Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
SALDANHA DEPOT - SALDANHA DEPOT - SALDANHA DEPOT -
Organization Type
GOVERNMENT
Published
03 Sept 2026
OCDS Reference
ocds-9t57fa-168890
TRANSNET rail infrastructure manager seeks a supplier to manufacture and deliver 60,000 metres of 80mm² hard-drawn copper catenary wire, conforming to SANS 182-1, to the saldanha depot on a once-off basis. Bidders must achieve a minimum technical score of 80 out of 100 to proceed to price evaluation, and the wire is designated for 90% local content.
Closing date and time: 17 September 2026 at 11:00am; bids must be submitted electronically via the Transnet e-Tender Submission Portal (TDPS) at https://esupplierportal.transnet.net/portal/ — no paper submissions accepted.
Bidders must be registered on the Central Supplier Database (CSD) and provide a CSD number or SARS Tax Compliance Status PIN; foreign suppliers without a local entity are exempt from CSD but must meet tax requirements.
Bidders must achieve a minimum technical score of 80 out of 100 points, evaluated on delivery lead time (35 points), MOU/Authorisation Letter or OEM Confirmation Letter (35 points), and previous experience with similar work (30 points).
Delivery lead time must be stated; scoring favours shorter lead times (≤4 weeks = 35 points, decreasing to 0 for >12 weeks).
Bidders who are not the OEM/manufacturer must submit a valid MOU or Authorisation Letter from the OEM on official letterhead, dated and signed, authorising supply of the specific items.
Bidders must submit inspection certificates, delivery notes, and invoices as proof of previous supply of similar items; these must be signed, stamped, and dated with clear item descriptions.
Pricing must be completed on the TDPS system in South African Rand inclusive of VAT, on a delivered basis to Saldanha Depot; prices must remain firm and fixed for the contract duration.
The wire is designated for 90% local content; bidders must complete the Local Content and Production scoring schedule and the Specific Goals Points Claim Form to claim preference points.
All returnable documents listed in Section 5 must be submitted, including SBD 1, RFP Declaration forms, Specific Goals Points Claim Form, and the Non-Disclosure Agreement; each page must be signed, stamped, and dated.
Clarification requests must be submitted to Susan de Jongh before 12:00 pm on 14 September 2026; no formal briefing session will be held.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 17 September 2026 - 11:00
Venue
null
Categories
Request for Bid(Open-Tender)
SALDANHA DEPOT - SALDANHA DEPOT - SALDANHA DEPOT -
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)03 Sept
2026
Tender Published
Tender was published
17 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
TRIM-2026-07-1571-8048-RFP.pdf
Transnet Rail Infrastructure Manager seeks a supplier for the once-off supply and delivery of 60,000 metres of 80mm² hard-drawn copper catenary wire (SANS 182-1) to the Saldanha Depot on the heavy-haul Ore Line. The contract is a single delivery with no transformation opportunities identified.
To download these documents and access AI-powered analysis, visit the main tender page.
Secure Transnet tenders using AI Matching & Recommendations, logistics infrastructure intelligence, compliance analysis, and application support for rail, ports, and pipelines.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 298 425
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Transnet Rail Infrastructure Manager (TRIM), an operating division of Transnet SOC Ltd, is a freight logistics company specializing in rail freight transportation. TRIM has an extensive rail network across South Africa with twenty-two maintenance depots forming part of its Network Asset Maintenance (NAM) department. The depots maintain rail network infrastructure to ensure availability, reliability, and safety. Maintenance includes replacement/replenishment of strategic commodities such as Permanent Way, Overhead Track Equipment (OHTE), Electrical Lighting & Power (EL&P), Civil structures, Signaling and Telecommunication Infrastructure. Two depots (Saldanha and Upington) are responsible for the 861km heavy-haul Ore Line. OHTE supplies electrical power to locomotives via overhead track wires including contact wire and catenary wire. This RFP seeks a supplier to supply and deliver 80mm2 Cu Catenary wire for the Saldanha Depot on a once-off basis.
