Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
GAUTENG - GAUTENG - GAUTENG - 1682
Organization Type
GOVERNMENT
Published
23 Nov 2026
OCDS Reference
ocds-9t57fa-179509
ESKOM requires the design, manufacture, testing, supply and delivery of steel high-voltage monopole structures and associated components for its dx gauteng cluster, called off as and when needed over a five-year period through the teap listing process. Bidders must submit a completed and signed form a (240-68099512 rev 9) confirming that their quality system meets category 1 pre-contract award requirements, addresses all ten iso 9001 clauses and reflects the seven quality principles, and accepts eskom's post-award access, audit and nonconformity controls. The most consequential point is that this document sets only the quality requirements; the closing date, submission channel, pricing, preference points and any csd, tax, b-bbee or CIDB eligibility rules are not stated here and must be confirmed from the main bid pack.
Quality form: Form A (240-68099512 Rev 9) must be completed and signed by the tenderer's quality representative, with every applicable ISO 9001 clause and quality principle marked.
Category selection: only Category 1 pre-contract award quality requirements may be marked; selecting more than one category is not permitted.
Site assessment: the form must state whether a site assessment applies.
ISO 9001 coverage: the quality system must address clauses 4 to 10 (context, leadership, planning, support, operation, performance evaluation, improvement) and the seven quality principles.
Post-award obligations: the supplier must accept Eskom's rights of access, rights to information, preservation, quality audits, management of nonconformities and special processes requirements.
Supplier/sub-supplier assessment: main supplier and sub-supplier capability and capacity assessment does not apply to this bid.
Missing bid mechanics: closing date and time, submission address, pricing, preference points and any CSD, tax, B-BBEE or CIDB requirements are not contained in this document and must be obtained from the main tender pack.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Check the registered grade against the tender conditions, or estimate a possible grade. Check CIDB registration · Estimate a CIDB grade.
Date & Time
Tuesday, 15 December 2026 - 10:00
Venue
https://teams.microsoft.com/meet/3149166621658733?p=yiai3tEoQGBRM01csx
Categories
Request for Bid(Open-Tender)
GAUTENG - GAUTENG - GAUTENG - 1682
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
Source: SHE Spec.pdf23 Nov
2026
Tender Published
Tender was published
15 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annex C.pdf
E-tendering Help Manual for supplier - 27 January 2025 (1).docx
Design, manufacture, test, supply and delivery of steel HV monopole structures and associated components, on an as-and-when-required basis, for the DX Gauteng Cluster over a five-year period. Bids are submitted electronically through Eskom's eTendering portal, which requires supplier registration and a CSD number before access.
steel HV monopole structures SDL&I strategy.docx
Design, manufacture, test, supply and delivery of steel HV monopole structures and associated components on an as-and-when-required basis for Eskom's DX Gauteng Cluster over five years, awarded through the TEAP listing process. Suppliers must meet socio-economic development and localisation obligations for the contract duration.
Annex D.pdf
Annexure J - SBD 4 - Tenderer's Disclosure - 20 April 2026.docx
Eskom requires the design, manufacture, testing, supply and delivery of steel high-voltage monopole structures and associated components on an as-and-when-required basis for the DX Gauteng Cluster over a five-year period.
Annex E.pdf
SHE Spec.pdf
The department requires the design, manufacture, test, supply, and delivery of steel HV monopole structures and associated components on an as-and-when-required basis for the Gauteng Cluster over a five-year period. Bidders must comply with extensive Safety, Health, and Environment (SHE) specifications, including statutory appointments, medical surveillance, and welfare facilities.
SAFETY Annexure B.pdf
Steel HV monopole structures and associated components are to be designed, manufactured, tested, supplied and delivered by Eskom for the DX Gauteng Cluster on an as and when required basis for a period of five (5) years.
Eskom General Conditions of Purchase - 31 May 2024.pdf
Eskom requires the design, manufacture, testing, supply and delivery of steel high-voltage monopole structures and associated components on an as-and-when-required basis for the DX Gauteng Cluster over a five-year period. The agreement operates under Eskom's General Conditions of Purchase, which govern pricing, delivery, acceptance, warranty and termination.
Technical Returnables for the Procurement of Steel Mono Poles.pdf
The procurement covers the design, manufacture, test, supply and delivery of steel high-voltage monopole structures and associated components on an as and when required basis for the DX Gauteng Cluster for a period of five years. It applies to Eskom Distribution sub-transmission overhead line projects.
NEC3 SC Steel HV Monopole Structures.pdf
Supply and delivery of steel high-voltage monopole structures and associated components on an as-and-when-required basis for the DX Gauteng Cluster for five years. The purchaser is Eskom Holdings, and the contract is an NEC3 Supply Contract with rate-based pricing.
Technical Specification 240-75883378 Rev 2 .pdf
Supply and delivery of steel high-voltage monopole structures and associated components on an as-and-when-required basis for the DX Gauteng Cluster for a period of five years, including design, manufacture, test and delivery. The procurement covers the design, manufacture, test, supply and delivery of steel HV monopole structures and associated components for the DX Gauteng Cluster.
Standard Bidding Document (SBD) 4 Bidders Disclosure (1).doc
Eskom requires the design, manufacture, testing, supply and delivery of steel high-voltage monopole structures and associated components on an as-and-when basis for the DX Gauteng Cluster over a five-year period.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (1).docx
Eskom requires the design, manufacture, testing, supply and delivery of steel high-voltage monopole structures and associated components for the DX Gauteng Cluster, on an as-and-when-required basis over a five-year period.
