of Labour Rates) completed.
CVs for the Contract Manager, Supervisor/Site Foreman and Health & Safety Officer, appended to the tender schedule.
Schedule of Deviations: only deviations recorded there are valid; no other amendment is recognised.
Proof of aviation liability insurance before work starts, and annually thereafter.
A compliant B-BBEE certificate annually for the contract duration.
Offer conditions
The offer stays open for the period of validity stated in the Tender Data.
Within two weeks of receiving the signed agreement the contractor must contact the employer's agent to arrange securities, bonds, guarantees and proof of insurance.
The agreement becomes binding unless the contractor objects in writing within five working days of receipt.
Technical Specifications
Source: NEC 6 MONTHS_PLUMBING SERVICES 1.pdf (unknown)
Scope
Maintenance of plumbing services across all ACSA facilities at Cape Town International Airport, on landside and airside, plus other aerodrome areas pointed out by ACSA.
Covers preventative, routine, planned and unplanned maintenance and maintenance-related projects.
Plumbing covers all water, sewer and stormwater services inside buildings; water pipes outside buildings up to 50 mm diameter; sewer pipes outside buildings up to 110 mm diameter.
Work includes
Repairs to water pipes, sewer pipes, valves, manholes, toilets, urinals, handwash basins, kitchen sinks, showers, geysers and associated plumbing infrastructure.
Repairs, cleaning and pumping of grease sumps and grease traps.
Roof cleaning, and repair and cleaning of downpipes, gutters and gullies.
Purchase of spare parts as required by ACSA.
Maintenance modes
Day shift maintenance: 08:00 to 16:00, Monday to Friday, excluding weekends and public holidays; paid at a monthly rate.
Ad hoc maintenance: work outside day shift hours; the contractor reports to the employer's representative, signs the register, and submits a written service report before leaving site.
Daily inspections at least three times per day (start, middle and end of shift) by a competent plumber, per SABS 0400 AZ2 16.
Special inspections with airport management and the service manager roughly every two weeks.
Standards
Work must comply with the red book guidelines and SANS standards, including SABS 0400, SANS 52056 (roof drainage) and SANS 50858 (grease traps).
Airside work must comply with the ICAO Airport Services Manual and the Manual for Working Airside – Volume 5.
Site and staffing
Working areas: landside, remote sites and airside.
The contractor must be available every day of the year, including nights, weekends and public holidays; rates must allow for this.
Key personnel: Contract Manager, Supervisor/Site Foreman and Health & Safety Officer.
Day shift staffing per the activity schedule: Contract Manager 72 hours (twice a week), Health & Safety Officer 72 hours (Mon–Fri), Supervisor 180 hours, two Artisans 180 hours each, two semi-skilled labourers 180 hours each, two labourers 180 hours each.
The contractor must familiarise itself with the site to assess conditions and understand the scope.
Experience & Qualifications
Source: NEC 6 MONTHS_PLUMBING SERVICES 1.pdf
Key personnel
The contractor must name and provide CVs for the following, appended to the tender schedule:
Contract Manager
Supervisor/Site Foreman
Health and Safety Officer
For each, the tender schedule records the job title, responsibility, qualifications and experience.
No minimum years of experience or specific qualifications are stated in the document.
Quality Management
Source: NEC 6 MONTHS_PLUMBING SERVICES 1.pdf
Quality plan
The contractor must compile and submit a quality management plan for approval by the employer's agent.
Costs are disallowed where the contractor fails to follow a procedure in its quality plan, fails to follow an acceptance or procurement procedure in the service information, or fails to give a required early warning.
Costs of correcting defects after completion, or defects caused by not following the quality plan or by not exercising reasonable skill, care and diligence, are disallowed.
Standards and inspections
Work must comply with the red book guidelines and SANS standards, including SABS 0400, SANS 52056 (roof drainage) and SANS 50858 (grease traps).
Airside work must comply with the ICAO Airport Services Manual and the Manual for Working Airside – Volume 5.
Daily inspections at least three times per day by a competent plumber, per SABS 0400 AZ2 16.
Special inspections with airport management and the service manager roughly every two weeks.
The contractor warrants that the results of the services, when complete, are fit for their intended purpose.
Pricing Schedule
Source: NEC 6 MONTHS_PLUMBING SERVICES 1.pdf
Pricing form
NEC3 Term Service Contract, Main Option A: priced contract with Activity Schedule.
Prices are VAT exclusive; VAT at 15% is added to reach the total contract value carried to the Form of Offer.
Quantities in the price list are estimates for comparing tenders and may change.
Item rates must include dumping fees, all labour rates, power tools, plant, equipment and vehicles; no additional hiring cost is paid by ACSA and no mark-up may be added to these items.
