Issuing Organization
Eastern Cape - Coega Development CooperationLocation
Eastern Cape
Closing Date
15 Sept 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
CDC Head Office, Corner Alcyon Road & Zibuko Street - Zone 1, Coega SEZ - Gqeberha - 6100
Organization Type
GOVERNMENT
Published
07 Aug 2026
OCDS Reference
ocds-9t57fa-164862
The coega development corporation is procuring a contractor to construct a 1.1 Km extension of alumina street in zone 5 of the coega sez, providing access for heavy vehicles and operational vehicles to the new wastewater treatment works. The works include road layerworks, asphalt surfacing, stormwater drainage, kerbing, and reinstatement of existing services. Bidders must be registered with the CIDB in the prescribed category, and contractors with CIDB grading 8ce or higher must subcontract at least 36% of the works to smmes.
Bidders must be registered with the CIDB in the prescribed category.
Contractors with CIDB grading 8CE or higher must subcontract at least 36% of the works to SMMEs.
Bids must be submitted by 15 September 2026 at 12:00; late submissions are disqualified.
Bidders must complete the Proposed Key Personnel form; the data will be strictly monitored during the contract.
Bidders must comply with the Preferential Procurement Regulations, 2022, and achieve a B-BBEE Minimum Level of 4.
The Contractor must provide transport for local labour within a 30 km radius using an enclosed, roadworthy vehicle with a driver holding a PDP.
The Contractor must obtain all wayleaves, permissions, and permits, and apply for an excavation permit from CDC before any excavation commences.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Tuesday, 15 September 2026 - 12:00
Venue
Coega BPO Auditorium, Discovery Building, 136 Tutu Street, Zone 4, Coega SEZ, Gqeberha
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Bid documents for this tender process can be downloaded free of charge from the cdc website (www.coega.com) Or the national treasury e-tender portal publication from 12h00 on 07 august 2026. The cdc will not take responsibility for any errors that may occur in the downloading of documents. Bidders are therefore required to ensure that they download the full pack with NO missing pages. For any further information, kindly visit cdc website (www.coega.co.za) Under current tenders.
Categories
Request for Bid(Open-Tender)
CDC Head Office, Corner Alcyon Road & Zibuko Street - Zone 1, Coega SEZ - Gqeberha - 6100
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: CDC-363-26_Book 1.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
07 Aug
2026
Tender Published
Tender was published
15 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
CDC-363-26_Book 1.pdf
The Coega Development Corporation (CDC) is procuring a contractor for the construction of a 1.1 km extension of Alumina Street in Zone 5 of the Coega SEZ, including asphalt surfacing, stormwater infrastructure, and associated works, with a 6-month construction period.
CDC-363-26_Book 2.pdf
Construction of a 1.1 km extension of Alumina Street in Zone 5 of the Coega SEZ to provide heavy vehicle and operational access to the new Coega Wastewater Treatment Works. The works include earthworks, road layerworks, asphalt surfacing, kerbing, stormwater drainage, and reinstatement of existing services.
Tender Online Advert - CDC-363-26.pdf
Construction of a 1.1 km extension of Alumina Street in Zone 5 of the Coega Special Economic Zone, including roadworks, stormwater infrastructure, kerbing, asphalt surfacing, and related works, to provide access for sludge removal by heavy vehicles serving the new Coega Wastewater Treatment Works.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Eastern Cape - Coega Development CooperationContact Person
Ms Zine Mtanda
Phone
000-000-0000
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 2 510 966
Range
Based on 16 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: Tender Online Advert - CDC-363-26.pdfThe project involves the construction of a 1.1 km extension of Alumina Street in Zone 5 of the Coega SEZ, providing access for heavy vehicles to the new Coega Wastewater Treatment Works and its conveyance pipelines and pumpstations. It forms part of the CDC's overall infrastructure development for the Coega SEZ. The construction period is 6 months from commencement.
Important Dates
Source: Tender Online Advert - CDC-363-26.pdf (TENDER)Mandatory briefing: 18 August 2026 at 10h00 at the Coega BPO Auditorium, Discovery Building, 136 Tutu Street, Zone 4, Coega SEZ, Gqeberha (coordinates 33.788782° South, 25.618021° East). Attendance is compulsory.
Bid documents available for download: from 12h00 on 07 August 2026 on the CDC website (www.coega.co.za) or the National Treasury e-tender portal.
Physical bid documents available for collection: from 12h00 on 07 August 2026 at the CDC Main Office, Coega Business Centre, Cnr Alcyon Rd and Zibuko Street, Zone 1, Coega SEZ, Gqeberha, two working days after a written request.
Clarification queries: accepted from 07 August 2026 to 01 September 2026. No new queries received after 01 September 2026 will be considered.
Closing: Tuesday, 15 September 2026 at 12h00.
Contact Information
Source: Tender Online Advert - CDC-363-26.pdf (TENDER)SCM contact: Ms Zine Mtanda, Unit Head: Supply Chain Management, e-mail [email protected]. Queries accepted in writing only, between 07 August 2026 and 01 September 2026.
Physical submission address: Document Control, CDC main office, Coega Business Centre, Cnr Alcyon Rd and Zibuko Street, Zone 1, Coega SEZ, Gqeberha.
Tip-offs anonymous hotline: 0800 007 035 (toll-free) for reporting theft, fraud, dishonesty, bribery, blackmail or intimidation.
Submission Guidelines
Source: Tender Online Advert - CDC-363-26.pdf (TENDER)Submission channel: one original of the completed bid document in a secure, sealed, tamper-proof envelope, clearly marked with the contract number and title, handed in at Document Control at the CDC main office, Coega Business Centre, Cnr Alcyon Rd and Zibuko Street, Zone 1, Coega SEZ, Gqeberha.
Closing: Tuesday, 15 September 2026 at 12h00. Late submissions are not considered.
Rejected channels: telegraphic, telexed, tippexed, facsimiled or e-mail submissions are not accepted.
Packaging: torn, unsealed, loose or compromised packaging may be deemed non-responsive and disqualified.
Returnable forms: all mandatory forms must be completed and signed, including the POPI Act consent form (separate form for each JV party). Incomplete submissions are null and void and non-responsive.
Disqualification risks: failure to provide any mandatory information, misrepresentation of information, or omission of required documents.
Contact details: bidders must provide full and correct contact details when downloading bid documents; CDC is not accountable for omissions.
Queries: all enquiries must be in writing only, directed to the SCM Unit Head; no telephonic or other communication with CDC staff, agents or clients is permitted.
Confidentiality: no disclosure of tender amounts, method of work, terms or conditions to other tenderers or non-submitting parties.
Public opening: bids are opened in public; one representative may not represent more than one bidding entity.
Evaluation Criteria
Source: Tender Online Advert - CDC-363-26.pdf (TENDER)Preference points: 80/20 system — 80 points for price, 20 points for specific goals.
Functionality: bidders must achieve a minimum of 60 points on functionality to be evaluated further; the criteria and weights are provided in the bid document.
CIDB verification: CDC may verify CIDB registration status on the CIDB website at any stage during evaluation and adjudication.
Capacity: CDC will not award more than two active projects to one bidder unless one project has reached 80% completion or beyond. A capacity assessment may be conducted if the recommended bidder is the only responsive provider and already holds two contracts.
Reservation: CDC reserves the right not to accept the lowest proposal in part or in whole, or any proposal.
Technical Specifications
Source: Tender Online Advert - CDC-363-26.pdf (TENDER)Scope: construction of a 1.1 km extension of Alumina Street in Zone 5 of the Coega SEZ, providing access for heavy vehicles to the new Coega Wastewater Treatment Works and its conveyance pipelines and pumpstations.
Construction period: 6 months from the commencement date.
Main work elements:
Detailed scope is provided in the bid document.
Methodology
Source: Tender Online Advert - CDC-363-26.pdfThe project is part of the CDC's overall infrastructure development for the Coega SEZ, specifically the extension of Alumina Road to serve the new Coega Wastewater Treatment Works and its conveyance pipelines and pumpstations, providing access for heavy vehicle sludge removal.
The scope of work is detailed in the bid document; the construction period is 6 months from commencement.
Bidders must follow the detailed scope and specifications in the bid document.
Quality Management
Source: Tender Online Advert - CDC-363-26.pdfQuality requirements: material testing and compliance with specifications and standards are part of the scope.
SHEQ: the successful bidder must develop Occupational Health, Safety and Environmental Management Systems complying with SANS norms and standards; CDC SHEQ Unit will monitor compliance and implementation of OHS, environmental and quality requirements for the contract duration.
ISO certifications: CDC holds ISO 9001:2015, ISO 14001:2015, ISO 45001:2018, ISO 20000-1:2018 and ISO 27001:2022 certifications, indicating quality, environmental, OHS, IT service and information security management standards.