Technical Pole purchasing schedule.pdf
Design, manufacture, test, supply and delivery of steel high-voltage monopole structures and associated components is required for the DX Gauteng cluster. The procurement is for a period of five years on an as and when required basis.
Invitation to Tender (ITT) Monopoles.pdf
Eskom requires the design, manufacture, testing, supply and delivery of steel high-voltage monopole structures and associated components for the DX Gauteng cluster on an as-and-when-required basis over a five-year period. Products that are technically compliant may be added to Eskom's Technically Evaluated and Acceptable Products (TEAP) database.
Authorisation Form.pdf
Eskom is to design, manufacture, test, supply and deliver steel HV monopole structures and associated components for the DX Gauteng cluster on an as-and-when basis for a five-year period.
QUALITY 240-12248652 (Rev 7)_List of Tender Returnables-Cat 1 .pdf
Design, manufacture, test, supply and delivery of steel high-voltage monopole structures and associated components on an as-and-when-required basis for Eskom's Dx Gauteng Cluster over a five-year period.
SAFETY Tender Evaluation Criteria.pdf
The department requires the design, manufacture, test, supply and delivery of steel HV monopole structures and associated components on an as and when required basis for the DX Gauteng cluster over five years. The procurement will be carried out for Eskom's DX Gauteng cluster over a five‑year period.
Non-Disclosure Agreement (NDA) Vendors.docx
The tender requires the design, manufacture, test, supply and delivery of steel HV monopole structures and associated components on an as‑and‑when‑required basis for the DX Gauteng cluster over a five‑year period. Bids must be submitted by 10:00 on 15 December 2026.
Monopoles SBD 6.2 local content certificate Annah.doc
The procurement involves the design, manufacture, test, supply, and delivery of steel HV monopole structures and associated components on an as-and-when-required basis for the Eskom DX Gauteng Cluster over a five-year period. Bidders must comply with strict local production and content thresholds, specifically 100% local content for monopoles and 100% for assembling and testing, as detailed in the SBD 6.2 declaration form. The bid closing date is 15 December 2026 at 10:00.
Environmental Evaluation Criteria.pdf
Steel HV monopole structures and associated components are required on an as and when required basis for Eskom's DX Gauteng Cluster for a period of five (5) years. The scope covers design, manufacture, test, supply and delivery. An environmental management policy applies at 100 percent weight.
240-62044728 (Rev. 11) Eskom Holdings Ltd Standard Conditions of Tender.pdf
Design, manufacture, test, supply and delivery of steel high-voltage monopole structures and associated components for Eskom's DX Gauteng Cluster, on an as-and-when-required basis over a five-year period.
Supplier Declaration of Interest Template(3).docx
Eskom requires the design, manufacture, testing, supply and delivery of steel high-voltage monopole structures and associated components for the DX Gauteng Cluster, on an as-and-when-required basis over a five-year period.
QUALITY 240-68099512 (Rev 9) Form A Tender & Contract Quality Requirements Cat 1.pdf
Supply and delivery of steel HV monopole structures and associated components on an as and when required basis for the DX Gauteng Cluster for a period of five years. The closing date is 15 December 2026 at 10:00 South Africa Standard Time.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 435 990
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Purpose
Contractor obligations
Reference framework
Technical Specifications
Source: SHE Spec.pdf (unknown)Scope of supply
SHE plan
Legal and Eskom compliance
Appointments and roles
SHE policy and COID
Welfare and hygiene
Occupational health
Risk assessment and incidents
Emergency management
Non-conformance
Quality Management
Source: SHE Spec.pdfNon-conformance system
Food safety
Compliance Requirements
Source: SHE Spec.pdf (unknown)Statutory registration
Legislation
Eskom requirements
Documentation to be held
Health & Safety
Source: SHE Spec.pdfSHE plan and policy
Legal compliance
Appointments
Coid
Welfare and hygiene
Occupational health
Risk assessment
Incident investigation
Emergency management
Non-conformance
Environmental
Source: SHE Spec.pdfDuty of care
Description
Source: Non-Disclosure Agreement (NDA) Vendors.docxEskom Holdings SOC Ltd is the disclosing party. It is incorporated in South Africa, registration number 2002/015527/06, with registered office at Megawatt Park, Maxwell Drive, Sunninghill ext.3, Sandton.
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors.docx (unknown)Contract contact
Technical Specifications
Source: Non-Disclosure Agreement (NDA) Vendors.docx (unknown)Project scope
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (1).docx (unknown)Mandatory returnable: E-Tendering Training Acknowledgement Form.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (1).docx (unknown)Responsiveness requirement: a fully completed E-Tendering Training Acknowledgement Form must be submitted.
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (1).docx (unknown)Scope: design, manufacture, testing, supply and delivery of steel high-voltage monopole structures and associated components.
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (1).docx (unknown)Mandatory compliance document: E-Tendering Training Acknowledgement Form.