Important Dates
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)Closing date: 17 September 2026 at 11:00am. No formal briefing session will be held. Clarification requests must be submitted to Susan de Jongh before 12:00 pm on 14 September 2026.
Briefing Session
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)No formal briefing session will be held. Respondents with queries should email the Transnet employees indicated in the Communication section.
Contact Information
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)Bidding procedure/technical enquiries: Susan de Jongh, 021 940 3340, [email protected]. Post-closing communication: Estelle van Wyk, 021 940 1901 / 084 764 1601, [email protected]. Complaints: [email protected].
Submission Guidelines
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)Bids must be submitted electronically via the Transnet e-Tender Submission Portal (TDPS) at https://esupplierportal.transnet.net/portal/. Bidders must register on the portal, log an intent to bid, and upload bid documents against the tender. Each upload is limited to 30MB; multiple uploads are permitted. All pricing must be completed electronically on the portal; paper pricing schedules will not be accepted. Bids must be submitted at least a day before closing to avoid technical issues; Transnet is not liable for bidder's technical challenges. Late submissions will not be accepted. Each company must register and submit under its own profile; no company may submit on behalf of another. Joint Ventures may submit through any JV partner's profile. All pages of bid documents must be signed, stamped, and dated before uploading. All returnable documents listed in Section 5 must be returned with the proposal. Returnable forms include: SBD 1 (Invitation to Bid), RFP Declaration Certificate of Acquaintance & Breach of Law Form, RFP Declaration and Breach of Law Form, RFP Clarification Request Form, Specific Goals Points Claim Form, Protection of Personal Information form, Local Content and Production scoring schedule, Delivery Lead Time scoring schedule, Transnet's General Bid Conditions, Transnet's Supplier Integrity Pact, and Non-Disclosure Agreement. Bidders must also submit proof of authority (e.g., company resolution) for the signatory. Bids must be lodged on time; failure to submit all required documents or a priced offer will result in disqualification.
Returnable Documents
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)Returnable documents include: Mandatory documents (submission by closing date/time, signed and dated); Returnable documents used for scoring (B-BBEE Certificate/Sworn Affidavit/CIPC Certificate, Local Content and Production Annexures C, D, E per sector, DTIC Exemption letter if applicable); Essential returnable documents (Transnet's General Bid Conditions, Transnet's Supplier Integrity Pact, Non-Disclosure Agreement, RFP Declaration and Breach of Law Form, RFP Clarification Request Form, Specific Goals Points Claim Form, Protection of Personal Information form, Local Content and Production scoring schedule, Delivery Lead Time scoring schedule). Bidders must confirm submission of each document by indicating Yes/No.
Evaluation Criteria
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)Evaluation is in stages. Stage 1: Test for Administrative and Substantive Responsiveness — bid lodged on time, all returnable documents completed and returned, bid signed by authorised representative, priced offer loaded on TDPS, material compliance with scope. Stage 2: Minimum Threshold of 80 points for Technical Criteria: (1) Delivery Lead Times (35 points): ≤4 weeks = 35, >4-≤6 = 28, >6-≤8 = 21, >8-≤10 = 14, >10-≤12 = 7, >12 = 0. (2) MOU/Authorization Letter or OEM Confirmation Letter (35 points): 5 if valid MOU/authorization or OEM confirmation submitted, 0 if not. (3) Previous Experience of Similar Work (30 points): 5 = >6 inspection certificates with delivery notes and invoices; 4 = >4-≤6; 3 = >3-≤4; 2 = >2-≤3; 1 = 1-≤2; 0 = none or not properly documented. Stage 3: Final Weighted Scoring — Price (80 points) using formula PS = 80(1 - (Pt-Pmin)/Pmin); Specific Goals (20 points): B-BBEE Level 1 or 2 = 10 points, 51% black owned = 5 points, Local Content and Production = 5 points (Electrical Cable products designated 90%). Stage 4: Price negotiations if price not market-related, sequential negotiation with highest, then 2nd, then 3rd ranked bidders. Stage 5: Award of business and conclusion of contract. Bidders must meet the technical threshold of 80 points to proceed to price evaluation.