Financial Requirements
Source: Tender Online Advert - CDC-363-26.pdf (TENDER)VAT: bidders must be VAT registered and bids must be submitted VAT inclusive. Non-VAT vendors whose contract would take annual turnover above R1 million must include VAT in prices and register with SARS immediately upon award; award is conditional on proof of VAT registration.
Bid document fee: R700.00 per set for physical documents, payable by electronic transfer to CDC, Standard Bank, Port Elizabeth, Branch Code 000017, Account No. 0000 08000 8224, using contract number CDC/363/26 as reference. Proof of deposit required on collection; no cash accepted.
Tender validity: 12 weeks from the tender closing date.
Compensation Fund: successful JV/Consortium must provide valid proof of registration with the Compensation Fund or an approved licensed insurer, specified as the JV entity for the project duration.
Compliance Requirements
Source: Tender Online Advert - CDC-363-26.pdf (TENDER)CIDB: bidders must have an active CIDB contractor grading of 7CE or higher. Grading of 6CE PE is not eligible. Registration must be valid and active from bid closing to award. If not registered at closing but capable, submit proof of application. JV combined grading must meet 7CE.
CSD: proof of registration on the National Treasury Central Supplier Database (CSD) or a CSD registration number is required.
Tax compliance: award only to tax-compliant bidders; tax status verified through CSD and SARS website. Bidders must remain tax compliant throughout the validity period.
B-BBEE: per Amended Construction Codes — Generic entities and QSEs with less than 51% Black ownership must submit a valid SANAS-accredited B-BBEE Verification Certificate. QSEs with at least 51% Black ownership and EMEs with turnover above R3 million must also submit a SANAS-accredited certificate and comply with the 40% sub-minimum for Skills Development. EMEs with turnover below R3 million may submit a sworn affidavit or CIPC certificate. JVs must submit a consolidated B-BBEE certificate for this project, plus individual certificates or affidavits of each entity.
CIPC: bidders and all JV members must confirm company registration with CIPC; CDC will not award to de-registered businesses and may verify via BizPortal.
Public servants: prohibited from doing business with organs of state; verification will be done and contravention leads to disqualification.
Conflict of interest: an entity that is part of a JV/Consortium may not form part of more than one bid submission.
POPI Act: bidders must complete and sign the POPI Act consent form; separate form for each JV party.
Legislation: the tender is subject to PFMA, Preferential Procurement Regulations 2022, CIDB Act, National Treasury Regulations, Infrastructure Development Act 2014, NQF Amendment Act, Skills Development Act, Disaster Management Act, B-BBEE Act, OHS Act, Compensation for Occupational Injuries and Disease Act, NEMA, National Archives and Records Service Act, SANS norms and standards, and other applicable built-environment legislation and municipal bylaws.
B-BBEE Requirements
Source: Tender Online Advert - CDC-363-26.pdf (TENDER)Preference points: 80/20 system — 80 points for price, 20 points for specific goals.
B-BBEE certificates: per Amended Construction Codes — Generic entities and QSEs with less than 51% Black ownership must submit a valid SANAS-accredited B-BBEE Verification Certificate. QSEs with at least 51% Black ownership and EMEs with turnover above R3 million must also submit a SANAS-accredited certificate and comply with the 40% sub-minimum for Skills Development to avoid discounting of their B-BBEE level. EMEs with turnover below R3 million are exempt from the sub-minimum and may submit a sworn affidavit or CIPC certificate confirming ownership and turnover.
JV/Consortium: a consolidated B-BBEE certificate must be submitted, prepared and issued for this specific project, accompanied by individual B-BBEE certificates or affidavits of each participating entity.
Health & Safety
Source: Tender Online Advert - CDC-363-26.pdfOHS compliance: the successful bidder must comply with the Occupational Health and Safety Act and Regulations and the Compensation for Occupational Injuries and Disease Act, and all relevant legislation, throughout the contract.
SHEQ systems: upon appointment, the service provider must develop Occupational Health, Safety and Environmental Management Systems complying with SANS norms and standards.
Monitoring: CDC SHEQ Unit will monitor compliance and implementation of OHS, environmental and quality requirements for the contract duration.
CHSO/M: the successful bidder must appoint a registered Construction Health and Safety Officer or Manager (CHSO/M) with SACPCMP on a full-time basis on site, with at least 5 years of proven experience. Candidate registration is not accepted.
Legislation: OHS Act and Regulations, Compensation for Occupational Injuries and Disease Act, and NEMA apply.
Contractual Terms
Source: Tender Online Advert - CDC-363-26.pdfContract period: 6 months from commencement date.
Tender validity: 12 weeks from closing date.
Legislation: contract subject to PFMA, Preferential Procurement Regulations 2022, CIDB Act, National Treasury Regulations, Infrastructure Development Act 2014, NQF Amendment Act, Skills Development Act, Disaster Management Act, B-BBEE Act, OHS Act, Compensation for Occupational Injuries and Disease Act, NEMA, National Archives and Records Service Act, SANS norms and standards, and other applicable legislation and municipal bylaws.
JV/Consortium: combined CIDB grading must meet 7CE; each entity may only be part of one bid; successful JV must provide proof of Compensation Fund or licensed insurer registration.
Capacity: CDC will not award more than two active projects to one bidder unless one project has reached 80% completion; capacity assessment may be conducted for a third contract.
Confidentiality: no disclosure of tender amounts, method of work, terms or conditions to other tenderers or non-submitting parties.
Reservation: CDC reserves the right not to accept the lowest proposal in part or in whole, or any proposal.
Special Conditions
Source: Tender Online Advert - CDC-363-26.pdf (TENDER)Confidentiality: no disclosure of tender amounts, method of work, terms or conditions to other tenderers or non-submitting parties, except to the client's legal and technical advisors.
Reservation: CDC reserves the right not to accept the lowest proposal in part or in whole, or any proposal.
Conflict of interest: an entity that is part of a JV/Consortium may not form part of more than one bid submission.
Public servants: prohibited from doing business with organs of state; contravention leads to disqualification.
Misrepresentation: any misrepresentation of information leads to immediate disqualification; the authorised person must conduct quality control on all documentation and sign the submission.
Requirements
Source: Tender Online Advert - CDC-363-26.pdf (TENDER)CIDB: active grading of 7CE or higher; 6CE PE not eligible. Registration must be valid from closing to award; if not registered at closing but capable, submit proof of application. JV combined grading must meet 7CE.
VAT: bidders must be VAT registered and bids submitted VAT inclusive. Non-VAT vendors whose contract would take turnover above R1 million must include VAT and register with SARS upon award.
CSD: proof of registration on the National Treasury Central Supplier Database or a CSD registration number is required.
Tax compliance: award only to tax-compliant bidders; verified through CSD and SARS.
CIPC: bidders and JV members must confirm company registration; de-registered businesses will not be awarded.
Incomplete submissions: deemed null and void and non-responsive.
Important Dates
Source: CDC-363-26_Book 1.pdf (TENDER)Important dates:
Contact Information
Source: CDC-363-26_Book 1.pdf (TENDER)Contact:
Submission Guidelines
Source: CDC-363-26_Book 1.pdf (TENDER)Submission channel: sealed, tamper-proof envelope or container delivered to the CDC main office, Coega Business Centre, Cnr Alcyon Rd and Zibuko Street, Zone 1, Coega SEZ, Gqeberha, before the closing time. The envelope must be clearly marked with the contract number and title. One original only; no telegraphic, telexed, tippexed, facsimiled or e-mailed submissions. Late submissions are not accepted. Bidders must bring proof of identification to access the building.
Returnable forms (all must be completed and signed):
Disqualification risks:
Evaluation Criteria
Source: CDC-363-26_Book 1.pdf (TENDER)Evaluation method: Method 2 — Functionality, Price, and Preference. The 80/20 preference point system applies: 80 points for price, 20 points for specific goals (B-BBEE status level).
Functionality threshold: Bidders must achieve a minimum of 60 points out of the total functionality points to be evaluated further. The functionality criteria are detailed in Appendix A1.
Functionality criteria (from Appendix A):
Preference points: B-BBEE status level points per the 80/20 table — Level 1: 20, Level 2: 18, Level 3: 16, Level 4: 12, Level 5: 8, Level 6: 6, Level 7: 4, Level 8: 2, Non-compliant: 0.
Only the bidder with the highest total points may be selected, except in instances identified in section 2(1)(f) of the Public Procurement Act, 2024.
Additional evaluation conditions:
Technical Specifications
Source: CDC-363-26_Book 1.pdf (TENDER)Scope: Construction of a 1.1km extension of Alumina Street in Zone 5 of the Coega SEZ, providing access for sludge removal by heavy vehicles to the new Coega Wastewater Treatment Works.
Main elements include:
Construction period: 6 months from the commencement date.