Contact Information
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Fraud and corruption reporting
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfInspection and acceptance
Rejection
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfPricing basis
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Payment terms
Delivery costs
Packing materials
Compliance Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Statutory compliance
Ethics
Indemnity
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfContract basis
Warranty
Assignment and subcontracting
Breach and termination
Indemnity
Entire agreement
Description
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docxEskom tender submissions are made through an eTendering portal rather than at physical tender offices. Suppliers must register their details before they can upload documents. Access requires a CSD number, a verified email address and a cellphone number beginning with +27. Each login is protected by a one-time pin sent to the registered cellphone and email. Once logged in, the supplier selects the tender reference number and uploads documents under the appropriate categories. The system also allows closed tenders to be issued directly to selected suppliers by email link.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docx (unknown)Submission address
Enquiries
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docx (unknown)Submission channel
File preparation
Submission confirmation
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docx (unknown)Procurement scope
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docx (unknown)Access compliance
Submission Guidelines
Source: Authorisation Form.pdf (unknown)Returnable document
Supporting attachments
Compliance Requirements
Source: Authorisation Form.pdf (unknown)Authorisation to sign
Description
Source: steel HV monopole structures SDL&I strategy.docxEskom requires the design, manufacture, testing, supply and delivery of steel HV monopole structures and associated components for the DX Gauteng Cluster, on an as-and-when-required basis over five years, procured through the TEAP listing process.
Suppliers must contribute to the six SD&L elements for the duration of the contract: B-BBEE, localisation, industrialisation, skills development, job creation and supplier development.
Contact Information
Source: steel HV monopole structures SDL&I strategy.docx (unknown)Local content enquiries (DTI)
Technical enquiries (DTI)
SD&L execution support — Gauteng Cluster
Submission Guidelines
Source: steel HV monopole structures SDL&I strategy.docx (unknown)Returnable documents
Local content exemption
Evaluation Criteria
Source: steel HV monopole structures SDL&I strategy.docx (unknown)Preference point system: 90/10, scored on the B-BBEE Evaluation Scorecard.
B-BBEE preference
Specific goals under PPPFA section 2(1)(d–f)
Mandatory subcontracting (condition of award)
Local content
Technical Specifications
Source: steel HV monopole structures SDL&I strategy.docx (unknown)Scope
Local content
Skills development
Job creation
Enterprise and supplier development
Monitoring and reporting
Financial Requirements
Source: steel HV monopole structures SDL&I strategy.docx (unknown)Compliance Requirements
Source: steel HV monopole structures SDL&I strategy.docx (unknown)B-bbee
Local content
Subcontracting
Description
Source: Invitation to Tender (ITT) Monopoles.pdfEskom invites tenders for the design, manufacture, testing, supply and delivery of steel high-voltage monopole structures and associated components for the DX Gauteng cluster, on an as-and-when-required basis over five years.
Technically compliant products may be added to Eskom's Technically Evaluated and Acceptable Products (TEAP) database.
Tender documents are issued free of charge.
Submitting a tender is deemed acceptance of Eskom's Standard Conditions of Tender, available at www.eskom.co.za.
The Tender Data takes precedence over the Standard Conditions of Tender where the two conflict.
The scope of work is set out in the attached NEC3 Supply Contract.
Important Dates
Source: Invitation to Tender (ITT) Monopoles.pdf (TENDER)Closing date and time: 15 December 2026 at 10:00 SAST.
Clarification meeting: 1 December 2026 at 14:00 SAST, non-compulsory, held on Microsoft Teams.
Clarification meeting link: https://teams.microsoft.com/meet/3149166621658733?p=yiai3tEoQGBRM01csx
Meeting ID: 314 916 662 165 873 3
Passcode: oM9p3Sw7
Dial-in: +27 21 834 0825,,333335819# (Cape Town); phone conference ID 333 335 819#
Clarification queries close: 5 working days before the tender submission deadline.
Tender validity: 280 days from the closing date.
Tender issue date: 20 November 2026.
Submission Guidelines
Source: Invitation to Tender (ITT) Monopoles.pdf (TENDER)Submission method: electronic upload via the Eskom Tender Bulletin e-tendering page only.
Format: all documents in PDF; the price list must also be PDF.
Upload limits: 500 MB per document; 4 GB total per submission.
No ZIP or compressed files; no hard copies accepted.
Organise uploads into the Technical, Commercial, Financial and other folders.
Ensure the submission status shows as complete before the closing time.
If a tender is resubmitted, only the latest version is accepted; earlier submissions become null and void.
Late tenders are not accepted.
Returnable documents — disqualifiable if not submitted, completed and signed by the closing date and time:
Returnables that score zero if omitted or incomplete (no disqualification):
Returnables required before contract award:
Evaluation Criteria
Source: Invitation to Tender (ITT) Monopoles.pdf (TENDER)Evaluation stages, in order:
Price evaluation basis:
Specific goals:
Other evaluation points:
Technical Specifications
Source: Invitation to Tender (ITT) Monopoles.pdf (TENDER)Scope: design, manufacture, test, supply and delivery of steel high-voltage monopole structures and associated components for the DX Gauteng cluster, on an as-and-when-required basis over five years.
Products that pass the technical evaluation may be added to Eskom's Technically Evaluated and Acceptable Products (TEAP) database.
Technical requirements and the detailed evaluation criteria are set out in a separately attached document.
The scope of work is contained in the attached NEC3 Supply Contract.
Factory evaluation: bidders must make their facilities and resources available for an Eskom factory visit, at which the submitted information and the factory's documented processes and procedures are verified.
Cataloguing: the successful bidder may be required to supply cataloguing information per item after award and to label all delivered materials to Eskom's labelling specification; where cataloguing applies, the pricing schedule must include a cataloguing line item, which Eskom pays for.