Technical Specifications
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)The scope is the supply and delivery of 80mm² Cu catenary wire for the Saldanha Depot on a once-off basis. Item 1: WIRE, ELECTRICAL; TYPE: CATENARY, CONDUCTOR DIAMETER: 80 MM2, INSULATION COLOR: NONE, POTENTIAL RATING: 50 KV, DIMENSIONS: 2 KM, CONDUCTOR MATERIAL: COPPER HARD DRAWN, PACKAGE TYPE: REEL, WOOD; SPECIFICATION: SANS182 PART1, 1; ITEM USED ON OHTE; STRAND 7/3.75MM. Item no. 54011471. Refer to SANS 182-1 and drawing H500110-3-133-E-DE-0126-01. Quantity: 60,000 p/m. Item 2: Transportation and delivery to Saldanha Depot (sum 1). The wire is used on Overhead Track Equipment (OHTE) for the heavy-haul Ore Line. Bidders must submit details of their environmental commitments, including waste disposal, recycling, and energy conservation policies.
Methodology
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)The supplier shall be fully responsible to Transnet for the acts and omissions of persons directly or indirectly employed by them. The supplier must comply with the requirements stated in the RFP. Evaluation methodology is staged: Stage 1 - Test for Administrative and Substantive Responsiveness; Stage 2 - Minimum Threshold of 80 points for Technical Criteria; Stage 3 - Final Weighted Scoring (Price 80, Specific Goals 20); Stage 4 - Price Negotiations; Stage 5 - Award of business and conclusion of contract.
Experience & Qualifications
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)Bidders must submit proof of previous experience supplying similar items: inspection certificates (signed, dated, with clear item descriptions), delivery notes (signed, stamped, dated), and invoices (signed, dated). Scoring based on number of such documents submitted. Bidders who are not the OEM/manufacturer must submit a valid Authorization Letter or Memorandum of Understanding (MOU) from the OEM/manufacturer authorising supply and support for the contract duration. Bidders who are the OEM/manufacturer must submit an OEM Confirmation Letter on official letterhead confirming manufacture of the specific items.
Quality Management
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)The catenary wire must comply with SANS 182-1 specification and drawing H500110-3-133-E-DE-0126-01. Bidders must submit inspection certificates (signed, dated, with clear item descriptions) as proof of previous supply of similar items.
Pricing Schedule
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)Pricing schedule: Item 1 - WIRE, ELECTRICAL; TYPE: CATENARY, CONDUCTOR DIAMETER: 80 MM2, INSULATION COLOR: NONE, POTENTIAL RATING: 50 KV, DIMENSIONS: 2 KM, CONDUCTOR MATERIAL: COPPER HARD DRAWN, PACKAGE TYPE: REEL, WOOD; SPECIFICATION: SANS182 PART1, 1; ITEM USED ON OHTE; STRAND 7/3.75MM. Item no. 54011471. Refer to SANS 182-1 and drawing H500110-3-133-E-DE-0126-01. Quantity: 60,000 p/m. Item 2 - sum 1 Transportation and delivery to Saldanha Depot. Pricing must be completed on the TDPS system. Prices quoted in South African Rand inclusive of VAT. Prices on delivered basis to Saldanha Depot. Any disbursement not specifically priced will not be accepted. Bidders must use the provided pricing schedule format. Discounts only considered if unconditional. Manufacturing and delivery lead time from receipt of purchase order to be stated. Prices must remain firm and fixed for contract duration.
Financial Requirements
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)Pricing must be completed on the TDPS system. Prices must be quoted in South African Rand inclusive of VAT. Prices are on a delivered basis to the Saldanha Depot. Any disbursement not specifically priced will not be accepted. Bidders must use the provided pricing schedule format; deviation may result in non-responsiveness. Discounts are only considered if unconditional. Manufacturing and delivery lead time from receipt of purchase order must be stated. Prices must remain firm and fixed for the contract duration. Transnet may negotiate a market-related price if the highest scoring bidder's price is not market-related, or cancel the RFP.