Standards and compliance: The works must comply with the Conditions of Contract for Construction (Red Book) Second Edition 2017 (FIDIC), the CIDB Standard for Uniformity in Engineering and Construction Works Contracts, and all applicable legislation including the OHS Act, NEMA, and SANS norms.
Site information: No site visits are allowed; information will be shared at the compulsory briefing meeting.
Financial Requirements
Source: CDC-363-26_Book 1.pdf (TENDER)Pricing:
Guarantees:
Payment terms: Not specified in the extracted text.
Financial capacity:
Compliance Requirements
Source: CDC-363-26_Book 1.pdf (TENDER)Mandatory compliance:
Description
Source: CDC-363-26_Book 2.pdfof 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
Contract
Part c3: scope of works
Item pg.
C3.1 Description of The Works 3
C3.2 Engineering Specifications 8
C3.3 Procurement 11
C3.4 Construction 12
C3.5 Management 27
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.1: Description of the works
.
C3.1.1 Project overview
The continued expansion of industrial development within the Coega Special Economic Zone
(SEZ), together with associated residential growth in surrounding areas including Motherwell
North, has resulted in increasing wastewater treatment demands within the region. The existing
Fish Water Flats Wastewater Treatment Works (WWTW), which historically accommodated flows
from these areas, has reached its hydraulic and process capacity limits and cannot support
projected future growth.
In response to these constraints, the Coega Development Corporation (CDC) initiated the
development of new wastewater treatment infrastructure within Zone 5 of the SEZ. The overall
infrastructure strategy provides for the development of separate Domestic and Industrial
Wastewater Treatment Works, allowing each facility to be designed in accordance with the
specific characteristics of its influent stream.
The Domestic WWTW forms the first phase of implementation and has been prioritised to
address immediate treatment requirements.
CDC’s intention is to construct the Coega Wastewater Treatment Works in phases to
accommodate domestic effluent from the Motherwell areas, including future developments, as
well as effluent from industrial areas within Zone 5 of the SEZ.
The proposed extension of Alumina Street forms part of Phase 1 of the Coega Wastewater
Treatment Works. This extension will provide access for heavy vehicles to the sludge drying pads
for sludge removal, as well as access for operational and maintenance vehicles during the
operation and maintenance phases of the facility.
It must be noted that a Contractor, in terms of the prescribed category of CIDB, will be appointed.
The Contractor must familiarize themself with the above-mentioned requirements and price the
document accordingly.
C3.1.2 Employer’s objectives
The Employer’s objective is to appoint a Contractor for the construction of an access road to
provide access to the Wastewater Treatment Works (WWTW).
The Employer intends to award the Contract as soon as possible. The Contract will be deemed
to commence upon acceptance of the Notification of Award by the successful bidder. The formal
contract agreement will be concluded as soon as practicable thereafter.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.1.3 Description of the works
This contract covers:
C3.1.4 Extent of the works
The extent of the planned works entails the extension of Alumina Street to the new proposed
WWTW site.
The following main elements for the Project are, inter alia of the following works as shown on the
drawings or as directed by the Engineer:
The works have been separated into sections in the Schedules of Quantities as listed below:
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
The works have been separated into sections in the Schedules of Quantities as listed below:
Schedule 1: Preliminary and General
Schedule 2: Provisional Sums, Dayworks, and Temporary and Permanent Works
Schedule 3: Occupational Health & Safety
Schedule 4: Site Clearance
Schedule 5: Roadworks
Schedule 6: Kerbing and Channelling
Schedule 7: Stormwater Drainage
Schedule 8: Ancillary Works
Schedule 9: Bulk Sewer Crossing
Schedule 10: Reinstatement
Summary of Schedules
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.1.5 Location of works.
The project area is located within Zone 5 of the Coega Development Corporation (CDC) Special
Economic Zone (SEZ) approximately 20km north of Gqeberha and is situated in the NMBM
jurisdiction in the Eastern Cape. The site is accessible from the N2 highway. The Alumina street
is just south of the WWTW site on the N2 side. See plan layout of the road below.
The location coordinates are as follows:
Latitude - 33°46'24.58"S
Longitude - 25°39'28.84"E
Figure 1: The red line is the proposed Alumina street extension, starting close to Sanitech.
C3.1.6 Temporary works
The following items shall form most of the temporary works under the Contract for which the
Contractor shall be responsible, which shall not be limited to such, but might be expanded or
altered by the Engineer should circumstances on site validate such:
depicted by the scope.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
site.
well as that of the Engineer.
related responsibilities.
required to enable the permanent works to be constructed. The design of the lateral support
is to be undertaken by the Contractor’s Professional Engineer and included in the tendered
rate.
.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.2: Engineering
C3.2.1 Design services and activity matrix
The Contractor is not expected to execute any designs on this Contract, except for
Temporary Works (only if instructed by the Engineer and where otherwise specified in the
Contract).
Description responsible
Obtain the necessary approvals from relevant Employer
authorities and submit documents to relevant
authorities.
Concept, feasibility, and overall process. Employer
Basic engineering and detail layout to bid stage. Engineer
Final design to approved for construction stage. Engineer
Temporary works. Contractor
Preparation of as-built drawings. Contractor and Engineer
C3.2.2 Employer’s design
The Employer procured the services of SMEC South Africa (Pty) Ltd to undertake the
design and documentation on their behalf. The final design and working drawings will be
issued to the successful bidder to carry out the works according to the contract document,
drawings, and relevant specifications.
C3.2.3 Drawings
The drawings issued to Tenderers as part of the tender documents must be regarded as
provisional and preliminary for the Tender’s benefit to generally assess the scope of work
and to develop their pricing strategy. These drawings are marked as “Tender Drawings”.
The tender drawings are attached as Annexure A.
The construction of the Works shall be carried out against drawing revisions marked as
“For Construction Purposes”. The Contractor must ensure that they always refer to the
latest construction drawing revision issued by the Engineer.
The Engineer may issue, from time to time, during the construction of the Works,
revisions to previously issued drawings as may be required for adequate construction
and completion of the Works. Such revisions will be in PDF format only and it is the
responsibility of the Contractor to print hardcopies. The Contractor shall keep an
updated drawing register for use on site.
All drawings, specifications, and copies thereof remain the property of the Employer,
and the Contractor shall return all drawings and copies thereof to the Employer at the
completion of the contract.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
TENDER DRAWING No. TENDER DRAWING DESCRIPTION
EC0050-01-CIV-RDS-001-001 Alumina Street Layout and Longsection
EC0050-01-CIV-RDS-001-002 Alumina Layout and Longsections 0 – 272m
EC0050-01-CIV-RDS-001-003 Alumina Layout and Longsections 272 – 544m
EC0050-01-CIV-RDS-001-004 Alumina Layout and Longsections 544 – 816m
EC0050-01-CIV-RDS-001-005 Alumina Layout and Longsections 816 – 1088m
EC0050-01-CIV-RDS-001-006 Alumina Detailed Cross Section
EC0050-01-CIV-RDS-001-007 Alumina Detailed Cross Section
EC0050-01-CIV-RDS-001-008 Alumina Detailed Cross Section
EC0050-01-CIV-RDS-001-009 Alumina Detailed Cross Section
EC0050-01-CIV-RDS-001-010 Alumina Street Road Furniture
EC0050-01-CIV-RDS-001-011 Alumina Street Road Details
EC0050-01-CIV-STW-001-001 Alumina Street Stormwater Layout
EC0050-01-CIV-STW-001-002 Alumina Street Channel Longsections
EC0050-01-CIV-STW-001-003 Alumina Street Stormwater Pipe Longsections
EC0050-01-CIV-STW-001-004 Alumina Street Stormwater Details
EC0050-01-CIV-STW-001-005 Alumina Street Stormwater Details
EC0050-01-CIV-STW-001-006 Alumina Street Stormwater Details
The Contractor will be supplied with two unreduced prints of each of the construction
drawings. These prints are issued free of charge and the Contractor shall make any
additional prints they may require at their own cost.
Drawings will be provided for the obtaining of way-leaves as required by the concerned
services authorities.
The levels on drawings are subject to confirmation on site and the Contractor shall submit
all levels to the Engineer for confirmation before commencing with construction.
Only figured dimensions shall be used and drawings shall not be scaled unless so
instructed by the Engineer. The Engineer will supply all figured dimensions omitted from
the drawings.
The drawings shall be kept in good condition on site at all times. The Engineer and/or their
representative shall at all times have reasonable access to the drawings.
As-Built Drawings:
One extra drawing set will be provided to the Contractor to compile “As-Builts”.
As the work progresses, the Contractor shall keep full records of all amendments to and
deviations from the drawings as issued to the Contractor at the start of the Contract. The
Contractor must submit this information to the Engineer monthly with their payment
certificate. The true positions (coordinated), invert levels, and ground levels of all services
shall be indicated on these drawings. The Contractor shall be responsible for making
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
copies of these drawings as required for the monthly submission of the as-built information.