SHEQ: safety, quality and environmental requirements apply and are attached separately; the environmental requirements are specified in the environmental specification.
Pricing Schedule
Source: Invitation to Tender (ITT) Monopoles.pdfPricing schedule: contained in the NEC3 Supply Contract, or submitted separately if not included there.
Format: PDF only.
Upload limits: 500 MB per document; 4 GB total submission.
Prices are evaluated inclusive of VAT and corrected for arithmetic errors.
Contingencies in any bill of quantities or activity schedule are excluded from evaluation.
Where cataloguing applies, the pricing schedule must include a cataloguing line item, paid for by Eskom.
Unconditional discounts count for evaluation; conditional discounts apply only when payment is made.
Alternative tenders are not allowed.
Clarification queries close 5 working days before the submission deadline.
Financial Requirements
Source: Invitation to Tender (ITT) Monopoles.pdf (TENDER)Pricing
Payment terms
Performance security
Financial analysis
Risk mitigation Eskom may require
Price negotiation
Compliance Requirements
Source: Invitation to Tender (ITT) Monopoles.pdf (TENDER)Eligibility
Mandatory contractual requirements before award
B-bbee
CIDB, CSDG and CPG
Subcontracting
Contractual requirements process
Health & Safety
Source: Invitation to Tender (ITT) Monopoles.pdfSHEQ compliance — safety, health, environmental and quality — is a legal and contractual requirement for the contract.
Safety, quality and environmental requirements are attached separately and must be demonstrated as in place and legally valid.
SHEQ is not an evaluation criterion; it is assessed after technical evaluation and ranking of viable tenders.
A bidder has one opportunity, within 7 working days after the first evaluation, to resubmit SHEQ requirements not fully met.
Failure to meet SHEQ requirements by the deadline may render the bid non-responsive and ineligible for award.
A valid Letter of Good Standing with the compensation body, FEMA or RMA is required before award.
Contractual Terms
Source: Invitation to Tender (ITT) Monopoles.pdfContract form: NEC3 Supply Contract, signed and completed in full and submitted with the tender.
Contract period: five years, on an as-and-when-required basis.
Tender validity: 280 days from the closing date.
Payment: within 30 days of undisputed invoices for contracts below R50 000 000 including VAT; within 60 days for contracts above that value.
Performance security: not applicable.
Risk mitigation Eskom may impose: a performance bond from an Eskom Treasury pre-approved financial institution, a parent company guarantee supported by the parent's approved annual financial statements, a reduced contract, or milestone-based payment.
Price negotiation: Eskom may negotiate with preferred bidders where tendered prices are not market-related.
Subcontracting: subcontracting to own subsidiaries is discouraged as potential fronting and must be declared.
Eligibility consequences: sanctions-list nationality, multiple tenders, JV agreements without joint and several liability, conflicts of interest, unauthorised signatories, National Treasury or Eskom restrictions, Tender Defaulter listing, and 100% subcontracting all render a bid ineligible.
Contractual requirements are assessed after ranking; one resubmission within 7 working days is allowed, and failure may lead to non-responsiveness or award to another bidder.
Section
Source: Invitation to Tender (ITT) Monopoles.pdfStage 1 — desktop evaluation of mandatory returnables: full compliance required.
Stage 2 — desktop functionality evaluation: minimum 8 out of 11 points; only passing bidders proceed to the factory stage.
Stage 3 — factory evaluation: Eskom verifies the Stage 1 and Stage 2 information on site, including documented processes and procedures; only passing bidders are listed as technically approved.
Price: 90 points, evaluated inclusive of VAT, corrected for arithmetic errors, excluding contingencies, adjusted for acceptable variations, compared on net present value, with unconditional discounts counted and conditional discounts applied only at payment.
Specific goals: 10 points under the PPPFA; missing proof scores zero without disqualification.
Ranking: 90/10 preference point system, highest combined score first.
Eskom may award to a bidder other than the highest scorer on objective criteria.
Reverse e-auction does not apply; alternative tenders are not allowed.
Description
Source: Technical Specification 240-75883378 Rev 2 .pdfThe specification sets out requirements for the design, manufacture, testing, supply and erection of steel pole overhead line supports for Eskom's distribution and transmission networks. It replaces the previous standard SCSSCABG2 Rev.0 and extends scope to cover design and fabrication aspects aligned with ASCE 48-11, incorporating international best practice and aspects of SANS 10225 for lighting masts. It applies to free-standing and guyed steel poles, including constant-taper and tapered sections, and covers inspection of fabricated components, transport, assembly and erection. The document applies throughout Eskom Holdings Limited divisions.
Important Dates
Source: Technical Specification 240-75883378 Rev 2 .pdf (unknown)Fabrication drawings: submit within four weeks of contract award for approval.
Submission Guidelines
Source: Technical Specification 240-75883378 Rev 2 .pdf (unknown)Returnable documents
Submission format
Evaluation Criteria
Source: Technical Specification 240-75883378 Rev 2 .pdf (unknown)Evaluation stages
Minimum qualifying criteria
Technical Specifications
Source: Technical Specification 240-75883378 Rev 2 .pdf (unknown)Scope
Design standards
Geometry and limits
Base plates and holding-down bolts
Earthing
Ladders and steps
Fall arrest
Jacking system
Pole tops and lifting
Fabrication
Dimensional tolerances
Attachment points and bolt holes
Marking
Welding and galvanising
Handling, packing and transport
Erection
Mechanical testing
Experience & Qualifications
Source: Technical Specification 240-75883378 Rev 2 .pdfNo specific experience or qualification requirements for bidders are stated in this technical specification. The document focuses on technical requirements for the product and fabrication process.