Spares and materials are charged at net cost (excluding VAT, all discounts deducted) plus a mark-up; VAT does not form part of the mark-up calculation.
Section A – Preliminary & General
Site establishment (equipment, tools, vehicles, parking): R140,000 once off.
Health, safety and environmental requirements (safety file, including medical examinations): R20,000 once off.
Insurance: monthly.
Vehicle permits, branding and security visibility and personal permits: provisional sum R50,800.
Contract administration costs are not paid upfront but drawn down as required; preliminaries are paid at proven cost.
If the permit provisional sum is exhausted, the contractor bears the additional cost.
Section B – Activity Schedule
Spares and materials: provisional sum R200,000.
Mark-up on third-party procured parts/supplies: 10%.
Day shift maintenance: monthly rate; Contract Manager 72 hours (twice a week), Health and Safety Officer 72 hours (Mon–Fri), Supervisor 180 hours, two Artisans 180 hours each, two semi-skilled labourers 180 hours each, two labourers 180 hours each.
Roof drainage system (SANS 52056): quarterly, 4.
Grease traps and drains (SANS 50858): repairs, pumping and cleaning.
Sucking, cleaning, pumping and disposal of fats from ±4.5 m³ grease traps outside buildings: 45.
Sucking, cleaning, pumping and disposal of fats from 1.5 m³ mini grease traps inside buildings: 20.
Section C – Schedule of Labour Rates
After-hours rates for Supervisor, Artisan, semi-skilled labour and labour for weekdays, Saturdays, Sundays and public holidays.
Fixed travel charge per kilometre per call-out.
The total tendered amount is not fixed and is subject to fluctuation from inflation and exchange rate variation.
Financial Requirements
Source: NEC 6 MONTHS_PLUMBING SERVICES 1.pdf (unknown)
Pricing format
NEC3 Term Service Contract, Main Option A: priced contract with Activity Schedule.
Prices are VAT exclusive; VAT at 15% is added to reach the total contract value carried to the Form of Offer.
Quantities in the price list are estimates for comparing tenders and may change.
Item rates must include dumping fees, all labour rates, power tools, plant, equipment and vehicles; no additional hiring cost is paid by ACSA and no mark-up may be added to these items.
Spares and materials are charged at net cost (excluding VAT, all discounts deducted) plus a mark-up; VAT does not form part of the mark-up calculation.
Price list sections
Section A – Preliminary & General: site establishment R140,000 (once off); health, safety and environmental requirements (safety file, including medical examinations) R20,000 (once off); insurance monthly; vehicle permits, branding and security visibility and personal permits provisional sum R50,800. Contract administration costs are not paid upfront but drawn down as required; preliminaries are paid at proven cost. If the permit provisional sum is exhausted, the contractor bears the additional cost.
Section B – Activity Schedule: spares and materials provisional sum R200,000; mark-up on third-party procured parts 10%; day shift maintenance monthly rates; roof drainage system quarterly (4); grease trap and drain work; sucking, cleaning, pumping and disposal of fats from ±4.5 m³ grease traps outside buildings (45); from 1.5 m³ mini grease traps inside buildings (20).
Section C – Schedule of Labour Rates: after-hours rates for Supervisor, Artisan, semi-skilled labour and labour for weekdays, Saturdays, Sundays and public holidays, plus a fixed travel charge per kilometre per call-out.
Insurance
Aviation liability insurance with an indemnity limit of not less than R300,000.
Proof of insurance to ACSA before work starts and annually for the project duration.
The contractor provides the insurances stated in the Contract Data, in the joint names of the parties, from the starting date until the defects certificate or termination certificate is issued.
Payment
Assessment interval: the 15th day of each successive month.
Payment within 4 weeks.
Interest on late payment at Nedbank's prime lending rate.
Currency: South African Rand.
Price adjustment for inflation only on contract anniversary after negotiation; sectoral determination and bargaining council labour rates apply once published or gazetted.
Compliance Requirements
Source: NEC 6 MONTHS_PLUMBING SERVICES 1.pdf (unknown)
B-bbee
A compliant B-BBEE certificate must be presented annually for the duration of the contract.
Failure to do so is a material breach and may result in cancellation of the contract.
Occupational health and safety
The contractor is an employer in its own right under the Occupational Health and Safety Act and must ensure all work, equipment, plant and materials comply with the Act and the Construction Regulations.
The contractor must complete the Section 37(2) appointment (Annexure D).
The employer may appoint the contractor as Principal Contractor for the site.
The contractor must comply with all applicable health, safety and environmental laws and ensure subcontractors and employees do the same.
Insurance
Aviation liability insurance of at least R300,000, with proof submitted before work starts and annually.
Key personnel
CVs for the Contract Manager, Supervisor/Site Foreman and Health & Safety Officer must be appended to the tender schedule.