The cost of these copies is considered to be included in the Contractor’s overall rates.
The monthly payment certificate will only be paid after receiving the full “as-built”
information of work included in the applicable certificate. The taking-over certificate shall
only be issued after the Engineer has received a properly completed set of “as-built”
drawings from the Contractor. No separate payment shall be made for this service as all
costs related thereto shall be deemed to be included in the related items.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.3: Procurement
C3.3.1 Preferential procurement procedures
C3.3.1.1 Resources standards
C3.3.1 Preferential Procurement Procedures
The tenders will be evaluated in terms of the Tender Document and scored in terms of
Procurement Regulations , 2022
C3.3.2 Resources Standards Pertaining to Targeted Procurement
The tenders will be evaluated in terms of the Tender Document and scored in terms of
Procurement Regulations , 2022
C3.3.3 Scope of Mandatory Subcontract Work (SMMEs)
In terms of CDC’s commitment to SMME development, should the Contractor be of CIDB
grading of 8CE or higher will be required to employ SMMEs to carry out certain portions of
the works. CDC’s target for SMME involvement in each Project is 36%.
C3.3.4 Preferred Subcontractors/Suppliers (SMMEs)
As indicated in the specification referred to in C3.3.3 above.
C3.3.5 Employment of Local Labour
It is the intention that this Contract should make maximum use of the local labour force that
is presently under-employed. To this end, the Contractor shall limit the utilisation on the
Contract of non-local employees to that of key personnel only and to employ and train local
labour to the extent necessary for the execution and completion of this Contract.
The Contractor shall fill in the form entitled Proposed Key Personnel in the Forms to be
completed by the Bidder. The data stated on the above-mentioned form will be strictly
monitored during the Contract period and any deviations there from shall be subject to the
prior approval of the Engineer, which approval shall not be unreasonably withheld.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.4: Construction
C3.4.1 Works specification
The works are to be executed subject to these specifications, standards and workmanship
requirements. Please note that compliance with all these specifications and standards,
including requirements in terms of qualifications, accreditation (where applicable), and
work experience of both the tendering entity and its key people will be material in the
Employer’s risk assessment for awarding this contract.
Where reference is made to the standard specifications in this contract, it means the latest
edition of the documents which apply to the specific discipline involved in the works, as
referenced under any of the headings below. The standard specifications may, due to their
generality and completeness, also cover items not applicable to this particular contract.
C3.4.1.1 Project Specifications
Project specifications include amendments to the standard specifications as well as
supplemental specifications applicable to work items not covered by the standard
specifications. Project specifications, where applicable, may be found throughout this
document, including works drawings. The pricing data and schedule may also contain
references to standard specifications as well as project specifications, for clarification in
terms of pricing for certain items, where applicable.
In the event of any discrepancy between the project specifications and a part of the
standard specifications found in the Works Information of this document, the project
specifications take precedence. Any conflict, disagreement, omission, discrepancy, or any
other such ambiguity in the specifications or drawings that appear to the appointed
Contractor must be brought to the attention of the Engineer for clarity.
C3.4.1.2 Accreditation, Qualifications, and Work Experience
Minimum requirements for work experience, qualifications, and accreditation (where
applicable) as well as minimum personnel are as stated under the headings below. The
bidder must supply the relevant information regarding accreditations, qualifications, and
work experience for both the enterprise and key people who will be working on this contract
on the appropriate returnable schedule in the Works Information.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.4.2 Standard sabs project specifications – sabs 1200
The standard technical specifications on which this contract is based are the South African
Bureau of Standards Standardized Specifications for Civil Engineering Construction SABS
Although not bound in, nor issued with this document, the following sections of the
Standardised Specifications of SABS 1200 shall form part of this Contract.
Specification Series Year Title
SANS 1200 A 1986 General
SANS 1200 C 1980 Site clearance
SANS 1200 DB 1989 Earthworks (pipe trenches)
SANS 1200 DM 1981 Earthworks (Roads, Sub grade)
SANS 1200 LB 1983 Bedding (pipes)
SANS 1200 LE 1982 Stormwater Drainage
SANS 1200 ME 1981 Sub-base
SANS 1200 MF 1981 Base
SANS 1200 MH 1981 Asphalt base and surfacing
SANS 1200 MJ 1981 Segmented Paving
SANS 1200 MK 1983 Kerbing and channelling
SANS 1200 MM 1984 Ancillary Roadworks
The variations to and additions to the standard specifications are included under the section
defining the Amended Specifications and are prefixed “PS”, followed by the applicable clause
reference. The clauses and payment items dealt with in this part of the project specifications
are numbered such that each item referred to in the standard specification is clearly reflected.
The prefix "PSA" indicates an amendment to SABS 1200A, "PSC" to SABS 1200C, etc. The
numbers following these prefixes are the relevant Clause numbers in SABS 1200.
Particular Specifications are included under the section called Particular Specifications. If a
Particular Specification conflicts with either the variations and additions to the standardised
specifications or the SABS/SANS Standard Specifications, clarification shall be obtained
from the Engineer.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.4.3 Applicable SANS standards for construction works
The following SANS specifications are also applicable to this document unless amended in
any particular specification or shown as an amended standards specification. The Contractor
is advised to obtain these standard specifications from Standards South Africa (a division of
SABS) in Pretoria.
Specification Year Title Applicable to:
Ps, psl,
SANS 1294 2012 Precast concrete manhole sections and components PSG, PSLC,
Psld, psle
Construction and Management Requirements for Works
SANS 1921 – 1 2018 Contracts Part 1: General Engineering and Construction C3.4.4
Works and where accommodation of traffic is involved
Construction and Management Requirements for Works
SANS 1921 - 2 2018 Contracts Part 2: Accommodation of Traffic on Public C3.4.4
Roads Occupied by the Contractor
Construction and Management Requirements for Works
SANS 1921 - 4 2018 Contracts Part 4: Third-party management support in works C3.4.4
contracts
Construction and Management Requirements for Works
SANS 1921 - 5 2004 Contracts Part 3: Earthworks activities which are to be C3.4.4
performed by hand
Construction and Management Requirements for Works
SANS 1921 - 6 2004 c3.4.4
Contracts Part 6: HIV/AIDS Awareness
These Specifications are not issued with this volume but are available at the Contractor’s
expense from Standards South Africa.
Office Address: Postal Address: Telephone:
1 Dr Lategan Road Private Bag X191 National: 086 127 7227
Groenkloof PRETORIA Email: [email protected]
Pretoria 0001
The Project Specifications referred to above can be found in Annexure B.
The Project Specifications form an integral part of the Contract documents and supplement
the Standard Specifications.
The hierarchy of documentation applicable to this Contract is as follows:
Letter of Offer of Acceptance
Appendix to Tender within the Contract Data (what Contractor Specified in his
tender during the tender phase)
Particular Conditions of Contract
General Conditional of Contract
Project Drawings
Project Specifications (Specials)
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
Standard Specifications
Standard Drawings
Schedule and any other documents forming part of the Contract (SoQs)
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.4.4 Sans1921
The SANS 1921 - Volumes 1, 2 and 6 - Construction and Management requirements for
works standards and associated specification data are applicable.
Volume 1 – General Engineering and construction works
Volume 6 – HIV/AIDS awareness
The following amended specification data for SANS 1921 applies to this Contract:
The SANS 1921 specification is amended under section C5 – Amendments to Standard
Specifications.
The variations to and additions to the standard specifications are included under the
section called Amended Standard Specifications in table format. Such amendments take
precedence over the SANS Standard Specification.
Particular Specifications are included under the section called Particular Specifications.
Where a Particular Specification conflicts with either the variations and additions to the
standardised specifications or the SABS/ SANS Standard Specifications, clarification shall
be obtained from the Engineer.
C3.4.5 Health and safety specification
Refer to Annexure D: Employers Project Specific Health and Safety Specification for
Construction.
C3.4.6 Plant and materials
C3.4.6.1 Plant and materials supplied by the Employer
None.
The Contractor is to enquire with CDC and NMBM with regards to the acquisition of
granular bedding material from a local quarry.
C3.4.6.2 Materials, samples, and shop drawings
The Contractor shall, when so ordered, deliver to an approved testing laboratory, samples
of materials to be used in the Works. No laboratory for use by the Engineer will be required.
However, the Contractor shall provide and maintain their own equipment to do all tests
required to enable them to fulfil their obligations in terms of the specifications in this regard.
Should the Contractor wish to utilise any materials other than those specified on the
working drawings or specified in the standard specifications, project specifications or
schedule of quantities, the Contractor will be required to submit to the Engineer in writing
requesting the use of the alternative material. This written request must be accompanied
by sufficient information (test results, comparative tests, certificates etc.) to enable the
Engineer to make an informed decision.