Quality Management
Source: Technical Specification 240-75883378 Rev 2 .pdfQuality assurance requirements
Compliance Requirements
Source: Technical Specification 240-75883378 Rev 2 .pdf (unknown)Standards and certification
B-bbee
Health & Safety
Source: Technical Specification 240-75883378 Rev 2 .pdfHealth and safety requirements
Contractual Terms
Source: Technical Specification 240-75883378 Rev 2 .pdfThe contract is for a five-year period on an as-and-when-required basis for the DX Gauteng Cluster. The fabricator must submit fabrication drawings within four weeks of contract award for approval. Acceptance of designs by Eskom does not relieve the fabricator of responsibility for compliance with the specification or for providing correctly designed and manufactured components. Alternative designs must be accompanied by a summary document and outline drawings at tender stage. PLS Pole files for accepted alternative structures must be submitted after contract award. Erection instructions must be provided with completed structures.
Section
Source: Technical Specification 240-75883378 Rev 2 .pdfQuality assurance and inspections form part of the evaluation: Eskom may conduct inspections during fabrication and will review the fabricator's quality plan, fabrication drawings, welding inspection results, welder certification and mill certificates. Mechanical testing to IEC 60652 is required, with acceptance criteria specified in Table 6. Untested structures are subject to a strength factor of 0.9.
Submission Guidelines
Source: Standard Bidding Document (SBD) 4 Bidders Disclosure (1).doc (unknown)Returnable form:
Disqualification risks:
Compliance Requirements
Source: Standard Bidding Document (SBD) 4 Bidders Disclosure (1).doc (unknown)Bidder disclosure (SBD 4):
Consequences:
Description
Source: Monopoles SBD 6.2 local content certificate Annah.docThe bid covers the design, manufacture, testing, supply and delivery of steel HV monopole structures and associated components for the DX Gauteng Cluster, on an as-and-when-required basis over five years. Local production and content requirements apply to the monopoles and to assembling and testing.
Submission Guidelines
Source: Monopoles SBD 6.2 local content certificate Annah.doc (unknown)Returnable document:
Disqualification risks:
Evaluation Criteria
Source: Monopoles SBD 6.2 local content certificate Annah.doc (unknown)Local content is assessed as a bidding condition before price and B-BBEE are considered.
Minimum local content thresholds:
A bid that does not meet both thresholds is disqualified. Where a two-stage process applies, stage one tests the local content threshold and stage two evaluates price and B-BBEE.
Technical Specifications
Source: Monopoles SBD 6.2 local content certificate Annah.doc (unknown)Scope covers steel HV monopole structures and associated components, supplied and delivered on an as-and-when-required basis for the DX Gauteng Cluster over five years.
Local content applies to two commodity groups:
Local content is measured in terms of SABS technical specification SATS 1286.
Financial Requirements
Source: Monopoles SBD 6.2 local content certificate Annah.doc (unknown)Local content is calculated as a percentage of the bid price excluding VAT, using the SATS 1286 formula: local content = (1 − imported content ÷ bid price excluding VAT) × 100.
Imported content covers the cost of imported components, parts or materials, including costs abroad, freight, landing costs, dock duties, import duty and similar taxes at the South African port of entry.
Where imported content exists, currency conversions must use the SARB rate published at 12:00 on the date seven calendar days before the bid closing date. Rates are available at www.reservebank.co.za and proof of the rate used must be submitted.
Compliance Requirements
Source: Monopoles SBD 6.2 local content certificate Annah.doc (unknown)Local production and content:
Description
Source: Technical Returnables for the Procurement of Steel Mono Poles.pdfPurpose
Applicability
Reference documents (most recent edition applies)
Definitions
Subcontracting and joint ventures
Evaluation stages
Submission Guidelines
Source: Technical Returnables for the Procurement of Steel Mono Poles.pdf (unknown)Technical file
Returnable tables (all must be completed and signed)
Disqualification risks
Evaluation Criteria
Source: Technical Returnables for the Procurement of Steel Mono Poles.pdf (unknown)Evaluation stages (sequential)
Functionality scoring (Table A.4, total 11)
Scoring rule
Technical Specifications
Source: Technical Returnables for the Procurement of Steel Mono Poles.pdf (unknown)Scope
Mandatory technical returnables (Stage 1)
Functionality requirements (Stage 2)
Subcontracting and joint ventures
Standards and references
Experience & Qualifications
Source: Technical Returnables for the Procurement of Steel Mono Poles.pdfDesign personnel
Previous manufacturing experience
Drawing office
Compliance Requirements
Source: Technical Returnables for the Procurement of Steel Mono Poles.pdf (unknown)Mandatory returnables — failure to submit any one in full disqualifies the bid without a request to remedy
Technical compliance
Document status
Subcontracting restriction
Health & Safety
Source: Technical Returnables for the Procurement of Steel Mono Poles.pdfNormative reference
Safe handling
Safe storage and loading
Section
Source: Technical Returnables for the Procurement of Steel Mono Poles.pdfStage 1 — Desktop review of mandatory returnables
Stage 2 — Desktop functionality scoring (Table A.4)
Stage 3 — Factory visit
Description
Source: NEC3 SC Steel HV Monopole Structures.pdfEskom Holdings SOC Ltd requires the design, manufacture, testing, supply and delivery of steel high-voltage monopole structures and associated components for the Dx Gauteng Cluster.