Other
The contractor must not cede, delegate or assign rights or obligations without the employer's written consent.
Joint ventures, consortia or unincorporated groupings are jointly and severally liable; the key person authorised to bind the contractor must be notified within one week of the contract date.
Health & Safety
Source: NEC 6 MONTHS_PLUMBING SERVICES 1.pdf
Statutory duties
The contractor is an employer in its own right under the Occupational Health and Safety Act and must ensure all work, equipment, plant and materials comply with the Act and the Construction Regulations.
The contractor must complete the Section 37(2) appointment (Annexure D).
The employer may appoint the contractor as Principal Contractor for the site.
The contractor must comply with all applicable health, safety and environmental laws and ensure subcontractors, employees and others under its control do the same.
Site requirements
A detailed site safety plan and work method statements must be compiled and submitted for approval, in line with the Manual for Working Airside – Volume 5.
All site staff must attend a safety training course and obtain ACSA permits, including vehicle and equipment driving permits for airside drivers.
Adequate lighting, safety, security and operational arrangements must be provided during night shift.
The maintenance area must be cleaned after each shift to the satisfaction of airport management staff.
A health and safety officer is part of the required day shift team.
Contractual Terms
Source: NEC 6 MONTHS_PLUMBING SERVICES 1.pdf
Contract form
NEC3 Term Service Contract (TSC3), April 2013.
Main Option A: priced contract with Activity Schedule.
Dispute resolution Option W1.
Secondary Options: X1 price adjustment, X2 changes in law, X17 low service damages, X18 limitation of liability, X19 task order, plus Z additional conditions.
Key dates and payment
Starting date: on signing of the contract by ACSA.
Completion: 6 months from the starting date.
Defects date: 12 months after completion of the whole of the works; defects correction period 2 weeks.
Assessment interval: 15th of each month; payment within 4 weeks.
Interest on late payment at Nedbank's prime lending rate.
Currency: South African Rand.
Price adjustment for inflation only on contract anniversary after negotiation; sectoral determination and bargaining council labour rates apply once published or gazetted.
Task orders
The service manager may instruct tasks within a stated period; each task order sets out the work, a priced list, start and completion dates, delay damages and the total price.
No task order is issued after the end of the service period.
Liability and damages
Low service damages apply as set out in the annexure.
Neither party is liable for indirect or consequential loss, including loss of profit, income or revenue.
The employer's liability to the contractor for indirect or consequential loss is limited to R0.00.
Insurance proceeds are excluded from the calculation of liability limits.
Other conditions
The contractor may not cede, delegate or assign rights or obligations without the employer's written consent; the employer may cede and delegate its rights.
Joint ventures, consortia or unincorporated groupings are jointly and severally liable; the key person authorised to bind the contractor must be notified within one week of the contract date.
Ethics: no bribery or corrupt practice; breach is grounds for termination.
Confidentiality: contract information must be kept confidential; images of the works require prior written consent and rights vest in the employer.
Step-in rights: if the contractor defaults and does not remedy within 2 weeks, the employer may remedy at the contractor's cost.
Intellectual property remains with the originator; the contractor grants the employer a royalty-free licence for the works.
Disputes go to an adjudicator or arbitrator from the listed panels; arbitration in Johannesburg under the Rules for the Conduct of Arbitrations 2013.
The service manager needs the employer's written consent for design, scope or works information changes of 5% or more, or a completion date extension of more than 30 days.
RFQRFQ74830 bid 13 November 2026.pdfReview complete
Important Dates
Source: RFQ74830 bid 13 November 2026.pdf (RFQ)
Closing date: 09 December 2026 at 16:00 (South African time).
Compulsory briefing session: 27 November 2026 at 10:00, at Southern Office Block Building, ground floor, Cape Town International Airport, Matroosfontein, Cape Town, 7490. Attendance is mandatory; sign the attendance list in the name of the tendering entity.
Compulsory site inspection: 27 November 2026 at 10:00, at Cape Town International Airport. Bring ID document (not driving licence), safety boots, and reflector vest.
Closing date for enquiries: 03 December 2026 at 16:00.
Tender documents available from 16 November 2026 on e-Tender Portal.
All communication during the tender period must go to ACSA's Supply Chain Department, not the Principal Agent.
Bidders must not contact any ACSA employee other than the listed contact person.
Submission Guidelines
Source: RFQ74830 bid 13 November 2026.pdf (RFQ)
Submission method: email only, to [email protected]. Do not Cc or Bcc any ACSA employee.
Closing time: 09 December 2026 at 16:00 (South African time). Late bids are not accepted.
Split the submission into at least four attachments of 4 MB each; do not send one large attachment.