Shop drawings shall be submitted to the Engineer and client for approval 28 days prior to
the commencement of the final ordering of equipment and/or the manufacturing of the
works.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.4.7 Construction equipment
The Contractor must ensure that plant and equipment as tendered in the Schedule of the
Returnable Documents are in good working order and are utilised for their intended
purposes and that the plant and equipment are insured against all eventualities. The
Contractor shall not undertake or conduct any major repairs, modifications, or overhauls
of the plant at the site. All equipment must comply with the requirements as stipulated in
the Environmental regulations and specifications and contained in the OHS Act.
C3.4.8 Existing services
C3.4.8.1 Location and protection
SANS 1921-1 Clause 4.17 has relevance and is added to herewith.
All enquiries on the latest situation with services are to be undertaken by the Contractor.
The location of the services shown on the drawing by the Employer was effective at the
time of design and based on existing as-built information if available and may have
changed. The time required to confirm the latest situation with services has to be allowed
for by the Contractor in their programme for construction.
Attention is drawn to the fact that whilst the position of the existing pipelines in servitudes,
as well as other services in the vicinity of servitudes, and all other services are indicated
on the drawings have been provided as accurately as possible, this information may not
be completely accurate and it will be necessary for the Contractor to communicate with the
service providers and to prove, trace, and expose services which the Contractor has been
made aware of as a result of their interaction with service providers. The Contractor shall
coordinate meetings with all relevant service providers before construction commences
and take all the necessary steps to ascertain the location of existing services before
commencing work on any section of the Works. The rates tendered for the location of
services and proving of same as well as the updating of existing records of services, shall
be deemed to include for these meetings.
The Contractor shall establish at the meetings with service providers, the lead times
required to update records, and shall accommodate this activity in their Construction
Programme.
The Contractor shall take all the necessary steps to ascertain the location of existing
services before commencing any section of the Works and shall exercise the greatest care
when working in the vicinity of such services. Before commencing their operations in any
particular area, the Contractor shall request the latest available drawings from the relevant
local Service Authorities, showing the location of their services already installed. The
Contractor shall ensure that adequate time is allowed for making contact with the relevant
Service Authorities for them to respond meaningfully. The Contractor shall compare the
latest service locations obtained from the Service Authorities with the drawings provided
for construction and where required, such construction drawings shall be updated. The
Engineer shall be notified of any changes in service locations found on the construction
drawings.
The Contractor shall procure the required equipment which will enable him to prove
services.
The Contractor shall locate existing pipes, optic fibre cables, electric cables, and/or any
other services by hand excavation without the use of picks, to minimise the risk of
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
damaging existing services. The Contractor shall be held responsible for any damage
caused to existing services.
It is a requirement of this contract that the Contractor exposes and proves every known
service within the site ahead of any work being performed, to determine whether its level
or location clashes with the Works. All services are to be proven in conjunction with each
service provider prior to excavation. Such proving shall be timed to coincide with the
requirements of the programme and the limitations on the length of work fronts as
specified.
The cost of this work is to be included in the tendered rates for excavation and all tendered
rates shall be deemed to include the exposing of known services and the proving of its
location. No additional payment will be considered for the exposing and proving of services
as payment for this shall be deemed to be included in existing payment items as specified
in the Bill of Quantities for all types of excavation. The item for excavation by hand to
expose unknown and known services where instructed by the Engineer is for use by the
Engineer only on an as-and-when-required basis.
The Contractor shall be required to prove every service, indicating X, Y, and Z coordinates.
Claims for delays etc. arising from non-compliance with this requirement will not be
entertained.
In addition to the marking/pinpointing of known services, the Contractor is to screen the
area of the proposed excavations using appropriate electronic tracing apparatus for other
buried services, such as pipes or cables that may not be shown in services records. All
services found in this manner shall be classified as known services and shall be proved as
set out above.
Service connections to individual erven are to be located and handled in a manner
acceptable to the Engineer. Located and proved services are deemed to be known
services.
Should any services which are not on the drawings be located, the Contractor shall add
the new information to the drawings for the Employer to update their information. All
tendered rates for trench excavations and road works shall include the locating of services
and the updating of drawings for the Employer.
The top surface of all existing thrust blocks is to be proven and sufficiently protected before
any excavation near these thrust blocks takes place. Such thrust blocks shall be defined
as a “service”.
Work is to take place alongside existing water pipelines, electricity cables, and fibre optic
cables, these must remain in service at all times during the construction of this Project.
The consequences of rupturing these pipelines or cables are severe and apart from the
financial implications, possible loss of life to those working nearby and/or extensive
property damage is a real threat. The Contractor’s attention is therefore drawn to the
necessity to exercise due caution during construction, particularly during excavation.
Where work is to be undertaken beneath power lines, the Engineer shall be informed at
least 21 working days in advance of such construction being carried out, so that the
necessary arrangements can be verified with the authorities. The Contractor shall ensure
that they are, at all times, familiar with the conditions of their wayleave approvals and shall
adhere to the restrictions for working in servitude areas at all times.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
The Contractor will be held responsible for any damage to known existing services caused
by or arising out of their operations and any damage shall be made good at their own
expense. Damage to unknown services shall be repaired as soon as possible and
liability shall be determined on site when such damage should occur. The Contractor is
responsible for the relocation of services.
C3.4.8.2 Reinstatement of services and structure damaged during
Construction
The Contractor shall take adequate measures approved by the Engineer to protect and
prevent damage to existing works and services. The Contractor shall immediately notify
the Works manager as well as the Engineer, of any damage caused to existing works and
services.
Where the Contractor is responsible for damage for which repairs have to be carried out
by an outside authority, the costs of these repairs will be recovered by a deduction from
the Contractor's Payment Certificate. The Employer will attend to the payment due to
outside authorities.
The cost of repairing any damage to services, due to miscalculations or negligence on the
part of the Contractor or their failure to carry out the duties set out in this Clause, shall be
borne by the Contractor.
C3.4.9 Relocation of existing services
It is the responsibility of the Contractor to negotiate the relocation of services with the
relevant service providers.
The Contractor shall ensure that they commence with such negotiations well in advance
to be able to plan and programme such work into the programme for the construction of
the Works without causing a delay to the construction of the Works.
The Contractor will be responsible for the payment of initial deposits and relocation costs
and will only be reimbursed for such costs from the relevant item in the Bill of Quantities
on a re-measurable basis, once proof of relevant payments have been received by the
Employer.
The Contractor is to further note that no excavation machinery may excavate within 300
mm vertically or horizontally of existing water pipelines unless otherwise agreed by the
Engineer, the balance of the excavation being carried out is to be done by hand or by other
means approved by the Engineer.
C3.4.10 Site establishment
C3.4.10.1 Location
No pre-determined site camp has been earmarked for this Project and it will be up to the
Contractor to make the necessary arrangements for a suitable campsite. The Contractor
is however required to obtain approval of his choice of campsite from the Employer.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.4.10.2 Storage and Laboratory Facilities
Once the Contractor has chosen a site, they will be required to make all necessary
arrangements for water, telephone, and power connections with the relevant service
owners in the area.
The Contractor shall provide sheds for storage of materials and offices for their own use
as required. The Contractor may establish their own laboratory on site or may employ the
services of an independent commercial laboratory. Whatever method is used, the
Contractor must submit the results of tests carried out on materials and workmanship when
submitting work for acceptance by the Engineer. The costs for these tests shall be deemed
to be included in the relevant rates and no additional payment will be made for testing as
required.
C3.4.10.3 Services and Facilities provided by the Employer
The Employer will supply no services and/or facilities. The Contractor will supply all
necessary facilities as set out in the Project Specifications.
C3.4.10.4 Vehicles and Equipment
None.
C3.4.10.5 Advertising Rights
No advertising will be permitted without the express written consent of the Employer.
C3.4.10.6 Notice Boards
No notice boards will be permitted without prior consultation and approval from the
Employer.
C3.4.11 Facilities provided by the contractor
C3.4.11.1 Facilities required by the Engineer
a) Engineer’s Office
To be provided as stipulated in the schedule of quantities. The Engineer’s
Representative will be allowed free use of the Contractor’s facilities under this
Contract, as well as free use of survey equipment and survey assistants to carry out
control work as and when required.
b) Photographic Record of Work
It is desired to obtain a photographic record of the successive stages of construction.
Photos shall be captured continuously throughout the Project and submitted to the
Engineer at the end of each week. Photos will be delivered on a suitably sized
portable USB drive. Photos will be in jpeg format of at least 48MP quality at 9:16 ratio.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
At least 25 photos should be captured each day.
C3.4.11.2 Facilities required by the Contractor
a) Contractor’s Office and Sheds
The Contractor shall provide at the Works, temporary offices for their own use, the
use of their representatives, and all necessary shelter for workmen and sheds for the
storage of tools, plant, and materials. Sheds for the storage of cement must be
waterproofed with a raised floor of wood or concrete etc. In addition, sheds for storing
rubber and weatherproofed plastic material are to be light-proof.