The contract is on an as-and-when-required basis over a period of five years.
The contract is based on the NEC3 Supply Contract (SC3), comprising Part C1 (Agreements and Contract Data), Part C2 (Pricing Data) and Part C3 (Scope of Work).
Important Dates
Source: NEC3 SC Steel HV Monopole Structures.pdf (unknown)Closing date: 15 December 2026 at 08:00.
No briefing or site visit is stated in the available text.
Contact Information
Source: NEC3 SC Steel HV Monopole Structures.pdf (unknown)Purchaser
Megawatt Park
Maxwell Drive
Sandton
Johannesburg, 2199
Supply Manager
Enquiries: no enquiry contact is stated in the available text.
Submission Guidelines
Source: NEC3 SC Steel HV Monopole Structures.pdf (unknown)Returnable documents
Submission method and address are not stated in the available text; bidders must confirm from the full tender data.
Evaluation Criteria
Source: NEC3 SC Steel HV Monopole Structures.pdf (unknown)Evaluation stages
Scoring split, minimum qualifying score and preference point system are not stated in the available text.
Technical Specifications
Source: NEC3 SC Steel HV Monopole Structures.pdf (unknown)Scope
Delivery
Quality and testing
Documentation to be supplied
Design
Subcontracting
Spares and consumables
Quality Management
Source: NEC3 SC Steel HV Monopole Structures.pdfISO 9001:2015 must govern quality testing and manufacturing of the monopole structures.
Factory acceptance testing (FAT) applies.
Inspection documentation to be made available: fabrication QA plan, fabrication drawings for the poles, welding inspection results, welder certifications and mill certificates for steel.
The Supplier must submit its design for acceptance under the procedure in the Goods Information.
Operating manuals and maintenance schedules must be provided.
Pricing Schedule
Source: NEC3 SC Steel HV Monopole Structures.pdfPricing is on the Price Schedule (C2.2), which may contain lump sums, rates multiplied by quantities, or time-based items.
The Supplier must enter rates and prices for all items and may add items it considers necessary.
The tendered total of the Prices must be fully inclusive of everything required to provide the goods and services.
No adjustment to lump sum prices if actual quantities differ; changes only through compensation events.
Prices must include the cost of correcting defects.
The amount due is calculated from completed lump sums, quantities multiplied by rates, plus other amounts, less amounts retained.
Invoices must show the contract number, title, Supplier and Supply Manager details, VAT numbers, description of goods and services, and amounts excluding and including VAT.
The Purchaser's VAT number is 4740101508.
Financial Requirements
Source: NEC3 SC Steel HV Monopole Structures.pdf (unknown)Pricing
Payment
Price adjustment
Delay damages
Guarantees and insurance
Liability
Compliance Requirements
Source: NEC3 SC Steel HV Monopole Structures.pdf (unknown)Eligibility
B-bbee
Joint ventures
Ethics
Health, safety and environment
Insurance
Nuclear liability
Health & Safety
Source: NEC3 SC Steel HV Monopole Structures.pdfThe Supplier must take all reasonable precautions to maintain health and safety.
The Prices must include sufficient allowance for compliance with all applicable health and safety laws and the contract's health and safety rules.
The Supplier must ensure that subcontractors, employees and others under its direction comply with health and safety requirements.
Asbestos requirements:
The Supplier must comply with all applicable environmental laws and Eskom's SHEQS policy and procedures.
Environmental
Source: NEC3 SC Steel HV Monopole Structures.pdfThe Supplier must comply with the National Environmental Management Act and all applicable regulations, Eskom's SHEQS policy, procedures, specifications and guidelines, and the Environmental Requirements for Contractors and/or Suppliers in Eskom Distribution.
Asbestos removal and disposal must be done by a registered asbestos contractor, instructed by the Purchaser at the Purchaser's expense, in line with South African legislation.
Contractual Terms
Source: NEC3 SC Steel HV Monopole Structures.pdfContract form: NEC3 Supply Contract (April 2013), including Options X1 (price adjustment), X2 (changes in law), X3 (multiple currencies), X4 (parent company guarantee), X7 (delay damages) and Z1 to Z15 additional conditions.
Starting date: five years.
Delivery date: stated on each Purchase Order.
Programme: first programme within one week of the Contract Date; revised programmes at intervals no longer than one week.
Defects date: 12 months after delivery.
Defect correction period: one week.
Defects access period: one day.
Period for reply: one week.
Payment: 30 days after a correct tax invoice; assessment on the 25th of each month or after delivery.
Delay damages: R1 000 per day, capped at 10% of the Purchase Order or Task Order value.
Liability: indirect loss limited to R0; total liability limited to the Task Order value; end of liability 12 months after delivery.
Adjudicator: selected from the ICE-SA panel; if not agreed, appointed by AFSA.
Arbitration: rules of the Association of Arbitrators (Southern Africa), held in Johannesburg.
Cession, delegation and assignment: only with the Purchaser's written consent.
Joint ventures: members jointly and severally liable; key person to be notified within two weeks.
B-BBEE status change: notify within seven days; updated certificate within 30 days; decrease may lead to renegotiation or termination.
Confidentiality: information to be kept confidential; images require written consent.
Ethics: prohibited actions may lead to termination.