Use the official forms provided; do not retype them. Complete and sign all returnable documents.
Returnable documents include: SBD 1 (Invitation to Bid, signed as cover page), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Past SCM Practices), SBD 9 (Independent Bid Determination), Form of Offer and Acceptance (NEC3 Term Service Contract), pricing schedules, and any other forms listed in Part T2.
Proof of authority (e.g. company resolution) must accompany the signature.
Bids must be submitted in the prescribed format; no other format is acceptable.
Telegraphic, telephonic, telex, facsimile or e-mail tenders will not be accepted (e-mail is the only electronic channel allowed).
Evaluation Criteria
Source: RFQ74830 bid 13 November 2026.pdf (RFQ)
Evaluation is in stages:
Stage 1 – Mandatory Administration Criteria: fully completed and signed Form of Offer and Acceptance (NEC3 Term Service Contract); attendance at compulsory briefing and site inspection; active CIDB grading 2 SO or higher; CSD registration; tax matters in order with SARS; on award only, valid insurance and COIDA letter of good standing.
Stage 2 – Functionality (100 points): minimum threshold of 70 points to proceed. Breakdown: Tenderer's Resources (Qualifications and Experience) – 30 points; Company References – 30 points; Company Experience – 40 points.
Resources: CVs and certified qualification certificates for key personnel (Contract Manager, Supervisor/Site Foreman, Health & Safety Officer) are mandatory; missing CVs or certificates lead to automatic disqualification. Only 3 personnel are evaluated.
Company References: minimum 4 reference letters, not older than 10 years, demonstrating combined plumbing maintenance contract value of at least R500,000. Only reference letters or completion certificates are accepted; award letters, contracts, work orders are not. Scoring: 5 or more references – 30 points; 4 references – 20 points; fewer than 4 – zero.
Company Experience: 8 years and above – 40 points; 3 to 7 years – 22 points; below 3 years – zero.
Stage 3 – Price and Preference (80/20 system, for bids up to R50 million): maximum 80 points for price, 20 points for specific goals (B-BBEE status and ownership categories).
Stage 5 – Objective Criteria: award to highest points scorer unless objective criteria justify another bidder.
Technical Specifications
Source: RFQ74830 bid 13 November 2026.pdf (RFQ)
Provision of plumbing services for a period of six (6) months at Cape Town International Airport.
Scope of work is defined in Part C3 of the tender document, referencing the NEC3 Term Service Contract.
Key personnel required: Contract Manager, Supervisor/Site Foreman, and Health & Safety Officer. Their qualifications and experience are evaluated.
The work involves plumbing maintenance; specific details are in the NEC3 Term Service Contract and scope of works.
Financial Requirements
Source: RFQ74830 bid 13 November 2026.pdf (RFQ)
Pricing must be fixed for the full contract duration; no price adjustments for foreign fluctuations or other factors.
Prices must include all duties, taxes (except VAT) and levies applicable 14 days before closing. VAT must be shown separately.
Prices to be stated in Rand.
Bid security, bonds, guarantees, retention, and payment terms are not specified in the provided text.
Insurance: proof of valid insurance is required on award only, before contract signature.
COIDA letter of good standing required on award only.
Compliance Requirements
Source: RFQ74830 bid 13 November 2026.pdf (RFQ)
CSD registration is mandatory; no award will be made to a supplier not registered on the Central Supplier Database.
Tax compliance: bidders must submit a SARS Tax Compliance Status (TCS) PIN or CSD number. For consortia/JVs/subcontractors, each party must submit a separate TCS PIN/CSD number.
CIDB grading: valid CIDB contractor grading 2 SO or higher is required.
B-BBEE: preference points claimed under the 80/20 system. Proof required: sworn affidavit (for EMEs/QSEs as applicable) or B-BBEE certificate from a SANAS accredited agency. Joint ventures must provide a consolidated certificate.
Specific goals for preference points (max 20): B-BBEE Level 1 – 5 points; Level 2 – 4.5; Level 3 – 4; Level 4 – 3; Level 5 – 2; Level 6 – 0.5; Level 7 – 0.3; Level 8 – 0.1; Black youth majority-owned – 5; Black women majority-owned – 5; Company majority owned by people with disabilities – 5; non-compliant – 0.
Proof of ownership categories must be submitted to claim those points.
Foreign suppliers: must complete the questionnaire; if not resident in RSA and no branch/permanent establishment/income/tax liability, TCS PIN not required.
Workers' Compensation (COIDA) letter of good standing required on award.
Insurance proof required on award.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
CAPE TOWN INTERNATIONAL AIRPORT SOUTHERN OFFICE BLOCK BUILDING GROUND FLOOR, RECEPTION, PROCUREMENT - Matroosfontein - Cape Town - 7490
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
14 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.