The Contractor shall maintain the site in a clean, orderly and sanitary condition and
shall take all the necessary steps and precautions to prevent the pollution of the
surrounding area by anyone in any way. These steps and precautions shall be to the
satisfaction of the Engineer and CDC.
b) Contractor’s Telephone
The Contractor will be required to obtain a cellular telephone for their own use on the
site.
c) Latrines
The Contractor shall provide, maintain, move to positions required, and finally remove,
proper latrines in compliance with the relevant Municipal Sanitation General By-laws,
as well as CDC’s requirements. Latrines must be properly screened and secluded from
public view and their use shall be strictly enforced. The Contractor shall provide
chemical toilets (or other approved toilets). Soak-aways and septic tanks will not be
allowed on the site. Temporary latrines must be sited so that they are within reasonable
distance of the working place.
d) Sufficient latrines must be provided having regard to the number of persons employed
on the Works. All latrines shall be adequately ventilated, properly disinfected, and kept
in a clean condition.
e) Contract Name Board
At the time of erecting the sheds and offices, the Contractor shall erect on or adjacent
to the Site, in a conspicuous place to be agreed upon by the Engineer, a Contract
name board as detailed in clause 3.1, Part AB of SANS 1200. The total cost for the
procurement and erection thereof will be deemed to be included in the schedule of
quantities. Ensure drawing has space for the CWP number to be displayed.
f) Transport
The contractor shall provide transportation for local labour in a 30km radius from the
project area for the full construction period. This transportation must be an enclosed
roadworthy licensed vehicle to ensure safety and comfort for the passengers. Open or
non-enclosed transport options are not acceptable. The Contractor will be responsible
for arranging a driver with a valid driver’s license and PDP, covering all associated
costs including fuel, insurance, and any other necessary operating expenses.
Additionally, the Contractor must ensure the vehicle has access to safe and secure
parking when not in use.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.4.12 Site usage
Access to the site shall be limited to the Contractor and their personnel only. The main
Contractor shall be responsible for controlling unauthorized entry to the site and shall
inform the Engineer of any breach of such rules. The site shall be managed and used for
its intended purpose.
C3.4.12.1 Site Usage: Additional Requirements for Construction Activities
a) The Contractor shall be responsible for the construction of any deviation for the
accommodation of traffic. In all cases shall the existing number of traffic lanes and
possible movements of traffic be retained.
b) The Contractor's tendered rates for the relevant items in the schedule of quantities shall
include full compensation for all possible additional costs which may arise from this and
no claims for extra payment following on inconvenience caused by or as a result of the
modus operandi to be followed will be considered.
c) The travelling public shall have the right of way on public roads, and the Contractor
shall make use of approved methods to control the movement of his equipment and
vehicles so as not to constitute a hazard on the road.
d) Failure to maintain road signs, warning signs, flicker lights, etc. in good condition shall
constitute ample reason for the Engineer to stop the works until the road signs, etc.
have been repaired to their satisfaction.
e) The Contractor may not commence constructional activities before adequate provision
has been made for accommodating traffic according to the requirements of this
document and the South African Road Traffic Signs Manual.
f) The Contractor shall submit proposals in connection with directional signs to the
Engineer for approval by an approved traffic plan.
g) The Contractor may not construct any deviations without the prior written approval from
the Engineer.
h) The Contractor shall be responsible for repairing any damage caused to infrastructure
and vegetation in the areas of construction. Failure to repair any damage will give the
Employer (CDC) the right to withhold payments due to the Contractor until repairs
have been made to the satisfaction of the Engineer and Employer. Any expenses
incurred in this regard will be for the Contractor's own account and the Employer will
not be liable for any payment in this regard.
i) The Contractor shall make provision for the coordination of work with other
contractors that may be operating in the project area that is outside the scope of this
Project.
C3.4.13 Permits and way leaves
The Contractor shall be responsible for obtaining all the wayleaves, permissions, or
permits applicable to working near any existing services or other infrastructure on Site and
shall abide by the safety conditions imposed by such wayleaves, permissions, or permits.
The Contractor shall liaise with CDC and shall ensure that all required Wayleaves have
been obtained before the commencement of works. The Contractor will at all times be
required to be in contact with the relevant service providers.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
The Contractor shall ensure that all wayleaves, permissions, and permits are kept on site
and are available for inspection by the relevant service authorities on demand. The
contractor shall also ensure that any wayleaves in respect of electricity services are
renewed timeously every three months.
The Contractor shall be responsible for applying to the CDC for an excavation permit. The
Contractor must make provision for this as no excavation may commence before receiving
this permit. The Contractor must apply for this permit immediately at the start of the Project.
C3.4.14 Construction in restricted areas
It may be necessary for the Contractor to work within confined areas. Apart from the case of
the exceptions described in this sub-clause, no additional payment will be made for work
done in restricted areas. In certain places, the width of the excavations adjacent to existing
road pavement layers may be reduced to as little as zero and the working space may be
confined.
The method of construction in these confined areas will depend largely on the Contractor's
constructional plant. However, the Contractor shall note that measurement and payment will
be according to the specified cross-sections and dimensions irrespective of the method used
to achieve these cross-sections and dimensions that the bid rates and amounts shall be
deemed to include full compensation for any special equipment and construction methods
or for any difficulty encountered in working in confined areas and narrow widths, and at/or
around obstructions, and that no extra payment will be made nor will any claim for additional
payment be considered in such cases.
C3.4.15 Alterations, additions, extensions and modification to
Existing works
The Contractor must satisfy themself that the dimensions, accuracy, alignment, levels, and
setting out of the site, existing road, structures, or components thereof are compatible with
the proposed Works and must notify the Engineer where this is not the case.
C3.4.16 Inspection of adjoining properties
The Contractor together with the Engineer must inspect all adjacent structures for defects,
cracks etc. before commencing with the works that may have a potential to damage
surrounding buildings and properties. Notes and photographs must be taken of each
structure surrounding the development, to record any existing defects prior to the
commencement of the works.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.4.17 Water for construction purposes, power supply and other
Services
The Contractor shall make all their own arrangements concerning the supply of construction
water, electrical power, and all other services. No direct payment will be made for the
provision of such services. The cost thereof shall be deemed to be included in the rates and
amounts bid for the various items of work for which these services are required.
C3.4.18 Survey control and setting out of the works
The Contractor must check all survey control beacons if indicated on the drawings before
commencing with the works and must notify the Engineer of any discrepancy.
C3.4.19 Change in scope of the works
The Employer reserves the right to amend the quantities and scope of works (increase or
decrease quantities) prior to or during the Contract and the Contractor shall forfeit all claims
linked to loss of profits or consequential losses against the Employer in this regard.
C3.4.20 Survey requirements
The Contractor may only backfill pipe trenches on instruction by the Employer’s
Representative. The Contractor shall not backfill until after the as-built point data for the pipe
invert level and position is captured and approved by the Engineer.
The Contractor shall be responsible for capturing a 5m wide tache strip survey of the surface
along the pipeline routes after commissioning.
The above information is to be surveyed by a suitably qualified and professionally registered
person. It is imperative that the surveyor utilises the nearest survey control point and notifies
the Engineer thereof. The survey shall be done in Hartebeesthoek Lo25 projection.
Survey of pipelines, bends, specials, fittings, and chambers shall be captured to an accuracy
of less than 10mm by a Professionally Registered Surveyor.
The Contractor will be required to prove the accuracy of the GPS device they intend on using
prior to any as-built data being captured. The Employer’s Representative may request further
accuracy tests and verified calibration certificates during the Contract should they deem it
necessary.
Suitable checks on the accuracy of the information provided may be carried out by the
Employer’s Representative and should any of the information provided be found to be
inaccurate or untrue, the Employer’s Representative reserves the right on behalf of the
Employer to withhold payment or to employ the services of an engineering surveyor to re-
survey all the works, at the Contractor’s expense. In this case a minimum of three quotations
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
is required from three independent engineering surveyors of the Employer’s choice and the
cost thereof will be deducted from money owed to the Contractor.
For other infrastructure, the Contractor shall ensure that all existing and constructed
infrastructure under the Contract is shown on the as built survey.
Survey Methods, issued by the Committee of Land Transport Officials.
electronically in an ASCII file with the following format: Code [SPACE] X Co-ordinate
[SPACE] Y Co-ordinate [SPACE] Z Co-ordinate [SPACE] Description.
surveyed by a suitably qualified person referenced to the nearest construction benchmarks
used for the Project.
format showing all relevant construction information. All other surveyed information must also
be shown on the drawings.
Information requirements need to be confirmed with the Engineer.
LandXML format of the digital terrain model must be provided.