Insurance: Supplier provides Insurance Table A cover; Purchaser provides Insurance Table B cover.
Nuclear liability: Purchaser indemnifies the Supplier for nuclear damage, with exceptions.
Asbestos: specific exposure limits and procedures apply.
Section
Source: NEC3 SC Steel HV Monopole Structures.pdfTechnical evaluation is against document 240-143268939.
ISO 9001:2015 must govern quality testing and manufacturing of the monopole structures.
The quality section of the Scope of Work sets out the quality requirements.
Scoring weights and minimum thresholds are not stated in the available text.
Description
Source: Environmental Evaluation Criteria.pdfSupply and delivery of steel HV monopole structures and associated components for the DX Gauteng Cluster, on an as and when required basis over a five-year period. The structures are to be designed, manufactured and tested by the supplier.
Evaluation Criteria
Source: Environmental Evaluation Criteria.pdf (unknown)Environmental management policy — weighted 100% of the environmental criteria.
Technical Specifications
Source: Environmental Evaluation Criteria.pdf (unknown)Scope: design, manufacture, test, supply and delivery of steel HV monopole structures and associated components.
Compliance Requirements
Source: Environmental Evaluation Criteria.pdf (unknown)Environmental policy requirements (all three carry equal weight within the environmental criteria):
Environmental
Source: Environmental Evaluation Criteria.pdfEnvironmental evaluation criteria — total weight 100%.
Description
Source: 240-62044728 (Rev. 11) Eskom Holdings Ltd Standard Conditions of Tender.pdfThe scope covers the design, manufacture, testing, supply and delivery of steel high-voltage monopole structures and associated components for the DX Gauteng Cluster, on an as-and-when-required basis over a five-year period.
Important Dates
Source: 240-62044728 (Rev. 11) Eskom Holdings Ltd Standard Conditions of Tender.pdf (TENDER)Closing
Compulsory site visit / clarification meeting
Clarification queries
Submission Guidelines
Source: 240-62044728 (Rev. 11) Eskom Holdings Ltd Standard Conditions of Tender.pdf (TENDER)Submission method
Packaging and marking
Returnable documents
Disqualification risks
Evaluation Criteria
Source: 240-62044728 (Rev. 11) Eskom Holdings Ltd Standard Conditions of Tender.pdf (TENDER)Evaluation stages
Preference point system
Arithmetical errors
Reverse e-auction
Technical Specifications
Source: 240-62044728 (Rev. 11) Eskom Holdings Ltd Standard Conditions of Tender.pdf (TENDER)Scope
Standards and compliance
Quality Management
Source: 240-62044728 (Rev. 11) Eskom Holdings Ltd Standard Conditions of Tender.pdfSHEQ requirements
Quality assurance
Pricing Schedule
Source: 240-62044728 (Rev. 11) Eskom Holdings Ltd Standard Conditions of Tender.pdfPricing requirements
Arithmetical errors
Ranking
Financial Requirements
Source: 240-62044728 (Rev. 11) Eskom Holdings Ltd Standard Conditions of Tender.pdf (TENDER)Pricing
Security
Insurance
Financial risk assessment
Costs
Compliance Requirements
Source: 240-62044728 (Rev. 11) Eskom Holdings Ltd Standard Conditions of Tender.pdf (TENDER)Eligibility
Statutory and regulatory compliance
B-bbee
Sheq
Misrepresentation
Health & Safety
Source: 240-62044728 (Rev. 11) Eskom Holdings Ltd Standard Conditions of Tender.pdfSHEQ compliance
CIDB and skills development
Tender compliance
Contractual Terms
Source: 240-62044728 (Rev. 11) Eskom Holdings Ltd Standard Conditions of Tender.pdfCommunication
Eskom's rights
Tender validity
Confidentiality and copyright
Contract formation
Section
Source: 240-62044728 (Rev. 11) Eskom Holdings Ltd Standard Conditions of Tender.pdfEvaluation sequence
Preference points
Arithmetical error correction
Reverse e-auction
Submission Guidelines
Source: Annexure J - SBD 4 - Tenderer's Disclosure - 20 April 2026.docx (unknown)Returnable form:
Disqualification risks:
Evaluation Criteria
Source: Annexure J - SBD 4 - Tenderer's Disclosure - 20 April 2026.docx (unknown)Eligibility screening:
Compliance Requirements
Source: Annexure J - SBD 4 - Tenderer's Disclosure - 20 April 2026.docx (unknown)SBD 4 (Tenderer's Disclosure): mandatory declaration covering state employment of directors, trustees, shareholders, members, partners or controlling-interest holders; relationships with Eskom employees; and interests in other related enterprises.
Exclusion:
Description
Source: Technical Pole purchasing schedule.pdfSupply of steel high-voltage monopole structures and associated components to the DX Gauteng Cluster over a five-year period.
Technical Specifications
Source: Technical Pole purchasing schedule.pdf (unknown)Scope of supply
Purchasing schedule entries
Standards and testing
Evaluation Criteria
Source: SAFETY Tender Evaluation Criteria.pdf (unknown)OHS evaluation
Technical Specifications
Source: SAFETY Tender Evaluation Criteria.pdf (unknown)Procurement scope
Compliance Requirements
Source: SAFETY Tender Evaluation Criteria.pdf (unknown)Mandatory OHS returnables
B-bbee
Health & Safety
Source: SAFETY Tender Evaluation Criteria.pdfRequired OHS submissions
Section
Source: SAFETY Tender Evaluation Criteria.pdfThe OHS evaluation uses the high-risk template. Each returnable is marked as present, absent or not applicable, and the outcome is either Recommended or Not recommended.