Compliance Requirements
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)Bidders must be registered on the Central Supplier Database (CSD) and provide a CSD number or SARS Tax Compliance Status PIN. Foreign suppliers without a local entity are exempt from CSD but must meet tax requirements. Bidders must be tax compliant and remain so for the contract term. Bidders must comply with the Employment Equity Act, including Section 53. Bidders must submit a B-BBEE Status Level Verification Certificate or Sworn Affidavit (for EMEs & QSEs). Bidders must submit a signed SBD 1 (Invitation to Bid) and complete all returnable documents. Bidders must not submit more than one offer per bid invitation. Joint ventures must submit a signed JV/consortium agreement or written intention stating percentage split and responsibilities. Security clearance may be required for the successful bidder, its personnel, and subcontractors to the level of CONFIDENTIAL/SECRET/TOP SECRET. Bidders must disclose any relationship with Transnet employees or former employees. Bidders must complete the DPIP/FPPO declaration form.
Environmental
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)Green Economy / Carbon Footprint: Transnet requests details of the bidder's environmental commitments, including waste disposal, recycling, and energy conservation policies.
Contractual Terms
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)Conditions of contract: No identified opportunities of economic transformation and empowerment due to once-off delivery. Bidders must be bound by Transnet's General Bid Conditions, Standard Terms and Conditions, and any other standard or special conditions. Legal review: proposals subject to review and acceptance/rejection of proposed contractual terms by Transnet's Legal Counsel; material deviation may result in disqualification. Transnet reserves rights to modify goods/services, award contract at any time, split award, cancel bid process, validate information, request audited financial statements, not accept changes to bid rates after closing, cancel contract and place bidder on restricted suppliers database for incorrect information, award to next ranked bidder if preferred bidder fails to sign/commence. Bidders must not canvass Transnet officers between closing and award. Collusion leads to disqualification and restriction. Confidentiality: all information treated with strict confidence; Non-Disclosure Agreement must be acquainted. Bidders must disclose any relationship with Transnet employees or former employees. Bidders must submit to jurisdiction of South African courts. Foreign bidders must appoint an authorised representative in RSA.
Special Conditions
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)Bidders must submit bids via the Transnet e-Tender Submission Portal. No paper pricing schedules accepted. Bidders should submit at least a day before closing to avoid technical issues; Transnet not liable for bidder's technical challenges. No late submissions accepted. Each company must register its own profile and submit through its own profile; no company may submit on behalf of another. Joint Ventures may submit through any JV partner's profile. Bidders must sign, stamp, and date each page before uploading. All returnable documents must be returned with proposals. Any additional conditions must be in an accompanying letter. Bidders must state intention to respond as JV/consortium and submit signed JV/consortium agreement or written confirmation of intention with percentage split and responsibilities. Bidders must disclose any former Transnet employee/board member relationships in the past 10 years. Bidders must complete the DPIP/FPPO declaration form. Transnet may conduct due diligence on sub-contractors to detect fronting.
Requirements
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)Bidders must comply with all applicable laws and regulations, including the Employment Equity Act (Section 53). Tax compliance is mandatory: bidders must be tax compliant and remain so for the contract term, submit a SARS PIN or TCS certificate, and register on the Central Supplier Database (CSD). Foreign suppliers without a local entity need not register on CSD. For consortia/JVs/sub-contractors, each party must submit separate tax compliance documentation. Security clearance may be required for the successful bidder, its personnel, and subcontractors to the level of CONFIDENTIAL/SECRET/TOP SECRET. Bidders must submit only one proposal per bid invitation. Bidders must be legally authorised to sign the bid documents.
Section
Source: TRIM-2026-07-1571-8048-RFP.pdf (RFP)Contact persons: Susan de Jongh (021 940 3340, [email protected]) for bidding procedure/technical enquiries and RFP clarifications before closing; Estelle van Wyk (021 940 1901 / 084 764 1601, [email protected]) for post-closing communication. Complaints to [email protected].
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
04 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
subsidiary of Transnet
Contact
011-584-0808[email protected]www.transnet.netLevel 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.