Minimum As-Built Data to be captured:
Coordinates and Levels for the
Item Description
following
Pipelines Positions and levels of buried,
fittings installed tees,
and/or every change in direction
(bend start and end points)
Manholes & Position of all Manholes &
Catchpits Catchpits four opposite points around a
circular Manhole
corners
from chamber from centre of
crown of pipe
Roads Position of road length, width,
camber
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.4.21 Maintenance requirements
The Contractor shall make themselves available for immediate repairs and maintenance
work on the Project for the duration of the defects notification period.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.5: Management
C3.5.1.1 Management of the works
The Contractor shall attend all management meetings at the Engineer's request. Site
meetings will be held every week as per the dates agreed. This will include contract
management and technical meetings.
The Health & Safety meetings will form part of the Contract Management meetings.
The Contractor will be required to present all relevant and requested information including
early warnings, quality plans, schedules, (including progress) subcontractor management,
and health, environmental, and safety issues at such meetings.
All meetings are to be recorded using minutes and a register prepared and circulated by the
person who convened the meeting. Such minutes or registers are not to be used to confirm
actions or instructions under the contract. These are to be done separately by the person
identified in the Conditions of Contract to carry out such actions or instructions.
C3.5.1.2 Program of the works
The programme, progress reports, subsequent updates, revisions, and supplementary
programmes as detailed in this section are an essential part of the project control system
used by the Engineer for managing the Works on behalf of the Employer and in monitoring
the progress of the work under the Contract. The information and data provided by the
Contractor for this procedure must therefore be reliable, accurate, and timely in presentation.
The Program shall reflect the full scope of work, contractual start and completion dates, and
critical path, and shall make allowances for inspections and subsequent rectifications of
work. The program shall be submitted in both hard and soft copy forms using the Microsoft
Projects software package, or other similar programming application software, once
accepted by the Engineer.
To demonstrate the actual progress of the work under the Contract the Contractor shall
update and submit the following to the Engineer weekly (or other agreed schedule):
a) The revised program, in the form of a three-week look-ahead, showing two (2) separate
bars for each activity as per i) and ii) below to enable a comparison of the actual progress
with the first program,
(i) The first programme activity bar, and
(ii) The revised activity bar identifying the currently forecast start and finish dates of the
activity, and the status (% complete of each activity)
b) The progress ‘S curves’ based on the latest Accepted Programme,
c) Deviations between the “current” activity schedule from the “baseline” activity schedule
together with the ‘S curves’ will form the basis for assessing progress and performance.
of 48
COEGA DEVELOPMENT CORPORATION (PTY) LTD CONTRACT No. CDC/363/26
Construction of 1.1Km Extension of Alumina Street in Zone 5 of The Coega SEZ
C3.5.1.3 Monthly status report
The Contractor shall provide a written status report one week prior to each Contract
Management meeting or such other reporting period as may be required by the Engineer
from time-to-time. The report shall summarise progress and problems encountered during
that month in respect of all parts of the work under the Contract.
As a minimum, the report shall include:
progress against the accepted programme
summary of progress achieved during the period using progress ‘S curves’
list of milestones achieved during the period
critical path activities
status of design, procurement, and off-site works
status of on-site works
deviations from the accepted programme and in particular, the forecast completion
dates of activities which have or should have commenced
status of approvals
actual or anticipated problems with the corresponding action plans to minimise the
impact
summary of works planned for the following period
cash-flow status versus the original forecast
A labour resource schedule which must distinguish between the Contractor’s
permanent labour and the temporary local labour employment
time for training of local labour
other information specifically required by the Engineer
The Contractor's programme shall be a level 4 detailed schedule.
When drawing up this programme, the Contractor shall, inter alia, take into consideration
and make allowance for:
expected weather conditions and their effects
known physical conditions or artificial obstructions
the reasonable requirements of any sub-Contractors (steel supplier or other)
the accommodation and safeguarding of public access and traffic
working in association with approved Contractors involved in other associated
Contracts
health, safety and environmental requirements
all other actions that are required in terms of this document.
If any change to the critical path becomes necessary, the Contractor shall notify the Engineer
in writing forthwith.
The Contractor's programme shows the duration of operations in working days and shall be
realistic and based on quantities and applied resources.
The programme shall allow for special non-working days and the number of days stipulated
in the project specifications for inclement weather.
of 48
Important Dates
Source: CDC-363-26_Book 2.pdf (unknown)Closing date: 15 September 2026 at 12:00.
Contact Information
Source: CDC-363-26_Book 2.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"ic characteristics of its influent stream."}
Submission Guidelines
Source: CDC-363-26_Book 2.pdf (unknown)Returnable documents must be completed and submitted with the bid. Required forms include the standard National Treasury forms (SBD 1, SBD 4, SBD 6.1, SBD 8, SBD 9) and the Proposed Key Personnel form. Bidders must be registered with the CIDB in the prescribed category. Bids must be submitted by the closing date and time; late submissions are disqualified. All returnable forms must be signed and complete.
Evaluation Criteria
Source: CDC-363-26_Book 2.pdf (unknown)Tenders will be evaluated and scored in terms of the Procurement Regulations, 2022. Bidders must comply with the Preferential Procurement Regulations. Contractors with CIDB grading 8CE or higher must subcontract at least 36% of the works to SMMEs. Compliance with specifications, standards, qualifications, accreditation, and work experience of the entity and key personnel is material to the Employer's risk assessment for awarding the contract.
Technical Specifications
Source: CDC-363-26_Book 2.pdf (unknown)Scope of works: site clearance, road-bed treatment, cut-to-fill and cut-to-spoil earthworks, subgrade/subbase/base layerworks, cement-stabilised subbase, asphalt surfacing with MC 30 SP prime coating, locating/relocating/protecting existing services, saw cutting, kerbing and channelling, ancillary roadworks, stormwater drainage, manholes, catchpits, stormwater swale, reinstatement of existing services. Works are separated into schedules 1-10 in the Bill of Quantities. Location: Zone 5 of the Coega SEZ, approximately 20km north of Gqeberha, accessible from the N2 highway. Coordinates: Latitude 33°46'24.58"S, Longitude 25°39'28.84"E. The extension provides access to the Wastewater Treatment Works for heavy vehicles and operational/maintenance vehicles. Contractor is not expected to execute designs except temporary works; Employer's design by SMEC South Africa. Tender drawings are provisional; construction against 'For Construction Purposes' revisions. Contractor receives two free prints of each construction drawing; additional at own cost. As-built drawings: one extra set provided; Contractor must keep records of amendments and submit monthly with payment certificate; taking-over certificate requires completed as-built set. Contractor must provide photographic record: at least 25 photos per day, 48MP, 9:16 ratio, submitted weekly on USB. Contractor must provide transport for local labour within 30km radius (enclosed, roadworthy vehicle with driver holding PDP). Contractor must obtain all wayleaves, permissions, permits, and apply for excavation permit from CDC before any excavation. No excavation machinery within 300mm of water pipelines without Engineer's approval. Contractor must prove every service with X, Y, Z coordinates before excavation. Survey requirements: backfill only after as-built data captured and approved; 5m tache strip survey after commissioning; survey by professionally registered person in Hartebeesthoek Lo25 projection; accuracy <10mm.