Description
Source: QUALITY 240-12248652 (Rev 7)_List of Tender Returnables-Cat 1 .pdfDesign, manufacture, test, supply and delivery of steel high-voltage monopole structures and associated components for the DX Gauteng Cluster.
Submission Guidelines
Source: QUALITY 240-12248652 (Rev 7)_List of Tender Returnables-Cat 1 .pdf (TENDER)Returnable quality documents (Category 1):
Evaluation Criteria
Source: QUALITY 240-12248652 (Rev 7)_List of Tender Returnables-Cat 1 .pdf (TENDER)Quality requirements are scored per deliverable, with each listed item carrying a weight of 1.
Section A — Quality management system (maximum 4 points)
Section B — Evidence of QMS in operation (maximum 5 points)
Section C — Contract quality plan (maximum 1 point)
Section D — Quality control plan (maximum 1 point)
Section E — Additional requirements (maximum 2 points)
Technical Specifications
Source: QUALITY 240-12248652 (Rev 7)_List of Tender Returnables-Cat 1 .pdf (TENDER)Scope: design, manufacture, test, supply and delivery of steel high-voltage monopole structures and associated components.
Compliance Requirements
Source: QUALITY 240-12248652 (Rev 7)_List of Tender Returnables-Cat 1 .pdf (TENDER)Quality management
Returnable quality documents
Section
Source: QUALITY 240-12248652 (Rev 7)_List of Tender Returnables-Cat 1 .pdfQuality returnables are scored item by item, each item weighted 1.
Section A — Quality management system (maximum 4 points)
Section B — QMS in operation (maximum 5 points)
Section C — Contract quality plan (maximum 1 point)
Section D — Quality control plan (maximum 1 point)
Section E — Additional requirements (maximum 2 points)
Description
Source: SAFETY Annexure B.pdfThe main supplier must inform Eskom before bringing any contractor or supplier on board and before that party begins work on the contract.
Submission Guidelines
Source: SAFETY Annexure B.pdf (unknown)Returnable document:
Submission:
Technical Specifications
Source: SAFETY Annexure B.pdf (unknown)Scope of supply:
Contractor and supplier management obligations:
Quality Management
Source: SAFETY Annexure B.pdfContractor and supplier management:
Acknowledgement:
Financial Requirements
Source: SAFETY Annexure B.pdf (unknown)Penalties:
Compliance Requirements
Source: SAFETY Annexure B.pdf (unknown)Legislation and standards:
Post-award obligation:
Induction:
References:
Returnable form:
Submission Guidelines
Source: Supplier Declaration of Interest Template(3).docx (unknown)Returnable document
Disqualification risks
Compliance Requirements
Source: Supplier Declaration of Interest Template(3).docx (unknown)Returnable declaration
Declarable interests
Prohibition
Description
Source: QUALITY 240-68099512 (Rev 9) Form A Tender & Contract Quality Requirements Cat 1.pdfThe contract covers the design, manufacture, testing, supply and delivery of steel high-voltage monopole structures and associated components for the Dx Gauteng Cluster.
Submission Guidelines
Source: QUALITY 240-68099512 (Rev 9) Form A Tender & Contract Quality Requirements Cat 1.pdf (unknown)Returnable quality form
Submission channel and closing time are not stated in this document.
Evaluation Criteria
Source: QUALITY 240-68099512 (Rev 9) Form A Tender & Contract Quality Requirements Cat 1.pdf (unknown)Quality requirements are assessed before contract award under Clause 3 of specification 240-105658000.
No scoring formula, preference point system or minimum qualifying score is stated in this document.
Technical Specifications
Source: QUALITY 240-68099512 (Rev 9) Form A Tender & Contract Quality Requirements Cat 1.pdf (unknown)Scope
Quality requirements
Quality standard
Methodology
Source: QUALITY 240-68099512 (Rev 9) Form A Tender & Contract Quality Requirements Cat 1.pdfThe tenderer's quality system must address each ISO 9001 clause:
The system must also reflect each quality principle:
Quality Management
Source: QUALITY 240-68099512 (Rev 9) Form A Tender & Contract Quality Requirements Cat 1.pdfPre-contract award
Post-contract award
Sign-off
Compliance Requirements
Source: QUALITY 240-68099512 (Rev 9) Form A Tender & Contract Quality Requirements Cat 1.pdf (unknown)Quality compliance
No CSD, tax, B-BBEE, CIDB or professional registration requirements are stated in this document.
Section
Source: QUALITY 240-68099512 (Rev 9) Form A Tender & Contract Quality Requirements Cat 1.pdfQuality evaluation before award
Post-award monitoring
No price, preference point or functionality scoring is stated in this document.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
GAUTENG - GAUTENG - GAUTENG - 1682
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
25
Last checked
24 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
A strategic guide for medical equipment suppliers, maintenance companies, and healthcare technology providers bidding for tenders across South Africa's nine provincial health departments. Covers SAHPRA registration, OEM authorisation, service level agreements, and technical evaluation criteria.
A comprehensive guide to securing medical equipment maintenance tenders in South African public hospitals. Learn about SLA management, OEM certifications, and clinical engineering requirements.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Electrical Equipment. Unlock full pricing strategies, bid frequency, and historical win rates.