Methodology
Source: CDC-363-26_Book 2.pdf (unknown)Works specification: compliance with specifications, standards, qualifications, accreditation, and work experience is material to Employer's risk assessment. Project specifications take precedence over standard specifications; conflicts brought to Engineer's attention. Standard SABS specifications: SANS 1200 series applies (A, C, DB, DM, LB, LE, ME, MF, MH, MJ, MK, MM); amendments prefixed 'PS'. Applicable SANS standards: SANS 1294 (precast concrete manholes), SANS 1921-1 (general engineering), SANS 1921-2 (traffic accommodation), SANS 1921-4 (third-party management), SANS 1921-5 (hand earthworks), SANS 1921-6 (HIV/AIDS awareness); Contractor must obtain at own expense. Document hierarchy: Letter of Offer, Appendix, Particular Conditions, General Conditions, Scope, Drawings, Project Specs, Standard Specs, Standard Drawings, Schedules. Plant and materials: no Employer-supplied plant; Contractor to enquire about granular bedding from local quarry; deliver material samples for testing; maintain own testing equipment; submit alternative material requests with test results; submit shop drawings 28 days before ordering/manufacturing. Construction equipment: plant must be in good working order, insured, no major repairs on site, comply with environmental and OHS regulations. Existing services: Contractor must locate, prove, and protect all services; coordinate with service providers; hand-excavate near services; prove every service with X, Y, Z coordinates; screen for buried services; update drawings; protect thrust blocks; keep services in operation; notify Engineer 21 working days before working under power lines; responsible for damage to known services. Reinstatement of services: Contractor must protect existing works, notify Engineer of damage, bear costs of repairs for damage caused by negligence, and recover costs from payment certificates if repaired by outside authorities. Relocation of existing services: Contractor negotiates with service providers, plans in advance, pays deposits and relocation costs (reimbursed on re-measurable basis), and no excavation machinery within 300mm of water pipelines without Engineer's approval. Site establishment: Contractor chooses campsite with Employer approval; provides storage sheds, offices, laboratory facilities, water/power connections; Employer supplies no services; no advertising or notice boards without consent. Facilities provided by Contractor: Engineer's office, photographic record (at least 25 photos/day, 48MP, 9:16 ratio, submitted weekly on USB), Contractor's office and sheds, telephone, latrines (chemical toilets, no soak-aways), contract name board, and transport for local labour within 30km radius (enclosed, roadworthy vehicle with driver holding PDP). Site usage: access limited to Contractor and personnel; Contractor controls unauthorised entry. Additional requirements: maintain traffic lanes, no claims for inconvenience, public right of way, maintain road signs, no construction before traffic accommodation, submit traffic plan, no deviations without approval, repair any damage, coordinate with other contractors. Permits and wayleaves: Contractor obtains all wayleaves, permissions, permits; liaises with CDC; keeps documents on site; renews electricity wayleaves every 3 months; applies for excavation permit from CDC before any excavation. Construction in restricted areas: no additional payment for confined spaces; bid rates include special equipment and methods; measurement per specified cross-sections. Alterations to existing works: Contractor must verify dimensions, accuracy, alignment, levels, and setting out are compatible with proposed works; notify Engineer of discrepancies. Inspection of adjoining properties: Contractor and Engineer must inspect adjacent structures for defects before commencing works; record notes and photographs. Water, power, and other services: Contractor makes own arrangements; costs included in rates. Survey control and setting out: Contractor must check all survey control beacons and notify Engineer of discrepancies. Survey requirements: backfill only after as-built data captured and approved; 5m tache strip survey after commissioning; survey by professionally registered person in Hartebeesthoek Lo25 projection; accuracy <10mm; GPS accuracy tests; as-built data in ASCII and DWG formats; LandXML terrain model; minimum data includes pipelines, manholes, roads. Maintenance requirements: Contractor responsible for maintenance work during defects notification period. Management of works: weekly meetings (contract and technical); minutes not used to confirm actions or instructions; separate process for contract actions. Programme of works: Contractor must submit and update weekly three-week look-ahead with two bars per activity (baseline and revised), progress S-curves, and deviations; programme must be level 4 detailed schedule; allow for weather, physical conditions, subcontractors, public access, and other contractors. Monthly status report: Contractor must submit monthly report summarising progress, milestones, critical path, design/procurement status, deviations, approvals, problems, planned works, cash-flow, labour resource schedule (permanent vs local), training time, and other Engineer-required information.
Experience & Qualifications
Source: CDC-363-26_Book 2.pdfCompliance with specifications, standards, qualifications, accreditation, and work experience of both the tendering entity and its key people is material to the Employer's risk assessment for awarding the contract. Bidder must supply relevant information regarding accreditations, qualifications, and work experience for both the enterprise and key people on the appropriate returnable schedule. Minimum requirements for work experience, qualifications, and accreditation are stated under the headings in the document. Contractor must complete the Proposed Key Personnel form; data strictly monitored during contract period; deviations subject to prior approval of Engineer.
Quality Management
Source: CDC-363-26_Book 2.pdfContractor must deliver material samples to approved testing laboratory when ordered; maintain own testing equipment; submit test results when submitting work for acceptance. Costs for tests included in rates; no additional payment. Contractor may establish own laboratory or employ independent commercial laboratory. Alternative materials require written request to Engineer with test results, comparative tests, certificates. Shop drawings submitted to Engineer and client for approval 28 days prior to final ordering or manufacturing. Contractor must keep site clean, orderly, sanitary; prevent pollution. Contractor must maintain drawing register and refer to latest construction drawing revisions. As-built drawings: keep records of amendments, submit monthly with payment certificate; taking-over certificate requires completed as-built set.
Pricing Schedule
Source: CDC-363-26_Book 2.pdfTender drawings are provisional for pricing strategy; construction against 'For Construction Purposes' revisions. Monthly payment certificate paid only after receiving full as-built information for work included in the certificate. No separate payment for as-built drawings; costs deemed included in related items. Tendered rates include costs for locating and proving services, updating drawings, exposing known services, and working in confined areas. No additional payment for restricted areas, special equipment, or construction methods. Contractor makes own arrangements for construction water, power, and other services; costs included in rates. Relocation of services: Contractor pays deposits and relocation costs, reimbursed on re-measurable basis from Bill of Quantities once proof of payment received. Measurement and payment according to specified cross-sections and dimensions irrespective of method used.
Financial Requirements
Source: CDC-363-26_Book 2.pdf (unknown)Payment certificates are paid monthly after receiving full as-built information for work included in the certificate. No separate payment for as-built drawings; costs deemed included in related items. Tendered rates include costs for locating and proving services, updating drawings, exposing known services, and working in confined areas. No additional payment for restricted areas, special equipment, or construction methods. Contractor makes own arrangements for construction water, power, and other services; costs included in rates. Relocation of services: Contractor pays deposits and relocation costs, reimbursed on re-measurable basis from Bill of Quantities once proof of payment received. Employer reserves right to amend quantities and scope; Contractor forfeits claims for loss of profits or consequential losses.
Compliance Requirements
Source: CDC-363-26_Book 2.pdf (unknown)Bidders must be registered with the CIDB in the prescribed category. Bidders must complete the Proposed Key Personnel form; data strictly monitored during contract. Bidders must comply with the Preferential Procurement Regulations, 2022. B-BBEE Minimum Level: 4. Contractors with CIDB grading 8CE or higher must subcontract at least 36% of works to SMMEs. Maximum use of local labour; non-local employees limited to key personnel only. Standard National Treasury forms required: SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination).
B-BBEE Requirements
Source: CDC-363-26_Book 2.pdf (unknown)Preferential procurement: tenders evaluated and scored in terms of Procurement Regulations 2022. Mandatory SMME subcontracting: contractors with CIDB grading 8CE or higher must employ SMMEs for certain portions; CDC target is 36% SMME involvement. Employment of local labour: maximum use of local labour force; non-local employees limited to key personnel only; Contractor must complete Proposed Key Personnel form and comply with monitoring.
Health & Safety
Source: CDC-363-26_Book 2.pdfHealth and safety specification: refer to Annexure D: Employer's Project Specific Health and Safety Specification for Construction. Contractor must provide all personnel, equipment, clothing, accessories to adhere to OHS Act. Contractor must provide temporary barricading and fencing around camp site. Contractor must comply with environmental and OH&S responsibilities. Contractor must provide latrines in compliance with Municipal Sanitation General By-laws and CDC requirements; chemical toilets or approved toilets; no soak-aways or septic tanks. Contractor must provide site, administrative, and security staff as required. Contractor must attend site meetings and other scheduled meetings chaired by Engineer. Contractor must ensure all equipment complies with environmental regulations and OHS Act. Contractor must notify Engineer at least 21 working days before working under power lines. Contractor must ensure wayleaves, permissions, permits kept on site for inspection.
Environmental
Source: CDC-363-26_Book 2.pdfEnvironmental compliance and management is part of the works. Contractor must provide all personnel, equipment, and accessories to adhere to environmental responsibilities. Contractor must comply with environmental regulations and specifications contained in the OHS Act. Contractor must prevent pollution of surrounding area. Project environmental specifications are included in Annexure E. Contractor must comply with environmental specifications and standards as part of the contract.
Contractual Terms
Source: CDC-363-26_Book 2.pdfChange in scope: Employer reserves right to amend quantities and scope; Contractor forfeits claims for loss of profits or consequential losses. Contractor responsible for damage to known services; repairs at own expense. Damage to unknown services repaired as soon as possible; liability determined on site. Contractor responsible for relocation of services. Contractor must protect existing works and notify Engineer of any damage; costs of repairs by outside authorities deducted from payment certificate. Contractor must provide transport for local labour within 30km radius for full construction period; vehicle must be enclosed, roadworthy, licensed, with driver holding valid license and PDP; costs including fuel and insurance for Contractor's account. Site usage: access limited to Contractor and personnel; Contractor controls unauthorised entry. Contractor must maintain existing traffic lanes; no claims for inconvenience; travelling public has right of way; maintain road signs; no construction before traffic accommodation; submit traffic plan; no deviations without approval; repair any damage; coordinate with other contractors. Contractor must obtain all wayleaves, permissions, permits; keep on site; renew electricity wayleaves every 3 months; apply for excavation permit from CDC before any excavation. Contractor must inspect adjacent structures for defects before commencing works; record notes and photographs. Contractor must check survey control beacons and notify Engineer of discrepancies. Contractor must verify dimensions, accuracy, alignment, levels, and setting out are compatible with proposed works; notify Engineer of discrepancies.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
CDC Head Office, Corner Alcyon Road & Zibuko Street - Zone 1, Coega SEZ - Gqeberha - 6100
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
07 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.